Project Manager √
Site Manager √ √ √
HSE Coordinator √ √ √
HSE Officer √ √
QA QC √
Admin dan Logistic
Supervisor Electrical √ √
Supervisor Sipil √
Drafter √
Foreman √
Labour √
Pelatihaan Penggunaan
First Aid
Bahaya Listrik APAR
√ √
√ √ √
√ √ √
√ √
√ √ √
√ √
√
√ √
√ √
Bulan I Bulan II
Parameter Frekuensi Target I II III IV I
Pelatihan HSE
a. Basic Safety Training Pra pekerjaan 1 (20 org)
b. Pelatihan Bahaya listrik Pra pekerjaan 1 (20 org)
c. Penggunaan APAR Setiap 6 bulan 1 (20 org)
d. First Aid Setiap 6 bulan 1 (20 org)
Bulan II Bulan III Bulan IV Bulan V Bulan VI Bulan VII
II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
No Isssue Tindak Lanjut
1 Mengganti scaffolding
H Fisika : Bising - -
H Kimia : debu - -
H Welding Fume : Cd : - -
TWA= 0.01mg/m3
H Welding Fume : As : - -
TWA = 0.01mg/m3
H Welding Fume : Cr - -
(metal dan cr III
compounds) : TWA :0.5
mg/m3
H Biologi : - -
Mikroorganisme
(virus/bakteri/jamur)
H Biologi : Nyamuk - -
H Ergonomic : Postur
Janggal
H Psikososial : Fatigue - -
S Tersengat listrik - -
E - - -
Sec - - -
Sec - sabotase -
PENGENDALIAN EKSISTING
OPPORTUNITY PERATURAN (Eliminasi/Substitusi/
KONSEKUENSI
Engineering/
L Y/T No. Peraturan Administratif/APD)
- heat stress our door activity normal Y KepmenakerTrans. No.13 ADM
Tahun 2011
buangan kampuh las Pencemaran tanah, dampak ringan Y UU No. 18 tahun 2008 ENG
dan potongan logam ADM
Demonstrasi kerusakan peralatan, cedera berat, terhentinya T - ADM
kegiatan operasional pengiriman minyak
Ear muff / earplug, basic safety training Safety & IH Staff, Pipeline 3 - - - C S √ - - II
Technician
Welding mask Civil Spv 3 - - - D S √ - - II
1 - - - A R - - √ III
Pemantauan - - -
Pengendalian - - -
Pengendalian - - -
Pengendalian - - -
Major Accident Hazard ADM Inspeksi APAR, Fire drill, Pre job Mech Spv, Safety 5 4 - - C T
Safey Meeting & IH Staff, Pipeline
Technician
Pengendalian - - -
Pengendalian - - -