LANGKAH KERJA
No Data M Km
1 S. Utama 4.359 4,35
2 S. Total 9.253 9,25
JARAK KE 10
= 0,10 x LB
= 0.10 x 4359
= 435,9m
𝐽𝑃
Skala = 𝐽𝑆
1 𝑗𝑝
= 43590
15.000
Jp x 25.555 = 1 x 43590
43590
Jp = 25.555
= 1,7 cm
KONTUR
𝑎 𝑘𝑜𝑛𝑡𝑢𝑟 𝑇𝑖𝑛𝑔𝑔𝑖−𝑋
= 𝑘𝑜𝑛𝑡𝑢𝑟 𝑇𝑖𝑛𝑔𝑔𝑖−𝑘𝑜𝑛𝑡𝑢𝑟 𝑟𝑒𝑛𝑑𝑎ℎ
𝑏
0,2 60−𝑋
= 60−50
0,5
0,2 60−𝑋
=
0,5 10
2
60- x = 0,5
60- x = 4
X = 60 – 4
= 56
JARAK KE 85
= 0,85 x LB
= 0.85 x 4.359
= 3.705,1m
𝐽𝑃
Skala = 𝐽𝑆
1 𝑗𝑝
= 370.510
25.555
Jp x 25.555 = 1 x 370.510
370.510
Jp =
25.555
= 14,4cm
KONTUR
𝑎 𝑘𝑜𝑛𝑡𝑢𝑟 𝑇𝑖𝑛𝑔𝑔𝑖−𝑋
= 𝑘𝑜𝑛𝑡𝑢𝑟 𝑇𝑖𝑛𝑔𝑔𝑖−𝑘𝑜𝑛𝑡𝑢𝑟 𝑟𝑒𝑛𝑑𝑎ℎ
𝑏
1,1 20−𝑥
=
1,5 20−10
1,1 20−𝑋
=
1,5 10
11
20- x = 1,5
20- x = 7,3
X = 20 – 7,3
= 12,7
(56−12,7)
So =
(0,75𝑥 43.590)
43,3
=
32.692
= 0,00132
b. Metode Average Slope
𝐻
So =
(0,9𝑥 𝐿)
80−20
=
0,9 x 13,612
50
=
12.250
= 0,0040
2. Perhitungan luas setiap kontur
Rumus L = banyak grid x (skala)2
Kontur 0-20
L = 1 x (25.555)2
= 1 x 653.058.025
= 653.058.025cm2 = 65305,8025 m2
Kontur 20-30
L = 34 x (25.555)2
= 34 x 653.058.025
Kontur 30-40
L = 16 x (25.555)2
= 16 x 653.058.025
= 10.448.928.400 cm2 = 1044892,84 m2
Kontur 40 - 50
L = 1 x (25.555)2
= 1 x 653.058.025 cm2
= 653.058.025cm2 = 65305,8025 m2
Kontur 50 - 60
L = 0 x (10.000)2
= 00000000 cm2 = 0000 m2
Kontur 60 - 70
L = 3 x (25.555)2
= 3 x 653.058.025 cm2
= 1.959.174.075 cm2 = 195917,40 m2
Kontur 70 - 80
L = 2 x (25.555)2
= 2 x 653.058.025 cm2
= 1.306.116.050 cm2 = 130611,60 m2
Kontur 80 - 90
L = 0 x (10.000)2
= 00000000 cm2 = 0000 m2
3. Tabel mean altitude of watershed (H)
Kelas elevasi A (m2) A (km2) Kum. Diatas %
limit
0-20 65305,8025 6,53058025 336,32488225 100%
20-30 2220397,28 222,039728 114,28515425 33,9%
= 0,0000037459454
6. Perhitungan panjang kontur
Kontur 20 = 2,7 cm
Kontur 30 = 12,6 cm
Kontur 40 = 7,6 cm
Kontur 50 = 7,7 cm
Kontur 60 = 6,1 cm
Kontur 70 = 4,9 cm
Kontur 80 = 1,3 cm
7. Tabel hasil setiap pengukuran
No Data Hasil
1 So Metode 85-10 slope factor
= 0,00132
Metode average slope
= 0,0040
2 H
3 Sb 0,0000037459454