This paper aims to analyze slope stability in bulk haul sago causeway pier
located on Obi island, North Maluku island of Halmahera. Initial design of the
slope of this already exists, but it is less efficient in terms of material and there is
no land for long-term maintenance. By doing a variation on the calculation of
slope and soil shear angle, expected to get a slope that has a tilt and slide the
optimum angle. As for the slope maintenance will be made with trap that there is
land that allows it to do treatments.
All analyzes will be conducted with the help of software Geo-Slope 2003. Method
will be used in this analysis is the method of Bishop. For the modeling itself is done by
dividing the slope into 5 pieces crosswise and 1 lengthwise pieces. Slopes were analyzed
in the sea conditions and the tide ebb with the ground state in undrained conditions. The
criteria for the optimum slope is the slope which has a safety factor of> 1.3 at the time of
the slope to receive its own expense and traffic load above it, and the safety factor of>
1.1 at the time of the slope affected by the earthquake.
Based on the analysis has been done, got several variations of the slope that can be
used. In this paper selected an optimum slope of a cross-sectional variation in the slope
of 30 ° and 45 ° with the longitudinal shear angle of 45º until 50 ° equal ground. This
slope has a safety factor of each 1.312 and 1.112. With the slope of the volume of deposits
can be reduced, otherwise the slope maintenance can be done with the addition of trap
with a width of 4 meters and a height of 5 meters are also useful as a counterweight or
additional stabilization.
ii
KATA PENGANTAR
Puji syukur kita panjatkan kehadirat Alah SWT, yang telah memberikan kita
nikmat yang tak terhingga dan tiada batasan, sehingga Tugas Akhir dengan Judul
“Analisis Stabilitas Timbunan Pada Konstruksi Causeway Dermaga Curah
Pulau Obi, Provinsi Maluku Utara” dapat terselesaikan. Tugas Akhir ini adalah
salah satu syarat untuk menyelesaikan Program Diploma III Jurusan Teknik Sipil
Politeknik Negeri Bandung.
iii
Penulis menyadari adanya keterbatasan dalam penulisan Tugas Akhir ini,
oleh karena itu kritik dan saran yang bermanfaat serta membangun untuk
memperbaiki Tugas Akhir ini selanjutnya, sangat diharapkan. Semoga Tugas
Akhir ini berguna untuk semua pihak, terutama bagi para pembaca, baik secara
langsung maupun tidak langsung.
Penulis
iv
DAFTAR ISI
ABSTRAK ................................................................................................................................... i
ABSTRACT .................................................................................................................................. ii
v
2.2.1.2 Sudut Geser Dalam ................................................................................ II-9
vi
3.2.1 Penyelidikan Lapangan .......................................................................... III-2
3.2.1.1 Pengukuran Topografi dan Bathymetri ..................................... III-3
3.2.1.2 Pengeboran dan Pengujian Laboratorium .................................. III-5
3.2.2 Data Gambar .......................................................................................... III-8
3.3 Analisis Data ................................................................................................... III-9
3.3.1 Desain Timbunan ................................................................................... III-9
3.3.2 Interpretasi statigrafi .............................................................................. III-12
3.3.3 Parameter Tanah .................................................................................... III-14
3.4 Analisis Stabilitas Lereng ................................................................................ III-14
3.4.1 Pemilihan alternatif dan kemiringan optimum ................................... III-19
DAFTAR PUSTAKA
LAMPIRAN
vii
DAFTAR TABEL
BAB II
Tabel 2.3 Hubungan antara kepadatan, ɤd, nilai N-SPT, qc, dan sudut geser tanah ...... II-9
Tabel 2.5 Harga-harga yang umum dari sudut geser internal ( ) dengan kondisi
drained untuk pasir dan lanau. ................................................................... II-15
Tabel 2.6 Kohesi dari pusat lingkaran unjung dasar talud (β<53°) .............................. II-28
BAB III
Tabel 3.1 Resume Hasil Uji Boring pada Titik BH 01 ................................................ III-6
Tabel 3.2 Resume Hasil Uji Boring pada Titik BH 02 ................................................ III-6
