STANDAR PROSEDUR
WAREHOUSE LOGISTIC
(QSP-AC-LOG-01)
Approval
Prepared by, Checked by, Approved by,
Warehouse Staff Management Representative President Director
Signed
Daftar Isi
1. Pendahuluan..........................................................................................................4
1.1 Tujuan..........................................................................................................................................................4
1.2 Ruang Lingkup............................................................................................................................................4
2. Referensi................................................................................................................4
3. Definisi dan Singkatan..........................................................................................4
4. Tanggung Jawab, Wewenang dan Kompetensi.................................................5
4.1 User..............................................................................................................................................................5
4.2 Warehouse Staff.........................................................................................................................................5
5. Uraian Prosedur....................................................................................................5
5.1 Proses Penerimaan Material....................................................................................................................5
5.2 Proses Pengiriman Material......................................................................................................................5
5.3 Penanganan Ketidaksesuaian..................................................................................................................5
Daftar Rekaman
Nomor Nama Rekaman Masa Simpan
- - -
1. Pendahuluan
1.1 Tujuan
Prosedur ini merupakan pengendalian seluruh aktifitas yang dilaksanakan di gudang logistik
ALSSACORP yang bertujuan untuk Pengendalian keluar-masuk barang, penerimaan, pemeriksaan
secara visual dan pengiriman barang; termasuk juga pengepakan barang.
2. Referensi
Nomor Judul
UU No. 1 Tahun 1970 Keselamatan dan Kesehatan Kerja.
Occupational Health and Safety Management System
OHSAS 18001 : 2007
Requirements
ISO 14001:2015 Enviromental Safety Management Requirements
Peraturan Pemerintah No. 50 Penerapan Sistem Manajemen Keselamatan dan Kesehatan
Tahun 2012 kerja
4.1 User
Membuat M/SR lengkap dengan spesifikasi untuk barang yang di request
Memparaf pada rekor Out-going material yang tersedia pada saat pengambilan barang dari
gudang
Memeriksa di tempat penerimaan dan mengecek barang yang dibeli sesuai dengan spesifikasi
yang diminta
5. Uraian Prosedur