Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik

Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Isi

BAB 1 PENDAHULUAN.................................................................................1-1

BAB 2 METODOLOGI PENYELIDIKAN TANAH....................................2-2


2.1 LINGKUP PEKERJAAN ..............................................................................2-2
2.2 METODOLOGI PENYELIDIKAN TANAH LAPANGAN ..................................2-2
2.2.1 Pemboran ...............................................................................................2-2
2.2.2 Pengambilan Contoh Tanah Tidak Terganggu......................................2-3
2.2.3 SPT (Standard Penetration Test) ...........................................................2-4
2.2.4 DCPT (Dutch Cone Penetration Test)/Sondir .......................................2-4
2.3 METODOLOGI PENYELIDIKAN TANAH LABORATORIUM ..........................2-4
2.3.1 Specific Gravity......................................................................................2-5
2.3.2 Water Content / Moisture Content .........................................................2-5
2.3.3 Analisis Saringan dan Hidrometer.........................................................2-5
2.3.4 Atterberg’s Limit ....................................................................................2-6
2.3.5 Triaxial-UU............................................................................................2-6
2.3.6 Consolidation Test .................................................................................2-6

BAB 3 ANALISIS GEOTEKNIK ...................................................................3-1


3.1 KLASIFIKASI TANAH.............................................................................3-1
3.2 PROFIL LAPISAN TANAH .........................................................................3-2
3.3 PARAMETER TANAH ................................................................................3-9
3.3.1 Hasil Uji Laboratorium..........................................................................3-9
3.3.2 Korelasi Parameter Tanah...................................................................3-10
3.4 ANALISIS PENURUNAN 1-D KONSOLIDASI TERZAGHI ...........................3-11
3.4.1 Immediate atau Elastic Settlement (Si) ................................................3-11
3.4.2 Consolidation Settlement (Sc) ..............................................................3-11
3.4.3 Time Rate Consolidation......................................................................3-12
3.4.4 Hasil Analisis Penurunan Konsolidasi ................................................3-13

BAB 4 ANALISIS DAYA DUKUNG PONDASI TIANG ............................4-1


4.1 KAPASITAS DAYA DUKUNG PONDASI TIANG ..........................................4-1
4.1.1 Kapasitas Daya Dukung Aksial Tiang Tunggal.....................................4-2
4.1.2 Tahanan Geser Selimut Tiang................................................................4-2
4.1.3 Tahanan Ujung Tiang ............................................................................4-3
4.1.4 Kapasitas Tarik Tiang............................................................................4-4
4.1.5 Kapasitas Lateral Tiang Tunggal ..........................................................4-4
4.2 PENENTUAN PARAMETER ........................................................................4-6
4.3 KAPASITAS DAYA DUKUNG IJIN TIANG ..................................................4-7
4.4 HASIL ANALISIS DAYA DUKUNG PONDASI TIANG ..................................4-8

i
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BAB 5 KESIMPULAN.....................................................................................5-1

LAMPIRAN A: Boring Log


LAMPIRAN B: CPT Log
LAMPIRAN C: Hasil Uji Laboratorium
LAMPIRAN D: Perhitungan Daya Dukung Pondasi Tiang

ii
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Gambar

GAMBAR 1-1 LOKASI TITIK PENYELIDIKAN TANAH ......................................................1-1

GAMBAR 2-1 ROTARY DRILLING MACHINE ...................................................................2-3

GAMBAR 2-2 TABUNG SHELBY .....................................................................................2-3

GAMBAR 2-3 SPLIT SPOON SAMPLER ..........................................................................2-4

GAMBAR 3-1 PROFIL LAPISAN TANAH POTONGAN A-A DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-3

GAMBAR 3-2 PROFIL LAPISAN TANAH POTONGAN B-B DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-4

GAMBAR 3-3 PROFIL LAPISAN TANAH POTONGAN C-C DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-5

GAMBAR 3-4 PROFIL LAPISAN TANAH POTONGAN D-D DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-6

GAMBAR 3-5 PROFIL LAPISAN TANAH POTONGAN E-E DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-7

GAMBAR 3-6 PROFIL LAPISAN TANAH POTONGAN F-F DI LOKASI KOLAM RENANG
TANJUNG REDEP ....................................................................................3-8

GAMBAR 3-7 GRAFIK C VS KEDALAMAN .......................................................................3-9

GAMBAR 3-8 GRAFIK VS KEDALAMAN ......................................................................3-9

GAMBAR 3-9 GRAFIK CC VS KEDALAMAN ..................................................................3-10

GAMBAR 3-10 KORELASI ANTARA NILAI N-SPT DENGAN KUAT GESER UNDRAINED
(TERZAGHI & PECK, 1967) ..................................................................3-10

GAMBAR 3-11 KORELASI ANTARA NILAI N-SPT DENGAN SUDUT GESER DALAM
(TERZAGHI)...........................................................................................3-11

GAMBAR 3-12 GRAFIK PENURUNAN KONSOLIDASI UNTUK BEBERAPA VARIASI TINGGI


TIMBUNAN .............................................................................................3-14

GAMBAR 3-13 GRAFIK TIME RATE CONSOLIDATION ....................................................3-14

iii
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

GAMBAR 4-1 RUANG LINGKUP PERHITUNGAN PONDASI ............................................4-1

GAMBAR 4-2 DAYA DUKUNG AKSIAL PONDASI TIANG ................................................4-2

GAMBAR 4-3 FAKTOR ADHESI API METHOD 2 (1986) ...............................................4-3

GAMBAR 4-4 KURVA P-Y UNTUK TIANG DENGAN BEBAN LATERAL ............................4-4

GAMBAR 4-5 PENENTUAN BENTUK KURVA P-Y LEMPUNG LUNAK HINGGA KAKU
(MATLOCK) .............................................................................................4-5

GAMBAR 4-6 PENENTUAN KEDALAMAN KRITIS TIANG DENGAN BEBAN LATERAL PADA
TANAH NON-KOHESIF (REESE, COX, DAN COOP).................................4-6

GAMBAR 4-7 PENENTUAN KURVA P-Y PASIR (REESE, COX, DAN COOP) .................4-6

GAMBAR 4-8 MINIMAL TEBAL DATA TANAH DI BAWAH DASAR PONDASI UNTUK
PERHITUNGAN KAPASITAS DAYA DUKUNG UJUNG................................4-7

iv
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Daftar Tabel

TABEL 3-1 KLASIFIKASI TANAH LEMPUNG BERDASARKAN N-SPT ......................... 3-1

TABEL 3-2 KLASIFIKASI TANAH PASIR BERDASARKAN N-SPT............................... 3-1

TABEL 3-3 PARAMETER UNTUK PERHITUNGAN PENURUNAN DAN WAKTU KONSOLIDASI ..


................................................................................................. 3-13

TABEL 4-1 KOREKSI NILAI N-SPT ...................................................................... 4-7

TABEL 4-2 RANGKUMAN HASIL PERHITUNGAN KAPASITAS PONDASI TIANG .............. 4-9

v
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 1 PENDAHULUAN

Sehubungan dengan detail desain kolam renang di Tanjung Redeb – Berau, Kalimantan Timur,
PT. Byma Arsihas telah melakukan penyelidikan tanah untuk mendapatkan data keadaan tanah
untuk selanjutnya data tersebut digunakan untuk keperluan analisis geoteknik di lokasi kolam
renang tersebut. Penyelidikan tanah yang dilakukan berupa pemboran sebanyak 5 titik, uji
sondir sebanyak 12 titik, dan pengujian laboratorium. Penyelidikan tanah tersebut dilakukan
mulai tanggal 29 Januari 2007 hingga tanggal 11 Februari 2007. Adapun lokasi penyelidikan
tanah tersebut dapat dilihat pada Gambar 1-1.

BH-1
S-06 S-01

S-02

BH-04
S-03

S-09 BH-02
S-05
S-07
BH-03
BH-05

S-04

U
S-08

Gambar 1-1 Lokasi Titik Penyelidikan Tanah

1-1
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 2 METODOLOGI PENYELIDIKAN


TANAH

2.1 LINGKUP PEKERJAAN


Lingkup pekerjaan penyelidikan tanah ini meliputi penyelidikan lapangan dan pengujian
laboratorium yang terdiri dari:
1. Penyelidikan lapangan yang dilakukan meliputi:
a. 3 (tiga) titik pemboran mesin hingga kedalaman 40 m
b. 2 (dua) titik pemboran mesin hingga kedalaman 30 m
c. 12 (dua belas) titik penyondiran dengan alat sondir kapasitas 2-ton
d. Standard Penetration Test
e. Pengambilan undisturbed soil samples
2. Pengujian laboratorium yang dilakukan meliputi:
a. Uji index properties
b. Analisis butiran tanah
c. Triaxial UU Test
d. Consolidation Test

2.2 METODOLOGI PENYELIDIKAN TANAH LAPANGAN


Penyelidikan tanah yang dilakukan sesuai dengan American Standard for Testing Material
(ASTM). Penyelidikan tanah ditujukan untuk memahami struktur tanah dan sifat mekanika
tanah di wilayah proyek. Lingkup pekerjaan penyelidikan tanah yang dilakukan meliputi:

2.2.1 Pemboran
Pemboran inti sebanyak 5 titik bor. Sebanyak 3 titik dilakukan hingga mencapai kedalaman
pemboran sedalam 40 m dan 2 titik dilakukan hingga kedalaman 30 m. Selama pengeboran,
dilakukan pengamatan secara visual terhadap perlapisan tanah. Pada kedalaman tertentu
dilakukan pengambilan contoh tanah (disturbed sample dan undisturbed sample) dan Standard
Penetration Test (SPT).
Prosedur pelaksanaan dan peralatan pemboran dalam mengacu pada ASTM D 1452-80,
“Standard Practice for Soil Investigation and Sampling by Auger Borings”, ASTM D 420 - 93,
“Standard Guide for Investigating and Sampling Soil and Rock”, ASTM D 2488 - 93,
“Standard Practice for Description and Identification of Soils (Visual-Manual Procedure)” dan
ASTM D 2113 – 83, “Standard Practice for Diamond Core Drilling for Site Investigation”.
Data hasil pemboran dalam disajikan dalam field logs (Bore - Logs) yang didalamnya tercakup:
identifikasi proyek, nomor boring, lokasi, orientasi, tanggal mulai pemboran, tanggal akhir
pemboran, dan nama operator, elevasi koordinat bagian atas bore hole, klasifikasi/deskripsi
tanah (kekerasan, warna, derajat pelapukan, dan identifikasi lainnya yang masih berhubungan),
deskripsi litologi, kondisi air tanah, pengambilan contoh tanah, in situ test di bore hole, dst.

2-2
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Gambar 2-1 Rotary drilling machine

2.2.2 Pengambilan Contoh Tanah Tidak Terganggu


Undisturbed samples yang dilaksanakan adalah sebanyak 20 tabung untuk keperluan uji
laboratorium. Pelaksanaan pengambilan contoh tanah tidak terganggu mengacu pada ASTM
D 1587-94 “Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils”.
Contoh tanah undisturbed diambil dari kedalaman tertentu dengan menggunakan Shelby tube
sampler (thin walled tube sampler). Kemudian contoh tanah dilindungi dari goncangan,
getaran dan perubahan kadar air, yang bertujuan untuk menjaga struktur tanah dan komposisi
fisiknya tetap seperti kondisi aslinya, sampai contoh tersebut dikeluarkan untuk kemudian diuji
di laboratorium. Kedalaman bagian atas contoh dan panjang sampler dicatat di boring log.

Gambar 2-2 Tabung shelby

2-3
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

2.2.3 SPT (Standard Penetration Test)


SPT (Standard Penetration Test) yang dilakukan adalah sebanyak 110 test dengan interval
kedalaman lebih kurang setiap 1.5 m. Prosedur pelaksanaan dan peralatan Standard
Penetration Test mengacu pada ASTM D 1586 – 84, "Standard Method for Penetration Test
and Split Barrel Sampling of Soils". Hammer yang digunakan seberat 140 lbs (63 kg) dengan
tinggi jatuh 30” (76.2 cm). Jumlah total tumbukan yang dibutuhkan untuk penetrasi tanah 3 ×
15 cm dicatat. Nilai SPT, dinyatakan dengan nilai N, didapat dari jumlah tumbukan yang
diperlukan untuk penetrasi 2 × 15 cm terakhir.

Gambar 2-3 Split spoon sampler

2.2.4 DCPT (Dutch Cone Penetration Test)/Sondir


Prosedur pelaksanaan Dutch Cone Penetration Test (DCPT) dilakukan berdasarkan standar
ASTM D 3441-86, “Method for Deep Quasi-Static, Cone and Friction Cone Penetration Tests
of Soil”. Nilai tahanan ujung konus, qc, dan friksi lokal atau friksi selimut, fs, diukur untuk
setiap interval 20 cm.

