Anda di halaman 1dari 26

LAPORAN LENGKAP PRAKTIKUM PERENCANAAN

TAMBANG TERBUKA

TOPAN
09320190151

LABORATORIUM PERENCANAAN TAMBANG TERBUKA


PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNOLOGI INDUSTRI
UNIVERSITAS MUSLIM INDONESIA

MAKASSAR
2022
LAPORAN LENGKAP PRAKTIKUM PERENCANAAN
TAMBANG TERBUKA

TOPAN
09320190151

LABORATORIUM PERENCANAAN TAMBANG TERBUKA


PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNOLOGI INDUSTRI
UNIVERSITAS MUSLIM INDONESIA

MAKASSAR
2022
HALAMAN PENGESAHAN

TOPAN
09320190151

LAPORAN LENGKAP PRAKTIKUM


PERENCANAAN TAMBANG TERBUKA

Diajukan Sebagai Syarat Kelulusan Praktikum Perencanaan Tambang Terbuka


Pada Laboratorium Perencanaan Tambang Terbuka Program Studi Teknik
Pertambangan Fakultas Teknologi Industri Universitas Muslim Indonesia

Disetujui,

ASISTEN PARAF

1. Al Alif Muhammad, S.T. (………………… )

2. Dewi Ariyanto, S.T. (………………. )

3. Jihan Fitri Ramdita Putri Gouw, S.T. (………………… )

4. Kurniawan Idris, S.T. (………………. )

5. Muhammad Ikbal (………………… )

6. Sumantriman, S.T. (………………. )

Menyetujui,

Halaman Pengesahan - ii
Koordinator Laboratorium Perencanaan Tambang Terbuka

Al Alif Muhammad, S. T.

Mengetahui,
Kepala Laboratorium Perencanaan Tambang Terbuka

Ir. Arif Nurwaskito, S.T., M.Si., IPP.


NIPS. 109 03 0798

Halaman Pengesahan - iii


KATA PENGANTAR

Assalamu Alaikum Warahmatullahi Wabarakatuh


Alhamdulillah, segala puji dan syukur bagi Allah SWT Tuhan semesta alam
atau berkat hidayah taufik, serta rahmat kesehatan-nya, saya dapat menyelesaikan
laporan lemgkap laboratorium perencanaan tambang terbuka ini. Sholawat serta
salam kepada Nabi Muhammad SAW, keluarga dan para sahabatnya yang selalu
istiqamah dijalannya.
Selama melakukan penyusunan laporan lengkap, penulis banyak menemukan
kendala-kendala namun berkat dukungan dari berbagai pihak, akhinya laporan
lengkap ini dapat terselesaikan dengan baik. Olehnya, dengan segala kerendahan hati
penulis menyampaikan ucapan terima kasih yang sebesar-besarnya kepada:
1. Bapak Ir. Firman Nullah Yusuf, S.T., M.T., IPP., selaku ketua Program Studi
Teknik Pertambangan Fakultas Teknologi Industri Universitas Muslim
Indonesia.
2. Bapak Ir. Arif Nurwaskito, S.T., M.Si., IPP., selaku Kepala Laboratorium
Perencanaan Tambang Terbuka Program Studi Teknik Pertambangan
Fakultas Teknologi Industri Universitas Muslim Indonesia.
3. Bapak Ir. Arif Nurwaskito, S.T., M.Si., IPP. dan Bapak Ir. Harwan, S.T.,
M.T., selaku Dosen Pengampuh Mata Kuliah Perencanaan Tambang Terbuka
Program Studi Teknik Pertambangan Fakultas Teknologi Industri Universitas
Muslim Indonesia.
4. Kakak Al Alif Muhammad, S.T., selaku Koordinator Praktikum Perencanaan
Tambang Terbuka Laboratorium Perencanaan Tambang Terbuka Program
Studi Teknik Pertambangan Fakultas Teknologi Industri Universitas Muslim
Indonesia.
5. Kakak-kakak asisten Praktikum Perencanaan Tambang Terbuka yang telah
membimbing kami dengan baik.
6. Orang tua saya tercinta yang telah mendukung penuh dalam hal ini membantu
baik secara moral maupun secara materi.
7. Teman-teman seperjuangan angkatan 2019 yang telah banyak membantu
selama proses praktikum berlangsung.

