Anda di halaman 1dari 23

PERENCANAAN

PONDASI DALAM
KELOMPOK 2
KELOMPOK 2

LULU MUMTAZA KAYSA 0311 16 4000 0 014


NAUFAL YASIR FAISAL 0311 16 4000 0 019
DIAZ RACHMA ISNAENI 0311 16 4000 0 023
Pondasi Abutment Jembatan
Pondasi Abutment Jembatan
Diketahui :
Data-Data yang diberikan
Ditanya :
Pembahasan :
ASUMSI
◦ m= 6
s
◦ n= 4
◦ D= 0,8 m
◦ S= 2,5 x 0,8 = 2 m
◦ B= (n-1)x(S+1,2) = 7,2 m
◦ L= (m-1)x(S+1,2) = 11.2 m
Pembahasan :
V1

H1

Eh1

Eh2

310
206,667

0 0
Gaya berat akibat abutmen jembatan
B (m) l (m) L (m) ρbeton (ton/m3) W (ton)

W1 7.2 1 11.2 2.4 193.536


W2 1 2.7 10 2.4 64.8
W3 1.5 1.5 10 2.4 54
W4 1 1 10 2.4 12
W5 1 1 10 2.4 24
W6 0.5 0.5 10 2.4 6
Gaya berat akibat beban tanah
ΣW 354.336
γtanah
B (m) l (m) L (m) W (ton)
(ton/m3)

M1 2.1 2.7 10 1.8 102.06

M2 1.1 2 10 1.8 39.6

M3 1 1 10 1.8 9

M4 1.6 0.5 10 1.8 14.4

ΣM 165.06
Mencari nilai σ 𝑀𝑖, σ 𝑉𝑖, σ 𝐻𝑖
ton e (m) momen

V1 325 0 0
W1 193.536 0 0
W2 64.8 0 0
W3 54 0.25 13.5 ton ton
W4 12 -0.83333 -10 H1 17.5 V1 325
W5 24 -1 -24
Eh1 32 ΣW 354.336
W6 6 -0.75 -4.5
Eh2 112 ΣM 165.06
M1 102.06 -1.55 -158.193
M2 39.6 -2.05 -81.18 ΣH 161.5 ΣV 844.396
M3 9 -1.16667 -10.5
M4 14.4 -1.8 -25.92
EH1 32 3.1 99.2
EH2 112 2.066667 231.4667
H1 50 5.2 260
∑m 289.8737
Beban yang diterima pondasi
e Tiang Pancang
1 2 3 4 satuan x1 3
x2 1
X 3 1 1 3 m x3 1
x4 3
Kuadratik
Y 5 5 5 5 m x12 54
x22 6
V 844.396 844.396 844.396 844.396 ton x32 6
x42 54
My 289.8737 289.8737 289.8737 289.8737 ton.m
X4 X2
Rmax 27.93633 32.76755 37.59878 42.43001 ton

𝑉 𝑀𝑦. 𝑥 𝑀𝑥. 𝑦
𝑅𝑚𝑎𝑥 = ± ±
𝑚 × 𝑛 σ 𝑥2 σ 𝑦2 s

844,396 289,8737(3)
𝑅𝑚𝑎𝑥 = +
6 ×4 120

𝑅𝑚𝑎𝑥 = 42,43 𝑡𝑜𝑛

*Perjanjian arah : Tarik (-), Tekan (+) x3 x1


Data N-SPT
TABEL
PERHITUNGAN DAYA DUKUNG IJIN (AKSIAL-TEKAN) TIANG PANCANG
BERDASARKAN HARGA SPT DAN DATA BOR, DGN FORMULA MAYEERHOF DAN BAZARA

Bor No. : BH-2 Depth. Increment : 1 m


Project : Apartemen Citraland 0.5*Depth. Increment : 0.5 m
Location : - M.A.T : 6 m
Pile Dim. : Ø 80 cm SF pondasi tiang : 3

fsi* S fsi*
selimut selimut
N2 yg dipakai
Depth N L/P N>15sand N>15sand N1 gsat g' po N2 2N1 N rata2 ujung Qujung fsi tiang tiang Qult = Qujung + Qijin = Qult/SF
(m) (blow /ft) 15+.. 0,6 N (t/m3) (t/m3) (ton/m2) (ton) (ton/m2) (ton) (ton) S Rsi SF=3 ; (ton)

