TUGAS AKHIR
Diajukan Untuk Memenuhi Persyaratan
Ujian Sarjana Teknik Kimia
OLEH :
NURJANNAH
NIM : 080405066
Nurjannah
080405066
− Biaya Produksi
: Rp. 1.181.400.934.952,27,-
− Hasil Penjualan
: Rp. 3.813.193.785.047,20,-
− Laba Bersih
: Rp. 4.690.146.938.400,-
− Profit Margin
: Rp. 610.815.371.310,-
Hal
KATA PENGANTAR ................................................................................................. i
INTISARI .................................................................................................................. iii
DAFTAR ISI .............................................................................................................. iv
DAFTAR TABEL .................................................................................................... vii
DAFTAR GAMBAR ................................................................................................ xii
DAFTAR LAMPIRAN ........................................................................................... xiii
BAB I PENDAHULUAN .................................................................................. I-1
1.1 Latar Belakang ............................................................................... I-1
1.2 Perumusan Masalah ....................................................................... I-3
1.3 Tujuan Pra Rancangan Pabrik ........................................................ I-3
1.4 Manfaat Pra Rancangan Pabrik ...................................................... I-3
BAB II TINJAUAN PUSTAKA ....................................................................... II-1
2.1 Minyak Kelapa Sawit ( RBDPO) ................................................. II-1
2.1 Virgin Coconut Oil ( VCO )..............................................II-4
2.3 Sabun.............................................................................II-6
2.3.1 Sejarah sabun..........................................................II-6
2.3.2 Pembuatan Sabun....................................................II-6
2.3.3 Jenis –Jenis Sabun...................................................II-7
2.4 Sifat – Sifat bahan baku dan Produk..................................II-7
2.4.1 Sifat – Sifat bahan baku...........................................II-8
2.5 Proses Pembuatan Sabun.................................................II-10
2.5.1 Netralisasi Asam Lemak..........................................II-10
2.5.2 Saponifikasi Trigliserida Langsung...........................II-11
2.5.3 Saponifikasi Metil Ester Asam Lemak......................II-12
2.6 Pemilihan Proses............................................................II-13
2.7 Deskripsi Proses.............................................................II-14
BAB III NERACA MASSA………………………………………………..III-1
3.1 Tangki Mixing KOH (TM-01) .................................................... III-1
3.2 Tangki Saponifikasi (TS) ........................................................... III-1
Hal
Tabel 1.1 Data Import Sabun Transparan di Indonesi ........................................ I-2
Tabel 2.1 Komposisi Asam Lemak dalam Minyak Sawit ................................ II-1
Tabel 2.2 Komposisi Asam Lemak virgin coconut oil (VCO) ...................II-5
Tabel 2.3 Perbandingan ketiga proses saponifikasi berdasarkan keunggulan
Dan kelemahan masing-masing proses ....................................II-13
Tabel 3.1 Tangki Mixing KOH (TM-01) ........................................................ III-1
Tabel 3.2 Tangki Saponifikasi (TS) ................................................................ III-1
Tabel 3.3 Hasil Perhitungan Neraca massa pada Separator ............................ III-2
Tabel 3.4 Hasil Perhitungan Neraca massa pada Tangki Mixing (TM-02)..... III-2
Tabel 4.1 Neraca Panas di Heater (E-101) ...................................................... IV-2
Tabel 4.2 Neraca Panas di Saponifikasi ......................................................... IV-2
Tabel 4.3 Neraca Panas di Cooler 01 ............................................................. IV-2
Tabel 4.4 Neraca Panas di Tangki Pengaduk 02 (TM-02) .............................. IV-2
Tabel 6.1 Daftar Instrumentasi pada Pra Rancangan Pabrik Pembuatan
Sabun Transparan dari RBDPO dan VCO ..................................... VI-7
Tabel 7.1 Kebutuhan Uap (steam) ................................................................. VII-1
Tabel 7.2 Kebutuhan Air Pendingin pada Alat.............................................. VII-2
Tabel 7.4 Pemakaian Air Untuk Berbagai Kebutuhan .................................. VII-3
Tabel 7.5 Kualitas Air Sungai Deli, Belawan ............................................... VII-4
Tabel 7.6 Perincian Kebutuhan Listrik ........................................................ VII-11
Tabel 8.1 Perincian Luas Tanah ................................................................... VIII-4
Tabel 9.1 Jadwal Kerja Karyawan Shift ........................................................ IX-10
Tabel 9.2 Jumlah Karyawan dan Kualifikasinya ........................................... IX-10
Tabel 9.3 Perincian Gaji Karyawan ............................................................... IX-12
Tabel LA.1.1 Neraca Massa Tangki Mixing KOH (TM-01) ................................. LA-3
Tabel LA.1.2 Neraca Massa Tangki Saponifikasi ............................................... LA-4
Tabel LA.1.3 Neraca Massa Tangki Separator ..................................................... LA-6
Tabel LA.1.4 Neraca Massa Tangki Mixing (TM-02) ......................................... LA-8
Hal
Gambar 2.1 Flowsheet Pra Rancangan Pabrik Pembuatan Sabun
Transparan dari RBDPO dan VCO ....................................... II-16
Gambar 6.1 Instrumentasi Tangki Saponifikasi ................................................. VI-4
Gambar 6.2 Instrumentasi pada Pompa ...................................................VI-4
Gambar 6.3 Instrumentasi pada Tangki ...................................................VI-5
Gambar 6.4 Instrumentasi pada Tangki Pencampur .................................VI-5
Gambar 6.5 Instrumentasi Cooler ...........................................................VI-6
Gambar 6.6 Instrumentasi Separator .......................................................VI-6
Gambar 7.1 Diagram Alir Pengolahan Air .................................................... VII-27
Gambar 8.1 Tata Letak Pra Rancangan Pabrik Pembuatan Sabun
Transparan dari RBDPO dan VCO ............................................. VIII-6
Gambar 9.1 Bagan Struktur Organisasi Perusahaan Pra Rancangan
Pabrik Pembuatan Sabun Transparan .......................................... IX-15
Gambar LE.1 Grafik BEP ................................................................................. LE-29
Hal
LAMPIRAN A PERHITUNGAN NERACA MASSA ....................................... LA-1
LAMPIRAN B PERHITUNGAN NERACA PANAS ........................................ LB-1
LAMPIRAN C PERHITUNGAN SPESIFIKASI PERALATAN ...................... LC-1
LAMPIRAN D PERHITUNGAN SPESIFIKASI ALAT UTILITAS ................ LD-1
LAMPIRAN E PERHITUNGAN ASPEK EKONOMI ...................................... LE-1
Dari tabel 2.2 dapat kita lihat bahwa VCO memiliki kandungan Asam Laurat yang
sangat tinggi, dimana Asam Laurat ini sangat perlu dalam proses pembuatan
sabun transparan yang berfungsi untuk menghaluskan dan melembabkan kulit.
2.3 Sabun
2.3.1 Sejarah Sabun.
3. Kalium Hidroksida
(KOH)
Sifat – sifat :
• Berat molekul : 56,10 gr/mol
• Spesifik grafity : 2,044
• Titik leleh : 380 0C
• Titik didih : 1320 0C
5. Asam Sitrat
• Densitas : 1,665 ×103
kg/m3
• Titik lebur : 426 K
(153 °C)
• Temperatur penguraian
termal : 448 K (175 °C)
6. Etanol
• Berat Molekul : 46,07
g/mol
7. Gula
● Berat molekul : 180,18 gr/mol
● Spesific gravity : 1,544
● Suhu lebur : 146°C
● Kelarutan dalam air : 82 gr/100 ml (17,5°C)
● Tidak mudah atau sedikit larut dalam alkohol.
● Pada bentuk kristal monohidratnya berwarna putih.
8. Pewangi
Pewangi merupakan bahan yang ditambahkan dalam suatu produk
kosmetik dengan bertujuan untuk menutupi bau yang tidak enak dari
bahan lain dan untuk memberikan wangi yang menyenangkan terhadap
pemakainya. Jumlah yang ditambahkan tergantung kebutuhan tetapi
biasanya 0,5-5% untuk campuran sabun. Pewangi yang biasa dipakai
adalah Essential Oil dan Fragrance Oils. Pewangi yang digunakan pada
Pra Rancangan Pabrik Pembuatan Sabun Transparan ini adalah Essential
Oils.
2. Gliserol
● Berat Molekul : 92,09 g/mol
● Densitas : 1,26 g/ cm3
● Titik didih : 290 0C
● Titik leleh : 17,9 0C
● Indeks bias, 20 0C : 1, 47399
● Tekanan uap, 100 0C : 26 KPa
● Viskositas, 20 0C : 1495 cp
● Specific gravity, 25/25 0C : 1, 2620
● Panas penguapan, 55 0C : 88,12 J/mol
● Flash point : 177 0C
● Fire point : 204 0C
(Perry, 1997)
Gas CO2 yang terbentuk dipisahkan dengan gas separator dimana gas CO2
dihilangkan dengan steam. Disamping memisahkan CO2, gas separator juga dapat
memisahkan senyawa-senyawa volatile lain yang terdapat pada sabun transparan,
sehingga dihasilkan sabun transparan yang lebih murni. Proses netralisasi asam
lemak dengan Na2CO3 dan NaOH ini dikenal dengan nama Mazzoni CC,
sementara proses yang terdahulu yakni Netralisasi asam lemak dengan
menggunakan NaOH dengan nama Mazzoni.
Secara keseluruhan proses Netralisasi asam lemak ini dinyatakan dalam
persamaan reaksi sebagai berikut :
O O
CH2 O C R CH2OH K O C R
O O
CH O C R 3 KOH CH- OH K O C R
O O
CH2 O C R CH2OH K O C R
3.1.3. SEPARATOR
Tabel 3.3 Hasil Perhitungan Neraca massa pada Separator
NERACA PANAS
Basis perhitungan : 1 jam operasi
Satuan operasi : kJ/jam
Temperatur referensi : 25oC = 298 K
Q = ∫ mi . Cp i . dT ……………………...........………..…………….........(4
Perhitungan Panas Bahan Masuk (Qin) dan keluar (Qout)
-1)
BP
Q = Fi ∫ Cp l i dT + ΔH vl + ∫ Cp dT ………………...........……......(4
T
298
gi
BP
-2)
4.2 Saponifikasi
Fungsi : Tempat berlangsungnya reaksi pembentukan Sabun
Tabel 4.2 Neraca Panas di Saponifikasi
Masuk (kkal/jam) Masuk (kkal/jam)
Panas umpan 277.695,456
Panas steam 18.124,91
Panas produk 299.462,045
Σ 299.462,045 299.462,045
4.3 Cooler - 01
Fungsi : Menurunkan suhu sebelum diumpankan ke TM - 02
Tabel 4.3 Neraca Panas di Cooler - 01
Masuk (kJ/jam) Keluar (kJ/jam)
Panas umpan 239.411,754
Panas Qc 174.117,639
Panas produk 65.294,114
Σ 239.411,754 239.411,754
5.7 Separator
Fungsi : Untuk memisahkan sabun dengan gliserol dan impurities
berdasarkan gaya Gravitasi, lama pemisahan 60 menit
Bentuk : Tangki silinder vertikal dengan alas datar dan tutup datar.
Bahan : Carbon steel, SA – 285, Gr.C
Jumlah : 1 unit
Laju Alir massa : 9.518,819 kg/jam
Kondisi operasi :
Tutup
- Diameter : 2,250 m
- Tebal : 1,5 in
Pengaduk
- Kecepatan putaran(N) = 60 rpm = 1 rps
- Diameter impeler (Da) = 0,750 m
- Tinggi pengaduk dari dasar (E) = 0,750 m
Jaket Pemanas
- Diameter dalam jaket (D1) = 2,289 m
- Diameter luar jaket (D2) = 2,329 m
6.1 Instrumentasi
Instrumentasi adalah peralatan yang dipakai di dalam suatu proses kontrol
untuk mengatur jalannya suatu proses agar diperoleh hasil sesuai dengan yang
diharapkan. Alat-alat instrumentasi dipasang pada setiap peralatan proses dengan
tujuan agar para teknisi dapat memantau dan mengontrol kondisi di lapangan.
Dengan adanya istrumentasi ini pula, para teknisi dapat segera melakukan
tindakan apabila terjadi kejanggalan dalam proses. Namun pada dasarnya, tujuan
pengendalian tersebut adalah agar kondisi proses di pabrik mencapai tingkat
kesalahan (error) yang paling minimum sehingga produk dapat dihasilkan secara
optimal (Considine, 1985).
Tujuan pabrik secara keseluruhan adalah untuk mengkonversi bahan baku
tertentu menjadi produk yang diinginkan menggunakan sumber-sumber energi
yang tersedia, dengan cara yang paling ekonomis. Selama operasi ini, suatu pabrik
kimia harus memenuhi beberapa persyaratan yang ditentukan perancangnya dan
kondisi-kondisi teknis, ekonomi, serta sosial secara umum dengan adanya
perubahan-prubahan eksternal yang mempengaruhi (gangguan). Diantara
persyaratan-persyaratan tersebut adalah sebagai berikut:
1. Keamanan
2. Spesifikasi produk
3. Peraturan-peraturan yang berhubungan dengan lingkungan
4. Jenis peralatan yang digunakan
5. Ekonomi
Semua persyaratan yang disebutkan di atas memerlukan pengawasan yang kontinu
terhadap operasi di dalam pabrik kimia dan pengendalian eksternal untuk
menjamin tercapainya tujuan operasi pabrik. Hal ini dilakukan dengan suatu
susunan peralatan yang rasional (alat-alat ukur, valve, kontroler, komputer) yang
disebut juga dengan instrumentasi dan campur tangan manusia (perancang pabrik
dan operator pabrik), yang keduanya merupakan suatu sistem kontrol
(Stephanopoulos, 1984).
TI
PI
EHC
LC
FC
TS
6.1.2 Pompa
Variabel yang dikontrol pada pompa adalah laju aliran . Untuk mengetahui
laju aliran pada pompa dipasang pengendali aliran Flow Control (FC). Jika laju
aliran pompa lebih besar dari yang diinginkan, maka secara otomatis katup
(control valve) masukan akan menutup atau memperkecil pembukaan katup.
Demikian pula jika laju aliran pompa lebih kecil dari yang diinginkan, maka
secara otomatis katup masukan pompa akan memperbesar pembukaan katup.
FC
LI
FC
AC/DC (110-220 V)
TI
EHC
LC
FC
TC
6.1.6 Separator
Instrumentasi pada separator mencakup pressure indicator (PI) dan level
controller (LC). Pressure indicator (PI) berfungsi untuk menunjukkan tekanan
dalam separator. Level controller (LC) berfungsi untuk mengontrol tinggi cairan
yang ada di dalam separator dengan mengatur aliran umpan yang masuk.
PI
LC
Steam yang digunakan adalah saturated steam pada temperatur 100 oC dan
tekanan 1 bar. Jumlah steam yang dibutuhkan adalah 601,729 kg/jam.
Tambahan untuk faktor kebocoran sebesar 10 %. (Perry, 1999) maka uap
yang hilang adalah :
Air yang hilang karena drift loss biasanya 0,1 – 0,2 % dari air pendingin
yang masuk ke refrigerator (Perry, 1999). Ditetapkan drift loss 0,2 %, maka:
Wd = 0,002 × 8.800,919 = 17,6018 kg/jam
Air yang hilang karena blowdown bergantung pada jumlah siklus sirkulasi
air pendingin, biasanya antara 3 – 5 siklus (Perry, 1997). Ditetapkan 5 siklus,
maka:
We 134,6540
S −1 5 −1
Wb = = = 33,6635 kg/jam (Perry, 1999)
7.2.1 Screening
Tahap screening merupakan tahap awal dari pengolahan air. Adapun
tujuan screening adalah (Degremont, 1991):
- Menjaga struktur alur dalam utilitas terhadap objek besar yang mungkin
merusak fasilitas unit utilitas.