Tabel 3.3 Resume Hasil Uji Boring pada Titik BH 03 ................................................ III-7
Tabel 3.4 Resume Hasil Uji Boring pada Titik BH 04 ................................................ III-7
Tabel 3.5 Resume Hasil Uji Boring pada Titik BH 05 ................................................ III-7
BAB IV
Tabel 4.1 Korelasi berat jenis tanah (γ) untuk tanah kohesif dan non kohesif ............. IV-2
Tabel 4.3 Empirical values for ø, Dr, and unit weight of granular soil based on the
SPT at about 6 m depth normally consolidated [
approximately, ø = 28°+15°Dr(±2°) ] ..................................................... IV-3
viii
Tabel 4.8 Parameter tanah pada potongan melintang E ............................................... IV-5
Tabel 4.10 Parameter tanah kondisi undrained pada potongan melintang A ............... IV-6
Tabel 4.11 Parameter tanah kondisi undrained pada potongan melintang B ............... IV-6
Tabel 4.12 Parameter tanah kondisi undrained pada potongan melintang C ............... IV-6
Tabel 4.13 Parameter tanah kondisi undrained pada potongan melintang D ............... IV-7
Tabel 4.14 Parameter tanah kondisi undrained pada potongan melintang E ............... IV-7
Tabel 4.15 Parameter tanah kondisi undrained pada potongan melintang F................ IV-7
Tabel 4.16 Hasil perhitungan FS pada potongan lereng A,B,C,D,dan E tanpa beban
gempa ...................................................................................................... IV-15
Tabel 4.17 Hasil perhitungan FS pada potongan melintang F tanpa beban gempa ...... IV-15
Tabel 4.19 Hasil perhitungan FS pada potongan melintang F dengan beban gempa ... IV-16
Tabel 4.21 Hasil perhitungan FS pada potongan melintang F dengan beban gempa
dan keadaan air laut pasang ..................................................................... IV-17
ix
DAFTAR GAMBAR
Bab I
Gambar 1.4.a Lokasi pengamatan yang berada di Kepulauan Halmahera .......................... I-5
Gambar 1.4.b Lokasi pengamatan yang berada di Pulau Obi ............................................. I-5
Gambar 1.5 Tampak atas causeway dan jetty yang berada di Pulau Obi, Maluku Utara. .... I-7
Gambar 1.6 Tampak samping causeway yang berada di Pulau Obi, Maluku Utara. ........... I-7
Bab II
Gambar 2.1 Tampak samping dan tampak atas contoh dermaga ........................................ II-2
Gambar 2.4 Dermaga tipe Jetty dengan menggunakan akses penguhubung Trestle. .......... II-5
Gambar 2.7 Garis Keruntuhan Mohr dan hokum keruntuhan dari Mohr-Coulumb ............ II-12
Gambar 2.8 Kemiringan bidang keruntuhan dengan bidang utama besar didalam tanah .... II-13
x
Gambar 2.16 Kelongsoran jatuhan bebas ........................................................................... II-19
Gambar 2.19 Analisis lereng dengan tinggi terbatas metoda Culman ................................. II-22
Gambar 2.20 Analisis stabilitas lereng denga cara prosedur massa dalam tanah lempung
yang homogen ( ) ............................................................................... II-25
Gambar 2.21 (a) Definisi dari parameter-parameter untuk tipe keruntuhan lereng
lingkaran titik tengah (midpoint circle), dan (b) grafik hubungan antara
angka stabilitas dengan sudut kemiringan lereng (digambar lagi setelah
Terzaghi dan Peck, 1976) ........................................................................... II-27
Gambar 2.22 Kohesi dari pusat lingkaran kritis untuk ......................................... II-28
Gambar 2.23 Analisa stabilitas dengan metoda irisan yang biasa : (a) Permukaan bidang
yang dicoba; (b) gaya yang bekerja pada irisan nomor n ............................ II-31
Gambar 2.24 Analisa stabilitas dengan metoda irisan yang biasa untuk lereng pada tanah
berlapis ....................................................................................................... II-32
Gambar 2.28 Lereng yang perlu dilakukan perawatan pada potongan melintang D
timbunan causeway ..................................................................................... II-35
Gambar 2.29 Beban hydraulic excavator pada trap 1 atau atas ................................ II-36
Gambar 2.30 Beban hydraulic excavator pada trap 2 atau bawah ............................ II-36
Gambar 2.31 Wilayah gempa dengan percepatan puncak batuan dasar perioda ulang 500
tahun ........................................................................................................... II-38
Gambar 2.32 Contoh tanah laterit yang berada dilapangan ................................................ II-39
Gambar 2.33 Lapisan tanah laterit dengan tebal 1.5m ....................................................... II-40
