Mulai
INPUT DATA
HITUNG(INPUT)
Apakah
perhitungan
benar?
Selesai
General Information
Field FIRMAN
Well Type (Oil/Gas?W/I Oil Well
etc)
Well Number BGS-19
Deviation Survey Vertical Well
SBHT / @ Depth 1610 degF@mBRT Based on client
information
Casing
OD 9-5/8 inch
ID 8,681 inch
Inner String/Tubing
OD 3-1/2” inch
ID 2,992 inch
Macaroni Pipe
OD 1,9 Inch
ID 1,462 Inch
4.3.2 Komposisi Cement Slurry
Data Satuan
Density 15,8 Ppg
Yield 1,212 cuft/sack
Fresh Water 3,323 gps
Total Mix Fluid 5,488 gps
4.3.4 Profil Sumur
4.4 Perhitungan Kapasitas Workstring
8.6812
= 1029.4
= 0.0732075 bbl/ft
= 0.2401937 bbl/m
2.9922
= 1029.4
= 0.0068127 bbl/ft
= 0.0285329 bbl/m
1.4622
= 1029.4
= 0.0020764 bbl/ft
= 0.0020764 bbl/ft × 3.281 ft/m
= 0.0068127 bbl/m
𝐼𝐷𝑡𝑢𝑏𝑖𝑛𝑔2 − (𝑂𝐷𝑚𝑎𝑐𝑎𝑟𝑜𝑛𝑖 2)
= 𝑥 3.281
1029.4
2.9922 −(1.92)
= 𝑥 3.281
1029.4
= 0.00519 bbl/ft
= 0.00519 bbl/ft x 3.281 ft/m
= 0.01703 bbl/m
Idmacaroni𝟐
={ x 3.281} x EOM
1029.4
1.4622
={ 𝑥 3.281} 1605
1029.4
= 10.93 bbl
=0.16210499 x (1710-1605)
= 17.02 bbls
= 17.02 + 3
=20.02 bbl
= 92.74 sack
4.6.3 Perhitungan Volume Weighted Gel Yang Dibutuhkan Untuk Mengisi
Volume Tubing Setingi 105 Meter (m) : dengan persamaan (3-2)
= 2.996 bbl