HALAMAN PENGESAHAN

MUAMMAR
JUMAT SIANG

LAPORAN LENGKAP
PRAKTIKUM PERENCANAAN TAMBANG TERBUKA

Diajukan sebagai salah satu syarat kelulusan pada Praktikum Perencanaan Tambang
Terbuka Laboratorium Perencanaan Tambang Terbuka Program Studi Teknik
Pertambangan Fakultas Teknologi Industri Universitas Muslim Indonesia

Disetujui,

ASISTEN PARAF

1. Al Alif Muhammad, S.T. (......................)

2. Dewi Ariyanto, S.T (........................)

3. Jihan Fitri Ramdita Putri Gouw, S.T. (......................)

4. Kurniawan Idris, S.T. (........................)

5. Muhammad Ikbal (......................)

6. Sumantriman, S.T. (........................)

Halaman Pengesahan-ii
Mengetahui,
Koordinator Praktikum Perencanaan Tambang Terbuka
Program Studi Teknik Pertambangan FTI-UMI

Al Alif Muhammad, S.T.

Menyetujui,
Kepala Laboratorium Perencanaan Tambang Terbuka
Program Studi Teknik Pertambangan FTI-UMI

Ir. Arif Nurwaskito, S.T., M,Si., IPP


NIPS. 109 03 0798

Halaman Pengesahan-iii
KATA PENGANTAR

Assalamu Alaikum Warahmatullahi Wabarakatuh.


Alhamdulillah, segala puji dan syukur bagi Allah SWT Tuhan semesta alam
atas berkah hidayah taufik, serta rahmat kesehatan-nya saya dapat menyelesaikan
laporan lengkap perencanaan tambang terbuka ini. Sholawat serta salam kepada
Nabi Muhammad SAW, keluarga dan para sahabatnya yang selalu istiqamah di
jalan-nya.
Selama melakukan laporan lengkap, penulis banyak menemukan kendala-
kendala umum berkat dari dukungan dari berbagai pihak, akhirnya laporan lengakap
ini dapat di selesaikan dengan baik. Olehnya, dengan segala kerendahan hati penulis
menyampaikan ucapan terimah kasih yang sebesar-besarnya kepada:
1. Bapak Ir. Firman Nullah Yusuf, S.T., M.T., IPP., selaku ketua Program Studi
Teknik Pertambangan Fakultas Teknologi Industri Universitas Muslim
Indonesia.
2. Bapak Ir. Arif Nurwaskito, S.T., M.Si., IPP., selaku Kepala Laboratorium
Perencanaan Tambang Terbuka Program Studi Teknik Pertambangan Fakultas
Teknologi Industri Universitas Muslim Indonesia.
3. Bapak Ir. Habibie Anwar, S.T., M.T. IPP. selaku Pengampuh Mata Kuliah
Perencanaan Tambang Terbuka Program Studi Teknik Pertambangan Fakultas
Teknologi Industri Universitas Muslim Indonesia.
4. Kakak Al Alif Muhammad, S.T., selaku Koordinator Praktikum Perencanaan
Tambang Terbuka Laboratorium Perencanaan Tambang Terbuka Program
Studi Teknik Pertambangan Fakultas Teknologi Industri Universitas Muslim
Indonesia.
5. Kakak-kakak Asisten Praktikum Perencanaan Tambang Terbuka yang telah
membimbing kami dengan baik.
6. Orang tua saya tercinta yang telah mendukung penuh dalam hal ini membantu
baik secara moral maupun secara materi.
7. Teman-teman seperjuangan angkatan 2019 Program Studi Teknik
Pertambangan Fakultas Teknologi Industri Universitas Muslim Indonesia.

Kata Pengantar-iv
Akhir kata, penulis menghanturkan maaf yang sebasar-besarnya apa bila
dalam pembuatan laporan lengkap belum sempurna. Semoga laporan ini dapat
bermanfaat bagi para pembacanya.
Semoga Allah SWT. senantiasa memberikan berkah pada setiap umatnya yang
senantiasa berbagi ilmu.
Billahi Taufik Walhidayah, Wassalamu alaikum warahmatullahi wabarakatu.