Kata Pengantar - iv
Akhir kata, penulis menhanturkan maaf yang sebesar-besarnya apabila dalam
penulisan laporan lengkap ini massih banyak kesalahan maupun kehilafan. Semoga
dikemudian hari, laporan ini dapat memberikan sumbangsih bagi ilmu pengetahuan
dan memberikan manfaat bagi pembacanya.
Billahi Taufik Walhidayah, Wassalamu alaikum warahmatullahi wabarakatu.

Makassar, 08 November 2022

Penulis

Kata Pengantar - v
DAFTAR ISI

Halaman

HALAMAN JUDUL.................................................................................... i
HALAMAN PENGESAHAN...................................................................... ii
KATA PENGANTAR ................................................................................. iv
DAFTAR ISI ................................................................................................ vi
DAFTAR GAMBAR ................................................................................... vii
DAFTAR TABEL .......................................................................................
DAFTAR LAMPIRAN ...............................................................................
BAB I PENDAHULUAN
1.1 Latar Belakang...................................................................................... 1
1.2 Maksud dan Tujuan ............................................................................. 2
1.3 Alat dan Bahan .................................................................................... 2
1.4 Manfaat Praktikum .............................................................................. 3
1.5 Lokasi, Waktu dan Tempat Pelaksaan Praktikum ............................... 3
BAB II LAPORAN TIAP MATA ACARA
2.1 Pembuatan Peta Izin Usaha Pertambangan.......................................... 7
2.2 Geological Database............................................................................ 33
2.3 DTM Surface dan Solid Model............................................................. 87
2.4 Estimasi Sumberdaya............................................................................ 126
2.5 Pit and Dump Design .......................................................................... 154
2.6 Mine Hauling Road Design .................................................................
BAB III PENUTUP
3.1 Kesimpulan ..........................................................................................
3.2 Saran ....................................................................................................
DAFTAR PUSTAKA
LAMPIRAN

Daftar Isi - vi
DAFTAR GAMBAR

Gambar Halaman
1.1 Peta Tunjuk Lokasi............................................................................ 6
A. MATA ACARA I PEMBUATAN PETA IZIN USAHA PERTAMBANGAN
2.1 Tampilan Startup ArcGIS 10.............................................................. 14
2.2 Halaman Utama ArcGIS 10................................................................ 15
3.1 Data Lokasi........................................................................................ 20
3.2 Data Koordinat................................................................................... 21
3.3 Tampilan awal ArcGIS 10.................................................................. 21
3.4 Mengatur coordinate system.............................................................. 22
3.5 Mengkoneksikan folder shp............................................................... 23
3.6 Proses menambahkan shp batas Kabupaten ...................................... 23
3.7 Menambahkan titik koordinat ........................................................... 24
3.8 Menambahkan label pada titik koordinat........................................... 24
3.9 Membuar area IUP............................................................................. 25
3.10 Membuar polygon.............................................................................. 25
3.11 Luas area IUP..................................................................................... 26
3.12 Hasil menyeleksi batas Kabupaten.................................................... 27
3.13 Hasil menyeleksi batas Kecamatan.................................................... 27
3.14 Hasil menyeleksi batas Desa.............................................................. 28
3.15 Hasil tambahan data shp jalan............................................................ 28
3.16 Hasil mengedit icon........................................................................... 29
3.17 Hasil mengatur ukuran kertas............................................................ 29
3.18 Hasil penambahan skala dan grid...................................................... 30
3.19 Hasil penambahan north arrow, scale bar dan legenda..................... 30
3.20 Melengkapi e-tiket............................................................................. 31
3.21 Menyimpan peta................................................................................. 31
4.1 Hasil Pembuatan Peta Izin Usaha Pertambangan.............................. 32
B. MATA ACARA II GEOLOGICAL DATABASE
2.1 Tampilan Startup Surpac 6.6.2.............................................................. 43
3.1 Data collar.............................................................................………. 47
3.2 Data assay.............................................................................………. 48

