Anda di halaman 1dari 18

WRD

DOCUMENT FLARE CO2 REMARK


Vent Stack
SYSTEM SNUFFING
PROCEDURE
Function Test Procedure/ SAT Procedure ü ü Include di IO
Flushing/ Blowing Procedure ü ü Include di IO
Reinstatement Procedure ü ü Include di IO
Leak Test Procedure ü ü Include di IO
Purging Procedure ü Include di IO
LIST
Spare Part List for Commissioning & Start Up ü ü Sudah submit IFC, ting
Spare Part List for 2 years ü ü Sudah submit IFC, ting
IOM Manual ü ü Sudah Approv
DOCUMENT
Asbuilt Drawing ü ü
MDR ü ü Target W-2 M

Sudah MOS (Flare System, Vent Stack)


Target SAT W-2 Untuk Flare system, lanjut ke Cluster D
Monitoring
REMARK Tanggal
Document

Include di IOM Routing TTD


Include di IOM Routing TTD
Include di IOM Routing TTD
Include di IOM Routing TTD
Include di IOM Routing TTD

Sudah submit IFC, tinggal ttd basah Routing TTD


Sudah submit IFC, tinggal ttd basah Routing TTD
Sudah Approve AFC Routing TTD

Target W-2 MDR Routing PEP


KRT
DOCUMENT REMARK
OHC

PROCEDURE
Function Test Procedure/ SAT Procedure ü
Bolt Tightening Procedure ü
LIST
Spare Part List for Commissioning & Start Up ü Gabung dengan IOM
Spare Part List for 2 years ü Gabung dengan IOM
IOM Manual ü
DOCUMENT
Asbuilt Drawing ü
MDR ü Mulai disusun MDR dari progess yang sudah ada

Target FAT 30-31 Mei 2023


REMARK Monitoring Document

Submit hardcopy 19 Mei 2023


Submit hardcopy 19 Mei 2023

Gabung dengan IOM Routing TTD


Gabung dengan IOM Routing TTD
Routing TTD

usun MDR dari progess yang sudah ada Target 22 Mei 2023
ODIRA
DOCUMENT REMARK
PUMP

PROCEDURE
Function Test Procedure/ SAT Procedure ü Sudah Approve AFC
LIST
Spare Part List for Commissioning & Start Up ü Sudah Approve AFC
Spare Part List for 2 years ü Sudah Approve AFC
IOM Manual ü Sudah Approve AFC
DOCUMENT
Asbuilt Drawing ü Target tgl 16 Mei 2023 Collect MDR (sampai tahap MOS)
MDR ü Target tgl 16 Mei 2023 Collect MDR (sampai tahap MOS)

Pompa Closed Drain Pump & Sump Pump


Update per 04 Mei 23_Siap untuk FAT, menunggu konfirmasi PI / MIGAS
MOS Target tgl 16 Mei 2023
Estimasi Instalasi 3-4 hari dan kemudian lanjut SAT (cek kelengkapan di lapangan)
Cek apakah perlu flexible joint

Injection Pump?
REMARK Monitoring Document Tanggal

Sudah Approve AFC CLOSE

Sudah Approve AFC Submit hardcopy (19 Mei 2023)


Sudah Approve AFC Submit hardcopy (19 Mei 2023)
Sudah Approve AFC Submit hardcopy (19 Mei 2023)

16 Mei 2023 Collect MDR (sampai tahap MOS)


16 Mei 2023 Collect MDR (sampai tahap MOS)
DURAQUIPT
DOCUMENT REMARK
PUMP

PROCEDURE
Function Test Procedure/ SAT Procedure ü Sudah Approve AFC
LIST
Spare Part List for Commissioning & Start Up ü Target minggu ke 2 - 3 Mei 23
Spare Part List for 2 years ü Target minggu ke 2 - 3 Mei 23
IOM Manual ü Target minggu ke 2 - 3 Mei 23
DOCUMENT
Asbuilt Drawing ü
MDR ü Akhir mei MDR (max tahapan sblm FAT)

Pompa KO Drum ( 2 Unit)


Target FAT planning 10 Mei 23 tapi mundur ke awal Juni 23
Target SAT palnning W-2 Juni 23
REMARK Monitoring Document Tanggal

Sudah Approve AFC CLOSE

Target minggu ke 2 - 3 Mei 23 Submit hardcopy (19 Mei 2023)


Target minggu ke 2 - 3 Mei 23 Submit hardcopy (19 Mei 2023)
Target minggu ke 2 - 3 Mei 23 Submit hardcopy (19 Mei 2023)

MDR (max tahapan sblm FAT)


BBI
DOCUMENT COMPRESSOR REMARK
PACKAGE
PROCEDURE
Function Test Procedure/ SAT Procedure ü
Boxing Up Procedure ü
Flushing/ Blowing Procedure ü
Reinstatement Procedure ü
Leak Test Procedure ü
LIST
Spare Part List for Commissioning & Start Up ü
Spare Part List for 2 years ü
IOM Manual ü
DOCUMENT
Test Package (Piping) ü
Asbuilt Drawing ü
MDR ü
Monitoring
REMARK Tanggal
Document
BKM
DOCUMENT REMARK
VESSEL