- Memudahkan pemisahan dan menyingkirkan partikel-partikel padat yang
besar yang terbawa dalam air sungai.
Pada tahap ini, partikel yang besar akan tersaring tanpa bantuan bahan
kimia. Sedangkan partikel-partikel yang lebih kecil akan terikut bersama air
menuju unit pengolahan selanjutnya.
7.2.2Sedimentasi
Setelah air disaring pada tahap screening, di dalam air tersebut masih
terdapat partikel-partikel padatan kecil yang tidak tersaring pada screening. Untuk
menghilangkan padatan-padatan tersebut, maka air yang sudah disaring tadi
7.2.3 Klarifikasi
Klarifikasi merupakan proses penghilangan kekeruhan di dalam air. Air
screening di alirkan ke dalam clarifier setelah diinjeksikan larutan alum Al2(SO4)3
dan larutan soda abu Na2CO3. Larutan Al2(SO4)3 berfungsi sebagai koagulan
utama dan larutan dan larutan Na2CO3 sebagai koagulan tambahan yang berfungsi
sebagai bahan pembantu untuk mempercepat pengendapan dengan penyesuaian
pH (basa) dan bereaksi substitusi dengan ion – ion logam membentuk senyawaan
karbonat yang kurang/tidak larut. Reaksi koagulasi yang terjadi adalah (Culp dkk,
1978) :
Al2(SO4)3 . 14H2O + 6HCO3- 2Al(OH)3 + 3SO42- + 6CO2 + 14H2O
Setelah pencampuran yang disertai pengadukan maka akan terbentuk flok-
flok yang akan mengendap ke dasar clarifier karena gaya gravitasi, sedangkan air
jernih akan keluar melimpah (over flow) yang selanjutnya akan masuk ke
penyaring pasir (sand filter) untuk penyaringan.
Pemakaian larutan alum umumnya hingga 50 ppm terhadap jumlah air
yang akan diolah, sedangkan perbandingan pemakaian alum dan soda abu = 1 :
0,54 (Baumann, 1971).
Perhitungan alum dan abu soda yang diperlukan :
Total kebutuhan air = 1673,0237 kg/jam
Pemakaian larutan alum = 50 ppm
Pemakaian larutan soda abu = 0,54 × 50 = 27 ppm
Larutan alum Al2(SO4)3 yang dibutuhkan = 50.10-6 × 1673,0237 = 0,0836
kg/jam
Larutan abu soda Na2CO3 yang dibutuhkan = 27.10-6 × 1673,0237 = 0,04517
kg/jam
7.2.5 Demineralisasi
Air untuk umpan ketel dan proses harus murni dan bebas dari garam-
garam terlarut. Untuk itu perlu dilakukan proses demineralisasi, dimana alat
demineralisasi dibagi atas :
a. Penukar kation
Berfungsi untuk mengikat logam – logam alkali dan mengurangi kesadahan
air yang digunakan. Proses yang terjadi adalah pertukaran antara kation Ca,
Mg, dan Mn yang larut dalam air dengan kation hidrogen dan resin. Resin
yang digunakan bertipe gel dengan merek IR–22 (Lorch, 1981).
Reaksi yang terjadi :
2H+R + Ca2+ Ca2+R + 2H+
2H+R + Mg2+ Mg2+R + 2H+
2H+R + Mn2+ Mn2+R + 2H+
× 264,17 gal/m3
547,1043 kg/jam
= 3
997,08 kg/m
= 144,9518 gal/jam
Kesadahan air = 2,151 gr/gal × 144,9518 gal/jam × 24 jam/hari
= 7484,681 gr/hari = 7,4846 kg/hari
× 264,17 gal/m3
547,1043 kg/jam
=
997,08 kg/m3
= 144,951 gal/jam
Kesadahan air = 6,3970 gr/gal × 144,951 gal/jam × 24 jam/hari
= 22.254,1635 gr/hari = 22,2541 kg/hari
Perhitungan Ukuran Anion Exchanger:
Jumlah air yang diolah = 547,1043 = 2,415 gal/menit
22,2541 kg/hari
Kebutuhan resin = 3
= 0,635 ft3/hari
35 kg/ft
0,635
Tinggi resin = = 0,2024 ft
3,14
Sehingga volume resin yang dibutuhkan = 0,2024 ft × 3,14 ft2 = 0,6358 ft3
0,6358 ft 3 × 35 kg/ft 3
Waktu regenerasi = = 1 hari = 24 jam
17,7679 kg/hari
7.2.6 Deaerator
Deaerator berfungsi untuk memanaskan air yang keluar dari alat penukar
ion (ion exchanger) dan kondensat bekas sebelum dikirim sebagai air umpan
ketel. Pada deaerator ini, air dipanaskan hingga 90°C supaya gas-gas yang terlarut
dalam air, seperti O2 dan CO2 dapat dihilangkan, sebab gas-gas tersebut dapat
menyebabkan korosi. Pemanasan dilakukan dengan menggunakan koil pemanas di
dalam deaerator.
Tutup
- Diameter : 0,609 m
- Tinggi : 0,3048 m
- Tebal : 0,1459 in
Lokasi dan tata letak pabrik merupakan suatu hal yang sangat penting
dalam suatu rancangan pabrik. Dimana hal ini akan sangat mempengaruhi
keuntungan pabrik dan kesempatan untuk melakukan ekspansi di masa depan.
Banyak faktor yang harus dipertimbangkan ketika memilih suatu tempat yang
tepat sebagai lokasi pabrik, seperti pasokan bahan baku, fasilitas transportasi,
ketersediaan pekerja, pengaruh lingkungan dan sebagainya.
Dari pendapat ahli yang dikemukakan di atas dapat diambil arti dari kata
organisasi, yaitu kelompok orang yang secara sadar bekerjasama untuk mencapai
tujuan bersama dengan menekankan wewenang dan tanggung jawab masing-
masing. Secara ringkas, ada tiga unsur utama dalam organisasi, yaitu (Sutarto,
2002):
1. Adanya sekelompok orang
2. Adanya hubungan dan pembagian tugas
3. Adanya tujuan yang ingin dicapai
Menurut pola hubungan kerja, serta lalu lintas wewenang dan tanggung jawab,
maka bentuk-bentuk organisasi itu dapat dibedakan atas (Patria Jati, 2000):
Dapat digunakan oleh setiap organisasi yang besar, apapun tujuannya, betapa
pun luas tugasnya dan betapa pun kompleks susunan organisasinya.
Pengambilan keputusan lebih berbobot karena adanya staf ahli.
Konsep the right man on the right place dapat lebih terjamin
Dari uraian di atas dapat diketahui kebaikan dan keburukan dari beberapa
bentuk organisasi. Setelah mempertimbangkan baik dan buruknya maka pada
Pra-rancangan Pabrik Pembuatan Sabun Transpaan menggunakan bentuk
Fungsi dari manajemen adalah meliputi usaha memimpin dan mengatur faktor-
faktor ekonomis sedemikian rupa, sehingga usaha itu memberikan
perkembangan dan keuntungan bagi mereka yang ada di lingkungan
perusahaan.
Dengan penjelasan ini dapat diambil suatu pengertian bahwa manajemen itu
diartikan sebagai seni dan ilmu perencanaan (planning), pengorganisasian,
penyusunan, pengarahan, dan pengawasan dari sumber daya manusia untuk
mencapai tujuan (criteria) yang telah ditetapkan (Siagian, 1992).
Menurut Siagian (1992), manajemen dibagi menjadi tiga kelas pada perusahaan
besar yaitu:
1. Top manajemen
2. Middle manajemen
3. Operating manajemen
Orang yang memimpin (pelaksana) manajemen disebut dengan manajer.
Manajer ini berfungsi atau bertugas untuk mengawasi dan mengontrol agar
1. Perusahaan Perorangan
2. Persekutuan dengan firma
3. Persekutuan Komanditer
4. Perseroan Terbatas
5. Koperasi
6. Perusahaan Negara
7. Perusahaan Daerah
9.4.3 Direktur
Direktur merupakan pimpinan tertinggi yang diangkat oleh RUPS. Adapun
tugas-tugas direktur adalah:
9.4.5 Sekretaris
Sekretaris diangkat oleh Direktur untuk menangani masalah surat-menyurat
untuk pihak perusahaan, menangani kearsipan dan pekerjaan lainnya untuk
membantu Direktur dalam menangani administrasi perusahaan.
Pabrik pembuatan Sabun Transparan ini direncanakan beroperasi 330 hari per
tahun secara kontinu 24 jam sehari. Berdasarkan pengaturan jam kerja,
karyawan dapat digolongkan menjadi tiga golongan, yaitu:
Hari
Re
1 1 1
gu 1 2 3 4 5 6 7 8 9
0 1 2
I I I
I I I
A I I I - - I I I -
I I I
I I I
I I I
I I I
B - - I I I - I I I
I I I
I I I
I I I
I I I
C - - I I I - I I I
I I I
I I I
I I I
I I I
D I I - I I I - - I
I I I
I I I
X-1
PD = × HPT
IP
12
Dengan: PD = piutang dagang
IP = jangka waktu yang diberikan (3 bulan)
HPT = hasil penjualan tahunan
Dari hasil perhitungan pada Lampiran E diperoleh modal kerja sebesar
Rp. 2.212.100.923.159
Total Modal Investasi = Modal Investasi Tetap + Modal Kerja
= Rp. 1.181.400.934.952,27 + Rp.
2.212.100.923.159,26
= Rp . 3.393.501.858.111,53
Modal investasi berasal dari :
- Modal sendiri/saham-saham sebanyak 70 % dari modal investasi total
Modal sendiri adalah Rp . 2.375.451.300.678,07
× 100 %
Laba sebelum pajak
PM =
Total penjualan
× 100%
Rp. 872.568.387.586,04
PM =
Rp. 4.690.146.938.400,00
PM = 18,60 %
Dari hasil perhitungan diperoleh profit margin sebesar 18,60 %, maka pra
rancangan pabrik ini memberikan keuntungan.
× 100 %
Biaya Tetap
Total Penjualan − Biaya Variabel
BEP =
× 100 %
Rp . 364.094.010.292,52
Rp. 4.690.146.938.400,00 − Rp . 3.449.099.774.754,68
BEP =
BEP = 29,33 %
Kapasitas produksi pada titik BEP = 29,33 % × 149.250.000,24
kg/tahun
= 43786435,13 kg/tahun
Nilai penjualan sabun transparan pada titik BEP = 29,33 % ×
4.477.500.007.200
= Rp. 1.313.593.053.883,44
× 100 %
Laba setelah pajak
ROI =
Total Modal Investasi
× 100 %
Rp . 610.815.371.310,22
ROI =
Rp . 3.393.501.858.111,53
ROI = 17,999 %
Analisa ini dilakukan untuk mengetahui laju pengembalian modal investasi
total dalam pendirian pabrik. Kategori resiko pengembalian modal tersebut
adalah:
• ROI ≤ 15 % resiko pengembalian modal rendah.
× 1 tahun
1
POT =
0,17999
POT = 5,556 tahun = 6 tahun
Dari hasil perhitungan, didapat bahwa seluruh modal investasi akan
kembali setelah 6 tahun operasi.
× 100 %
Laba setelah pajak
RON =
Modal sendiri
× 100 %
Rp . 610.815.371.310,22
RON =
Rp . 2.375.451.300.678,07 .
RON = 25,713 %
−
Biaya Produksi : Rp. 3.813.193.785.047,20,-
−
Hasil Penjualan : Rp. 4.690.146.938.400,-
−
Laba Bersih : Rp. 610.815.371.310,-
−
Profit Margin : 18,60 %
Break Even Point : 29,33%
- Return on Investment : 17,999 %
−
- Return on Network : 25,713 %
−
Pay Out Time : 6 tahun
Internal Rate of Return : 24,2332
Dari hasil analisa aspek ekonomi, maka dapat disimpulkan bahwa
rancangan pabrik pembuatan sabun transparan dari minyak sawit (RBDPO) dan
VCO layak untuk didirikan.
Dimana sisa VCO dan RBDPO dalam produk sebanyak 0,5 % dari produk
merupakan impuritis.
Jumlah Senyawa Sabun yang berasal dari VCO : 20 % x 45 kg = 9 kg
Jumlah Senyawa Sabun yang berasal dari RBDPO : 80 % x 45 kg = 36 kg
Senyawa Sabun = 45 kg
Konversi, X = 95 %
45kg
Maka, jumlah VCO + RBDPO sebagai bahan baku : = 47,368 kg
0,95
Berat VCO + RBDPO : 47,368 kg x 1000 = 47368 gr
47368
Jumlah mol : = 16,842 mol
2812,41
Berat KOH : BM KOH x 16,842 mol
: 56 x 16,842 mol
: 943,152 gr = 0,943 kg
TM-01
F5KOH
F5Air
F5
Tabel LA.1.1 Hasil Perhitungan Neraca Massa Pada Tangki Mixing KOH 30 %
(TM-01).