2.3 METODOLOGI PENYELIDIKAN TANAH LABORATORIUM


Uji laboratorium yang dilaksanakan adalah:
5 Index properties
5 Grainsize analysis
5 Triaxial UU
5 Consolidation
Metoda pelaksanaan uji laboratorium mengikuti standar-standar berikut ini:

2-4
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

2.3.1 Specific Gravity


Specific gravity dari tanah, Gs, didefinisikan sebagai perbandingan massa volume partikel
tanah di udara dengan massa volume yang sebanding dengan gas free distilled water di udara
pada suhu kamar (umumnya 68° F {20° C}). Specific gravity ditentukan berdasarkan jumlah
dari pycnometer yang sudah dikalibrasi, dimana massa dan suhu dari contoh tanah de-
aerasi/air distilasi diukur.
Test dilakukan berdasarkan ASTM D 854-92, ”Standard Test Method for Specific Gravity of
Soils”. Metoda ini digunakan pada contoh tanah dengan komposisi ukuran partikel lebih kecil
daripada saringan No. 4 (4.75 mm). Untuk partikel dengan ukuran lebih besar dari saringan
tersebut, prosedur pelaksanaan mengacu pada ”Test Method Specific Gravity and Absorption
of Coarse Aggregate (ASTM C 127-88)”. Specific gravity dari tanah diperlukan untuk
menentukan hubungan antara berat dan volume tanah, dan digunakan untuk perhitungan test
laboratorium lainnya.

2.3.2 Water Content / Moisture Content


Moisture content, w, didefinisikan sebagai perbandingan antara berat air di dalam contoh
tanah dengan berat partikel solid. Contoh basah mula-mula ditimbang, kemudian dikeringkan
di dalam oven pada suhu 230° F (110° C) hingga mencapai berat konstan. Berat contoh
setelah dikeringkan adalah berat partikel solid. Perubahan berat yang terjadi selama proses
pengeringan setara dengan berat air. Untuk tanah organik, terkadang disarankan untuk
menurunkan suhu pengeringan hingga mencapai 140° F (60° C).
Test dilakukan mengacu pada ASTM D 2216-92, ”Test Method for Laboratory Determination
of Water (Moisture) Content of Soil and Rock”. Moisture content diperlukan untuk
menentukan properties tanah dan dapat dikorelasikan dengan parameter-parameter lainnya.

2.3.3 Analisis Saringan dan Hidrometer


Test ini dilakukan dalam dua tahapan, yaitu: analisis saringan untuk tanah berbutir kasar (pasir,
kerikil), dan analisis hidrometer untuk tanah berbutir halus (lempung, lanau). Tanah yang
mengandung butiran kasar dan butiran halus di uji secara berurutan. Material dengan ukuran
lebih kecil dari saringan No. 200 (0.075 mm atau lebih kecil) dianalisis dengan menggunakan
hidrometer.
Analisis saringan memberikan pengukuran secara langsung terhadap distribusi ukuran partikel
tanah dengan cara melewatkan contoh pada sejumlah wire screens, dari ukuran yang terbesar
hingga terkecil. Jumlah material yang tertahan di tiap-tiap saringan kemudian ditimbang.
Prosedur pelaksanaan pengujian ini mengacu pada ASTM C 136-95a, ”Method for Sieve
Analysis of Fine and Coarse Aggregates”.
Pelaksanaan uji hidrometer mengacu pada Hukum Stokes. Diameter partikel tanah
didefinisikan sebagai diameter bola yang memiliki unit massa dan kecepatan jatuh yang sama
dengan partikel tanah. Jadi distribusi ukuran partikel didapatkan dengan menggunakan sebuah
hydrometer untuk mengukur perubahan specific gravity, suspensi tanah-air seperti partikel
tanah mengendap.
Hasil analisis dicatat dalam combined grain size distribution plot sebagai persentase contoh
yang lebih kecil beratnya versus log diameter partikel. Data ini diperlukan di dalam klasifikasi
tanah. Kurva tersebut juga dapat menunjukkan parameter-parameter lainnya, seperti diameter

2-5
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

efektif (D10) dan koefisien uniformity (Cu). Test dilakukan berdasarkan ASTM D 422-63
”Method for Particle Size Analysis of Soils”, dan ASTM D 1140 – 92 ”Test Method for
Amount of Material in Soils Finer than the No.200 (75-μm) Sieve”.

2.3.4 Atterberg’s Limit


Liquid limit dilakukan dengan cara meletakkan pasta tanah dalam mangkuk kuningan
kemudian digores tepat ditengahnya dengan alat penggores standar. Dengan menjalankan alat
pemutar, mangkuk kemudian dinaikturunkan dari ketinggian 0.4 inci (10 mm) dengan
kecepatan 2 drop/detik. Liquid limit dinyatakan sebagai moisture content dari tanah yang
dibutuhkan untuk menutup goresan yang berjarak 0.5 inci (13 mm) sepanjang dasar contoh
tanah dalam mangkuk sesudah 25 pukulan. Pengujian dilakukan menurut ASTM D 4318.
Plastic limit ditentukan dengan mengetahui secara pasti moisture content terkecil, dimana
material dapat digulung hingga diameter 0.125 inches (3.2 mm) tanpa mengalami keretakan.
Pengujian dilakukan sesuai dengan ASTM D 4318-95, ”Test Method for Liquid Limit, Plastic
Limit and Plasticity Index of Soils”.
Shrinkage limit (SL) didefinisikan sebagai water content maksimum dimana pengurangan
water content tidak akan menurunkan volume dari massa tanah. Pengujian dilakukan dengan
mengacu pada ASTM D 427-93, ”Test Method for Shrinkage Factors of Soils”.
Nilai-nilai ini digunakan didalam klasifikasi tanah dan dapat dikorelasikan dengan parameter-
parameter lainnya.

2.3.5 Triaxial-UU
Tujuan test ini adalah untuk memperoleh parameter kekuatan tanah dalam kondisi undrained.
Pada uji ini contoh yang diuji tidak diperkenankan untuk mengalami konsolidasi akibat
tekanan confining dan selama geser berlangsung tidak diperkenankan adanya aliran
(undrained). Dibutuhkan minimal tiga buah pengujian dengan tekanan confining yang
berbeda-beda untuk mendapatkan parameter tegangan total. Jika selama pengujian tekanan air
pori diukur, maka parameter tegangan efektif juga dapat diukur. Pengujian dilakukan menurut
ASTM D 2850-95, “Test Method for Unconsolidated, Undrained Compressive Strength of
Cohesive Soils in Triaxial Compression”.

2.3.6 Consolidation Test


Test ini bertujuan untuk memperoleh nilai koefisien konsolidasi Cc dan Cv yang selanjutnya
dipergunakan untuk memprediksi lamanya konsolidasi dan besarnya settlement. Metode yang
digunakan dalam pengujian konsolidasi adalah pengujian konsolidasi satu dimensi. Pada uji ini
spesimen diletakkan pada konsolidometer (oedometer) diantara dua batu pori sehingga
memungkinkan terjadinya drainase. Berbagai prosedur pembebanan dapat digunakan selama
pengujian. Pengujian dengan peningkatan pembebanan adalah yang paling umum digunakan.
Pada prosedur ini, spesimen diberikan beban yang semakin bertambah. Biasanya beban awal
yang digunakan besarnya 1/16 tsf (5 kPa) dan ditambah menjadi dua kalinya hingga mencapai
16 tsf (1600 kPa). Setelah pemberian beban, perubahan tingga sampel dimonitor umumnya
selama 24 jam. Untuk mengevaluasi parameter rekompresi, siklus pembebanan unload/reload
dapat dilakukan selama pembebanan. Agar diperoleh hasil pengamatan parameter rekompresi
yang lebih baik untuk lempung terkonsolidasi berlebih (over consolidated clay), siklus

2-6
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

unload/reload dilakukan setelah tekanan pra konsolidasi terdefinisikan. Setelah beban


maksimum tercapai, beban dikurangi secara bertahap. Pengujian dilakukan menurut ASTM D
2435-90, ”Test Method for One Dimensional Consolidation Properties of Soils”.
Data dari uji konsolidasi biasanya ditampilkan dalam grafik e-log p dengan plot angka pori (e)
sebagai fungsi dari logaritma tekanan (p) atau dalam grafik ε-log p dimana ε adalah regangan
dalam %. Parameter-parameter yang diperlukan untuk perhitungan penurunan dapat diperoleh
dari kurva ini adalah: indeks kompresi (Cc), indeks rekompresi (Cr), tekanan pra konsolidasi
(Po atau Pc) dan angka pori awal (eo).

2-7
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 3 ANALISIS GEOTEKNIK

3.1 KLASIFIKASI TANAH


Dengan menggunakan nilai N-SPT dapat ditentukan konsistensi dari lapisan tanah lempung
dan pasir seperti yang terlihat pada Tabel 3-1. Sedangkan untuk menentukan besarnya sudut
geser dalam berdasarkan nilai N-SPT pada tanah pasir dapat digunakan Tabel 3-2.

Tabel 3-1 Klasifikasi Tanah Lempung Berdasarkan N-SPT


(After Bowles, 1988)

Consistency N’70 Remarks


Very soft 0-2 Squishes between fingers when squeezed
Young
clay
NC

Soft 3-5 Very easily deformed by squeezing


Medium 6-9
Stiff 10-16 Hard to deform by hand squeezing
increasing

cemented
Aged/

Very stiff 17-30 Very hard to deform by hand


OCR

Hard > 30 Nearly impossible to deform by hand

Tabel 3-2 Klasifikasi Tanah Pasir Berdasarkan N-SPT


(After Bowles, 1988)

Description Very Loose Loose Medium Dense Very dense


Dr 0 0.15 0.35 0.65 0.85
SPT N’70
Fine 1-2 3-6 7-15 16-30 ?
Medium 2-3 4-7 8-20 21-40 > 40
Coarse 3-6 5-9 10-25 26-45 > 45
φ
Fine 26-28 28-30 30-34 33-38
Medium 27-28 30-32 32-36 36-42 < 50
Coarse 28-30 30-34 33-40 40-50

γwet (kN/m3) 11-16 14-18 17-20 17-22 20-23

3-1
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

3.2 PROFIL LAPISAN TANAH


Lapisan tanah di lokasi kolam renang secara umum terbagi atas tanah lempung lanauan dengan
konsistensi sangat lunak (very soft), sedang hingga keras (medium stiff – hard) dan batuan
lempung (claystone) pada kedalaman tanah keras. Selain itu, dijumpai batubara (coal) dan
tanah organik (peat) di beberapa lokasi. Simplifikasi lapisan tanah yang dijumpai di lokasi
kolam renang ini dapat dilihat pada Gambar 3-1 - Gambar 3-6.

3-2
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1 A
A S-06 S-01

S-02

BH-04
S-03

S-09 BH-02
S-05
S-07
BH-03
BH-05

S-04

25.00m 15.00m

U
S-06 S-01 S-08
qc (kg/cm2 ) BH-01 qc (kg/cm2 )

1
1

2
SILTY CLAY, very soft
1 N=1-2
1

1
1
1

1
1
3
qc>150 8 SILTY CLAY, med. stiff to very stiff
N=8-21 qc>150
21
73
100
100
100
100
100
100
100
100
100
100

CLAYSTONE
N>100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard
Gambar 3-1 Profil lapisan tanah potongan A-A di lokasi Kolam Renang Tanjung Redep

3-3
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1
S-06 S-01

S-02

B BH-04
S-03

S-09 BH-02
S-05 B
S-07
BH-03
BH-05

S-04

U
S-08

30.00m 28.00m

BH-04 BH-02 S-05 qc (kg/cm2 )

1 1

1 1
1 1

1 1 SILTY CLAY, very soft


N=1-2
1 1
1 1

1 1
8 2
25 2
SILTY CLAY, stiff to very stiff
45 N=8-45 26
50 14
qc>150
55 86
50 SILTY CLAY, hard 90
N>45
50 50
50 82
19 82
SILTY CLAY, very stiff 52
???
20
N=19-26 26
40
100 COAL
PEAT
68
???
N=40-100 N<1
1
100
100 40
100 ???
100
100
100
100
100
100 CLAYSTONE 100
N>100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard

Gambar 3-2 Profil lapisan tanah potongan B-B di lokasi Kolam Renang Tanjung Redep

3-4
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

BH-1
S-06 S-01

S-02

BH-04
S-03

C S-09 BH-02
S-05
S-07
BH-03
BH-05 C

S-04

U
S-08

25.00m 25.00m 33.00m

S-09 qc (kg/cm2 )
S-07 qc (kg/cm2) BH-03 BH-05
1 2
1
1
2 SILTY CLAY, very soft 2
N=1-2
1 1
qc>150 1 1
2 1

2 2

??? 5 5
qc>150 12 SILTY CLAY, medium stiff to stiff 4
100 N=4-12
5
100
5
100
7
100
100
100
100
100
100
100
100
100
100
CLAYSTONE 100
N>100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard

Gambar 3-3 Profil lapisan tanah potongan C-C di lokasi Kolam Renang Tanjung Redep

3-5
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

D
BH-1
S-01
S-06

S-02

BH-04 S-03

S-09 BH-02
S-05
S-07
BH-03
BH-05

D
S-04

U
S-08
30.00m 30.00m

S-06 qc (kg/cm2) BH-04 S-07 qc (kg/cm2)

1
1 SILTY CLAY, very soft
N=1-2
1
1
1

1
8 SILTY CLAY, med. stiff to very stiff
N=8-25 qc>150
25

45
50
SILTY CLAY, hard
55
N>45
qc>150 50

???
50
50
19 SILTY CLAY, very stiff
N=19-20
??? 20 ???
40 COAL
100 N=40-100
??? 100 ???
100
100
??? 100
100 CLAYSTONE
N>100
100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard

Gambar 3-4 Profil lapisan tanah potongan D-D di lokasi Kolam Renang Tanjung Redep