1 0 L 0.000 0.000 0.000 1.557 1.557 1.557 0.000 0 0.00 3.62 37.08 0.00 0.00 0.00 37.08
2 3 L 3.000 3.000 3 1.557 1.557 2.3355 6.204 6 6.00 3.73 38.29 3.00 7.54 7.54 45.83 15.28
3 3 L 3.000 3.000 3 1.557 1.557 3.8925 4.693 6 4.69 3.92 40.23 2.35 5.90 13.44 53.66 17.89
4 3 L 3.000 3.000 3.000 1.557 1.557 5.4495 3.774 6 3.77 4.17 42.80 1.89 4.74 18.18 60.98 20.33
5 4 L 4.000 4.000 4 1.557 1.557 7.0065 4.208 8 4.21 4.47 45.79 2.10 5.29 23.47 69.26 23.09
6 5 L 5.000 5.000 5 1.624 1.624 8.597 4.867 10 4.87 4.88 50.08 2.43 6.12 29.58 79.66 26.55
7 6 L 6.000 6.000 6 1.733 0.733 9.7755 5.677 12 5.68 5.39 55.21 2.84 7.13 36.72 91.93 30.64
8 7 L 7.000 7.000 7 1.733 0.733 10.5085 6.510 14 6.51 6.40 65.65 3.26 8.18 44.90 110.54 36.85
9 9 L 9.000 9.000 9 1.733 0.733 11.2415 8.230 18 8.23 6.85 70.20 4.12 10.34 55.24 125.44 41.81
10 11 L 11.000 11.000 11 1.733 0.733 11.9745 9.893 22 9.89 7.58 77.69 4.95 12.43 67.67 145.36 48.45
11 11.5 L 11.500 11.500 11.5 1.742 0.742 12.712 10.174 23 10.17 8.46 86.79 5.09 12.79 80.46 167.24 55.75
12 12 L 12.000 12.000 12 1.742 0.742 13.454 10.445 24 10.45 9.37 96.09 5.22 13.13 93.58 189.68 63.23
13 14 L 14.000 14.000 14 1.742 0.742 14.196 11.992 28 11.99 10.36 106.19 6.00 15.07 108.65 214.84 71.61 OK
14 15 L 15.000 15.000 15 1.742 0.742 14.938 12.648 30 12.65 11.32 116.05 6.32 15.89 124.55 240.60 80.20
15 16 L 16.000 16.000 16 1.742 0.742 15.68 13.284 32 13.28 12.25 125.63 6.64 16.69 141.24 266.87 88.96
16 18 L 18.000 18.000 18 1.763 0.763 16.4325 14.714 36 14.71 12.99 133.20 7.36 18.49 159.73 292.93 97.64
17 19 L 19.000 19.000 19 1.763 0.763 17.1955 15.293 38 15.29 13.46 138.05 7.65 19.22 178.95 317.00 105.67
Data SONDIR
Daya Dukung Tiang Pancang
DATA N-SPT
DDTP Single

(lihat excel Kedalaman


P1 71,61 ton 13 m
spt) tiang pancang

DATA SONDIR
DDTP Single

(lihat excel Kedalaman


P1 71,06 ton 10 m
sondir) tiang pancang

DD 1 tiang dalam Group


= DDTP single x Ef

N SPT
DD 1 tiang dalam grup satuan
PGroup 44.1470802 ton
SONDIR
DDTP Group satuan
PGroup 43.80541203 ton
N SPT

DD 1 tiang
Rmax ≤ pancang dalam
Group kedalaman tiang
(ok) 13 m
pancang
42.43000833 ≤ 44.1470802

SONDIR

DD 1 tiang
Rmax ≤ pancang dalam
Group kedalaman
(ok) 10 m
tiang pancang
42.43000833 ≤ 43.80541203
Hijin > H 1tiang max
zf m2 3.654068 1.4 R

R m2 2.610049 ((EI/KB)^(1/4))

E ton/m2 3389218 4700/(f'c)^0,5

I m4 0.020106 1/64*phi*D^4

K ton/m3 1835.46 K1/1.5

B m 0.8 diameter tiang

m n momen Zf=1.4 R Hu(ton/m)


6 4 289.8737 3.654 158.66

dimana :

HU=2MU/(E+ZF) SF =3 Hijin=Hu/SF

Hijin H1
ok
52.89 > 6.729167
Defleksi

𝐻(𝑒 + 𝑍𝑓)3 161,5(0+3.654068226 )3


𝛿= = = 0.009636 m
12(3389218.199 )(0.020106193 )
12𝐸𝐼

𝛿 max = 2,5 𝑐𝑚 > 𝛿 = 0,9 𝑐𝑚 OK