Makassar, 08 November 2022

Penulis

Kata Pengantar-v
DAFTAR ISI

Halaman
HALAMAN JUDUL.................................................................................... ii
LEMBAR PENGESAHAN......................................................................... iii
KATA PENGANTAR ................................................................................. iv
DAFTAR ISI ................................................................................................ v
DAFTAR GAMBAR ................................................................................... vi
DAFTAR TABEL ....................................................................................... vii
DAFTAR LAMPIRAN ............................................................................... xi
BAB I PENDAHULUAN
1.1 Latar Belakang...................................................................................... 1
1.2 Maksud dan Tujuan .............................................................................. 2
1.3 Alat dan Bahan ..................................................................................... 3
1.4 Manfaat Praktikum ............................................................................... 4
1.5 Waktu dan Tempat Pelaksanaan Praktikum.......................................... 5
BAB II LAPORAN TIAP MATA ACARA
2.1 Pembuatan Peta Izin Usaha Pertambangan............................................ 8
2.2 Geological Database............................................................................. 31
2.3 DTM Surface & Solid Model................................................................. 58
2.4 Estimasi Sumber Daya........................................................................... 90
2.5 Pit & Dump Design ............................................................................... 117
2.6 Mine Hauling Road Design .................................................................. 139
BAB III PENUTUP
3.1 Kesimpulan ........................................................................................... 169
3.2 Saran ..................................................................................................... 170
DAFTAR PUSTAKA
LAMPIRAN

Daftar Isi-v
DAFTAR GAMBAR

Gambar Halaman
1.1 Peta lokasi ............................................................................................... 6
A. Pembuatan Peta Izin Usaha Pertambangan (IUP)
2.1 Tampilan Startup ArcGIS 10 ................................................................. 16
2.2 Halaman utama ArcGIS 10 .................................................................... 16
4.1 Peta IUP Citra ........................................................................................ 21
4.2 Peta IUP ................................................................................................. 21
B. Geological Database
2.1 Tampilan Startup Surpac ....................................................................... 28
2.2 Halaman utama Software Surpac ........................................................... 29
3.1 Pilih Folder Database ............................................................................ 36
3.2 Open Database........................................................................................ 37
3.3 Tulis Nama File ...................................................................................... 37
3.4 Apply ...................................................................................................... 38
3.5 Apply ...................................................................................................... 38
3.6 Klik Kanan Dan Tekan Add ................................................................... 39
3.7 Tambah Data Geology ........................................................................... 39
3.8 Apply ...................................................................................................... 40
3.9 Pilih Semua Data CSV ........................................................................... 40
3.10 Klik Kanan Dan Open File .................................................................... 41
3.11 Kalibrasi Data Collar.............................................................................. 41
3.12 Kalibrasi Data Assay ............................................................................. 42
3.13 Kalibrasi Data Survey ............................................................................ 42
3.14 Klik Kanan Dan Masukkan Ni Dan Fe .................................................. 43
3.15 Kalibrasi Data Geologi ......................................................................... 43
3.16 Aplly ....................................................................................................... 44
3.17 Import Data ............................................................................................ 44
3.18 Sesuaikan Nama File .............................................................................. 45
3.19 Apply ...................................................................................................... 45
3.20 Pilih Database Sesuai Dengan Format .................................................. 46

Daftar Gambar-vi
3.21 Apply ......................................................................................................... 46
3.22 Pilih File Csv Matikan Centang Translation dan Styles ........................... 47
3.23 Sesuaikan Dengan Kolom ........................................................................ 48
3.24 Apply ......................................................................................................... 48
3.25 Klik Drill Display Style ............................................................................ 49
3.26 Klik Geologi ............................................................................................. 49
3.27 Pilih Warna Biru Untuk Brk ..................................................................... 50
3.28 Pilih Warna Hijau Untuk Lim .................................................................. 50
3.29 Pilih Warna Merah Untuk Sap ................................................................. 51
3.30 Display Drillholes .................................................................................... 52
3.31 Pilih Geology ............................................................................................ 52
3.32 Pilih Lithology .......................................................................................... 53
3.33 Pilih Centered ........................................................................................... 53
3.34 Pilih Posisi ................................................................................................ 54
3.35 Ubah Size .................................................................................................. 54
3.36 Apply ......................................................................................................... 55
3.37 Tampilan Drillholes .................................................................................. 55
4.1 Hasil Geological Database ....................................................................... 56
C. Dtm Survace Dan Solid Model
2.1 Tampilan Startup Surpac 6.6.2 ................................................................. 67
3.1 Centang Folder Tempat Penyimpanan File............................................... 72
3.2 Mengekstrak Ketebalan Dan Kedalaman Zona ................................................. 72