3-6
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

E
BH-1
S-06 S-01

S-02

BH-04
S-03
BH-02
S-09
S-05
S-07

BH-03
BH-05

S-04

U S-08

E
25.00m 25.00m 25.00m 20.00m 25.00m

BH-01 S-02 qc (kg/cm2) BH-02 BH-03 S-04 qc (kg/cm2)


S-08 qc (kg/cm2)

2 1 1
CLAY
1
1 1
1 1 2
SILTY CLAY, very soft
2 1 N=1-2 1
1 1 1
1 1 2

1 1 2
1 2 5
SILTY CLAY, medium stiff to very stiff
1 2 12 N=5-26 qc>150
100 qc>150
1 26
100
1 14
qc>150 100
3 86
100
90
8 100
50
21 100
82
73 100
82
100 SILTY CLAY, hard
100 N>45 52

100 26

100 68
PEAT
N<1
1 CLAYSTONE
100
40 N>100
100
100
100
100
100
100
100
100 100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard

Gambar 3-5 Profil lapisan tanah potongan E-E di lokasi Kolam Renang Tanjung Redep

3-7
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

F
BH-1
S-06 S-01

S-02

BH-04
S-03

S-09 BH-02
S-07 S-05
BH-03

BH-05

S-04

F
U
S-08

64.00m 20.00m

S-01 qc (kg/cm2 )
S-05 qc (kg/cm2 ) BH-05
CH, SILTY CLAY, very soft
2

1
2
SILTY CLAY, very soft
N=1-2 1
1
1

2
5

SILTY CLAY, medium stiff 4


N=4-7
5
qc>150 5
7
100
qc>150 100
100
100
100
CLAYSTONE
N>100 100
100

KETERANGAN :

SILTY CLAY, SILTY CLAY, SILTY CLAY, COAL PEAT CLAYSTONE


very soft med. stiff to very stiff hard

Gambar 3-6 Profil lapisan tanah potongan F-F di lokasi Kolam Renang Tanjung Redep

3-8
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

3.3 PARAMETER TANAH

3.3.1 Hasil Uji Laboratorium


Grafik parameter-parameter tanah hasil uji laboratorium ditunjukkan pada Gambar 3-7 -
Gambar 3-9.
UU, c (kN/m2)
0.00 0.05 0.10 0.15 0.20
0
BH-01 BH-02
2

4 BH-03 BH-04

6 BH-05
Kedalaman (m)

10

12

14

16

18

20

Gambar 3-7 Grafik c vs kedalaman

UU, φ (deg)
0 1 2 3 4 5
0

2 BH-01 BH-02

4 BH-03 BH-04

6
BH-05
Kedalaman (m)

10

12

14

16

18

20

Gambar 3-8 Grafik φ vs kedalaman

3-9
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Cc
0 0.2 0.4 0.6 0.8 1
0

6
Kedalaman (m)

10

12
BH-01 BH-02
14

16 BH-03 BH-04

18 BH-05

20

Gambar 3-9 Grafik Cc vs kedalaman

3.3.2 Korelasi Parameter Tanah


Parameter tanah ditentukan berdasarkan hasil penyelidikan tanah. Pada kondisi dimana tidak
terdapat hasil pengujian tanah atau properti tanah sulit diukur secara langsung, parameter
tanah ditentukan berdasarkan engineering judgment maupun korelasi terhadap properti tanah.
Korelasi properti tanah disajikan dalam Gambar 3-10 dan Gambar 3-11.

Soil groups refer to


Unified system
2
Undrained shear strength - kN/m

CH Sowers

CL

SC-ML

Terzaghi and Peck

SPT N-value - blows/300 mm

Gambar 3-10 Korelasi Antara Nilai N-SPT Dengan Kuat Geser Undrained
(Terzaghi & Peck, 1967)

3-10
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Gambar 3-11 Korelasi Antara Nilai N-SPT Dengan Sudut Geser Dalam (Terzaghi)

3.4 ANALISIS PENURUNAN 1-D KONSOLIDASI TERZAGHI


Settlement dari suatu lapisan tanah yang dibebani dapat dibedakan menjadi 2 (dua) jenis, yaitu :
immediate/elastic settlement dan consolidation settlement.

3.4.1 Immediate atau Elastic Settlement (Si)


Elastic settlement dari tanah terjadi sewaktu atau setelah masa konstruksi suatu struktur.
Persamaan untuk mengevaluasi besarnya elastic settlement rata-rata dari pondasi fleksibel di tanah
lempung jenuh (saturated clay) menurut Janbu, Bjerrum, dan Kjaernsli adalah sebagai berikut:
qo × B
Si = A1 × A 2 ×
Es
dimana,
qo = beban luar
Es = Young’s modulus
A1 = koefisien modifikasi sebagai fungsi dari H/B
A2 = koefisien modifikasi sebagai fungsi dari Df/B
Berdasarkan kondisi aktual di lapangan, elastic settlement pada lokasi kolam renang dapat
diantisipasi dengan penimbunan kembali lokasi tanah yang sebelumnya digali untuk kebutuhan
konstruksi, hingga mencapai kedalaman yang diinginkan (levelling).

3.4.2 Consolidation Settlement (Sc)


Consolidation settlement merupakan settlement yang bergantung pada waktu dan terjadi sebagai
hasil dari pengaliran air pori dari rongga yang berada pada tanah lempung jenuh (saturated
clayey soils). Pengaliran air pori dari rongga terjadi saat tanah lempung jenuh dikenai beban
tambahan. Persamaan settlement konsolidasi satu dimensi adalah sebagai berikut :

3-11
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Normally consolidated clays:


Cc × Hc p + Δp av
SC = × log 0
1 + e0 pc
Over consolidated clays dengan po+Δpav<pc
Cs × H c p + Δp av
SC = × log 0
1 + e0 pc
Over consolidated clays dengan po<pc<po+Δpav
Cs × H c p C × Hc p + Δp av
SC = log c + c log 0
1 + e0 p0 1 + e0 pc
dimana,
po = tekanan tanah efektif di lapisan lempung
Δpav = pertambahan beban/tekanan rata-rata di lapisan lempung
pc = tekanan pre-consolidation
eo = initial void ratio di lapisan lempung
Cc = compression index
Cs = swelling index
Hc = tebal lapisan lempung

Total settlement (St) dari tanah adalah sebagai berikut:


St = S i + Sc

3.4.3 Time Rate Consolidation


Konsolidasi adalah hasil disipasi dari excess tekanan air pori pada lapisan lempung. Disipasi
tekanan air pori, pada suatu waktu, meningkatkan tekanan efektif, yang kemudian
menyebabkan settlement. Untuk memperkirakan tingkat konsolidasi dari lapisan lempung
pada waktu (t) setelah dikenai beban, tingkat disipasi excess tekanan air pori harus diketahui
terlebih dahulu.
Besar konsolidasi rata-rata dari lapisan lempung adalah sebagai berikut:
St
U =
S max
dimana,
St = settlement lapisan lempung pada waktu (t) setelah dikenai beban
Smax = settlement konsolidasi maksimum pada lempung bila dikenai beban
Lamanya waktu (t) untuk mencapai tingkat konsolidasi yang diinginkan dapat diperkirakan
dengan menggunakan formula:
Tv × H 2
t =
Cv

dimana,
H = drainage path maksimum
Cv = koefisien konsolidasi (hasil uji laboratorium)

3-12
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Tv = faktor waktu non dimensional


2
π ⎛ U% ⎞
×⎜
= ⎟
4 ⎝ 100 ⎠
Penurunan konsolidasi dihitung berdasarkan teori konsolidasi satu dimensi dari Terzaghi:
cc H q + Δp
Sc = log 0
1 + e0 q0
dimana:
Sc : penurunan konsolidasi
cc : koefisien konsolidasi
H : tebal tanah lempung
e0 : angka pori awal
q0 : tegangan efektif awal
Δp : pertambahan tegangan akibat beban fondasi

3.4.4 Hasil Analisis Penurunan Konsolidasi


Berdasarkan data tanah di lokasi kolam renang, parameter yang digunakan untuk melakukan
analisis konsolidasi ditunjukkan pada Tabel 3-3 .

Tabel 3-3 Parameter untuk perhitungan penurunan dan waktu konsolidasi

Cv
Bor. No. Kedalaman (m) Cc 2
(cm /detik)
BH-01 16.00 - 16.55 0.594 0.00050
BH-02 16.00 - 16.55 0.143 0.00115
BH-03 2.50 - 3.00 0.560 0.00080
BH-04 11.00 - 11.55 0.561 0.00040
BH-04 27.00 - 27.50 0.207 0.00040
BH-05 2.50 - 3.00 0.617 0.00120
BH-05 16.00 - 16.50 0.587 0.00140

Analisis penurunan dilakukan pada analisis penurunan konsolidasi saja, mengingat kebiasaan di
lapangan immediate settlement (penurunan elastis) akan diperbaiki langsung saat konstruksi
dengan melakukan leveling pada elevasi design.
Hasil analisis konsolidasi untuk kolam renang tanjung redeb ditunjukkan pada Gambar 3-12
dan Gambar 3-13.

3-13
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

90.0

80.0

70.0
Penurunan Konsolidasi (mm)

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
Tinggi Timbunan (m)
Penurunan Konsolidasi

Gambar 3-12 Grafik penurunan konsolidasi untuk beberapa variasi tinggi timbunan

Waktu Konsolidasi (bulan)


0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500
0.00

10.00

20.00

30.00
Derajat Konsolidasi (%)

40.00

50.00

60.00

70.00

80.00

90.00

100.00
Waktu Konsolidasi

Gambar 3-13 Grafik time rate consolidation

3-14
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 4 ANALISIS DAYA DUKUNG PONDASI


TIANG

4.1 KAPASITAS DAYA DUKUNG PONDASI TIANG


Pondasi tiang biasa digunakan untuk memastikan suatu bangunan berada dalam kondisi aman.
Situasi yang memerlukan tiang sebagai sistem pondasi adalah sebagai berikut:
5 Lapisan tanah pada lokasi pekerjaan merupakan lapisan yang sangat kompresibel dan
memiliki daya dukung yang rendah.
5 Struktur atas menerima gaya horizontal.
5 Struktur atas menerima gaya uplift.
Pondasi tiang menahan beban kompresi melalui tahanan selimut dan tahanan ujung, beban
uplift ditahan melalui tahanan selimut dan beban lateral ditahan oleh kekakuan tiang dan tanah
disekelilingnya. Perhitungan kapasitas daya dukung pondasi dilakukan dengan meninjau
beberapa kondisi sebagai berikut:
1. Kapasitas daya dukung tiang
- Kapasitas daya dukung aksial tiang tunggal
- Kapasitas daya dukung group tiang
2. Interaksi tanah dan group tiang

P V

P
M TRANS
PH

M LONG

PH
- Panjang pondasi tiang
- Penulangan Pile Cap

Daya Dukung Pondasi Tiang Tunggal

Analisa group tiang untuk gaya-gaya


yang bekerja pada tiang pondasi

Gambar 4-1 Ruang Lingkup Perhitungan Pondasi

4-1
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

4.1.1 Kapasitas Daya Dukung Aksial Tiang Tunggal


Secara umum, kapasitas daya dukung ultimate aksial dari pondasi tiang, dapat diperoleh
dengan menjumlahkan kapasitas daya dukung ujung dan tahanan geser selimut tiang. Kapasitas
daya dukung tersebut dapat ditulis seperti terlihat pada persamaan dibawah ini.
Qu = Qp + Qs
dimana:
Qu = kapasitas daya dukung ultimate
Qp = kapasitas daya dukung ujung ultimate
Qs = tahanan geser selimut tiang ultimate

Qs

Qp

Gambar 4-2 Daya Dukung Aksial Pondasi Tiang

4.1.2 Tahanan Geser Selimut Tiang


Tahanan geser selimut tiang ultimate dari pondasi pada tanah c-φ dapat dihitung berdasarkan
persamaan sebagai berikut:
Qs = Qsc + Qsφ
dimana:
Qs = tahanan geser selimut tiang ultimate
Qsc = kontribusi dari kohesi tanah, c (pada tanah lempung)
Qsφ = kontribusi dari sudut geser dalam tanah, φ (pada tanah pasir)

Secara umum, kontribusi kohesi tanah untuk tahanan geser selimut tiang ultimate dapat
diperoleh dengan menggunakan persamaan sebagai berikut:

4-2
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Qsc = ∑ α ⋅ cu −i ⋅ li ⋅ p

dimana:
α = faktor adhesi
cu-i = kohesi tanah undrained pada lapisan ke-i
li = panjang tiang pada lapisan ke-i
p = keliling tiang
Besarnya nilai faktor adhesi, α, khususnya untuk tiang pancang, dapat ditentukan dengan
menggunakan metoda dari API sebagai berikut:

Gambar 4-3 Faktor Adhesi API Method 2 (1986)

4.1.3 Tahanan Ujung Tiang


Secara umum, kapasitas daya dukung ujung pondasi tiang yang terletak pada lapisan tanah c-φ
dapat dihitung berdasarkan persamaan sebagai berikut:
Qp = Ap (c Nc* + q’ Nq*)
dimana:
Ap = luas penampang bagian ujung tiang
c = kohesi tanah pada bagian ujung tiang
q’ = tegangan vertikal efektif pada daerah ujung tiang
Nc*, Nq* = Faktor daya dukung

Tahanan ujung tiang diperhitungkan untuk jenis tanah lempung, yaitu:


Qp = 9 c Ap

4-3
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

4.1.4 Kapasitas Tarik Tiang


Desain tiang terhadap beban tarik sangat penting untuk struktur yang mengalami beban
seismik. Pada beberapa kondisi, kapasitas tarik tiang menentukan kedalaman penetrasi
minimum yang diperlukan.
Menurut Nicola dan Randolph (1993), pada tanah kohesif berbutir halus (fine grained), dimana
pembebanan diasumsikan terjadi pada kondisi undrained, tahanan sisi tiang pada kondisi tekan
dihitung sama dengan kondisi tarik. Sedangkan pada tanah non-kohesif atau tanah teralirkan
bebas (free-draining), Nicola dan Randolph (1993) menyatakan bahwa tahanan sisi biasanya
dihitung 70% dari tahanan sisi untuk kondisi tekan. Karena tanah dasar pada lokasi proyek
terdiri dari tanah kohesif dan non kohesif, tahanan sisi untuk kondisi tarik dihitung 70% dari
tahanan sisi untuk kondisi tekan.

