PT PLN (PERSERO)

WILAYAH KALSELTENG

SINGLE LINE DIAGRAM SISTEM BARITO

AREA PENYALURAN DAN PENGATUR BEBAN


SISTEM KALSELTENG

i
LEMBAR PENGESAHAN
DIBUAT OLEH
No Nama Jabatan Tanda Tangan Tanggal
1 Ahmad Fitra Purwoko JE. APP

2 Ari Nurhayati JE. APP

3 M. Yahya JE. Analisa & Evaluasi

4 Didik Kurniawan AE. Analisa & Evaluasi

5 Nur Maulidiah Octavia JE. Perencanaan Operasi

6 Andi Kurniawan JE. Perencanaan Operasi

7 Hernando Gandhi AE. Perencanaan Operasi

8 Adeck Aprilyan K AE. Perencanaan Operasi

9 A. Hadian Noor PLT Spv. Transaksi Energi

10 Dede Kusmana R PLT Spv. Pengatur Operasi

11 Rusli Aprianto Spv. Perencanaan Operasi

DIPERIKSA

Nama Jabatan Tanda Tangan Tanggal

A. Edy Syukral Siregar PLT Asman Operasi Sistem

DISAHKAN
Nama Jabatan Tanda Tangan Tanggal

Muchamad Chaliq Fadli Manajer AP2B

ii
PT PLN (PERSERO) AP2B SISTEM KALSELTENG
SINGLE LINE DIAGRAM No. Dokumen : AP2B/FM/02-03 Edisi : 01

SISTEM BARITO Berlaku Efektif : 28 DESEMBER 2016 Revisi : 06

KATA PENGANTAR
Buku Single Line Diagram sistem Barito ini merupakan representasi sistem
tenaga listrik interkoneksi sistem Barito. Buku ini dapat digunakan sebagai panduan
bagi Pelaksana Pengendali Operasi (Dispatcher) mengoperasikan sistem.
Single Line Diagram (diagram satu garis) adalah sistem tenaga listrik dari
pusat listrik sampai ke pusat beban dengan sistem tiga phasa dapat diwakili oleh satu
garis.
Mengingat perkembangan Sistem Barito di masa mendatang, maka Buku
Single Line Diagram sistem Barito ini akan selalu diperbarui sesuai dengan
perubahan konfigurasi sistem.
Terakhir kami ucapkan terimakasih kepada semua pihak yang telah
membantu baik langsung maupun tidak langsung sehingga Buku Single Line
Diagram sistem Barito ini dapat diterbitkan.

ii
PT PLN (PERSERO) AP2B SISTEM KALSELTENG
SINGLE LINE DIAGRAM No. Dokumen : AP2B/FM/02-03 Edisi : 01

SISTEM BARITO Berlaku Efektif : 28 DESEMBER 2016 Revisi : 06

DAFTAR ISI
KATA PENGANTAR ............................................................................................................. ii
DAFTAR ISI ........................................................................................................................... iii
PENDAHULUAN ...................................................................................................................iv
Konfigurasi Jaringan Sistem Barito ....................................................................................iv
Pasokan Sistem Barito ......................................................................................................... v
Gardu Induk Sistem Barito...................................................................................................vi
SINGLE LINE DIAGRAM SISTEM BARITO ...................................................................... 1
SINGLE LINE DIAGRAM GI PALANGKARAYA .............................................................. 2
SINGLE LINE DIAGRAM GI PULANG PISAU .................................................................. 3
SINGLE LINE DIAGRAM GIS MINTIN .............................................................................. 4
SINGLE LINE DIAGRAM GI SELAT ................................................................................... 5
SINGLE LINE DIAGRAM GI KAYUTANGI ....................................................................... 6
SINGLE LINE DIAGRAM GI SEBERANG BARITO .......................................................... 7
SINGLE LINE DIAGRAM GI TRISAKTI 150 & 70 ............................................................. 8
SINGLE LINE DIAGRAM GI ULIN...................................................................................... 9
SINGLE LINE DIAGRAM GI CEMPAKA .......................................................................... 10
SINGLE LINE DIAGRAM GI MANTUIL ........................................................................... 11
SINGLE LINE DIAGRAM GI PELAIHARI ........................................................................ 12
SINGLE LINE DIAGRAM GI ASAM ASAM ..................................................................... 13
SINGLE LINE DIAGRAM GI RANTAU ............................................................................ 14
SINGLE LINE DIAGRAM GI BARIKIN ............................................................................ 15
SINGLE LINE DIAGRAM GI TANJUNG ........................................................................... 16
SINGLE LINE DIAGRAM GI AMUNTAI .......................................................................... 17
SINGLE LINE DIAGRAM GI KASONGAN ....................................................................... 18
SINGLE LINE DIAGRAM GI BATULICIN ........................................................................ 19
SINGLE LINE DIAGRAM GI SAMPIT .............................................................................. 20
SINGLE LINE DIAGRAM PLTA PM.NOOR ..................................................................... 21
SINGLE LINE DIAGRAM GI BUNTOK ............................................................................ 22
SINGLE LINE DIAGRAM GI MUARA TEWEH ............................................................... 23
SINGLE LINE DIAGRAM BANGKANAI .......................................................................... 24

iii
DATA TRAFO ...................................................................................................................... 25
DATA TRANSMISI .............................................................................................................. 26

iv
PENDAHULUAN

Konfigurasi Jaringan Sistem Barito

Saluran Udara Tegangan Tinggi Sistem Barito terdiri dari 150 kV dan 70 kV yang
beroperasi di Kalimantan Selatan dan Kalimantan Tengah. Wilayah dan instalasi yang
meliputi pelayanan kota dan kabupaten :

di provinsi Kalimantan Selatan yaitu : di provinsi Kalimantan Tengah yaitu:


- Kota Banjarmasin, - Kota Palangkaraya,
- Kota Banjarbaru, - Kabupaten Kuala Kapuas,
- Kabupaten Banjar, - Kabupaten Pulang Pisau,
- Kabupaten Barito Kuala, - Kabupaten Barito Timur,
- Kabupaten Tapin, - Kabupaten Katingan.
- Kabupaten Tanah Bumbu, - Kabupaten Kota Waringin Timur
- Kabupaten Tanah Laut,
- Kabupaten Tabalong,
- Kabupaten Balangan,
- Kabupaten Hulu Sungai Utara,
- Kabupaten Hulu Sungai Tengah,
- Kabupaten Hulu Sungai Selatan.

GI MUARA TEWEH
PLTMGPLTGU
BANGKANAI
BANGKANAI
120 MW
120COD
MW 2015
GI KUALA KURUN
COD 2015

PLTD TANJUNG
GI KASONGAN 1,7 MW
KE
GI PALANGKARAYA GI KUARO
(KALTIM)
GI BUNTOK

GI AMUNTAI
GI TANJUNG
GIGISAMPIT
SAMPIT PLTD TANJUNG
1,7 MW
GI KASONGAN KE
GI KUARO
GI PALANGKARAYA (KALTIM)
GI PULANG PISAU
PLTD BAAMANG GI BARIKIN
GIS MINTIN
12.2 MW GI SELAT
GI SAMPIT
SDDSD GI AMUNTAI
GI TANJUNG
GI KAYUTANGI

GI PULANG PISAU
GI TRISAKTI

GI SEBAR GI RANTAU
GI ULIN GI BARIKIN
PLTD BAAMANG GI SELAT
12,2 MW
GI SATUI GI KAYUTANGI

GI CEMPAKA
GI MANTUIL

GI SEBAR GI TRISAKTI
GI PELAIHARI GI
GI ULIN

GI ASAM - ASAM

GI SATUI

GI MANTUIL GI CEMPAKA

GI PELAIHARI GI BATULICIN

GI ASAM ASAM

iv
Pasokan Sistem Barito
Sistem Barito dipasok dari pembangkit Sektor Barito, pembangkit sektor Asam-
Asam, pembangkit Area Palangkaraya, Area Kotabaru , pembangkit sewa, dan
pembangkit excess power.
1. Pembangkit Sektor Barito
- PLTD Trisakti - PLTD Kapuas
- PLTG Trisakti - PLTD Panangkalaan
- PLTA PM. Noor - PLTD Barabai
- PLTD Maburai - PLTMG Bangkanai
2. Pembangkit Sektor Asam-asam
- PLTU Asam-asam unit 1 dan 2
- PLTU Asam-asam unit 3 dan 4
- PLTU Pulang Pisau unit 1 dan 2
3. Pembangkit Area Palangkaraya
- PLTD Kahayan
- PLTD Baamang
4. Pembangkit Area Kotabaru
- PLTD Pagatan
5. Pembangkit Sewa
- PLTD Sewatama 30 - PLTD Kaltimex PH4 Sampit
- PLTD Prasti Wahyu Kapuas - PLTD Sewatama Trisakti
- PLTD Prasti Wahyu Trisakti - PLTD Sewatama Tapin
- PLTD Kaltimex Palangkaraya - PLTD Sewatama Tanjung
- PLTD Kaltimex PH3 Sampit - PLTD UPM Pagatan
6. Pembangkit Excess Power
- PLTU WTU (Wijaya Tri Utama)
- PLTU TAP (Tanjung Alam Perkasa)
- PLTU MSW (Makmur Sejahtera Wisesa)
- PLTU SSM & MAS (Sukajadi Sawit Mekar & Musim Mas Agro)
- PLTU RIMAU Elektrik
- PLTU DSP (Dua Samudera Perkasa)
- PLTU Conch Cement
- PLTU Unggul Lestari
- PLTU CBSA (Cahaya Borneo Sukses Agrosindo)

v
Gardu Induk Sistem Barito
Gardu induk yang melayani di provinsi Kalimantan Selatan yaitu :
1. Gardu Induk Kayutangi 8. Gardu Induk Pelaihari
2. Gardu Induk Seberang Barito 9. Gardu Induk Asam Asam
3. Gardu Induk Trisakti 150 kV 10. Gardu Induk Rantau
4. Gardu Induk Trisakti 70 kV 11. Gardu Induk Barikin
5. Gardu Induk Ulin 12. Gardu Induk Amuntai
6. Gardu Induk Mantuil 13. Gardu Induk Tanjung
7. Gardu Induk Cempaka 14. Gardu Induk Batulicin
Gardu induk yang melayani di provinsi Kalimantan Tengah yaitu :
1. Gardu Induk Palangkaraya 8. Gardu Induk Muara Teweh
2. Gardu Induk Pulang Pisau 9. Gardu Induk Bangkanai
3. Gardu Induk Selat
4. Gardu Induk Kasongan
5. Gardu Induk Sampit
6. GIS Mintin
7. Gardu Induk Buntok

vi
AP2B/FM/02-03

TEWEH BNTOK
BKNAI
A A A
B B B

1 2 3 4
1 1 1

#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16

PLTMG
BANGKANAI PLTD PLTD
TEWEH BNTOK

MINTIN AMTAI KUARO


SELAT
A A A A A A A A
1
B B B B B B B B

KSNGN PLKRY PPSAU TNJNG


1
BRKIN IBT 1
1 1 2 1 1 2 1 2 1

#1 #2
PLTU
PLTD PLTD SEWA PLTU PLTD PLTD RIMAU
PRAYA KPUAS PRASTI PLTU
A KHYAN PULANG PISAU
WAHYU CONCH
B
KAPUAS
SMPIT PLTD
PLTD BRBAI PLTD PLTD
PNKLN
1

