NERACA MASSA

PRARANCANGAN PABRIK SODIUM DODEKILBENZENE SULFONAT DARI DODEKILBENZ

Kapasitas 15,000 Ton/Tahun Berat Molekul


Operasi 330 Hari/Tahun C6H5.C12H25
Basis Operasi 24 Jam/Hari C9H10
Bahan Baku 1 Jam OLEUM 20%
(15.000Produk
𝑡𝑜𝑛)/(1 𝑡𝑎ℎ𝑢𝑛)×(1.000 𝑘𝑔)/(1 𝑡𝑜𝑛)×(1 𝑡𝑎ℎ𝑢𝑛)/(330 ℎ𝑎𝑟𝑖)×(1 ℎ𝑎𝑟𝑖)/(24
CH𝑗𝑎𝑚)
.C H SO
6 5 12 25 3

C6H5.C12H25SO3.Na
= 1893.9394 Kg/Jam Na2SO4
= 1.0000 NaOH
H2SO4
SO3
S
H2O

Konversi Reaksi Sulfonasi 96% (Austin, 1984)


Basis 5.3148 5.3148
Perbandingan 1 1.25

Reaksi Sulfonasi Reaktor 1


Reaksi pembentukan C6H5.C12H25 + H2SO4.SO3
Mula-mula 5.3148 6.6435
Bereaksi 5.1022 5.1022
Sisa 0.2126 1.5413

1 Reaktor 1
DDB mula-mula 5.3148 Kmol/jam 1307.4407
DDB yang bereaksi 5.1022 kmol/jam 1255.1430
DDB sisa 0.2126 Kmol/jam 52.2976
Oleum 20% mula- mula 6.6435 Kmol/jam 1182.5429
Oleum 20% bereaksi 5.1022 Kmol/jam 408.1766
Oleum 20% sisa 1.5413 Kmol/jam 274.3499456
ADDB yang dihasilkan 5.1022 Kmol/jam 1663.3196
H2SO4 sisa 5.1022 Kmol/jam 500.0163

Reaksi Sulfonasi Reaktor 2


Reaksi pembentukan C6H5.C12H25 + H2SO4.SO3
Mula-mula 0.2126 1.5413
Bereaksi 0.2041 0.2041
Sisa 0.0085 1.3372

2 Reaktor 2
DDB mula-mula 0.2126 Kmol/jam 52.2976
DDB yang bereaksi 0.2041 Kmol/jam 50.2057
DDB sisa 0.0085 Kmol/jam 2.0919
Oleum 20% mula- mula 1.5413 Kmol/jam 274.3499
Oleum 20% bereaksi 0.2041 Kmol/jam 16.3271
Oleum 20% sisa 1.3372 Kmol/jam 238.0222
ADDB yang dihasilkan 0.2041 Kmol/jam 66.5328
H2SO4 sisa 0.2041 Kmol/jam 20.0007

Reaksi Samping
Diinginkan H2SO4 dengan konsentrasi = 78%
x= 100%
Reksi Samping H2SO4.SO3 + H2O
Mula-mula 1.3372 12.2553
Bereaksi 1.3372 1.3372
Sisa 0.0000 10.9181

3 Mixer
DDB masuk 0.0085 Kmol/jam 2.0919
DDBS masuk 5.3063 Kmol/jam 1729.8524
H2SO4 masuk 5.3063 Kmol/jam 520.0170
H2O masuk 12.2553 Kmol/jam 220.5948
H2O keluar 10.9181 Kmol/jam 196.5251
H2SO4 sisa 2.6744 Kmol/jam 262.0919
H2SO4 keluar 782.1089

4 Decanter
DDB masuk 2.0919
DDBS masuk 1729.8524
H2SO4 masuk 782.1089
H2SO4 produk 766.4667
H2SO4 sisa 15.6422
H2O masuk 196.5251
H2O produk 196.5251
5 Netralizer
C6H5.C12H25SO3 umpan = 5.3063 kmol/jam
H2SO4 umpan = 0.1596 kmol/jam
x= 100%
Reaksi penetralan C6H5.C12H25SO3 + NaOH
Mula-mula 5.3063 5.3063
Reaksi 5.3063 5.3063
Sisa 0.0000 0.0000

Reaksi penetralan H2SO4 + 2 NaOH


Mula-mula 0.1596 0.3192
Reaksi 0.1596 0.3192
Sisa 0.0000 0.0000

DDBS masuk 5.3063 Kmol/jam 1729.8524


DDBS bereaksi 5.3063 Kmol/jam 1729.8524
SDDBS 5.3063 Kmol/jam 1846.5909
H2SO4 masuk 0.1596 Kmol/jam 15.6422
Kebutuhan NaOH 5.6255 Kmol/jam 225.0210
Na2SO4 0.1596 Kmol/jam 22.6652
H2O Keluar (100%)/(%
5.6255 𝑘𝑒𝑚𝑢𝑟𝑛𝑖𝑎𝑛
Kmol/jam 𝑝𝑟𝑜𝑑𝑢𝑘)×𝑚𝑎𝑠𝑠𝑎 101.2594
𝑝𝑟𝑜𝑑𝑢𝑘

6 Spray Dryer
Kemurnian C6H5.C12H25SO3Na = 97.50%
Total massa produk= 1893.9394

H2O diuapkan = massa masuk - total massa produk = 327.6705

Massa
Komponen Fraksi (%)massa
(kg/jam)
C6H5.C12H25 2.0919 0.0011 0.1105
C9H10 5.2298 0.0028 0.2761
C6H5.C12H25SO3Na 1846.5909 0.9750 97.5000 99.0833
H2O 17.3616 0.0092 0.9167

Na2SO4
22.6652 0.0120 1.1967
Jumlah 1893.9394 1 100

Neraca Massa Total


Masuk Keluar (kg/jam)
Komponen (kg/jam) Produk Utama
Produk Samping Limbah
C6H5.C12H25 1307.4407 2.0919
C9H10 5.2298 5.2298
H2SO4.SO3 1182.5429
C6H5.C12H25SO3
H2SO4 766.4666966
H20 464.3675 17.3616 196.5251 327.6705
NaOH 225.0210
C6H5.C12H25SO3Na 1846.5909 0.0000
Na2SO4 22.6652
Jumlah 3184.6018 3184.6018 0.0000

Arus (kg/jam)
Komponen
Arus 1 Arus 2 Arus 3 Arus 4 Arus 5
C6H5.C12H25 1307.4407 52.2976 2.0919
C9H10 5.2298 5.2298 5.2298
H2SO4.SO3 1182.5429 274.3499 238.0222
C6H5.C12H25SO3 1663.3196 1729.8524
H2SO4 500.0163 520.0170
H20 220.5948
NaOH
C6H5.C12H25SO3Na
Na2SO4
Jumlah 1312.6704 1182.5429 2495.2133 2495.2133 220.5948106

3184.6018
NERACA MASSA
ZENE SULFONAT DARI DODEKILBENZENE DAN OLEUM 20% DENGAN KAPASITAS 15.000 TON/TAHUN

Berat Molekul
C6H5.C12H25 246 kg/kmol
C9H10 118 kg/kmol
OLEUM 20% 178 kg/kmol
𝑖)/(24 𝑗𝑎𝑚)
C6H .C H SO3 326 kg/kmol
5 12 25