4.1.5 Kapasitas Lateral Tiang Tunggal


Defleksi lateral tiang akibat beban aksial pada pondasi dapat meningkatkan kisaran tekanan
elastik pada tiang. Akibatnya metoda yang digunakan harus mempertimbangkan kondisi tanah
pada saat yields plastically up to end pada saat selama keruntuhan geser terjadi. Dengan
menggunakan metoda p-y dari Matlock maka tegangan tanah dapat dianalisis. Metoda ini juga
dapat memperhitungkan efek deformasi tanah plastis pada reaksi tiang. Berikut ini diuraikan
penjelasan mengenai metoda p-y, yang diambil dari “Pile Design and Construction Practice” oleh
Tomlinson. Bentuk dari kurva p-y dapat dilihat dalam Gambar 4-4 Kurva P-Y untuk Tiang
dengan Beban Lateral

. Tiap-tiap kurva menggambarkan tahanan lateral tanah pada kedalaman tertentu.

Gambar 4-4 Kurva P-Y untuk Tiang dengan Beban Lateral

Metoda untuk menggambarkan kurva p-y telah disusun untuk tanah dengan kenaikan modulus
yang linear, misalnya pada lempung soft firm normally consolidated dan tanah granular.
Faktor empirik diperoleh Matlock melalui pengujian pembebanan tiang lateral. Dalam metoda
ini, langkah pertama adalah menghitung tahanan lateral ultimate tanah lempung akibat beban
lateral. Pada dasarnya metoda Matlock serupa dengan metoda konvensional. Namun, faktor
daya dukung untuk beban lateral Nc didapatkan melalui pendekatan yang sedikit berbeda.
Di bawah kedalaman kritis, rx, koefisien Nc, diambil sebesar 9 (sembilan). Di atas kedalaman
tersebut, Nc, diperoleh melalui persamaan berikut ini:

4-4
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

γx Jx
Nc = 3 + +
cu B
dimana:
γ = density dari tanah
x = kedalaman dihitung dari permukaan tanah
cu = undrained cohesion lapisan lempung
J = factor empiris
B = lebar pondasi tiang
Pengujian yang dilakukan oleh Matlock memberikan harga J pada saat keruntuhan berkisar dari
0.5 untuk lempung lunak hingga 0.25 untuk lempung yang lebih kaku. Kedalaman kritis
diperoleh melalui persamaan berikut:
6B
xr=
γB
+J
cu
Tahanan ultimate di atas dan di bawah kedalaman kritis dinyatakan dalam kurva p-y sebagai
gaya (pu) per unit panjang tiang, yang tergantung pada undrained strength tanah (Cu).
pu = Nc cu B
Dari titik nol hingga titik a dalam Gambar 4-5, terlihat bahwa bentuk dari kurva p-y dihasilkan
dari kurva tegangan-regangan yang diperoleh dari pengujian contoh tanah pada undrained
triaxial compression, atau dari kurva load-settlement hasil plate loading test.

Gambar 4-5 Penentuan Bentuk Kurva P-Y Lempung Lunak Hingga Kaku (Matlock)
Bentuk kurva ditentukan berdasarkan persamaan berikut ini:
p y
= 0.53
pu yc
yc adalah defleksi regangan pada saat tegangan sama dengan tegangan maksimum yang
dihasilkan dari kurva tegangan-regangan laboratorium. Matlock merekomendasikan nilai rata-
rata sebesar 0.010 untuk lempung normally consolidated untuk digunakan pada persamaan
berikut ini:
yc = 2.5 εc B

4-5
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Prosedur yang sama juga dapat diterapkan untuk tanah pasir. Penurunan tahanan tanah lateral
untuk pasir diberikan oleh Reese dkk. seperti terlihat pada Gambar 4-6 dan Gambar 4-7
berikut ini.

Gambar 4-6 Penentuan Kedalaman Kritis Tiang Dengan Beban Lateral Pada Tanah Non-
Kohesif (Reese, Cox, dan Coop)

Gambar 4-7 Penentuan Kurva P-Y Pasir (Reese, Cox, dan Coop)
Dimana x adalah kedalaman di bawah permukaan tanah yang dipilih untuk kurva p-y tertentu.

4.2 PENENTUAN PARAMETER


Dalam melakukan analisis untuk desain pondasi diperlukan parameter-parameter yang akurat.
Penentuan parameter tersebut dilakukan berdasarkan hasil penyelidikan tanah. Parameter
tanah yang digunakan harus memenuhi persyaratan kedalaman dari pondasi tersebut seperti
terlihat pada Gambar 4-8.

4-6
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

a=4B

b=6-8 B

Le/B > 2.5

3-4B

Gambar 4-8 Minimal Tebal Data Tanah Di Bawah Dasar Pondasi Untuk Perhitungan
Kapasitas Daya Dukung Ujung

Tabel 4-1 berikut ini menunjukkan besarnya koreksi terhadap nilai N-SPT yang diperoleh di
lapangan tergantung dari metoda pelaksanaan yang digunakan.

Tabel 4-1 Koreksi Nilai N-SPT

Estimated Rod Correction Factor fo r


Countr Hammer Hammer Release Energy (%) 60% Rod Energy
Type
Donut Free Fall 78 78/60 = 1.30
Japan Donut Rope an Pulley with 67 67/60 = 1.12
special throw release
Safety Rope and Pulley 60 60/60 = 1.00
US
Donut Rope and Pulley 45 45/60 = 0.75
Argentina Donut Rope and Pulley 45 45/60 = 0.75
Donut Free Fall 60 60/60 = 1.00
China
Donut Rope and Pulley 50 50/60 = 0.83

4.3 KAPASITAS DAYA DUKUNG IJIN TIANG


Dalam analisis dengan metoda statik, beban desain dari tiang dengan panjang yang diketahui,
secara umum telah diperhitungkan dengan cara membagi daya dukung ultimate pada lapisan
tanah pendukung atau:
Qu
Q all =
SF
dimana:
SF = angka keamanan

4-7
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Kisaran angka keamanan terutama tergantung pada reliabilitas dari metoda analisis statik
tertentu dengan pertimbangan-pertimbangan sebagai berikut:
• Faktor ketidakpastian data tanah yang ada.
• Variasi dari lapisan tanah.
• Efek dan konsistensi dari metoda instalasi tiang yang diusulkan.
• Tingkat pengawasan konstruksi.
Pada umumnya, angka keamanan yang sering digunakan berkisar antara 2 – 4 untuk kondisi
operasional atau untuk beban yang bekerja selama operasi.
Menurut Tomlinson (1977), penentuan kapasitas ijin dari tiang adalah seperti ditunjukkan pada
persamaan berikut:
Kapasitas ultimate tiang
Kapasitas ijin tiang =
2,5
Canadian Foundation Engineering Manual dan AASHTO 1992 menyarankan penggunaan
angka keamanan sebesar 2.5 untuk kapasitas tiang.
Selain harus mampu menahan beban yang bekerja pada kondisi operasional maka pondasi
tiang juga harus mampu menahan beban yang bekerja pada kondisi gempa. Untuk itu, pondasi
harus mampu mengantisipasi momen dan gaya cabut yang terjadi akibat kondisi gempa.
Kapasitas tekan pondasi tiang terhadap beban gempa (temporary load) dimana beban gempa
didasarkan pada Peraturan Gempa baru (2003) yang berlaku adalah 1.3 lebih besar daripada
kapasitas ijin untuk kondisi operasi.
Berdasarkan hal tersebut, untuk memenuhi persyaratan angka keamanan dalam seluruh desain
pondasi tiang pada Kolam Renang Tanjung Redeb – Kab. Berau ini, diambil angka keamanan
sebagai berikut:
o Angka keamanan tekan pondasi tiang pada kondisi operasi = 2.0
o Kapasitas ijin tekan saat kondisi gempa adalah 1,3 x kapasitas ijin untuk kondisi
operasi, atau SF = 1.6
o Angka keamanan tarik pondasi tiang =2.5

4.4 HASIL ANALISIS DAYA DUKUNG PONDASI TIANG


Pada analisis daya dukung pondasi tiang, digunakan tiang pancang (spun pile) dengan diameter
0.40 m, 0.45 m, 0.50 m dan 0.60 m. Rangkuman hasil perhitungan pondasi tiang dapat dilihat
pada . Perhitungan pondasi tiang secara lengkap dapat dilihat pada Lampiran D.

4-8
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Tabel 4-2 Rangkuman hasil perhitungan kapasitas pondasi tiang

Kapasitas Tiang
Properti Tiang
Ultimate (kN)
Ref.
Boring No. Jenis Diameter Perkiraan Compres- Pull
Tiang Kedalaman sion Out
Tiang
(m) (m)

BH-1 Spun 0.40 25.00 1341.99 498.64


Pile 0.45 25.00 1602.51 562.85
0.50 25.00 1883.65 628.85
0.60 25.00 2507.79 759.56

BH-2 Spun 0.40 20.00 1185.01 476.90


Pile 0.45 20.00 1407.36 538.02
0.50 20.00 1646.20 600.57
0.60 20.00 2173.36 724.64

BH-3 Spun 0.40 16.00 1147.08 354.62


Pile 0.45 16.00 1383.25 400.15
0.50 16.00 1640.02 446.83
0.60 16.00 2215.43 539.36

BH-4 Spun 0.40 18.00 1117.10 559.63


Pile 0.45 18.00 1304.45 630.94
0.50 18.00 1502.41 703.54
0.60 18.00 1930.12 847.80

BH-5 Spun 0.40 21.00 1306.55 470.46


Pile 0.45 21.00 1562.65 530.85
0.50 21.00 1839.36 592.74
0.60 21.00 2454.63 715.44

4-9
Laporan Akhir Penyelidikan Tanah dan Analisis Geoteknik
Detail Desain Kolam Renang di Tanjung Redeb - Berau, Kalimantan Timur

Bab 5 KESIMPULAN

Hasil penyelidikan lapangan dan test laboratorium di atas dapat disimpulkan sebagai berikut:
1. Lapisan tanah pada lokasi kolam renang Tanjung Redep, Kab Berau pada umumnya
adalah sebagai berikut :
- Lapisan atas, merupakan tanah lunak (very soft – soft silty clay) yang merupakan
jenis tanah aluvial endapan dari sungai Segah. Lapisan ini hingga pada elevasi -16.00
s/d -25.00 dari permukaan tanah. Lapisan ini sangat lunak dan sangat compresible.
- Pada beberapa lokasi,dibawah lapisan lunak terdapat lapisan lempung sedang
(medium silty clay).
- Pada kedalaman 16.00 – 25.00 terdapa lapisan lempung keras (very stiff – hard clay),
lapisan ini merupakan lapisan bearing stratum atau lapisan pendukung.
2. Karena sifatnya yang lunak pada permkaan, timbunan langsung yang sifatnya struktural
tidak direkomendasikan. Jika pekerjaan timbunan akan dilaksanakan perlu dilakukan
perbaikan tanah.
3. Direkomendasikan untuk setiap bangunan dipikul oleh pondasi tiang untuk menghindari
penurunan yang besar dan differential settlement.
4. Struktur yang dibangunan dengan melakukan galian hendaknya mempertimbangkan gaya
up-lift karena muka air tanah pada lokasi tersebut cukup tinggi.

5-1
LAMPIRAN A
BORING LOG
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 09 to 11, 2007
BORE HOLE NO. : B-1 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
0.00 SILTY CLAY, few fine sand, very soft.

1.20 02/30

2.50

3.00 3.00 01/52

4.50 01/53

6.00

6.55 6.70 02/30

8.00 01/50

9.50 01/53

11.00 CH
11.55 11.55 01/50

13.00 01/55

14.55 01/52

16.00

16.55 16.55 01/46

18.00 01/52

19.70 03/30

21.00 21.00
SILTY CLAY, yellowish brown to brownish grey,
21.55 stiff to very stiff. 21.70 08/30

CH
23.15 21/30

24.50
CLAY / CLAYSTONE, brownish grey, hard. 24.70 73/30

N > 100
26.15 50/10

N > 100
B1.TXT - Times-Normal

27.55 50/13

N > 100
29.00 50/12

30.00
CONTINUE TO NEXT PAGE.

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 09 to 11, 2007
BORE HOLE NO. : B-1 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
30.00 CLAY / CLAYSTONE, brownish grey, hard. N > 100
30.55 50/12

N > 100
32.00
CLAYEY GRAVEL, brownish grey, very dense. 32.15 50/10

N > 100
33.70 50/05

N > 100
35.00 50/11

GP
N > 100
36.55 50/10

N > 100
38.00 50/10

N > 100
39.50 39.55 50/10
PT PEAT / COAL, black, dense.
40.00
END OF THIS BORING.