Massa keluar
Massa Masuk (kg/jam)
Komponen (kg/jam)
Alur 3 Alur 4 Alur 5
KOH 0,934 - 0,934
Air - 2,2 2,2
TOTAL 0,934 2,2 3,143
F1 VCO F2 RBDPO
F5 KOH
TS F6 Sabun
F5 Air
Alur 1
F1 VCO = 20 % x 47,368 = 9,474 kg/jam
Alur 2
F2 RBDPO = 80 % x 47,368 = 37,894 kg/jam
Alur 5
F5 KOH = 0,943 kg/jam
F5 Air = 2,2 kg/jam
Alur 6
F6 Sabun = 9,474 kg/jam + 37,894 kg/jam + 0,943 kg/jam + 2,2 kg/jam
= 50,511 kg/jam
SEPARATOR
F6 Sabun F8 Sabun
F8 Air
F7 Gliserol F8 Impuritis
F7 Air
F6 = F7 + F8
Alur 6
F6 Sabun = 50,511 kg/jam
Alur 7
F7 Gliserol = 3,311 kg/jam
F7 Air = 0,75 kg/jam
Alur 8
F8 = F6 – F7
= 50,511 kg/jam – 4,061 kg/jam
= 46,45 kg/jam
Dimana, F8 Sabun = 45 kg/jam
F8 Air = 1,45 kg/jam
F8 Impuritis = 0,5 kg/jam
F10
F10 Etanol, 300C
F11
F11 Gliserol, 300C
F12
F12 Gula, 300C
F15
F15 Asam Sitrat, 300C
F17
F17 Pewarna 300C
F19
F19 Pewangi, 300C
F9 Air, 40 oC
F9 F20
F9 Sabun, 40 oC
TM-02
F9 Impuritis, 40 oC
F20 Sabun Transparan , 40 oC
Alur 11
F11 Gliserin (99%) = 15 kg/jam
Dimana Air yang dibutuhkan adalah 1 % x 15 kg = 0,15 kg/jam
Alur 12
F12 Gula = 5 kg/jam
Alur 15
F15 Asam Sitrat = 3 kg/jam
Alur 17
F17 Pewarna = 3 kg/jam
Alur 19
F19 Pewangi (98%) = 7 kg/jam
Dimana Air yang dibutuhkan adalah 2 % x 7 kg = 0,14 kg/jam
Alur 20
F20 Sabun = 45 kg/jam
F20 Air = 2,5 kg/jam
20
F Etanol = 19 kg/jam
20
F Gula = 5 kg/jam
F20 Gliserin = 15 kg/jam
F20 Asam Sitrat = 3 kg/jam
F20 Pewarna = 3 kg/jam
F20 Pewangi = 7 kg/jam
20
F Impuritis = 0,5 kg/jam
TM-01
F5KOH
F5Air
F5
F1 VCO F2 RBDPO
F5 KOH
TS F6 Sabun
F5 Air
Alur 1
F1 VCO = 20 % x 8.926,356 = 1.785,271 kg/jam
Alur 2
F2 RBDPO = 80 % x 8.926,356 = 7.141,085 kg/jam
Alur 5
F5 KOH = 177,739 kg/jam
5
F Air = 414,724 kg/jam
SEPARATOR
6
F Sabun F8 Sabun
F8 Air
F7 Gliserol F8 Impuritis
F7 Air
Alur 6
F6 Sabun = 9.518,819 kg/jam
F9 Air, 40 oC
F9 F20
F9 Sabun, 40 oC
TM-02
F9 Impuritis, 40 oC
F20 Sabun Transparan , 40 oC
Alur 10
F10 Etanol = 3.580,492 kg/jam
Dimana Air yang di butuhkan adalah 4 % x 3.580,492 kg = 143,219 kg/jam
Alur 11
F11 Gliserin = 2.826,705 kg/jam
Dimana Air yang dibutuhkan adalah 1 % x 2.826,705 kg = 28,267 kg/jam
Alur 13
F12 Gula = 942,235 kg/jam
Alur 12
F15 Asam Sitrat = 565,341 kg/jam
Alur 15
F19 Pewangi = 1.319,129 kg/jam
Dimana Air yang dibutuhkan adalah 2 % x 1.319,129 kg = 26,383 kg/jam
Alur 20
F20 Sabun = 8.480,114 kg/jam
F20 Air = 471,117 kg/jam
F20 Etanol = 3580,492 kg/jam
F20 Gula = 942,235 kg/jam
F20 Gliserin = 2.826,705 kg/jam
20
F Asam Sitrat = 565,341 kg/jam
F20 Pewarna = 565,341 kg/jam
F20 Pewangi = 1.319,129 kg/jam
F20 Impuritis = 94,223 kg/jam
Tabel LA.2.4 Hasil Perhitungan Neraca massa pada Tangki Mixing (TM-02).
Massa
KOMPONEN Massa Masuk (kg/jam) Keluar
(kg/jam)
Alur 9 Alur 10 Alur 11 Alur 12 Alur 15 Alur 17 Alur 19 Alur 20
Sabun 8.480,114 - - - - - - 8.480,114
Air 273,248 143,219 28,267 - - - 26,383 471,117
Etanol - 3580,492 - - - - - 3580,492
Gliserin - - 2.826,705 - - - - 2.826,705
Gula - - - 942,235 - - - 942,235
Asam Sitrat - - - - 565,341 - - 565,341
Pewarna - - - - - 565,341 565,341
Pewangi - - - - - - 1.319,129 1.319,129
Impuritis 94,223 - - - - - - 94,223
SUB TOTAL 8847,585 3723,711 2854,972 942,235 565,341 565,341 1345,512 18.844,697
TOTAL 18.844,697 18.844,697
Steam
T=100 0C
P=1 atm
Tangki RBDPO 1
RBDPO RBDPO
T=30 0C T=80 0C
P=1 atm P=1 atm
Kondensat
T= 100 0C
P= 1 atm
= 451,535 kg / jam
243.796,641 kkal/jam
msteam =
539,928 kkal/kg
Kondensat
T= 100 0C
P=1 atm
Panas reaksi :
Reaksi :
O O
CH2 O C R CH2OH K O C R
O O
CH O C R + 3 KOH CH OH + K O C R
O O
80 oC, 1 atm
CH2 O C R CH2OH K O C R
= 41,631 kg / jam
22.478,149 kkal/jam
msteam =
539,928 kkal/kg
LB.3. Cooler
Air pendingin
T=30 0C
P=1 atm
Sabun
H2O
Impurities 8 Cooler 9
T=80 0C Sabun
P=1 atm H2O
Gliserol
T=40 0C
P=1 atm
Air pendingin bekas
T= 50 0C
P= 1 atm
= −
(-174.117,639) kkal/jam
(208,6 − 125,9)
= −
(-174.117,639) kkal/jam
(82,7/4,18)
−
(-174.117,639) kkal/jam
(19,784 kkal/kg)
= 8.800,932 kg/jam
Steam
T=10 0C F11 Gliserin 15
P=1 atm F10 Etanol T= 30 0C F Pewangi
T= 30 0C T= 30 0C
F16 Sabun
F16 Etanol
F16 Gliserin
F13 Gula Tangki pengaduk 02 F16 Gula
12
F As.Sitrat F16As. Sitrat
F14 Pewarna F16 Pewarna
T= 30 0C F16 Pewangi
F9 Kondensat F16 Impurities
Sabun T= 100 0C F16 H2O
H2O P= 1 atm T=40 0C
Impurities P=1 atm
T=40 0C
P=1 atm
Universitas Sumatera Utara
Neraca Panas Total :
Q16 = Q9 + Q10 + Q11 + Q12 + Q13+ Q14 + Q15
Q = m.Cp.dT
Neraca panas masuk pada alur 9
Total panas masuk pada alur 9 = 65.294,114 kkal/jam
= 108,563 kg / jam
58.616,359 kkal/jam
msteam =
567,318 kkal/kg
Keterangan gambar :
Ht
Hs Ht = Tinggi tangki
Hs = Tinggi silinder
Dt =Diameter tangki
Dt
V = π D t . H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
8
Dt = 11,402 m = 448,9092 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(38,3556 psi) (224,45458 in)
2(13.700 psi)(0,8) − 0,6(38,3556 psi)
= 1,643 in
Tebal shell standar yang digunakan = 2 in
(Brownell,1959)
Keterangan gambar :
Ht
Hs Ht = Tinggi tangki
Hs = Tinggi silinder
Dt =Diameter tangki
Dt
V = π D t . H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
1872,844 m3 = π D t
3 3
8
Dt = 11,6700 m = 459,4507 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(37,4156 psi) (229,72536 in)
2(13.700 psi)(0,8) − 0,6(37,4156 psi)
= 1,642 in
Tebal shell standar yang digunakan = 2 in
(Brownell,1959)
Keterangan gambar :
Ht
Hs
Ht = Tinggi tangki
Hs = Tinggi silinder
Dt
Dt =Diameter tangki
Gambar LB.6 Tangki Gliserin (T-05)
Data desain :
Laju alir massa Gliserin = 2.826,705 kg/jam
Densitas Gliserin = 1260 kg/m3
Perhitungan :
A. Volume tangki
kg jam
2.826,705 x 30 hari x 24
=
jam hari
Volume Larutan,Vl
kg
1260 3
m
= 1615,26 m3
Faktor kelonggaran (fk) = 20%
Volume tangki, VT = ( 1 + 0,2 ) x 1615,26 m3 = 1938,312 m3
Vs = π D t
3 3
1938,312 m3 = π D t
3 3
8
Dt = 11,80448 m = 464,7426 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(48,2451 psi) (232,37129 in)
2(13.700 psi)(0,8) − 0,6(48,2451 psi)
= 1,7621 in
Tebal shell standar yang digunakan = 2 in
(Brownell,1959)
d. Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan = 2 in
8. Tangki Etanol
Fungsi : Tangki penyimpanan Etanol.
Bentuk : Tangki silinder vertikal dengan alas datar dan tutup ellipsoidal.
Bahan : Carbon steel, SA – 285, Gr.C
Jumlah : 2 unit
He Keterangan gambar :
Ht = Tinggi tangki
Ht
Hs
Hs = Tinggi silinder
Dt =Diameter tangki
Dt
Data desain :
Laju alir massa Etanol = 3580,492 kg/jam
Densitas Etanol = 1514 kg/m3
Perhitungan :
A. Volume tangki
kg jam
3580,492 x 30 hari x 24
=
jam hari
Volume Larutan,Vl
kg
1514 3
m
3
= 1702,744 m
Volume larutan untuk 1 tangki = 1702,744 / 2 = 851,372 m3
Faktor kelonggaran (fk) = 20%
Volume tangki, VT = ( 1 + 0,2 ) x 851,372 m3 = 1021,646 m3
V = π D t . H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
1021,646 m3 = π D t
3 3
8
Dt = 9,5356 m = 375,4170 in
851,372 x14,3034
=
1021,646
= 11,9195 m = 469,2713 in
Tebal shell dan head
Tekanan desain (Pdesain) :
Po = 14,696 psia
Phidrostatis = ρgHc = (1514 kg/m3)(9,8 m/s2)( 11,9195 m)
= 176852,2 N/m2 = 24,7593 psia
Poperasi = Po + P = 14,696 psia + 24,7593 psia = 39,4553 psia
Pdesain = (1+fk)Poperasi = (1+0,2) 39,4553 psia = 47,346 psia
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(47,346 psi) (187,7085 in)
2(13.700 psi)(0,8) − 0,6(47,346 psi)
= 1,6559 in
Tebal shell standar yang digunakan = 2 in (Brownell,1959)
d. Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan = 2 in
Ht
Keterangan gambar :
Hs
Ht = Tinggi tangki
Hs = Tinggi silinder
Dt
Dt =Diameter tangki
Gambar LB.8 Tangki Gliserin (T-06)
Data desain :
Laju alir massa Gliserin = 1.319,129 kg/jam
Densitas Gliserin = 912,28 kg/m3
Perhitungan :
A. Volume tangki
kg jam
1.319,129 x 30 hari x 24
=
jam hari
Volume Larutan,Vl
kg
912,28 3
m
= 1041,098 m3
Faktor kelonggaran (fk) = 20%
Volume tangki, VT = ( 1 + 0,2 ) x 1041,098 m3 = 1249,3176 m3
Vs = π D t
3 3
1249,3176 m3 = π D t
3 3
8
Dt = 10,1969 m = 401,454 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(36,7796 psi) (200,72673 in)
2(13.700 psi)(0,8) − 0,6(36,7796 psi)
= 1,587 in
Tebal shell standar yang digunakan = 2 in
(Brownell,1959)
d. Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan = 2 in
Keterangan gambar :
Ht
Hs
Ht = Tinggi tangki
Hs = Tinggi silinder
Dt
Dt =Diameter tangki
Gambar LB.9 Tangki Gliserol (T-03)
Data desain :
Laju alir massa Gliserol = 671,234kg/jam
Densitas Gliserol = 1261 kg/m3
Perhitungan :
A. Volume tangki
kg jam
671,234 x 30 hari x 24
=
jam hari
Volume Larutan,Vl
kg
1261 3
m
= 383,2581 m3
Faktor kelonggaran (fk) = 20%
Volume tangki, VT = ( 1 + 0,2 ) x 383,2581 m3 = 459,9097 m3
V = π D t . H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
459,9097 m3 = π D t
3 3
8
Dt = 7,3038 m = 287,728 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(36,6012 psi) (143,864 in)
2(13.700 psi)(0,8) − 0,6(36,6012 psi)
= 1,4904 in
Tebal shell standar yang digunakan = 1,5 in
(Brownell,1959)
d. Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan =1,5 in
Data desain :
Laju alir massa Sabun = 18.844,697 kg/jam
Densitas Sabun = 1056 kg/m3
Perhitungan :
A. Volume Gudang
kg jam
18.844,697 x 30 hari x 24
=
jam hari
Kebutuhan ruang
kg
1056 3
m
= 10.759,859 m3
Diasumsikan tinggi maksimum penyimpanan = 8 m
Direncanakan : P,panjang = L=,ebar
Data desain :
Laju alir massa Gula = 942,235 kg/jam
Densitas gula = 1212 kg/m3
Perhitungan :
A. Volume Gudang
kg jam
942,235 x 30 hari x 24
=
jam hari
Kebutuhan ruang
kg
1212 3
m
3
= 559,7435 m
Diasumsikan tinggi maksimum penyimpanan = 8 m
Direncanakan : P,panjang = L=,ebar
Data desain :
Laju alir massa pewarna = 565,341 kg/jam
Densitas Pewarna = 1532 kg/m3
Perhitungan :
A. Volume Gudang
kg jam
565,341 x 30 hari x 24
=
jam hari
Kebutuhan ruang
kg
1532 3
m
= 265,6955 m3
Diasumsikan tinggi maksimum penyimpanan = 8 m
Direncanakan : P,panjang = L=,lebar
=
565,341 x 30 hari x 24
jam hari
Kebutuhan ruang
kg
1257 3
m
= 323,823 m3
Diasumsikan tinggi maksimum penyimpanan = 8 m
Direncanakan : P,panjang = L=,lebar
15. Separator
Fungsi : Untuk memisahkan sabun dengan gliserol dan impurities
berdasarkan gaya Gravitasi, lama pemisahan 60 menit
Bentuk : Tangki silinder vertikal dengan alas datar dan tutup datar.
