Material Gambar 3D
DATA UMUM PROYEK
ADMINISTRASI PROYEK
Nama Pekerjaan : Consultancy Services for: Project Preparation Consultant (PPC) for Bridges –
Package 5 (Aceh, North Sumatera, West Sumatera, South Sumatera) Loan No.
3455-INO
Nama Pengguna Jasa : Engineering Services Project (ESP), Bahan dan Peralatan Jembatan, Satuan
Kerja Direktorat Pembangunan Jembatan, Direktorat Jenderal Bina Marga,
Kementerian PUPR.
Nama Konsultan : WAPCOS Limited Joint Venture with DOLSAR Engineering Inc. Co, PT Indra
Karya (Persero), PT Bina Karya (Persero), PT Multi Phi Beta, PT Pola Agungand
Sub-Consultant with PT. Greenfield Environment Solution
Nomor Kontrak : HK 0202-Bt/PPK-ESP.Jbt/346
Tanggal Kontrak : 27 April 2020
Waktu Pelaksanaan : 599 Hari
PENDAHULUAN
PENDAHULUAN
Jembatan Ampera
Detail Lokasi
Jembatan Air Ogan III terletak di Jalan
Lingkar Selatan, di Sungai Ogan,
Kabupaten Ogan Ilir, Provinsi Sumatera
Selatan
Koordinat
Latitude : -3.05669
Longitude : 104.77552
PENDAHULUAN
Jembatan Eksisting
PENDAHULUAN
• Tipe Struktur
Post-tensioned Cast-in-site Concrete
Box Girder
• Bentang
Total Panjang mainspan jembatan
adalah 276.2 m (78.1 – 120 – 78.1 m).
PENDAHULUAN
POTONGAN MELINTANG
Pier P2
PENDAHULUAN
POTONGAN MELINTANG
Pier P5
PENDAHULUAN
BH-7
BH-1
BH-2
BH-8
BH-4
BH-6 BH-10
BH-15
BH-12
BH-14
BH-9
BH-11
BH-13
DATA GEOTEKNIK
01 – BORELOG
Logger : Rendi Alif Inclination : 900 63.5 kg Y = 966241.988 Logger : Rendi Alif Inclination : 900 63.5 kg Y = 9662201.85
Approved : Khadavi Cassing Diameter : 8.4 cm SPT Hammer Elevation : 6.00 (mdpl) = UDS Approved : Khadavi Cassing Diameter : 8.4 cm SPT Hammer Elevation : 6.00 (mdpl) = UDS
Dropping Distc : 76 cm Manual GWL : m = DS Dropping Distc : 76 cm Manual GWL : m = DS
Automatic Total depth : 30.00 m = Water Table Automatic Total depth : 30.00 m = Water Table
CONSISTENSY
CONSISTENSY
Type of Sample
Type of Sample
THICKNESS-m
THICKNESS-m
AND DENSITY
AND DENSITY
Blows Peneration
DEPTH (m)
Blows Peneration
DEPTH (m)
DATE
DATE
NSPT GRAPHIC NSPT GRAPHIC
LOG
LOG
SOIL DESCRIPTION each NSPT CORE BOX SOIL DESCRIPTION each NSPT CORE BOX
15 cm 15 cm
1st 2nd 3rd 0 10 20 30 40 50 60 1st 2nd 3rd 0 10 20 30 40 50 60
0.0 0.0
-0.5 -0.5
Test Pit
Test Pit
-1.0 -1.0
-1.5 -1.5
-2.0 -2.0
-2.5 -2.5
-3.0 -3.0
-3.5 -3.5
-4.0 SPT -4.0 SPT
-4.5 -4.5
-5.0 -5.0
-5.5 -5.5
-6.0 SPT -6.0 SPT
-8.5 -8.5
-9.0 -9.0
-9.5 -9.5
-10.0 SPT -10.0 SPT
-10.5 -10.5
-11.0 -11.0
-11.5 -11.5
PASIR
4.0
seragam, abu-abu dan coklat muda
-12.5 -12.5
-13.0 -13.0
-13.5 -13.5 LONGGAR
1.0
PASIR
lembab, abu-abu kecoklatan
-15.0 -15.0
LANAU BERPASIR
-15.5 -15.5
LEMPUNG SANGAT LUNAK,
-16.0 SPT 3 3 3 6 -16.0 SPT KEPASIRAN bewarna abu-abu 2 2 2 4
-16.5 -16.5
3.0
AGAK KAKU, abu-abu kecoklatan
-17.0 -17.0
-17.5 -17.5
LEMPUNG
-18.0 SPT 5 7 9 16 -18.0 SPT 6 8 12 20
CUKUP KERAS, bewarna abu-abu
-18.5 -18.5 kecoklatan
-19.0 -19.0
-19.5 -19.5
-20.0 SPT 5 10 15 25 -20.0 SPT 9 11 20 31
-20.5 -20.5
LEMPUNG
-21.0 -21.0 CUKUP KERAS sampai SANGAT
-21.5 -21.5 KERAS, bewarna abu-abu
Cuaca Cerah Berawan ….4 Desember 2020
kecoklatan
-22.0 SPT 7 13 15 28 -22.0 SPT 15 24 32 56
10.0
-23.0 -23.0
PADAT, butiran sedang seragam,
-23.5 lembab, abu-abu kecoklatan -23.5
-24.0 SPT 6 9 13 22 -24.0 SPT 15 25 38 >60
-24.5 -24.5
-25.0 -25.0
-25.5 -25.5
SANGAT PADAT pada kedalaman
-26.0 SPT 8 14 15 29 -26.0 SPT 23.00 - 24.00 m, abu-abu dan 10 15 15 30
PASIR
-26.5 -26.5 lembab, pada kedalaman > 26.00
PADAT bewarana abu-abu
-27.0 -27.0
kehitaman, berbutir kasar
-27.5 -27.5
-28.0 SPT 9 18 24 42 -28.0 SPT 8 15 20 35
-28.5 -28.5
PADAT, butiran halus, basah abu-
PASIR
-29.0 -29.0
2.0
PASIR
-33.5
SANGAT PADAT, lembab, butiran
-34.0 SPT sedang bewarna abu-abu 20 25 28 53
-34.5
-35.0
-35.5
-36.0 SPT 52 >60 >60
-36.5
-37.0
-37.5
-38.0 SPT >60 >60
NAVAL
-38.5 SANGAT KERAS, abu-abu
kecoklatan
-39.0
-39.5
-40.0
STRATIGRAFI
PENENTUAN KLASIFIKASI SITUS
Penentuan Klasifikasi Situs (NSPT Rata-Rata) CONTOH ANALISIS KLASIFIKASI SITUS
PADA P3 (BH 7) Rekap Kelas Situs Tanah
Profil tanah BH-07
Interval SPT 2 m Data Tanah Struktur Posisi Kelas Situs
D N - SPT di BH 5 P1 Approachspan SE
Jenis Tanah di/N Konsistensi
[m] [blows/30 cm] (m)
BH 6 P2 Mainspan SE
0 0
2 Pasir 3 2 0.66667 Very loose
BH 7 P3 Mainspan SE
4 Pasir 6 4 0.33333 Loose BH 8 P4 Mainspan SE
6 Lempung 6 6 0.33333 Medium Stiff BH 9 P5 Mainspan SE
8 Lempung 16 8 0.125 Very Stiff BH 10 P6 Approachspan SE
10 Pasir 25 10 0.08 Medium Dense BH 11 P7 Approachspan SE
12 Pasir 28 12 0.07143 Medium Dense BH 12 P8 Approachspan SE
14 Pasir 22 14 0.09091 Medium Dense
16 Pasir 29 16 0.06897 Medium Dense
Dengan menggunakan cara analisis
18 Pasir 42 18 0.04762 Dense yang sama dengan P3 (BH 7),
20 Pasir 32 20 0.0625 Dense
22 Pasir 55 22 0.03636Interval
Very Dense
didapatkan semua data tanah di
2
24 Lempung 60 24 0.03333S di Very Hard30 DED Duplikasi Jembatan Ogan
26 Lempung 60 26 0.03333S di/NiVery Hard2.05 tergolong dalam Kelas Situs Tanah
28 Lempung 60 28 0.03333N Very Hard S di
30 Lempung 60 30 0.03333
avg
Very Hard Lunak (SE)
S di/Ni
Interval 2
S di 30 Navg 14.638 SE
S di/Ni 2.05
Klasifikasi Situs Berdasarkan SNI 8460:2017 Navg S di Note
S di/Ni Navg > 50 -----} Tanah Keras [SC]
Navg ≥ 15 & Navg ≤ 50 -----} Tanah Sedang [SD]
Navg 14.638 SE Navg < 15 -----} Tanah Lunak [SE]
Note
Navg > 50 -----} Tanah Keras [SC]
Navg ≥ 15 & Navg ≤ 50 -----} Tanah Sedang [SD]
PENENTUAN KLASIFIKASI SITUS
Penentuan Klasifikasi Situs (Potensi Likuifaksi) Analisis Potensi Likuifaksi
Untuk memastikan apakah site class harus Liquefaction Potensial Integral (LPI) menggunakan nilai Factor of safety (FoS dari
menggunakan site class tanah SE atau SF, maka terlebih analisis Simplified Procedure Method) dan fungsi kedalaman tanah (Wz). Potensi
dahulu diperhitungkan potensi likuifaksi yang ada di likuifaksi (LPI) didefinisikan dalam rumus sebagai berikut:
lokasi tersebut.
Dengan:
LPI = Nilai Liquefaction Potensial integral
F = Potensi kejadian likuifaksi, ditentukan dengan persamaan,
F= (1-FS) untuk FS < 1, F= 0 untuk FS > 1
w(z) = Faktor bobot kedalaman, dimana w(z) = 10-0.5z; dengan z adalah kedalaman
yang ditinjau, maksimal 20 m.
H1 = 0 -1 m
H2 = 6 m
PENENTUAN KLASIFIKASI SITUS
2. Menentukan nilai FoS likuifaksi dengan Simplified Procedure Method
1. GENERAL DATA Level Depth Layer # Type N-field gdry gs a t % Fines geff s'v0 sv0 rd CSR CN (N1)60 a b (N1)60cs CRR7.5 Dr f Ks CRR7.5*MSF*K Conclusion FoS
Soil Description
[m CD] [m] [-] [
bl ows 3 3
/30cm] [kN/m ] [kN/m ]
3
[kN/m ] [kPa] [kPa] [-] [-] [-] [-] [-] [-] s
PGA (amax) 0.2 g 0 0 1 Loose coarse SAND Granular 4 14 16 10 6 0 0 1.00
Ground Water Level 0 m CD -0.5 0.5 1 Loose coarse SAND Granular 4 14 16 10 6 3 8 1.00 0.35 1.70 7 0.87 1.02 8 0.09 52.92 0.75 1.00 0.15 Liquefiable 0.44
-1 1 1 Loose coarse SAND Granular 4 14 16 10 6 6 16 0.99 0.34 1.70 7 0.87 1.02 8 0.09 48.70 0.75 1.00 0.15 Liquefiable 0.44
Earthquake Magnitude (Mw) 6 -1.5 1.5 1 Loose coarse SAND Granular 4 14 16 10 6 9 24 0.99 0.34 1.70 7 0.87 1.02 8 0.09 46.39 0.75 1.00 0.15 Liquefiable 0.44
rd in CSR formula, calculated using Liao & Whitman -2 2 1 Loose coarse SAND Granular 4 14 16 10 6 12 32 0.98 0.34 1.70 7 0.87 1.02 8 0.09 44.81 0.75 1.00 0.15 Liquefiable 0.45
-2.5 2.5 1 Loose coarse SAND Granular 4 14 16 10 6 15 40 0.98 0.34 1.70 7 0.87 1.02 8 0.09 43.63 0.75 1.00 0.15 Liquefiable 0.45
MSF 1.77 -3 3 1 Loose coarse SAND Granular 4 14 16 10 6 18 48 0.98 0.34 1.70 7 0.87 1.02 8 0.09 42.68 0.75 1.00 0.15 Liquefiable 0.45
-3.5 3.5 1 Loose coarse SAND Granular 4 14 16 10 6 21 56 0.97 0.34 1.70 7 0.87 1.02 8 0.09 41.90 0.75 1.00 0.15 Liquefiable 0.45
-4 4 1 Loose coarse SAND Granular 4 14 16 10 6 24 64 0.97 0.34 1.70 7 0.87 1.02 8 0.09 41.24 0.75 1.00 0.15 Liquefiable 0.45
2. CORRECTION FACTORS -4.5 4.5 1 Loose coarse SAND Granular 4 14 16 10 6 27 72 0.97 0.33 1.70 7 0.87 1.02 8 0.09 40.66 0.75 1.00 0.15 Liquefiable 0.45
CE Correction for hammer energy ratio 1.00 -5 5 1 Loose coarse SAND Granular 4 14 16 10 6 30 80 0.96 0.33 1.70 7 0.87 1.02 8 0.09 40.15 0.75 1.00 0.15 Liquefiable 0.46
-5.5 5.5 1 Loose coarse SAND Granular 4 14 16 10 6 33 88 0.96 0.33 1.70 7 0.87 1.02 8 0.09 39.69 1.00 1.00 0.15 Liquefiable 0.46
CB Correction for borehole size of diameter 1.00 -6 6 1 Loose coarse SAND Granular 4 14 16 10 6 36 96 0.95 0.33 1.67 7 0.87 1.02 8 0.08 38.92 1.00 1.00 0.15 Liquefiable 0.45
-6.5 6.5 2 Sandy SILT Other 6 15 17 35 7 39.5 104.5 0.95 0.33 1.59 10 5.00 1.20 16 0.11 45.40 0.75 1.00 0.19 Non-Liquefiable 0.59
CR Correction for rod length 1.00 -7 7 2 Sandy SILT Other 6 15 17 35 7 43 113 0.95 0.32 1.52 9 5.00 1.20 16 0.11 44.07 0.75 1.00 0.19 Non-Liquefiable 0.58
-7.5 7.5 2 Sandy SILT Other 6 15 17 35 7 46.5 121.5 0.94 0.32 1.47 9 5.00 1.20 16 0.10 42.88 0.75 1.00 0.18 Non-Liquefiable 0.57
CS Correction for sampler with or without liners 1.00
-8 8 2 Sandy SILT Other 6 15 17 35 7 50 130 0.94 0.32 1.41 8 5.00 1.20 15 0.10 41.81 0.75 1.00 0.18 Non-Liquefiable 0.56
CN Liao & Whitman -8.5 8.5 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 53.8 138.8 0.93 0.31 1.36 34 0.00 1.00 34 78.56 0.65 1.00 Non-Liquefiable
-9 9 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 57.6 147.6 0.93 0.31 1.32 33 0.00 1.00 33 76.71 0.65 1.00 Non-Liquefiable
-9.5 9.5 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 61.4 156.4 0.92 0.30 1.28 32 0.00 1.00 32 75.01 0.65 1.00 Non-Liquefiable
Notes: -10 10 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 65.2 165.2 0.91 0.30 1.24 31 0.00 1.00 31 73.45 0.65 1.00 Non-Liquefiable
-10.5 10.5 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 69 174 0.89 0.29 1.20 30 0.00 1.00 30 72.01 0.65 1.00 Non-Liquefiable
-11 11 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 72.8 182.8 0.88 0.29 1.17 29 0.00 1.00 29 0.43 70.67 0.65 1.00 0.75 Non-Liquefiable 2.62
• Dr using Yoshida et al N60; -11.5 11.5 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 76.6 191.6 0.87 0.28 1.14 29 0.00 1.00 29 0.39 69.42 0.65 1.00 0.69 Non-Liquefiable 2.45
•
-17 17 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 118.4 288.4 0.72 0.23 0.92 23 0.00 1.00 23 0.26 59.61 0.75 0.96 0.44 Non-Liquefiable 1.91
One have to be careful that the given thickness of a -17.5 17.5 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 122.2 297.2 0.71 0.22 0.90 23 0.00 1.00 23 0.25 58.95 0.75 0.95 0.42 Non-Liquefiable 1.89
layer is not smaller than the discretisation step -18 18 3 Medium Dense to Dense SAND Granular 25 15 17.6 2.85 7.6 126 306 0.69 0.22 0.89 22 0.00 1.00 22 0.25 58.33 0.75 0.94 0.41 Non-Liquefiable 1.88
-18.5 18.5 4 Dense SAND Granular 40 18 20 2 10 131 316 0.68 0.21 0.87 35 0.00 1.00 35 71.42 0.65 0.91 Non-Liquefiable
otherwise some layers might completely 'ignored' -19 19 4 Dense SAND Granular 40 18 20 2 10 136 326 0.67 0.21 0.86 34 0.00 1.00 34 70.49 0.65 0.90 Non-Liquefiable
• in the calculation; -19.5 19.5 4 Dense SAND Granular 40 18 20 2 10 141 336 0.65 0.20 0.84 34 0.00 1.00 34 69.61 0.65 0.89 Non-Liquefiable
-20 20 4 Dense SAND Granular 40 18 20 2 10 146 346 0.64 0.20 0.83 33 0.00 1.00 33 68.76 0.65 0.88 Non-Liquefiable
-20.5 20.5 4 Dense SAND Granular 40 18 20 2 10 151 356 0.63 0.19 0.81 33 0.00 1.00 33 67.96 0.65 0.87 Non-Liquefiable
• CN correction factor is correctly approximated by -21 21 4 Dense SAND Granular 40 18 20 2 10 156 366 0.61 0.19 0.80 32 0.00 1.00 32 67.19 0.65 0.86 Non-Liquefiable
the choosen equations (Liao & Whitman OR Kayen -21.5 21.5 4 Dense SAND Granular 40 18 20 2 10 161 376 0.60 0.18 0.79 32 0.00 1.00 32 66.45 0.65 0.85 Non-Liquefiable
-22 22 4 Dense SAND Granular 40 18 20 2 10 166 386 0.59 0.18 0.78 31 0.00 1.00 31 65.74 0.65 0.84 Non-Liquefiable
et al) for overburden pressure respectively up to -22.5 22.5 4 Dense SAND Granular 40 18 20 2 10 171 396 0.57 0.17 0.76 31 0.00 1.00 31 65.06 0.65 0.83 Non-Liquefiable
• 200 kPa and 300 kPa. -23
Reache 23 4 Dense SAND Granular 40 18 20 2 10 176 406 0.56 0.17 0.75 30 0.00 1.00 30 64.41 0.65 0.82 Non-Liquefiable
d max.