Gambar 2.35 Penempatan Geotextile non woven pada causeway ...................................... II-42
Gambar 2.36 Contoh lapisan pelindung yang dibuat dari beton precast ............................ II-42
Gambar 2.37 Batu armor melindungi keseluruhan lereng timbunan .................................. II-43
Gambar 2.38 Batu armor yang berada pada potongan melintang dari timbunan causeway II-43
xi
Gambar 2.40 Tampak atas plat injak ................................................................................. II-44
Bab III
Gambar 3.2. Potongan memanjang topografi dan bathymetri rencana dermaga curah
Pulau Obi ................................................................................................... III-4
Gambar 3.3. Peta situasi topografi dan bathymetri rencana dermaga curah Pulau Obi ....... III-4
Gambar 3.4. Letak dari 5 titik Bor Hole pada lokasi yang akan ditimbun ......................... III-5
Gambar 3.5. Jenis tanah yang berada pada lokasi yang akan ditimbun ............................... III-6
Gambar 3.9. Potongan melintang timbunan causeway tanpa trap ...................................... III-10
Gambar 3.10. Potongan melintang timbunan causeway dengan trap ................................. III-11
Gambar 3.11. Tampak atas desain timbunan causeway dengan trap................................... III-12
Gambar 3.12. Memasukan data penyelidikan lapangan kedalam gambar ........................... III-13
Gambar 3.15. Potongan melintang kepala causeway yang dilengkapi dengan statigrafi.... III-14
Gambar 3.18 Potongan melintang A dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-17
Gambar 3.19 Potongan melintang B dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-17
Gambar 3.20 Potongan melintang C dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-17
Gambar 3.21 Potongan melintang D dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-18
xii
Gambar 3.22 Potongan melintang E dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-18
Gambar 3.23 Potongan melintang F dengan variasi kemiringan 25°,30°, 35°,40°, 45°,
dan 50°........................................................................................................ III-18
Bab IV
Gambar 4.1 Potongan melintang D yang telah dilengkapi dengan variasi kemiringan
serta statigrafi ................................................................................................ IV-1
Gambar 4.2 Koordinat pada setiap titik yang diperlukan .................................................... IV-2
Gambar 4.6 Hasil penarikan garis dari input data parameter lapisan tanah ........................ IV-10
Gambar 4.12.a Hasil input data titik pembebanan kombinasi 1 ......................................... IV-13
Gambar 4.14 Kontur FS dari potongan A pada kombinasi 1 (1.108) ................................. IV-18
Gambar 4.15 Kontur FS dari potongan B pada kombinasi 1 (1.178) ................................. IV-18
Gambar 4.16 Kontur FS dari potongan C pada kombinasi 1 (1.123) ................................. IV-19
Gambar 4.17 Kontur FS dari potongan E pada kombinasi 1 (1.121) ................................. IV-19
Gambar 4.18 Kontur FS dari potongan A pada kombinasi 2 (1.114) ................................. IV-19
Gambar 4.19 Kontur FS dari potongan B pada kombinasi 2 (1.283) ................................. IV-20
Gambar 4.20 Kontur FS dari potongan C pada kombinasi 2 (1.249) ................................. IV-20
Gambar 4.21 Kontur FS dari potongan D pada kombinasi 2 (1.132) ................................. IV-21
Gambar 4.22 Kontur FS dari potongan E pada kombinasi 2 (1.128) ................................. IV-21
xiii
Gambar 4.23 Kontur FS dari potongan F pada kombinasi 2 (1.123) .................................. IV-22
Gambar 4.26 Tampak atas desain ulang konstruksi causeway ............................................ IV-24
Gambar 4.28 Tampak samping desain ulang konstruksi causeway .................................... IV-25
Gambar 4.35 Detail penampang armour layer pada potongan memanjang F ..................... IV-26
xiv
DAFTAR LAMPIRAN
LAMPIRAN I
I–1 Surat Pengajuan Topik Tugas Akhir
I–2 Surat Siap Sidang
LAMPIRAN II
LAMPIRAN III
LAMPIRAN IV
LAMPIRAN V
xv
DAFTAR ISTILAH
Anorganik
Terbuat dari unsur yang tidak mudah terurai
Apron
Daerah yang terletak diantara sisi dermaga dan sisi depan gudang dimana terdapat
pengalihan kegiatan angkutan laut (kapal) ke kegiatan angkutan darat.
Armour layer
Lapisan batuan berfungsi sebagai pelindung lereng timbunan yang bersentuhan langsung
dengan tekanan dari gelombang air laut.
