Bismillah 2
Bismillah 2
Oleh
M.IRFAN.KURNIAWAN
NIM. 19010059
Oleh
M.IRFAN.KURNIAWAN
NIM. 19010059
i
PENGOPRASIAN DAN PERBAIKAN PERALATAN RIG DI PT
TIGA MUSIM MAS JAYA
Oleh
M.IRFAN.KURNIAWAN
NIM. 19010059
Dosen Pembimbing
ii
KATA PENGANTAR
Puji syukur penulis panjatkan kepada Tuhan Yang Maha Esa yang telah
tersebut diantaranya :
2. Ibu Ir. Hj. Hanifah Handayani, M.T selaku Direktur Akamigas Balongan;
masih terdapat kekurangan, oleh karena itu penulis mengharapkan masukan dan
saran yang membangun guna menjadikan Laporan Tugas Akhir ini lebih baik.
Penulis
M.IRFAN.KUNIAWAN
NIM. 19010057
DAFTAR ISI
iii
Halama
n
JUDUL .....................................................................................................................i
LEMBAR PERSETUJUAN....................................................................................ii
KATA PENGANTAR............................................................................................iii
DAFTAR ISI...........................................................................................................iv
DAFTAR GAMBAR..............................................................................................vi
DAFTAR TABEL..................................................................................................vii
DAFTAR LAMPIRAN........................................................................................viii
I. PENDAHULUAN............................................................................................1
1.1 Latar Belakang............................................................................................1
1.2 Tujuan.........................................................................................................1
1.2.1 Tujuan Umum.................................................................................1
1.2.2 Tujuan Khusus................................................................................1
1.3 Manfaat.......................................................................................................2
1.3.1 Manfaat Bagi Mahasiswa.......................................................................2
1.3.2 Manfaat bagi Institut Teknologi Petroleum Balongan....................2
1.3.3 Manfaat Bagi Institusi Tempat Tugas Akhir..................................2
II. TINJAUAN TEORI..........................................................................................3
2.1 PEMBORAN EKSPLORASI.....................................................................3
2.2 Peralatan Utama Pemboran.........................................................................4
2.2.1 Power Supply Equipment.................................................................4
2.2.2 Distribution (Transmission) Equipment...........................................4
2.2.3 Substructure......................................................................................4
2.2.4 Rig Floor...........................................................................................5
III. METODOLOGI................................................................................................5
3.1 Pendahuluan................................................................................................5
3.2 Pengambilan Data.......................................................................................5
3.3 Pengolangan Data.......................................................................................5
IV. RENCANA KEGIATAN.................................................................................7
V. KESIMPULAN SEMENTARA........................................................................7
DAFTAR PUSTAKA
iv
LAMPIRAN
RIWAYAT HIDUP
v
DAFTAR GAMBAR
vi
DAFTAR TABEL
vii
DAFTAR LAMPIRAN
viii
I. PENDAHULUAN
Tiga Musim Mas Jaya adalah perusahaan kontraktor yang bergerak di bidang
merupakan badan usaha milik swasta atau perorangan yang berdiri pada
tahun 1995 silam. Pada awal berdiri, perusahaan ini bernama PT. Sinar
Timur yang kemudian berganti nama menjadi PT. Tiga musim Mas Jaya
1.2 TUJUAN
I.2.1 TUJUAN UMUM
1
2. Mengetahui pengoprasian Peralatan yang berada di RIG
1.3 MANFAAT
lapangan.
2
I.3.3 Manfaat Bagi Instutusi Tempat Tugas Akhir
1. Dapat bekerja sama dengan mahasiswa untuk membantu kegiatan
operasional institusi.
3
telekomunikasi, air, listrik dsb), perhitungan perkiraan biaya
pemboran.
d. Test produksi dengan Drill Stem Test (DST) dan survey lubang bor
dengan logging
distribusi (transmisi) yang biasa di gunakan ada dua macan ,yaitu sistim
4
transmisi mekanis dan sistim transmisi listrik.
2.2.3 Substructure
Fungsinya untuk menahan beban tekan yang berasal dari peralatan
2.2.4 Rig Floor
III. METODOLOGI
yang dimiliki. Untuk mendukung tugas akhir dan kajian yang dilakukan,
antara lain :
a. Pendahuluan
observasi lapangan.
b. Pengambilan Data
kembali optimal.
5
c. Pengolahan Data
6
Pendahuluan
Pengambilan Data
Data RiG :
1. Data HP Equitment
2. RPM
3. Jenis RIG
Pengolahan Data
Kesimpulan
7
IV. RENCANA KEGIATAN
Kegiatan tugas akhir rencana akan dilaksanakan selama 1 bulan dengan
MINGGU
NO RINCIAN KEGIATAN
1 2 3 4
1 Pengenalan Lapangan
2 Pengambilan data
3 Penyusunan laporan & slide
4 Presentasi
V. KESIMPULAN