C6H5.C12H25SO3.Na 348 kg/kmol


Na2SO4 142 kg/kmol
NaOH 40 kg/kmol
H2SO4 98 kg/kmol
SO3 80 kg/kmol
S 32 kg/kmol
H2O 18 kg/kmol

C6H5.C12H25SO3 + H2SO4

5.1022 5.1022
5.1022 5.1022

Reaktor 1
Kg/jam Masuk Keluar
Komponen
Kg/jam arus 1(kg/jam) arus 2(kg/jam) arus 3 (kg/jam)
Kg/jam C6H5.C12H25 1307.4407 52.2976
Kg/jam C9H10 5.2298 5.2298
Kg/jam H2SO4.SO3 1182.5429 274.3499
Kg/jam C6H5.C12H25SO3 1663.3196
Kg/jam H2SO4 500.0163
Kg/jam Jumlah 2495.2133 2495.2133

C6H5.C12H25SO3 + H2SO4

0.2041 0.2041
0.2041 0.2041

Reaktor 2
Kg/jam Masuk Keluar
Komponen
Kg/jam arus 3(kg/jam) arus 4(kg/jam)
Kg/jam C6H5.C12H25 52.2976 2.0919
Kg/jam C9H10 5.2298 5.2298
Kg/jam H2SO4.SO3 274.3499 238.0222
Kg/jam C6H5.C12H25SO3 1663.3196 1729.8524
Kg/jam H2SO4 500.0163 520.0170
Kg/jam Jumlah 2495.2133 2495.2133

2 H2SO4

2.6744
2.6744

Mixer
Kg/jam Masuk Keluar
Komponen
Kg/jam arus 4 (kg/jam) arus 5 (kg/jam) arus 6 (kg/jam)
Kg/jam C6H5.C12H25 2.0919 2.0919
Kg/jam C9H10 5.2298 5.2298
Kg/jam H2SO4.SO3 238.0222
Kg/jam C6H5.C12H25SO3 1729.8524 1729.8524
Kg/jam H2SO4 520.0170 782.1089
H20 220.5948 196.5251
Jumlah 2715.8081 2715.8081

Decanter
Kg/jam Masuk Keluar
Komponen
Kg/jam arus 6 (kg/jam) arus 8 (kg/jam) arus 7 (kg/jam)
Kg/jam C6H5.C12H25 2.0919 2.0919
Kg/jam C9H10 5.2298 5.2298
Kg/jam C6H5.C12H25SO3 1729.8524 1729.8524
Kg/jam H2SO4 782.1089 15.6422 766.4667
Kg/jam H20 196.5251 196.5251
Jumlah 2715.8081 2715.8081
C6H5.C12H25SO3Na + H2O

5.3063 5.3063
5.3063 5.3063

Na2SO4 + 2 H20

0.1596 0.3192
0.1596 0.3192

Netralizer
Kg/jam Masuk Keluar
Komponen
Kg/jam arus 8 (kg/jam) arus 9 (kg/jam) arus 10 (kg/jam)
Kg/jam C6H5.C12H25 2.0919 2.0919
Kg/jam C9H10 5.2298 5.2298
Kg/jam C6H5.C12H25SO3 1729.8524
Kg/jam C6H5.C12H25SO3Na 1846.5909
Kg/jam H2SO4 15.6422
H2O 0 243.7727 345.0321
NaOH 225.0210
Na2SO4 22.6652
Jumlah 2221.6099 2221.6099

Spray Dryer
Masuk Keluar
Komponen
Kg/jam arus 10 (kg/jam) arus 11 (kg/jam) arus 12 (kg/jam)
C6H5.C12H25 2.0919 2.0919
Kg/jam C9H10 5.2298 5.2298
C6H5.C12H25SO3Na 1846.5909 1846.5909
H2O 345.0321 327.6705 17.3616
Na2SO4 22.6652 22.6652
Jumlah 2221.6099 2221.6099
Arus (kg/jam)
Arus 6 Arus 7 Arus 8 Arus 9 Arus 10 Arus 11 Arus 12
2.0919 2.0919 2.0919 2.0919
5.2298 5.2298 5.2298 5.2298

1729.8524 1729.8524
782.1089 766.4667 15.6422
196.5251 196.5251 243.7727 345.0321 327.6705 17.3616
225.0210
1846.5909 0.0000 1846.5909
22.6652 22.6652
2715.8081 962.9918 1752.8163 468.7937 2221.6099 327.6705077499 1893.9394
kg/jam

3184.6018
1

Reaktor 1 3

2
3 Reaktor 2 4

Mixer 1 6

6 Decanter

7
9

Netralizer

1
1

10 Spray
Dryer
15000
ton/tahun
Tangki Penyimpanan Dodekilbenzene (T-01)

Fungsi = Menyimpan bahan baku Dodekilbenzene


Lama Penyimpanan = 7 Hari
Kondisi Operasi = T = 30 o
C
P = 1 atm

Tujuan : 1. Menentukan tipe tangki


2. Menentukan bahan konstruksi
3. Menentukan kapasitas Dodekilbenzene yang disimpan
4. Menentukan volume perancangan
5. Menentukan dimensi tangki

1 Menentukan Tipe Tangki


Dalam perancangan ini dipilih tipe tangki silinder tegak dengan dasar datar, dengan alasan:
a. Tangki vertikal mampu menampung dalam kapasitas yang besar
b. Konstruksi yang mudah sehingga lebih ekonomis.
c. Cocok untuk kondisi atmosferis

2 Menentukan Bahan konstruksi


Dalam perancangan dipilih bahan konstruksi tangki Carbon steel SA 167 Grade 11 tipe 316 dengan pertimbangan:
a. Tahan terhadap korosi Tabel 13.1,hal 251,Brownell
b. Harga murah
c. Kekuatan baik (mempunyai allowable stress cukup besar yaitu 18.750)

3 Menentukan kapasitas Dodekilbenzene yang disimpan


Kemurnian Dodekilbenzene yang disimpan:
C6H5.C12H25 = 99.60%
C9H10 = 0.40%
Waktu Penyimpanan = 7 Hari 168 Jam

Komponen m (kg/jam) BM kmol/jam %w % mol


C6H5.C12H25 1307.4407 246 5.3148 0.9960 0.9917
C9H10 5.2298 118 0.0443 0.0040 0.0083
Jumlah 1312.6704 5.3591 1 1

Jumlah Dodekilbenzene yang harus disimpan selama 7 hari adalah :


Massa = 220528.6302 kg
= 486181.8287 lb

4 Menentukan Volume Perancangan


a. Menghitung densitas campuran
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n
C6H5.C12H25 0.2482 0.2435 0.2857 774.26 0.8678
C9H10 0.2884 0.258 0.2857 684.6 0.8462
Jumlah

Densitas campuran = 845.8538 kg/m3


= 52.8048 lb/ft3

b. Volume campuran dan volume perancangan


Volume campuran = 9207.1497186281 ft3 260.7170 m3
Diambil Over design = 20%
Kapasitas perancangan = 11048.579662354 ft3 312.8604 m3