Daftar Gambar - vii


3.3 Data survey......................................................................................... 48
3.4 Data geology...................................................................................... 49
3.5 Data topografi.................................................................................... 49
3.6 Tampilan awal surpac 6.6.2............................................................... 50
3.7 Mengatur lembar kerja surpac 6.6.2.................................................. 50
3.8 Membuat database baru..................................................................... 51
3.9 Menghapus data yang tidak digunakan ............................................. 51
3.10 Mengimport database........................................................................ 52
3.11 Mengatur kolom data......................................................................... 52
3.12 Mengatur warna lubang bor............................................................... 53
3.13 Memberi warna masing-masing litology............................................ 53
3.14 Memilih display drillhole................................................................... 54
3.15 Mengatur trace style........................................................................... 55
3.16 Mengatur collar style......................................................................... 55
3.17 Mengatur labels.................................................................................. 56
3.18 Tampilan lubang bor.......................................................................... 56
3.19 Menyimpan data lubang bor.............................................................. 57
3.20 Memperbesar lubang bor................................................................... 57
3.21 Hasil mengimport data topografi....................................................... 58
3.22 Tampilan topografi pada lembar kerja............................................... 58
3.23 Mengubah bentuk topografi menjadi DTM....................................... 59
3.24 Menambahkan kontur........................................................................ 59
3.25 Menambahkan countur major dan countur minor............................. 60
3.26 Menggabungkan countur major dan countur minor.......................... 60
3.27 Menggabungkan topografi dan lubang bor........................................ 61
3.28 Menggabungkan geological database pada peta IUP........................ 61
4.1 Hasil geological database.................................................................. 62
C. MATA ACARA III DTM SURFACE AND SOLID MODEL
2.1 Tampilan Startup Surpac........................................................................ 75
2.2 Halaman Utama Software Surpac.......................................................... 75
3.1 Langkah 1.............................................................................................. 77
3.2 Langkah 2............................................................................................... 77

Daftar Gambar - viii


3.3 Langkah 3............................................................................................... 78
3.4 Langkah 4............................................................................................... 78
3.5 Langkah 5............................................................................................... 79
3.6 Langkah 6............................................................................................... 79
3.7 Langkah 7............................................................................................... 80
3.8 Langkah 8............................................................................................... 80
3.9 Langkah 9............................................................................................... 81
3.10 Langkah 10............................................................................................. 81
3.11 Langkah 11............................................................................................. 82
3.12 Langkah 12............................................................................................. 82
3.13 Langkah 13............................................................................................. 83
3.14 Langkah 14............................................................................................. 83
3.15 Langkah 15............................................................................................. 84
3.16 Langkah 16............................................................................................. 84
3.17 Langkah 17............................................................................................. 85
3.18 Langkah 18............................................................................................. 85
4.1 Hasil solid limonite.................................................................................. 86
4.2 Hasil solid saprolite.................................................................................. 86
4.3 Hasil solid bedrock................................................................................... 87
D. MATA ACARA IV ESTIMASI SUMBERDAYA
2.1 Hubungan antara hasil ekplorasi, sumberdaya mineral dan
Cadangan bijih................................................................................... 92
3.1 Komposit Zona Laterit....................................................................... 102
3.2 Komposit downhole........................................................................... 103
3.3 Define the geology zones.................................................................... 103
3.4 Komposit laterit.................................................................................. 104
3.5 Analisis basic statistic window.......................................................... 104
3.6 Load data from string file.................................................................. 105
3.7 Basic statistic..................................................................................... 105
3.8 Normal distribution curve.................................................................. 106
3.9 Statistic report.................................................................................... 106
3.10 Tampilan excel................................................................................... 107
3.11 Graphics string maths........................................................................ 107