depth
MSF using revised Idriss scalling factor of
theory
PENENTUAN KLASIFIKASI SITUS
3. Menentukan Besarnya Tingkat Potensi Likuifaksi (LPI)
DATA Citra DEMNAS Hidrometri Topografi dan Bathimetri Tata guna lahan Hujan
Rekomendasi Penanganan
ANALISA DAERAH ALIRAN SUNGAI (DAS)
Periode Periode
No. Xrt Kt S XT No. Xrt Yt Yn Sn Kt Sx XT
Ulang Ulang
1 2 61.82 0.00 22.67 61.82 1 2 61.82 0.3065 0.4952 0.9497 -0.1987 22.67 57.31
2 5 61.82 0.84 22.67 80.86 2 5 61.82 1.4999 0.4952 0.9497 1.0579 22.67 85.80
3 10 61.82 1.28 22.67 90.84 3 10 61.82 2.2504 0.4952 0.9497 1.8482 22.67 103.72
4 25 61.82 1.71 22.67 100.59 4 25 61.82 3.1255 0.4952 0.9497 2.7696 22.67 124.61
5 50 61.82 2.05 22.67 108.30 5 50 61.82 3.9019 0.4952 0.9497 3.5871 22.67 143.15
6 100 61.82 2.33 22.67 114.65 6 100 61.82 4.6001 0.4952 0.9497 4.3223 22.67 159.82
160,00
140,00
120,00
100,00
80,00
60,00
40,00
20,00
0,00
0 20 40 60 80 100 120
PUH (Tahun)
ANALISA UJI DISTRIBUSI PROBABILITAS
Hasil Normal Log Normal Gumbel Log Pearson Type III Hasil Normal Log Normal Gumbel Log Pearson Type III
Chi-Kuadrat Hitung Smirnov Hitung (ΔP
4.00 4.00 4.00 8.00 0.49 0.40 0.43 0.866
(χ2) max)
Chi-Kuadrat Kritis Smirnov Kritis (ΔP
5.991 5.991 5.991 5.991 0.41 0.41 0.41 0.41
(χ2cr) kritis)
Keterangan diterima diterima diterima tidak diterima Keterangan Tidak diterima diterima tidak diterima tidak diterima
Berdasarkan Tabel adalah Log Normal karena nilai X² hitung < dari Jika jumlah data 10 dan α (derajat kepercayaan) adalah 5%, maka dari
X²kritis (paling kecil) tabel diperoleh Δp kritis = 0,41. jadi nilai Δp max < Δp kritis. Berdasarkan
= 5.50 < 5,991. jadi debit banjir dengan periode ulang 2, 5, 10, 25, Tabel 3.21 adalah distribusi Log Normal karena nilai Δp Terhitung < Δp
50, 100 adalah: Metode Normal, Log Normal, dan Gumbel kritis (paling kecil) = 0.40< 0,41. jadi debit banjir dengan periode ulang
2, 5, 10, 25, 50, 100
Maka, Metode Log Normal yang dipakai menggunakan metode
Smirnov Kolmogorov
7000
Q100 2 3668.97
6000
Q50
5 4787.73
Q m3/detik
5000
Q25
4000
10 5503.95
3000
Q10
2000 Q5 25 6307.29
1000 Q2 50 7024.69
0
0 10 20 30 40 50 60 70 80 90 100 110
100 7676.37
T (jam)
ANALISA DEBIT BANJIR LAPANGAN
2 3668.97
5 4787.73
10 5503.95
25 6307.29
50 7024.69
100 7676.37
Tinggi muka air banjir (MAB) pada jembatan Ogan berdasarkan informasi warga sekitar, setinggi +12 m atau di bawah
PileCap. Dengan menghitung menggunakan metode Q teoritis terhadap Q di lapangan, pendekatan menggunakan
HEC – RAS V 4.0 didapat Q 100 = 7676.37 m3/det dengan MAB = +12 m, dengan asumsi merupakan Q periode
ulang 100 tahun yang mendekati Q lapangan adalah Q yang dihitung dengan menggunakan Metode Nakayasu
ANALISA MORFOLOGI SUNGAI
Endapan antara
5-6 m dari bibir
sungai
Endapan hingga
Mundur hingga
4-5 meter dari
10-15 m dari Mundur hingga 5-7 m
bibir sungai
bibir sungai dari bibir sungai
Potensi Gerusan
-Gerusan umum yang terjadi di sungai
-Gerusan lokal di sekitar pier
Conctraction Scour
Pier Scour
No METODE Kondisi Konfigurasi Pondasi Contraction Scour (m) Pier Scour (m) Total Scouring
Jembatan Rencana +
1 CSU Equation Borepile 5x6 0.9 3.54 4.44
Eksisting
Conctraction
Scour
Pier Scour
No METODE Kondisi Contraction Scour (m) Pier Scour (m) Total Scouring
1 CSU Equation Jembatan Eksisting 1.29 3.04 4.33
Jembatan Eksisting +
2 CSU Equation 1.29 3.95 5.24
Rencana
Dilakukan berdasarkan standar HEC 18 FHWA NHI 01-001 Terjadinya gerusan jembatan eksisting
terhadap adanya jembatan rencana
Federal Highway Administration
ANALISA GERUSAN JEMBATAN
EKSISTING (RANGKA BAJA)
REKAPITULASI GERUSAN PADA PILAR JEMBATAN EKSISTING
Kondisi Lokasi P1 P2 P3 P4 P5 P6
D50(mm) 0.68 0.68 0.68 0.68 0.68 0.68
Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour
Sudut Aliran 0.00 0.00 0.00 0.00 0.00 0.00
Diameter Pile 0.6 0.6 0.6 0.6 0.6 0.6
V 6.1 6.1 6.1 6.1 6.1 6.1
Jembatan Fr 0.361 0.359 0.356 0.345 0.351 0.357
Eksisting K1 1.00 1.00 1.00 1.00 1.00 1.00
K2 1.00 1.00 1.00 1.00 1.00 1.00
K3 1.00 1.00 1.00 1.00 1.00 1.00
Y1 7.50 7.50 7.50 7.50 7.50 7.50
V1 6.10 6.10 6.10 6.10 6.10 6.10
Ys Pier 3.01 3.03 3.04 3.08 3.06 3.03
Ys Average 3.041666667
Kondisi Lokasi P1 P2 P3 P4 P5 P6
D50(mm) 0.68 0.68 0.68 0.68 0.68 0.68
Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour Live Bed Scour
Sudut Aliran 0.00 0.00 0.00 0.00 0.00 0.00
Diameter Pile 0.6 0.6 0.6 0.6 0.6 0.6
Jembatan V 6.1 6.1 6.1 6.1 6.1 6.1
Eksisting & Fr 0.711 0.711 0.711 0.711 0.711 0.711
Jembatan K1 1.00 1.00 1.00 1.00 1.00 1.00
Rencana
K2 1.00 1.00 1.00 1.00 1.00 1.00
K3 1.00 1.00 1.00 1.00 1.00 1.00
Y1 8.86 8.99 9.12 9.71 9.38 9.05
V1 6.10 6.10 6.10 6.10 6.10 6.10
Ys Pier 3.93 3.94 3.95 3.98 3.96 3.94
Ys Average 3.95
Dilakukan berdasarkan standar HEC 18 FHWA NHI 01-001 Federal Highway Administration
PEMANTAUAN ELEVASI MUKA AIR
SELAMA MASA & PASCA KONTRUKSI
Ruang bebas horizontal dan vertikal di bawah jembatan disesuaikan kebutuhan lalu
lintas kapal, kapal yang sering melewati jalur sungai jembatan OGAN III adalah
kapal Tongkang
free-board minimal 1.5meter dari muka air banjir. FB Jembatan dari MAB Q100 =
13 m
Vertical Clearance jembatan minimal 5,1 meter untuk kapal Lewat,
Tinggi Maksimal kapal tongkang yang lewat 7 m, FB = 6 m,
FB Minimal < FB Rencana = 5.1 < 6 m OK
• Fase tektonik yang berkembang di Cekungan Sumatra Selatan menurut Pulunggono dkk,
1992 terdiri dari 3 fase yaitu : Tahap Kompresional (Jura Akhir – Kapur Awal), Tahap
Ekstensional (Kapur Akhir – Tersier Awal), dan Tahap Kompresional (Miosen Tengah – Resent).
• Berdasarkan informasi geologi regional, lokasi Jembatan Air Ogan III cukup jauh dari lokasi
sesar aktif. Namun di bagian Utara terdapat perlipatan batuan berupa antiklin dan sinklin
akibat pengaruh fase kompresional yang terjadi di wilayah Cekungan Sumatra Selatan.
• Umumnya likuifaksi terjadi pada lingkungan geologi kuarter (Seed dan Idris,
1997)
• Syarat terjadinya likuifaksi menurut (Juang dan Jiang, 2000) : lapisan sedimen
berupa pasir (non kohesif), bersifat terurai / gembur, berada di bawah muka air
tanah / jenuh air, muka air tanah dangkal, serta gempa bumi yang kuat dan
lama.
bergradasi baik dengan ukuran butir kasar (Tsuchida, 1970 ; Ishihara, 1985).
Saran
1. Perlu dipertimbangkan lagi untuk kedalaman pondasi, mengingat karakteristik batuan menunjukkan belum
mencapai posisi bedrock.
2. Untuk mengetahui kondisi struktur geologi / sesar yang bersifat lokal yang terdapat di lokasi penelitian, maka perlu
dilakukan studi khusus dengan melakukan survei geologi/geofisika bawah permukaan.
CODE DAN STANDAR
PERENCANAAN STRUKTUR JEMBATAN
CODE DAN STANDAR PERENCANAAN
STRUKTUR JEMBATAN
01 – STANDAR NASIONAL INDONESIA (SNI)
● Pembebanan Untuk Jembatan SNI 1725:2016
● Perencanaan Jembatan Terhadap Beban Gempa SNI 2833:2016
● Perencanaan Struktur Beton Untuk Jembatan RSNI T-12-2004
● Persyaratan Beton Struktural Untuk Bangunan Gedung SNI 2847:2013
● Persyaratan Perancangan Geoteknik SNI 8460:2017
Final Stage/
During Construction
Service Limit State
Stress
Condition fci* (MPa) f'c (MPa)
Allowable Allowable
Stress 33.2 Stress 41.5
– Faktor Beban Dinamis Beban statis truk rencana harus diperbesar sesuai dengan FBD
berdasarkan gambar di bawah. . Faktor beban dinamis tidak perlu
diterapkan pada beban pejalan kaki atau beban terbagi rata (BTR). Untuk
perencanaan, FBD dinyatakan sebagai beban statis ekuivalen.
Gaya rem harus diasumsikan untuk bekerja secara horizontal pada jarak 1800 mm di atas
permukaan jalan pada masing-masing arah longitudinal dan dipilih yang paling menentukan.
• Perbedaan Penurunan
Nilai differential settlement antar pier yang digunakan pada desain adalah sebesar 1 cm. Nilai ini
dibandingkan terhadap nilai settlement yang didapatkan dari analisa geoteknik.
PEMBEBANAN JEMBATAN
• Beban Angin
PEMBEBANAN JEMBATAN
• Temperatur Merata • Gradien Temperatur
PEMBEBANAN JEMBATAN
• Rangkak - Susut
Efek rangkak dan susut direncanakan berdasarkan rekomendasi CEB-FIP 1990. Untuk beton prategang, perhitungan rangkak dan
susut adalah hingga lebih dari 40 tahun (15.500 hari). Untuk perpindahan bearing adalah lebih dari 30 tahun. Rata-rata kelembaban
relatif diambil sebesar 70% (konsensus KKJTJ).
Ss = 0,2163
PEMBEBANAN JEMBATAN
S1 = 0,1538
PEMBEBANAN JEMBATAN
• RESPONSE SPECTRUM
0,5
Spectrum Acceleration, Sa (g)
0,4
0,3
0,2
0,1
0
0 0,25 0,5 0,75 1 1,25 1,5 1,75 2 2,25 2,5 2,75 3 3,25 3,5 3,75 4
Period (second)
PEMBEBANAN JEMBATAN
• FAKTOR MODIFIKASI RESPON (R)
a. Desain Pondasi, R=1
b. Desain Pier
Kategori operasional Jembatan Air Ogan 3 adalah
Essential, maka R yang digunakan adalah:
- Sumbu transversal, R = 1.5
- Sumbu longitudinal, R = 3.5
c. Connections (Bearing dan Expansion Joint), R = 0.8
PEMBEBANAN JEMBATAN
KOMBINASI PEMBEBANAN (SNI 1725:2016)
Limit States No. Load Comb DL SDL PT CR-SH LL BR WS WSPx WSPy WL TU TG STL
Limit States No. Load Comb DL SDL PT CR-SH LL BR WS WSPx WSPy TU Limit States No. Load Comb DL SDL PT CR-SH LL BR EQx EQy
1 ULS1a 1.3 2 1 0.5 1.8 1.8 - - - 0.5 15 EXT1a 1.3 2 1 0.5 0.3 0.3 1 0.3333
2 ULS1b 1.3 2 1 0.5 1.8 1.8 - - - 1.2 16 EXT1b 1.3 2 1 0.5 0.3 0.3 0.3333 1
3 ULS2a 1.3 2 1 0.5 1.4 1.4 - - - 0.5 17 EXT1c 1.3 2 1 0.5 0.3 0.3 -1 -0.3333
4 ULS2b 1.3 2 1 0.5 1.4 1.4 - - - 1.2 18 EXT1d 1.3 2 1 0.5 0.3 0.3 -0.3333 -1
Extreme
5 ULS3a 1.3 2 1 0.5 - - 1.4 - 1.4 0.5 19 EXT1e 1.3 2 1 0.5 0.3 0.3 -1 0.3333
6 ULS3b 1.3 2 1 0.5 - - - 1.4 - 0.5 20 EXT1f 1.3 2 1 0.5 0.3 0.3 0.3333 -1
7 ULS3c 1.3 2 1 0.5 - - 1.4 - 1.4 1.2 21 EXT1g 1.3 2 1 0.5 0.3 0.3 1 -0.3333
ULS
8 ULS3d 1.3 2 1 0.5 - - - 1.4 - 1.2 22 EXT1h 1.3 2 1 0.5 0.3 0.3 -0.3333 1
9 ULS4a 1.3 2 1 0.5 - - - - - 0.5
10 ULS4b 1.3 2 1 0.5 - - - - - 1.2
11 ULS5a 1.3 2 1 0.5 - - 0.4 - 0.4 0.5
12 ULS5b 1.3 2 1 0.5 - - - 0.4 - 0.5
13 ULS5c 1.3 2 1 0.5 - - 0.4 - 0.4 1.2
14 ULS5d 1.3 2 1 0.5 - - - 0.4 - 1.2
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
METODE KONSTRUKSI
PEMODELAN STRUKTUR
PEMODELAN STRUKTUR
Software struktur yang digunakan untuk analisis
struktur jembatan Duplikasi Air Ogan 3 ini adalah
Midas Civil dari MIDAS IT Co., Ltd., Korea.