5 Dimensi Tangki
a. Diameter, Tinggi, dan Jumlah Tangki
Menentukan tinggi dan diameter tangki :
Diambil perbandingan D/H = 8/3
𝑉𝑡=(𝜋𝐷^2 𝐻)/4

𝐷=(32/3 𝑉/𝜋)^(1/3)
= 33.4813 ft

𝐻=3/8 𝐷 = 12.5555 ft

Maka diambil: (Appendix E, Brownell, hal. 346)


Diameter standar = 35 ft
420 inch
10.6680 m
Tinggi standar = 18 ft
216 inch
5.4864 m
Sehingga:
Kapasitas standar = 3080 bbl
489.67996 m3
Course plate = 3

b. Tebal Dinding Shell

𝑡_𝑠=𝜌(𝐻−1)12𝐷/(2×144×𝑓×𝐸)+� (Brownell, pers.3.17)

dimana :
ts = tebal shell, in
D = diameter dalam
f = allowable stress, psia = 18750
E = effisiensi sambungan = 0.8 (double welded butt joint, Tabel 13.2
C = faktor koreksi, in = 0.125
P = internal pressure, lb/in2
ρ= 845.8538 kg/m3
52.8048 lb/ft3

Tebal shell tiap course plate


No. Plate ts (in)
H
Course Hitung Standar
1 18 0.2123 1/ 4 0.25
2 12 0.1815 3/16 0.1875
3 6 0.1507 3/16 0.1875

c. Tekanan Desain
ℎ_𝑐𝑎𝑖𝑟𝑎𝑛=𝑉_𝑐𝑎𝑖𝑟𝑎𝑛/(𝜋/4 𝐷^2 )
2.9183 m

g= 9.8 m/s2
Tekanan hidrostatis = ρ.g.h cairan
24191.0701 Pa
0.2387 atm
Tekanan operasi = 1 atm
Tekanan desain (Pi) = 1,2 x ( P operasi + P hidrostatis)
1.4865 atm
21.8515 psi

d. Roof Desain
Direncanakan head berbentuk Thorispherical Flanged and Dished head
rc = 420 inch
icr = 25.2

(Brownell & Young 1959, p.138)

�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
= 1.7706

𝑡ℎ=(𝑃.𝑟𝑐.�)/(2.𝑓.𝐸−0,2𝑃)+� = 0.6667 inch

th standar = 3/4 inch (Tabel 5.6 Brownell & Young)


= 0.75 inch

maka, digunakan sf = 8 inch (Table 5.8 Brownell & Young)


= 0.2032 m

ID = OD - 2*th
ID = 418.5 inch 10.6299 m

a = ID/2 = 209.2500 inch


AB = a-irc = 184.0500 inch
BC = rc-irc = 394.8000 inch
AC = √((��)^2−(𝐴𝐵)^2 ) = 349.2744 inch
b = rc - AC = 70.7256 inch

OA = Sf + b + t head = 79.4756 inch

Tinggi total tangki = Tinggi tangki + Tinggi head


= 5.4864 + 2.0187
= 7.5051 m

Dimensi
kapasitas : 0.0000 m3
Diameter : 0.0000 m
Tinggi : 0.2580 m
Tebal shell : 0.1875 in
Jumlah course : 0
Tinggi head : 0.0000 in
Tebal head : 0.0000 in
Jumlah : 1 buah
Harga : $76,141
303 K
14.7 psi

dengan pertimbangan:
l 251,Brownell

kg / 7 hari
219650.0301
878.6001
220528.6302
ρL (g/mL) ρL (kg/m3) m (kg/jam) fraksi massa ρL campuran (kg/m3)
0.8456 845.6068 1307.4407 0.9960 842.2379
0.9076 907.5949 5.2298 0.0040 3.6159
1312.6704 1 845.8538

Tabel 5.4 dan 5.6, hal 87 dan 88, Brownell


Data tebal standard
3/16 in 0.1875
1/4 in 0.2500
5/16 in 0.3125
3/8 in 0.3750
7/16 in 0.4375
1/2 in 0.5000
(double welded butt joint, Tabel 13.2, Brownell) 5/8 in 0.6250
3/4 in 0.7500
7/8 in 0.8750
1 in 1.0000
1(1/8) in 1.1250
1(1/4) in 1.2500
1(3/8) in 1.3750
1(1/2) in 1.5000
1(3/4) in 1.7500
2 in 2.0000
2(1/4) in 2.25
2(1/2) in 2.5
2(3/4) in 2.75
3 in 3
ownell & Young)

ownell & Young)

34.8611 ft

1.7964 m

2.0187 m
Tangki Penyimpanan Oleum 20% (T-02)

Fungsi = Menyimpan bahan baku Oleum 20%


Lama Penyimpanan = 7 Hari
Kondisi Operasi = T = 30 o
C 303
P = 1 atm 14.7

Tujuan : 1. Menentukan tipe tangki


2. Menentukan bahan konstruksi
3. Menentukan kapasitas Oleum yang disimpan
4. Menentukan volume perancangan
5. Menentukan dimensi tangki

1 Menentukan Tipe Tangki


Dalam perancangan ini dipilih tipe tangki silinder tegak dengan dasar datar, dengan alasan:
a. Tangki vertikal mampu menampung dalam kapasitas yang besar
b. Konstruksi yang mudah sehingga lebih ekonomis.
c. Cocok untuk kondisi atmosferis

2 Menentukan Bahan konstruksi


Dari tabel 23-3 Perry,
dipilih bahan konstruksi, yaitu Stainless Steel 316 AISI ( 18Cr, 12Ni, 2.5Mo)
Pertimbangan : Cairan dalam tangki mengandung asam.

3 Menentukan kapasitas Oleum 20% yang disimpan


Waktu Penyimpanan = 7 Hari 168 Jam

Komponen m (kg/jam) BM kmol/jam %w % mol kg /7 hari


H2SO4.SO3 1182.5429 178 6.6435 1.0000 1.0000 198667.2020
Jumlah 1182.5429 6.6435 1 1 198667.2020

Jumlah Oleum 20% yang harus disimpan selama 7 hari adalah :


Massa = 198667.2020 kg
= 437985.6869 lb

4 Menentukan Volume Perancangan


a. Menghitung densitas campuran
T = 30 C
o
303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρL (g/mL)
H2SO4 0.42169 0.19356 0.28570 925 0.8928 1.8270
SO3 0.63003 0.19602 0.41787 490.85 0.6694 1.8754
Jumlah
Densitas campuran = 1836.6629 kg/m3
= 114.6589 lb/ft3

b. Volume campuran dan volume perancangan


Volume campuran = 3819.9020968 ft3 108.1674 m3
Diambil Over design = 20%
Kapasitas perancangan = 4583.8825162 ft3 129.8009 m3

5 Dimensi Tangki
a. Diameter, Tinggi, dan Jumlah Tangki
Menentukan tinggi dan diameter tangki :
Diambil perbandingan D/H = 8/3
𝑉𝑡=(𝜋𝐷^2 𝐻)/4

𝐷=(32/3 𝑉/𝜋)^(1/3)
= 24.9715 ft

𝐻=3/8 𝐷 = 9.3643 ft

Maka diambil: (Appendix E, Brownell, hal. 346)