Daftar Gambar - ix
3.12 New/open............................................................................................ 108
3.13 Creating new block model definition................................................. 108
3.14 Coordinate extents............................................................................. 109
3.15 Create model...................................................................................... 109
3.16 Display............................................................................................... 110
3.17 Block Model....................................................................................... 110
3.18 Attributes............................................................................................ 111
3.19 Add Attributes.................................................................................... 111
3.20 Block Attributes.................................................................................. 112
3.21 Save.................................................................................................... 112
4.1 Block Model....................................................................................... 113
4.2 Sumberdaya tereka............................................................................. 113
4.3 Sumberdaya tertunjuk........................................................................ 114
4.4 Sumberdaya terukur........................................................................... 114
E. MATA ACARA V PIT AND DUMP DESIGN
2.1 Hubungan antara hasil ekplorasi, sumberdaya mineral dan
Cadangan bijih................................................................................... 120
2.2 Bagian-bagian jenjang........................................................................ 128
3.1 Block model........................................................................................ 131
3.2 Display............................................................................................... 132
3.3 Identifity block values........................................................................ 132
3.4 Block attributes.................................................................................. 133
3.5 Colour by attributes........................................................................... 133
3.6 Block colours...................................................................................... 134
3.7 Elevasi terendah................................................................................. 134
3.8 Elevasi tertinggi................................................................................. 135
3.9 Create a new layer ............................................................................ 136
3.10 Planes................................................................................................. 136
3.10 Quick planes....................................................................................... 137
3.11 Ore di elevasi terendah....................................................................... 137
3.12 Boundery............................................................................................ 138
3.13 Pit design............................................................................................ 138
3.14 Set slope gradient............................................................................... 139

Daftar Gambar - x
3.15 Expand segment by bench height....................................................... 139
3.16 Next plane.......................................................................................... 140
3.17 Expand segment by berm width......................................................... 140
3.18 Hasil desain Pit pada salah satu elevasi............................................. 141
3.19 Hasil desain pit semua elevasi........................................................... 141
3.20 Clip or interest................................................................................... 142
3.21 Create a DTM from a layer................................................................ 142
3.22 Hasil DTM......................................................................................... 143
3.23 Intersection......................................................................................... 143
3.24 Hasil Intersection............................................................................... 144
3.25 Inside the boundery............................................................................ 144
3.26 Hasil................................................................................................... 145
3.27 Create a DTM from a layer................................................................ 145
3.28 Hasil DTM......................................................................................... 146
3.29 Data topo............................................................................................ 146
3.30 Create a new layer............................................................................. 147
3.31 Copy segment..................................................................................... 147
3.32 Copy a string segment........................................................................ 148
3.33 Break a line by removing a selected segment.................................... 148
3.34 Point................................................................................................... 149
3.35 Multi bench design............................................................................. 149
3.36 Hasil Multi bench design ................................................................... 150
3.37 DTM waste dump............................................................................... 150
3.38 DTM waste dump pada data topo...................................................... 151
3.39 Volumes............................................................................................. 151
3.40 Apply.................................................................................................. 152
3.41 Jumlah Volume Cut and fill waste dump............................................ 152
4.1 Hasil desain pit .................................................................................. 153
4.2 Hasil desain waste dump.................................................................... 153
F. MATA ACARA VI MINE HAULING ROAD DESIGN

Daftar Gambar - xi
Daftar Gambar - xii
DAFTAR TABEL

Tabel Halaman
A. MATA ACARA V PIT AND DUMP DESIGN
4.1 Jumlah volume cut and fill waste dump.......................................... 154
4.2 Report cadangan.............................................................................. 154
B. MATA ACARA VI MINE HAULING ROAD DESIGN
4.1 Cut and Fill..................................................................................... 194

Daftar Tabel - viii


DAFTAR LAMPIRAN

Lampiran
A. Tugas Pendahuluan;
B. Lembar Asistensi;
C. Kartu Kontrol;
D. Catatan Praktikum.