Tampak 3D, tampak atas, tampak samping, dan box girder cross section
PEMODELAN STRUKTUR
Beban Rem
PEMODELAN STRUKTUR
Temperatur merata
Gradien temperatur
OUTPUT MODEL
1. Respon Dinamik
PERIOD & MODAL MASS PARTICIPATION
MODE 1
Animation
MODE 1
3D View
MODE 1
Side View
MODE 1
Top View
MODE 2
Animation
MODE 2
3D View
MODE 2
Side View
MODE 2
Top View
MODE 3
Animation
MODE 3
3D View
MODE 3
Side View
MODE 3
Top View
MODE 4
Animation
MODE 4
3D View
MODE 4
Side View
MODE 4
Top View
MODE 5
Animation
MODE 5
3D View
MODE 5
Side View
MODE 5
Top View
2. Tegangan Box Girder
TEGANGAN BOX GIRDER
A. STRESS DIAGRAM DURING CONSTRUCTION
Figure 2 Top fiber stress box girder stage 1 after stressing Figure 3 Bottom fiber stress box girder stage 1 after stressing
Figure 5 Top fiber stress box girder stage 2 (after form traveler activation) Figure 6 Bottom fiber stress box girder stage 2 (after form traveler activation)
Figure 8 Top fiber stress box girder stage 3 (after stressing) Figure 9 Bottom fiber stress box girder stage 3 (after stressing)
Figure 11 Top fiber stress box girder stage 4 (after stressing) Figure 12 Bottom fiber stress box girder stage 4 (after stressing)
Figure 14 Top fiber stress box girder stage 5 (after stressing) Figure 15 Bottom fiber stress box girder stage 5 (after stressing)
Figure 17 Top fiber stress box girder stage 6 (after stressing) Figure 18 Bottom fiber stress box girder stage 6 (after stressing)
Figure 20 Top fiber stress box girder stage 7 (after stressing) Figure 21 Bottom fiber stress box girder stage 7 (after stressing)
Figure 23 Top fiber stress box girder stage 8 (after stressing) Figure 24 Bottom fiber stress box girder stage 8 (after stressing)
Figure 26 Top fiber stress box girder stage 9 (after stressing) Figure 27 Bottom fiber stress box girder stage 9 (after stressing)
Figure 29 Top fiber stress box girder stage 10 (after stressing) Figure 30 Bottom fiber stress box girder stage 10 (after stressing)
Figure 32 Top fiber stress box girder stage 11 (after stressing) Figure 33 Bottom fiber stress box girder stage 11 (after stressing)
Figure 35 Top fiber stress box girder stage 12 (after stressing) Figure 36 Bottom fiber stress box girder stage 12 (after stressing)
Figure 38 Top fiber stress box girder stage 13 (after stressing) Figure 39 Bottom fiber stress box girder stage 13 (after stressing)
Figure 41 Top fiber stress box girder stage 14 (after stressing) Figure 42 Bottom fiber stress box girder stage 14 (after stressing)
Figure 44 Top fiber stress box girder stage 15 (after stressing) Figure 45 Bottom fiber stress box girder stage 15 (after stressing)
Figure 47 Top fiber stress box girder stage 16 (after stressing) Figure 48 Bottom fiber stress box girder stage 16 (after stressing)
Figure 50 Top fiber stress box girder stage 17 (after stressing) Figure 51 Bottom fiber stress box girder stage 17 (after stressing)
Figure 53 Top fiber stress box girder stage 18 (after stressing) Figure 54 Bottom fiber stress box girder stage 18 (after stressing)
Figure 57 Top fiber stress box girder stage 19 (after stressing) Figure 58 Bottom fiber stress box girder stage 19 (after stressing)
Figure 55 Element activation (segment 17) Figure 56 Tendon activation until segment 19 (cantilever maximum)
TEGANGAN BOX GIRDER
A.20 Stage 20 Side Span Segments + Closure Activation (After Bottom Temdon Stressing)
Figure 61 Top fiber stress box girder stage 20 (after stressing) Figure 62 Bottom fiber stress box girder stage 20 (after stressing)
Figure 59 Element activation (side span segments + closure side span) Figure 60 Bottom tendon side span activation
TEGANGAN BOX GIRDER
Figure 65 Top fiber stress box girder stage 21 (after closure mid span Figure 66 Bottom fiber stress box girder stage 21 (after closure mid span
activation) activation)
Figure 63 Element activation (closure mid span) Figure 64 Just before bottom tendon mid span activation
TEGANGAN BOX GIRDER
Figure 69 Top fiber stress box girder stage 22 (after stressing) Figure 70 Bottom fiber stress box girder stage 22 (after stressing)
Figure 67 Element activation (closure mid span) Figure 68 Bottom tendon mid span activation
TEGANGAN BOX GIRDER
Figure 72 Top fiber stress box girder stage 23 Figure 73 Bottom fiber stress box girder stage 23
Figure 75 Top fiber stress box girder stage 24 Figure 76 Bottom fiber stress box girder stage 24
Figure 75 Top fiber stress box girder stage 25 Figure 76 Bottom fiber stress box girder stage 25
B.1 SLS1a
B.2 SLS3a
B.3 SLS4a
Nilai
settlement
yang
digunakan
TEGANGAN BOX GIRDER
Tegangan Box akibat settlement berdasarkan perhitungan Geoteknik:
DS_Top Fibre
DS_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS1a_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS1a_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS1c_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS1c_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS3a_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS3a_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS3c_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS3c_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS4a_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS4a_Bottom Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS4c_Top Fibre
TEGANGAN BOX GIRDER
Tegangan Box saat SLS (dengan nilai settlement berdasarkan perhitungan Geoteknik) :
SLS4c_Bottom Fibre
3. Expansion Joint Movement
EXPANSION JOINT MOVEMENT
EXPANSION JOINT MOVEMENT
4. Bearing Forces & Movement
EXPANSION JOINT MOVEMENT
ANALISIS STRUKTUR JEMBATAN
1. Analisa Daya Dukung Pondasi
PARAMETER TANAH DAN KORELASI
Korelasi SPT Korelasi cu (undrained shear strength)
Terzaghi dan Peck (1967) memberikan deskripsi kualitas hubungan antara nilai SPT Kuat geser tanah lempung dalam kondisi undrained dapat dikorelasikan
dengan kerapatan relatif pada tanah dasar. Berikut merupakan korelasi nilai SPT dengan nilai N-SPT hasil uji lapangan. Terzaghi bersama beberapa peneliti
dengan kerapatan relatif tanah. lain mengeluarkan hubungan antara cu dan N-SPT sebagai berikut.
Peck (1996) memberikan persamaan dan grafik korelasi antara nilai N-SPT dengan
Burt Look (2007) memberikan korelasi antara jenis tanah dengan berat
sudut geser dalam (𝜙) untuk tanah pasir. Grafik dan persamaan korelasi dapat dilihat
volumenya sebagai berikut:
pada gambar sebagai berikut.
Tabel Korelasi Berat Volume dengan Jenis Tanah
Menurut Bowles, 1986 dan U.S Army 1994 modulus elastisitas dapat dikorelasikan
Angka poisson ratio menurut Bowles, 1986 dapat dikorelasikan sebagai
sebagai berikut:
berikut.
Q u = Qs + Q p
dengan:
Setelah kapasitas daya dukung ultimit telah dihitung dari penjumlahan tahanan geser
selimut dengan tahanan ujung tiang. Maka perlu diperhitungkan safety factor untuk
mengetahui besarnya beban yang diijinkan untuk diterima oleh pile.
Q
Q = ult
all SF
dengan:
Qall : Kapasitas daya dukung ijin maksimum yang diterima oleh satu tiang
SF : Faktor keamanan yang sudah mempertimbangkan pengaruh likuifaksi. Berikut nilai SF untuk kondisi:
SF Tekan : 3 SF Tekan : 2
Statik Gempa
SF Tarik : 3.5 SF Tarik : 2.33
PERHITUNGAN FONDASI P3
Logger : Rendi Alif Inclination : 900 63.5 kg Y = 966241.988 Logger : Rendi Alif Inclination : 900 63.5 kg Y = 9662201.85
Approved : Khadavi Cassing Diameter : 8.4 cm SPT Hammer Elevation : 6.00 (mdpl) = UDS Approved : Khadavi Cassing Diameter : 8.4 cm SPT Hammer Elevation : 6.00 (mdpl) = UDS
Dropping Distc : 76 cm Manual GWL : m = DS Dropping Distc : 76 cm Manual GWL : m = DS
Automatic Total depth : 30.00 m = Water Table Automatic Total depth : 30.00 m = Water Table
CONSISTENSY
CONSISTENSY
Type of Sample
Type of Sample
THICKNESS-m
THICKNESS-m
AND DENSITY
AND DENSITY
Blows Peneration
DEPTH (m)
Blows Peneration
DEPTH (m)
DATE
DATE
NSPT GRAPHIC NSPT GRAPHIC
LOG
LOG
SOIL DESCRIPTION each NSPT CORE BOX SOIL DESCRIPTION each NSPT CORE BOX
15 cm 15 cm
1st 2nd 3rd 0 10 20 30 40 50 60 1st 2nd 3rd 0 10 20 30 40 50 60
0.0 0.0
-0.5 -0.5
Test Pit
Test Pit
-1.0 -1.0
-1.5 -1.5
-2.0 -2.0
-2.5 -2.5
-3.0 -3.0
-3.5 -3.5
-4.0 SPT -4.0 SPT
-4.5 -4.5
-5.0 -5.0
-5.5 -5.5
-6.0 SPT -6.0 SPT
-8.5 -8.5
-9.0 -9.0
-9.5 -9.5
-10.0 SPT -10.0 SPT
-10.5 -10.5
-11.0 -11.0
-11.5 -11.5
PASIR
4.0
seragam, abu-abu dan coklat muda
-12.5 -12.5
-13.0 -13.0
-13.5 -13.5 LONGGAR
1.0
PASIR
lembab, abu-abu kecoklatan
-15.0 -15.0
LANAU BERPASIR
-15.5 -15.5
LEMPUNG SANGAT LUNAK,
-16.0 SPT 3 3 3 6 -16.0 SPT KEPASIRAN bewarna abu-abu 2 2 2 4
-16.5 -16.5
3.0
AGAK KAKU, abu-abu kecoklatan
-17.0 -17.0
-17.5 -17.5
LEMPUNG
-18.0 SPT 5 7 9 16 -18.0 SPT 6 8 12 20
CUKUP KERAS, bewarna abu-abu
-18.5 -18.5 kecoklatan
-19.0 -19.0
-19.5 -19.5
-20.0 SPT 5 10 15 25 -20.0 SPT 9 11 20 31
-20.5 -20.5
LEMPUNG
-21.0 -21.0 CUKUP KERAS sampai SANGAT
-21.5 -21.5 KERAS, bewarna abu-abu
Cuaca Cerah Berawan ….4 Desember 2020
kecoklatan
-22.0 SPT 7 13 15 28 -22.0 SPT 15 24 32 56
10.0
-23.0 -23.0
PADAT, butiran sedang seragam,
-23.5 lembab, abu-abu kecoklatan -23.5
-24.0 SPT 6 9 13 22 -24.0 SPT 15 25 38 >60
-24.5 -24.5
-25.0 -25.0
-25.5 -25.5
SANGAT PADAT pada kedalaman
-26.0 SPT 8 14 15 29 -26.0 SPT 23.00 - 24.00 m, abu-abu dan 10 15 15 30
PASIR
-26.5 -26.5 lembab, pada kedalaman > 26.00
PADAT bewarana abu-abu
-27.0 -27.0
kehitaman, berbutir kasar
-27.5 -27.5
-28.0 SPT 9 18 24 42 -28.0 SPT 8 15 20 35
-28.5 -28.5
PADAT, butiran halus, basah abu-
PASIR
-29.0 -29.0
2.0
PASIR
-33.5
SANGAT PADAT, lembab, butiran
-34.0 SPT sedang bewarna abu-abu 20 25 28 53
-34.5
-35.0
-35.5
-36.0 SPT 52 >60 >60
-36.5
-37.0
-37.5
-38.0 SPT >60 >60
NAVAL
-38.5 SANGAT KERAS, abu-abu
kecoklatan
-39.0
-39.5
-40.0
PERHITUNGAN FONDASI P3
BH-07
Soil Layer – BH 7 Depth
[m]
Jenis Tanah
N - SPT
[bl ows /30 cm]
Konsistensi N-SPT
0 10 20 30 40 50 60 70
FREE STANDING 10 M 0 0
0 Pasir 0 2 3
2 Pasir 3 Very loose 4 6
4 Pasir 6 Loose 6 6
6 Lempung 6 Medium Stiff
Depth [m]
8 16
8 Lempung 16 Very Stiff 10 25
Frestanding 10 m 10 Pasir 25 Medium Dense 12 28
12 Pasir 28 Medium Dense 14 22
LONGITUDINAL 14 Pasir 22 Medium Dense 16 29
16 Pasir 29 Medium Dense 18 42
18 Pasir 42 Dense 20 32
20 Pasir 32 Dense 22 55
22 Pasir 55 Very Dense 24 60
24 Lempung 60 Very Hard 26 60
26 Lempung 60 Very Hard 28 60
28 Lempung 60 Very Hard 30 60
30 Lempung 60 Very Hard
Depth γ Cu ɸ k
Layer Soil Type E50
Top (m) Bottom (m) kN/m3 kN/m2 [⁰] kN/m3
1 10 12 Sand (Reese) 4 - 21 5430 -
2 12 14 Sand (Reese) 5.0 - 23.49 5430 -
3 14 16 Stiff Clay w/free water 5 30 - 54300 0.01
4 16 18 Stiff Clay w/free water 6 80 - 108500 0.005
5 18 26 Sand (Reese) 6.75 - 32.64 16300 -
6 26 30 Sand (Reese) 7.5 - 36.02 33900 -
7 30 32 Sand (Reese) 10 - 40.49 33900 -
8 32 40 Stiff Clay w/free water 10 250 - 217000 0.004
PERHITUNGAN FONDASI P3
Parameter fondasi Konfigurasi fondasi Input parameter fondasi pada Group
Pondasi P3
2251
Nx Qy Qz Mx My Mz YL (LONGITUDINAL)
MINNx -62296 -214 -4 1885 43 -25222
MINQy -50810 -25146 -6067 -5837 38770 -124721
MINQz -51168 3939 -19752 -21376 132781 -29735
MINMx -52543 3907 -19509 -30076 121512 -15051
MINMy -51235 -9105 19632 24393 -132283 -49540
MINMz -50895 -24945 -6058 -8101 37542 -162870 ZL (TRANSVERSAL)
ULS.sup
MAXNx -49359 -24708 6635 9659 -43306 -137846
MAXQy -51594 19980 5948 8854 -38272 45446
MAXQz -51235 -9105 19632 24393 -132283 -49540
MAXMx -49949 -9059 19390 33093 -121013 -66035
XL (VERTIKAL)
MAXMy -51168 3939 -19752 -21376 132781 -29735
MAXMz -56200 -1415 2 1903 -86 104165
PEMBEBANAN P3
Gaya gaya yang bekerja (pembebanan dari struktur untuk kondisi eksisting)
setelah di tambah berat pile cap
FX FY MZ FZ MY MX
LOAD CASE
KN KN KN-m KN KN-m KN-m
13.MINNx 109152.3 -214.0 -25222.0 -4.0 43.0 1885.0
14.MINQy 97666.3 -25146.0 -124721.0 -6067.0 38770.0 -5837.0
15.MINQz 98024.3 3939.0 -29735.0 -19752.0 132781.0 -21376.0
16.MINMx 99399.3 3907.0 -15051.0 -19509.0 121512.0 -30076.0
17.MINMy 98091.3 -9105.0 -49540.0 19632.0 -132283.0 24393.0
18.MINMz 97751.3 -24945.0 -162870.0 -6058.0 37542.0 -8101.0
19.MAXNx 96215.3 -24708.0 -137846.0 6635.0 -43306.0 9659.0
20.MAXQy 98450.3 19980.0 45446.0 5948.0 -38272.0 8854.0
21.MAXQz 98091.3 -9105.0 -49540.0 19632.0 -132283.0 24393.0
22.MAXMx 96805.3 -9059.0 -66035.0 19390.0 -121013.0 33093.0
23.MAXMy 98024.3 3939.0 -29735.0 -19752.0 132781.0 -21376.0
24.MAXMz 103056.3 -1415.0 104165.0 2.0 -86.0 1903.0
REAKSI PONDASI P3
Reaksi fondasi beban SLS Reaksi fondasi beban ULS
Reaksi Reaksi
Kombinasi Pembebanan Kombinasi Pembebanan
Pondasi [kN] Pondasi [kN]
1.MINNx 3195.8 13.MINNx 3802.7
2.MINQy 3004.1 14.MINQy 4570.9
3.MINQz 3633.0 15.MINQz 4257.3
4.MINMx 3322.2 16.MINMx 4250.0
5.MINMy 3627.5 17.MINMy 4130.9
6.MINMz 3664.0 18.MINMz 4295.0
SLS ULS
7.MAXNx 3007.9
19.MAXNx 4402.5
8.MAXQy 3049.6 20.MAXQy 4665.6
9.MAXQz 3627.5 21.MAXQz 4130.9
10.MAXMx 3102.1 22.MAXMx 4024.2
11.MAXMy 3633.0 23.MAXMy 4257.3
12.MAXMz 3627.5 24.MAXMz 4252.3
Diagram reaksi aksial pondasi SLS Diagram reaksi aksial pondasi ULS
SLS ULS
Allowable Kapasitas Allowable Kapasitas
Kontrol Nilai Maksimum [kN] Kontrol Nilai Maksimum [kN]
Statis [kN] Gempa [kN]
Aksial Tekan 3664.0 4570.5 EXTREME 4665.6 6855.8
REKAP PONDASI MAIN SPAN
2. Analisa Penurunan Pondasi
PENURUNAN PONDASI
PENURUNAN PONDASI
PENURUNAN PONDASI Q
Q
1
4
2/3 of pile 4
length
2/3 of pile
length
qn
qn
[Sand]
[Clay]
[Sand]
1 4
2/3 of pile
length
4
2/3 of pile
length
qn
qn
[Clay]
[Sand]
[Clay]
Struktur: P2 P3 P4 P5
Immediate Settlement
13.07 9.78 14.30 3.38
(mm):
D Immediate Settlement
3.28 4.52 10.92
(mm):
Penurunan Konsolidasi
0.70 5.46 2.37 3.61
(mm):
Total Penurunan (mm): 13.76 15.25 16.67 6.99
Parameter Dolphin
Type fondasi : Steel pipe
Jumlah tiang/Dolphin : 8
Jumlah Dolphin :6
Diameter/tebal : 812.8 mm/12 mm
Panjang fondasi : 30 m
DESAIN DOLPHIN
Gaya akibat tumbukan kapal
Menurut SNI Pembebanan, gaya akibat tumbukan kapal dijelaskan sebagai berikut:
1 Parameter Kapal
Tonase berat mati muatan kapal (asumsi) DWT = 100 t
DWT = 1000 kN
Kecepatan tumbukan kapal (asumsi) V = 5 knot
V = 2.572 m/s
2 Gaya tumbukan kapal Ps = 1016.67 kN
River Bed
• Technical Data
- Type of Foundation : Bored Pile Deep Foundation
- Materal : Reinforced Concrete
- Concrete compressive strength : 30 MPa
- Pile Diameter : 1.5 meter
- Pile Configuration : 5L x 6T (both P3 and P4)
SSI
• Modelling
ANALISIS NILAI KONSTANTA SPRING
(CONTOH: PIER P4)
Model SSI dari struktur Grafik defleksi vs kedalaman (didapatkan dari hasil model SSI)
ANALISIS NILAI KONSTANTA SPRING
(CONTOH: PIER P4)
4. Menentukan nilai k1
• Nilai defleksi yang didapatkan dari SSI diiterasi Kembali ke grafik p-y untuk mendapatkan nilai k1
Contoh pada panjang tiang 19 m
0.004
ANALISIS NILAI KONSTANTA SPRING (CONTOH: PIER P4)
5. Iterasi dilakukan sampai perbedaan nilai k < 10 %
P4 Berikut hasil iterasi pada panjang tiang 19 m, Pada iterasi ini nilai k1, k2, k3, K4, K5, K6 &
Depth k1 k2 k3 k4 k5 k6 k7 k7 sudah dibawah 10 % atau berdekatan.