Bahan : Carbon steel, SA – 285, Gr.C
Jumlah : 1 unit
= 1,811 m3
9.518,819
a. Volume larutan, V =
5.256
= 0,0301 m3
1,811
Volume larutan pada saat pemisahaan =
60
α
Untuk fraksi 0,9 maka H/D = 0,78 (Table 10-64, Perry’s, 1999)
Volume tangki Vt = L x R2 − sin α × cos α
57,30
(Perry’s, 1999)
1,811 = 5,257 R2
R = 0,5869 m
R (radius) = 0,5869 m
Volume tangki (V)
π π 8π 3 π 3
V = Vs + 2 Vh = D3 + 2 D3 = D +2 D
3 24 24 24
10π 3 5π 3
D = D
= 24 12
5π 3
1,811 = D
12
= = 1,333 m = 4,3733 ft
πD
Vc shell 1,158
π
2
2
4 (1,034 )
4
L = Hs + H = 2 (0,278) + 1,333 =1,8905 m
Tekanan hidrostatik :
P=ρxgxL
= 5.256 kg/m3 x 9,8 m/det2 x 1,8905 m = 97.381 Pa
Factor kelonggaran = 5 %
Maka : P design = (1,05) x 97.381 Pa
= 102250,07 Pa = 102,2500 kPa
= = 3,911 mnt
( Hc) xD 4,373 x 3,655
Waktu pemisahaan, Wr = Vr 4,0869
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(102,250 psi) (21,938 in)
2(13.700 psi)(0,8) − 0,6(102,25 psi)
= 1,3526 in
Tebal shell standar yang digunakan = 1,5 in
(Brownell,1959)
Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan =1,5 in
V = π D t H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
8
Volume tutup tangki (Ve)
Ve = π Dt3
1
24
Volume tangki (V)
V = Vs + Ve
Vl =
1
π Dt 2 Hc s
4
1,4132 m3 =
1
π (1,026 ) 2 x H cs
4
Hcs = 1,7100 m = 67,3262 in
Tinggi total cairan (Hc)
Hc = Hcs = 1,7100 m = 67,3262 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(= 24,7170 psi) (20,197 in)
2(13.700 psi)(0,8) − 0,6(24,7170 psi)
= 1,272 in
Tebal shell standar yang digunakan = 1,5 in
(Brownell,1959)
Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan =1,5 in
D. Pengaduk
Jenis : Marine Propeller tiga daun
Kecepatan putaran(N) = 60 rpm = 1 rps (US Petent)
Effisiensi motor = 80 %
Pengaduk didesain dengan standar sebagai berikut : ( McCabe,
1994)
Da : Dt = 1 : 3 J : Dt = 1:12
W : Da = 1 : 5 L : Da = 1 : 4 E: Da = 1:1
Jadi :
- Diameter impeler (Da) = 1/3 x Dt = 1/3 x 1,026 m = 0,3342 m = 1,218 ft
- Lebar baffel (J) = 1/12 x Dt = 1/12 x 1,026 m = 0,0855 m = 0,2804 ft
- Lebar daun impeler (W) = 1/5 x Da = 1/5 x 0,3342 m= 0,0684 m= 0.224 ft
- Panjang daun impeller (L) = 1/4 x Da = 1/4 x 0,3342 m= 0.085 m= 0.28 ft
- Tinggi pengaduk dari dasar (E) = Da = 0,3342 m = 1,218 ft
V = π D t H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
8
Volume tutup tangki (Ve)
Ve = π Dt3
1
24
Volume tangki (V)
5,412 m3 = π Dt3
10
24
Dt = 1,6052 m = 63,1977 in
Vl =
1
π Dt 2 Hc s
4
5,412 m3 =
1
π (1,6502) 2 x H cs
4
Hcs = 2,6757 m = 105,3445 in
Tinggi total cairan (Hc)
Hc = Hcs = 2,6757 m = 105,3445 in
C. Tebal shell dan head
Tekanan desain (Pdesain) :
Po = 14,696 psia
Phidrostatis = ρgHc = (4220,9 kg/m3)(9,8 m/s2)( 2,6757 m)
= 110682,2418 N/m2 = 15,4955 psia
Poperasi = Po + P = 14,696 psia + 15,4955 psia = 30,1915 psia
Pdesain = (1+fk)Poperasi = (1+0,2) 30,1915 psia = 36,2298 psia
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(36,2298 psi) (31,598 in)
2(13.700 psi)(0,8) − 0,6(36,2298 psi)
= 1,3022 in
Tebal shell standar yang digunakan = 1,5 in
(Brownell,1959)
Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan =1,5 in
D. Pengaduk
Jenis : Marine Propeller tiga daun
Kecepatan putaran(N) = 60 rpm = 1 rps (US Petent)
Effisiensi motor = 80 %
Pengaduk didesain dengan standar sebagai berikut : ( McCabe,
1994)
Da : Dt = 1 : 3 J : Dt = 1:12
W : Da = 1 : 5 L : Da = 1 : 4 E: Da = 1:1
Jadi :
- Diameter impeler (Da) = 1/3 x Dt = 1/3 x 1,6052 m = 0,5350 m = 1,7550 ft
- Lebar baffel (J) = 1/12 x Dt = 1/12 x 1,6052 m = 0,1337 m = 0,4387 ft
- Lebar daun impeler (W) = 1/5 x Da = 1/5 x 0,5350 m= 0,107 m= 0,51 ft
- Panjang daun impeller (L) = 1/4 x Da = 1/4 x 0,535 m= 0,133 m= 0,438 ft
- Tinggi pengaduk dari dasar (E) = Da = 0,5350 m = 1,7550 ft
V = π D t H s ( sH: D t = 3 : 2
1 2
4
Vs = π D t
3 3
Ve = π Dt3
1
24
Volume tangki (V)
V = Vs + Ve
14,903 m3 = π Dt3
10
24
Dt = 2,250 m = 88,575 in
Vl =
1
π Dt 2 Hc s
4
14,903 m3 =
1
π (2,187 ) 2 x H cs
4
Hcs = 3,751 m = 147,661 in
Tinggi total cairan (Hc)
Hc = Hcs = 3,751 m = 147,661 in
t= + nC
PR
2SE − 0,6P
= + 10 x (0,125 in)
(64,486 psi) (44,287 in)
2(13.700 psi)(0,8) − 0,6(64,486 psi)
= 1,381 in
Tebal shell standar yang digunakan = 1,5 in
(Brownell,1959)
Tebal tutup tangki
Tutup atas tangki terbuat dari bahan yang sama dengan shell.
Tebal tutup atas yang digunakan =1,5 in
D. Pengaduk
Jenis : Marine Propeller tiga daun
Kecepatan putaran(N) = 60 rpm = 1 rps (US Petent)
Effisiensi motor = 80 %
Pengaduk didesain dengan standar sebagai berikut : ( McCabe, 1994)
Da : Dt = 1 : 3 J : Dt = 1:12
W : Da = 1 : 5 L : Da = 1 : 4 E: Da = 1:1
Jadi :
- Diameter impeler (Da) = 1/3 x Dt = 1/3 x 2,250 m = 0,750 m = 2,460 ft
Desain pipa:
Di,opt = 0,363 (mv)0,45(ρ)0,13 (Timmerhaus, 2004)
= 0,363 (0,000561 m3/s)0,45 (883 kg/m3)0,13
= 1,1893 in
ρ× v×D
Bilangan Reynold:
NRe =
μ
(55,1257 lbm/ft3 )(1,9069 ft/s)(0,115 ft)
=
0,00343 lbm/ft.s
= 139.170,4028 (Turbulen)
Untuk pipa Commercial Steel diperoleh harga ε = 0,000046 (Geankoplis, 2003)
Friction loss:
A v2
= 0,55 1 − 2 = 0,5 5(1 − 0)
2,644 2
A1 2α
1 Sharp edge entrance: hc
2(1)(32,174)
= 0,0597 ft.lbf/lbm
v2 2,644 2
1 elbow 90o: hf = n.Kf. = 1(0,75) = 0,0815
2. g c 2(32,174)
ft.lbf/lbm
v2 2,644 2
1 check valve: hf = n.Kf. = 1(2) = 0,21733 ft.lbf/lbm
(60)(. 2,644)
2. g c 2(32,174)
∆L.v 2
(0,0874 ).2.(32,174)
2
Pipa lurus 60 ft: Ff = 4f = 4(0,00487)
D.2.g c
= 1 (1 − 0 )
= 1,452 ft.lbf/lbm
A1
2(1)(32,174)
= n 1 −
2 2
v2 2,644
A2 2.α .g c
2
1 Sharp edge exit: hex
= 0,1086 ft.lbf/lbm
Total friction loss: ∑F = 1,920 ft.lbf/lbm
( )
Dari persamaan Bernoulli:
v 2 − v1 + g ( z 2 − z1 ) + 2
P − P1
+ ∑ F + Ws = 0
2α ρ
1 2 2
(Geankoplis, 2003)
dimana: v1 = v2
P1 = 1 atm
P2 = 1 atm
∆P = 0 atm = 0 lbf/ft2
tinggi pemompaan ∆Z = 4 ft
maka : 0 +
32,174
(4) + 1,920 + Ws = 0
32,174
Ws = - 5,920 ft.lbf/lbm
Efisiensi pompa, η= 75 %,
Ws
Wp =- (Geankoplis, 2003)
η
Daya pompa: P = m × Wp
= 0,0143 hp
Maka dipilih pompa dengan daya motor 0,5 hp.
Desain pipa:
Di,opt = 3,6 (mv)0,45(ρ)0,13 (Timmerhaus, 2004)
= 0,363 (0,00241 m3/s)0,45 (823, kg/m3)0,13
= 2,245 in
ρ× v×D
Bilangan Reynold:
NRe =
μ
(51,4173 lbm/ft 3 )(2,9202 ft/s)(0,1711 ft)
=
0,00452 lbm/ft.s
= 5.720,43 (Turbulen)
Untuk pipa Commercial Steel diperoleh harga ε = 0,000046 (Geankoplis, 2003)
Friction loss:
A v2
= 0,55 1 − 2 = 0,5 5(1 − 0)
2,9202 2
A1 2α
1 Sharp edge entrance: hc
2(1)(32,174)
= 0,0728 ft.lbf/lbm
v2 2,9202 2
2 elbow 90o: hf = n.Kf. = 2(0,00867) = 0,1907
2. g c 2(32,174)
ft.lbf/lbm
v2 2,9202 2
1 check valve: hf = n.Kf. = 1(2) = 0,265 ft.lbf/lbm
(60)(. 2,9202)
2. g c 2(32,174)
∆L.v 2
(0,1722).2.(32,174)
2
Pipa lurus 60 ft: Ff = 4f = 4(0,00867)
D.2.g c
= 1 (1 − 0 )
= 0,899 ft.lbf/lbm
A
2(1)(32,174)
= n 1 − 1
2 2
v2 2,9202
A2 2.α .g c
2
1 Sharp edge exit: hex
= 0,1325 ft.lbf/lbm
Total friction loss: ∑F = 1,568 ft.lbf/lbm
( )
Dari persamaan Bernoulli:
v 2 − v1 + g ( z 2 − z1 ) + 2
P − P1
+ ∑ F + Ws = 0
2α ρ
1 2 2
(Geankoplis, 2003)
dimana: v1 = v2
maka : 0 +
32,174
(15) + 1,568 + Ws = 0
32,174
Ws = - 21,568 ft.lbf/lbm
Efisiensi pompa, η= 75 %,
Ws
Wp =- (Geankoplis, 2003)
η
- 21,568
=-
0,75
= 28,758 ft.lbf/lbm.
Daya pompa: P = m × Wp
= 0,0125 hp
Maka dipilih pompa dengan daya motor 0,5 hp.
ρ× v×D
Bilangan Reynold:
NRe =
μ
(94,519 lbm/ft3 )(2,230 ft/s)(0,1149 ft)
=
0,00013 lbm/ft.s
= 279.116,4556 (Turbulen)
Untuk pipa Commercial Steel diperoleh harga ε = 0,000046 (Geankoplis, 2003)
Friction loss:
A v2
= 0,55 1 − 2 = 0,5 5(1 − 0)
1,784 2
A1 2α
1 Sharp edge entrance: hc
2(1)(32,174)
= 0,0272 ft.lbf/lbm
v2 1,784 2
1 elbow 90o: hf = n.Kf. = 1(0,75) = 0,0371
2. g c 2(32,174)
ft.lbf/lbm
v2 1,784 2
1 check valve: hf = n.Kf. = 1(2) = 0,0989 ft.lbf/lbm
(60)(. 1,784)
2. g c 2(32,174)
∆L.v 2
(0,1722).2.(32,174)
2
Pipa lurus 60 ft: Ff = 4f = 4(0,00487)
D.2.g c
= 0,670 ft.lbf/lbm
1 Sharp edge exit: hex
= 0,0494 ft.lbf/lbm
Total friction loss: ∑F = 0,8833 ft.lbf/lbm
( )
Dari persamaan Bernoulli:
v 2 − v1 + g ( z 2 − z1 ) + 2
P − P1
+ ∑ F + Ws = 0
2α ρ
1 2 2
(Geankoplis, 2003)
dimana: v1 = v2
P1 = 1 atm
P2 = 1 atm
∆P = 0 atm = 0 lbf/ft2
tinggi pemompaan ∆Z = 20 ft
maka : 0 +
32,174
(20) + 0,8833 + Ws = 0
32,174
Ws = - 20,8833 ft.lbf/lbm
Efisiensi pompa, η= 75 %,
Ws
Wp =- (Geankoplis, 2003)
η
- 20,8833
=-
0,75
= 27,844 ft.lbf/lbm.
Daya pompa: P = m × Wp
= 0,0294 hp
Maka dipilih pompa dengan daya motor 0,5 hp.
ρ× v×D
Bilangan Reynold:
NRe =
μ
(78,661 lbm/ft3 )(2,1159 ft/s ft/s)(0,1149 ft)
=
0,000562lbm/ft.s
= 220.355,1581 (Turbulen)
Untuk pipa Commercial Steel diperoleh harga ε = 0,000046 (Geankoplis, 2003)
Friction loss:
(60)(. 1,692)
2. g c 2(32,174)
∆L.v 2
(0,1722).2.(32,174)
2
Pipa lurus 60 ft: Ff = 4f = 4(0,00487)
D.2.g c
( )
= 0,6034 ft.lbf/lbm
A1
−
2(1)(32,174)
= n 1 −
2
A2 2.α .g c
2
v2 2 1,692
1 Sharp edge exit: hex = 1 1 0
= 0,044 ft.lbf/lbm
Total friction loss: ∑F = 0,7949 ft.lbf/lbm
( )
Dari persamaan Bernoulli:
v 2 − v1 + g ( z 2 − z1 ) + 2
P − P1
+ ∑ F + Ws = 0
2α ρ
1 2 2
(Geankoplis, 2003)
dimana: v1 = v2
P1 = 1 atm
P2 = 1 atm
∆P = 0 atm = 0 lbf/ft2
tinggi pemompaan ∆Z = 20 ft
maka : 0 +
32,174
(20) + 0,7949 + Ws = 0
32,174
Ws = - 20,794 ft.lbf/lbm
Efisiensi pompa, η= 75 %,
Ws
Wp =- (Geankoplis, 2003)
η
- 20,794
=-
0,75
= 27,726 ft.lbf/lbm.
= 0,0698 hp
Maka dipilih pompa dengan daya motor 0,5 hp.
Friction loss:
A v2
= 0,55 1 − 2 = 0,5 5(1 − 0)
1,8907 2
A1 2α
1 Sharp edge entrance: hc
2(1)(32,174)
= 0,0244 ft.lbf/lbm
v2 1,8907 2
1 elbow 90o: hf = n.Kf. = 1(0,75) = 0,0333
2. g c 2(32,174)
ft.lbf/lbm
v2 1,8907 2
1 check valve: hf = n.Kf. = 1(2) = 0,0890 ft.lbf/lbm
(60)(. 1,8907 )
2. g c 2(32,174)
∆L.v 2
(0,1722).2.(32,174)
2
= 1 (1 − 0)
= 0,6034 ft.lbf/lbm
A
2(1)(32,174)
= n 1 − 1
2 2
v2 1,8907
A2 2.α .g c
2
1 Sharp edge exit: hex
= 0,044 ft.lbf/lbm
Total friction loss: ∑F = 0,7949 ft.lbf/lbm
( )
Dari persamaan Bernoulli:
v 2 − v1 + g ( z 2 − z1 ) + 2
P − P1
+ ∑ F + Ws = 0
2α ρ
1 2 2
(Geankoplis, 2003)
dimana: v1 = v2
P1 = 1 atm
P2 = 1 atm
∆P = 0 atm = 0 lbf/ft2
maka : 0 +
32,174
(20) + 0,7949 + Ws = 0
32,174
Ws = - 20,794 ft.lbf/lbm
Efisiensi pompa, η= 75 %,
Ws
Wp =- (Geankoplis, 2003)
η
- 20,794
=-
0,75
= 27,726 ft.lbf/lbm.
Daya pompa: P = m × Wp
= 0,0365 hp
Maka dipilih pompa dengan daya motor 0,5 hp.
Δt 2 − Δt 1
LMTD = = = 38,9965 °F
54
Δt 72
2,3log 2 2,3log
Δt 1 18
(2) Tc dan tc
T1 + T2 176 + 104
Tc = = = 140 °F
2 2
t1 + t 2 104 + 86
tc = = = 95 °F
2 2
(3) Dari Tabel 8, hal. 840, Kern, 1965, kondensor untuk fluida panas cairan dan
fluida dingin air, diperoleh UD = 250-500, dan faktor pengotor (Rd) = 0,003.