Daftar Lampiran - ix
BAB I
PENDAHULUAN
BAB I
PENDAHULUAN

1.1 Latar Belakang

Sistem penambangan adalah suatu cara atau teknik yang dilakukan


untuk membebaskan atau mengambil endapan bahan galian yang mempunyai
arti ekonomis dari batuan induknya untuk diolah lebih lanjut sehingga dapat
memberikan keuntungan yang besar dengan memperhatikan keamanan dan
keselamatan kerja yang terbaik serta meminimalisasi dampak lingkungan
yang dapat ditimbulkannya.
Perencanaan adalah penentuan persyaratan teknik pencapaian sasaran
kegiatan serta urutan teknik pelaksanaan dalam berbagai macam anak
kegiatan yang harus dilaksanakan untuk pencapaian tujuan dan sasaran
kegiatan. Perencanaan tambang dibagi menjadi beberapa tahapan, yaitu tahap
eksplorasi tahap konseptual, tahap desain, dan tahap evaluasi. Tahap desain
merupakan tahap perancangan tambang yang akan dilakukan sesusai dengan
data yang dihasilkan dari tahap eksplorasi dan konseptual, sehingga
dihasilkan optimasi keekonomian pit limit dan tahapan penambangannya.
ArcGIS adalah salah satu software yang dikembangkan oleh ESRI
(Environment Science & Research Institue) yang merupakan kompilasi
fungsi-fungsi dari berbagai macam software GIS yang berbeda seperti GIS
desktop, server dan GIS berbasis web. Software ini mulai dirilis oleh ESRI
Pada tahun 2000. Surpac merupakan salah satu perangkat lunak yang dapat
digunakan antara lain untuk membuat pemodelan geologi, rencana
pembuatan pit dan penambangan. Geological Database terdiri dari beberapa
tabel, dimana tiap tabel memiliki jenis data tertentu. Dalam tiap tabel terdiri
dari beberapa kolom data. Tiap tabel juga memiliki isi berupa data. Surpac
menggunakan model database relasional dan mendukung beberapa jenis
database, termasuk Oracle, Paradox dan Microsoft Access.
Pada kegiatan Praktikum Perencanaan Tambang Terbuka, kita
menggunakan software Arcgis untuk pembuatan peta izin usaha
pertambangan dan software Surpac untuk pembuatan geological database,

Pendahuluan - 1
DTM surface and block model hingga desain mine hauling road. Surpac
mudah digunakan dan fleksibel dalam penggunaannya untuk beberapa
bidang seperti geology, surveying, engineering (Avicenna A, 2019).
1.2 Maksud dan Tujuan

1.2.1 Pembuatan Peta Izin Usaha Pertambangan (IUP)


1. Maksud
Maksud dari praktikum Peta IUP yaitu untuk melakukan pembuatan peta
Izin Usaha Pertambangan (IUP) dengan menggunakan bantuan software
ArcGIS.
2. Tujuan
a. Membuat peta lokasi penambangan;
b. Untuk mengetahui batas wilayah Izin Usaha Pertambangan (IUP).
1.2.2 Geological Database
1. Maksud
Adapun maksud mengikuti praktikum ini mengetahui Geological Database.
2. Tujuan
a. Membuat basis data untuk pemodelan;
b. Mengimport data bor kemudian mengkorelasikannya.
1.2.3 DTM Surface dan Solid Model
1. Maksud
Adapun maksud praktikum ini yaitu untuk mengetahui DTM surface &
solid model.
2. Tujuan
a. Membuat DTM Surface & Solid Model pada database yang dibuat.
b. Mengetahui volume dari litologi endapan nikel.
1.2.4 Estimasi Sumberdaya
1. Maksud
Adapun maksud mengikuti praktikum ini yaitu mengetahui apa itu
geostatistik dan pembuatan block model.
2. Tujuan
a. Mampu membuat dan memahami domain, statistic dasar.
b. Mampu membuat dan memahami konsep variogram dan modelling
variogram.

Pendahuluan - 2
1.2.5 Pit and Dump Design
1. Maksud
Adapun maksud praktikum untuk praktikan dapat mengetahui pit design.
2. Tujuan
a. Mampu membuat kontur stripping ratio;
b. Mampu membuat pit design.
1.2.6 Mine Hauling Road Design
1. Maksud
Maksud dari praktikum ini yaitu mengetahui pembuatan mine hauling
road design menggunakan Surpac 6.6.2.
2. Tujuan
Tujuan dari praktikum ini yaitu untuk mengetahui cara membuat jalan
dan badan jalan serta mengetahui cara menghitung cut and full.

