Project Information Dhoho International Airport Kediri
info Jalan Tol Kediri Tulung Agung dan Jalan Tol Malang Kepanjen
Situbondo - Jember 71 km
Mojokerto Gempol 38 km
CORPORATE PRESENTATION
PT WIJAYA KARYA (Persero) Tbk.
PROJECT INFORMATION (GENERAL)
Objektif Meningkatkan Konektivitas dan menekan disparitas pembangunan di Jawa Timur bagian Selatan
Spesifikasi Teknis
---Luas Lahan 371 ha
---Runway 3.300 m
---Lebar Landasan 45 m
---Apron Komersial 548 x 141 m
---Apron VIP 221 x 97 m
---Garbarata 12 Unit
---Luas Terminal 18.000 m2
---Parkir Kendaraan 37.000 m2
Kapasitas per Tahun 1,5 juta penumpang
Durasi 3 Tahun (April 2020 – 2023)
PROJECT INFORMATION (LANDSIDE)
Pekerjaan Kontrak Utama Landside Tahap Dua, Pengembangan
Nama Proyek Airport
Baru di Kediri, Jawa Timur, Indonesia
Lokasi Kediri, Jawa Timur
Sifat Kontrak Lump Sump
Durasi Proyek 365 Hari Kalender
Masa Pemeliharaan 12 Bulan
Start Proyek 23 Maret 2022
Finish Proyek 23 Maret 2023
Rp 1.817.312.136.678 (Netto)
Nilai Kontrak (Satu Triliyun Delapan Ratus Tujuh Belas Milliar Tiga Ratus Dua
Belas Juta Seratus Tiga Puluh Enam Ribu Enam Ratus Tujuh Puluh
Delapan Rupiah)
Client PT Surya Dhoho Investama
Engineer Surbana Jurong
QS Consultant WT Partnership
Designer Atkins & Wiratman
Construction
PT Kandu
Management
Resident Engineer PT Kandu
Pekerjaan Bandara Land Side Lengkap dengan Bangunan
Lingkup Pekerjaan Fasilitas
(Struktur, Arsitektur, MEP dan Site Development)
PHOTO
PHOTO
BEGINNING OF LEAN CONSTRUCTION
• Survei yang dilakukan oleh Mckinsey Global Institute menunjukan
bahwa produktivitas industri konstruksi paling rendah dibandingkan
industri lainnya sejak 1947 hingga 2012. Walaupun upaya untuk
meningkatkan produktivitas konstruksi sudah dilakukan PMI dan
IPMA mulai dari tahun 1960an sampai panduan tersebut
difinalisasi menjadi PMBOK di tahun 1980, tapi belum mampu
mendongkrak dan terus menurun.
• BP Whiting Refinery Project 17% improvement in Schedule Performance Index after implementation of Lean Construction
• Process Sewer Installation 50% cost reduction from $4M to $2M
• Piping revamp on Cat Cracking Unit ($26M TIC): dramatically behind schedule until implementation of Lean Construction
• 2.1 Billion dollar Refinery Expansion Project in Venezuela
• 700% productivity improvement on Piping installation
• Plan to increase manpower peaked at 18000, after Lean Construction improvement, the projects finished on time with 10800
manpower peak.
• 50% Improvements in the percentage of planned weekly assignments completed
• 600% productivity improvement on Support installation
• 200% productivity improvement on Column Construction
• Boldt Construction mengurangi cost hingga 12.5% dan mempercepat proyek hingga 9%
• Chandos Construction berhasil mengurangi cost hingga 3% dan waktu proyek hingga 25%
• DPR Construction mencapai cost reduction sampai 16% dan mengurangi waktu hingga 10%
• Selain itu beberapa perusahaan yang sudah sukses mengimplementasikan Lean Construction adalah Turner Construction,
Skanska, Belfour Beatty, Haskell, PCL Construction, dan beberapa perusahaan lain.
(Sumber :: Prof Ballard, Berkeley University, founder Lean Construction Institute; Reinbold, Ana. 2017, Benefit of Lean Construction; Research Lean Construction
from Salford University, UK, Lean Construction Congress Presentation)
WHY PROJECT, PROGRAM, PORTFOLIO OFTEN
END IN FAILURE?