3.3 Mengatur Ketebalan Dan Kedalaman ...................................................... 73


3.4 Mengisi Spesifikasi Sesuai Dengan Kode Zona Litology .................................. 73

3.5 Bentuk spesifikasi sesuai dengan kode zona litology ............................... 74


3.6 Mengubah Ke Bentuk DTM ............................................................................... 74
3.7 Mengatur Warna DTM .............................................................................. 75
3.8 Membuat Layer Baru ................................................................................ 75
3.9 Melakukan Digitasi Pada Lubang Bor ..................................................... 76
3.10 Menyelesaikan Hingga Lubang Bor Terakhir .......................................... 76

Daftar Gambar-vii
3.11 Memotong Masing-Masing Litology Sesuai Dengan Boundary .............. 77
3.12 Memasukkan Boundary Ke DTM ............................................................ 77
3.13 Tampilan DTM Surface Top Limonit ...................................................... 78
3.14 Tampilan DTM Surface Top Saprolit ...................................................... 78
3.15 Tampilan DTM Surface Top Bedrock ...................................................... 79
3.16 Tampilan DTM Surface Bottom Bedrock ................................................. 79
3.17 Membuat Solid Limonit ............................................................................ 80
3.18 Memberikan Nama Dan Warna Pada Solid .............................................. 80
3.19 Tampilan Solid Limonit ............................................................................ 81
3.20 Tampilan Solid Saprolite .......................................................................... 81
3.21 Tampilan Solid Bedrock ........................................................................... 82
3.22 Menghitung Volume Solid ....................................................................... 82
3.23 Volume Solid Limonit .............................................................................. 83
3.24 Volume Solid Saprolite ............................................................................ 83
3.25 Volume Solid Bedrock .............................................................................. 84
4.1 Solid Limonit ............................................................................................ 85
4.2 Solid Saprolit ............................................................................................ 86
4.3 Volume Limonit ....................................................................................... 87
4.4 Volume Saprolit ........................................................................................ 87
D. Estimasi Dan Sumber Daya
2.1 Diagram Proses Perencanaan Tambang ................................................... 101
3.1 Komposit Zona Laterit ............................................................................. 103
3.2 Komposit Downhole ................................................................................. 104
3.3 Komposit Laterit ....................................................................................... 104
3.4 Analisis Basic Statistic Window ............................................................... 105
3.5 Load Data From String File ..................................................................... 105
3.6 Basic Statistic ........................................................................................... 106
3.7 Normal Distribution Curve ....................................................................... 106
3.8 Statistic Report ......................................................................................... 107
3.9 Tampilan Excel ......................................................................................... 107

Daftar Gambar-viii
3.10 Graphics String Maths ............................................................................. 108
3.11 Normal Distribution Curve ....................................................................... 108
3.12 Report Being And Distance ...................................................................... 109
3.13 Masukkan Data Komposit Laterit Cut ...................................................... 109
3.14 Masukkan Data Variogram ...................................................................... 110
3.15 Primary Variogram .................................................................................. 110
3.16 Secondary Variogram ............................................................................... 111
3.17 Validation Variogram ............................................................................... 111
3.18 Kriged Value ............................................................................................. 112
3.19 Atribut Pembuatan Block Model .............................................................. 112
3.20 Tampilan Block Model ............................................................................. 113
4.1 Statistik Ni ................................................................................................ 114
4.2 Tampilan Block Model ............................................................................. 114
E. Pit And Dump Design
2.1 Diagram Proses Perencanaan Tambang ................................................... 122
3.1 Langkah 1 ................................................................................................. 128
3.2 Langkah 2 ................................................................................................. 128
3.3 Langkah 3 ................................................................................................. 129
3.4 Langkah 4 ................................................................................................. 129
3.5 Langkah 5 ................................................................................................. 130
3.6 Langkah 6 ................................................................................................. 130
3.7 Langkah 7 ................................................................................................. 131
3.8 Langkah 8 ................................................................................................. 131
3.9 Langkah 9 ................................................................................................. 132
3.10 Langkah 10 ............................................................................................... 132
3.11 Langkah 11 ............................................................................................... 133
3.12 Langkah 12 ............................................................................................... 133
3.13 Langkah 13 ............................................................................................... 134
3.14 Langkah 14 ............................................................................................... 134
3.15 Langkah 15 ............................................................................................... 135
4.1 Hasil Pit Design ........................................................................................ 136
4.2 Hasil West Dump Design .......................................................................... 137