MBRAI SWTMA

A
SEBAR A
PLTA #1 #2

B B PMNOR PLTU
KYTNG RNTAU MSW
PLTD
SMPIT
1 2 1
BTLCN
1 2 3

1 A
B
1

PLTD PLTD
SWD9TM PLSTK PLTG 1

TRSKT PLTD
TAPIN
3
IBT IBT
4
1 2 IBT
CMPKA
8 3 4

A ULIN A
B
TRSKT B EXCESS PLTD PLTU
TRSKT150 MJIS PGTAN DSP
1 2 5 6
70 7 1 2 3 4 5 6 1

5 5 6

B A

#1
2

1
5A1
5AB1
5B1
1

2
5AB2
5B2

5A2
WJAYA 1 PLTD TAP PLTD PRASTI

#2
SW10 SW20 SW SWD16 SLZER WAHYU

3
TRISAKTI TRISAKTI

5AB3
5B3

5A3
PLTU
A ASAM ASAM
B
A

4
PLHRI

5A4
5AB4
5B4
B

#3
1

MTUIL

5
5AB5

5A5
1 2

6
5AB6

5A6

7
5A7
5B7

5AB7

#4
AASAM
WJAYA 2

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM SISTEM BARITO
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

1
AP2B/FM/02-03

KSNGN MINTIN SELAT


1 2 1 2

PRAYA
CT : CT : CT : CT :
600 / 5 A 600 / 5 A 600 / 5 A 600 / 5 A

A
B
150 KV

CT : CT :
300 / 5 A 150 / 5 A
UNINDO UNINDO
60 MVA 30 MVA
150/20 kV
3 Phase
1 150/20 kV 2
3 Phase
YNyn0(d5) YNyn0(d5)
11,67 % 12,18 %
CT : CT :
2000 / 5 A 1000 / 5 A

20 KV 20 KV

CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT :
400 / 5 A 600 / 5 A 600 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 600 / 5 A 400 / 5 A 400 / 5 A 300 / 5 A 600 / 5 A 300 / 5 A 800 / 5 A 600 / 5 A

PRY-4 PRY-5 PRY-6 PRY-7 EX - PLTD


EX COUPLING PRY-1 PRY-2 PRY-3 EX - PLTD PRY-8 PRY-9
SEWA KPM SEWA AEP
KIP
6 MW
PLTD STR 20 / 0.4 kV 3 MW
KAHAYAN
BARU
20 KV 20 KV

8 MW
STR KIT STR KIT PLTD SEWA
KALTIMEX
#4 #1 #2 #3
1 X 1.5 MW 3 X 2.5 MW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI PALANGKARAYA
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

2
AP2B/FM/02-03

L1
SELAT L2 PRAYA
150 KV

CT :
200 / 5 A
MEIDEN
10 MVA
150/20 kV
1
PPSAU
3 Phase
Yy0d1
10,24 %
CT :
500 / 5 A

20 KV

CT : CT : CT :
200 / 5 A 200 / 5 A 200 / 5 A

PP-1 PP-2 PP-3


STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI PULANG PISAU
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

3
AP2B/FM/02-03

PLTU
PULANG PISAU

UNIT 1 UNIT 2

PRAYA SELAT
1 2 1 2
MINTN
CT : CT : CT : CT : CT : CT :
500 / 1 A 500 / 1 A 500 / 1 A 500 / 1 A 750 / 1 A 750 / 1 A

A
150 KV
B

CT :
200 / 1 A

10 MVA
150/20 kV
3 Phase
YNyn0(d1)
10,5 %

CT :
400 / 1 A

20 KV

CT : CT : CT : CT :
150 / 1 A 150 / 1 A 150/ 1 A 150 / 1 A

MTN-1 MTN-2 MTN-3 MTN-4


STR

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GIS MINTIN
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

4
AP2B/FM/02-03

SEBAR MINTIN PRAYA


1 2 1 2

CT : CT : CT : CT :
400 / 5 A 1200 / 5 A 600 / 5 A 600 / 5 A

SELAT
A
150 KV
B
CT : CT :
150 / 5 A 300 / 5 A

PASTI PASTI
20 MVA 30 MVA
150/20 kV 150/20 kV
3 Phase 1 3 Phase 2
YNyn0(d1) YNyn0(d1)
12,52 % 12,98 %
CT : CT :
600 / 5 A 1000 / 5 A

CT :
1000 / 5 A
20 KV 20 KV

CT : CT : CT : CT : CT : CT :
CT : CT :
300 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400/ 5 A 400 / 5 A
400 / 5 A 400 / 5 A
SL-1
SL-5 SL-2 SL-3 SL-4 SL-6 SL-7
20 KV
STR GI