Diambil UD = 400 Btu/jam⋅ft2⋅°F
Luas permukaan untuk perpindahan panas,
A= = = 10,5798 ft 2
Q 165.031,0305 Btu/jam
U D × Δt 400 Btu
× 38,9965 o F
jam ⋅ ft ⋅ F
2 o
(5) Pada tc = 95 °F
c = 0,98 Btu/lbm.°F (Gambar 2, Kern, 1965)
k = 0,345 Btu/jam lbm ft.°F (tabel 5, Kern, 1965)
k 0,345
µ
De = =1
0 ,14
µw
µw
0,345
De k 0,077
Gp =
w
aa
Gp = = 1.875.517,865 lbm/jam.ft2
19.505,3858 lb/jam
0,0104
(3) Bilangan Reynold
Pada Tc = 140 °F
µ = 1,657 cP = 4,0099 lbm/ft2⋅jam
D × Gp
Re p =
µ
0,115 × 1.875.517,865
Re p = = 53.788,0133
4,0099
(4) Taksir JH dari Gambar 24, Kern, diperoleh JH = 130 pada Res = 53.788,0133
(5) Pada Tc = 140 °F
c = 0,768 Btu/lbm⋅°F
k = 0,0633 Btu/jam lbm ft.°F
k 0,0633
k c.µ 3 µ
hi = jH × × × = 130 × × 3,6459 × 1 = 260,8879 Btu / jam. ft 2
1 0 ,14
µw
0,0633
De k 0,115
ID
Koreksi hio = hi × = 260,8879 × = 216,8827 Btu / jam. ft
1,38
OD 1,66
(6) Clean Overall Coefficient, UC
= + 0,002
1 1
Ud 114,5619
Ud = 93,4579 Btu / jam. ft 2 F
(8) Luas yang diperlukan, A :
A= = = 45,2818 ft 2
Q 165.031,0305
Ud × ∆t 93,4579 × 38,9965
Dari tabel 11 (Kern,1965) diperoleh :
Luas eksternal (a) = 0,435 ft2/ft
Panjang hairpins yang diperlukan = A/a = 45,2818 /0,435 = 104,096 ft
Digunakan pipa dengan panjang 10 ft dengan 6 hairpins.
Koreksi Ud :
A = a.(24) = 0,435 x 12 = 5,22 ft2
Uc − Ud 114,5619 − 93,4579
Rd = = = 0,001971
Uc × Ud 114,5619 × 93,4579
Kondisi operasi :
Temperatur = 28 °C
Densitas air (ρ) = 995,68 kg/m3 (Geankoplis,
1997)
Laju alir massa (F) = 1.673,0238 kg/jam
1.673,0238 kg/jam × 1 jam/3600 s
Laju alir volume (Q) = 3
= 0,0005 m3/s
995,68 kg/m
Dari tabel 5.1 Physical Chemical Treatment of Water and Wastewater
Ukuran bar :
Lebar bar = 5 mm; Tebal bar = 20 mm;
Bar clear spacing = 20 mm; Slope = 30°
LD-1
1200
1200
20
Gambar LD.1 Sketsa sebagian bar screen , satuan mm (dilihat dari atas)
Kondisi operasi :
Temperatur = 30 °C
Tekanan = 1 atm
Densitas air (ρ) = 995,68 kg/m3 = 62,1585 lbm/ft3 (Geankoplis,
1997)
Laju alir massa (F) = 1.673,0238 kg/jam = 1,0245 lbm/s
h
L = K v
υ0
Desain panjang ideal bak : (Kawamura,
1991)
dengan : K = faktor keamanan = 1,5
h = kedalaman air efektif ( 10 – 16 ft); diambil 10 ft.
Uji desain :
=
(10 x 2 x 1) ft 3
= 20,2238 menit
0,9889 ft 3 / min
Desain diterima ,dimana t diizinkan 6 – 16 menit (Kawamura, 1991).
=
Q laju alir volumetrik
Surface loading :
A luas permukaan masukan air
0,9889 ft3/min (7,481 gal/ft3)
= 2 ft x 1 ft
= 3,6991 gpm/ft2
Desain diterima, dimana surface loading diizinkan diantara 4 – 10 gpm/ft2
(Kawamura, 1991).
Headloss (∆h); bak menggunakan gate valve, full open (16 in) :
∆h = K v2
2g
Perhitungan:
Ukuran Tangki
0,0837 kg/jam × 24 jam/hari × 30 hari
Volume larutan, Vl =
0,3 × 1363 kg/m 3
= 0,1473 m3
Volume tangki, Vt = 1,2 × 0,1473 m3 = 0,1768 m3
Direncanakan perbandingan diameter dengan tinggi silinder tangki, D : H = 3 : 2
V=
1 2
πD H
4
3
0,1768 m3 = πD 2 D
1
4 2
0,1768 m3 = πD3
3
8
t=
PD
2SE − 1,2P
=
(16,8291 psia)( 0,5499 m)
2(12650psia)(0,8) − 1,2(16,8291 psia)
= 0,0005 m = 0,0180 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0180 in + 0,125 in = 0,1430 in
Daya Pengaduk
Jenis pengaduk : flat 6 blade turbin impeller
Jumlah baffle : 4 buah
dengan :
Dt = diameter tangki
Da = diameter impeller
E = tinggi turbin dari dasar tangki
L = panjang blade pada turbin
W = lebar blade pada turbin
J = lebar baffle
ρ N (D a )2
N Re = (Geankoplis, 1997)
μ
=
(85,0889)(1)(0,1833 x3,2808)
2
= 45.791,9556
6,72 ⋅ 10− 4
N Re
P=
K T .n 3 .D a ρ
5
gc
(McCabe,1999)
KT = 6,3
(McCabe,1999)
= 1,3105 ft.lbf/det x
1Hp
= 0,0024 Hp
550 ft.lbf/det
Kondisi operasi :
Temperatur = 30 °C
Tekanan = 1 atm
Na2CO3 yang digunakan = 27 ppm
Na2CO3 yang digunakan berupa larutan 30 % (% berat)
Laju massa Na2CO3 = 0,0452 kg/jam
Densitas Na2CO3 30 % = 1327 kg/m3 = 82,845 lbm/ft3 (Perry, 1999)
Kebutuhan perancangan = 30 hari
Faktor keamanan = 20 %
0,0980 m3 = πD 2 ((3/2D ))
4
1
4
0,0980 m3 = πD3
3
8
Maka: D = 0,3050 m ; H = 0,4575 m
=
(16,1859 psia)( 0,3050 m)
2(12650psia)(0,8) − 1,2(16,1859 psia)
= 0,0002 m = 0,0096 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0096 in + 0,125 in = 0,1346 in
Daya Pengaduk
Jenis pengaduk : flat 6 blade turbin impeller
Jumlah baffle : 4 buah
Untuk turbin standar (McCabe, 1999), diperoleh:
Da/Dt = 1/3 ; Da = 1/3 x 0,3050 m = 0,1017 m
E/Da = 1 ; E = 0,1017 m
L/Da = ¼ ; L = ¼ x 0,1017 m = 0,0254 m
W/Da = 1/5 ; W = 1/5 x 0,1017 m = 0,0203 m
J/Dt = 1/12 ; J = 1/12 x 0,3050 m = 0,0254 m
dengan :
Dt = diameter tangki
Da = diameter impeller
E = tinggi turbin dari dasar tangki
L = panjang blade pada turbin
W = lebar blade pada turbin
J = lebar baffle
ρ N (D a )2
N Re = (Geankoplis,
μ
1997)
P=
K T .n 3 .D a ρ
5
(
gc
McCabe,1999)
KT = 6,3
(McCabe,1999)
6,3.(1 put/det)3 .(0,1017 × 0,0905 ft)5 (82,845 lbm/ft 3 )
P=
32,174 lbm.ft/lbf.det 2
= 0,0670 ft.lbf/det x
1hp
= 0,0001 Hp
550 ft.lbf/det
Kondisi operasi :
Temperatur = 30 °C
Tekanan = 1 atm
H2SO4 yang digunakan mempunyai konsentrasi 5 % (% berat)
Laju massa H2SO4 = 0,1698 kg/jam
Densitas H2SO4 = 1061,7 kg/m3 = 66,2801 lbm/ft3 (Perry,
1999)
Kebutuhan perancangan = 30 hari
Faktor keamanan = 20 %
V=
1 2
πD H
2,7628 m3 = πD 2 (3/2D )
4
1
4
2,7628 m3 = πD3
3
8
Maka, D = 8,5955 m ; H = 12,8932 m
t=
PD
2SE − 1,2P
=
(32,4555 psia)( 8,5955 m)
2(12650psia)(0,8) − 1,2(32,4555 psia)
= 0,0138 m = 0,5437 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,5437 in + 0,125 in = 0,6687 in
Daya Pengaduk
Jenis pengaduk : flat 6 blade turbin impeller
Jumlah baffle : 4 buah
Untuk turbin standar (McCabe, 1999), diperoleh:
Da/Dt = 1/3 ; Da = 1/3 x 8,5955 m = 2,8652 m
E/Da = 1 ; E = 2,8652 m
L/Da = ¼ ; L = ¼ x 2,8652 = 0,7163 m
W/Da = 1/5 ; W = 1/5 x 2,8652 = 0,5730 m
J/Dt = 1/12 ; J = 1/12 x 8,5955 = 0,7163 m
ρ N (D a )
Bilangan Reynold,
=
2
N Re (Geankoplis, 1983)
μ
N Re =
(66,2801 )(1)(6,6827 × 2,8652)2 = 488.046,1011
0,012
NRe > 10.000, maka perhitungan dengan pengadukan menggunakan rumus:
(McCabe,
gc
1999)
KT = 4,1 (McCabe,
1999)
4,1 (1 put/det)3 .(2,8652 × 3,2808 ft)5 (66,2801 lbm/ft3 )
P=
1Hp
2
x
32,174 lbm.ft/lbf.det 550 ft.lbf/det
= 426 Hp
Efisiensi motor penggerak = 80 %
426
Daya motor penggerak = = 496,87 Hp
0,8
Maka daya motor yang dipilih 500 hp
( )
Maka : Hs : Di = 3 : 2
πDi 2 3 2 Di
Maka : Vs=
πDi 2 (3Di )
4
0,8550 =
8
Di = 2,6599 f
Hs = 3/2 Di = 3/2 (2,6599)
= 3,9899 m = 13,0868 ft
volume cairan x tinggi silinder
Tinggi cairan dalam tangki =
volume silinder
(0,7125 m3 )(3,9899 m)
= = 3,3249 m
0,8550 m3
Tebal Dinding Tangki
Tekanan hidrostatik, Phid = ρx g x l
= 1518 kg/m3 x 9,8 m/det2 x 3,3249 m
= 49.462,6696 kg/m.det2
kg 1000 g 1m
= 49.462,6696 2
x x
m.det 1kg 100cm
= 494.626,6958 g/cm.det2 = 7,1740 psia
t=
PD
2SE − 1,2P
=
(22,9634 psia)( 2,6599 m)
2(12650psia)(0,8) − 1,2(22,9634 psia)
= 0,0030 m = 0,1190 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,1190 in + 0,125 in = 0,2440 in
Daya Pengaduk
Jenis pengaduk : flat 6 blade turbin impeller
Jumlah baffle : 4 buah
Untuk turbin standar (McCabe, 1999), diperoleh:
Da/Dt = 1/3 ; Da = 1/3 x 2,6599 m = 0,8866 m
E/Da = 1 ; E = 0,8866 m
L/Da = ¼ ; L = ¼ x 0,8866 m = 0,2217 m
W/Da = 1/5 ; W = 1/5 x 0,8866 m = 0,1773 m
J/Dt = 1/12 ; J = 1/12 x 2,6599 m = 0,0927 m
dengan :
Dt = diameter tangki
Da = diameter impeller
E = tinggi turbin dari dasar tangki
L = panjang blade pada turbin
W = lebar blade pada turbin
J = lebar baffle
Kecepatan pengadukan, N = 1 putaran/det
Viskositas NaOH 4% = 4,302 . 10-4 lbm/ft.det (Othmer,
1967)
Bilangan Reynold,
N Re = = 1.864.025,3775
4,302 ⋅ 10− 4
NRe > 10.000, maka perhitungan dengan pengadukan menggunakan rumus:
P=
K T .n 3 .D a ρ
5
(
gc
McCabe,1999)
KT = 4,1
(McCabe,1999)
P=
4,1.(1 put/det)3 .(2,9082 ft)5 (94,7662 lbm/ft3 ) 1hp
2
x
32,174 lbm.ft/lbf.det 550 ft.lbf/det
= 0,0120 Hp
Kondisi operasi:
Temperatur = 30 °C
Tekanan = 1 atm
Ca(ClO)2 yang digunakan = 2 ppm
Ca(ClO)2 yang digunakan berupa larutan 70 % (% berat)
Laju massa Ca(ClO)2 = 0,0027 kg/jam
V=
1 2
πD H
4
3
0,1368 m3 = πD 2 D
1
4 2
0,1368 m3 = πD3
3
8
Maka, D = 0,4257 m ; H = 0,6385 m
t=
PD
2SE − 1,2P
=
(16,440 psia)( 0,4257 m)
2(12650psia)(0,8) − 1,2(16,440 psia)
= 0,0003 m = 0,013 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,013 in + 0,125 in = 0,138 in
Daya Pengaduk :
Jenis pengaduk : flat 6 blade turbin impeller
Jumlah baffle : 4 buah
Untuk turbin standar (McCabe, 1993), diperoleh:
Da/Dt = 1/3 ; Da = 1/3 x 0,4257 m = 0,1419 m
E/Da = 1 ; E = 0,1419
L/Da = ¼ ; L = 1/4 x 0,1419 m = 0,0355 m
W/Da = 1/5 ; W = 1/5 x 0,1419 m = 0,0284 m
J/Dt = 1/12 ; J = 1/12 x 0,4257 m = 0,0355 m
dengan :
Dt = diameter tangki
Da = diameter impeller
E = tinggi turbin dari dasar tangki
L = panjang blade pada turbin
W = lebar blade pada turbin
J = lebar baffle
Kecepatan pengadukan, N = 1 putaran/det
ρ N ( D a )2
Bilangan Reynold,
N Re =
µ
(Pers. 3.4-1, Geankoplis,
N Re = = 25.607,2065
6,7194 ⋅ 10− 4
NRe < 10.000, maka perhitungan dengan pengadukan menggunakan rumus:
P=
K T .n 3 .D a ρ
5
N Re g c
KT = 4,05
P=
4,05.(1 put/det)3 .(0,135 ft)5 (79,4088 lbm/ft3 ) 1hp
2
x
(4850,0323)(32,17 lbm.ft/lbf.det ) 550 ft.lbf/det
= 1,058.10− 6 hp
Efisiensi motor penggerak = 80 %
1,058.10−6
Daya motor penggerak = = 1,322.10-6 Hp
0,8
Maka daya motor yang dipilih 0,05 Hp
Data:
Laju massa air (F1) = 1.673,0238 kg/jam
Laju massa Al2(SO4)3 (F2) = 0,0837 kg/jam
Laju massa Na2CO3 (F3) = 0,0452 kg/jam
Laju massa total, m = 1.673,0238 kg/jam = 0,9962 kg/detik
Reaksi koagulasi:
Al2(SO4)3 + 3 Na2CO3 + 3 H2O → 2 Al(OH)3 + 3 Na2SO4 + 3CO2
Perhitungan:
Dari Metcalf & Eddy, 1984, diperoleh :
Untuk clarifier tipe upflow (radial):
Kedalaman air = 3-10 m
Settling time = 1-3 jam
Dipilih : kedalaman air (H) = 3 m, waktu pengendapan = 1 jam
Diameter dan Tinggi clarifier
(1.673,1526 )
Densitas larutan,
ρ=
+ +
1.673,0238 0,0837 0,0452
996,2 2710 2533
ρ = 996,247 kg/m3 = 0,996 gr/cm3
1.673,1526 kg/jam × 1 jam
Volume cairan, V = = 1,6795 m3
996,247
V = 1/4 π D2H
4 × 1,6795
D = ( )1/2 = = 0,3566 m
1/2
4V
πH 3,14 × 3
Maka, diameter clarifier = 0,3566 m
Tinggi clarifier = 1,5 D = 0,5349 m
t=
PD
2SE − 1,2P
=
(16,2260 psia)( 0,3566 m)
2(12650psia)(0,8) − 1,2(16,2260 psia)
= 0,0003 m = 0,0113 in
1Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0113 in + 0,125 in = 0,1349 in
Desain torka yang diperlukan untuk operasi kontinu yang diperlukan untuk
pemutaran (turnable drive) : (Azad,
1976)
T, ft-lb = 0,25 D2 LF
Faktor beban (Load Factor) : 30 lb/ft arm (untuk reaksi koagulasi sedimentasi )
Sehingga : T = 0,25 [(0,3174 m).(3,2808 ft/m) ]2.30
T = 8,1361 ft-lb
Daya Clarifier
P = 0,006 D2 (Ulrich, 1984)
dimana: P = daya yang dibutuhkan, kW
Sehingga,
π.Di 2 Hs
Volume silinder tangki (Vs) =
4
Direncanakan perbandingan tinggi tangki dengan diameter tangki Hs : Di = 3 : 1
3π .Di 3
Vs =
4
3π .Di 3
0,6721 m3 =
4
Di = 0,6582 m; H = 1,9746 m
t=
PD
2SE − 1,2P
=
(16,8979 psia)( 0,6582 m)
2(12650psia)(0,8) − 1,2(16,8979 psia)
= 0,0006 m = 0,0217 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0217 in + 0,125 in = 0,1467 in
Kondisi operasi :
Temperatur = 30 °C
Tekanan = 1 atm
Data :
Laju massa air = 547,1044 kg/jam
Densitas air = 995,68 kg/m3 = 62,1985 lbm/ft3
(Geankoplis,1997)
Kebutuhan perancangan = 1 jam
Faktor keamanan = 20 %
= 3,0 ft
Diameter tutup = diameter tangki = 2 ft
Rasio axis = 2 : 1
Tinggi tutup =
1
(2) = 1 ft = 0,3048
2
(Brownell,1959)
Sehingga, tinggi cation exchanger = 3,0 ft + 2(1) ft = 5 ft = 1,524 m
t=
PD
2SE − 1,2P
=
(17,695 psia)(0,609 m)
2(12650psia)(0,8) − 1,2(17,695 psia)
= 0,00053 m = 0,0209 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0209 in + 0,125 in = 0,1459 in
Kondisi operasi :
Temperatur = 30 oC
Tekanan = 1 atm
Laju massa air = 547,1044 kg/jam
Densitas air = 995,68 kg/m3 (Geankoplis, 1997)
= 3 ft = 0,9144 m
Diameter tutup = diameter tangki = 0,3048 m
Rasio axis = 2 : 1
Tinggi tutup =
1
(0,3048) = 0,1524 m (Brownell,1959)
2
Sehingga, tinggi anion exchanger = 0,9144 + 2(0,1524) = 3,304 m
t=
PD
2SE − 1,2P
=
(20,341 psia)(0,3048 m)
2(12650psia)(0,8) − 1,2(20,341 psia)
= 0,00061 m = 0,0241 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0241 in + 0,125 in = 0,149 in
Kondisi operasi :
Fraksi suhu air masuk menara 60°C = 0,7
Fraksi suhu air masuk menara 40°C = 0,3
Suhu air masuk menara (TL2) = 0,7x60 + 0,3x40 = 54°C = 129,2°F
Suhu air keluar menara (TL1) = 28°C = 82,4°F
Suhu udara (TG1) = 28 °C = 82,4°F
Dari Gambar 12-14 Perry dkk, 1999, diperoleh suhu wet bulb, Tw = 70°F.