B1a.TXT - Times-Normal

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 03 to 04, 2007
BORE HOLE NO. : B-2 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
0.00 SILTY CLAY, grey to yellowish grey, few sand,
very soft.
1.00 01/62

2.50

3.00 3.00 01/76

4.50 01/54

6.00

6.50 6.50 01/63

8.00 01/59
CH

9.50 01/54

11.00

11.50 11.50 01/51

13.15 02/31

14.65 02/30

16.00

16.50 16.50 SILTY CLAY, yellowish grey to brownish grey, 16.65 26/30
stiff to very stiff.

CH 18.15 14/30

19.50
SILTY CLAY, brownish grey, hard. 19.70 86/30

N > 100
21.15 90/25

N > 100
22.70 50/13

CH
24.15 82/27

25.70 82/30

27.15 52/30
27.50
B2.TXT - Times-Normal

SILTY CLAY, brownish grey, very stiff.

CH 28.70 26/30

30.00
CONTINUE TO NEXT PAGE.

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 03 to 04, 2007
BORE HOLE NO. : B-2 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
30.00 SILTY CLAY, brownish grey, hard. 30.15 68/30
CH
31.50 31.55 01/50
PEAT, black, very soft.
PT
33.00
CLAY / CLAYSTONE, dark grey, hard. 33.15 40/30
N > 100
34.15 50/12

N > 100
36.00 50/12

N > 100
37.55 50/10

N > 100
39.00
SANDSTONE, brownish grey, very dense. 39.15 50/05

40.00
END OF THIS BORING.

B2a.TXT - Times-Normal

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : January 31, 2007
BORE HOLE NO. : B-3 DRILLER : Endin A.M.
DEPTH : 25.12 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
0.00 SILTY CLAY, grey, very soft to soft.

1.00 01/71

2.50 01/52
3.00

3.52

4.65 02/30

6.00

6.50 CH 6.50 01/53

8.00 01/52

9.65 02/30

11.00

11.55 11.70 02/30

13.00
As above, medium stiff to stiff. 13.15 05/30

CH 14.70 12/30

N > 100
16.00 16.00 50/08
CLAY / CLAYSTONE, grey to dark grey, hard.

N > 100
17.55 50/08

N > 100
19.00 50/10

N > 100
20.55 50/08

N > 100
22.00 50/06

N > 100
23.55 50/11

N > 100
25.12 25.00 50/12
END OF THIS BORING.
B3.TXT - Times-Normal

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 05 to 07, 2007
BORE HOLE NO. : B-4 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
0.00 SILTY CLAY, grey to dark grey, few sand, very soft.

1.00 01/69

2.50

3.00 3.00 01/52

4.50 01/50

6.00

6.50 CH 6.50 01/53

8.00 01/61

9.50 01/55

11.00

11.50 11.50 01/50

13.00
SILTY CLAY, yellowish grey, some sand, few fine gravel, 13.15 08/30
stiff to very stiff.

14.65 25/30
CH
16.00

16.55 16.55 SILTY CLAY, reddish grey, few sand & gravel, hard. 16.70 45/30

18.15 50/30
CH
19.70 55/30

N > 100
21.00
As above, hard. 21.15 50/12

N > 100
22.55 50/12
CH
N > 100
24.15 50/10
24.50
SILTY CLAY, brownish grey, very stiff.

25.70 19/30

CH
B4.TXT - Times-Normal

27.70 20/30

29.00
PEAT, black, dense. 29.15 40/30
PT
30.00
CONTINUE TO NEXT PAGE.

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 05 to 07, 2007
BORE HOLE NO. : B-4 DRILLER : Endin A.M.
DEPTH : 40.00 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
30.00 PEAT, black, dense. N > 100
30.55 50/08

N > 100
PT 32.00 50/10

N > 100
33.50 33.55 50/07
CLAY / CLAYSTONE, dark grey, hard.

N > 100
35.00 50/08

N > 100
36.55 50/10

N > 100
38.00 50/10

N > 100
39.55 50/12
40.00
END OF THIS BORING.

B4a.TXT - Times-Normal

Plate
P.T. PETROSOL
BORING LOG
CLIENT : PT. BORING METHOD : CORING & SAMPLING
PROJECT : - SPT : Automatic hammer
LOCATION : Tanjung Redep - Berau, Kaltim DATE : February 02, 2007
BORE HOLE NO. : B-5 DRILLER : Endin A.M.
DEPTH : 30.10 m LOGGER : Widoyoko
COORDINATE : - RECORDED BY : Jeffrey
ELEVATION : -
GROUND WATER LEVEL : 0.00m (at the surface)
(meter)

(meter)

RECOVERY
(kg/cm2)
SPT - N value
SAMPLE

SYMBOL
DEPTH

CHART
GRAPH

DEPTH

(%)
ROCK/SOIL DESCRIPTION

qu
USCS

BLOWS N PER FOOT

Depth
(m)
PER
CM 40 80 40 80
0.00 SILTY CLAY, green to dark grey, very soft.

1.15 02/30

2.50

3.00 3.00 01/51

4.65 02/30

6.00

6.50 CH 6.50 01/60

8.00 01/52

9.50 01/50

11.00

11.50 11.65 02/30

13.00
As above, medium stiff. 13.15 05/30

14.60 04/30

16.00

16.55 16.70 05/30


CH
18.15 05/30

19.70 07/30

N > 100
21.00 21.00 50/12
CLAY / CLAYSTONE, grey to dark grey, hard.

N > 100
22.55 50/13

N > 100
24.00 50/12

N > 100
25.55 50/10

N > 100
27.00 50/10
B5.TXT - Times-Normal

N > 100
28.55 50/12

N > 100
30.10 30.00 50/10
END OF THIS BORING.

Plate
LAMPIRAN B
CPT LOG
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 02 February, 2007.
POINT : S.01 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
5 LF/CR : RATIO OF
LOCAL FRICT-
ION TO CONE
RESISTANCE
M E T E R

10
i n
D E P T H

15

20
S01.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 01 February, 2007.
POINT : S.02 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5
ION TO CONE
RESISTANCE
M E T E R

10
i n
D E P T H

15
S02.TXT - Times-Normal

20

CONE RESISTANCE >200 KG/CM2

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 01 February, 2007.
POINT : S.03 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R
i n

10
D E P T H

15
S03.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 31 January, 2007.
POINT : S.04 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R
i n

10
D E P T H

15

CONE RESISTANCE >200 KG/CM2


S04.TXT - Times-Normal

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 31 January, 2007.
POINT : S.05 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R
i n

10
D E P T H

15
S05.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 02 February, 2007.
POINT : S.06 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
5 LOCAL FRICT-
ION TO CONE
RESISTANCE
M E T E R

10
i n
D E P T H

15 S06.TXT - Times-Normal

20

CONE RESISTANCE >200 KG/CM2

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 30 January, 2007.
POINT : S.07 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R
i n

10
D E P T H

15
CONE RESISTANCE >200 KG/CM2
S07.TXT - Times-Normal

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 30 January, 2007.
POINT : S.08 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R
i n

10
D E P T H

15

CONE RESISTANCE >200 KG/CM2


S08.TXT - Times-Normal

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 29 January, 2007.
POINT : S.09 OPERATOR : Edi Suryono
GROUND WATER LEVEL : 0.00 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R

CONE RESISTANCE >200 KG/CM2


i n

10
D E P T H

15
S09.TXT - Times-Normal

20

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 03 February, 2007.
POINT : S.10 OPERATOR : Edi Suryono
GROUND WATER LEVEL : +0.20 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
5
LF/CR : RATIO OF
LOCAL FRICT-
ION TO CONE
RESISTANCE
M E T E R

10
i n
D E P T H

15

20
S10.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2


25

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 03 February, 2007.
POINT : S.11 OPERATOR : Edi Suryono
GROUND WATER LEVEL : +0.20 (at the surface) RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
5 LF/CR : RATIO OF
LOCAL FRICT-
ION TO CONE
RESISTANCE
M E T E R

10
i n
D E P T H

15

20
S11.TXT - Times-Normal

CONE RESISTANCE >200 KG/CM2

Plate
P.T. PETROSOL
GRAPHS OF 2-ton DCPT
CLIENT : PT. COORDINATES : N = E =
PROJECT : - ELEVATION : -
LOCATION : Tanjung Redep - Berau, Kaltim DATE : 29 January, 2007.
POINT : S.12 OPERATOR : Edi Suryono
GROUND WATER LEVEL : -0.80 RECORDED : Jeffrey

0 2 4 6 8 10 12 LF/CR (%)
0 400 800 1200 1600 2000 2400 TF (kg/cm)
0 40 80 120 160 200 240 CR (kg/cm2)
0

NOTE :
CR : CONE RESIST-
ANCE IN KG
PER CM2
TF : TOTAL FRICT-
ION IN KG/CM
PERIMETER
LF/CR : RATIO OF
LOCAL FRICT-
5 ION TO CONE
RESISTANCE
M E T E R

CONE RESISTANCE >200 KG/CM2


i n

10
D E P T H

15
S12.TXT - Times-Normal

20

Plate
LAMPIRAN C
HASIL UJI LABORATORIUM
ATTERBERG LIMIT
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 01 DATE : Feb. 2007
DEPTH (M) 16,00 - 16,50 REMARKS :

85

80
WATER CONTENT (%)

75

70

65

60

55
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 72.89 Plastic Index, IP (%) = 45.68


Plastic Limit,PL (%) = 27.21 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 01 DATE : Feb. 2007
DEPTH (M) 21,00 - 21,55 REMARKS :

40

35
WATER CONTENT (%)

30

25

20

15
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 26.09 Plastic Index, IP (%) = 11.19


Plastic Limit,PL (%) = 14.90 Classification = CL
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 02 DATE : Feb. 2007
DEPTH (M) 11,00 - 11,50 REMARKS :

95

90
WATER CONTENT (%)

85

80

75

70

65

60
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 77.41 Plastic Index, IP (%) = 47.68


Plastic Limit,PL (%) = 29.73 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 02 DATE : Feb. 2007
DEPTH (M) 16,00 - 16,50 REMARKS :

55

50
WATER CONTENT (%)

45

40

35

30

25
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 40.82 Plastic Index, IP (%) = 16.82


Plastic Limit,PL (%) = 24.00 Classification = CL
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 03 DATE : Feb. 2007
DEPTH (M) 2,50 - 3,00 REMARKS :

95

90
WATER CONTENT (%)

85

80

75

70

65

60
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 78.36 Plastic Index, IP (%) = 48.11


Plastic Limit,PL (%) = 30.25 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 03 DATE : Feb. 2007
DEPTH (M) 11,00 - 11,55 REMARKS :

75

70
WATER CONTENT (%)

65

60

55

50
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 63.45 Plastic Index, IP (%) = 37.39


Plastic Limit,PL (%) = 26.06 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 04 DATE : Feb. 2007
DEPTH (M) 11,00 - 11,50 REMARKS :

85

80
WATER CONTENT (%)

75

70

65

60

55
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 73.14 Plastic Index, IP (%) = 44.47


Plastic Limit,PL (%) = 28.67 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 04 DATE : Feb. 2007
DEPTH (M) 16,00 - 16,55 REMARKS :

50

45
WATER CONTENT (%)

40

35

30

25
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 38.84 Plastic Index, IP (%) = 17.89


Plastic Limit,PL (%) = 20.95 Classification = CL
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 04 DATE : Feb. 2007
DEPTH (M) 27,00 - 27,55 REMARKS :

65

60
WATER CONTENT (%)

55

50

45

40

35
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 50.00 Plastic Index, IP (%) = 24.73


Plastic Limit,PL (%) = 25.27 Classification = CL - CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 05 DATE : Feb. 2007
DEPTH (M) 16,00 - 16,50 REMARKS :

90
85
WATER CONTENT (%)

80
75
70
65
60
55
50
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 66.92 Plastic Index, IP (%) = 42.78


Plastic Limit,PL (%) = 24.14 Classification = CH
LIQUID AND PLASTIC LIMIT DETERMINATION

LOCATION : TANJUNG REDEB TESTED BY : Tatang


SAMPLE No. B - 05 DATE : Feb. 2007
DEPTH (M) 2,50 - 3,00 REMARKS :

95

90
WATER CONTENT (%)

85

80

75

70

65

60
10 NUMBER OF BLOWS 100

UNIFIED CLASSIFICATION
60
Platicity Index %

50
CL CH
40

30
OH - MH
20

10
CL-ML ML-OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit %

Liquid Limit, LL (%) = 73.73 Plastic Index, IP (%) = 44.18


Plastic Limit,PL (%) = 29.55 Classification = CH
TRIAXIAL UU
(UNCONSOLIDATED UNDRAINED)
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 01 Date : Feb, 2007
Depth 16,00 - 16,55 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.411 0.500 0.000 0.911 0.911 0.706
1.00 0.457 1.000 0.000 1.457 1.457 1.229
1.50 0.499 1.500 0.000 1.999 1.999 1.750

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.176 kg/cm2


o
Angle of Int. Friction : 2.4
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 02 Date : Feb, 2007
Depth 11,00 - 22,50 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.130 0.500 0.000 0.630 0.630 0.565
1.00 0.143 1.000 0.000 1.143 1.143 1.072
1.50 0.166 1.500 0.000 1.666 1.666 1.583