B
Bathymetri
Gambaran elevasi permukaan tanah dibawah muka air laut
Base slide
Bearing capacity
Boring log
xvi
Caisson box
Kotak dari beton untuk menahan air
Causeway
Timbunan material yang melintang sepanjang badan air atau lahan yang
digunakan sebagai jalan penghubung untuk menuju dermaga
Clay
Tanah lempung
Combination slide
Kelongsoran yang terjadi akibat kelongsoran translasi dan rotasi
Counterweight
Deformasi
Perubahan bentuk
Dermaga
Diaphragma wall
Dinding diafragma
Echosunder
Alat ukur kedalaman air laut
xvii
EDM (Electronic Data Measurement)
Metode pengukuran kedalaman laut dengan alat elektronik
Elevasi
Beda tinggi suatu titik yang dari permukaan air laut
Engineering Properties
Faktor keamanan
Nilai perbandingan antara kekuatan geser tanah terhadap kekuatan geser yang diterima
sepanjang bidang tanah
Geosintetik
Bahan sintetis yang pada umumnya terbuat dari bahan plastik yang digunakan untuk
aplikasi teknik sipil dalam lingkungan tanah.
Geo-slope
Aplikasi yang digunakan untuk menganalisa kestabilan lereng
Geotextile
Geotextile woven
Geotekstil yang dibuat berupa lembaran yang seratnya bisa searah atau tidak dan
xviii
geotextile ini berfungsi sebagai perkuatan tanah
Geotextile non-woven
Geosintetik tanpa dianyam yang tidak berfungsi struktural namun hanya berfungsi
sebagai separator
Gravel
Batu kerikil
Hydraulic excavator
Indeks Properties
Jetty
Dermaga apung yang dibangun dengan membentuk sudut terhadap garis pantai.
K
Kohesif
Koordinat
Dua bilangan atau huruf yang menggambarkan posisi suatu titik
xix
L
Laterit
Jenis tanah lempung yang telah hilang unsur hara didalamnya
Lereng
N-SPT
Nikel
Hasil tambang berupa logam berwarna putih perak
Organik
Terbuat dari unsur yang mudah terurai
Parameter Tanah
Nilai yang terkandung dalam suatu jenis tanah
Pelabuhan
xx
Tempat pemberhentian kapal setelah melakukan pelayaran
Preloading
Pembebanan
Quay wall
Dinding dermaga
Remolded
Relative density
Rolling
Peristiwa jatuhnya massa tanah atau batu yang disebabkan oleh hilangnya kontak
dengan permukaan tanah.
Sand
Pasir
Sheet pile
Dinding penahan sementara berupa deretan
Silt
Lanau, bahan peralihan antara lempung dan pasir halus, kurang plastis dan lebih
mudah untuk teraliri air.
xxi
Slip
Perairan di antara dua Jetty yang berdampingan
Slope slide
Kelongsoran yang permukaan kelongsorannya sampai bidang lereng dan belum melewati
ujung kaki lereng.
Stabilitas lereng
Kestabilan dari suatu lahan yang beda tinggi
Stabilitas
Kestabilan
Surcharge
Beban tambahan
Talud
Lereng
Tanah granular
Tanah yang yang mempunyai sudut geser tanah
Toe slide
Kelongsoran yang permukaan bidang kelongsorannya melalui ujung kaki lereng.
Topless
xxii
Peristiwa yang terjadi akibat adanya momen guling yang bekerja pada suatu
titik putar di bawah suatu titik massa.
Topografi
Gambaran elevasi permukaan tanah diatas muka air laut
Trestel
Jalan/ akses dari dermaga menuju darat
Coba-coba
Undrained
Undrained cohesion
Wharf
Dermaga yang bentuknya paralel dengan pantai dan biasanya berimpit dengan garis
pantai.
xxiii
DAFTAR NOTASI
Simbol Penjelasan
Inggris
= Lebar potongan
= Kohesi
= Kedalaman pondasi
FS = Angka keamanan
H = Tinggi
= Tinggi kritis
= angka stabilitas
= Momen dorong
= Momen perlawanan
= Gaya normal
= Gaya normal-reaksi
= Gaya tangensial
= Gaya tangensial-reaksi
= Geser
xxiv
Simbol Penjelasan
Huruf Yunani
= Sudut
= Sudut
= Berat volume
= Beda tinggi
= Sudut
= Tegangan normal
= Tegangan geser
= (2/3 tan )
xxv
DAFTAR PUSTAKA
Bowles, Joseph E., 1993, Sifat-sifat Fisik dan Geoteknis Tanah, Jakarta:
Erlangga.
Penanganan Longsoran.
Slope/w.
http://danieltamado.blogspot.com/2011/08/tinjauan-jenis-struktur-dermaga.html
xxvi