1.3 Alat dan Bahan

1.3.1 Pembuatan Peta Izin Usaha Pertambangan (IUP)


1. Alat
a. Laptop;
b. Mouse;
c. Terminal Colokan;
d. Flashdisk.
2. Tujuan
a. Software ArcGIS 10.8.
1.3.2 Geological Database
1. Alat
a. Terminal;
b. Mouse;
c. Aplikasi Surpac;
d. Laptop.
2. Bahan
a. Modul;
b. Kertas Hvs.
1.3.3 DTM Surface & Solid Model

Pendahuluan - 3
1. Alat
a. Terminal;
b. Mouse;
c. Aplikasi Surpac;
d. Laptop.
2. Bahan
a. Kertas HVS.
1.3.4 Geostatistik & Block Model
1. Alat
a. Terminal;
b. Mouse;
c. Aplikasi Surpac;
d. Laptop;
2. Bahan
a. Kertas HVS.
1.3.5 Pit and Dump Design
1. Alat
a. Terminal;
b. Mouse;
c. Aplikasi Surpac;
d. Laptop.
2. Bahan
a. Modul;
b. Kertas Hvs.
1.3.6 Mine Hauling Road Design
1. Alat
a. Laptop;
b. Mouse;
c. Terminal Colokan;
d. Alat Tulis Menulis.
2. Bahan
a. Software Surpac 6.6.2.

1.4 Manfaat Praktikum

Manfaat dari praktikum Perencanaan Tambang Terbuka adalah:

Pendahuluan - 4
1. Pembuatan Peta Izin Usaha Pertambangan (IUP)
Praktikan dapat mengetahui dan memahami tentang cara-cara membuat
peta batas izin usaha pertambangan.
2. Geological Database
Praktikan dapat mengetahui dan mampu membuat database, mengimpor
database, mengatur drillhole style dan mengdisplay drillhole.
3. DTM Surface And Solid Model
Praktikan dapat mengetahui dan mampu membuat penampang drillhole
dan solid model litologi.
4. Estimasi Sumberdaya
Praktikan dapat mengetahui dan mampu memahami konsep statistik dasar,
variogram dan modeling variogram serta mampu membuat block model,
Estimasi block model dan validasi block model.
5. Pit And Dump Design
Praktikan dapat mengetahui dan mampu membuat kontur stripping ratio
dan membuat pit design.
6. Mine Hauling Road Design
Praktikan dapat mengetahui dan mampu membuat jalan dan badan jalan
serta menghitung cut and fill.

1.5 Lokasi, Waktu dan Tempat Pelaksaan Praktikum

Praktikum ini dilakukan di laboratorium Perencanaan Tambang


Terbuka selama kurang lebih 1 bulan terhitung sejak pada tanggal 24
September 2022 – 7 November 2022. Lokasi wilayah laboratorium
Perencanaan Tambang Terbuka secara administratif terletak di Jl. Urip
Sumoharjo No.km.5, Panaikang, Kec. Panakkukang, Kota Makassar,
Sulawesi Selatan dan secara astronomis terletak pada koordinat 5° 8'9.28"
Lintang Selatan Dan 119°26'54.53" Bujur Timur
Lokasi Praktikum dapat dicapai dari panakukang menuju kampus II
UMI dengan menggunakan transportasi darat dengan jarak ± 2 km jalanan
beraspal dan dapat ditempuh dengan menggunakan kendaraan roda dua
maupun roda empat dengan waktu tempuh ± 6 Menit. Peta lokasi dapat
dilihat pada gambar 1.1.

Pendahuluan - 5
Pendahuluan - 6
Gambar 1.1 Peta Tunjuk Lokasi

Pendahuluan - 6
BAB III
PENUTUP

3.1 Kesimpulan

Perencanaan Tambang merupakan suatu proses penetapan desain tambang


dan langkah-langkah kegiatan yang akan dilakukan dalam menentukan kelayakan
rancangan tambang dan tahapan pelaksanaan operasi penambangan guna mencapai
hasil yang telah ditentukan. Suatu perencanaan yang baik harus ditunjang dengan
berbagai unsur yang saling terkait. Salah satu perencanaan yang sangat menentukan
adalah sumber daya manusia (perencana) yang mampu memperkirakan kemungkinan
dan cara mengantisipasi masalah baik dari aspek geoteknik, keekonomian,
keselamatan dan kesehatan kerja, konservasi dan lingkungan.
Laboratorium Perencanaan Tambang Terbuka merupakan salah satu fasilitas
pendukung kegiatan belajar mengajar di Program Studi Teknik Pertambangan FTI-
UMI. Saat ini, laboratorium Perencanaan Tambang berada di bawah kepemimpinan
Bapak Ir. Arif Nurwaskito, S. T., M. Si., IPP. sebagai kepala laboratorium.
Laboratorium ini menyediakan software Arcgis dan software Surpac yang membantu
untuk melakukan perencanaan pada tambang terbuka.