Daftar Gambar-ix
4.3 Gabungan Antara Pit dan West Dump Design.......................................... 137
F. Mine Hauling Road Design
3.1 Pit And Dump Design ............................................................................... 154
3.2 Set Slope Gradient .................................................................................... 154
3.3 Set The Design Gradient........................................................................... 155
3.4 Create A New Layer ................................................................................. 155
3.5 Start A New Segment For Digitizing ........................................................ 156
3.6 Triangle .................................................................................................... 156
3.7 Garis Untuk Membuat Desain Jalan Tambang ......................................... 157
3.8 Drape Segment Over DTM ....................................................................... 157
3.9 Garis Jalan Tambang ................................................................................ 158
3.10 Smooth String File .................................................................................... 158
3.11 Smooth Counturing String........................................................................ 159
3.12 Create Longitudinal Profile ..................................................................... 159
3.13 Create Longitudinal Profile ..................................................................... 160
3.14 Longitudinal Profile ................................................................................. 160
3.15 Start A New Segment For Digitizing ........................................................ 161
3.16 Road Design ............................................................................................. 161
3.17 Apply Longitudinal Profile ....................................................................... 162
3.18 Create Road Outline ................................................................................. 162
3.19 Set Slope Gradietnt ................................................................................... 163
3.20 Expand Segment By Bench Height ........................................................... 163
3.21 Tampilan Road Design ............................................................................. 164
3.22 Save File ................................................................................................... 164
3.23 Create A DTM From A Layer Dan Save File ........................................... 165
3.24 DTM Cut And Fill Volumes ...................................................................... 165
4.1 Hasil Road Design .................................................................................... 166
4.2 Volume Cut And Fill ................................................................................. 166

Daftar Gambar-x
Daftar Gambar-xi
DAFTAR LAMPIRAN

Lampiran

A. Tugas Pendahuluan;
B. Lembar Asistensi;
C. Kartu Kontrol;
D. Catatan Praktikum

Daftar Lampiran – xi
BAB I
PENDAHULUAN

1.1 Latar Belakang

Perencanaan Tambang merupakan suatu proses penetapan desain tambang


dan langkah-langkah kegiatan yang akan dilakukan dalam menentukan kelayakan
rancangan tambang dan tahapan pelaksanaan operasi penambangan guna mencapai
hasil yang telah ditentukan. Suatu perencanaan yang baik harus ditunjang dengan
berbagai unsur yang saling terkait. Perencanaan tambang terdiri dari 3 (tiga) tahapan,
yaitu tahapan pemodelan geologi, perencanaan jangka Panjang (long-term planning)
dan perencanaan jangka pendek (short-term planning) (Barber dan Hanna, 2000).
Geologi merupakan dasar bagi perencanaan tambang dalam hal pemodelan
sumberdaya, data geoteknik dan hidrologi dan reklamasi. Perencanaan jangka
panjang sering diarahkan pada strategic planning atau feasibility study. Perencanaan
jangka pendek, yaitu perencanaan operasional untuk mencapai perencanaan yang
telah ditetapkan pada perencanaan jangka panjang. Salah satu aspek terpenting dalam
perencanaan tambang adalah desain pit tambang dimana tahapan ini dilakukan
setelah tahap eksplorasi dan studi konseptual diadakan. Perpaduan nikel (Ni), krom
(Cr) dan besi (Fe) menghasilkan baja tahan karat (stainless steel) yang banyak
diaplikasikan pada peralatan dapur (sendok, dan peralatan memasak), ornamen-
ornamen rumah dan gedung, serta komponen industri (Sukandarrumidi, 2007).
Batuan ultrabasa yang ada di atas permukaan bumi. Istilah Laterit sendiri diambil
dari bahasa Latin “later” yang berarti batubata merah, yang dikemukakan oleh yang
digunakan sebagai bahan bangunan di Mysore, Canara dan Malabr yang merupakan
wilayah India bagian selatan. Material tersebut sangat rapuh dan mudah dipotong,
tetapi apabila terlalu lama terekspos, maka akan cepat sekali mengeras dan sangat
kuat.
Surpac merupakan salah satu perangkat lunak yang dapat digunakan antara
lain untuk membuat pemodelan geologi, rencana pembuatan Pit dan penambangan.
Aplikasi Surpac di kembangkan oleh Gemcom Software International.Inc (sekarang
berubah nama menjadi Geovia/Surpac Minex Group Pty Ltd). Didirikan pada tahun
1985, Gemcom memiliki jangkauan global memberikan solusi yang komprehensif di
semua pusat pertambangan besar di lebih dari 130 negara (Setiadi, 2015).