Dari kurva kelembaban, diperoleh H = 0,013 kg uap air/kg udara kering
Dari Gambar 12-14 Perry dkk, 1999, diperoleh konsentrasi air = 1,75
gal/ft2⋅menit
Densitas air (54°C) = 987,12 kg/m3
Laju massa air pendingin = 7040,737 kg/jam
Laju volumetrik air pendingin = 7040,737 / 987,12 = 71,756 m3/jam
Kapasitas air, Q = 71,756 m3/jam × 264,17 gal/m3 / (60 menit/jam)
= 315,929 gal/menit
29 (1,207.10-7)(1,013.105)
= 1,716 m
Diambil performance menara 90 %, maka dari Gambar 12-15 Perry dkk,
1999, diperoleh tenaga kipas 0,03 Hp/ft2.
Daya menara = 0,03 Hp/ft2 × 347,84 ft2 = 10,43 hp
Digunakan daya standar 11 hp
Kondisi operasi :
Temperatur = 30 oC
Laju massa air = 1.673,0238 kg/jam
Densitas air = 995,68 kg/m3 = 62,1586 lbm/ft3 (Geankoplis,
1997)
Kebutuhan perancangan = 3 jam
V=
1 2
πD H
4
6
6,0490 m 3 = πD 2 D
1
4 5
6,0490 m 3 = πD3
3
10
D = 1,858 m ; H = 2,229 m
volume cairan x tinggi silinder
Tinggi cairan dalam tangki =
volume silinder
(5,0408)(2,2298)
= = 1,858 m = 6,096 ft
(6,0490)
Tebal Dinding Tangki
Tekanan hidrostatik, Phid = ρx g x l
= 995,68 kg/m3 x 9,8 m/det2 x 1,858 m
= 18.131,1565 kg/m.det2
kg 1000 g 1m
= 18.131,1565 2
x x
m.det 1kg 100cm
= 181.311,5647 kg/cm.det2 = 2,6297 psia
t=
PD
2SE − 1,2P
=
(18,1920 psia)(1,8581 m)
2(12650psia)(0,8) − 1,2(18,1920 psia)
= 0,0017 m = 0,0658 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,0658 in + 0,125 in = 0,1908 in
Kondisi operasi :
Temperatur = 30 °C
Tekanan = 1 atm
Laju massa air = 940 kg/jam
Densitas air = 995,68 kg/m3 (Perry, 1997)
Kebutuhan perancangan = 24 jam
Faktor keamanan = 20 %
Perhitungan:
940, kg/jam × 24 jam
Volume air, Va = 3
= 22,6579 m3
995,68 kg/m
(22,6579 )(4,2701)
Tinggi air dalam tangki = = 3,5584 m
(27,1895 )
=
(20,7186 psia)(2,8467 m)
2(12650psia)(0,8) − 1,2(20,7186psia)
= 0,0029 m = 0,1149 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,1149 in + 0,125 in = 0,2399 in
LD.15 Deaerator (DE)
Fungsi : Menghilangkan gas-gas yang terlarut dalam air umpan ketel
Bentuk : Silinder horizontal dengan tutup atas dan bawah elipsoidal
Bahan konstruksi : Carbon steel SA-283 Grade C
Jumlah :1
Kondisi operasi : Temperatur = 90 oC
Tekanan = 1 atm
Kebutuhan Perancangan = 24 jam
Laju alir massa air = 547,1044 kg/jam
Densitas air (ρ) = 995,28 kg/m3 = 62,1936 lbm/ft3 (Perry,
1999)
Faktor keamanan = 20 %
Perhitungan :
547,1044 kg/jam × 24 jam
Volume air, Va = = 13,1875 m3
995,28 kg/m3
V=
1 2
πD H
4
3
15,8250 m3 = πD 2 D
1
4 2
15,8250 m3 = πD3
3
8
Maka: D = 2,3768 m ; H = 3,5652 m
x 2,971 m = 0,5942 m
1
Tinggi tutup =
4
(Brownell,1959)
Tinggi tangki total = 3,5652 x 2( 0,5942 ) = 4,2369 m
Tebal tangki
Tekanan hidrostatik, Phid = ρxgxl
= 996,24 kg/m3 x 9,8 m/det2 x 4,2369 m
= 41.342,6630 kg/m.det2
kg 1000 g 1m
= 41.342,6630 2
x x
m.det 1kg 100cm
= 413.426,6302 kg/cm.det2 = 5,9962 psia
t=
PD
2SE − 1,2P
=
(21,7269 psia)(2,3768 m)
2(12650psia)(0,8) − 1,2(21,7269 psia)
= 0,0026 m = 0,1006 in
Faktor korosi = 0,125 in
Kondisi operasi :
Temperatur : 30 °C
Tekanan : 1 atm
Laju volume solar = 124,652 L/jam
Densitas solar = 0,89 kg/L (Perry,
1997)
Kebutuhan perancangan = 7 hari
Perhitungan :
a. Volume Tangki
Volume solar (Va) = 124,652 L/jam x 7 hari x 24 jam/hari
= 20.941,536 L = 20,9415 m3
Direncanakan membuat 1 tangki dan faktor kelonggaran 20%, maka :
Volume 1 tangki, Vl = 1,2 x 20,9415 m3 = 25,1298 m3
Vs =
π 3
D
3
- Volume tutup tangki (Ve) :
2π 2 π 1 π 3
R Hd = D2 D =
6 4 24
Vh = D
3
(Brownell,1959)
- Volume tangki (V) :
Vt = Vs + Vh
πD 3
3
=
8
25,1298 m3 = 1,1775 D 3
D3 = 21,3416 m3
D = 2,7738 m
D = 109,2047 in
D = 3,6984 m
4
Hs =
3
c. Diameter tutup
Diameter tutup = diameter tangki = 2,7738 m
t=
PD
2SE − 1,2P
=
(19,5581 psia)(4,281 m)
2(12650psia)(0,8) − 1,2(19,5581 psia)
= 0,00270 m = 0,1065 in
Faktor korosi = 0,125 in
Maka tebal shell yang dibutuhkan = 0,1065 in + 0,125 in = 0,2315 in
0,01648 ft 3 /s
Kecepatan linear, v = Q/A = = 2,7470 ft/s
0,006 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0)
2(1)(32,174)
2,4457 2
A1 2α
2(1)(32,174 )
v2 2,4457 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,185 ft.lbf/lbm
2.g c
A
1 Sharp edge exit = hex= 1 − 1 (1 − 0)
2(1)(32,174 )
2
v2 2,4457 2
A2 2.α .g c
= = 0,092
ft.lbf/lbm
Total friction loss : ∑ F = 2,1862 ft.lbf/lbm
Kerja yang diperlukan, -Wf ;
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 2,4457 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
2,4457 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 2,1862 + 0 = 0
2 x 32,174 32,174 62,16
P1 = 2446,0788 lbf/ft2
1 ft 2
= 2446,0788 lbf/ft2 x = 16,9866 lbf/in2
144 in 2
Sehingga,
2446,0788 − 2117,92
-Wf = + 0,0929 + 3 + 2,1862
62,16
= 10,5584 ft.lbf/lbm
= 0,021hp
0,0175
Tenaga pompa yang dibutuhkan = (Geankoplis, 1983)
0,8
Maka dipilih pompa yang berdaya motor 0,05 hp
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,01648)0,45 (62,1258)0,13
= 1,0051 in
0,01648 ft 3 /s
Kecepatan linear, v = Q/A = = 2,7470 ft/s
0,006 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0)
2(1)(32,174)
2,4457 2
A1 2α
= 0,0511 ft.lbf/lbm
v2 2,4457 2
1 elbow 90o: hf = n.Kf. = 1(0,75) = 0,0697 ft.lbf/lbm
2.g c 2(32,174)
2(1)(32,174 )
v2 2,4457 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,185 ft.lbf/lbm
2.g c
A
1 Sharp edge exit = hex= 1 − 1 (1 − 0)
2(1)(32,174 )
2
v2 2,4457 2
A2 2.α .g c
= = 0,092
ft.lbf/lbm
Total friction loss : ∑ F = 2,1862 ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 2,4457 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
2,4457 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 2,1862 + 0 = 0
2 x 32,174 32,174 62,16
P1 = 2446,0788 lbf/ft2
1 ft 2
= 2446,0788 lbf/ft2 x 2
= 16,9866 lbf/in2
144 in
Sehingga,
2446,0788 − 2117,92
-Wf = + 0,0929 + 3 + 2,1862
62,16
= 10,5584 ft.lbf/lbm
Daya pompa, Ws ;
− W f .Q . ρ
WS =
550
.
= = 0,0175 hp
10,5584 ft.lbf / lbm x0,0146 ft 3 / s x 62,16 lbm / ft 3
550 ft.lbf / s.hp
Untuk efisiensi alat 80%, maka :
= 0,021hp
0,0175
Tenaga pompa yang dibutuhkan = (Geankoplis, 1983)
0,8
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 0,08365 kg/jam = 5,1226.10-5 lbm/s
Densitas alum (ρ) = 1363 kg/m3 = 85,0898 lbm/ft3 (Othmer,
1967)
Viskositas alum (µ) = 6,72 10-4 cP = 4,5158.10-7 lbm/ft.s (Othmer,
1967)
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (6,0201.10-7)0,45 (85,0898)0,13
= 0,01103 in
Dari Appendiks A.5 Geankoplis (1997), dipilih pipa commercial steel :
Ukuran nominal : 0,125 in
Schedule number : 40
Diameter Dalam (ID) : 0,269 in = 0,0224 ft
Diameter Luar (OD) : 0,405 in = 0,0338 ft
Inside sectional area : 0,0004 ft2
5,36.10 - 7 ft 3 /s
Kecepatan linear, v = Q/A = = 0,001 ft/s
0,0004 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0 )
2(1)(32,174 )
0,0012
A1 2α
= 3,352.10-8 ft.lbf/lbm
2(1)(32,174 )
v2 0,0012
1 elbow 90° = hf = n.Kf. = 1(0,75) = 4,5722.10-8
2. g c
ft.lbf/lbm
2(1)(32,174 )
v2 0,0012
1 check valve = hf = n.Kf. = 1(2,0) = 1,2192.10-7
2.g c
(30)(. 0,001 )
ft.lbf/lbm
∆L.v 2
(0,0224).2.(32,174)
2
A
exit=hex= 1 − 1 = (1 − 0)
2(1)(32,174)
2
v2 0,0012
A2 2.α .g c
1Sharp edge =6,09.10-8
ft.lbf/lbm
Total friction loss : ∑ F = 1,5675.10-6 ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
= = 7,3542 x 10 − 7 hp
6,00 ft.lbf / lbm x 7,9224.10 - 7 ft 3 / s x 85,0898 lbm / ft 3
550 ft.lbf / s.hp
Kondisi operasi :
P = 1 atm
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (2,973.10-7)0,45 (82,8423)0,13
= 0,008 in
= 4,721.10-9 ft.lbf/lbm
2(1)(32,174 )
v2 0,0007 2
2 elbow 90° = hf = n.Kf. = 2(0,75) = 1,288.10-8 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 0,0007 2
1 check valve = hf = n.Kf. = 1(2,0) = 1,717.10-8 ft.lbf/lbm
2.g c
A1
1Sharpedgeexit=hex= 1 − = (1 − 0)
2(1)(32,174)
2
v2 0,0007 2
A2 2.α .g c
=8,584.10-9
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 0,0007 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
0,0007 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 4,11 x10− 7 + 0 = 0
2 x 32,174 32,174 82,8423
P1 = 2366,4539 lbf/ft2
1 ft 2
= 2366,4539 lbf/ft2 x 2
= 16,4336 lbf/in2
144 in
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 1489,5498 kg/jam = 0,9121 lbm/s
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
0,0146 ft 3 /s
Kecepatan linear, v = Q/A = = 1,411 ft/s
0,006 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
Friction loss :
A2 v 2
1 Sharp edge entrance= hc = 0,55 1 − = 0,55 (1 − 0 )
2(1)(32,174 )
1,4112
A1 2α
= 0,01701 ft.lbf/lbm
v2 1,4112
2 elbow 90o: hf = n.Kf. = 2(0,75) = 0,0464 ft.lbf/lbm
2.g c 2(32,174)
2(1)(32,174 )
v2 1,411 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,0618 ft.lbf/lbm
2.g c
A
1 Sharp edge exit = hex= 1 − 1 (1 − 0)
2(1)(32,174 )
2
v2 1,4112
A2 2.α .g c
= = 0,030
ft.lbf/lbm
Total friction loss : ∑ F = 0,6082 ft.lbf/lbm
Kerja yang diperlukan, -Wf ;
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
ρ
(Geankoplis,1983)
2.g c gc
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,411 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,4112 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,6082 + 0 = 0
2 x 32,174 32,174 62,16
P1 = 2344,1338 lbf/ft2
1 ft 2
= 2344,1338 lbf/ft2 x = 16,2787 lbf/in2
144 in 2
Sehingga,
2344,1338 − 2117,92
-Wf = + 0,0308 + 3 + 0,6082
62,16
= 7,2787 ft.lbf/lbm
Daya pompa, Ws ;
− W f .Q . ρ
WS =
550
.