Diameter standar = 30 ft
360 inch
9.1440 m
Tinggi standar = 12 ft
144 inch
3.6576 m
Sehingga:
Kapasitas standar = 1510 bbl
240.0704 m3
Course plate = 2

b. Tebal Dinding Shell

𝑡_𝑠=𝜌(𝐻−1)12𝐷/(2×144×𝑓×𝐸)+�
(Brownell, pers.3.17)

dimana :
ts = tebal shell, in
D = diameter dalam
f = allowable stress, psia = 18750
E = effisiensi sambungan = 0.8 (double welded butt joint, Tabel 13.2, Brownel
C = faktor koreksi, in = 0.125
P = internal pressure, lb/in2
ρ = 1836.6629 kg/m3
114.6589 lb/ft3

Tebal shell tiap course plate


No. Plate ts (in)
H
Course Hitung Standar
1 12 0.2301 1/ 4 0.25
2 6 0.1728 3/16 0.1875

c. Tekanan Desain
ℎ_𝑐𝑎𝑖𝑟𝑎𝑛=𝑉_𝑐𝑎𝑖𝑟𝑎𝑛/(𝜋/4 𝐷^2 )
1.6480 m

g= 9.8 m/s2
Tekanan hidrostatis = ρ.g.h cairan
29662.6436 Pa
0.2927 atm
Tekanan operasi = 1 atm
Tekanan desain (Pi) = 1,2 x ( P operasi + P hidrostatis)
1.5513 atm
22.8041 psi

d. Roof Desain
Direncanakan head berbentuk Thorispherical Flanged and Dished head

rc = 360 inch
icr = 21.6

(Brownell & Young 1959, p.138)


�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
= 1.7706

𝑡ℎ=(𝑃.𝑟𝑐.�)/(2.𝑓.𝐸−0,2𝑃)+� = 0.6096 inch

th standar = 5/8 inch (Tabel 5.6 Brownell & Young)


= 0.625 inch

maka, digunakan sf = 6 inch (Table 5.8 Brownell & Young)


= 0.1524 m

ID = OD - 2*th
ID = 358.75 inch 9.11225 m 29.8839

a = ID/2 = 179.3750 inch


AB = a-irc = 157.7750 inch
BC = rc-irc = 338.4000 inch
AC = √((��)^2−(𝐴𝐵)^2 ) = 299.3687 inch
b = rc - AC = 60.6313 inch 1.5400

OA = Sf + b + t head = 67.2563 inch 1.7083

Tinggi total tangki = Tinggi tangki + Tinggi head


= 3.6576 + 1.7083
= 5.3659 m
K
psi

ρL (kg/m3) m (kg/jam) fraksi massa ρL campuran (kg/m3)


1826.9712 946.0343 0.8 1461.5770
1875.4298 236.5086 0.2 375.0860
1182.5429 1 1836.6629
Tabel 5.4 dan 5.6, hal 87 dan 88, Brownell
Data tebal standard
3/16 in 0.1875
1/4 in 0.2500
5/16 in 0.3125
3/8 in 0.3750
7/16 in 0.4375
1/2 in 0.5000
ded butt joint, Tabel 13.2, Brownell) 5/8 in 0.6250
3/4 in 0.7500
7/8 in 0.8750
1 in 1.0000
1(1/8) in 1.1250
1(1/4) in 1.2500
1(3/8) in 1.3750
1(1/2) in 1.5000
1(3/4) in 1.7500
2 in 2.0000
2(1/4) in 2.25
2(1/2) in 2.5
2(3/4) in 2.75
3 in 3
ft

m
Tangki Penyimpanan NaOH (T-03)

Fungsi = Menyimpan bahan baku NaOH 48%


Lama Penyimpanan = 7 Hari
Kondisi Operasi = T = 30 C
o
303
P = 1 atm 14.7

Tujuan : 1. Menentukan tipe tangki


2. Menentukan bahan konstruksi
3. Menentukan kapasitas NaOH yang disimpan
4. Menentukan volume perancangan
5. Menentukan dimensi tangki

1 Menentukan Tipe Tangki


Dalam perancangan ini dipilih tipe tangki silinder tegak dengan dasar datar, dengan alasan:
a. Tangki vertikal mampu menampung dalam kapasitas yang besar
b. Konstruksi yang mudah sehingga lebih ekonomis.
c. Cocok untuk kondisi atmosferis

2 Menentukan Bahan konstruksi


Dalam perancangan dipilih bahan konstruksi tangki Carbon steel SA 167 Grade 11 tipe 316 dengan pertimbangan:
a. Tahan terhadap korosi Tabel 13.1,hal 251,Brownell
b. Harga murah
c. Kekuatan baik (mempunyai allowable stress cukup besar yaitu 18.750)

3 Menentukan kapasitas NaOH yang disimpan


Kemurnian NaOH yang disimpan:
NaOH = 48%
H2O = 52%
Waktu Penyimpanan = 7 Hari 168 Jam

Komponen m (kg/jam) BM kmol/jam %w % mol kg /7 hari


NaOH 225.0210 40 5.6255 0.48 0.2935 37803.5202
H2O 243.7727 18 13.5429 0.52 0.7065 40953.8136
Jumlah 468.7937 19.1685 1 1 78757.3338

Jumlah NaOH yang harus disimpan selama 7 hari adalah:


Massa = 78757.3338 kg
= 173629.9933 lb

4 Menentukan Volume Perancangan


a. Menghitung densitas campuran
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρL (g/mL)
NaOH 0.19975 0.09793 0.25382 2820 0.971560722 1.9093
H2O 0.3471 0.274 0.28571 647.13 0.834907965 1.0230
Jumlah

Densitas campuran = 1448.4291 kg/m3


= 90.4223 lb/ft3

b. Volume campuran dan volume perancangan


Volume campuran = 1920.2124194 ft3 54.3743 m3
Diambil Over design = 20%
Kapasitas perancangan = 2304.25490327 ft3 65.2491 m3

5 Dimensi Tangki
a. Diameter, Tinggi, dan Jumlah Tangki
Menentukan tinggi dan diameter tangki :
Diambil perbandingan D/H = 8/3
𝑉𝑡=(𝜋𝐷^2 𝐻)/4

𝐷=(32/3 𝑉/𝜋)^(1/3)
= 19.8553 ft

𝐻=3/8 𝐷 = 7.4457 ft

Maka diambil: (Appendix E, Brownell, hal. 346)


Diameter standar = 25 ft
300 inch
7.6200 m
Tinggi standar = 12 ft
144 inch
3.6576 m
Sehingga:
Kapasitas standar = 1050 bbl
166.93635 m3
Course plate = 2

b. Tebal Dinding Shell

𝑡_𝑠=𝜌(𝐻−1)12𝐷/(2×144×𝑓×𝐸)+�
(Brownell, pers.3.17)

dimana :
ts = tebal shell, in
D = diameter dalam
f = allowable stress, psia = 18750
E = effisiensi sambungan = 0.8 (double welded butt joint, Tabel 13.2, Browne
C = faktor koreksi, in = 0.125
P = internal pressure, lb/in2
ρ = 1448.4291 kg/m3
90.4223 lb/ft3