PROCEDURE
Function Test Procedure/ SAT Procedure ü Sudah Approved
Boxing Up Procedure ü Sudah Approved
Flushing/ Blowing Procedure ü Sudah Approved
Reinstatement Procedure ü Sudah Approved
Leak Test Procedure ü Sudah Approved
Purging Procedure ü Sudah Approved
LIST
Spare Part List for Commissioning & Start Up ü Sudah Approved
Spare Part List for 2 years ü Sudah Approved
IOM Manual ü Sudah Approved
DOCUMENT
Test Package (Piping) ü
Asbuilt Drawing ü
MDR ü MDR target W-3 Mei 2023

MOS SP BBS (KO Drum sudah MOS)


MOS Cluster D (Awal Juni)
Monitoring
REMARK Tanggal
Document

Sudah Approved CLOSE


Sudah Approved CLOSE
Sudah Approved CLOSE
Sudah Approved CLOSE
Sudah Approved CLOSE
Sudah Approved CLOSE

Sudah Approved CLOSE


Sudah Approved CLOSE
Sudah Approved CLOSE

MDR target W-3 Mei 2023 On Progress Scan


JKB
DOCUMENT FIRE REMARK
TANK PIPING
PROTECTION
PROCEDURE
Function Test Procedure/ SAT Procedure ü
Boxing Up Procedure ü
Flushing/ Blowing Procedure ü ü
Reinstatement Procedure ü ü ü
Leak Test Procedure ü ü
Purging Procedure ü
LIST
Spare Part List for Commissioning & Start Up ü ü ü
Spare Part List for 2 years ü ü ü
IOM Manual ü ü ü
DOCUMENT
Test Package (Piping) ü ü Team Precomm hanya memastikan
Asbuilt Drawing ü ü ü Team Precomm hanya memastikan
MDR ü ü ü Team Precomm hanya memastikan
Monitoring
REMARK Tanggal
Document

Rev. 0 For Sign


Rev. 0 09 Maret 2023 For Sign
Rev. 0 09 Maret 2023 For Sign
Rev. 0 For Sign
Rev. 0 For Sign
Rev. 0 09 Maret 2023 For Sign

comm hanya memastikan kelengkapan dokumen '


comm hanya memastikan kelengkapan dokumen
comm hanya memastikan kelengkapan dokumen
KKG
DOCUMENT REMARK
EI COMM

PROCEDURE
System Definition ü
Procedure Commissioning & Start Up ü
Index Summary List ü
Function Test Procedure/ SAT Procedure ü
-Procedure Loop Instrumentasi & Urutan Pengujian ü
-Procedure pengujian lapangan untuk Elektrikal ü
-Procedure pengujian fungsi Instrumentasi ü
-Procedure Precommissioning Elektrikal ü
-Procedure Precommissioning Instrument ü
-SAT Procedure for UPS ü
Index Test Summary (ITS) ü
LIST
Spare Part List for Commissioning & Start Up ü
Spare Part List for 2 years ü
IOM Manual ü
-IOM for Wireless Device ü
-IOM for MVT ü
-Manual Instruction for Pressure Gauge & Temperature Gauge ü `
-IOM for Level Gauge ü
-IOM for F&G Detector ü
-IOM for PD Flowmeter ü
-IOM for UPS ü
DOCUMENT
Asbuilt Drawing ü Team Precomm hanya memastikan kele
MDR ü Team Precomm hanya memastikan kele
-Wireless Device ü
-MVT ü
-Pressure Gauge & Temperature Gauge ü `
-Level Gauge ü
-F&G Detector ü
-PD Flowmeter ü
-UPS ü
-SDV ü
-Control Valve ü
-UFM ü
-Senior Orifice ü
-LV Switchgear ü
-Lightning Pole ü
Dossier Precomm Comm ü
Monitoring
REMARK Tanggal
Document

CLOSE
CLOSE
CLOSE

CLOSE
CLOSE
Rev. 1 07 Maret 2023 Sudah submit Re-IFC
CLOSE
CLOSE
Rev. 0 07 Maret 2023 Submit dokumen ke PEP
CLOSE

Deadline tanggal 10 Maret 2023


Submit dokumen ke PEP
Deadline tanggal 10 Maret 2023
IFI Ada Submit dokumen ke PEP
IFI Ada Submit dokumen ke PEP
` IFI Ada Submit dokumen ke PEP
IFI
IFI Ada Submit dokumen ke PEP
IFI Ada Submit dokumen ke PEP
IFI Ada

comm hanya memastikan kelengkapan dokumen


comm hanya memastikan kelengkapan dokumen
IFI
IFI
` IFI Ada
IFI
IFI Submit dokumen ke PEP
IFI Ada
IFI Ada
IFI
IFI
IFI
IFI
IFI
IFI Ada
Maret 2023

Maret 2023