= = 0,01207 hp
7,2787 ft.lbf / lbm x0,0146 ft 3 / s x 62,16 lbm / ft 3
550 ft.lbf / s.hp
Untuk efisiensi alat 80%, maka :
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 1489,5498 kg/jam = 0,9121 lbm/s
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,0146)0,45 (62,1258)0,13
= 0,9981 in
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0 )
2(1)(32,174 )
1,4112
A1 2α
= 0,01701 ft.lbf/lbm
v2 1,4112
2 elbow 90o: hf = n.Kf. = 2(0,75) = 0,0464 ft.lbf/lbm
2.g c 2(32,174)
2(1)(32,174 )
v2 1,411 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,0618 ft.lbf/lbm
2.g c
A
1 Sharp edge exit = hex= 1 − 1 (1 − 0)
2(1)(32,174 )
2
v2 1,4112
A2 2.α .g c
= = 0,030
ft.lbf/lbm
Total friction loss : ∑ F = 0,6082 ft.lbf/lbm
Kerja yang diperlukan, -Wf ;
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
ρ
(Geankoplis,1983)
2.g c gc
Bila :
= 0,0150 hp
0,01207
Tenaga pompa yang dibutuhkan = (Geankoplis, 1983)
0,8
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,004)0,45 (62,1258)0,13
= 0,5746 in
Friction loss :
= 0,0114 ft.lbf/lbm
2(1)(32,174 )
v2 1,1592
3 elbow 90° = hf = n.Kf. = 3(0,75) = 0,04704 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 1,1592
1 check valve = hf = n.Kf. = 1(2,0) = 0,0418 ft.lbf/lbm
2.g c
A1
= 1 − = (1 − 0)
2(1)(32,174)
2
A2 2.α .g c
v2 1,1592
1 Sharp edge exit = hex =0,021
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,0686 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,1592 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,6389 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2345,4165 lbf/ft2
1 ft 2
= 2345,4165 lbf/ft2 x 2
= 16,3061 lbf/in2
144 in
Sehingga,
= = 0,00356 hp
7,3196 ft.lbf / lbm x0,0022 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00445 hp
0,00356
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 436,8142 kg/jam = 0,267 lbm/detik
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0)
2(1)(32,174)
1,1592
A1 2α
= 0,0114 ft.lbf/lbm
2(1)(32,174 )
v2 1,1592
3 elbow 90° = hf = n.Kf. = 3(0,75) = 0,04704 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 1,1592
1 check valve = hf = n.Kf. = 1(2,0) = 0,0418 ft.lbf/lbm
2.g c
A
= 1 − 1 = (1 − 0)
2(1)(32,174)
2
v2 1,1592
A2 2.α .g c
1 Sharp edge exit = hex =0,021
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,0686 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,1592 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,6389 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2345,4165 lbf/ft2
1 ft 2
= 2345,4165 lbf/ft2 x = 16,3061 lbf/in2
144 in 2
Sehingga,
2345,4165 − 2117,92
-Wf = + 0,021 + 3 + 0,6389
62,1258
= 7,3196 ft.lbf/lbm
Daya pompa, Ws ;
= = 0,00356 hp
7,3196 ft.lbf / lbm x0,0022 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00445 hp
0,00356
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30oC
Laju alir massa (F) = 904 kg/jam = 0,55359 lbm/s
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,0089)0,45 (62,1258)0,13
= 0,7956 in
2(1)(32,174 )
v2 1,4843 2
1 elbow 90° = hf = n.Kf. = 1(0,75) = 0,0256 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 1,4843 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,0684 ft.lbf/lbm
2.g c
A
= 1 − 1 = (1 − 0 )
2(1)(32,174 )
2
v2 1,4843 2
A2 2.α .g c
1 Sharp edge exit = hex = 0,0342
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,4778 ft/s
P1 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,4778 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,2764 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2323,7154 lbf/ft2
1 ft 2
= 2323,7154 lbf/ft2 x = 16,1369 lbf/in2
144 in 2
Sehingga,
2323,7154 − 2117,92
-Wf = + 0,0342 + 3 + 0,2764
62,1258
= 6,6214 ft.lbf/lbm
Daya pompa, Ws ;
− W f .Q . ρ
WS =
550
= = 0,00664 hp
2323,7154 ft.lbf / lbm x 0,0089 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00833 hp
0,00664
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 0,1355 kg/jam = 8,299.10-5 lbm/s
Densitas H2SO4 (ρ) = 1061,7 kg/m3 = 66,2801 lbm/ft3 (Othmer,
1967)
Viskositas H2SO4 (µ) = 5,2 cP = 0,012 lbm/ft.s (Othmer,
1967)
= 8,376.10-8 ft.lbf/lbm
2(1)(32,174 )
v2 0,00312
3 elbow 90° = hf = n.Kf. = 3(0,75) = 3,426.10-7 ft.lbf/lbm
2. g c
( )( )
v2 0,00312
1 check valve = hf = n.Kf. = 1(2,0) = 3,045.10-7 ft.lbf/lbm
2.g c 2 1 32,174
A
exit=hex= 1 − 1 = (1 − 0 )
( )( )
2
v2 0,00312
2 α
1Sharpedge =1,522.10-7
A 2 . . g c 2 1 32,174
ft.lbf/lbm
Total friction loss : ∑ F = 1,593.10-5 ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
= = 9,054.10− 7 hp
6,000 ft.lbf / lbm x 6,5612.10- 7 ft 3 / s x 66,2801lbm / ft 3
550 ft.lbf / s.hp
Untuk efisiensi alat 80%, maka :
9,054.10−7
Tenaga pompa yang dibutuhkan = =1,1317.10− 7 hp (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,004)0,45 (62,1258)0,13
= 0,5746 in
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0)
2(1)(32,174)
1,1592
A1 2α
= 0,0114 ft.lbf/lbm
2(1)(32,174 )
v2 1,1592
1 check valve = hf = n.Kf. = 1(2,0) = 0,0418 ft.lbf/lbm
2.g c
A
= 1 − 1 = (1 − 0)
2(1)(32,174)
2
v2 1,1592
A2 2.α .g c
1 Sharp edge exit = hex =0,021
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,0686 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,1592 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,6389 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2345,4165 lbf/ft2
1 ft 2
= 2345,4165 lbf/ft2 x = 16,3061 lbf/in2
144 in 2
Sehingga,
2345,4165 − 2117,92
-Wf = + 0,021 + 3 + 0,6389
62,1258
= 7,3196 ft.lbf/lbm
= = 0,00356 hp
7,3196 ft.lbf / lbm x0,0022 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00445 hp
0,00356
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 0,0479 kg//jam = 2,9378.10-5 lbm/s
Densitas NaOH (ρ) = 1518 kg/m3 = 94,7662 lbm/ft (Othmer,
1967)
Viskositas NaOH (µ) = 0,00043 cP = 2,8909.10-7 lbm/ft.s (Othmer,
1967)
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (3,0999 x 10-7)0,45 (94,7662)0,13
3,0999 x 10-7 ft 3 /s
Kecepatan linear, v = Q/A = = 0,0007 ft/s
0,0004 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
= 5.695,20838 (Turbulen)
Untuk pipa commercial steel, harga ε = 0,000046 (Geankoplis,
1997)
Pada NRe = 2.984,1922 dan ε/D = 0,00205
Dari Fig.2.10-3 Geankoplis (1997), diperoleh harga f = 0,011
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0 )
2(1)(32,174 )
0,0004 2
A1 2α
2(1)(32,174 )
v2 0,0004 2
3 elbow 90° = hf = n.Kf. = 3(0,75) = 5,7660 x 10-9
2. g c
ft.lbf/lbm
2(1)(32,174 )
v2 0,0004 2
1 check valve = hf = n.Kf. = 1(2,0) = 5,1253 x 10-9
2. g c
ft.lbf/lbm
A
1 Sharp edge exit hex= 1 − 1 = (1 − 0 )
2(1)(32,174 )
2
v2 0,0004 2
A2 2.α .g c
= 2,562x10-8
ft.lbf/lbm
Total friction loss : ∑ F = 1,5205.10-7 ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 0,0004 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
0,0004 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 1,5205.10 -7 + 0 = 0
2 x 32,174 32,174 94,7662
P1 = 2402,226 lbf/ft2
1 ft 2
= 2402,226 lbf/ft2 x 2
= 16,682 lbf/in2
144 in
Sehingga,
2402,226 − 2117,92
-Wf = + 2,562 x 10 -9 + 3 + 1,5205.10 -7
94,7662
= 6,000 ft.lbf/lbm
Daya pompa, Ws ;
= = 1,6793.10 − 7 hp
6,000 ft.lbf / lbm x 1,6243 x 10 -7 ft 3 / s x 94,7662 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
1,6793.10 −7
Tenaga pompa yang dibutuhkan = = 2,0991.10 − 7 hp (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 0,00258 kg/jam = 1,5817.10-6 lbm/s
Densitas kaporit (ρ) = 1272 kg/m3 = 79,4088 lbm/ft3 (Othmer,
1967)
Viskositas kaporit (µ) = 6,7197.10-4 cP = 4,5156.10-7 lbm/ft.s (Othmer,
1967)
Desain pompa :
Di,opt = 3,9 (Q)0,36 (µ)0,18
(Walas,1988)
= 3,9 (1,991.10-8)0,36 (6,7197.10-4)0,18
1,991.10 -8 ft 3 /s
Kecepatan linear, v = Q/A = 2
= 4,9794.10-5 ft/s
0,0004 ft
ρ× v× D
µ
Bilangan Reynold : NRe =
= 196,3051 (Laminar)
16
Untuk laminar, f = (Geankoplis,
N Re
1997)
16
=
196,3051
= 0,0815
Friction loss :
A v2
1 Sharp edge entrance=hc=0,55 1 − 2 =0,55 (1 − 0 )
2(1)(32,174 )
(4,9794.10 -5 ) 2
A1 2α
= 2,1193.10-11 ft.lbf/lbm
2(1)(32,174 )
v2 (4,9794.10 -5 ) 2
1 elbow 90° = hf = n.Kf. = 1(0,75) = 2,8899.10-11
2. g c
ft.lbf/lbm
2(1)(32,174 )
v2 (4,9794.10 -5 ) 2
1 check valve = hf = n.Kf. =1(2,0) = 7,7066.10-11
2.g c
ft.lbf/lbm
Pipalurus20ft=Ff=4f =4(0,0819)
D.2.g c
ft.lbf/lbm
A v2
1 Sharp edge exit=hex= 1 − 1 = (1 − 0 )
2(1)(32,174 )
2
(4,9794.10 -5 ) 2
A2 2.α .g c
=3,853.10-11
ft.lbf/lbm
Total friction loss : ∑ F = 1,1373.10-8 ft.lbf/lbm
Kerja yang diperlukan, -Wf ;
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 4,9794.10-5 ft/s
P1 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
(4,9794 x10 −5 ) 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 1,1373 x10 −8 + 0 = 0
2 x 32,174 32,174 79,4088
P1 = 2356,1464 lbf/ft2
1 ft 2
= 2356,1464 lbf/ft2 x 2
= 16,3621 lbf/in2
144 in
Sehingga,
2356,1464 − 2117,92
-Wf = + 3,8533 x 10 −11 + 3 + 1,1373 x 10 −8
79,4088
= 6,00 ft.lbf/lbm
Daya pompa, Ws ;
= = 1,7254 x10 −8 hp
6,00 ft.lbf / lbm x 1,991.10 -8 ft 3 / s x 79,4088 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
1,7254 x10 −8
Tenaga pompa yang dibutuhkan = = 2,1568 x10 −8 hp (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 904 kg/jam = 0,55359 lbm/s
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,0089)0,45 (62,1258)0,13
= 0,7956 in
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0 )
2(1)(32,174 )
1,4843 2
A1 2α
= 0,0188 ft.lbf/lbm
2(1)(32,174 )
v2 1,4843 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,0684 ft.lbf/lbm
2.g c
A1
= 1 − = (1 − 0 )
2(1)(32,174 )
2
A2 2.α .g c
v2 1,4843 2
1 Sharp edge exit = hex = 0,0342
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,4843 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,4843 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 13,2820 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 3132.143 lbf/ft2
1 ft 2
= 3132.143 lbf/ft2 x 2
= 21,7509 lbf/in2
144 in
Sehingga,
3132,143 − 2117,92
-Wf = + 0,03423 + 3 + 13,2820
62,1258
= 32,6325 ft.lbf/lbm
Daya pompa, Ws ;
− W f .Q . ρ
WS =
550
= = 0,032 hp
32,6325 ft.lbf / lbm x 0,0089 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 436,8142 kg/jam = 0,267 lbm/detik
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,004)0,45 (62,1258)0,13
= 0,5746 in
Friction loss :
A2 v 2
1 Sharp edge entrance= hc = 0,55 1 − = 0,55 (1 − 0)
A1 2α 2(1)(32,174)
1,1592
= 0,0114 ft.lbf/lbm
2(1)(32,174 )
v2 1,1592
3 elbow 90° = hf = n.Kf. = 3(0,75) = 0,04704 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 1,1592
1 check valve = hf = n.Kf. = 1(2,0) = 0,0418 ft.lbf/lbm
2.g c
A1
= 1 − = (1 − 0)
2(1)(32,174)
2
A2 2.α .g c
v2 1,1592
1 Sharp edge exit = hex =0,021
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,0686 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
= = 0,00356 hp
7,3196 ft.lbf / lbm x0,0022 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00445 hp
0,00356
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 25 oC
Laju alir massa (F) = 7.040,737 kg/jam = 4,311 lbm/s
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
0,4984 ft 3 /s
Kecepatan linear, v = Q/A = = 3,5858 ft/s
0,1390 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0 )
2(1)(32,174 )
3,5858 2
A1 2α
= 0,1099 ft.lbf/lbm
2(1)(32,174 )
v2 3,5858 2
1 check valve = hf = n.Kf. = 1(2,0) = 0,3996 ft.lbf/lbm
2.g c
A
1 − 1 = (1 − 0 )
2(1)(32,174 )
2
v2 3,5858 2
A2 2.α .g c
1 Sharp edge exit = hex = = 0,1998
ft.lbf/lbm
Total friction loss : ∑ F = 1,8643 ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 3,5858 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
3,5858 2 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 1,8643 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2432,7121 lbf/ft2
1 ft 2
2
= 2432,7121 lbf/ft x 2
= 16,8938 lbf/in2
144 in
Sehingga,
2432,7121 − 2117,92
-Wf = + 0,1998 + 3 + 1,8643
62,1258
= 10,1283 ft.lbf/lbm
Daya pompa, Ws ;
= = 0,570 hp
10,1283 ft.lbf / lbm x 0,4984 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,7132 hp
0,570
Tenaga pompa yang dibutuhkan = (Geankoplis, 1983)
0,8
Maka dipilih pompa yang berdaya motor 1 hp
Kondisi operasi :
P = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 436,8142 kg/jam = 0,267 lbm/detik
Densitas (ρ) = 995,68 kg/m3 = 62,1258 lbm/ft3
Viskositas (µ) = 0,8007 cP = 0,0005 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,004)0,45 (62,1258)0,13
= 0,5746 in
Friction loss :
A v2
1 Sharp edge entrance= hc = 0,55 1 − 2 = 0,55 (1 − 0)
2(1)(32,174)
1,1592
A1 2α
= 0,0114 ft.lbf/lbm
2(1)(32,174 )
v2 1,1592
3 elbow 90° = hf = n.Kf. = 3(0,75) = 0,04704 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 1,1592
1 check valve = hf = n.Kf. = 1(2,0) = 0,0418 ft.lbf/lbm
2.g c
A
= 1 − 1 = (1 − 0)
2(1)(32,174)
2
v2 1,1592
A2 2.α .g c
1 Sharp edge exit = hex =0,021
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
v1 = 0 ; v2 = 1,0686 ft/s
P2 = 1 atm = 14,696 lbf/in2 = 2117,92 lbf/ft2
Maka :
1,1592 − 0 32,174 (3 − 0) 2117,92 − P1
+ + + 0,6389 + 0 = 0
2 x 32,174 32,174 62,1258
P1 = 2345,4165 lbf/ft2
2 1 ft 2
= 2345,4165 lbf/ft x 2
= 16,3061 lbf/in2
144 in
Sehingga,
2345,4165 − 2117,92
-Wf = + 0,021 + 3 + 0,6389
62,1258
= 7,3196 ft.lbf/lbm
Daya pompa, Ws ;
− W f .Q . ρ
WS =
550
= = 0,00356 hp
7,3196 ft.lbf / lbm x0,0022 ft 3 / s x 62,1258 lbm / ft 3
550 ft.lbf / s.hp
.