Tebal shell tiap course plate


No. Plate ts (in)
H
Course Hitung Standar
1 12 0.1941 1/ 4 0.25
2 6 0.1564 3/16 0.1875

c. Tekanan Desain
ℎ_𝑐𝑎𝑖𝑟𝑎𝑛=𝑉_𝑐𝑎𝑖𝑟𝑎𝑛/(𝜋/4 𝐷^2 )
1.1929 m

g= 9.8 m/s2
Tekanan hidrostatis = ρ.g.h cairan
16933.1274 Pa
0.1671 atm
Tekanan operasi = 1 atm
Tekanan desain (Pi) = 1,2 x ( P operasi + P hidrostatis)
1.4005 atm
20.5879 psi

d. Roof Desain
Direncanakan head berbentuk Thorispherical Flanged and Dished head

rc = 300 inch
icr = 18

(Brownell & Young 1959, p.138)


�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
= 1.7706

𝑡ℎ=(𝑃.𝑟𝑐.�)/(2.𝑓.𝐸−0,2𝑃)+� = 0.4896 in

th standar = 1/2 in (Tabel 5.6 Brownell & Young)


= 0.5000 in

maka, digunakan sf = 6 in (Table 5.8 Brownell & Young)


= 0.1524 m

ID = OD - 2*th
ID = 299 in 7.5946 m 24.9067

a = ID/2 = 149.5000 in
AB = a-irc = 131.5000 in
BC = rc-irc = 282.0000 in
AC = √((��)^2−(𝐴𝐵)^2 ) = 249.4629 in
b = rc - AC = 50.5371 in 1.2836

OA = Sf + b + t head = 57.0371 in 1.4487

Tinggi total tangki = Tinggi tangki + Tinggi head


= 3.6576 + 1.4487
= 5.1063 m
K
psi

pertimbangan:
ρL (kg/m3) m (kg/jam) fraksi massa ρL campuran (kg/m3)
1909.2966 225.0210 0.48 916.4623833101
1023.0130 243.7727 0.52 531.9667533471
468.7937 1 1448.4291366573

Tabel 5.4 dan 5.6, hal 87 dan 88, Brownell


Data tebal standard
3/16 in 0.1875
1/4 in 0.2500
5/16 in 0.3125
3/8 in 0.3750
7/16 in 0.4375
1/2 in 0.5000
utt joint, Tabel 13.2, Brownell) 5/8 in 0.6250
3/4 in 0.7500
7/8 in 0.8750
1 in 1.0000
1(1/8) in 1.1250
1(1/4) in 1.2500
1(3/8) in 1.3750
1(1/2) in 1.5000
1(3/4) in 1.7500
2 in 2.0000
2(1/4) in 2.25
2(1/2) in 2.5
2(3/4) in 2.75
3 in 3
ft

m
Tangki Penyimpanan H2SO4 (T-04)

Fungsi = Menyimpan produk H2SO4


Lama Penyimpanan = 7 Hari
Kondisi Operasi = T = 30 o
C 303
P = 1 atm 14.7

Tujuan : 1. Menentukan tipe tangki


2. Menentukan bahan konstruksi
3. Menentukan kapasitas H2SO4 yang disimpan
4. Menentukan volume perancangan
5. Menentukan dimensi tangki

1 Menentukan Tipe Tangki


Dalam perancangan ini dipilih tipe tangki silinder tegak dengan dasar datar, dengan alasan:
a. Tangki vertikal mampu menampung dalam kapasitas yang besar
b. Konstruksi yang mudah sehingga lebih ekonomis.
c. Cocok untuk kondisi atmosferis

2 Menentukan Bahan konstruksi


Dari tabel 23-3 Perry,
dipilih bahan konstruksi, yaitu Stainless Steel 316 AISI ( 18Cr, 12Ni, 2.5Mo)
Pertimbangan : Cairan dalam tangki mengandung asam.

3 Menentukan kapasitas H2SO4 yang disimpan


Kemurnian H2SO4 yang disimpan
H2SO4 = 98%
H2O = 2%
Waktu Penyimpanan = 7 Hari 168 Jam

Komponen m (kg/jam) BM kmol/jam %w % mol kg /7 hari


H2SO4 766.4667 98 7.8211 0.7959 0.4174 128766.4050
H2O 196.5251 18 10.9181 0.2041 0.5826 33016.2247
Jumlah 962.9918 18.7392 1 1 161782.6297

Jumlah H2SO4 yang harus disimpan selama 7 hari adalah:


Massa = 161782.6297 kg
= 356669.2212 lb

4 Menentukan Volume Perancangan


a. Menghitung densitas campuran
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρL (g/mL)
H2SO4 0.42169 0.19356 0.2857 925 0.892810357 1.8270
H2O 0.3471 0.274 0.28571 647.13 0.834907965 1.0230
Jumlah

Densitas campuran = 1662.9013 kg/m3


= 103.8113 lb/ft3

b. Volume campuran dan volume perancangan


Volume campuran = 3435.7451 ft3 97.2893 m3
Diambil Over design = 20%
Kapasitas perancangan = 4122.8942 ft3 116.7472 m3

5 Dimensi Tangki
a. Diameter, Tinggi, dan Jumlah Tangki
Menentukan tinggi dan diameter tangki :
Diambil perbandingan D/H = 8/3
𝑉𝑡=(𝜋𝐷^2 𝐻)/4

𝐷=(32/3 𝑉/𝜋)^(1/3)
= 24.1046 ft

𝐻=3/8 𝐷 = 9.0392 ft

Maka diambil: (Appendix E, Brownell, hal. 346)


Diameter standar = 25 ft
300 inch
7.6200 m
Tinggi standar = 12 ft
144 inch
3.6576 m
Sehingga:
Kapasitas standar = 1050 bbl
166.93635 m3
Course plate = 2

b. Tebal Dinding Shell

𝑡_𝑠=𝜌(𝐻−1)12𝐷/(2×144×𝑓×𝐸)+�
(Brownell, pers.3.17)

dimana :
ts = tebal shell, in
D = diameter dalam
f = allowable stress, psia = 18750
E = effisiensi sambungan = 0.8 (double welded butt joint, Tabel 13.2, Brownell)
C = faktor koreksi, in = 0.125
P = internal pressure, lb/in2
ρ = 1662.9013 kg/m3
103.8113 lb/ft3

Tebal shell tiap course plate


No. Plate ts (in)
H
Course Hitung Standar
1 12 0.2043 1/ 4 0.2500
2 6 0.1610 3/16 0.1875

c. Tekanan Desain
ℎ_𝑐𝑎𝑖𝑟𝑎𝑛=𝑉_𝑐𝑎𝑖𝑟𝑎𝑛/(𝜋/4 𝐷^2 )
2.1344 m

g= 9.8 m/s2
Tekanan hidrostatis = ρ.g.h cairan
### Pa
0.3433 atm
Tekanan operasi = 1 atm
Tekanan desain (Pi) = 1,2 x ( P operasi + P hidrostatis)
1.6119 atm
23.6956 psi

d. Roof Desain
Direncanakan head berbentuk Thorispherical Flanged and Dished head

rc = 300 inch
icr = 18
(Brownell & Young 1959, p.138)
�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
= 1.7706

𝑡ℎ=(𝑃.𝑟𝑐.�)/(2.𝑓.𝐸−0,2𝑃)+� = 0.5446 inch

th standar = 5/8 inch (Tabel 5.6 Brownell & Young)