STR KIT

#1 #2 PRASTI
2 X 3.0 MW WAHYU
PLTD KPUAS KAPUAS

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI SELAT
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

5
AP2B/FM/02-03

SEBAR
1 2

CT : CT :
600 / 5 A 600 / 5 A

A
B
150 KV

CT :
200 / 5 A

PAUWELS
30 MVA
KYTNG
150/20 kV
3 Phase 1
YNyn0(d5)
12.75 %
CT :
400 / 5 A

20 KV

CT : CT : CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A

KT-1 KT-2 KT-3 KT-4 KT-5


STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI KAYUTANGI
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

6
AP2B/FM/02-03

TRSKT SELAT KYTNG


1 2 1 2 1 2

CT :
300 / 5 A
CT :
300 / 5 A SEBAR CT :
800 / 5 A
CT :
1200 / 5 A
CT :
600 / 5 A
CT :
600 / 5 A

A
B
150 KV

CT : CT :
100 / 5 A 100 / 5 A
UNINDO UNINDO
20 MVA 20 MVA
150/20 kV 150/20 kV
3 Phase 3 Phase
YNyn0 1 YNyn0 2
10,77 % 10,77 %

CT : CT :
600 / 5 A 400 / 5 A

20 KV 20 KV

CT :
CT : CT : CT : CT : CT : 300 / 5 A CT : CT : CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 1000 / 1 A

SB-1 SB-2 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-9 SB-10
STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI SEBERANG BARITO
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

7
AP2B/FM/02-03

PLTD
PLTD PSTCK PLTG
SWD9 3,0 MW
TRSKT
16 MW
17 MW

SEBAR MTUIL CT : CT :
1 2 1 2 400 / 5 A 400 / 5 A
ULIN
IBT 1 IBT 2
UNINDO
16 MVA
UNINDO
16 MVA ASEA
31 MVA
Savoisienne
31 MVA
AEG AEG UNINDO 1 2
3 4
150/20 kV 150/20 kV 6 MVA 6 MVA 27 MVA
3 Phase 3 Phase 150/20 kV 150/20 kV 70/6 kV 70/6 kV
4
70/11 kV
YNd5
10.58 %
YNd5
10.58 %
3 Phase
YNd5
3 Phase
YNd5
3 Phase
Yd5
3 3 Phase
Yd5
8 3 Phase
Yd5
12 % 12.07 % 6.6 % 6.6 % 6%
CT : CT : CT : CT : CT : CT : CT : CT :
300 / 5 A 300 / 5 A 800 / 5 A 800 / 5 A 100 / 5 A 100 / 5 A 100 / 5 A 100 / 5 A CT : CT : CT : CT : CT :
50 / 5 A 50 / 5 A 250 / 5 A 400 / 5 A 400 / 5 A
A
B CT :
70 KV
CT :
150 KV CT : CT : CT :
100 / 5 A 150 / 5 A
150 / 5 A 150 / 5 A 100 / 5 A

TRSKT 150 CT :
300 / 5 A
Takoka
6 MVA
Takoka
6 MVA
UNINDO
10 MVA
UNINDO
10 MVA
TRSKT 70 UNINDO
15 MVA
70/20 kV
3 Phase
1 70/20 kV
3 Phase 2 70/20 kV
3 Phase 5 70/20 kV
3 Phase
6 70/20 kV
3 Phase
7
UNINDO Yd5 YNyn0
Yd5 YNyn0 YNyn0
60 MVA 6.74 % 6%
6.74 % 6% 5.65 %
150/20 kV
3 Phase 5 CT : CT : CT : CT : CT :
YNyn0d1
12.1 % 200 / 5 A 200 / 5 A 300 / 5 A 300 / 5 A 630 / 5 A
20 KV
CT : 20 KV 20 KV
2000 / 5 A

CT :
20 KV 20 KV 600 / 5 A
CT : CT : CT : CT : CT : CT :
CT :
200 / 5 A
TS-4 CT : CT :
200 / 5 A 500 / 5 A 500 / 5 A 500 / 5 A 500 / 5 A 500 / 5 A
400 / 5 A 150 / 5 A

CT : CT : CT : CT : CT : CT : CT : CT :
TS-14
CT :
1000 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A CT : 400 / 5 A 600 / 5 A 400 / 5 A 400 / 5 A TS-1 TS-11 TS-9 TS-8 TS-10 TS-15 TS-2 TS-3 TS-7
1000 / 5 A
STR GI
TS-21 TS-17 TS-18 TS-20 TS-19
TS-12 TS-13 TS-16 TS-GS TS-22 2 X 6 MW

#5 #6 #2
PLTD PLTD
SWD16 SULZER

PRASTI
10 MW 10 MW
SEWATAMA SEWATAMA WAHYU
SEWATAMA
10 20 TRISAKTI
TRISAKTI 10 MW
PLTU
TAP
MT-4
MT-10
MT-11

CT :
1000 / 5 A

PLTU
WJAYA

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI TRISAKTI 150 & 70
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

