PELEDAKAN TERKONTROL

PENGGUNAAN PELEDAKAN TRIMMING DAN


PRESPLIT
MEMPERKECIL KERUSAKAN DINDING AKHIR
MENAMBAH KESTABILAN DINDING AKHIR

SIFAT BATUAN DINDING AKHIR


SISI BARAT AB PHASE 2
BATUAN

UCS (MPA)

MUDSTONE

2,2 4,3

60

SILTSTONE

6 9.5

20

SANDSTONE

9,7 12.8

15

CABONACEOUS
MUDSTONE

PELEDAKAN TRIM
TERSEDIA BIDANG BEBAS (FREE FACE) SEJAJAR
DENGAN DINDING AKHIR.
MAKSIMAL 6 ROW UNTUK PELEDAKAN DEKAT
DINDING AKHIR.
DIMENSI JARAK LUBANG TRIM KE TOE 3 METER,
KE CREST 6.6 METER DAN SPASI ANTAR LUBANG
4.2 METER.
MENGGUNAKAN ISIAN KOLOM BAHAN PELEDAK
UNTUK LUBANG TRIM.
MENGGUNAKAN GAS BAG UNTUK MEMBUAT
KOLOM UDARA SEHINGGA MENGARAHKAN
PELEDAKAN DAN MENGURANGI KERUSAKAN
DINDING.
MENGGUNAKAN WAKTU TUNDA 109 MS UNTUK
KONTROL ROW, ECHELON 67 M DAN 42 M.

PELEDAKAN PRESPLIT
LUBANG PRESPLIT DIBUAT TEGAK (VERTIKAL)
PADA CREST.
JARAK ANTAR LUBANG PRESPLIT 3 METER DAN
JARAK KE LUBANG TRIM 3 METER.
MAKSIMAL 6 ROW UNTUK PELEDAKAN DEKAT
DINDING AKHIR DAN MEMPUNYAI BIDANG BEBAS
(FREE FACE).
PADA LUBANG PRESPLIT DIGUNAKAN DYNO SPLIT
DENGAN DIAMETER 32 MM DAN PANJANG 18
METER.
UNTUK PELEDAKAN PRESPLIT DILAKUKAN
BERSAMAAN PADA AWAL PENYALAAN BERTUJUAN
MEMBELAH BATUAN DAN MENCIPTAKAN BIDANG
BEBAS DEKAT DINDING AKHIR.

SKETSA PEMBORAN DINDING BARAT PIT AB PHASE 2


PRODUCTION HOLE
TRIM HOLE
17 m
6,6 m
6m

8m

FREE FACE

20 m

PRODUCTION HOLE
TRIM HOLE
70o
3m

6m

PRESPLIT HOLE
20 m
STAND OFF 1 m
40 m

20 m

10 m

8m

* POLA PENGEBORAN LUBANG TRIMBLAST


(TAMPAK ATAS)

Lubang Trimblast

Lubang Produksi

Toe (10 m)

Toe (20 m)

Crest

4.6 m

6.64 m

6m

9.2 m

8m

* POLA PELEDAKAN LUBANG TRIMBLAST

Trimblast Row

Toe (20 m)

Toe (10 m)

Crest

= 109 ms
= 67 ms
= 42 ms

Nonel Line

* KOLOM ISIAN LUBANG TRIMBLAST

Stemming

3m

Kantong Gas Penyumbat


0.5 m

ch
Ben

2.75 m

Kolom Udara

2.75 m

Kolom Isian

1m

3m

Stand off 1 m

Tahap I

* POLA PENGEBORAN LUBANG PRE-SPLIT


3m

6m

8m

(SAYATAN SAMPING)

10 m

Tahap I

Lubang Produksi

20 m

Tahap II
Lubang Trimblast
Lubang Pre-split

* POLA PENGEBORAN LUBANG PRE-SPLIT


(TAMPAK ATAS)

Lubang Trimblast

Lubang Produksi

CREST

Lubang Pre-Split

4.6 m

3m

9.2 m
3m

6m

8m

* POLA PELEDAKAN LUBANG PRE-SPLIT

Pre-Split Row
Trimblast Row

= 109 ms
= 67 ms
= 42 ms
= Detcord

Nonel Line
Nonel Line

* KOLOM ISIAN LUBANG PRE-SPLIT

Lubang Trimblast

Lubang Pre-split

Stemming
Kantong Gas Penyumbat

DYNO Split

Kolom Udara

Kolom Isian
20 m