Pendahuluan-1
1.2 Maksud dan Tujuan

A. Maksud
Maksud dari praktikum ini adalah dapat menegenal, mengetahui dan menguasai
ilmu tentang Perencanaan Tambang Terbuka yang menjadi salah satu aplikasi besar
didalam dunia pertambangan.
B. Tujuan
a. Peta Iup
1. Membuat peta lokasi penambangan;
2. Untuk mengetahui batas wilayah izin usaha penambangan.
b. Geological Database.
1. Membuat basis data untuk pemodelan;
2. Mengimport data bor kemudian mengkorelasikannya;
3. Membuat block modeling.
c. DTM Surface dan Solid Model
1. Membuat DTM surface, solid model
2. Menghitung volume model solid tersebut pada zona limonit, saprolit dan
bedrock.
d. Estimasi Dan Sumberdaya
1. Mampu membuat dan memahami dominan, statistic dasar;
2. Mampu membuat dan memahami konsep variogram dan modeling.
e. Pit And Dumd Design.
1. Mampu membuat kontur stripping ratio;
2. Mampu membuat pit design.
f. Mine Hauling Road Design
1. Mampu membuat jalan dan badan jalan
2. Mampu menghitung cut and fill
1.3 Alat dan Bahan

A. Pembuatan Peta Izin Usaha Pertambangan (IUP)


1. Alat
a. Laptop;
b. Mouse;

Pendahuluan-2
c. Terminal colokan.\
d. Software ArcGis 10.
2. Bahan
a. Modul
b. Kertas Hvs
B. Geological Database
1. Alat
a. Terminal Colokan;
b. Mouse;
c. Laptop;
d. Software Surpac 6.6.2
2. Bahan
c. Modul
d. Kertas Hvs
C. DTM Surface & Solid Model
1. Alat
a. Terminal Colokan;
b. Mouse;
c. Laptop;
d. Software Surpac 6.6.2.
2. Bahan
a. Kertas Hvs.
b. Modul
D. Estimasi Sumberdaya
1. Alat
a. Laptop;
b. Mouse;
c. Terminal Colokan;
d. Software Surpac 6.6.2.
2. Bahan
a. Modul;
b. Kertas Hvs.
E. Pit & Dump Design

Pendahuluan-3
1. Alat
a. Terminal Colokan;
b. Mouse;
c. Laptop;
d. Software Surpac 6.6.2.
2. Bahan
a. Modul;
b. Kertas Hvs.
F. Mine Hauling Road Design
1. Alat
a. Laptop;
b. Mouse;
c. Terminal Colokan;
d. Software surpac 6.6.2
2. Bahan
a. Kertas Hvs;
b. Modul
1.4 Manfaat Praktikum

Manfaat dari praktikum Perencanaan Tambang Terbuka adalah:


1. Pembuatan Peta Izin Usaha Pertambangan (IUP)
Praktikan dapat mengetahui dan memahami tentang cara-cara membuat peta
batas izin usaha pertambangan.
2. Geological Database
Praktikan dapat mengetahui dan mampu membuat database, mengimpor
database, mengatur drillhole style dan mengdisplay drillhole.
3. DTM Surface And Solid Model
Praktikan dapat mengetahui dan mampu membuat penampang drillhole dan solid
model litologi.
4. Estimasi Sumberdaya
Praktikan dapat mengetahui dan mampu memahami konsep statistik dasar,
variogram dan modeling variogram serta mampu membuat block model, Estimasi
block model dan validasi block model.