8
AP2B/FM/02-03

TRSKT CMPKA
1 2 1 2

CT : CT : CT : CT :
600 / 5 A 800 / 5 A
ULIN 300 / 5 A 300 / 5 A

70 KV
CT : CT : CT :
400 / 5 A CT :
100 / 5 A 600 / 5 A 600 / 5 A
PAUWELS AEG UNINDO PASTI
30 MVA 6 MVA 30 MVA
10 MVA 20 MVA
70/20 kV 70/6 kV 70/20 kV
70/20 kV 70/20 kV
3 Phase
3 Phase
YNyn0d11 1
3 Phase
Yd5 2 3 3 Phase
YNyn0
4 3 Phase
YNyn0+d1 5 YNyn0+d1 6
12.24 % 6.62 % 6% 12.95 %

CT : CT : CT : CT : CT :
1000 / 5 A 200 / 5 A 300 / 5 A 1000 / 5 A 1000 / 1 A
20 KV 20 KV 20 KV 20 KV
MOBILE TRAFO
20 KV

CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT :
300 / 5 A 600 / 5 A 400 / 5 A 150 / 5 A 150 / 5 A 400 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 1000 / 5 A 400 / 5 A

BM-1 BM-2 BM-3 BM-7 BM-8 BM-9 BM-10 BM-12 BM-13 BM-14 BM-15
STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI ULIN
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

9
AP2B/FM/02-03

MTUIL
BRKIN RNTAU AASAM PLHRI 1 2
ULIN PMNOR CT :
300 / 5 A
1 2 1 2
IBT
SAVOISIENNE
31 MVA
150/70 kV
CT : CT : CT : CT : CT : CT :
600 / 5 A 600 / 5 A 800 / 5 A 800 / 5 A 400 / 5 A 400 / 5 A
CT : CT : CT : CT :
300 / 5 A 300 / 5 A 300 / 5 A 300 / 5 A

CT :
300 / 5 A A
70 KV
CT : CT :
200 / 5 A
B
300 / 5 A 150 KV
OSAKA PASTI CT : CT :
10 MVA 10 MVA
70/20 kV 70/20 kV
400 / 5 A 300 / 5 A
3 3 Phase
4
CMPKA
3 Phase
Yy0y0 Yyn0d1
UNINDO
10.2 % 9.37 %
60 MVA
150/20 kV
CT : CT :
6
3 Phase
400 / 5 A 400 / 5 A
YNyn0d1
12.1 %
5

CT : CT :
20 KV 20 KV 20 KV 1000 / 5 A 2000 / 5 A

20 KV 20 KV
CT : CT : CT :
200 / 5 A 200 / 5 A 400 / 5 A

CT : CT : CT : CT : CT : CT :
150 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A
CT : CT : CT : CT : CT :
CP-3 CP-4 CP-6 CP-7 CP-8 CP-9 CP-10 CP-11 CP-12 CT : CT : CT : CT : CT : CT : 2000 / 5 A 100 / 5 A 300 / 5 A 300 / 5 A 400 / 5 A
1000 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 200 / 5 A

CP-13 CP-14 CP-15 CP-16 CP-17 CP-18 CP-19 CP-20 CP-21

STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI CEMPAKA
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

10
AP2B/FM/02-03

TRSKT CMPKA AASAM


1 2 1 2 1 2
MTUIL
CT : CT : CT : CT : CT : CT :
800 / 5 A 800 / 5 A 800 / 5 A 800 / 5 A 2000 / 5 A 2000 / 5 A

A
B
150 KV
CT : CT :
150 / 5 A 300 / 5 A

ABB UNINDO
30 MVA 20 MVA
150/20 kV 150/20 kV
3 Phase
YNyn0(d11)
1 3 Phase
YNyn0(d)
2
12.7 % 12,22 %

CT : CT :
2000 / 5 A 1000 / 5 A

20 KV 20 KV

CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 300 / 5 A 300 / 5 A 300 / 5 A 300 / 5 A
BUS RISER

MT-10 MT-11 MT-1 MT-2 MT-3 MT-4 MT-5 MT-6 MT-7 MT-8 MT-9
STR GI

TS-14

CT :
1000 / 5 A

PLTU
WJAYA

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI MANTUIL
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

11
AP2B/FM/02-03

CMPKA AASAM

CT : CT :
600 / 5 A 600 / 5 A

A
B
150 KV

CT :
200 / 5 A
UNINDO
30 MVA
150/20 kV
3 Phase 1
PLHRI
YNyn0(d11)
11.67 %

CT :
400 / 5 A

20 KV

CT : CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A

PH-1 PH-2 PH-3 PH-4 PH-5


STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI PELAIHARI
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

12
AP2B/FM/02-03

PLTU ASAM ASAM

UNIT 1 UNIT 2 UNIT 3 UNIT 4

1 2 3 4 5 6 7
A A
CT : CT : CT : CT : CT : CT : CT : CT : CT :
1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 600 / 5 A 1600 / 1 A 600 / 5 A

5A1 5A2 5A3 5A4 5A7

CT : CT : CT : CT : CT : CT : CT :
1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A

5AB1 5AB2 5AB3 5AB4 5AB5 5AB6 5AB7

5B1 5B2 5B3 5B4 5B5 5B6 5B7


CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT : CT :
1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A 1600 / 1 A

B B

Pauwels Electroputere

PLHRI
10 MVA

CMPKA
30 MVA
150/20 kV
3 Phase
YNyn0D11
2 150/20 kV
3 Phase
YNyn0
1 BATULICIN BATULICIN MANTUIL MANTUIL
12.21 % 10.3 %
2 1 2 1
CT :
200 / 1 A CT :
400 / 5 A