Untuk efisiensi alat 80%, maka :
= 0,00445 hp
0,00356
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
Kondisi operasi :
Tekanan = 1 atm
Temperatur = 30 oC
Laju alir massa (F) = 44,5052 kg/jam = 0,0272 lbm/s
Densitas (ρ) = 890,0712 kg/m3 = 55,5656 lbm/ft3
Viskositas (µ) = 1,2 cP = 0,0007 lbm/ft.s
Desain pompa :
Di,opt = 3,9 (Q)0,45 (ρ)0,13
(Walas,1988)
= 3,9 (0,00049)0,45 (55,5656)0,13
= 0,213 in
0,00139 ft 3 /s
Kecepatan linear, v = Q/A = = 0,6592 ft/s
0,00211 ft 2
ρ× v× D
µ
Bilangan Reynold : NRe =
= 0,00371 ft.lbf/lbm
2(1)(32,174 )
v2 1,06866 2
1 elbow 90° = hf = n.Kf. = 1(0,75) = 0,00506 ft.lbf/lbm
2. g c
2(1)(32,174 )
v2 0,6592 2
2 check valve = hf = n.Kf. = 2(2,0) = 0,0270 ft.lbf/lbm
2.g c
A
1 − 1 = (1 − 0 )
2(1)(32,174 )
2
v2 0,6592 2
A2 2.α .g c
1 Sharp edge exit = hex = = 0,0067
ft.lbf/lbm
+ ∑ F + Wf = 0
v22 − v12 g ( Z 2 − Z1 ) P2 − P1
+ +
2.g c gc ρ
(Geankoplis,1983)
Bila :
Wf =0
Z1 = 0 ; Z2 = 3 ft
= = 0,0007764 hp
6,369 ft.lbf / lbm x 0,001222 ft 3 / s x 55,5656 lbm / ft 3
550 ft.lbf / s.hp
= 0,000970 hp
0,0007764
Tenaga pompa yang dibutuhkan = (Geankoplis,
0,8
1983)
Maka dipilih pompa yang berdaya motor 0,05 hp
LE-1
X I
Cx = Cy 2 x
m
X 1 I y
dimana: Cx = harga alat pada tahun 2010
Cy = harga alat pada tahun dan kapasitas yang tersedia
X1 = kapasitas alat yang tersedia
X2 = kapasitas alat yang diinginkan
Ix = indeks harga pada tahun 2010
Iy = indeks harga pada tahun yang tersedia
m = faktor eksponensial untuk kapasitas (tergantung jenis alat)
Untuk menentukan indeks harga pada tahun 2010 digunakan metode
[n ⋅ ΣX i ⋅ Yi − ΣX i ⋅ ΣYi ]
regresi koefisien korelasi:
1992)
(n ⋅ ΣX i Yi ) − (ΣX i ⋅ ΣYi )
Tetapan regresi ditentukan oleh :
b=
(n ⋅ ΣX i 2 ) − (ΣX i )2
ΣYi. ΣXi 2 − ΣXi. ΣXi.Yi
a =
n.ΣXi 2 − (ΣXi) 2
Maka :
a =
(14184)(55748511) − (27937)(28307996) − 103604228
= = −32528,8
(14)(55748511) − (27937) 2 3185
(14)(28307996) − (27937)(14184) 53536
= = 16,809
(14)(55748511) − (27937) 2
b =
3185
a. Tangki RBDPO
Kapasitas tangki. X2 = 7.141,085 m3. Dari Gambar LE.1. diperoleh untuk harga
kapasitas tangki (X1) 1 m³ pada tahun 2002 adalah (Cy) US$ 5700. Dari tabel 6-4.
Peters et.al., 2004. faktor eksponen untuk tangki adalah (m) 0,57. Indeks harga
pada tahun 2002 (Iy) 1103.
105
Jan,2002
P-82
103 2
10-1 1 10 10 103
Capacity, m3
Indeks harga tahun 2010 (Ix) adalah 1256,8703 Maka estimasi harga tangki untuk
(X2) 2.442,7465 m3adalah:
Cx = US$ 5700 ×
0 , 57
5.712,87 1256,8703
×
1 1103
Cx = US$ 3.064.479,13 × (Rp 9025,-)/(US$ 1)
Cx = Rp . 27.963.372,030 ,-/unit
Dengan cara yang sama diperoleh perkiraan harga alat lainnya yang dapat dilihat
pada Tabel LE.2 untuk perkiraan peralatan proses dan Tabel LE.3 untuk perkiraan
peralatan utilitas.
Untuk harga alat non impor sampai di lokasi pabrik ditambahkan biaya sebagai
berikut:
- PPn = 10 % (Rusjdi, 2004)
- PPh = 10 % (Rusjdi, 2004)
- Transportasi lokal = 0,5 %
- Biaya tak terduga = 0,5 %
- Total = 21 %
1
SC 1 I Rp 29.434.863 Rp 29.434.863
2
V-03 1 I Rp 34.295.017 Rp 34.295.017
3
V-04 1 I Rp 25.823.204 Rp 25.823.204
4
V-05 1 I Rp 159.582.560 Rp 159.582.560
5
V-06 1 I Rp 100.721.463 Rp 100.721.463
6
V-08 1 I Rp 64.453.063 Rp 64.453.063
7
V-09 1 I Rp 140.093.157 Rp 140.093.157
8
V-10 1 I Rp 67.197.991 Rp 67.197.991
9
V-11 1 I Rp 140.093.157 Rp 140.093.157
10
V-12 1 I Rp 474.777.315 Rp 474.777.315
11
V-13 1 I Rp 116.484.278 Rp 116.484.278
12
V-14 1 I Rp 44.656.235 Rp 44.656.235
13
V-15 1 I Rp 3.135.717 Rp 3.135.717
14
V-16 1 I Rp 368.516.433 Rp 368.516.433
15
V-17 1 I Rp 536.603.100 Rp 536.603.100
16
V-01 1 NI 6.000.000 Rp 6.000.000
17
V-02 1 NI 8.000.000 Rp 8.000.000
18
V-07 1 NI 6.000.000 Rp 6.000.000
19
P-01 1 NI 10.000.000 Rp 10.000.000
*)
Keterangan : I: untuk peralatan impor. NI: untuk peralatan non impor.
Total harga peralatan tiba di lokasi pabrik (purchased-equipment delivered):
Total = 1,43 x (Rp. 87.054.807.938 + Rp . 2.655.552.821,-)
+ 1,21 (Rp. 11.816.143.741- + Rp. 2.636.952.746)
= Rp. 129.221.556.509,76
Biaya pemasangan diperkirakan 15 % dari total harga peralatan (Timmerhaus.
2004).
= 0,15 x Rp. 129.221.556.509,76
= Rp. 19.383.233.476,46
Sehingga total harga peralatan ditambah biaya pemasangan adalah:
Total Harga Peralatan (C) = Rp. 148.604.789.986,23
2004).
Biaya insulasi (G) = 0,6 × Rp. 148.604.789.98
= Rp. 89.162.873.991,74
= Rp. 22.290.718.497,93
= Rp. 44.581.436.995,87
Total biaya persediaan bahan baku proses dan utilitas selama 3 bulan (90 hari)
adalah Rp . 689.135.414.156,42
LE.2.2 Kas
LE.2.2.1 Gaji Pegawai
Tabel LE.6 Perincian Gaji Pegawai
Gaji/bulan Jumlah gaji/bulan
Jabatan Jumlah
(Rp) (Rp)
Dewan Komisaris 1 15.000.000 15.000.000
Direktur 1 25.000.000 25.000.000
Staf Ahli 1 8.000.000 8.000.000
Sekretaris 5 4.000.000 20.000.000
Manajer Produksi 1 10.000.000 10.000.000
Manajer Teknik 1 10.000.000 10.000.000
Manajer Umum dan Keuangan 1 10.000.000 10.000.000
Manajer Pemasaran 1 10.000.000 10.000.000
Kepala Seksi Proses 1 5.000.000 5.000.000
Kepala Seksi Laboratorium R & D 1 5.000.000 5.000.000
Kepala Seksi Utilitas 1 5.000.000 5.000.000
Kepala Seksi Pergudangan 1 5.000.000 5.000.000
Kepala Seksi Listrik 1 5.000.000 5.000.000
Kepala Seksi Instrumentasi 1 5.000.000 5.000.000
Kepala Seksi Pemeliharaan Pabrik 1 5.000.000 5.000.000
Kepala Seksi Mesin 1 5.000.000 5.000.000
Kepala Seksi Keuangan 1 5.000.000 5.000.000
Kepala Seksi Administrasi 1 5.000.000 5.000.000
Kepala Seksi Keamanan 1 5.000.000 5.000.000
Kepala Seksi Personalia 1 5.000.000 5.000.000
Kepala Seksi HUMAS 1 5.000.000 5.000.000
Kepala Seksi Distribusi 1 5.000.000 5.000.000
Kepala Seksi Penjualan 1 5.000.000 5.000.000
PD = × HPT
IP
12
dimana: PD = piutang dagang
IP = jangka waktu kredit yang diberikan (3 bulan)
HPT = hasil penjualan tahunan
Penjualan:
1. Harga jual gliserol= Rp 40.000,-/kg
Produksi gliserol = 671,234 kg/jam
Hasil penjualan gliserol tahunan yaitu:
= 536,99 kg/jam × 24 jam/hari × 330 hari/tahun × Rp 45.000,-/kg
= Rp. 212.646.931.200,00
2. Harga Jual Sabun transparan = Rp 30.000,-/kg
Produksi Sabun transparan = 18.844,697 kg/jam
Hasil penjualan Sabun transparan tahunan yaitu:
= 15.075,76 kg/jam × 24 jam/hari × 330 hari/tahun × Rp 30.000,-/kg
= Rp. 4.477.500.007.200,00
Tabel LE.9 Aturan depresiasi sesuai UU Republik Indonesia No. 17 Tahun 2000
Kelompok Harta Masa Tarif
Beberapa Jenis Harta
Berwujud (tahun) (%)
I.Bukan Bangunan
1.Kelompok 1 4 25 Mesin kantor. perlengkapan. alat perangkat/
tools industri.
2. Kelompok 2 8 12.5 Mobil. truk kerja
3. Kelompok 3 16 6.25 Mesin industri kimia. mesin industri mesin
II. Bangunan
Permanen 20 5 Bangunan sarana dan penunjang
Depresiasi dihitung dengan metode garis lurus dengan harga akhir nol.
P−L
D=
n
dimana: D = depresiasi per tahun
P = harga awal peralatan
L = harga akhir peralatan
n = umur peralatan (tahun)
LE.3.2.1 Biaya Variabel Bahan Baku Proses dan Utilitas per tahun
Total biaya persediaan bahan baku proses dan utilitas selama 1 tahun adalah:
= Rp. 3.443.386.673.265,66
Pengurangan bonus atas penghasilan bruto sesuai dengan UU RI No. 17/00 Pasal
6 ayat 1 sehingga:
Laba sebelum pajak (bruto) = Rp. 872.568.387.586,04
× 100 %
Laba sebelum pajak
PM =
Total penjualan
× 100%
Rp. 872.568.387.586,04
PM =
Rp. 4.690.146.938.400,00
PM = 18,60 %
× 100 %
Biaya Tetap
Total Penjualan − Biaya Variabel
BEP =
× 100
Rp . 364.094.010.292,52
Rp. 4.690.146.938.400,00 − Rp . 3.449.099.774.754,68
BEP =
%
BEP = 29,33 %
Kapasitas produksi pada titik BEP = 29,33 % × 149.250.000,24 kg/tahun
= 43786435,13 kg/tahun
Nilai penjualan sabun transparan pada titik BEP = 29,33 % ×
4.477.500.007.200
= Rp. 1.313.593.053.883,44
× 100 %
Laba setelah pajak
ROI =
Total Modal Investasi
× 100 %
Rp . 610.815.371.310,22
ROI =
Rp . 3.393.501.858.111,53
ROI = 17,999 %
× 1 tahun
1
POT =
0,17999
POT = 5,556 tahun =6 tahun
× 100 %
Laba setelah pajak
RON =
Modal sendiri
× 100 %
Rp . 610.815.371.310,22
RON =
Rp . 2.375.451.300.678,07 .
RON = 25,713 %