Pendahuluan-4
5. Pit And Dump Design
Praktikan dapat mengetahui dan mampu membuat kontur stripping ratio dan
membuat pit design.
6. Mine Hauling Road Design
Praktikan dapat mengetahui dan mampu membuat jalan dan badan jalan serta
menghitung cut and fill.
1.5 Waktu dan Tempat Pelaksanaan Praktikum

Praktikum ini dilakukan di laboratorium perencanaan tambang terbuka selama


lebih 1 bulan terhitung sejak pada tanggal 24 September 2022 – 7 November 2022.
Lokasi wilayah laboratorium perencanaan tambang terbuka secara administratif
terletak di Jl. Urip Sumoharjo No.km.5, Panaikang, Kec. Panakkukang, Kota
Makassar, Sulawesi Selatan Universitas Muslim Indonesia Fakultas Teknologi
Industri Jurusan Teknik Pertambangan dan secara astronomis terletak pada koordinat
5o9’0’’S lintang selatan dan 119o28’0’’E bujur timur.
Lokasi Praktikum dapat dicapai dari Jln. batua raya XII menuju kampus II
UMI dengan menggunakan transportasi darat dengan jarak ± 6 km ( jalanan beraspal
dan berbeton) dapat ditempuh dengan waktu ± 20 Menit.

Pendahuluan-5
BAB III
PENUTUP

3.1 Kesimpulan dan Saran

A. Peta Iup
Membuat peta lokasi penambangan membutuhkan shp daerah yang
dibutuhkan semisal kita ingin membuat peta lokasi Kabupaten Konawe, maka
kita harus membutuhkan shp daerah tersebut yang bisa di akses melalu tanah
air indonesia. Mengetahui batas wilayah izin usaha penambangan dapat
dilakukan dengan cara membuat polygon tertutup.
B Geological Database
Berdasarkan praktikum ini dapat disimpulkan bahwa Geological Database
terdiri dari beberapa tabel. Data yang dimaksud adalah assay, geology, survey
dan collar. Block model adalah suatu matrik block (atau disebut juga cell) dari
dimensi x, y, z yang akan menampilkan volume deposit. Setiap block
menentukan bagian ruang tiga dimensi tertentu. Biasanya block berbentuk
empat persegi panjang, juga dapat berbentuk jajaran genjang. Untuk membuat
database dan merancang block model pada endapan bahan galian contohnya
nikel laterit menggunakan aplikasi Surpac.
C. DTM Surface dan Solid Model
Pembuatan DTM surface dan solid model membutuhkan geological
database dan software. Data tersebut berisi data collar yaitu data yang
menunjukkan koordinat lobang bor. Kemudian, data assay yaitu data yang
menujukkan kadar setiap kedalaman. Data survey yaitu data yang menujukkan
arah pengeboran serta data geology yang menunjukkan litology.
D. Pit And Dumd Design.
Berdasarkan praktikum ini dapat disimpulkan bahwa pit adalah bukaan
yang dibuat di permukaan tanah, bertujuan untuk mengambil bijih dan akan
dibiarkan tetap terbuka (tidak ditimbun kembali) selama pengambilan bijih
masih berlangsung. Untuk membuat perencanaan tambang (desain pit) ada dua
pertimbangan yang harus diketahui dan dipahami. dan aman pada tambang
terbuka menggunakan aplikasi Surpac.
E. Mine Hauling Road Design

Penutup-169
Jalan angkut tambang bertujuan untuk menunjang kelancaran operasi
penambangan terutama dalam kegiatan pengangkutan. Medan berat yang
mungkin terdapat di sepanjang rute jalan tambang harus diatasi dengan
merancang jalan untuk meningkatkan aspek manfaat dan keselamatan kerja.
Adapun volume report yang di dapatkan yaitu cut vol 11397, fill vol 9426, nett
vol -1971, nett tonagge -1971.
3.2 Saran