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.056 kg/cm2


o
Angle of Int. Friction : 0.9
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 03 Date : Feb, 2007
Depth 2,50 - 3,00 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.248 0.500 0.000 0.748 0.748 0.624
1.00 0.280 1.000 0.000 1.280 1.280 1.140
1.50 0.306 1.500 0.000 1.806 1.806 1.653

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.106 kg/cm2


o
Angle of Int. Friction : 1.6
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 03 Date : Feb, 2007
Depth 11,00 - 22,50 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.319 0.500 0.000 0.819 0.819 0.660
1.00 0.372 1.000 0.000 1.372 1.372 1.186
1.50 0.416 1.500 0.000 1.916 1.916 1.708

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.128 kg/cm2


o
Angle of Int. Friction : 2.7
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 04 Date : Feb, 2007
Depth 11,00 - 11,50 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.178 0.500 0.000 0.678 0.678 0.589
1.00 0.202 1.000 0.000 1.202 1.202 1.101
1.50 0.220 1.500 0.000 1.720 1.720 1.610

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.075 kg/cm2


o
Angle of Int. Friction : 1.1
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 05 Date : Feb, 2007
Depth 2,50 - 3,00 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.314 0.500 0.000 0.814 0.814 0.657
1.00 0.385 1.000 0.000 1.385 1.385 1.193
1.50 0.460 1.500 0.000 1.960 1.960 1.730

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.110 kg/cm2


o
Angle of Int. Friction : 3.9
TRIAXIAL COMPRESSION TEST

Location TJ. REDEB - KALTIM Tested by: Maman U


Boring B - 05 Date : Feb, 2007
Depth 16,00 - 16,55 Method : Unconsolidated Undrained

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1 + σ3)


2
0.50 0.213 0.500 0.000 0.713 0.713 0.607
1.00 0.252 1.000 0.000 1.252 1.252 1.126
1.50 0.277 1.500 0.000 1.777 1.777 1.639

1.0

0.8
Shear Stress kg/cm2

0.6

0.4

0.2

0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0
Principal Stress kg/cm2

Cohesion (c) 0.087 kg/cm2


o
Angle of Int. Friction : 1.8
CONSOLIDATION
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 01 Date : February, 2007
Depth : 16,00 - 16,55 Remarks :

2.10 cc =

CC = 0.594
1.60
Void Ratio

1.10

0.60
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 02 Date : February, 2007
Depth : 16,00 - 16,50 Remarks :

1.00 cc =

CC = 0.143
0.80
Void Ratio

0.60

0.40
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 03 Date : February, 2007
Depth : 2,50 - 3,00 Remarks :

2.10 cc =

CC = 0.560
1.60
Void Ratio

1.10

0.60
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 04 Date : February, 2007
Depth : 11,00 - 11,50 Remarks :

2.10 cc =

CC = 0.561
1.60
Void Ratio

1.10

0.60
0.01 0.1 1 10 100

Log - P (kg/cm 2)
1.00
Coef.Consol (Cv) x 10-3 CM2/SEC

0.80

0.60

0.40

0.20

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 04 Date : February, 2007
Depth : 27,00 - 27,55 Remarks :

1.10 cc =

0.90 CC = 0.207
Void Ratio

0.70

0.50

0.30
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 05 Date : February, 2007
Depth : 2,50 - 3,00 Remarks :

2.60 cc =

2.10 CC = 0.617
Void Ratio

1.60

1.10

0.60
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
CONSOLIDATION TEST

Location : TANJUNG REDEB - KALTIM Done by : Cecep


Boring No: B - 05 Date : February, 2007
Depth : 16,00 - 16,55 Remarks :

2.10 cc =

CC = 0.587
1.60
Void Ratio

1.10

0.60
0.01 0.1 1 10 100

Log - P (kg/cm 2)
2.00
Coef.Consol (Cv) x 10-3 CM2/SEC

1.50

1.00

0.50

0.00
0.01 0.1 1 10 100
LAMPIRAN D
PERHITUNGAN DAYA DUKUNG
PONDASI TIANG
Project : TANJUNG REDEP, BERAU
Ref. : BH-1

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.40 m cu = 6.00 *N-SPT
Thick. : 0.075 m Compression
Perimeter : 1.26 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.13 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.08 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 7.5 7.5 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 15.1 15.1 9.5 24.6 10.6 10.6 0.8 11.4
-2.0 C1 2 12.0 1.00 15.1 30.2 11.6 41.7 10.6 21.1 1.7 22.8
-3.0 C1 1 6.0 1.00 7.5 37.7 6.8 44.5 5.3 26.4 2.5 28.9
-4.0 C1 1 6.0 1.00 7.5 45.2 7.8 53.0 5.3 31.7 3.4 35.0
-5.0 C1 1 6.0 1.00 7.5 52.8 6.8 59.6 5.3 36.9 4.2 41.2
-6.0 C1 2 12.0 1.00 15.1 67.9 13.6 81.4 10.6 47.5 5.1 52.6
-7.0 C1 2 12.0 1.00 15.1 82.9 13.6 96.5 10.6 58.1 5.9 64.0
-8.0 C1 1 6.0 1.00 7.5 90.5 6.8 97.3 5.3 63.3 6.7 70.1
-9.0 C1 1 6.0 1.00 7.5 98.0 6.8 104.8 5.3 68.6 7.6 76.2
-10.0 C1 1 6.0 1.00 7.5 105.6 6.8 112.3 5.3 73.9 8.4 82.3
-11.0 C1 1 6.0 1.00 7.5 113.1 6.8 119.9 5.3 79.2 9.3 88.4
-12.0 C1 1 6.0 1.00 7.5 120.6 6.8 127.4 5.3 84.4 10.1 94.6
-13.0 C1 1 6.0 1.00 7.5 128.2 6.8 135.0 5.3 89.7 11.0 100.7
-14.0 C1 1 6.0 1.00 7.5 135.7 6.8 142.5 5.3 95.0 11.8 106.8
-15.0 C1 1 6.0 1.00 7.5 143.3 6.8 150.0 5.3 100.3 12.6 112.9
-16.0 C1 1 6.0 1.00 7.5 150.8 6.8 157.6 5.3 105.6 13.5 119.0
-17.0 C1 1 6.0 1.00 7.5 158.3 6.8 165.1 5.3 110.8 14.3 125.2
-18.0 C1 1 6.0 1.00 7.5 165.9 6.8 172.7 5.3 116.1 15.2 131.3
-19.0 C1 3 18.0 1.00 22.6 188.5 20.4 208.9 15.8 131.9 16.0 148.0
-20.0 C1 3 18.0 1.00 22.6 211.1 20.4 231.5 15.8 147.8 16.8 164.6
-21.0 C2 8 48.0 0.77 46.4 257.6 54.3 311.8 32.5 180.3 17.7 198.0
-22.0 C2 8 48.0 0.77 46.4 304.0 54.3 358.3 32.5 212.8 18.5 231.3
-23.0 C2 21 126.0 0.50 79.2 383.2 142.5 525.7 55.4 268.2 19.4 287.6
-24.0 C2 21 126.0 0.50 79.2 462.3 142.5 604.8 55.4 323.6 20.2 343.9
-25.0 C3 73 350.0 0.50 219.9 682.3 659.7 1342.0 153.9 477.6 21.1 498.6
-26.0 C3 100 350.0 0.50 219.9 902.2 659.7 1561.9 153.9 631.5 21.9 653.4
-27.0 C3 100 350.0 0.50 219.9 1122.1 659.7 1781.8 153.9 785.5 22.7 808.2
-28.0 C3 100 350.0 0.50 219.9 1342.0 659.7 2001.7 153.9 939.4 23.6 963.0
-29.0 C3 100 350.0 0.50 219.9 1561.9 659.7 2221.6 153.9 1093.3 24.4 1117.8
-30.0 C3 100 350.0 0.50 219.9 1781.8 659.7 2441.5 153.9 1247.3 25.3 1272.5
-31.0 C3 100 350.0 0.50 219.9 2001.7 659.7 2661.5 153.9 1401.2 26.1 1427.3
-32.0 C3 100 350.0 0.50 219.9 2221.6 659.7 2881.4 153.9 1555.1 27.0 1582.1
-33.0 C3 100 350.0 0.50 219.9 2441.6 659.7 3101.3 153.9 1709.1 27.8 1736.9
-34.0 C3 100 350.0 0.50 219.9 2661.5 659.7 3321.2 153.9 1863.0 28.6 1891.7
-35.0 C3 100 350.0 0.50 219.9 2881.4 659.7 3541.1 153.9 2017.0 29.5 2046.4
-36.0 C3 100 350.0 0.50 219.9 3101.3 659.7 3761.0 153.9 2170.9 30.3 2201.2
-37.0 C3 100 350.0 0.50 219.9 3321.2 659.7 3980.9 153.9 2324.8 31.2 2356.0
-38.0 C3 100 350.0 0.50 219.9 3541.1 659.7 4200.8 153.9 2478.8 32.0 2510.8
-39.0 C3 100 350.0 0.50 219.9 3761.0 659.7 4420.8 153.9 2632.7 32.9 2665.6
-40.0 C3 100 350.0 0.50 219.9 3980.9 659.7 4640.7 153.9 2786.7 33.7 2820.3
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-1 Diameter : 0.4 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 0 1000 2000 3000 4000 5000 6000 7000 8000
0 0 0
2 Friction Friction*
End Wp
1 Qu Qpu
CH
1
-5 -5 -5

2
1
1
-10 -10 -10

1
1

1
-15 -15 -15

1
1
Depth (m)

Depth (m)

Depth (m)
-20 3 -20 -20

8
CH
21

-25 73 -25 -25


100
CLAYSTONE
100
100
-30 -30 -30
100

100

100
-35 100 -35 -35

100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-1

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.45 m cu = 6.00 *N-SPT
Thick. : 0.080 m Compression
Perimeter : 1.41 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.16 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.09 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 9.5 9.5 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 17.0 17.0 12.1 29.0 11.9 11.9 1.0 12.9
-2.0 C1 2 12.0 1.00 17.0 33.9 14.6 48.5 11.9 23.8 2.0 25.8
-3.0 C1 1 6.0 1.00 8.5 42.4 8.6 51.0 5.9 29.7 3.1 32.8
-4.0 C1 1 6.0 1.00 8.5 50.9 9.8 60.7 5.9 35.6 4.1 39.7
-5.0 C1 1 6.0 1.00 8.5 59.4 8.6 68.0 5.9 41.6 5.1 46.7
-6.0 C1 2 12.0 1.00 17.0 76.3 17.2 93.5 11.9 53.4 6.1 59.6
-7.0 C1 2 12.0 1.00 17.0 93.3 17.2 110.5 11.9 65.3 7.2 72.5
-8.0 C1 1 6.0 1.00 8.5 101.8 8.6 110.4 5.9 71.3 8.2 79.4
-9.0 C1 1 6.0 1.00 8.5 110.3 8.6 118.9 5.9 77.2 9.2 86.4
-10.0 C1 1 6.0 1.00 8.5 118.8 8.6 127.3 5.9 83.1 10.2 93.4
-11.0 C1 1 6.0 1.00 8.5 127.2 8.6 135.8 5.9 89.1 11.3 100.3
-12.0 C1 1 6.0 1.00 8.5 135.7 8.6 144.3 5.9 95.0 12.3 107.3
-13.0 C1 1 6.0 1.00 8.5 144.2 8.6 152.8 5.9 100.9 13.3 114.2
-14.0 C1 1 6.0 1.00 8.5 152.7 8.6 161.3 5.9 106.9 14.3 121.2
-15.0 C1 1 6.0 1.00 8.5 161.2 8.6 169.8 5.9 112.8 15.3 128.2
-16.0 C1 1 6.0 1.00 8.5 169.6 8.6 178.2 5.9 118.8 16.4 135.1
-17.0 C1 1 6.0 1.00 8.5 178.1 8.6 186.7 5.9 124.7 17.4 142.1
-18.0 C1 1 6.0 1.00 8.5 186.6 8.6 195.2 5.9 130.6 18.4 149.0
-19.0 C1 3 18.0 1.00 25.4 212.1 25.8 237.8 17.8 148.4 19.4 167.9
-20.0 C1 3 18.0 1.00 25.4 237.5 25.8 263.3 17.8 166.3 20.5 186.7
-21.0 C2 8 48.0 0.77 52.3 289.8 68.7 358.5 36.6 202.8 21.5 224.3
-22.0 C2 8 48.0 0.77 52.3 342.0 68.7 410.7 36.6 239.4 22.5 261.9
-23.0 C2 21 126.0 0.50 89.1 431.1 180.4 611.4 62.3 301.8 23.5 325.3
-24.0 C2 21 126.0 0.50 89.1 520.1 180.4 700.5 62.3 364.1 24.5 388.6
-25.0 C3 73 350.0 0.50 247.4 767.5 835.0 1602.5 173.2 537.3 25.6 562.8
-26.0 C3 100 350.0 0.50 247.4 1014.9 835.0 1849.9 173.2 710.5 26.6 737.1
-27.0 C3 100 350.0 0.50 247.4 1262.3 835.0 2097.3 173.2 883.6 27.6 911.3
-28.0 C3 100 350.0 0.50 247.4 1509.7 835.0 2344.7 173.2 1056.8 28.6 1085.5
-29.0 C3 100 350.0 0.50 247.4 1757.1 835.0 2592.1 173.2 1230.0 29.7 1259.7
-30.0 C3 100 350.0 0.50 247.4 2004.5 835.0 2839.5 173.2 1403.2 30.7 1433.9
-31.0 C3 100 350.0 0.50 247.4 2251.9 835.0 3086.9 173.2 1576.4 31.7 1608.1
-32.0 C3 100 350.0 0.50 247.4 2499.3 835.0 3334.3 173.2 1749.5 32.7 1782.3
-33.0 GR 100 350.0 0.50 247.4 2746.7 835.0 3581.7 173.2 1922.7 33.8 1956.5
-34.0 GR 100 350.0 0.50 247.4 2994.1 835.0 3829.1 173.2 2095.9 34.8 2130.7
-35.0 GR 100 350.0 0.50 247.4 3241.5 835.0 4076.5 173.2 2269.1 35.8 2304.9
-36.0 GR 100 350.0 0.50 247.4 3488.9 835.0 4323.9 173.2 2442.3 36.8 2479.1
-37.0 GR 100 350.0 0.50 247.4 3736.3 835.0 4571.3 173.2 2615.4 37.8 2653.3
-38.0 GR 100 350.0 0.50 247.4 3983.7 835.0 4818.7 173.2 2788.6 38.9 2827.5
-39.0 GR 100 350.0 0.50 247.4 4231.2 835.0 5066.1 173.2 2961.8 39.9 3001.7
-40.0 GR 100 350.0 0.50 247.4 4478.6 835.0 5313.5 173.2 3135.0 40.9 3175.9
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-1 Diameter : 0.45 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 0 1000 2000 3000 4000 5000 6000 7000 8000
0 0 0
2 Friction Friction*
End Wp
1 Qu Qpu
CH
1
-5 -5 -5