m kN/m kN/m kN/m kN/m kN/m kN/m kN/m
Freestanding
Depth Iterasi dihentikan sampai
13 294.1169 321.4867 354.2108 380.2914 393.6303 399.3736 400.4396 k1 k2 k3 k4 k5 k6 k7
(m) garfik (k) berdekatan atau
14 1025.676 1121.245 1227.544 1311.281 1355.688 1375.217 1379.349
% % % % % % dibawah 10 %
15 1332.949 1447.273 1595.039 1720.6 1780.668 1807.07 1813.387
19 3.8 9.1 8.0 4.7 1.8 0.6
16 9194.569 10270.51 11524.98 12450.96 12907.17 13118.65 13175.48
17 18342.31 21927.25 27532.88 32280.22 34728.2 35901.72 36237.21
18 42925.25 47927.29 56023.51 63193.86 67181.07 69094.57 69731.26
19 92662.62 96354.02 105997 114516.2 120110.2 122281.4 122977.3
20 198365.7 191798.9 197997.6 206381.3 209408.8 211195.1 211963.1
k0
keterengan
21 289426 289426 289426 289426 289426 289426 289426
k0
22 73471.67 139713.4 189660.2 204823.8 204728.7 202188.5 199764.9 k1
23 70222.46 111407.7 140388.7 156488.6 162873.7 165062.1 165181.7 k2
24 52518.94 72473.34 85222.18 93282.96 97360.43 99105.85 99531.84 k3
25 48891.38 69694.32 82484.55 90951.87 95726.37 97958.79 98640.49 k4
K5
26 60374.37 86760.26 99391.53 107830.1 112933.9 115462.7 116326.6
K6
27 82687.58 124020.7 150865.5 168522.9 179798.9 185647.9 187801.9 k7
28 108568.7 157575.4 157575.4 157575.4 157575.4 157575.4 157575.4
29 128165.5 167423.8 167423.8 167423.8 167423.8 167423.8 167423.8
30 160143.7 367915.1 368682.8 368682.8 368682.8 368682.8 368682.8
31 219055.2 389165.2 389165.2 389165.2 389165.2 389165.2 389165.2
32 270419.1 409647.6 409647.6 409647.6 409647.6 409647.6 409647.6
33 430130 430130 430130 430130 430130 430130 430130
34 450612.3 450612.3 450612.3 450612.3 450612.3 450612.3 450612.3
35 471094.7 471094.7 471094.7 471094.7 471094.7 471094.7 471094.7
36 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3 Dari semua iterasi pada table di atas,
37 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3 nilai spring yang digunakan untuk analisis SSI adalah nilai k7
38 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3 310099.3
RESUME SOIL SPRING Depth*
P2 P3 P4
K-long K-trans K-long K-trans K-long K-trans
P2 P3 P4 P5 (m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
Depth*
K-long K-trans K-long K-trans K-long K-trans K-long K-trans 0 0.00 0.00
(m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) -1 743.60 743.60
0 0.00 0.00 0.00 0.00 -2 880.79 880.79
-1 743.60 743.60 514.73 514.73 -3 1037.76 1037.76
-2 880.79 880.79 611.78 611.78 -4 1221.66 1221.66
-3 1037.76 1037.76 720.43 720.43 -5 1442.44 1442.44 Free Standing
-4 1221.66 1221.66 845.55 845.55 -6 1708.89 1708.89 Free Standing
-5 1442.44 1442.44 Free Standing 1362.09 1362.09 -7 2026.64 2026.64
-6 1708.89 1708.89 Free Standing 1382.65 1382.65 -8 2435.78 2435.78
-7 2026.64 2026.64 1935.80 1935.80 -9 5796.32 5796.32
-8 2435.78 2435.78 3185.72 3185.72 -10 7344.67 7344.67
-9 5796.32 5796.32 4631.19 4631.19 -11 11177.38 11177.38 79.57 79.57
-10 7344.67 7344.67 6019.00 6019.00 -12 16702.04 16702.04 245.33 245.33
-11 11177.38 11177.38 79.57 79.57 8669.90 8669.90 -13 24764.61 24764.61 587.25 587.25 400.44 400.44
-12 16702.04 16702.04 245.33 245.33 12413.97 12413.97 -14 37003.01 37003.01 127.68 127.68 1379.35 1379.35
-13 24764.61 24764.61 587.25 587.25 400.44 400.44 6986.85 6986.85 -15 56802.84 56802.84 294.02 294.02 1813.39 1813.39
-14 37003.01 37003.01 127.68 127.68 1379.35 1379.35 8319.26 8319.26 -16 85403.66 85403.66 316.30 316.30 13175.48 13175.48
-15 56802.84 56802.84 294.02 294.02 1813.39 1813.39 9505.60 9505.60 -17 181918.34 181918.34 550.24 550.24 36237.21 36237.21
-16 85403.66 85403.66 316.30 316.30 13175.48 13175.48 10546.51 10546.51 -18 210954.60 210954.60 3151.01 3151.01 69731.26 69731.26
-17 181918.34 181918.34 550.24 550.24 36237.21 36237.21 11418.74 11418.74 -19 222674.29 222674.29 5411.10 5411.10 122977.26 122977.26
-18 210954.60 210954.60 3151.01 3151.01 69731.26 69731.26 12214.26 12214.26 -20 234394.00 234394.00 8135.10 8135.10 211963.15 211963.15
-19 222674.29 222674.29 5411.10 5411.10 122977.26 122977.26 69864.29 69864.29 -21 246113.71 246113.71 11528.69 11528.69 289426.00 289426.00
-20 234394.00 234394.00 8135.10 8135.10 211963.15 211963.15 145949.89 145949.89 -22 257833.40 257833.40 18429.90 18429.90 199764.93 199764.93
-21 246113.71 246113.71 11528.69 11528.69 289426.00 289426.00 511856.11 511856.11 -23 269553.09 269553.09 29294.65 29294.65 165181.72 165181.72
-22 257833.40 257833.40 18429.90 18429.90 199764.93 199764.93 536230.17 536230.17 -24 281272.81 281272.81 47328.65 47328.65 99531.84 99531.84
-23 269553.09 269553.09 29294.65 29294.65 165181.72 165181.72 560604.31 560604.31 -25 369019.17 369019.17 79254.27 79254.27 98640.49 98640.49
-24 281272.81 281272.81 47328.65 47328.65 99531.84 99531.84 584978.39 584978.39 -26 369019.17 369019.17 127496.01 127496.01 116326.59 116326.59
-25 369019.17 369019.17 79254.27 79254.27 98640.49 98640.49 609352.50 609352.50 -27 350643.98 350643.98 187801.89 187801.89
-26 369019.17 369019.17 127496.01 127496.01 116326.59 116326.59 -28 363492.04 363492.04 157575.37 157575.37
-27 350643.98 350643.98 187801.89 187801.89 -29 368596.12 368596.12 167423.82 167423.82
-28 363492.04 363492.04 157575.37 157575.37 -30 410569.87 410569.87 368682.83 368682.83
-29 368596.12 368596.12 167423.82 167423.82 -31 433148.44 433148.44 389165.23 389165.23
-30 410569.87 410569.87 368682.83 368682.83 -32 312275.42 312275.42 409647.60 409647.60
-31 433148.44 433148.44 389165.23 389165.23 -33 312275.42 312275.42 430129.97 430129.97
-32 312275.42 312275.42 409647.60 409647.60 -34 312275.42 312275.42 450612.35 450612.35
-33 312275.42 312275.42 430129.97 430129.97 -35 312275.42 312275.42 471094.74 471094.74
-34 312275.42 312275.42 450612.35 450612.35 -36 312275.42 312275.42 310099.28 310099.28
-35 312275.42 312275.42 471094.74 471094.74 -37 312275.42 312275.42 310099.28 310099.28
-36 312275.42 312275.42 310099.28 310099.28 -38 312275.42 312275.42 310099.28 310099.28
-37 312275.42 312275.42 310099.28 310099.28
-38 312275.42 312275.42 310099.28 310099.28 * The depth is from bottom pile cap
scouring. -16
-17
-18
Berdasarkan hasil analisa, aksial tarik pada -19
tiang dapat menyebabkan ratio tulangan -20
membesar hingga kedalaman yang sudah -21
-22
memiliki momen yang relatif kecil. -23
-24
Tulangan bored pile akan dioptimasi -25
174%
-26
berdasarkan kedalaman. Dengan susunan -27
(38 D32)
sebagai berikut: -28
-29
0-5m : 4% -30
-31
5 - 22 m :3% -32
-33
0.5%
-34
22 - 29 m : 1.74 % -35
(12 D32)
-36
29 - 38 m : 0.5 % -37
Pile Toe -38
SSI
BORED PILE REINFORCEMENT
Diagram interaksi bored pile dengan ratio tulangan 4% (88 D32) untuk kedalaman 0-5m
SSI
BORED PILE REINFORCEMENT
Minimum φMn/Mu dengan ratio tulangan 4% (88 D32) untuk kedalaman 0-5m
SSI
BORED PILE REINFORCEMENT
Diagram interaksi bored pile dengan ratio tulangan 3% (66 D32) untuk kedalaman 5-22m
SSI
BORED PILE REINFORCEMENT
Minimum φMn/Mu dengan ratio tulangan 3% (66 D32) untuk kedalaman 5-22m
SSI
BORED PILE REINFORCEMENT
Diagram interaksi bored pile dengan ratio tulangan 1.74% (38 D32) untuk kedalaman 22-29m
SSI
BORED PILE REINFORCEMENT
Minimum φMn/Mu dengan ratio tulangan 1.74% (38 D32) untuk kedalaman 22-29m
SSI
BORED PILE REINFORCEMENT
Diagram interaksi bored pile dengan ratio tulangan 0.5% (12 D32) untuk kedalaman 29-38m
SSI
BORED PILE REINFORCEMENT
Minimum φMn/Mu dengan ratio tulangan 0.5% (12 D32) untuk kedalaman 29-38m
5. Desain Pile Cap
DESAIN PILE CAP
• Model
- Analisa FEM pilecap menggunakan software SAP2000, dimodelkan sebagai elemen thick shell
- Beban pada pilecap berupa gaya aksial pile, output dari GROUP, menggunakan kombinasi ULS
- Output momen yang terjadi pada pilecap untuk menghitung kebutuhan tulangan pada pilecap
- Pengecekan punching shear
P2 P3 P4 P5
DESAIN PILE CAP
L = 6.544m
L = 25m
DESAIN PILE CAP
6. Analisis Pier
ANALISIS PIER
• Cek Kelangsingan Pier
Vn = 16562 kN
Vr = 14905 kN
Vu = 3291 kN < Vr
Av = 22500 mm2
(D19-100 pada setiap sisi pier)
ANALISIS PIER
7. Beam-Column Joint
BEAM-COLUMN JOINT
BEAM-COLUMN JOINT
BEAM-COLUMN JOINT
8. Analisis Longitudinal Box Girder
KAPASITAS LENTUR BOX
• Tulangan Longitudinal
L =
Segmen Box Typical
Box Propereties
Ag = 13768000 mm2
I = 6.5337E+13 mm4
yt = 2746 mm
yb = 2779 mm
3
Sc top = 23793517844 mm
3
Sc bot = 23510975171 mm
bv = 6000 mm
2
A0 = 11425381.25 mm
tslab top = 250 mm
tslab bot = 250 mm
bw = 1600 mm
h = 5525 mm
hf = 250 mm
KAPASITAS LENTUR BOX
• Tulangan Longitudinal
Concrete properties
fc' = 41.5 MPa
β1 = 0.754
Momen Capacity
a a
M n = Aps bonded f pu bonded d p bonded − + Aps unbonded f pu unbonded d p unbonded − (5.7.3.2.2-1)
2 2
Trotoar
A : 0.279 m2
L : 1m
γconcrete : 24 kN/m3
SDL-Tr : 6.696 kN
ANALISIS TRANSVERSAL BOX GIRDER
L= 5m
P P.c Ptot M q
Axle No. c FBD (1/8π)
(kN) (kN) (kN) (kNm) (kN/m)
1 112.5 6 675 1.3 877.50 0.0398 34.932 33.535
2 112.5 0.880 99 1.3 128.70 0.0398 5.123 4.918
3 112.5 0.15 16.88 1.3 21.938 0.0398 0.873 0.838
4 112.5 0.13 14.63 1.3 19.013 0.0398 0.757 0.727
5 112.5 0.2 22.5 1.3 29.25 0.0398 1.164 1.118
6 112.5 0.1 11.25 1.3 14.625 0.0398 0.582 0.559
7 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
8 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
9 25 0.100 2.5 1.3 3.25 0.0398 0.129 0.124
Total 846.750 1100.775 43.821 42.068
L= 5m
P P.c Ptot M q
Axle No. c FBD (1/8π)
(kN) (kN) (kN) (kNm) (kN/m)
1 112.5 0.1 11.25 1.3 14.63 0.0398 0.582 0.559
2 112.5 1.00 112.5 1.3 146.25 0.0398 5.822 5.589
3 112.5 1.00 112.5 1.3 146.250 0.0398 5.822 5.589
4 112.5 0.1 11.25 1.3 14.625 0.0398 0.582 0.559
5 112.5 0.1 11.25 1.3 14.63 0.0398 0.582 0.559
6 112.5 0.15 16.88 1.3 21.938 0.0398 0.873 0.838
7 112.5 0.15 16.88 1.3 21.94 0.0398 0.873 0.838
8 112.5 0.1 11.25 1.3 14.63 0.0398 0.582 0.559
9 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
10 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
11 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
12 25 0.1 2.5 1.3 3.25 0.0398 0.129 0.124
Total 313.750 407.875 16.237 15.588
3. LL Interior (-)
L= 5m
P P.c Ptot M q
Axle No. c FBD (1/8π)
(kN) (kN) (kN) (kNm) (kN/m)
1 112.5 8.00 900 1.3 1170.00 0.0398 46.576 22.357
2 112.5 5.85 658.1 1.3 855.56 0.0398 34.059 16.348
3 112.5 3.70 416.3 1.3 541.125 0.0398 21.542 10.340
4 112.5 0.35 39.38 1.3 51.188 0.0398 2.038 0.978
5 112.5 0.10 11.25 1.3 14.63 0.0398 0.582 0.279
6 112.5 0.20 22.5 1.3 29.250 0.0398 1.164 0.559
7 112.5 0.20 22.5 1.3 29.25 0.0398 1.164 0.559
8 112.5 0.10 11.25 1.3 14.63 0.0398 0.582 0.279
9 25 0.10 2.5 1.3 3.25 0.0398 0.129 0.062
10 25 0.10 2.5 1.3 3.25 0.0398 0.129 0.062
11 25 0.10 2.5 1.3 3.25 0.0398 0.129 0.062
12 25 0.10 2.5 1.3 3.25 0.0398 0.129 0.062
Total 2091 2719 108.226 51.948
4. Cantilever
1750
750
250
2500
L= 2.5 m
P P.c Ptot M q
Axle No. c FBD (1/8π)
(kN) (kN) (kN) (kNm) (kN/m)
1 112.5 8.602 967.8 1.3 1258.10 0.0398 50.084 16.027
Total 967.8 1258.10 50.084 16.027
FBD
1.3 M = 1/8π x FBD x P q = 2M/L2
=
ANALISIS TRANSVERSAL BOX GIRDER
Crack Check
Analysis Resume
It is necessary to check the crack in the cantilever section if it exceeds 8ft or 2.4m. in length
Table. Load (q) resume for box girder transversal analysis Based on reinforcement analysis, note the following data:
q h = 600mm = 23.62in
No. Section Es = 2E+05MPa = 29007.6ksi
(kN/m) D = 2 x 16mm = 2 x 0.63in
Reinforcement Analysis
dc
● β = 1 +
1( h - dc )
Par Unit Rebar Calculation = 1.12
Joint: 40
Joint: 41
Joint: 42
3h. Pada Pushover analysis, pada model confined beton perlu diturunkan puncak dari kurva tegangan vs regangan confined beton tersebut. Dan, pada dynamic
properties dari struktur jembatan, perlu diperiksa apakah mode 1 benar ke arah transversal (cek boundary condition tumpuan). Oleh karena itu pushover analysis
mencakup sbb
i. Kuat tekan beton confined sebaiknya dibatasi maksimal 1.2x kuat tekan beton unconfined untuk pier. Untuk pile menggunakan persamaan Mander
ii. Capacity curve sebaiknya ditetapkan berdasarkan satu titik control
iii. Beban pushover diusulkan agar menggunakan pendekatan modal atau percepatan
iv. Titik kinerja untuk arah longitudinal/transversal terkesan belum konsisten
v. Kinerja harus ditinjau baik pada struktur global maupun elemen struktur individu jembatan yang memperlihatkan perilaku plastis
vi. Pengaruh massa pilecap belum terlihat dalam perhitungan pushover
vii. Kapasitas pondasi jembatan perlu diplot pada grafik kinerja yang dihasilkan.