20 KV 20 KV

CT :
CT :
CT :
Note : STR GI Asam
CT : CT : 200 / 5 A CT : CT :
400 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A 200 / 5 A Asam disuplai dari sisi
6 kV PLTU unit 1 dan 2
AS-21 AS-22 AS-23 AS-11 AS-12 AS-13

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI ASAM ASAM
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

13
AP2B/FM/02-03

CMPKA BRKIN

CT : CT :
1000 / 5 A 1000 / 5 A

A
B
150 KV

CT :
300 / 5 A

RNTAU
PAUWELS

1
30 MVA
150/20 kV
3 Phase
YNyn0+d
12.29 %

CT :
1000 / 5 A

20 KV

CT : CT :
CT : CT : CT :
600 / 5 A 600 / 5 A
300 / 5 A 400 / 5 A 400 / 5 A
RT-1 RT-5
RT-2 RT-3 RT-4
STR GI

PLTD PLTD
SEWATAMA TAPIN SEWATAMA TAPIN
10 MW 10 MW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI RANTAU
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

14
AP2B/FM/02-03

TNJNG AMTAI
1 2 CMPKA RNTAU 1 2

CT : CT : CT : CT : CT : CT :
600 / 1 A 600 / 1 A 1200 / 1 A 1200 / 1 A 600 / 5 A 600 / 5 A

A
B
150 KV

BRKIN
CT : CT :
250 / 5 A 300 / 5 A

PASTI UNINDO
30 MVA 30 MVA
150/20 kV 150/20 kV
3 Phase 1 3 Phase
YNyn0d
2
YNyn0d
13.2 % 12.77 %

CT : CT :
1000 / 5 A 1000 / 5 A

20 KV 20 KV

CT : CT :
CT : CT : 400 / 5 A 400 / 5 A CT : CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A

BK-4 BK-5 BK-6 BK-7 BK-8 BK-9


STR GI

BR-7 BR-4

PLTD BARABAI

BR-3

BR-1 BR-2 BR-8 BR-9 BR-10 BR-5 BR-6

NIGATA

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI BARIKIN
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

15
AP2B/FM/02-03

BRKIN BNTOK KUARO


1 2 1 2 1 2

CT : CT :
1200 / 5 A 1200 / 5 A

A
B
150 KV

CT :
150 / 5 A
PAUWELS
CT :
1
TNJNG
30 MVA
150/20 kV 300 / 1 A
3 Phase
YNyn0(d5)
12.5 %

CT :
1000 / 5 A

20 KV 20 KV

TJ-7 TJ-8 TJ-9 TJ-10


CT :
CT : CT : CT : 1000 / 5 A
CT : CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A

TJ-1 TJ-2 TJ-3 TJ-4 TJ-5 TJ-6

PLTD STR GI
SEWATAMA TANJUNG
SRD-1 SRD-5
10 MW

SRD-2 SRD-3 SRD-4

1 2

PLTD
MABURAI
10 MVA 20 MVA
2 X 0.8 MW #1 #2

PLTU MSW

UYA-1 UYA-2

PLTU PLTU
CONCH 1 (LAMA) CONCH 2 (BARU)

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI TANJUNG
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

16
AP2B/FM/02-03

BRKIN
1 2

CT : CT :
1200 / 5 A 1200 / 5 A

A
B
150 KV
CT :
200 / 5 A

30 MVA
150 / 20 KV
1 AMTAI
CT :
1000 / 5 A

20 KV

CT : CT : CT : CT : CT : CT :
300 / 5 A 600 / 5 A 600 / 5 A 300 / 5 A 300 / 5 A 300 / 5 A

AM-1 AM-2 AM-3 AM-4 AM-5 AM-6


STR GI

GH TAMIYANG

TM-1 TM-2

PL-4 PL-6

DAIHATSU DEUTZ PLTU


RIMAU
PLTD PANANGKALAAN

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI AMUNTAI
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

17
AP2B/FM/02-03

SMPIT PRAYA
1 2 KSGAN 1 2

A
B
150 KV

UNINDO
150 KV /
20 KV 1
30 MVA /
YNyn0
CT :
1000 / 5 A

20 KV

CT : CT : CT : CT :
600 / 5 A 300 / 5 A 300 / 5 A 300 / 5 A

KS-1 KS-2 KS-3 KS-4


STR GI

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI KASONGAN
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

18
AP2B/FM/02-03

AASAM
1 2

A
B
150 KV

30 MVA
150 / 20 KV
1
BTLCN
CT :
1000 / 5 A

20 KV

CT : CT : CT : CT :
CT : 300 / 5 A 300 / 5 A 600 / 5 A
300 / 5 A
600 / 5 A
MJIS-1 MJIS-2
BL-1 BL-2 BL-3 BL-4
STR GI

PGT-2

GH PLAJAU

EX-STMA
PJ-1 PJ-2 PJ-3 PGT-1 PGT-3
PAGATAN
5 MW

PLTD & SEWA


Excess MJIS PAGATAN

UPM
PLTU DSP 8 MW
5 MW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI BATULICIN
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

19
AP2B/FM/02-03

PKBUN KSNGN
1 2 1 2

CT : CT :
1200 / 5 A 1200 / 5 A

A
B
150 KV

CT :
150 / 5 A
PAUWELS
30 MVA
150/20 kV
3 Phase
YNyn0(d5)
11,67 %
1 SMPIT
CT :
1000 / 5 A

20 KV 20 KV

CT : CT : CT : CT : CT :
CT : CT :
400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A 400 / 5 A
400 / 5 A 400 / 5 A