= 0.625 inch

maka, digunakan sf = 6 inch (Table 5.8 Brownell & Young)


= 0.1524 m

ID = OD - 2*th
ID = 298.75 inch 7.58825 m 24.8859

a = ID/2 = 149.3750 inch


AB = a-irc = 131.3750 inch
BC = rc-irc = 282.0000 inch
AC = √((��)^2−(𝐴𝐵)^2= ) 249.5288 inch
b = rc - AC = 50.4712 inch 1.2820

OA = Sf + b + t head = 57.0962 inch 1.4502

Tinggi total tangki = Tinggi tangki + Tinggi head


= 3.6576 + 1.4502
= 5.1078 m
K
psi
ρL (kg/m3) m (kg/jam) fraksi massa ρL campuran (kg/m3)
1826.9712 766.4667 0.7959 1454.1272
1023.0130 196.5251 0.2041 208.7741
962.9918 1.0000 1662.9013

Tabel 5.4 dan 5.6, hal 87 dan 88, Brownell


Data tebal standard
3/16 in 0.1875
1/4 in 0.2500
5/16 in 0.3125
3/8 in 0.3750
7/16 in 0.4375
1/2 in 0.5000
butt joint, Tabel 13.2, Brownell) 5/8 in 0.6250
3/4 in 0.7500
7/8 in 0.8750
1 in 1.0000
1(1/8) in 1.1250
1(1/4) in 1.2500
1(3/8) in 1.3750
1(1/2) in 1.5000
1(3/4) in 1.7500
2 in 2.0000
2(1/4) in 2.25
2(1/2) in 2.5
2(3/4) in 2.75
3 in 3
ft

m
Tangki Penyimpanan Sodium Dodekilbenzen Sulfonat (S-01)

Fungsi = Menyimpan produk Sodium Dodekilbenzen Sulfonat


Lama Penyimpanan = 7 Hari
Kondisi Operasi = T = 30 o
C 303
P = 1 atm 14.7

Tujuan : 1. Menentukan tipe tangki


2. Menentukan bahan konstruksi
3. Menentukan kapasitas Dodekilbenzene yang disimpan
4. Menentukan volume perancangan
5. Menentukan dimensi tangki

1 Menentukan Tipe Tangki


Dalam perancangan ini dipilih tipe tangki silinder tegak dengan dasar datar, dengan alasan:
a. Tangki vertikal mampu menampung dalam kapasitas yang besar
b. Konstruksi yang mudah sehingga lebih ekonomis.
c. Cocok untuk kondisi atmosferis

2 Menentukan Bahan konstruksi


Dalam perancangan dipilih bahan konstruksi tangki Carbon steel SA 167 Grade 11 tipe 316 dengan pertimbangan:
a. Tahan terhadap korosi Tabel 13.1,hal 251,Brownell
b. Harga murah
c. Kekuatan baik (mempunyai allowable stress cukup besar yaitu 18.750)

3 Menentukan kapasitas Sodium Dodekilbenzen Sulfonat yang disimpan


Waktu Penyimpanan = 7 Hari 168 Jam

Komponen m (kg/jam) BM kmol/jam %w % mol kg / 7 hari


C6H5.C12H25 2.0919 246 0.0085 0.0011 0.0013 351.4400
C9H10 5.2298 118 0.0443 0.0028 0.0068 878.6001
C6H5.C12H25SO3Na 1846.5909 348 5.3063 0.9750 0.8185 310227.2737
H2O 17.3616 18 0.9645 0.0092 0.1488 2916.7524
Na2SO4 22.6652 142 0.1596 0.0120 0.0246 3807.7529
Jumlah 1893.9394 6.4833 1 1 318181.8192

Jumlah Sodium Dodekilbenzen Sulfonat yang harus disimpan selama 7 hari adalah:
Massa = 318181.8192 kg
= 701470.0022 lb

4 Menentukan Volume Perancangan


a. Menghitung densitas campuran
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρL (g/mL)
C6H5.C12H25SO3Na
C6H5.C12H25 0.2482 0.2435 0.2857 774.26 0.8678 0.8456
C9H10 0.2884 0.258 0.2857 684.6 0.8462 0.9076
H2O 0.3471 0.274 0.28571 647.13 0.8349 1.0230
Na2SO4 0.26141 0.1 0.28571 3700 0.9759 2.4729
Jumlah

Densitas campuran = 1105.8761 kg/m3


= 69.0374 lb/ft3

b. Volume campuran dan volume perancangan


Volume campuran = 10160.718302 ft3 287.7190 m3
Diambil Over design = 20%
Kapasitas perancangan = 12192.861963 ft3 345.2628 m3

5 Dimensi Tangki
a. Diameter, Tinggi, dan Jumlah Tangki
Menentukan tinggi dan diameter tangki :
Diambil perbandingan D/H = 8/3
𝑉𝑡=(𝜋𝐷^2 𝐻)/4

𝐷=(32/3 𝑉/𝜋)^(1/3)
= 34.5994 ft

𝐻=3/8 𝐷 = 12.9748 ft

Maka diambil: (Appendix E, Brownell, hal. 346)


Diameter standar = 35 ft
420 inch
10.6680 m
Tinggi standar = 18 ft
216 inch
5.4864 m
Sehingga:
Kapasitas standar = 3080 bbl
489.67996 m3
Course plate = 3

b. Tebal Dinding Shell

𝑡_𝑠=𝜌(𝐻−1)12𝐷/(2×144×𝑓×𝐸)+�
(Brownell, pers.3.17)
dimana :
ts = tebal shell, in
D = diameter dalam
f = allowable stress, psia = 18750
E = effisiensi sambungan = 0.8 (double welded butt joint, Tabel 13.2, Brownell)
C = faktor koreksi, in = 0.125
P = internal pressure, lb/in2
ρ = 1105.8761 kg/m3
69.0374 lb/ft3

Tebal shell tiap course plate


No. Plate ts (in)
H
Course Hitung Standar
1 18 0.2391 1/ 4 0.25
2 12 0.1988 1/ 4 0.25
3 6 0.1586 3/16 0.1875

c. Tekanan Desain
ℎ_𝑐𝑎𝑖𝑟𝑎𝑛=𝑉_𝑐𝑎𝑖𝑟𝑎𝑛/(𝜋/4 𝐷^2 )
3.2206 m

g= 9.8 m/s2
Tekanan hidrostatis = ρ.g.h cairan
### Pa
0.3445 atm
Tekanan operasi = 1 atm
Tekanan desain (Pi) = 1,2 x ( P operasi + P hidrostatis)
1.6134 atm
23.7164 psi

d. Roof Desain
Direncanakan head berbentuk Thorispherical Flanged and Dished head
rc = 420 inch
icr = 25.2

(Brownell & Young 1959, p.138)


�=1/4 (3+√(𝑟𝑐/𝑖𝑐𝑟))
= 1.7706

𝑡ℎ=(𝑃.𝑟𝑐.�)/(2.𝑓.𝐸−0,2𝑃)+�= 0.7130 inch

th standar = 3/4 inch (Tabel 5.6 Brownell & Young)


= 0.75 inch

maka, digunakan sf = 8 inch (Table 5.8 Brownell & Young)


