Anda di halaman 1dari 3

DATA HASIL PRAKTIKUM

KELOMPOK M6

1 suction penuh, discharge penuh

T motor motor Debit (Q) total head


ulangan suctio discharge
(ulangan BHP WHP µ (%)
ke V A (HP) n (bar) KW µ (bar) (m3/jam) (gpm) (bar) (mH2O)
) menit
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 1 220 1.18 1.95 0.2596 0.472 0.16425 0.15 2.625 11.558 2.1 21.42 0.06249 38.047
2 1 220 1.18 1.95 0.2596 0.472 0.16425 0.15 2.625 11.558 2.1 21.42 0.06249 38.047
3 1 220 1.18 1.95 0.2596 0.472 0.16425 0.15 2.625 11.558 2.1 21.42 0.06249 38.047
 Rata-rata 1 220 1.18 1.95 0.2596 0.472 0.16425 0.15 2.625 11.558 2.1 21.42 0.06249 38.047

2 suction penuh, discharge setengah

T motor motor Debit (Q) total head


ulangan suction discharg
(ulangan) BHP WHP µ (%)
ke V A (HP) (bar) KW µ e (bar) (m3/jam) (gpm) (bar) (mH2O)
menit
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 1 220 1.18 2.15625 0.2596 0.472 0.164251 0.15 2.6 11.48 2.30625 23.52375 0.068168 41.50225
2 1 220 1.18 2.15625 0.2596 0.472 0.164251 0.15 2.6 11.48 2.30625 23.52375 0.068168 41.50225
3 1 220 1.18 2.15625 0.2596 0.472 0.164251 0.15 2.6 11.48 2.30625 23.52375 0.068168 41.50225
 Rata-rata 1 220 1.18 2.15625 0.2596 0.472 0.164251 0.15 2.6 11.48 2.30625 23.52375 0.068168 41.50225
3. suction setengah, discharge penuh

T motor motor Debit (Q) total head


ulangan (ulangan A suctio discharge
ke ) menit V (HP) n (bar) KW µ BHP (bar) (m3/jam) (gpm) (bar) (mH2O) WHP µ (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 1 220 1.18 2.7 0.2596 0.472 0.16425 0.075 2.025 8.92 2.775 28.305 0.06373 38.8017
2 1 220 1.18 2.7 0.2596 0.472 0.16425 0.075 2.025 8.92 2.775 28.305 0.06373 38.8017
3 1 220 1.18 2.7 0.2596 0.472 0.16425 0.075 2.025 8.92 2.775 28.305 0.06373 38.8017
Rata-rata 1 220 1.18 2.7 0.2596 0.472 0.16425 0.075 2.025 8.92 2.775 28.305 0.06373 38.8017

GRAFIK

Hubungan Q dengan suction


3 perlakuan 3
2.5 f(x) = − 1.11075949367089 x + 4.95308544303798
perlakuan 2 suction
R² = 0.946876945424362
suction (bar)

2
perlakuan 1 Linear (suction)
1.5
Linear (suction)
1 Linear (suction)
0.5
0
1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7
Q (bar)
Hubungan Q dengan discharge Hubungan Q dengan
perlakuan 1 BHP
perlakuan 1 perlakuan 2
0.16 0.18
perlakuan 3
0.14 f(x) = 0.12748643761302 x − 0.183092224231465
perlakuan 2 0.16
f(x) = 0.164251
0.12 R² = 0.998643761301989 0.14 R² = 0 BHP
discharge (bar)

0.1 0.12
0.1 Linear (BHP)
0.08

BHP
0.08 Linear (BHP)
0.06 perlakuan 3 0.06 Linear (BHP)
0.04 0.04
0.02 0.02
0 0
1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7
Q (bar) Q (bar)

Hubungan Q dengan Efisiensi Hubungan Q dengan Total Head


Pompa 30
perlakuan 3
25 f(x) = − 10.0293851717902 x + 48.6539308318264
0.42 R² = 0.930947392284627 perlakuan 2

Total Head (mH2O)


perlakuan 2
0.41 20
Efisiensi Pompa

perlakuan 1
0.4 15
0.39 f(x) = 0.00343893389309366 x + 0.357877057592242
R² = 0.0809082837482111 10
0.38
perlakuan 3 perlakuan 1
0.37 5
0.36 0
8.5 9 9.5 10 10.5 11 11.5 12 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7
Q (gpm) Q (bar)

Anda mungkin juga menyukai