SPT-1 SPT-2 SPT-3 SPT-4 SPT-5 SPT-6


STR GI

Sebabi km 87 km 46 km 13
6 km 9 km

SBI 2
GH CUT NYAK DIEN PLTD BAAMANG

SBI 1 CD-1 CD-2 CD-3 CD-4 BT-1 BT-6 BT-7 BT-8

EXCESS POWER SSM EXCESS POWER MAS KALTIMEX PH 4 PLTD BAAMANG KALTIMEX PH 3
2,0 MW 2,0 MW 7,5 MW 7,7 MW 3 MW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI SAMPIT
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

20
AP2B/FM/02-03

CEMPAKA 1 CEMPAKA 2

CT : CT : CT : CT :
75 / 5 A 100 / 5 A 100 / 5 A 100 / 5 A

TAKAOKA
6 MVA 1 2 3
70/20 kV
3 Phase
Yy0
CT : CT : CT :
6.62 %
750 / 5 A 750 / 5 A 750 / 5 A

AR-1 AR-2 FUJI-1 FUJI-2 FUJI-3

STR 1 STR 2

BLACK
START

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM PLTA PM NOOR
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

21
AP2B/FM/02-03

TEWEH TNJNG
1 2 1 2

CT : CT : CT : CT :
1200 / 5 A 1200 / 5 A 600 / 5 A 600 / 5 A

A
B
150 KV

CT :
150 / 5 A

30 MVA
150 / 20 KV
CT :
BNTOK
1000 / 5 A

20 KV

BTK-1 BTK-2 BTK-3 BTK-4


STR GI

OF4 OF3

Express Feeder
23 km 20 KV GH AMPAH

OF1 OF2 OF1 OF2 OF3

Sewa MTU #7 DEUTZ #5 MIrrless #3 MIrrless #4


Kaltimex 550 kW 800 kW 750 kW 750 kW
5,6 MW

SPARE SPARE SPARE

DEUTZ #9 DEUTZ #2 DEUTZ #1


800 kW 300 kW 400 kW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI BUNTOK
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS
22
AP2B/FM/02-03

BKNAI BNTOK
1 2 1 2

CT : CT : CT : CT :
1200 / 5 A 1200 / 5 A 1200 / 5 A 1200 / 5 A

A
B
150 KV

CT :
150 / 5 A

30 MVA
150 / 20 KV TEWEH GI MUARATEWEH
CT :
1000 / 5 A

20 KV

CT : CT : CT :
300 / 5 A 300 / 5 A 300 / 5 A

TWH-1 TWH-2 TWH-3


STR GI
Express Feeder
18,5 km
20 KV

PLTD MUARATEWEH /
GH BERINGIN
OF2 OF1

Merlis
940 kW

OF4 OF3

AEP DAG Daihatsu Komatsu Pacific


4x1 MW 1000 kW 1250 kW 4 x 500 kW 4 x 250 kW

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI MUARA TEWEH
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

23
AP2B/FM/02-03

1 2

150 KV
A
B

CT : CT : CT : CT :
200 / 1 A 200 / 1 A 200 / 1 A 200 / 1 A

50 MVA 1 50 MVA 2 50 MVA 3 50 MVA 4 5


150 / 11 KV 150 / 11 KV 150 / 11 KV 150 / 11 KV
CT : CT : CT : CT :
3150 / 1 A 3150 / 1 A 3150 / 1 A 3150 / 1 A

11 KV 11 KV 11 KV 11 KV

#1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16

BKN-1 BKN-2

DIBUAT STAFF RENOP


SINGLE LINE DIAGRAM GI BANGKANAI
DIPERIKSA SUPERVISOR RENOP
TANGGAL 28 DESEMBER 2016 DISETUJUI ASMAN OPSIS

24
DATA TRAFO
KAPASITAS TEGANGAN
NO LOKASI UNIT MERK
(MVA) (KV)
1 1 TAKAOKA 3 70,0 / 6,6
2 2 TAKAOKA 6 70,0 / 20,0
3 3 OSAKA 10 70,0 / 20,0
4 CEMPAKA 4 PASTI 10 70,0 / 20,0
5 5 PAUWELS 30 150,0 /20,0
6 6 SANDONG 60 150,0 /20,0
7 IBT SAVOISIENNE 31 150,0 /70,0
8 1 PAUWELS 30 70,0 / 20,0
9 2 AEG 6 70,0 / 6,0
10 ULIN 4 UNINDO 10 70,0 / 20,0
11 5 PASTI 20 70,0 / 20,0
12 6 PAUWELS 30 70,0 / 20,0
13 1 TAKAOKA 6 70,0 / 20,0
14 2 TAKAOKA 6 70,0 / 20,0
15 3 AEG 6 70,0 / 6,0
16 4 UNINDO 27 70,0 / 11,0
TRISAKTI 70
17 5 UNINDO 10 70,0 / 20,0
18 6 UNINDO 10 70,0 / 20,0
19 7 UNINDO 15 70,0 / 20,0
20 8 UNINDO 6 70,0 / 6,0
21 3 UNINDO 16 150,0 /20,0
22 4 UNINDO 16 150,0 /20,0
23 TRISAKTI 150 5 UNINDO 60 150,0 /20,0
24 IBT 1 ASEA 31 150,0 /20,0
25 IBT 2 SAVOISIENNE 31 150,0 /20,0
26 1 UNINDO 20 150,0 /20,0
SEBAR
27 2 UNINDO 20 150,0 /20,0
28 KAYUTANGI 1 PAUWELS 30 150,0 /20,0
29 1 PASTI 20 150,0 /20,0
SELAT
30 2 PASTI 30 150,0 /20,0
31 1 UNINDO 60 150,0 /20,0
PALANGKARAYA
32 2 UNINDO 30 150,0 /20,0
33 1 PASTI 30 150,0 /20,0
BARIKIN
34 2 UNINDO 30 150,0 /20,0
35 MANTUIL 1 ABB 30 150,0 /20,0
36 2 UNINDO 20 150,0 /20,0
37 ASAM ASAM 1 ELECTRO 10 150,0 /20,0
38 2 PAUWELS 30 150,0 /20,0
39 PULANG PISAU 1 MEIDEN 10 150,0 /20,0
40 MINTIN 1 JIANGXI 10 150,0 /20,0
41 PELAIHARI 1 UNINDO 30 150,0 /20,0
42 RANTAU 1 PAUWELS 30 150,0 /20,0
43 AMUNTAI 1 PASTI 30 150,0 /20,0
44 TANJUNG 1 PAUWELS 60 150,0 /20,0
45 KASONGAN 1 UNINDO 30 150,0 /20,0
46 BATULICIN 1 PAUWELS 30 150,0 /20,0
47 SAMPIT 1 PAUWELS 30 150,0 /20,0