viii. Kurva backbone mengacu pada NCHRP-440
PUSHOVER ANALYSIS
Karena beberapa data tulangan memiliki konfigurasi yang sama antara satu dan yang lain maka properties elemen dapat dikelompokkan menjadi
beberapa tipikal sebagai berikut.
1. BP25-1 5. BP34-1 9. P2
2. BP25-2 6. BP34-2 10. P3
3. BP25-3 7. BP34-3 11. P4
4. BP25-4 8. BP34-4 12. P5
PUSHOVER ANALYSIS
B. Kapasitas Material
1. BP25
Grafik kapasitas beton confined BP25-1 Grafik kapasitas beton confined BP25-2 Grafik kapasitas beton confined BP25-3 Grafik kapasitas beton confined BP25-4
PUSHOVER ANALYSIS
B. Kapasitas Material
2. BP34
Grafik kapasitas beton confined BP25-1 Grafik kapasitas beton confined BP34-2 Grafik kapasitas beton confined BP34-3 Grafik kapasitas beton confined BP34-4
PUSHOVER ANALYSIS
B. Kapasitas Material
3. Pier
Grafik kapasitas beton confined P2 Grafik kapasitas beton confined P3 Grafik kapasitas beton confined P4 Grafik kapasitas beton confined P5
PUSHOVER ANALYSIS
B. Kapasitas Material
13. Kapasitas Beton Unconfined
Grafik beton unconfined BP25-1, BP25- Grafik kapasitas beton unconfined P2, Grafik tegangan-regangan baja
2, BP25-3, BP25-4, BP34-1, BP34-2, P3, P4 dan P5 tulangan BP25-1, BP25-2, BP25-3,
BP34-3 dan BP34-4 BP25-4, BP34-1, BP34-2, BP34-3,
BP34-4, P2, P3, P4 dan P5
PUSHOVER ANALYSIS
C. Analisis
• Kategori leleh elemen mengacu pada NCHRP-440
PUSHOVER ANALYSIS
C. Analisis
Acuan untuk kurva backbone :
PUSHOVER ANALYSIS
C. Analisis
Dengan penerapan pada aplikasi struktur sebagai berikut.
C. Analisis
Dengan penerapan pada aplikasi struktur sebagai berikut.
C. Analisis
Dengan penerapan pada aplikasi struktur sebagai berikut.
C. Analisis
Dengan penerapan pada aplikasi struktur sebagai berikut.
C. Analisis
Beberapa asumsi yang digunakan pada analisis adalah sebagai berikut:
a. Mode -1
- Arah beban : dominan longitudinal jembatan (+).
- Tipe beban : modeshape : mode 1
- Titik tinjau : tengah bentang midspan
PUSHOVER ANALYSIS
C. Analisis
Beberapa asumsi yang digunakan pada analisis adalah sebagai berikut:
b. Mode - 2
- Arah beban : dominan transversal jembatan (+).
- Tipe beban : modeshape : mode 2
- Titik tinjau : tengah bentang midspan
PUSHOVER ANALYSIS
C. Analisis
Titik tinjau pada posisi tengah bentang mid span
Untuk kepentingan analisa pushover, maka di perlukan informasi mengenai kapasitas pilar yang akan
ditinjau. Informasi kapasitas pilar tersebut terekap dalam bentuk diagram interaksi P-M.
a. BP25-1
Penampang pile BP25-1 Diagram interaksi pilar BP25-1 untuk Diagram momen-curvatur pilar BP25-1
momen sumbu Y serta Z untuk momen sumbu Y serta Z
PUSHOVER ANALYSIS
Panjang sendi plastits didapat mengikuti ketentuan yang tertera pada SNI 2833:2016
Perencanaan Ketahanan Gempa Untuk Jembatan” dengan formulasi sebagai berikut :
LP = 0.74 m
e. BP34-1
Penampang pile BP34-1 Diagram interaksi pilar BP34-1 untuk Diagram momen-curvatur pilar BP34-1
momen sumbu Y serta Z untuk momen sumbu Y serta Z
PUSHOVER ANALYSIS
Panjang sendi plastits didapat mengikuti ketentuan yang tertera pada SNI 2833:2016
Perencanaan Ketahanan Gempa Untuk Jembatan” dengan formulasi sebagai berikut :
LP = 0.74 m
i. P2 dan P5
i. P2 dan P5
Panjang sendi plastits didapat mengikuti ketentuan yang tertera pada SNI 2833:2016
Perencanaan Ketahanan Gempa Untuk Jembatan” dengan formulasi sebagai berikut :
LP = 0.66 m
PUSHOVER ANALYSIS
j. P3 dan P4
Panjang sendi plastits didapat mengikuti ketentuan yang tertera pada SNI 2833:2016
Perencanaan Ketahanan Gempa Untuk Jembatan” dengan formulasi sebagai berikut :
LP = 0.85 m
PUSHOVER ANALYSIS
Performance Based Design adalah suatu metodologi dimana kriteria struktur diekspresikan untuk mencapai tujuan kinerja struktur pada saat terjadi gempa kuat
(ATC-40). Definisi Tujuan Kinerja Struktur adalah pencapaian level kinerja struktur yang ditentukan oleh deformasi struktur dibawah beban gempa yang ditentukan
oleh maksimum perpindahan struktur dan elemen struktur yang dapat diterima dengan besaran beban gempa kuat yang ditinjau. Level Kinerja adalah pembatasan
derajat kerusakan yang ditentukan oleh kerusakan fisik struktur dan elemen struktur sehingga tidak membahayakan keselamatan pengguna (Budiono, 2009).
Beberapa langkah yang harus dilakukan dalam proses peninjauan level kinerja struktur ialah sebagai berikut:
Analisis
Gaya dalam pada pier :
Kombinasi Ultimate Statik
ULS6.sup : 1.3DL+2SDL+PT+CrSHr+1.8LL Kombinasi Ultimate Ekstrim
ULS10.sup: 1.3DL+2SDL+PT+CrSHr+0.3LL+EQ(R_Pier)
Akibat Gempa dengan Rpier Rlong = 3, Transv = 1.5
EQ_Pier.sup
Pier #Element Kombinasi Nx Qy Qz Mx My Mz Pier #Element Kombinasi Nx Qy Qz Mx My Mz Pier #Element Kombinasi Nx Qy Qz Mx My Mz
P3A 2201 MINNx -37589 -6434 -212 1 889 -17569 P3A 2201 MINNx -26369 -3052 361 -191 -4728 -8318 P3A 2201 MINNx -2478 2620 574 -193 -5656 8521
MINQy -23789 -6859 -213 2 933 -20340 MINQy -19299 -8364 231 -379 4798 -25820 MINQy 2292 -2620 445 -381 3863 -8520
MINQz -7739 -6044 -215 3 972 -19745 MINQz -19493 -4859 -3021 1390 23508 -14775 MINQz -576 748 -2807 1387 22566 2427
MINMx -37201 -6335 -212 1 897 -17288 MINMx -24461 -4910 1620 -1435 12525 -14374 MINMx -634 746 1834 -1437 11596 2418
MINMy -37589 -6434 -212 1 889 -17569 MINMy -23314 -6421 2590 -1382 -21639 -19266 MINMy 577 -748 2803 -1384 -22568 -2427
MINMz -23789 -6859 -213 2 933 -20340 MINMz -19113 -8363 260 -391 4688 -25822 MINMz 2478 -2620 474 -394 3752 -8521
MAXNx -7739 -6044 -215 3 972 -19745 MAXNx -16438 -8228 -788 196 6598 -25723 MAXNx 2478 -2620 -574 193 5656 -8521
MAXQy -21540 -5619 -214 3 928 -16974 MAXQy -23509 -2916 -659 384 -2928 -8220 MAXQy -2292 2620 -445 381 -3863 8520
MAXQz -37201 -6335 -212 1 897 -17288 MAXQz -23250 -6404 2593 -1385 -21636 -19219 MAXQz 576 -748 2807 -1387 -22566 -2427
MAXMx -7739 -6044 -215 3 972 -19745 MAXMx -18282 -6353 -2047 1440 -10653 -19620 MAXMx 634 -746 -1834 1437 -11596 -2418
MAXMy -8523 -5908 -215 3 976 -19227 MAXMy -19624 -4836 -3017 1387 23511 -14689 MAXMy -577 748 -2803 1384 22568 2427
MAXMz -21540 -5619 -214 3 928 -16974 MAXMz -23694 -2916 -687 396 -2817 -8219 MAXMz -2478 2620 -474 394 -3752 8521
2206 MINNx -35735 -6434 -212 1 -454 23218 2206 MINNx -24514 -3173 340 -196 -3094 11415 2206 MINNx -2477 2500 554 -198 -2670 -7703
MINQy -21934 -6859 -213 2 -418 23137 MINQy -17446 -8243 281 -383 2338 26812 MINQy 2291 -2500 495 -385 2756 7706
MINQz -5885 -6044 -215 3 -390 18566 MINQz -17638 -4893 -3003 1405 8011 16135 MINQz -576 714 -2789 1403 8423 -2208
MINMx -35347 -6335 -212 1 -445 22870 MINMx -22606 -4945 1761 -1448 8866 16862 MINMx -634 711 1974 -1450 9288 -2199
MINMy -35735 -6434 -212 1 -454 23218 MINMy -21374 -6386 -1067 1016 -9791 21325 MINMy 663 -714 -853 1014 -9367 2207
MINMz -6669 -5908 -215 3 -385 18224 MINMz -19483 -3085 -34 234 -3191 10580 MINMz -2290 2500 180 231 -2779 -7707
MAXNx -5885 -6044 -215 3 -390 18566 MAXNx -14585 -8107 -767 201 2257 26046 MAXNx 2477 -2500 -554 198 2670 7703
MAXQy -19686 -5619 -214 3 -426 18647 MAXQy -21654 -3037 -708 388 -3175 10650 MAXQy -2291 2500 -495 385 -2756 -7706
MAXQz -35347 -6335 -212 1 -445 22870 MAXQz -21396 -6370 2576 -1401 -8846 21269 MAXQz 576 -714 2789 -1403 -8423 2208
MAXMx -5885 -6044 -215 3 -390 18566 MAXMx -16428 -6318 -2188 1453 -9701 20542 MAXMx 634 -711 -1974 1450 -9288 2199
MAXMy -6669 -5908 -215 3 -385 18224 MAXMy -17856 -4871 640 -1012 8955 16080 MAXMy -663 714 853 -1014 9367 -2207
MAXMz -35735 -6434 -212 1 -454 23218 MAXMz -19747 -8172 -393 -229 2355 26825 MAXMz 2290 -2500 -180 -231 2779 7707
Momen pier saat performance 10261 kNm < Momen ULS (Statik, 20340 kNm maupun ekstrim, 25822 kNm)
PUSHOVER ANALYSIS
Analisis
Diagram interaksi Pier arah Transversal
PUSHOVER ANALYSIS
Analisis
Gaya dalam pada pier saat performance:
Momen pier saat performance 31083 kNm > Momen ULS (Statik, 978 kNm maupun ekstrim, 22568 kNm)
Kapasitas lentur pier arah transversal besar karena tipe wall-type pier
3D DRAWING
GAMBAR 3D DUPLIKASI JEMBATAN AIR OGAN III
GAMBAR 3D DUPLIKASI JEMBATAN AIR OGAN III
GAMBAR 3D DUPLIKASI JEMBATAN AIR OGAN III
Studi kasus : Elevated Concrete Precast Box Girder
OUTLINE
Pembebanan
Lokasi tipikal
yang dibahas
Lokasi yang ditinjau memiliki tipikal struktur single pier dan pier kantilever
Untuk tipe substruktur lain akan tetap diasistensikan ke KKJTJ kedepannya
327
REKAP TIPE STRUKTUR
No Struktur Tipe Struktur Zona Lebar (m) Span (m) Pier Pondasi
1 U-Girder Simple Span 1, 4 10.8 32 Single Pier Group pile
2 Double Box Precast Simple Span 0, 1 2x10.8 39, 40, 42, 47.6, 50 Single Pier Group pile
Group pile
Single Pier
Monopile
3 Single Box Precast Simple Span 0, 1, 4 10.8 40, 42, 45, 46, 50 Kantilever Group pile
Pilecap
Portal
Monopile
Spesial Span Balance Cantilever
4 1 10.8 49.872+80+52 Single Pier Pilecap
Box Precast hbox variable
Group pile
Single Pier
Monopile
5 Single Box Precast Simple Span 1-4 14.3 40, 43, 47 Kantilever Group pile
Group pile
Portal
Monopile
6 Single Box Precast Continuous Span 2 14.3 45+60+45 Single Pier Group pile
7 Baja 3 14.3 37+54+37 Single Pier Group pile
8 U-Girder Simple Span 3 14.3 25, 30, 32 Single Pier Group pile
9 Single Box Precast Continuous Span 4 14.3 40+52+40 Single Pier Group pile
10 Double Box Precast Simple Span 4 10.8+8.8 43.3, 47, 50 Single Pier Group pile 328
TIPE – TIPE STRUKTUR RAMP
No Struktur Tipe Struktur Zona Lebar (m) Span (m) Pier Pondasi
1 Timbunan 0 8.8 175 - -
2 U-Girder Simple Span 0 8.8 32, 40 Single Pier Group pile
Cast In Site/Precast
3 Slab On Pile Ramp Ancol 10.8 10 Multi-pile Multi-pile
Slab
Ramp Single Pier Group pile
4 U-Girder Simple Span 10.8 25, 30, 32, 37.5
Ancol Portal Pier Group pile
5 Single Box Precast Simple Span Ramp Ancol 10.8 42, 45, 46, 50 Single Pier Group pile
329
AREA PEMBANGUNAN AWAL STRUKTUR P28S
(EJ) – P35S (EJ)
330
KRITERIA DESAIN
STANDAR ACUAN
• Technical Report MCEER-11-0004, LRFD Based Analysis and Design Procedures for
Bridge Bearings and Seismic Isolators
STANDAR ACUAN
• CEB-FIP Model Code for Creep and Shrinkage, 2010.