= 0.2032 m

ID = OD - 2*th
ID = 418.5 inch 10.6299 m 34.8611

a = ID/2 = 209.2500 inch


AB = a-irc = 184.0500 inch
BC = rc-irc = 394.8000 inch
AC = √((𝐵�)^2−(𝐴𝐵)^2
=) 349.2744 inch
b = rc - AC = 70.7256 inch 1.7964

OA = Sf + b + t head = 79.4756 inch 2.0187

Tinggi total tangki = Tinggi tangki + Tinggi head


= 5.4864 + 2.0187
= 7.5051 m
K
psi

engan pertimbangan:
Mencari densitas C6H4.C12H25.SO3.Na
ρL (kg/m3) m (kg/jam) fraksi massa ρL campuran (kg/m3) Komponen A
1090.7760 1851.8972 0.9751 1063.5828 C6H4.C12H25 0.2482
845.6068 2.0919 0.0011 0.9314 SO3 0.63003
907.5949 5.2298 0.0028 2.4992 Na 0.10896
1023.0130 17.3616 0.0091 9.3517 total
2472.9005 22.6652 0.0119 29.5111
1899.2457 1 1105.8761

Tabel 5.4 dan 5.6, hal 87 dan 88, Brownell


Data tebal standard
3/16 in 0.1875
1/4 in 0.2500
5/16 in 0.3125
3/8 in 0.3750
7/16 in 0.4375
1/2 in 0.5000
butt joint, Tabel 13.2, Brownell) 5/8 in 0.6250
3/4 in 0.7500
7/8 in 0.8750
1 in 1.0000
1(1/8) in 1.1250
1(1/4) in 1.2500
1(3/8) in 1.3750
1(1/2) in 1.5000
1(3/4) in 1.7500
2 in 2.0000
2(1/4) in 2.25
2(1/2) in 2.5
2(3/4) in 2.75
3 in 3
ft

m
.C12H25.SO3.Na m= 1846.5909 kg/jam 5.3063 kmol/jam
B n Tc (1-T/Tc)^n ρL (g/mL) ρL (kg/m3) kg/jam fraksi massa
0.2435 0.2857 774.26 0.8678 0.8456 845.6068 1305.3488 0.7049
0.19602 0.41787 490.85 0.6694 1.8754 1875.4298 424.5037 0.2292
0.10222 0.28571 2573 0.9648 0.9838 983.7898 122.0448 0.0659
1851.8972 1
ρL campuran (kg/m3)
596.0438
429.8979
64.8343
1090.7760
Heater (HE-01)

Fungsi = Memanaskan bahan baku Dodekilbenzene sebelum masuk Reaktor (R-01)

1 Massa Masuk
Komponen m (kg/jam) fraksi massa BM Kmol Fraksi mol
C6H5.C12H25 1307.4407 0.9960 246 5.3148 0.9917
C9H10 5.2298 0.0040 118 0.0443 0.0083
Jumlah 1312.6704 1 5.3591 1

2 Menghitung kebutuhan steam


Q pemanasan = 45458.1437192 kj/jam
Dipakai steam dengan spesifikasi sebagai berikut:
T= 200 C = 392.00 F
λ= 833.4 Btu/lbm = 1,938.49 Kj/Kg
Maka kebutuhan steam :
�/� = 45458.1437 kj/jam
1938.4884 kj/kg
= 23.4503 kg/jam

3 Kondisi Operasi
*Fluida dingin
t in = 30 °C 303 K 86
t out = 55 °C 328 K 131
Massa masuk = 1312.6704 kg/jam
= 2893.8942 lb/jam

*Fluida panas
T in = 200 °C 473 K 392
T out = 200 °C 473 K 392
Massa steam = 23.4503 kg/jam
= 51.6990 lb/jam

Q pemanasan = 45458.1437 kJ/jam


= 43094.3202 btu/jam

4 Menentukan Spesifikasi Alat

Fluida panas oF Fluida dingin oF Δt


392 Higher temp 131 261
392 Lower temp 86 306

(Δ𝑡2−Δ𝑡1)/𝑙𝑛(Δ𝑡2/Δ𝑡1)
ΔT LMTD
= 282.9038 o
F 139.3910 °C 412.3910

Tavg =((𝑇1+𝑇2))/2 392 o


F 200 °C 473

tavg = ta = (𝑡1+𝑡2)/2 108.5 o


F 42.5 °C 315.5
5 Menghitung Densitas

Komponen A B n Tc
C6H5.C12H25 0.2482 0.2435 0.2857 774.26
C9H10 0.2884 0.258 0.2857 684.6
H2O 0.3471 0.274 0.28571 647.13

Fluida dingin
T= 315.50 K
Komponen Fraksi massa ρ, kg/m3 x.ρ, kg/m3
C6H5.C12H25 0.996 837.71 834.3757
C9H10 0.004 897.79 3.5769
Total 1.00 837.9525
ρ fluida dingin = 837.9525 kg/m3

Fluida panas
T= 473.00 K
Komponen ρ, kg/m3
H2O 845.00

6. Menghitung viskositas
Log μ = A + B/T + CT + DT2
Komponen A B C D
C6H5.C12H25 -8.6157 1.7664E+03 1.4453E-02 -1.0385E-05
C9H10 -7.5064 1.3306E+03 1.2617E-02 -8.6008E-06
H2O -10.2158 1.7925E+03 1.7730E-02 -1.2631E-05

Fluida dingin
T= 315.50 K
Komponen Fraksi mol μ, cP μ.x
C6H5.C12H25 0.9917 3.23 3.2035
C9H10 0.0083 0.68 0.0057
Total 1.00 3.2091
viscosity > 1 cP maka termasuk heavy organic

Fluida panas
T= 473.00 K
Komponen μ, cP
H2O 0.14

7. Menghitung spesific heat


Cp = A + BT + CT2 + DT3
Cp = J/mol K
Komponen A B C D
C6H5.C12H25 202.922 2.0826E+00 -4.5475E-03 4.2038E-06
C9H10 208.904 -1.68E-01 5.83E-04 1.88E-06
H2O 92.053 -4.00E-02 -2.11E-04 5.35E-07
Fluida dingin
T= 315.50 K
Komponen Fraksi mol Cp (j/mol.K) Cp (j/kg.K) Cp.x
C6H5.C12H25 0.9917 539.34 2,192.45 2,174.32
C9H10 0.0083 272.97 2,313.27 19.13
Total 1.00 2,193.45

Fluida panas
T= 473.00 K
Komponen Cp (j/mol.K Cp (j/kg.K)
H2O 82.52 4,584.70

8. Menghitung konduktivitas termal


log10 Kliq = A+B(1-T/C)^2/7 k = A+BT+C (liquid n solid u/inorganic)
K = W/(m.K)
Komponen A B C
C6H5.C12H25 0.139 -2.24E-05 -1.52E-07
C10H21C6H5 0.1444 -3.23E-05 -1.56E-07
C14H29C6H5 0.1342 -1.48E-05 -1.47E-07
H2O -0.2758 0.004612 -5.5391E-06

Fluida dingin
T= - K
Komponen Fraksi mol k (W/m.K) k (Btu/hr.ft.F)k.x
C6H5.C12H25 - 1.38 0.80 0E+00
C10H21C6H5 - 1.39 0.81 0E+00
C14H29C6H5 - 1.36 0.79 0E+00
Total - 2.39 -

