ELEVATION SIDE ELEVATION

PLAN

No. Material Kode Jumlah Satuan


1 Line Post Insulator 20 kV a 3 Bh
2 Distribution Tie For AAAC b 3 Nitr
3 Travers Tumpu TM 3 Pole UNP c 1 Btg
4 Tuang Travers 36 x 6 x 650 mm d 1 Btg
5 Moer Bolt M16 x 200 mm e 1 Bh
6 Moer Bolt M16 x 250 mm f 1 Bh
7 Moer Bolt M12 x 45 m g 2 Bh
8 Tiang Beton h 1 Btg

KONSTRUKSI ISOLATOR TUMPU TUNGGAL Tgl 23 November 2018


3 PHASA 20 KV
POLITEKNIK NEGERI UJUNG PANDANG
Dig : MUH RIFQI A A4 05
Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
b

c
g

ELEVATION SIDE ELEVATION


*>45'

PLAN

No. Material Kode Jumlah Satuan


1 Line Post Insulator 20 kV a 6 Bh
2 Bare binding Wire b 6 Nitr
3 Travers Tumpu TM 3 Pole UNP c 2 Btg
4 Double Arming Bolt M16 x 300mm d 4 Btg
5 Tupang Travers e 2 Bh
6 Moer Bolt M16 x 250 mm f 2 Bh
7 Moer Bolt M12 x 45 m g 2 Bh
8 Tiang Beton h 1 Btg

KONSTRUKSI ISOLATOR TUMPU GANDA Tgl 23 November 2018


3 PHASA 20 KV
POLITEKNIK NEGERI UJUNG PANDANG
Dig : MUH RIFQI A A4 06
Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
j j
a

b
c g

f g
h

e c

ELEVATION SIDE ELEVATION

PLAN

No. Material Kode Jumlah Satuan


1 Isolator Tarik 20 kV a 6 Set
2 Strain Clamp b 6 Bh
3 Travers Opspan TM 3 Pole UNP c 2 Bh
4 Double Arming Bolt M16 x 300mm d 4 Bh
5 Moer Bolt M16 x 250 mm e 2 Bh
6 Tupang Travers 36 x 6 x 650 mm f 4 Bh
7 Moer Bolt M12 x 45 m g 4 Bh
8 Eye Bolt M16 h 6 Bh
9 Tiang Beton I 1 Btg
10 Line Post Insulator 20 kV j 1 Bh

KONSTRUKSI ISOLATOR ASPAN GANDA Tgl 23 November 2018

3 PHASA 20 KV
POLITEKNIK NEGERI UJUNG Dig : MUH RIFQI A A4 07
PANDANG Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
a

b
c g

f h

e e

ELEVATION SIDE ELEVATION

PLAN

No. Material Kode Jumlah Satuan


1 Isolator Tarik 20 kV a 3 Set
2 Strain Clamp b 3 Bh
3 Travers Tumpu TM 3 Pole UNP c 2 Bh
4 Double Arming Bolt M16 x 300 mm d 4 Bh
5 Moer Bolt M16 x 250 mm e 2 Bh
6 Tupang Travers 36 x 6 x 650 mm f 4 Bh
7 Moer Bolt M12 x 45 m g 4 Bh
8 Eye Bolt M16 h 3 Bh
9 Tiang Beton i 1 Btg
KONSTRUKSI ASPAN TUNGGAL Tgl 23 November 2018
3 PHASA 20 KV
POLITEKNIK NEGERI UJUNG PANDANG
Dig : MUH RIFQI A A4 08
Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
2 3
POLITEKNIK NEGERI UJUNG PANDANG

250
4
5

100
PROYEK KELISTRIKAN RE II

100 Minimum 1
2
3
1. Guy wire pole binder 4
2. tumbuckle
3. preformed terminction (8)

5,0m Minimum
4. Ovel Insulator (MV)
5. Guy wire
6. Stay rod
7. Guy wire fougtion plate
8. 7m polo
9. Concrate pad
Dip : Ir.H. HAMMA. MT

5
Dig : MUH RIFQI A

300
MINIMUM 3

6
Tgl 23 November 2018
3A D4 T.Listrik /421 16 003
A4 10

1125 Width of the village road 1125

8 7
a

b
c
g

e h

ELEVATION SIDE ELEVATION

90'

PLAN

No. Material Kode Jumlah Satuan


1 Isolator Tarik 20 kV a 6 Set
2 Strain Clamp b 6 Bh
3 Travers Afspan TM 3 Pole UNP c 4 Bh
4 Double Arming Bolt M16 x 300mm d 4 Bh
5 Moer Bolt M16 x 250 mm e 4 Bh
6 Tupang Travers 36 x 6 x 650 mm f 8 Bh
7 Moer Bolt M12 x 45 mm g 8 Bh
8 Eye Bolt M16 h 6 Bh
9 Tiang Beton i 1 Btg
10 Connector j 3 Btg

KONSTRUKSI ASPAL TUNGGAL + ASPAN Tgl 23 November 2018


TUNGGAL 3 PHASA 20 KV
POLITEKNIK NEGERI UJUNG Dig : MUH RIFQI A A4 09
PANDANG Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
1
250

300 4
MINIMUM
Optinal Poie Connection

Minimum 1. Guy wire pole binder


1000 2. Turnbuckle
3. Preformed Termination (4)
4. Oval Guy Insulaor (MV)
5. Guy Wire (As specified)
6. Stay rod (As specified)
7. Guy wire fondation plate (As specified)
8. Concrate pad

5
Minimum 2500

300
MINIMUM 3

150 MM
MAXIMUM

8 7

Tgl 23 November 2018


PROYEK KELISTRIKAN RE II

POLITEKNIK NEGERI UJUNG PANDANG


Dig : MUH RIFQI A A4 11
Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003
S1

B1

B2

B1

DETAIL

16A

ITEM
NO. DESCRIPTION
CODE

S1 1 Sangga Tupang Tekan

B1 2 Double Beugel
B2 1 Beugel

T6A 1 Plat Beton Bortulang

Tgl 23 November 2018


PROYEK KELISTRIKAN RE II

POLITEKNIK NEGERI UJUNG PANDANG


Dig : MUH RIFQI A A4 12
Dip : Ir.H. HAMMA. MT 3A D4 T.Listrik /421 16 003