1. Are problems in the field
captured properly and in real
9. Does your Project Control
time? 13. Is the constraint your
5. Does The information team too bussy with
received by WA was not collecting data and foreman faces in daily
2. Can your project control report
real time progress, forecast captured because its hard to information from Subcont problem raised to the
and look ahead? find under many and foreman so they have superior level and all
no time to analyze and related parties in real
3. Due to not real time update, Is 6. Does Your foreman get coordinate? time?
your planning not based on assignment from WA and 14. Is there a possibility
real time planning? meeting result? 10. Do your foreman and
supervisor sometimes and that the progress
4. Other information and stacked 7. Does New foreman not often hard to get their task report and constraint
up with ? Does Your foreman receive updated information promptly, because no clear reported to supervisor
and supervisor communicate properly? task information? is not accurate, is not
problem and progress using clear and needs time
WA and email ? 8. Does your project control 11. Does your foreman or
get the progress from to be clarified until
subcontractor sometimes
subcontractor and foreman get no clear information next week therefore
manually and based on during execution of the task impacting successor
report made by spreadsheet in field? And is it difficult or activity?
which cannot accommodate time-consuming to find the
predecessor & successor? supervisor to get clear
information?
WHY COMET – LPS DIGITAL LEAN CONSTRUCTION IS
IMPORTANT?
In one place
PEMBIAYAAN DAN PENDANAAN
PADA PROYEK KERJASAMA PEMERINTAH DENGAN BADAN USAHA
Strategi Meningkatkan
Revenue Stream sebagai
Revenue Stream
Project Badan Usaha Sumber Pendanaan:
sebagai Sumber
Financing Pelaksana
Pendanaan
(BUP)
APBN/PAJAK TARIF
Toll/User Fee
Mendorong revenue lainnya
Pembayaran 3.
Ketersediaan Pembayaran (misal dengan pembayaran
Ekuitas Badan Usaha Layanan Pengguna Lainnya sewa)
Ekuitas Pihak Ketiga (Availability
Pemegang Obligasi OPERASI Payment/AP) LAINNYA
Subsidi Land Value Identifikasi anggaran terkait
Perusahaan Asuransi 4.
Capture (LVC) untuk mendukung proyek.
“ Kerjasama antara Pemerintah dan Badan Usaha (KPBU) dalam penyediaan infrastruktur yang
bertujuan untuk kepentingan umum yang sebagian atau seluruhnya menggunakan
sumberdaya Badan Usaha dengan sebuah pembagian risiko antara para pihak
Perpres No. 38 tahun 2015 ” M A N FA A T
KPBU
PRINSIP DASAR KPBU
Cost-overruns dan Time-overruns minimal
Transfer risiko dari Pemerintah kepada
Swasta menyebabkan proyek KPBU tidak
dihitung sebagai ‘pinjaman’ (Off-balance
KEMITRAAN KEMANFAATAN BERSAING PENGENDALIAN EFEKTIF sheet)
Meminimalisasi Biaya keseluruhan
Proyek
ALOKASI RISIKO Mengurangi beban keuangan awal bagi
Pemerintah melalui pembayaran
PEMERINTAH BADAN USAHA terjadwal/rutin (flat and scheduled
payment) (KPBU-AP)
Penetapan Tarif Pendanaan Dapat menyediakan lebih banyak
Peraturan/Regulasi Desain layanan infrastruktur dengan anggaran
Kenaikan Biaya Konstruksi yang sama (KPBU-AP)
Politik Melibatkan lebih banyak stakeholders
Pengadaan Lahan Kenaikan Biaya Operasional
yang memonitor proyek secara lebih
Risiko Konstruksi transparan
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PEMBIAYAAN INFRASTRUKTUR PEKERJAAN UMUM DAN PERUMAHAN
PERBANDINGAN
SKEMA KPBU DENGAN SKEMA KONVENSIONAL
KONVENSIONAL KPBU
PEMERINTAH PEMERINTAH
Perjanjiann Pembayaran AP
Kerjasama
BADAN USAHA
Kontrak
PELAKSANA (BUP) PENGGUNA
Konstruksi
Tarif
APBN KONTRAKTOR
KONTRAKTOR
Perjanjian
Pendanaan Kontrak
LENDER/ Pinjaman
Konstruksi KONTRAKTOR
KONTRAKTOR
BANK
Kontrak Perjanjian
Operasional Pemegang Saham Kontrak
SPONSOR/ Operasional
EKUITAS OPERATOR
OPERATOR
Total Swasta
State
Rp2.058 T
Rp2.707 T
Investasi Budget Sumber Daya Air
(42%)
Infrastruktur
30% Rp577 T
Tahun 2020- Jalan dan Jembatan
2024 Funding
BUMN
Rp573 T
Rp1.353 T Gap
(21%) Permukiman
Rp6.445 T 70% Rp128 T
Pemerintah Perumahan
Rp2.385 T Rp780 T
(37%)
Rp623 T Rp1.435 T
Mojokerto Gempol 38 km
Info jalan tol 2030- 2034 :
Situbondo - Jember 71 km
Mojokerto Gempol 38 km
Terima kasih