3.2 Saran

3.2.1 Saran Untuk Laboratorium


Agar laboratorium menyediakan stop kontak untuk praktikan agar dapat
membantu praktikan yang membutuhkan, menyediakan rak sepatu yang lebih banyak
agar sepatu praktikan dapat tersusun dengan rapi.
3.2.2 Saran Untuk Asisten
Agar asisten dapat memberikan informasi jika tidak sempat untuk
mengasistensikan praktikan dan agar kiranya asisten dapat memberikan kejelasan
untuk proses asistensi agar praktikan tidak bingung serta agar tetap mempertahankan
cara mengajar Ketika praktikum maupun ketika asistensi.
3.2.3 Saran Untuk Praktikum Selanjutnya
Agar praktikan pada praktikum selanjutnya menyediakan segala
perlengkapan sebelum ikut praktikum misalnya mouse dan laptop dan agar praktikan
untuk praktikum selanjutnya bisa lebih rajin untuk asistensi.

Penutup - 230
DAFTAR PUSTAKA

Alkausar T, 2019. Rancangan Penambangan Pit SR4 Pada PT. Manggala Usaha
Manunggal Jobsite Bara Anugrah Sejahtera, Kabupaten Muara Enim,
Provinsi Sumatera Selatan. Jurnal Bina Tambang, Vol. 5, No. 1. Jurusan
Teknik Pertambangan. Universitas Negeri Padang. Padang.
Almasi, A., Jalalia, A., Toomanian, N., 2014, Using OK and IDW Methods For
Prediction The Spatial Variability Of A Horizon Depth and OM in Soils of
Shahrekord, Iran. Journal of Environment and Earth Science, Vol.4, No 15.
Anwar H et al, 2020. Evaluasi Geometri Jalan Angkut Tambang Dari Stockpile
Tanjung Gunung Ke Pit Damar Selatan Pada Penambangan Batubara Di PT.
Sebuku Iron Lateritic Ores (Silo) Kalimantan Selatan. Jurnal GEOSAPTA
Vol. 6 No.1 Januari 2020. Jurusan Teknik Pertambangan, Universitas Muslim
Indonesia. Makassar
Anwar H et al, 2021. Evaluasi Geometri Jalan Angkut Tambang Pada PT. Manakarra
Multi Mining Provinsi Sulawesi Barat. Jurnal Matriks Teknik Sipil Vol 9, No
1 (2021): Maret. Jurusan Teknik Pertambangan, Universitas Muslim
Indonesia. Makassar
Arrijal M, 2015. Pemodelan Endapan Nikel Laterit Menggunakan Software Surpac
Pada PT. Cipta Mandiri Putra Perkasa Kabupaten Morowali Provinsi
Sulawesi Tengah. Jurnal Geomine, Vol 03, Desember 2015. Universitas
Hasanuddin. Makassar
Azmi Avicenna, 2019. Rancangan Awal Desain Pit II Penambangan PT. Atika
Tunggal Mandiri Nagari Manggilang Kecamatan Pangkalan Koto Baru
Kabupaten Lima Puluh Kota. Tugas Akhir Teknik Pertambangan. Sekolah
Tinggi Teknologi Industri Padang. Padang.
Batawen U, 2021. Estimasi Sumberdaya Terukur Endapan Bijih Nikel Laterit
Menggunakan Metode Geostatistik (Ordinary Co-Kriging). Program Studi
Teknik Pertambangan. Universitas Hasanuddin. Makassar.
Budiyanto, Eko. 2002. Sistem Informasi geografis menggunakan Arc View GIS.
Yogyakarta
Gatot H, 2008. Akurasi Metode IDW dan Kriging Untuk Interpolasi Sebaran
Sedimen Tersuspensi. Forum Geografi, Vol. 22, No. 1, Juli 2008: 97 – 110.
Peneliti SIG di Bakosurtanal
Hardyanto, 2015. Pemodelan Endapan Nikel Laterit, Kabupaten Morowali, Provinsi