• • CEB-FIP
STANDAR ACUAN
Bulletin 33 Durability of Post-Tensioning Tendon, 2005.
• CEB-FIP Bulletin 97 External Tendons for Bridges, 2020
• Peta Sumber dan Bahaya Gempa Indonesia Tahun 2017.
• SNI 8460:2017 Persyaratan Perancangan Geoteknik.
• SNI 4155:2008 Cara Uji Penetrasi Lapangan dengan SPT.
• Foundation Analysis and Design, 5th Ed, by Joseph E. Bowles 1997.
• Principles of Foundation Engineering, 7th Ed, by Braja M. Das 2011.
• Pile Design and Construction Practice, 1st Ed, by M. J. Tomlinson 1977.
• Pile Foundation in Engineering Practice. Prakash, and Sharma,1990.
STANDAR ACUAN
• Panduan Geoteknik 4 Desain dan Konstruksi 2002.
• • Soil
STANDAR ACUAN
Mechanics in Engineering Practice. by Terzaghi, K. and Peck, R. B. (1967).
• An Engineering Manual for Settlement Studies. by J.M. Duncan and A.L Buchignani
(1976).
• Ultimate Bearing Capacity of Piles Drive Into Loose Sand. by Hideaki Khisida (1967)
• A Contribution To The Settlement Analysis Of Foundations On Clay, Skempton, A. W. and
Bjerrum, L. 1957
• Drilled Shafts: Construction Procedures and Design Method, Michael W. O’Neil and
Lymon C.Reese.
• Stability of Natural Deposits During Earthquakes. Kenji, Ishihara. 1985
• Liquefaction Resistance of Soils:Summary Report from the 1996 NCEER and 1998
NCEER/NSD Workshops on Evaluation of Liquefaction Resistance of Soils. Oktober 2001
SERVICEABILITY CRITERIA
KUAT TEKAN BETON DAN TEBAL SELIMUT BETON
Compressive
No. Structure Concrete Cover (mm)
Strength fc’ (MPa)
• Tegangan tarik untuk box precast pada daerah joint atau pertemuan antar
segmen box tidak diperkenankan mengalami tegangan tarik (batas tegangan
tarik = 0 Mpa).
BATAS TEGANGAN TEKAN BETON PADA KONDISI
SERVIS
• Due to the sum of effective prestress, permanent loads 0.45f'c (ksi) = 2.61 ksi = 18.00 MPa
• Due to the sum of effective prestress, permanent loads, and transient loads and 0.60φwf'c (MPa) = 2.61 ksi = 24.00 MPa
during shipping and handling
BATAS TEGANGAN TARIK BETON PADA KONDISI
SERVIS
BATAS TEGANGAN BETON
Tegangan tarik untuk box precast pada daerah joint atau pertemuan
antar segmen box tidak diperkenankan mengalami tegangan tarik (batas
tegangan tarik = 0 Mpa).
BATAS TEGANGAN TARIK PRINCIPAL STRESS DI WEB
• The principal tensile stresses in webs 0.11λ√f'c (ksi) = 0.26 ksi = 1.83 MPa
343
MATERIAL PROPERTIES
PRESTRESS
• PRESTRESS
PROTEKSI TENDON
346
TINGKAT LEVEL AGRESIVITAS DAN EXPOSURE
• Table 1.3: Aggressivity level and exposure examples as entry points in Table 1.2 (after EN
206-1) Sumber CEB-FIP Bulletin 33 Table 1.3.
• Berdasarkan table diatas bahwa untuk proyek Harbour II Aggressivity Level Medium
347
PROTECTION LEVELS
348
PROTEKSI PADA TENDON
• Internal tendon : Protection Layer 1(PL1). Syarat daripada PL1 adalah proteksi
level satu, yaitu dengan menggunakan duct yang diisi dengan material tahan
korosi (grouting)
349
BAJA TULANGAN
Pbarrier Pbarrier
BEBAN MATI TAMBAHAN (ASPAL)
• Beban Mati Tambahan adalah berat semua elemen tidak struktural yang dapat
bervariasi selama umur jembatan seperti:
• Aspal Beton sebesar 50 mm (qSDL) ( gaspal = 22 kN/m3)
• Rambu - Rambu.
qSDL (aspal)
PRESTRESS
asd
FAKTOR BEBAN DINAMIS
BEBAN HIDUP
360
GAYA REM
h 2600 mm
Tp 12 °C
0.4 Tp 4.8 °C
Tb 5 °C
Komponen Tegak
Sudut Komponen Sejajar
Lurus
(°) (N/mm)
(N/mm)
0 1.46 0.00
15 1.28 0.18
30 1.20 0.35
45 0.96 0.47
60 0.50 0.55
PETA GEMPA (PGA)
PETA GEMPA (SS)
PETA GEMPA (S1)
SEISMIC DESIGN CATEGORY
374
GROUND MOTION SCALING
• Pada arah horizontal, amplitude scaling mengikuti prosedur yang direkomendasikan oleh
MCEER, Seismic Isolation of Highway Bridges, pasal 3.4. Prosedur dalam penskalaan
tersebut adalah:
1. Penyusunan respon spektrum dengan damping damping 5% untuk setiap komponen arah
utama ground motion untuk masing-masing gempa yang dipilih.
2. Perhitungkan total spektra untuk setiap gempa dengan metode square root of the sum of
the squares (SRSS) untuk kedua arah utama horizontal.
3. Hitung rata-rata spektrum dengan mengambil rata-rata spektra SRSS untuk setiap gempa.
4. Bandingkan rata-rata spektra dengan target spektra dan diskalakan sedemikian rupa
sehingga nilainya tidak kurang dari 1.3 kali desain respon spektra dengan damping 5% pada
rentang periode 0.5 Teff sampai 1.5 Teff.
5. Skalakan masing-masing gempa untuk setiap komponen arah utamanya dengan faktor
skala yang didapatkan pada tahap sebelumnya.
375
GROUND MOTION SCALING
• Pada prosedur 1-3 sebelumnya didapatkan hasil spektra SRSS dan rata-rata SRSS 7 gempa seperti pada Gambar dibawah.
Selanjutnya untuk penskalaan dilakukan dalam dua tahap yaitu:
• Setiap pasang seed motions dari tujuh gempa diskalakan untuk meminimalisir sum of squared of difference antara target
spektra dan geometric mean dari ordinat spektra pada periode 1, 2, 3, dan 4 detik. Weight factor untuk periode tersebut
adalah 0.1, 0.3, 0.3, dan 0.3.
• Technical Report MCEER-11-0004
376
GROUND MOTION SCALING
T SPECTRAL
1.3*SE wi
(sec.) ACCELERATION (SE)
1 0.6975 0.9068 0.1
2 0.3488 0.4534 0.3
3 0.2325 0.3023 0.3
4 0.1744 0.2267 0.3
Final SF Final SF Th = 1.73 s
NO RECORDS SF1 SF2
(Horizontal) (Vertical) Tv = 0.3 s
1 GM-1 3.56 1.16 4.14 10.08
2 GM-2 1.39 1.16 1.62 2.91
3 GM-3 1.71 1.16 1.99 2.42
4 GM-4 2.88 1.16 3.35 1.28
5 GM-5 1.85 1.16 2.15 2.93
6 GM-6 1.73 1.16 2.02 2.12
7 GM-7 3.26 1.16 3.79 4.55
8 GM-8 1.56 1.16 1.82 2.61
9 GM-9 2.58 1.16 3.00 4.55
10 GM-10 2.77 1.16 3.21 4.08
11 GM-11 3.85 1.16 4.47 11.88
12 GM-12 3.60 1.16 4.19 5.12
377
GROUND MOTION SCALING
Hasil akhir respon spektra rata-rata dapat dilihat pada Gambar berikut dapat dilihat grafik rata-rata tujuh gempa lebih besar
pada rentang waktu (0.50 Teff – 1.5 Teff) = 0.86 – 2.58 detik untuk Teff = 1.76 detik
378
GROUND MOTION SCALING
Hasil akhir respon spektra rata-rata dapat dilihat pada Gambar berikut dapat dilihat grafik rata-rata tujuh gempa lebih besar
pada rentang waktu (0.50 Teff – 1.5 Teff) = 0.15 – 0.45 detik untuk Teff = 0.3 detik
379
KLASIFIKASI OPERASIONAL
• Klasifikasi Operasional untuk jalan Tol Ir. Wiyoto Wiyono, M. Sc., Section
Harbour Road II adalah sebagai Jembatan lainnya (other bridges).
Tahap 1:
1. LG berada pada posisi siap
erection segment.
2. Install dan setting posisi span jack
diatas pier head.
3. Erection segment EJ menggunakan
winch dan posisikan diatas span
jack.
4. Setting geometry segment EJ,
kemudian kunci menggunakan
fixity.
384
- Tahapan Pekerjaan Erection Segment (2)
Tahap 2:
1. Erection segment LS
menggunakan winch dan
posisikan diatas span jack.
2. Setting geometry segment LS,
kemudian kunci menggunakan
fixity.
Tahap 3:
1. Lanjutkan erection segment
typical, kemudian gantung
Detail-A Detail-B
segment ke LG menggunakan
stressbar.
2. Ulang tahapan diatas hingga
semua segment ter-erection.
385
- Tahapan Pekerjaan Erection Segment (3)
Tahap 4 :
1. Join segment satu-persatu
menggunakan epoxy dan
Temporary PT.
Tahap 5:
1. Setelah semua segment ter-
join, lanjutkan dengan
pekerjaan Wet Joint (by MC).
2. Pada saat menunggu curing
time beton Wet Joint (est. 3
hari) pekerjaan instalasi HDPE
dan strand dapat dilakukan.
386
- Tahapan Pekerjaan Erection Segment (4)
Tahap 6 :
1. Setelah umur Wet Joint telah
mencapai yang disyaratkan,
stressing permanent tendon.
2. Load transfer span dari LG ke
pier head menggunakan span
jack yang berada dibawah
segment EJ dan LS.
3. Pekerjaan erection segment
telah selesai dan LG siap untuk
launching ke span berikutnya.
387
STRUKTUR BOX GIRDER LEBAR 14.3 M
388
STRUKTUR BOX GIRDER LEBAR 14.3 M
389
SEGMENTASI P28S-P29S (ES-LS)
390
SEGMENTASI P29S-P30S (LS-LS)
391
SEGMENTASI P30S-P31S (LS-LS)
392
SEGMENTASI P31S-P32S (LS-LS)
393
SEGMENTASI P32S-P33S (LS-LS)
394
SEGMENTASI P33S-P34S (LS-EJ)
395
SEGMENTASI P34S-P35S (LS-EJ)
396
DIMENSI BOX EJ
2.6 M
1.8 M 1.8 M
397
DIMENSI BOX LS
2.6 M
1.8 M 1.8 M
398
DIMENSI BOX DV1
2.6 M
1M 1M
399
DIMENSI BOX S1
2.6 M
400
DIMENSI BOX SV
2.6 M
401
TENDON TIPIKAL
402
POTONGAN TENDON TIPIKAL EJ
TST
C1 C5
C2
C3 C4 TSB2
TSB3 TSB1
403
POTONGAN TENDON TIPIKAL DV
TST
B1
C1 - C5
TSB2
TSB3 TSB1
B1
404
POTONGAN TENDON TIPIKAL LS
405
TEGANGAN SERVIS BOX GIRDER L=47 M W=14.3
M
Pada kondisi layan tidak ada tegangan tarik yang terjadi pada joint box precast (ok) dan tegangan
tekan yang terjadi masih dibawah batas tegangan 0.45fc (MPa) = 0.45 x 40 = 18 MPa (ok) 406
TEGANGAN TARIK PRINCIPAL STRESS DI WEB
Pada kondisi layan 3, tegangan tarik yang terjadi pada web box masih dibawah batas tegangan Tarik
principal stress 1.67 MPa < 0.11λ√f'c (ksi) = 0.26 ksi = 1.83 MPa 407
DEFLEKSI BEBAN HIDUP BOX GIRDER L=47 M
W=14.3 M
Defleksi maksimum yang terjadi akibat beban kendaraan adalah 35.94 mm < L/800 =
47000/800 = 58.75 mm (ok). 408
MOMEN ULS BOX GIRDER L=47 M W=14.3 M
151287.6 kN.m
409
GAYA GESER ULS BOX GIRDER L=47 M W=14.3 M
-12153 kN
12123 kN
410
ANALISIS MOMEN LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
411
ANALISIS MOMEN LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
Unbonded Tendon Stress Calculation
D = 140 mm2
2
Apsu = 30800 mm Tendons nstrand e (mm) ntendons Ap unbonded 1 (mm2)
e = 316.2 mm C1 22 341 2 6160
dp unbonded = 2283.8 mm C2 22 310 2 6160
Jacking force = 0.75 fpu C3 22 310 2 6160
fpj = 1395 MPa C4 22 310 2 6160
fpe = 0.9 fpj C5 22 310 2 6160
= 1255.5 MPa
li = 46131.9 mm
Ns = 0
le = 46131.9 mm
fps calculation with corrected c values
d −c
f ps = f pe + 6300 p f py (5.6.3.1.2-1) converted from ksi to Mpa, in accordance with AASHTO 2007 (5.7.3.1.2-1)
e
l
fps unbonded = 1544.146 MPa
412
ANALISIS MOMEN LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
Stress Block Calculation
Components with Bonded Tendons Components with Unbonded Tendons
Mn = 170490.808 kNm
413
ANALISIS MOMEN LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
Minimum Reinforcement
When there's no change to composite section, Mdnc x Sc/Snc part may be taken as 0
fpe = 1116 Mpa Assume 20% total loss
Pf = 52184160 N
yt = 880 mm Distance from section centroid to compressive fiber
yb = 1720 mm Distance from section centroid to tensile fiber
3
Sc = 3.99E+09 mm Section modulus corresponding to yb
fcpe = 25.78 MPa
Mcr = 88657.84 KN.m
1.33Mu = 201212.51 KN.m
φMn = 153441.73 KN.m > Mcr = 88657.84 KN.m OK
Box Propereties
Ag = 7174000 mm2
2
Ao = 16149600 mm
I = 6.868E+12 mm4
yt = 880 mm
yb = 1720 mm
3
Snc = 3.99E+09 mm
bv = 700 mm
h = 2600 mm
concrete cover = 50 mm
ds = 2450 mm
dv = 2226.253 mm
415
ANALISIS GESER LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
416
ANALISIS GESER LONGITUDINAL BOX GIRDER
L=47 M W=14.3 M
Use D19-75 as shear reinforcement for box girder with 2 legs for each web.