2
1
1
-10 -10 -10

1
1

1
-15 -15 -15

1
1
Depth (m)

Depth (m)

Depth (m)
-20 3 -20 -20

8
CH
21

-25 73 -25 -25


100
CLAYSTONE
100
100
-30 -30 -30
100

100

100
-35 100 -35 -35

100
GR
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-1

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.50 m cu = 6.00 *N-SPT
Thick. : 0.090 m Compression
Perimeter : 1.57 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.20 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.12 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 11.8 11.8 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 18.8 18.8 14.9 33.8 13.2 13.2 1.3 14.5
-2.0 C1 2 12.0 1.00 18.8 37.7 18.0 55.7 13.2 26.4 2.6 28.9
-3.0 C1 1 6.0 1.00 9.4 47.1 10.6 57.7 6.6 33.0 3.8 36.8
-4.0 C1 1 6.0 1.00 9.4 56.5 12.2 68.7 6.6 39.6 5.1 44.7
-5.0 C1 1 6.0 1.00 9.4 66.0 10.6 76.6 6.6 46.2 6.4 52.6
-6.0 C1 2 12.0 1.00 18.8 84.8 21.2 106.0 13.2 59.4 7.7 67.0
-7.0 C1 2 12.0 1.00 18.8 103.7 21.2 124.9 13.2 72.6 8.9 81.5
-8.0 C1 1 6.0 1.00 9.4 113.1 10.6 123.7 6.6 79.2 10.2 89.4
-9.0 C1 1 6.0 1.00 9.4 122.5 10.6 133.1 6.6 85.8 11.5 97.2
-10.0 C1 1 6.0 1.00 9.4 131.9 10.6 142.6 6.6 92.4 12.8 105.1
-11.0 C1 1 6.0 1.00 9.4 141.4 10.6 152.0 6.6 99.0 14.0 113.0
-12.0 C1 1 6.0 1.00 9.4 150.8 10.6 161.4 6.6 105.6 15.3 120.9
-13.0 C1 1 6.0 1.00 9.4 160.2 10.6 170.8 6.6 112.2 16.6 128.7
-14.0 C1 1 6.0 1.00 9.4 169.6 10.6 180.2 6.6 118.8 17.9 136.6
-15.0 C1 1 6.0 1.00 9.4 179.1 10.6 189.7 6.6 125.3 19.1 144.5
-16.0 C1 1 6.0 1.00 9.4 188.5 10.6 199.1 6.6 131.9 20.4 152.3
-17.0 C1 1 6.0 1.00 9.4 197.9 10.6 208.5 6.6 138.5 21.7 160.2
-18.0 C1 1 6.0 1.00 9.4 207.3 10.6 217.9 6.6 145.1 23.0 168.1
-19.0 C1 3 18.0 1.00 28.3 235.6 31.8 267.4 19.8 164.9 24.2 189.2
-20.0 C1 3 18.0 1.00 28.3 263.9 31.8 295.7 19.8 184.7 25.5 210.2
-21.0 C2 8 48.0 0.77 58.1 322.0 84.8 406.8 40.6 225.4 26.8 252.1
-22.0 C2 8 48.0 0.77 58.1 380.0 84.8 464.8 40.6 266.0 28.1 294.1
-23.0 C2 21 126.0 0.50 99.0 479.0 222.7 701.6 69.3 335.3 29.3 364.6
-24.0 C2 21 126.0 0.50 99.0 577.9 222.7 800.6 69.3 404.6 30.6 435.2
-25.0 C3 73 350.0 0.50 274.9 852.8 1030.8 1883.7 192.4 597.0 31.9 628.9
-26.0 C3 100 350.0 0.50 274.9 1127.7 1030.8 2158.5 192.4 789.4 33.2 822.6
-27.0 C3 100 350.0 0.50 274.9 1402.6 1030.8 2433.4 192.4 981.8 34.4 1016.2
-28.0 C3 100 350.0 0.50 274.9 1677.5 1030.8 2708.3 192.4 1174.2 35.7 1209.9
-29.0 C3 100 350.0 0.50 274.9 1952.4 1030.8 2983.2 192.4 1366.7 37.0 1403.6
-30.0 C3 100 350.0 0.50 274.9 2227.3 1030.8 3258.1 192.4 1559.1 38.3 1597.3
-31.0 C3 100 350.0 0.50 274.9 2502.2 1030.8 3533.0 192.4 1751.5 39.5 1791.0
-32.0 C3 100 350.0 0.50 274.9 2777.0 1030.8 3807.9 192.4 1943.9 40.8 1984.7
-33.0 GR 100 350.0 0.50 274.9 3051.9 1030.8 4082.8 192.4 2136.4 42.1 2178.4
-34.0 GR 100 350.0 0.50 274.9 3326.8 1030.8 4357.7 192.4 2328.8 43.4 2372.1
-35.0 GR 100 350.0 0.50 274.9 3601.7 1030.8 4632.6 192.4 2521.2 44.6 2565.8
-36.0 GR 100 350.0 0.50 274.9 3876.6 1030.8 4907.4 192.4 2713.6 45.9 2759.5
-37.0 GR 100 350.0 0.50 274.9 4151.5 1030.8 5182.3 192.4 2906.0 47.2 2953.2
-38.0 GR 100 350.0 0.50 274.9 4426.4 1030.8 5457.2 192.4 3098.5 48.5 3146.9
-39.0 GR 100 350.0 0.50 274.9 4701.3 1030.8 5732.1 192.4 3290.9 49.7 3340.6
-40.0 GR 100 350.0 0.50 274.9 4976.2 1030.8 6007.0 192.4 3483.3 51.0 3534.3
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-1 Diameter : 0.5 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 0 1000 2000 3000 4000 5000 6000 7000 8000
0 0 0
2 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5

2
1
1
-10 -10 -10

1
1

1
-15 -15 -15

1
1
Depth (m)

Depth (m)

Depth (m)
-20 3 -20 -20

8
CH
21

-25 73 -25 -25


100
CLAYSTONE
100
100
-30 -30 -30
100

100

100
-35 100 -35 -35

100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-1

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.60 m cu = 6.00 *N-SPT
Thick. : 0.100 m Compression
Perimeter : 1.88 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.28 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.16 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 17.0 17.0 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 22.6 22.6 21.5 44.1 15.8 15.8 1.7 17.6
-2.0 C1 2 12.0 1.00 22.6 45.2 26.0 71.2 15.8 31.7 3.5 35.1
-3.0 C1 1 6.0 1.00 11.3 56.5 15.3 71.8 7.9 39.6 5.2 44.8
-4.0 C1 1 6.0 1.00 11.3 67.9 17.5 85.4 7.9 47.5 6.9 54.4
-5.0 C1 1 6.0 1.00 11.3 79.2 15.3 94.4 7.9 55.4 8.6 64.1
-6.0 C1 2 12.0 1.00 22.6 101.8 30.5 132.3 15.8 71.3 10.4 81.6
-7.0 C1 2 12.0 1.00 22.6 124.4 30.5 154.9 15.8 87.1 12.1 99.2
-8.0 C1 1 6.0 1.00 11.3 135.7 15.3 151.0 7.9 95.0 13.8 108.8
-9.0 C1 1 6.0 1.00 11.3 147.0 15.3 162.3 7.9 102.9 15.6 118.5
-10.0 C1 1 6.0 1.00 11.3 158.3 15.3 173.6 7.9 110.8 17.3 128.1
-11.0 C1 1 6.0 1.00 11.3 169.6 15.3 184.9 7.9 118.8 19.0 137.8
-12.0 C1 1 6.0 1.00 11.3 181.0 15.3 196.2 7.9 126.7 20.7 147.4
-13.0 C1 1 6.0 1.00 11.3 192.3 15.3 207.5 7.9 134.6 22.5 157.0
-14.0 C1 1 6.0 1.00 11.3 203.6 15.3 218.8 7.9 142.5 24.2 166.7
-15.0 C1 1 6.0 1.00 11.3 214.9 15.3 230.2 7.9 150.4 25.9 176.3
-16.0 C1 1 6.0 1.00 11.3 226.2 15.3 241.5 7.9 158.3 27.6 186.0
-17.0 C1 1 6.0 1.00 11.3 237.5 15.3 252.8 7.9 166.3 29.4 195.6
-18.0 C1 1 6.0 1.00 11.3 248.8 15.3 264.1 7.9 174.2 31.1 205.3
-19.0 C1 3 18.0 1.00 33.9 282.7 45.8 328.5 23.8 197.9 32.8 230.8
-20.0 C1 3 18.0 1.00 33.9 316.7 45.8 362.5 23.8 221.7 34.6 256.2
-21.0 C2 8 48.0 0.77 69.7 386.3 122.1 508.5 48.8 270.4 36.3 306.7
-22.0 C2 8 48.0 0.77 69.7 456.0 122.1 578.2 48.8 319.2 38.0 357.2
-23.0 C2 21 126.0 0.50 118.8 574.8 320.6 895.4 83.1 402.3 39.7 442.1
-24.0 C2 21 126.0 0.50 118.8 693.5 320.6 1014.1 83.1 485.5 41.5 526.9
-25.0 C3 73 350.0 0.50 329.9 1023.4 1484.4 2507.8 230.9 716.4 43.2 759.6
-26.0 C3 100 350.0 0.50 329.9 1353.3 1484.4 2837.7 230.9 947.3 44.9 992.2
-27.0 C3 100 350.0 0.50 329.9 1683.1 1484.4 3167.5 230.9 1178.2 46.7 1224.8
-28.0 C3 100 350.0 0.50 329.9 2013.0 1484.4 3497.4 230.9 1409.1 48.4 1457.5
-29.0 C3 100 350.0 0.50 329.9 2342.9 1484.4 3827.3 230.9 1640.0 50.1 1690.1
-30.0 C3 100 350.0 0.50 329.9 2672.7 1484.4 4157.1 230.9 1870.9 51.8 1922.7
-31.0 C3 100 350.0 0.50 329.9 3002.6 1484.4 4487.0 230.9 2101.8 53.6 2155.4
-32.0 C3 100 350.0 0.50 329.9 3332.5 1484.4 4816.9 230.9 2332.7 55.3 2388.0
-33.0 GR 100 350.0 0.50 329.9 3662.3 1484.4 5146.7 230.9 2563.6 57.0 2620.6
-34.0 GR 100 350.0 0.50 329.9 3992.2 1484.4 5476.6 230.9 2794.5 58.7 2853.3
-35.0 GR 100 350.0 0.50 329.9 4322.1 1484.4 5806.5 230.9 3025.4 60.5 3085.9
-36.0 GR 100 350.0 0.50 329.9 4651.9 1484.4 6136.3 230.9 3256.4 62.2 3318.6
-37.0 GR 100 350.0 0.50 329.9 4981.8 1484.4 6466.2 230.9 3487.3 63.9 3551.2
-38.0 GR 100 350.0 0.50 329.9 5311.7 1484.4 6796.1 230.9 3718.2 65.7 3783.8
-39.0 GR 100 350.0 0.50 329.9 5641.5 1484.4 7125.9 230.9 3949.1 67.4 4016.5
-40.0 GR 100 350.0 0.50 329.9 5971.4 1484.4 7455.8 230.9 4180.0 69.1 4249.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-1 Diameter : 0.6 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 0 1000 2000 3000 4000 5000 6000 7000 8000
0 0 0
2 Friction Friction*
End Wp
1 Qu Qpu
CH
1
-5 -5 -5

2
1
1
-10 -10 -10

1
1

1
-15 -15 -15

1
1
Depth (m)

Depth (m)