Sulawesi Tengah. Jurnal Geomine, Vol 02, Agustus 2015. Universitas
Hasanuddin. Makassar
Hariyadi S, 2018. Kajian Teknis Tahapan Penambangan Batubara Pada PT. Mega
Global Energy Kabupaten Kutai Kartanegara Kalimantan Timur. Jurnal
Geologi Pertambangan Vol. 1. Jurusan Teknik Pertambangan, Universitas
Kutai Kartanegara. Kalimantan Timur.
Hidayat Taufik, 2018. Desain Pit Compartment Pada Hill Konde South
Menggunakan Manual Pit Dan Automation Pit Desain Di PT. Vale Indonesia
Tbk. Jurnal Geomine, Vol. 6, No. 3: Desember 2018. Jurusan Teknik
Pertambangan. Universitas Muslim Indonesia. Makassar.
Isjudarto A, 2013. Pengaruh Morfologi Lokal Terhadap Pembentukan Nikel Laterit.
SEMINAR NASIONAL Ke 8 Tahun 2013: Rekayasa Teknologi Industri Dan
Informasi. STTNAS. Depok
Kurniadi A, dkk, 2017. Karakteristik Batuan Asal Pembentukan Endapan Nikel
Laterit Di Daerah Madang Dan Serakaman Tengah. Padjadjaran Geoscience
Journal. Vol.01, No. 02, Oktober 2017: 149-163. Universitas Padjajaran.
Jatinangor
Lambung, T. Y et al, 2017. Evaluasi Jalan Tambang untuk Meningkatkan
Produktivitas Alat Angkut pada Aktivitas Pemindahan Overburden. Jurnal
Geosapta. Vol. 2 No 2.
Nurhakim dan Sari Melati. 2011. Bahan Kuliah Permodelan dan Perencanaan
Tambang. Banjarbaru. Universitas Lambung Mangkurat.
Prabowo J et al, 2018. Perencanaan Project Perbaikan Segmen Jalan Tanggulungan
dan Pemasangan Culvert di PT. Vale Indonesia Tbk, Kecamatan Nuha,
Kabupaten Luwu Timur, Sulawesi Selatan. Vol. 4 No. 1 Tahun 2018. Prodi
Teknik Pertambangan, Universitas Islam Bandung. Bandung
Prodjosumarto, Partanto. 2004. Diklat Perencanaan Tambang Terbuka. Bandung.
Universitas Islam Bandung.
Purnomo H, 2018. Aplikasi Metode Interpolasi Inverse Distance Weighting Dalam
Penaksiran Sumberdaya Laterit Nikel. Jurnal Ilmiah Bidang Teknologi,
ANGKASA. Volume X, Nomor 1, Mei 2018. Sekolah Tinggi Teknologi
Nasional. Yogyakarta.
Salam M. 2018. Perencanaan Penambangan Tambang Terbuka Batubara Pada Pt
Wings Sejati Kalimantan Tengah. Vol 3 No. 3. Universitas Lambung
Mangkurat. Banjarbaru
Suwandhi, Awang. 2004. Diklat Perencanaan Tambang Terbuka, Perencanaan Jalan
Tambang. Bandung. Universitas Islam Bandung.
Suwandhi, A. 2004. Diklat Perencanaan Tambang Terbuka. Universitas Islam
Bandung. Bandung.
Syafrizal, 2011. Karakterisasi Mineralogy Endapan Nikel Laterit di daerah
Tinanggea Kabupaten Palangga Provinsi Sulawesi Tenggara. JTM. 18, (4).
Tim Asisten, 2022. Modul Praktikum Perencanaan Tambang Terbuka. Program Studi
Teknik Pertambangan. Universitas Muslim Indonesia. Makassar
Yasrebi, J., Saffari, M., Fathi, H., Karimian, N., Moazallahi, M and Gazni, R., 2009,
Evaluation and Comparison Of Ordinary Kriging and Inverse Distance
Weighting Method For Prediction Of Spatial Variability Of Some Soil
Chemical Parameters. Research Journal of Biological Science 4(1): 93-102.

Anda mungkin juga menyukai