A. Saran Untuk Asisten


a. Al Alif Muhammad, S.T.
Agar tetap mempertahankan caranya dalam memberikan materi dan asistensi
dan selalu membagi ilmunya kepada praktikan.
b. Kurniawan Idris, S.T.
Agar kiranya selalu mendampingi praktikannya hingga selesai setiap mata
acara.
c. Sumantriman, S.T.
Agar selalu memberikan ilmu yang didapatkan kepada praktikan dan selalu
sabar dalam menghadapi praktikan.
d. Muhammad Ikbal
Jadilah kakak asisten yang tetap mempertahankan caranya dalam
memberikan materi dan asistensi dan selalu membagi ilmunya kepada
praktikan serta tetap ramah terhadap praktikan.
e. Dewi A, S.T
Saya berharap agar sering berada di laboratotium, dan juga tepat waktu bila
jadwal untuk asistensi yang sebelumnya sudah di sepakati.
f. Jihan Fitri Ramdita Putri Gouw, S.T.
Agar kiranya tetap fokus pada saat memeriksa laporan dan pada saat
menjelaskan materi serta membantu praktikan yang belum menguasai
software sehingga praktikan lebih mudah dalam memperbaiki dan
menyelesaikannya dengan tepat waktu.
B. Saran Untuk Laboratorium
Sebaiknya laboratorium menyediakan video berupa penjelasan mengenai
setiap mata acara agar praktikan bisa dengan mudah untuk merefresh kembali
setiap mata acara yang diberikan. Dan juga Saran saya untuk laboratorium

Penutup-170
sebaiknya diperbanyak lagi rak sepatu dan selalu menjaga kebersihan
laboratorium baik didalam maupun diluar.
C. Saran Untuk Praktikum Selanjutnya
Agar praktikan lebih mempersiapkan alat dan bahannya pada saat praktikum
terutama laptop sehingga praktikum dapat berjalan dengan lancar.

Penutup-171
DAFTAR PUSTAKA

Arifin Tasrif, 3 Mei 2020 Mineral Energi dan Sumber Daya Mineral Republik
Indonesia.
E. Harseno and V. I. R. Tampubolon, “Aplikasi Sistem Informasii Geografis Dalam
Pemetaan Batas Administrasi, Tanah, Geologi, Penggunaan Lahan, Lereng
Daerah Istimewah Yogyakarta dan Daerah Aliran Sungai di Jawa Tengah
menggunakan Software ArcGis”.
Tim Penyusun 1987.PengetahuanPeta.Penerbit ITB Bandung.
Ansyarullah, A. 2020. Pemodelan dan Estimasi Sumberdaya Nikel Laterit Site Pulau
Pakal PT. ANTAM (Persero) Tbk Ubp Nickel Maluku Utara Menggunakan
Metode Inverse Distance Weight dan Ordinary Kriging. 12. 19 - 28.
Ansyarullah, A. 2020. Genesa Endapan Nikel Laterit.
Www.Academia.Edu/37110758/Genesa_Endapan_Nikel_Laterit. Diakses
pada: 09 Oktober 2022.
Himpunan Mahasiswa Teknik Geologi. 2017. Gemcom Surpac.
hmtg.itny.ac.id/gemcom-surpac/. Diakses pada: 09 Oktober 2022.
Adrianto, S. 2015. Peluang Aplikasi Teknologi Pengeringan Batubara dan Blending
Batubara di Indonesia Ditinjau dari Segi Ekonomi dan Lingkungan. Jurnal
Teknolo gi Mineral dan Batubara; Vol 8, No 3.
Lintjewas, L dkk. 2019. Profil Endapan Nikel Laterit di Daerah Palangga, Provinsi
Sulawesi Tenggara Profile Of Nickel Laterite Deposit in Palangga, Southeast
Sulawesi Province. Sulawesi Tenggara.
Aryanda, D., Ramli, M. and Djamaluddin., H. (2014) ‘Perancangan Sequence
Penambangan Batubara untuk Memenuhi Target Produksi Bulanan’, Geosains,
10(02), pp. 75–76.
Isjudarto A, 2013. Pengaruh Morfologi Lokal Terhadap Pembentukan Nikel Laterit.
Seminar Nasional Ke 8 Tahun 2013: Rekayasa Teknologi Industri Dan
Informasi. STTNAS. Depok
Kurniadi A, dkk, 2017. Karakteristik Batuan Asal Pembentukan Endapan Nikel
Laterit Di Daerah Madang Dan Serakaman Tengah. Padjadjaran Geoscience

