Anda di halaman 1dari 1

Footplat 2.5 x 2.

5 m
Kolom Struktur 80 x 80
Sloof 20x30 cm
Bore Pile 70 cm

Lift Lift
Lift

PROGRAM STUDI ARSITEKTUR


Barang
Lift Lift

Lift
Barang
FAKULTAS SAINS DAN TEKNOLOGI
Footplat 2.5 x 2.5 m
UNIVERSITAS TEKNOLOGI YOGYAKARTA
Kolom Struktur 80 x 80
Sloof 20x30 cm
Bore Pile 70 cm

JUDUL TUGAS :
Footplat 2.5 x 2.5 m
Kolom Struktur 80 x 80
Sloof 20x30 cm
Bore Pile 70 cm

HOTEL BINTANG 5

KEY PLAN
Kolom Struktur 55x55 NAMA MAHASAISWA : NIM :

Keramik 50 x 50

Rabat Beton HANDIKA APRIYANA


Urugan Pasir

-0.45
JUDUL GAMBAR : SKALA :

DETAIL PONDASI 1 : 50
Kolom Struktur 55x55
MUKA TANAH MUKA TANAH

Sloof 55/70 NAMA DOSEN :


KERAMIK 50 x 50
Urugan Tanah Kembali
Kolom Pedesta 55x55l Rabat Beton

Urugan Pasir

1
Selimut Beton 4 cm 4
5

NAMA ASISTEN :
Pile cape 300x80 75

Rabat Beton
Uruagan Pasir
MUKA TANAH MUKA TANAH
Tanah Asli
Sloof 55/70
Urugan Tanah Kembali
KETERANGAN:
Kolom Pedesta 40x40
SAMPAI TANAH KERAS

Selimut Beton 4 cm

Pile cape 200x80

10 5
Rabat Beton
Uruagan Pasir
Tanah Asli

SAMPAI TANAH KERAS

TANGGAL HALAMAN JUMLAH

DETAIL PONDASI
Skala 1:50