417
TRANSVERSAL BOX ANALYSIS
418
TRANSVERSAL BOX ANALYSIS
419
TRANSVERSAL BOX ANALYSIS
420
TRANSVERSAL BOX ANALYSIS
421
TRANSVERSAL BOX ANALYSIS
422
TRANSVERSAL BOX ANALYSIS
423
TRANSVERSAL BOX ANALYSIS
424
TRANSVERSAL BOX ANALYSIS
ULS Moment
425
TRANSVERSAL BOX ANALYSIS
ULS Shear
426
PENULANGAN TRANSVERSAL BOX
DL Barrier SDL LL Mu
Node Type
(kNm) (kNm) (kNm) (kNm) (kNm)
1 Overhang (Negative) -29.61 -35.82 -4.06 -117.35 -304.42
2 Top Slab (Positive) 9.10 -2.40 1.69 31.88 69.83
3 Top Slab (Negative) -31.51 -4.61 -5.06 -151.78 -330.13
4 Web (Top) 8.79 -23.10 1.98 84.98 139.17
5 Web (Bottom) -15.67 3.77 -1.35 -13.27 -38.14
6 Bottom Slab (Negative) -15.67 3.77 -1.35 -13.27 -38.14
7 Bottom Slab (Positive) 5.57 0.85 -0.09 14.77 34.28
427
PENULANGAN TRANSVERSAL BOX
Mu 1.33 Mu Concrete Dimension Mcr MIN Mdesign
Node Type
(kNm) (kNm) b (mm) h (mm) s (mm) d (mm) (kNm) (1.33Mu,Mcr) (kNm)
1 Overhang (Negative) -304.42 404.88 1000 480 40 429.00 123.01 123.01 304.42
2 Top Slab (Positive) 69.83 92.87 1000 250 40 202.00 33.37 33.37 69.83
3 Top Slab (Negative) -330.13 439.08 1000 469 40 418.00 117.44 117.44 330.13
4 Web (Top) 139.17 185.10 1000 350 40 300.50 65.41 65.41 139.17
5 Web (Bottom) -38.14 50.73 1000 350 40 300.50 65.41 50.73 50.73
6 Bottom Slab (Negative) -38.14 50.73 1000 425 40 378.50 96.44 50.73 50.73
7 Bottom Slab (Positive) 34.28 45.60 1000 210 40 163.50 23.55 23.55 34.28
428
PENGECEKAN GESER TRANSVERSAL
Cek (f Vc>Vu)
No Type b (mm) h (mm) s (mm) d (mm) Vu (kN) f Vc (kN)
STATUS
1 Overhang (Negative) 1000 480 40 440 50.74 347.85 OK
2 Top Slab ( Positive) 1000 250 40 210 76.99 166.02 OK
3 Top Slab (Negative) 1000 469 40 429 46.19 339.15 OK
4 Web (top) 1000 350 40 310 97.97 245.08 OK
5 Web (bot) 1000 350 41 309 105.23 244.29 OK
6 Bot Slab (Negative) 1000 425 41 384 35.71 303.58 OK
7 Bot Slab (Positive) 1000 210 42 168 25.75 132.82 OK
429
PERMODELAN ELEMEN SHELL
430
BEBAN TRUK
Beban roda truk dimodelkan sebagai area uniform load sesuai SNI 1725:2016
diperoleh:
112.5 ∗ 1
𝑃1 = = 6 𝑘𝑁/𝑚2
75 ∗ 25
5 ∗1
𝑃2 = = 1333.33 𝑘𝑁/𝑚2
15 ∗ 25
431
TRANSVERSAL BOX ANALYSIS
1. Live Load Moments in Cantilever 3. Positive Live Load Moments in the
Wings
Top Slab of the Box
432
BEBAN TRUK – MOMEN NEGATIF SAYAP
KANTILEVER
• Elemen yang terbebani:
4m 5m
1.75 m
433
BEBAN TRUK – MOMEN NEGATIF SAYAP
KANTILEVER
• Beban roda truk dimodelkan sebagai area uniform load sesuai SNI 1725:2016
4m 5m
434
BEBAN TRUK – MOMEN NEGATIF SAYAP
KANTILEVER
• Beban roda truk dimodelkan sebagai area uniform load sesuai SNI 1725:2016
1.75 m
435
DIAGRAM MOMEN ELEMEN SHELL: M11
436
DIAGRAM MOMEN ELEMEN SHELL: M22
437
DIAGRAM MOMEN ELEMEN SHELL: M12
438
OUTPUT GAYA DALAM ELEMEN SHELL
1.75 m
439
GAYA DALAM SLS: M11
440
GAYA DALAM SLS: M22
441
GAYA DALAM SLS: M12
442
BEBAN TRUK – MOMEN NEGATIF MID SPAN
4m 5m
1.75 m
1m
1.75 m
1m
1.75 m
443
BEBAN TRUK – MOMEN NEGATIF SAYAP
KANTILEVER
• Beban roda truk dimodelkan sebagai area uniform load sesuai SNI 1725:2016
444
DIAGRAM MOMEN ELEMEN SHELL: M11
445
DIAGRAM MOMEN ELEMEN SHELL: M22
446
DIAGRAM MOMEN ELEMEN SHELL: M12
447
OUTPUT GAYA DALAM ELEMEN SHELL
448
BEBAN TRUK – MOMEN POSITIF MID SPAN
4m 5m
1.75 m
1m
1.75 m
1m
1.75 m
449
BEBAN TRUK – MOMEN POSITIF SAYAP
KANTILEVER
• Beban roda truk dimodelkan sebagai area uniform load sesuai SNI 1725:2016
450
DIAGRAM MOMEN ELEMEN SHELL: M11
451
DIAGRAM MOMEN ELEMEN SHELL: M22
452
DIAGRAM MOMEN ELEMEN SHELL: M12
453
OUTPUT GAYA DALAM ELEMEN SHELL
454
PERBANDINGAN GAYA DALAM BOX
1 3
LL
(kNm) (kNm)
1 Overhang (Negative) -117.35 -69.50 -14.78 -84.29
2 Top Slab (Positive) 31.88 44.21 0.0039 44.22
3 Top Slab (Negative) -151.78 -85.80 -19.25 -105.05
Hasil analisis dengan menggunakan shell element menghasilkan momen top slab positif lebih besar
dibandingkan dengan menggunakan analisis pucher
455
PERHITUNGAN KAPASITAS PENAMPANG BOX
Mu 1.33 Mu Concrete Dimension Mcr MIN Mdesign
Node Type
(kNm) (kNm) b (mm) h (mm) s (mm) d (mm) (kNm) (1.33Mu,Mcr) (kNm)
1 Overhang (Negative) -280.84 373.52 1000 480 40 429.00 123.01 123.01 280.84
2 Top Slab (Positive) 119.81 159.35 1000 250 40 199.00 33.37 33.37 119.81
3 Top Slab (Negative) -329.07 437.66 1000 469 40 418.00 117.44 117.44 329.07
4 Web (Top) 95.34 126.80 1000 350 40 300.50 65.41 65.41 95.34
5 Web (Bottom) -40.26 53.55 1000 350 40 300.50 65.41 53.55 53.55
6 Bottom Slab (Negative) -18.30 24.35 1000 425 40 378.50 96.44 24.35 24.35
7 Bottom Slab (Positive) 19.36 25.74 1000 210 40 163.50 23.55 23.55 23.55
456
GAYA DALAM SLS ELEMEN SHELL DAN
PERHITUNGAN TEGANGAN TULANGAN
Diperoleh gaya dalam akibat kombinasi beban SLS
MSLS
Node Type
(kNm)
1 Overhang (Negative) -171.87
1.75 m
2 Top Slab (Positive) 69.11
3 Top Slab (Negative) -197.69
4 Web (Top) 52.01
5 Web (Bottom) -26.95
6 Bottom Slab (Negative) -13.42
7 Bottom Slab (Positive) 12.51
Perhitungan tegangan pada tulangan dilakukan dengan transformasi
penampang:
457
PERHITUNGAN LEBAR RETAK
458
CONTOH CASE 1 : PERHITUNGAN TEGANGAN
PADA TULANGAN
General Input :-
Width b 1000 mm Es 200000 N/mm2
Depth h 480 mm εc 0.003 mm
cover 40 mm εy 0.0021 mm
2
fy 420 N/mm Ec 29725 N/mm2 ACI318 clause 8.5.1
2
fc' 40 N/mm d 419 mm
Ma service 171.87 KN.m d' 56.5 mm
n= Es /Ec = 6.73
2
Section RFT. No of bars rebar Dia AS mm
Bottom Reinf. 7 T 13 Top = 886.667 mm2 S spacing Top = 150 mm
Top Reinf. 7 T 22 Bot. = 2533.33 mm2 S spacing Bot. = 150 mm
7 T 16 Bot. = 1340 mm2 S spacing Bot. = 150 mm
2- Check of Concrete & Steel Reinforcement stresses:-
= 3.92 N/mm2 ACI 318M-11, Eq 9-10
459
PERHITUNGAN LEBAR RETAK TEORETIS
Diperoleh:
3- Calculation of crack width :-
Crack width, = 0.128 mm ACI224R-01, Eq 4-2a
ok Crack Width <= wcr all= 0.150 mm, ACI224R-01,Table 4.1
460
PERHITUNGAN LEBAR RETAK TEORITIS
Diperoleh:
MSLS fs w
Node Type
(kNm) MPa mm
1 Overhang (Negative) -171.87 117.47 0.128
2 Top Slab (Positive) 69.11 109.62 0.153
3 Top Slab (Negative) -197.69 138.95 0.152
4 Web (Top) 52.01 103.86 0.148
5 Web (Bottom) -26.95 53.82 0.077
6 Bottom Slab (Negative) -13.42 43.49 0.056
7 Bottom Slab (Positive) 12.51 96.63 0.157
Tegangan pada tulangan masih memenuhi terhadap batas fy all = 0.6fy = 252 MPa.
Lebar retak yang terjadi masih dapat diterima (~0.15 mm).
461
TULANGAN BOX
462
TULANGAN BOX
463
ANALISIS DEVIATOR
464
ANALISIS DEVIATOR
Start (Segment EJ/LS)
External Tendon
use strand 0.6 inch
fpu = 1860 MPa
fpj = 80% × fpu = 1488 MPa
x= 14400 mm
2
Astrand = 140 mm 465
ANALISIS DEVIATOR
466
ANALISIS DEVIATOR
467
ANALISIS DEVIATOR
468
REAKSI GAYA AKSIAL TRANSVERSAL BOX
DEVIATOR
469
REAKSI GAYA GESER TRANSVERSAL BOX
DEVIATOR
470
REAKSI GAYA MOMEN TRANSVERSAL BOX
DEVIATOR
471
ANALISIS LENTUR BOTTOM SLAB TRANSVERSAL
BOX DEVIATOR
Flexure Reinforcement
Dimension
b = 1000 mm
h = 1000 mm As min2 = 3614.03 mm²
d = 960 mm 2
1.3As req = 2063.27 mm
Load Asused :
Mu = 450.069 kNm Asreq > Asmin , use Asreq
Asreq < Asmin , use max 1.3Asreq ,Asmin
Flexural Reinforcement As used = 3614.03 mm²
fb = 0.9 Db = 32 mm
fc ' 4Mu n used = 10
Asreq = 0.85 b d 1− 1−
fy 1.7 f b d 2
fc ' Asb used = 8042.48 mm² (10D32)
Check : OK
As req = 1587.13 mm²
Use 10 D32 on top side
1.4
Asmin = bd RSNI T-12-2004 (5.1-4)
fy
472
ANALISIS GESER BOTTOM SLAB TRANSVERSAL
BOX DEVIATOR
Shear Reinforcement
Dimension
b = 1000 mm Vs s
Av = RSNI T-12-2004 (5.2-7)
h = 1000 mm d fy
473
ANALISIS LENTUR WEB TRANSVERSAL BOX
DEVIATOR
Flexure Reinforcement
Dimension
b = 800 mm
h = 716 mm
d = 676 mm As min2 = 2035.9045 mm²
2
1.3As req = 212.46 mm
Load
Asused :
Mu = 139.54 kNm
Asreq > Asmin , use Asreq
Asreq < Asmin , use max 1.3Asreq ,Asmin
Flexural Reinforcement
As used = 2035.9045 mm²
fb = 0.9
Db = 32 mm
fc ' 4Mu
Asreq = 0.85 b d 1− 1− n used = 9
fy 1.7 f b d 2
fc ' Asb used = 7238.2295 mm² (9D32)
Check : OK
As req = 163.43348 mm² Use 9 D32 on each top and bottom side
1.4
Asmin = bd
fy RSNI T-12-2004 (5.1-4)
474
ANALISIS GESER WEB TRANSVERSAL BOX
DEVIATOR
Shear Reinforcement
Dimension
Vs s
b = 800 mm Av = RSNI T-12-2004 (5.2-7)
d fy
h = 716 mm
d = 676 mm AV = -258.57 mm²
1 b s
Av =
Load 3 fy RSNI T-12-2004 (5.2-9)
Vu = 60.48 kN
AV min = 95.24 mm²
Shear Reinforcement AV req = 95.24 mm²
fv = 0.75 Dv = 16 mm
n legs = 2
fc '
Vc = bw d RSNI T-12-2004 (5.2-3) s = 150 mm
6
AV used = 402.12 mm² (D16-150)
Check : OK
Vc = 570.05 kN
Use 2 legs of D16-150
Vs = (V u/f) - V c
= -489.41 kN
475
ANALISIS DEVIATOR
Untuk desain hairpin perhitungan dilakukan berdasarkan paper dari R.J Beaupre (SP 120-12, Deviator Behavior and Design
for Externally Post-Tensioned Bridges) dengan mengacu ke AASHTO.
476
R.J Beaupre (SP 120-12, Deviator Behavior and
Design for Externally Post-Tensioned Bridges)
477
R.J Beaupre (SP 120-12, Deviator Behavior and
Design for Externally Post-Tensioned Bridges)
478
REFERENSI HAIR PIN
Referensi untuk tulangan hair pin pada State of theArt Externally Post-Tensioned Bridges
with Deviators by L. C. Powell, J. E. Breen, and M. E. Kreger
479
TULANGAN DEVIATOR
TENDON PROPERTIES 2. Design Tendon loops based on 436.81 kN
Tendon 1 : 6" - 22 Fu : f (As) (fy)
As : Fu / (ffy) = 1964.49 mm2
fpu : 1860 MPa
A : 140 mm2 minimum use : 2 leg 6 D16 for each tendon
Design use : 2 leg 8 D16 = 3218.29 mm2 OK
CONCRETE PROPERTIES
f'c : 40 MPa 3. Tension Bottom Slab
Tu : 2878.614 kN
REINFORCEMENT PROPERTIES Tu
As : = 7615.38 mm2
fy : 420 MPa 0.9 fy
D1 : 16 mm
A1 : 201.14 mm2 Design use : 6 D-32 = 4827.43 mm2
10 D-25 = 4910.71 mm2
fy : 420 MPa TOTAL = 9738.14 mm2 > 7615.38 mm2 OK
D2 : 32 mm
A2 : 804.57 mm2
fy : 420 MPa
D3 : 25 mm
A2 : 491.07 mm2
ANALYSIS
Load Factor : 1.7
f tension : 0.9
f shear : 0.75
Bottom Slab
Bottom Slab
481
REFERENSI HAIR PIN
Referensi untuk tulangan hair pin pada Huang, Dongzhou, Concrete Segmental Bridges
Bottom Slab
Tampak Depan
Bottom Slab
Tampak Memanjang
Bottom Slab
482
Konsep strut and ties model untuk hair pin
TULANGAN HAIR PIN DEVIATOR
Kami juga sudah berkonstultasi dengan Pak Teddy S Theryo, PE beliau adalah Major Bridge Design
Engineer III, FDOT State Structures Design Office
• TULANGAN HAIR PIN DEVIATOR
Praktek kami di AS saat merancang / mendetailkan deviator, tension tie harus di detailkan
sebagai tulangan close hoop/stirrup. Jika Anda mendetailakn sebagai sebagai hairpin U terbalik,
maka panjang penyaluran tulangan harus mengikuti detail hook 90%.
Ada aspek penting lain dari desain deviator seperti yang dilampirkan. Kami biasanya harus
mendesain bagian diafragma dengan tinggi penuh dan lebar penuh dari sebuah deviator.
Namun, untuk jumlah total tendon kurang dari tiga (3), diafragma dapat dibuat
tapered/meruncing. Saya mengusulkan ini untuk merevisi pedoman desain kami. Seperti yang
Anda lihat, seluruh diafragma berpartisipasi dalam mentransfer beban vertikal dari tendon
eksternal. Dalam hal ini tulangan hoop atau hair pin manjadi kurang kritis, karena kami memiliki
mekanisme lain untuk mentransfer beban vertikal ke web box girder.