Penutup-172
Journal. Vol.01, No. 02, Oktober 2017: 149-163. Universitas Padjajaran.
Jatinangor
Setiadi, A. 2015. Tutorial Surpac 6.4 Geological Database Persiapan
Membuat Database. https://adriantosetiadi.wordpress.com/2015/11/12/tutorial-
surpac-6-geological-database-1/. Diakses pada: 09 Oktober 2022.Himpunan
Mahasiswa Geologi Fakultas Teknik UNHAS. 2022. Geological Software
Diakses pada: 09 Oktober 2022.
Patrarijaya. 2017. Perencanaan Tambang Terbuka.
www.patrarijaya.co.id/perencanaan-tambang-terbuka. Diakses pada: 09
Oktober 2022.
Irwandi, Arif dan Gatut Adisoma. 2002. Perencanaan Tambang. Bandung: Institut
Teknologi Bandung.
M.A.J. Martadinata dan Sepriadi. 2019. Pemodelan Desain Pit Batubara Dengan
Menggunakan Software Minescape 4.119. Palembang: Jurnal Teknik Patra
Akademika.
Sudrajat, N. 2013. Pertambangan Indonesia. Yogyakarta: Pustaka Yustisia.
Nurhakim (2020) ‘Klasifikasi metode penambangan dan perbandingannya’, p. 16.
Available at: http://mining.ft.ulm.ac.id/opencourseware/Nhk__Tamka-02.pdf.

Arrijal M, 2015. Pemodelan Endapan Nikel Laterit Menggunakan Software Surpac


Pada PT. Cipta Mandiri Putra Perkasa Kabupaten Morowali Provinsi
Sulawesi Tengah. Jurnal Geomine, Vol 03, Desember 2015. Universitas
Hasanuddin. Makassar.
Duantari, N. and Cahyono, B. (2017) ‘Analisis Perbandingan DTM ( Digital Terrain
Ranging ) dan Foto Udara dalam Pembuatan Kontur Peta Rupa Bumi
Indonesia’, Jurnal Teknik ITS, 6(2), pp. 2337-3520 (2301–928X Print).

Hardyanto, 2015. Pemodelan Endapan Nikel Laterit, Kabupaten Morowali, Provinsi


Sulawesi Tengah. Jurnal Geomine, Vol 02, Agustus 2015. Universitas
Hasanuddin. Makassar.
Isjudarto A, 2013. Pengaruh Morfologi Lokal Terhadap Pembentukan Nikel Laterit.
Seminar Nasional Ke 8 Tahun 2013: Rekayasa Teknologi Industri Dan
Informasi. STTNAS. Depok.
Kurniadi A, dkk, 2017. Karakteristik Batuan Asal Pembentukan Endapan Nikel
Laterit Di Daerah Madang Dan Serakaman Tengah. Padjadjaran Geoscience

Penutup-173
Journal. Vol.01, No. 02, Oktober 2017: 149-163. Universitas Padjajaran.
Jatinangor.
Nurhakim (2020). ‘Klasifikasi metode penambangan dan perbandingannya’, p. 16.
Available at: http://mining.ft.ulm.ac.id/opencourseware/NHK__TAMKA-
02.pdf.
Setiadi A, 2015. Tutorial Surpac 6.4 Geological Database Persiapan
Membuat Database.https://adrianto setiadi. wordpress.
com/2015/11/12/tutorial-surpac-6-geological-database-1/. Diakses pada: 09
Oktober 2022.Himpunan Mahasiswa Geologi Fakultas Teknik UNHAS. 2022.
Geological Software Diakses pada: 09 Oktober 2022.
Duantari and Cahyono, 2017. Pembuatan DTM (Digital Terrain Model).
Padjadjaran Geoscience Journal. Vol.01, No. 02, Oktober 2017: 149-163.
Universitas Padjajaran. Jatinangor.

Penutup-174
Penutup-175

Anda mungkin juga menyukai