25
DATA TRANSMISI
Penghantar Tegangan Jarak Penampang Jumlah
No Konduktor MVAR
Bay 1 - Bay 2 (kV) (km) (mm) Tow er
1 CEMPAKA - BARIKIN 150 106,250 ACSR 240 Single 7,31
2 CEMPAKA - RANTAU 150 60,430 ACSR 240 Single 323 4,10
3 BARIKIN - RANTAU 150 45,820 ACSR 240 Single 2,48

4 CEMPAKA - PLHARI 150 57,804 ACSR 330 Single 2,31


5 PLHARI - ASAM ASAM 150 34,679 ACSR 330 Single 263 4,15
6 CEMPAKA - ASAM ASAM 150 88,604 ACSR 330 Single 6,24

7 CEMPAKA 1 - MANTUIL 150 28,159 ACSR 240 Bundle 2,40


76
8 CEMPAKA 2 - MANTUIL 150 28,159 ACSR 240 Bundle 2,40

9 MANTUIL 1 - TRISAKTI 150 15,154 ACSR 240 Bundle 1,40


45
10 MANTUIL 2 - TRISAKTI 150 15,154 ACSR 240 Bundle 1,40

11 MANTUIL 1 - ASAM ASAM 150 110,000 ACSR 240 Bundle 10,32


294
12 MANTUIL 2 - ASAM ASAM 150 110,000 ACSR 240 Bundle 10,32

13 TRISAKTI 1 - SEBAR 150 6,341 ACSR 240 Single 0,36


16
14 TRISAKTI 2 - SEBAR 150 6,341 ACSR 240 Single 0,36

15 SEBAR 1 - KAYUTANGI 150 19,160 ACSR 240 Single 2,10


54
16 SEBAR 2 - KAYUTANGI 150 19,160 ACSR 240 Single 2,10

17 SEBAR 1 - SELAT 150 41,774 ACSR 240 Single 2,84


115
18 SEBAR 2 - SELAT 150 41,774 ACSR 240 Single 2,84

19 SELAT 1 - MINTIN 150 38,500 ACSR 240 Single 8,95


86
20 SELAT 2 - MINTIN 150 38,500 ACSR 240 Single 8,95

21 MINTIN 1 - PALANGKARAYA 150 85,000 ACSR 240 Single 4,86


295
22 MINTIN 2 - PALANGKARAYA 150 85,000 ACSR 240 Single 4,86

22 BARIKIN 1 - TANJUNG 150 59,762 ACSR 240 Bundle 5,46


117
23 BARIKIN 2 - TANJUNG 150 59,762 ACSR 240 Bundle 5,46

24 BARIKIN 1 - AMUNTAI 150 30,179 ACSR 240 Single 4,50


84
25 BARIKIN 2 - AMUNTAI 150 30,179 ACSR 240 Single 4,50

26 PALANGKARAYA 1 - KASONGAN 150 58,200 ACSR 240 Bundle 5,50


247
27 PALANGKARAYA 2 - KASONGAN 150 58,200 ACSR 240 Bundle

28 ASAM ASAM 1 - BATULICIN 150 138,587 ACSR 240 Single 9,46


396
29 ASAM ASAM 2 - BATULICIN 150 138,587 ACSR 240 Single 9,46

30 KASONGAN 1 - SAMPIT 150 110,250 ACSR 240 Bundle 10,70


315
31 KASONGAN 2 - SAMPIT 150 110,250 ACSR 240 Bundle 10,70

32 PLTA 1 - CEMPAKA 66 19,088 ACSR 120 Single 0,25


60
33 PLTA 2 - CEMPAKA 66 19,088 ACSR 120 Single 0,25

34 CEMPAKA 1 - ULIN 66 31,634 ACSR 120 Single 0,48


93
35 CEMPAKA 2 - ULIN 66 31,634 ACSR 120 Single 0,48

36 ULIN 1 - TRISAKTI 66 10,819 ACSR 240 Single 0,10


38