A. PLANNING
I. SHOP DRAWING :
- KERAMIK.
- SEMEN PC.
- AIR.
- ADDITIVE.
1. JIDAR ALUMINIUM.
2. BAK AIR ( EMBER ).
3. TEMPAT DUDUKAN / TATAKAN KERAMIK.
4. BENANG ATAU SENAR.
5. PALU KARET.
6. PLASTIC CROSS ATAU TILE SPACER.
7. WATERPASS.
8. BUSA / SPON
9. KAIN / LAP BASAH.
c. TENAGA KERJA :
B. PELAKSANAAN :
Jidar Aluminium
OK
OK
4. RENDAM KERAMIK YANG AKAN DIPASANG KEDALAM BAK
AIR ( EMBER ) SELAMA 1 JAM.
IN
OUT
Benang untuk
Arah Horisontal
Water
pass
Waterpass
16. LAKUKAN PENGECEKAN NAD DARI LATICRETE MENGGUNA-
KAN MATERIAL GROUTING NAD DENGAN ALAT BUSA /
SPON.
Busa /
Spon
FOTO PELAKSANAAN
PEKERJAAN DINDING KERAMIK
5. HASIL PEMASANGAN
DINDING KERAMIK
1. FOTO HASIL AKHIR PEMASANGAN
DINDING KERAMIK
PEREMPATAN KERAMIK
BERTEMU
PEREMPATAN
KERAMIK BERTEMU