Fluida panas
T= 473.00 K
Komponen k (W/m.K) k (Btu/hr.ft.F)
H2O (0.28) (0.16)
eaktor (R-01)

°F
°F

°F
°F

K
POMPA (P-01)

Fungsi : Mengalirkan umpan Dodekilbenzene dari tangki penyimpanan (T-01) ke Heater (HE-01)
Type : Centrifugal Pumps

1 Neraca Massa
Komponen m (kg/jam) fraksi berat BM kmol/jam fraksi mol
C6H5.C12H25 1307.4407 0.996 246.00 5.3148 0.9917
C9H10 5.2298 0.004 118.00 0.0443 0.0083
Jumlah 1312.6704 1.000 5.3591 1.0000

2 Menghitung Densitas
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρ (kg/m3)
C6H5.C12H25 0.2482 0.2435 0.2857 774.26 0.8678 845.6068
C9H10 0.2884 0.258 0.2857 684.6 0.8462 907.5949
Jumlah

3 Menghitung Viskositas
Log μ = A + B/T + CT + DT2
Komponen A B C D μ, cP Fraksi mol
C6H5.C12H25 -8.6157 1.7664E+03 1.4453E-02 -1.0385E-05 4.3634 0.9917
C9H10 -7.5064 1.3306E+03 1.2617E-02 -8.6008E-06 0.8286 0.0083
Total 1.0000

densitas (ρ) = 845.8538 kg/m3 52.8050 lb/ft3


Viskpsitas (µ) = 4.3342 cp 0.0029 lb/ft.s
laju massa (m) = 1312.6704 kg/jam 2894.4383 lb/jam

4 Laju Alir Volumetrik


�𝑓=𝑚𝑎𝑠𝑠𝑎/𝜌 = 54.814 ft3/jam

Over desain = 20%


Qf = 65.7765 ft³/jam
= 0.0183 ft³/sekon
= 8.2007 gpm

5 Desain Pompa

a Diameter Optimum Pipa (ID optimum)


𝐷𝑖=3,9× 〖�𝑓〗 ^0,45×𝜌^0,13
Di, opt = 1.08 in (Peters, hal.496)

Pemilihan Pipa standar ( Tabel. 11, Hal. 844, Kern )


IPS = 1 in 0.0833 ft
No. Sch = 40
OD = 1.32 in
ID = 1.049 in 0.0874 ft
flowarea/pipe (A) = 0.864 in2 0.00600 ft2

b Kecepatan linier
�=�𝑓/𝐴 = 3.0472 ft/s

c Faktor Friksi (f)


Bilangan Reynold
𝑁𝑅𝑒=𝜌𝑉𝐷/� = 4829.5728

Karena Nre >> 2100 maka, aliran turbulen

ε = 0.00015 (commercial steel) (tabel 5.2 Coulson P.201)


Dari Brown, fig.126, didapat ε/D = 0.0017
Dari Brown, fig.125, didapat f = 0.0450

6 Menentukan Sistem Perpipaan


diperkirakan :
Panjang pipa lurus, L = 5.36 m 17.5853024 ft nilai L dan elevasi dilihat dr tingg
Ketinggian elavasi, ∆Z = 0.899 m 2.94947516 ft
Total = 6.259 m 20.53477756 ft

Standar elbow = 3 unit sambungan pipa yg dipakai


Gate valve = 2 unit
Globe Valve = 1 unit

dari figur 127 Brown, hal 141 di peroleh :


Panjang ekivalen (Le)
Le standart elbow = 4.5 ft
Le Gate Valve = 45 ft didapatkan dari jenis valve (gate valve) dan ID nya
Le Globe valve = 1

Panjang pipa total = L1 + L2


dimana :
L1 = panjang pipa lurus
L2 = panjang ekivalen total
= (3 x Le elbow 90°) + (2 x Le gate valve) + (1 x globe valve)
= (3 x 4,5)+(2 x 1)+(1 x 45)
= 104.5 ft

panjang pipa total = 125.034778 ft


38.1106 m

7 Menentukan Head Pompa (W)


gc = 32.1740 ft-lbm/lbf det2

a Friction head (F)


F = 2 x f x L x V2/( gc x ID)
= 37.1505 ft-lbf/lbm

b Pressure head
P1 = 1 atm 2116.217 lbf/ft2
P2 = 1 atm 2116.217 lbf/ft3
∆P / ρ = 0 atm

c Velocity Head
Karena diameter tangki (D1) jauh lebih besar dari diameter pipa (D2)
maka: V1 = 0 (diabaikan)
Velocity Head = ∆V2 / 2gc
= 0.1443 ft-lbf/lbm

d Potential head = (∆z * g) / gc


= 2.9495

∆𝑃/𝜌+(∆𝑧×𝑔)/𝑔𝑐+ 〖∆𝑉〗 ^2/(2×𝑔𝑐)+�


Head Pompa (W) =

= 40.2442 ft.lbf/lbm

8 Daya Pompa
Daya pompa = w x ρ x Qf x 1Hp 550 ft-lbf/det
= 0.0706 hp

Dengan Qf = 8.201 gpm


Dari fig 14.37, peters diperoleh efesiensi pompa (EP) Berdasarkan Fig. 14.36 Peters Hal. 520 untuk : Q = 16,97
η = 45% (diambil dlm arsiran!!!)

Maka daya pompa sebenarnya


Daya pompa (BHP) = Daya pompa / EP
= 0.1569 hp
diambil = 0.25 hp

Dari fig 14.38 peters, diperoleh efesiensi motor (EM)


η = 80%
Daya motor (DHP) = 0.20 hp
diambil = 0.25 hp
e Heater (HE-01)

Fraksi berat x.ρ (kg/m3)


0.996 842.2379
0.004 3.6159
1 845.8538

μ.x
4.3273
0.0069
4.3342
ai L dan elevasi dilihat dr tinggi alat separator

e valve) dan ID nya


rs Hal. 520 untuk : Q = 16,9793 gpm memiliki efisiensi pompa 13%
POMPA (P-02)

Fungsi : Mengalirkan umpan Oleum 20% dari tangki penyimpanan (T-02) ke Heater (HE-02)
Type : Centrifugal Pumps

1 Neraca Massa
Komponen m (kg/jam) fraksi berat BM kmol/jam fraksi mol
H2SO4.SO3 1182.54287 1 178 6.6435 1
Jumlah 1182.54287 1 6.6435 1

2 Menghitung Densitas
T = 30 o
C 303.00 K
Dari yaws,1999
ρ = A.B – (1 – T/Tc )n
Komponen A B n Tc (1-T/Tc)^n ρ (kg/m3) m (kg/jam)
H2SO4 0.42169 0.19356 0.28570 925 0.8928 1826.9712 946.0342953035
SO3 0.63003 0.19602 0.41787 490.85 0.6694 1875.4298 236.5085738259
1182.5428691294

3 Menghitung Viskositas
Log μ = A + B/T + CT + DT2
Komponen A B C D μ, cP Fraksi mol μ.x
Fraksi berat x.ρ (kg/m3)
0.8 1461.577
0.2 375.086
1 1836.663