483
DESIGN GUIDELINES FDOT
484
PANJANG PENYALURAN
AASHTO 5.10.8.2.4a
Basic Hook Development Length
fc' = 40 MPa
fy = 420 MPa
db = 16 mm
= 0.63 in
l hb min = 150.00 mm
l hb = 10.09 in Basic hook development length
l hb = 256.28 mm Basic hook development length
Modification Factors
λrc = 1 Reinforcement confinement factor λer = As req/As use
2
λcw = 1 Coating Factor As req = 1964.49 mm
2
λer = 0.610 Excess Reinforcement Factor As use = 3218.29 mm
λ = 1 Concrete density modification factor
l dh = 156.44 mm
l dh use = 193.00 mm OK
485
PEMASANGAN TULANGAN BLISTER BOX
DEVIATOR
486
PEMASANGAN TIPIKAL TULANGAN BOX
DEVIATOR
487
ANALISIS TULANGAN BLISTER BOX DEVIATOR
Blister Configuration
Angle (ϴ) = 14.5 °
P cos ϴ e hor
P P sin ϴ V
H = P cos ϴ
= 5324.47 kN
488
ANALISIS TULANGAN BLISTER BOX DEVIATOR
Coefficient of frcition : 3. Positive Live Load Moments in the Top Slab of the Box
Concrete place monolithically
m = 1.4
Reinforcement Properties
fy = 420 MPa
ø = 0.6
s = 100 mm
489
ANALISIS TULANGAN BLISTER BOX DEVIATOR
Shear Friction
H
Avf = = 15092.04 mm²
ø·λ·fy·μ
Rebar configuration
nlegs = 4 legs
Dbar = 19 mm
3. Positive Live Load Moments
Abar =in the Top Slab of the Box
284 mm²
490
ANALISIS TULANGAN BLISTER BOX DEVIATOR
Secondary Moment at point A :
n = 1
P sin ϴ = 1377.00 kN
P cos ϴ = 5324.47 kN
e hor = 414 mm
e ver = 371 mm
MPT hor = 570.08 kNm
MPT ver = 1975.38 kNm
MA = MPT hor + MPT ver
= 2545.46 kNm
b = 1883 mm
h = 2000 mm
d 3. Positive Live 1960
= LoadmmMoments in the Top Slab of the Box
ø = 0.9
Dbar = 25 mm dbar = 25 mm
n = 3 n = 3
Abar = 491 mm² Abar = 491 mm²
Asuse = 1472.62 mm² Asuse = 1472.62 mm²
Horisontal reinforcement
Dbar 3. =Positive19Live
mm Load Moments
n =in the Top
2 Slab of the Box
Abar = 284 mm²
Asuse = 567.06 mm² OK
Tie Back :
TTB = 0.25 x P = 1374.91 kN
Ts
As req = = 5456.00 mm²
0.6fy
Reinforcement
Dbar = 25 mm n = 12
Abar = 491 mm²
Asuse = 5890.49 mm² OK
492
ANALISIS TULANGAN BLISTER BOX DEVIATOR
Hairpin reinforcement :
R= 4m
P
q= = 1374.91 kN/m
R
qxs
As, req = = 818.40 mm²
0.4 x fy
Dbar = 25 mm
Abar = 490.87 mm²
suse = 100 mm²
493
PEMASANGAN TIPIKAL TULANGAN BOX
DEVIATOR
494
PEMASANGAN TULANGAN BLISTER BOX
DEVIATOR
495
ANALISIS DIAFRAGMA BOX EJ
496
ANALISIS GAYA TENDON DIAFRAGMA BOX EJ
497
ANALISIS GAYA BEARING DIAFRAGMA BOX EJ
498
ANALISIS DIAFRAGMA BOX EJ
499
REAKSI GAYA AKSIAL TRANSVERSAL BOX EJ
500
REAKSI GAYA MOMEN TRANSVERSAL BOX EJ
501
REAKSI GAYA GESER TRANSVERSAL BOX EJ
502
ANALISIS LENTUR BOTTOM SLAB TRANSVERSAL
BOX EJ
503
ANALISIS GESER BOTTOM SLAB TRANSVERSAL
BOX EJ
504
ANALISIS LENTUR WEB TRANSVERSAL BOX EJ
505
ANALISIS GESER WEB TRANSVERSAL BOX EJ
506
ANALISIS LENTUR TOP SLAB TRANSVERSAL BOX
EJ
507
ANALISIS GESER TOP SLAB TRANSVERSAL BOX EJ
508
ANALISIS TULANGAN DIAFRAGMA DAN HAIRPIN
BOX EJ
Tendon Coordinate
H 2.60 m
Top Slab (t1) 0.25 m
Bot Slab (t2) 0.40 m
Web (t3) 0.35 m
509
ANALISIS TULANGAN DIAFRAGMA DAN HAIRPIN
BOX EJ
Step 2. Calculate ni and Ri
R1 = 0.24
R2 = 0.25
R3 = 0.51 510
ANALISIS TULANGAN DIAFRAGMA DAN HAIRPIN
BOX EJ
Step 3. Reinforcement
Jacking Force = 80 %
fpu = 1860 MPa
fy = 420 MPa
A= 140 mm2
n strand = 22 nos
n tendon = 5
P = 22915200 kN
Tv = 3538753.21 kN
Th = 3619386.84 kN
Drebar = 32 mm
Arebar = 804.57 mm2
14 D32 aligned vertically and
nv = 14 nos
nh = 15 nos 15 D32 aligned horizontally
511
ANALISIS TULANGAN SPALLING
Spalling reinforcement
Tendon Astrand fpu fc' fci' fy Jacking Load Pj Ts As req Drebar use As Astotal use
No 2 ntendon φ nrebar
inch - nstrand mm MPa MPa MPa MPa Force Factor kN kN mm² mm mm² mm²
1 0.6 - 4 140 1860 1 40 40 420 0.8 1.2 999.94 20.00 0.8 59.52 13 132.73 1 132.7
2 0.6 - 7 140 1860 1 40 40 420 0.8 1.2 1749.89 35.00 0.8 104.16 13 132.73 1 132.7
3 0.6 - 12 140 1860 1 40 40 420 0.8 1.2 2999.81 60.00 0.8 178.56 13 132.73 2 265.5
4 0.6 - 22 140 1860 1 40 40 420 0.8 1.2 5499.65 109.99 0.8 327.36 16 201.06 2 402.1
AASHTO 5.9.5.6.5b
SNI 2847 2019
512
PEMASANGAN TULANGAN SPALLING BOX EJ
513
PEMASANGAN TULANGAN BOX EJ (1)
514
PEMASANGAN TULANGAN BOX EJ (2)
515
PEMASANGAN TULANGAN BOX EJ (3)
516
PEMASANGAN TULANGAN BOX EJ (4)
517
• Permodelan dengan ATENA Science-GiD.
519
• Hasil Analisis dengan ATENA Science-GiD.
520
• Hasil Analisis dengan ATENA Science-GiD.
521
• Hasil Analisis dengan ATENA Science-GiD.
522
• Hasil Analisis dengan ATENA Science-GiD.
523
• Hasil Analisis dengan ATENA Science-GiD.
524
• Hasil Analisis dengan ATENA Science-GiD.
525
DATA LRB
No. CHARACTERISTCS SYMBOL VALUE UNITS
• Movement kondisi servis tidak termasuk
A SEISMIC ZONE
1 Soil Class (A, B, C, D, atau E) E
gempa frequent.
2 Peak Ground Acceleration PGA 0.275 g
526
LAYOUT LRB
527
MODE SHAPE
T= 1.658 s, f = 0.60761 Hz
Mode 1 - Transversal
530
Mode 2
T= 1.57822 s, f = 0.63362 Hz
Mode 2 - Transversal
531
Mode 3
T= 1.549 s, f = 0.64558 Hz
Mode 3 - Longitudinal
532
LRB RESPONSE GM-1
Long Trans
533
LRB RESPONSE GM-2
Long Trans
LRB RESPONSE GM-3
Long Trans
LRB RESPONSE GM-4
Long Trans
LRB RESPONSE GM-5
Long Trans
LRB RESPONSE GM-6
Long Trans
LRB RESPONSE GM-7
Long Trans
PIER TIPIKAL
CROSS SECTION SINGLE PIER TIPIKAL
Tipe Struktur : Single Pier Tipikal
Deck : Single Box 14.3 M
Span : 47 m
Dimensi Pier : 3 x 2.5 m
Tinggi Pier : 8.0 m
Tipe Pondasi : Borepile Dia 1.8 m
R Pier :1
R Pondasi :1
CROSS SECTION SINGLE PIER TIPIKAL
Pu = 28379 kN
Ag = 7465700 mm2
Pu/Ag = 3.81MPa
= 0.11 fc’
SHEAR REINFORCEMENT P30S
Longitudinal Direction Transversal Direction
Concrete Properties Concrete Properties
fc' = 35 MPa fc' = 35 MPa
Pier Dimension Pier Dimension
bw = 2500 mm bw = 3000 mm
h= 3000 mm h= 2500 mm
ln = 24800 mm ln = 24800 mm
Ec = 27805.57 MPa Ec = 27805.57 MPa
λ= 1 λ= 1
d= 2950 mm d= 2450 mm
concrete cover = 50 mm concrete cover = 50 mm
Reinforcement Properties Reinforcement Properties
fy = 420 fy = 420
Es = 200000 MPa Es = 200000 MPa
Load Input Load Input
Nu = 19798 kN Nu = 27550 kN
= 19798000 N Note : = 27550000 N Note :
Factor = 1.3 Factor = 1.3
Mp bot = 57589.56 kN.m Mp bot = 76364.42 kN.m
Mp use= 57589.56 kN.m Mp use= 76364422222 kN.m
Vu = 3018.81 kN Vu = 4002.97 kN
= 3018807.348 N = 4002973.746 N
Vc = 8642.97 kN Vc = 9148.72 kN
Vc max = 16812.44 kN TIPE 1 TIPE 2 Vc max = 18122.05 kN TIPE 1 TIPE 2
Vu = (Mn top + M n bot) /L Vu = (Mn bot) /L Vu = (Mn top + M n bot) /L Vu = (Mn bot) /L
Vc used = 8642.97 kN Moment Diagram Output 2 Vc used = 9148.72 kN Moment Diagram Output 2
Vs = -4617.90 kN Vs = -3811.43 kN
φ= 0.75 φ= 0.75
Vs max = 29087.39 kN Vs max = 28988.79 kN
Vs used = -4617.896 kN Vs used = -3811.426 kN
s= 200 s= 200
Avmin = 584.57 mm² > Av min req = 41.6666667 mm² OK Avmin = 701.48 mm² > Av min req = 50 mm² OK
Avreq = 584.57 mm² Avreq = 701.48 mm²
Shear Reinforcement Use Shear Reinforcement Use
D= 16 mm D= 16 mm
nreq = 12 legs nreq = 14 legs
Av = 2412.74 mm² Av = 2814.87 mm²
Shear Reinforcement Use 12 D16 - 200 Shear Reinforcement Use 14 D16 - 200
CONFINEMENT P30S
Confinement Confinement
Longitudinal Direction Transversal Direction
D= 16 mm D= 16 mm
sconf = 100 mm sconf = 100 mm
Ag = 7500000 mm² Ag = 7500000 mm²
Ac = 6960000 mm² Ac = 6960000 mm²
Confinement Use 12 D16 - 100 Longitudinal Direction Don't Use 14 D16 - 100 Transversal Direction
TULANGAN TORSI PIER P30S
Longitudinal Direction
Concrete Properties
fc' = 35 MPa
Pier Dimension
bw = 2500 mm
h= 3000 mm
cover = 50 mm
Acp = 7500000 mm²
pcp = 11000 mm
Ao = 6960000 mm²
dv = 2360 mm
Tcr = 9929582598 Nm
= 9929.58 kNm
φ= 0.75
0.25φTcr = 1861.80 kNm > Tu = 515.19 kNm
Torsion is neglected
Tu < 0.25 Tcr
PENULANGAN SINGLE PIER TIPIKAL
Tulangan utama : 96 D32
Tulangan geser : D16-100 (sendi plastis)
: D16-200 (di luar sendi plastis)
PIER HEAD TIPIKAL
DIMENSI PIER HEAD SINGLE PIER TIPIKAL
MODEL STM PIER HEAD SINGLE PIER TIPIKAL
M aterial Properties
f c' = 40 MPa
Vu Vu fy = 420 MPa
Es = 200000 MPa
Dim ension
Nu Nu a= 4706 mm
bpier = 2500 mm
bpier head = 3500 mm
hpier head = 2500 mm
cover= 100 mm
d = hpier head - concrete cover
= 2400 mm
av = a/2
= 2353 mm
= 46.17 °
Load
R R Vu = 13547 kN
Nuc = 1147.5 kN
TULANGAN PIER HEAD SINGLE PIER TIPIKAL
The limiting compressive stress in the strut is controlled by the tensile strain in the tie.
Tensile strain in Tie A-A' is:
εs = Tu/Ast use ∙Es
= 0.0016171
Strut Width:
ws = hb ∙sin ϴ + 2(hpier head - d)∙ cos ϴ
= 895.96 mm
• panjang penanaman penulangan ties pada pier head diambil dengan panjang
seperti pada gambar berikut
559
PANJANG PENGANGKURAN TIES PIERHEAD
Development of Reinforcement in Tension
fc' = 40 MPa
fy = 420 MPa
fye = 1.25 x fy = 525 MPa
db = 32 mm
ld = 1235.0 mm
561
TULANGAN PIER HEAD SINGLE PIER TIPIKAL
PIER KANTILEVER
CROSS SECTION SINGLE PIER KANTILEVER
Tipe Struktur : Single Pier KANTILEVER
Deck : Single Box 14.3 M
Span : 47 m
Dimensi Pier : 3 x 2.5 m
Tinggi Pier : 6.65 m
Tipe Pondasi : Borepile Dia 1.2 m
R Pier :1
R Pondasi :1
• CROSS SECTION SINGLE PIER KANTILEVER
Dimana:
Pu = 28782 kN
Ag = 7465700 mm2
Pu/Ag = 3.86 MPa
= 0.11 fc’
SHEAR REINFORCEMENT P34S
CONFINEMENT P34S
TULANGAN TORSI PIER P34S
Longitudinal Direction
Concrete Properties
fc' = 35 MPa
Pier Dimension
bw = 2500 mm
h= 3000 mm
cover = 50 mm
Acp = 7500000 mm²
pcp = 11000 mm
Ao = 6960000 mm²
dv = 2360 mm
Tcr = 9928987672 Nm
= 9928.99 kNm
φ= 0.75
0.25φTcr = 1861.69 kNm < Tu = 3120.40 kNm
Tu > 0.25 Tcr Torsion shall be considered
TULANGAN TORSI PIER P34S
Longitudinal Reinforcement
Al = 11593.75 mm²
. 2 𝑐 . 𝑐
Almin = 𝑃
𝑠
Al min = 34995.38 mm²
Tegangan tarik SLS yang terjadi pada pier 1.75 MPa < 0.5√35 =2.96 MPa (ok)
Tegangan tekan SLS yang terjadi pada pier 1.75 MPa < 0.45× 35 =2.96 MPa (ok) 573
TENDON DI PIER
574
PENULANGAN SINGLE PIER KANTILEVER
Tulangan utama : 96 D32
Tulangan geser : D16-100 (sendi plastis)
: D16-200 (di luar sendi plastis)
PIER HEAD KANTILEVER
DIMENSI PIER HEAD SINGLE PIER KANTILEVER
DESAIN TENDON KANTILEVER (1)
DESAIN TENDON KANTILEVER (2)
DESAIN TENDON KANTILEVER (3)
Assuming:
Distance between tendon to compression fiber d_p 2550 mm
Eccentricity between tendon and cg of section e 1175 mm
Allowable tension for preliminary calculation f_t-allow 0 MPa
Effective prestressing force P_e 1.66E+06 N
Prestressing stress after short term losses f_pi 1019 MPa
Prestressing stress after losses f_pe 643 MPa
Area of required strand A_strand-req 2587 mm^2
Area of strand A_strand 140 mm^2
Number of required strand n_strand-req 18
Number of strand per tendon n_strand 19
Number of required tendon n_tendon-req 0.97
DESAIN TENDON KANTILEVER (4)
DESAIN TENDON KANTILEVER (5)
STRESS PIERHEAD KANTILEVER
lset = 8130.800 mm
583
STRESS PIERHEAD KANTILEVER
a. Shrinkage
SH = (17000 - 150 RH)/145 (Mpa) RH = 70 %
SH = 44.83 Mpa
ES
fcir
b. Creep of Concrete
CRc = 12fcir - 7fcds
fcds = concrete stress at level of prestressing steel due to deck slab and SDL
fcds = 2.0000 Mpa
CRc = 100.24 Mpa
584
LOSSES PADA PIERHEAD KANTILEVER
6705 Batas
Pierhead
4453 2252
400
585
LOSSES PADA PIERHEAD KANTILEVER
586
TEGANGAN PADA PIERHEAD
Pier
Pier
6.58 MPa
Therefore, 5 top tendon of 0.6”-19 and 2 bottom tendon of 0.6”-7 with 25D19
reinforcement is sufficient to resist factored moment.
TULANGAN PIER HEAD SINGLE PIER KANTILEVER