Depth (m)
-20 3 -20 -20

8
CH
21

-25 73 -25 -25


100
CLAYSTONE
100
100
-30 -30 -30
100

100

100
-35 100 -35 -35

100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-2

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.40 m cu = 6.00 *N-SPT
Thick. : 0.075 m Compression
Perimeter : 1.26 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.13 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.08 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 3.8 3.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 7.5 7.5 4.8 12.3 5.3 5.3 0.8 6.1
-2.0 C1 1 6.0 1.00 7.5 15.1 5.8 20.9 5.3 10.6 1.7 12.2
-3.0 C1 1 6.0 1.00 7.5 22.6 6.8 29.4 5.3 15.8 2.5 18.4
-4.0 C1 1 6.0 1.00 7.5 30.2 7.8 37.9 5.3 21.1 3.4 24.5
-5.0 C1 1 6.0 1.00 7.5 37.7 6.8 44.5 5.3 26.4 4.2 30.6
-6.0 C1 1 6.0 1.00 7.5 45.2 6.8 52.0 5.3 31.7 5.1 36.7
-7.0 C1 1 6.0 1.00 7.5 52.8 6.8 59.6 5.3 36.9 5.9 42.8
-8.0 C1 1 6.0 1.00 7.5 60.3 6.8 67.1 5.3 42.2 6.7 49.0
-9.0 C1 1 6.0 1.00 7.5 67.9 6.8 74.6 5.3 47.5 7.6 55.1
-10.0 C1 1 6.0 1.00 7.5 75.4 6.8 82.2 5.3 52.8 8.4 61.2
-11.0 C1 1 6.0 1.00 7.5 82.9 6.8 89.7 5.3 58.1 9.3 67.3
-12.0 C1 1 6.0 1.00 7.5 90.5 6.8 97.3 5.3 63.3 10.1 73.4
-13.0 C1 2 12.0 1.00 15.1 105.6 13.6 119.1 10.6 73.9 11.0 84.8
-14.0 C1 2 12.0 1.00 15.1 120.6 13.6 134.2 10.6 84.4 11.8 96.2
-15.0 C1 2 12.0 1.00 15.1 135.7 13.6 149.3 10.6 95.0 12.6 107.6
-16.0 C2 26 156.0 0.50 98.0 233.7 176.4 410.2 68.6 163.6 13.5 177.1
-17.0 C2 26 156.0 0.50 98.0 331.8 176.4 508.2 68.6 232.2 14.3 246.5
-18.0 C2 14 84.0 0.50 52.8 384.5 95.0 479.5 36.9 269.2 15.2 284.3
-19.0 C2 14 84.0 0.50 52.8 437.3 95.0 532.3 36.9 306.1 16.0 322.1
-20.0 C3 86 350.0 0.50 219.9 657.2 527.8 1185.0 153.9 460.1 16.8 476.9
-21.0 C3 90 350.0 0.50 219.9 877.1 527.8 1404.9 153.9 614.0 17.7 631.7
-22.0 C3 50 300.0 0.50 188.5 1065.6 452.4 1518.0 131.9 745.9 18.5 764.5
-23.0 C3 50 300.0 0.50 188.5 1254.1 452.4 1706.5 131.9 877.9 19.4 897.3
-24.0 C3 82 350.0 0.50 219.9 1474.0 527.8 2001.8 153.9 1031.8 20.2 1052.0
-25.0 C3 82 350.0 0.50 219.9 1694.0 527.8 2221.7 153.9 1185.8 21.1 1206.8
-26.0 C3 82 350.0 0.50 219.9 1913.9 527.8 2441.7 153.9 1339.7 21.9 1361.6
-27.0 C3 52 312.0 0.50 196.0 2109.9 470.5 2580.4 137.2 1476.9 22.7 1499.7
-28.0 C3 26 156.0 0.50 98.0 2207.9 235.2 2443.2 68.6 1545.5 23.6 1569.1
-29.0 C3 26 156.0 0.50 98.0 2305.9 235.2 2541.2 68.6 1614.2 24.4 1638.6
-30.0 C3 68 350.0 0.50 219.9 2525.8 527.8 3053.6 153.9 1768.1 25.3 1793.4
-31.0 C3 68 350.0 0.50 219.9 2745.8 527.8 3273.5 153.9 1922.0 26.1 1948.1
-32.0 PT 1 6.0 1.00 7.5 2753.3 9.0 2762.3 5.3 1927.3 27.0 1954.3
-33.0 C4 40 240.0 0.50 150.8 2904.1 452.4 3356.5 105.6 2032.9 27.8 2060.7
-34.0 C4 100 350.0 0.50 219.9 3124.0 659.7 3783.7 153.9 2186.8 28.6 2215.4
-35.0 C4 100 350.0 0.50 219.9 3343.9 659.7 4003.7 153.9 2340.7 29.5 2370.2
-36.0 C4 100 350.0 0.50 219.9 3563.8 659.7 4223.6 153.9 2494.7 30.3 2525.0
-37.0 C4 100 350.0 0.50 219.9 3783.7 659.7 4443.5 153.9 2648.6 31.2 2679.8
-38.0 C4 100 350.0 0.50 219.9 4003.7 659.7 4663.4 153.9 2802.6 32.0 2834.6
-39.0 C4 100 350.0 0.50 219.9 4223.6 659.7 4883.3 153.9 2956.5 32.9 2989.3
-40.0 C4 100 350.0 0.50 219.9 4443.5 659.7 5103.2 153.9 3110.4 33.7 3144.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-2 Diameter : 0.4 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
2
1
1
-10 -10 -10
1

-15 2 -15 -15

26
CH
14
Depth (m)

Depth (m)

Depth (m)
-20 86 -20 -20
90

50
82
-25 CH -25 -25
82
52

26
-30 68 -30 -30

1
PT
40
100
-35 CLAYSTONE -35 -35
100

100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-2

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.45 m cu = 6.00 *N-SPT
Thick. : 0.080 m Compression
Perimeter : 1.41 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.16 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.09 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 4.8 4.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 8.5 8.5 6.0 14.5 5.9 5.9 1.0 7.0
-2.0 C1 1 6.0 1.00 8.5 17.0 7.3 24.3 5.9 11.9 2.0 13.9
-3.0 C1 1 6.0 1.00 8.5 25.4 8.6 34.0 5.9 17.8 3.1 20.9
-4.0 C1 1 6.0 1.00 8.5 33.9 9.8 43.8 5.9 23.8 4.1 27.8
-5.0 C1 1 6.0 1.00 8.5 42.4 8.6 51.0 5.9 29.7 5.1 34.8
-6.0 C1 1 6.0 1.00 8.5 50.9 8.6 59.5 5.9 35.6 6.1 41.8
-7.0 C1 1 6.0 1.00 8.5 59.4 8.6 68.0 5.9 41.6 7.2 48.7
-8.0 C1 1 6.0 1.00 8.5 67.9 8.6 76.4 5.9 47.5 8.2 55.7
-9.0 C1 1 6.0 1.00 8.5 76.3 8.6 84.9 5.9 53.4 9.2 62.6
-10.0 C1 1 6.0 1.00 8.5 84.8 8.6 93.4 5.9 59.4 10.2 69.6
-11.0 C1 1 6.0 1.00 8.5 93.3 8.6 101.9 5.9 65.3 11.3 76.6
-12.0 C1 1 6.0 1.00 8.5 101.8 8.6 110.4 5.9 71.3 12.3 83.5
-13.0 C1 2 12.0 1.00 17.0 118.8 17.2 135.9 11.9 83.1 13.3 96.4
-14.0 C1 2 12.0 1.00 17.0 135.7 17.2 152.9 11.9 95.0 14.3 109.3
-15.0 C1 2 12.0 1.00 17.0 152.7 17.2 169.9 11.9 106.9 15.3 122.2
-16.0 C2 26 156.0 0.50 110.3 263.0 223.3 486.2 77.2 184.1 16.4 200.4
-17.0 C2 26 156.0 0.50 110.3 373.2 223.3 596.5 77.2 261.3 17.4 278.6
-18.0 C2 14 84.0 0.50 59.4 432.6 120.2 552.8 41.6 302.8 18.4 321.2
-19.0 C2 14 84.0 0.50 59.4 492.0 120.2 612.2 41.6 344.4 19.4 363.8
-20.0 C3 86 350.0 0.50 247.4 739.4 668.0 1407.4 173.2 517.6 20.5 538.0
-21.0 C3 90 350.0 0.50 247.4 986.8 668.0 1654.8 173.2 690.7 21.5 712.2
-22.0 C3 50 300.0 0.50 212.1 1198.8 572.6 1771.4 148.4 839.2 22.5 861.7
-23.0 C3 50 300.0 0.50 212.1 1410.9 572.6 1983.4 148.4 987.6 23.5 1011.2
-24.0 C3 82 350.0 0.50 247.4 1658.3 668.0 2326.3 173.2 1160.8 24.5 1185.4
-25.0 C3 82 350.0 0.50 247.4 1905.7 668.0 2573.7 173.2 1334.0 25.6 1359.6
-26.0 C3 82 350.0 0.50 247.4 2153.1 668.0 2821.1 173.2 1507.2 26.6 1533.8
-27.0 C3 52 312.0 0.50 220.5 2373.6 595.5 2969.1 154.4 1661.5 27.6 1689.2
-28.0 C3 26 156.0 0.50 110.3 2483.9 297.7 2781.6 77.2 1738.7 28.6 1767.4
-29.0 C3 26 156.0 0.50 110.3 2594.2 297.7 2891.9 77.2 1815.9 29.7 1845.6
-30.0 C3 68 350.0 0.50 247.4 2841.6 668.0 3509.6 173.2 1989.1 30.7 2019.8
-31.0 C3 68 350.0 0.50 247.4 3089.0 668.0 3757.0 173.2 2162.3 31.7 2194.0
-32.0 PT 1 6.0 1.00 8.5 3097.5 11.5 3108.9 5.9 2168.2 32.7 2201.0
-33.0 C4 40 240.0 0.50 169.6 3267.1 572.6 3839.7 118.8 2287.0 33.8 2320.7
-34.0 C4 100 350.0 0.50 247.4 3514.5 835.0 4349.5 173.2 2460.2 34.8 2494.9
-35.0 C4 100 350.0 0.50 247.4 3761.9 835.0 4596.9 173.2 2633.3 35.8 2669.1
-36.0 C4 100 350.0 0.50 247.4 4009.3 835.0 4844.3 173.2 2806.5 36.8 2843.3
-37.0 C4 100 350.0 0.50 247.4 4256.7 835.0 5091.7 173.2 2979.7 37.8 3017.5
-38.0 C4 100 350.0 0.50 247.4 4504.1 835.0 5339.1 173.2 3152.9 38.9 3191.7
-39.0 C4 100 350.0 0.50 247.4 4751.5 835.0 5586.5 173.2 3326.1 39.9 3366.0
-40.0 C4 100 350.0 0.50 247.4 4998.9 835.0 5833.9 173.2 3499.2 40.9 3540.2
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-2 Diameter : 0.45 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
2
1
1
-10 -10 -10
1

-15 2 -15 -15

26
CH
14
Depth (m)

Depth (m)

Depth (m)
-20 86 -20 -20
90

50
82
-25 CH -25 -25
82
52

26
-30 68 -30 -30

1
PT
40
100
-35 CLAYSTONE -35 -35
100

100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-2

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.50 m cu = 6.00 *N-SPT
Thick. : 0.090 m Compression
Perimeter : 1.57 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.20 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.12 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 5.9 5.9 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 9.4 9.4 7.5 16.9 6.6 6.6 1.3 7.9
-2.0 C1 1 6.0 1.00 9.4 18.8 9.0 27.9 6.6 13.2 2.6 15.7
-3.0 C1 1 6.0 1.00 9.4 28.3 10.6 38.9 6.6 19.8 3.8 23.6
-4.0 C1 1 6.0 1.00 9.4 37.7 12.2 49.9 6.6 26.4 5.1 31.5
-5.0 C1 1 6.0 1.00 9.4 47.1 10.6 57.7 6.6 33.0 6.4 39.4
-6.0 C1 1 6.0 1.00 9.4 56.5 10.6 67.2 6.6 39.6 7.7 47.2
-7.0 C1 1 6.0 1.00 9.4 66.0 10.6 76.6 6.6 46.2 8.9 55.1
-8.0 C1 1 6.0 1.00 9.4 75.4 10.6 86.0 6.6 52.8 10.2 63.0
-9.0 C1 1 6.0 1.00 9.4 84.8 10.6 95.4 6.6 59.4 11.5 70.9
-10.0 C1 1 6.0 1.00 9.4 94.2 10.6 104.9 6.6 66.0 12.8 78.7
-11.0 C1 1 6.0 1.00 9.4 103.7 10.6 114.3 6.6 72.6 14.0 86.6
-12.0 C1 1 6.0 1.00 9.4 113.1 10.6 123.7 6.6 79.2 15.3 94.5
-13.0 C1 2 12.0 1.00 18.8 131.9 21.2 153.2 13.2 92.4 16.6 108.9
-14.0 C1 2 12.0 1.00 18.8 150.8 21.2 172.0 13.2 105.6 17.9 123.4
-15.0 C1 2 12.0 1.00 18.8 169.6 21.2 190.9 13.2 118.8 19.1 137.9
-16.0 C2 26 156.0 0.50 122.5 292.2 275.7 567.8 85.8 204.5 20.4 224.9
-17.0 C2 26 156.0 0.50 122.5 414.7 275.7 690.4 85.8 290.3 21.7 312.0
-18.0 C2 14 84.0 0.50 66.0 480.7 148.4 629.1 46.2 336.5 23.0 359.4
-19.0 C2 14 84.0 0.50 66.0 546.6 148.4 695.1 46.2 382.6 24.2 406.9
-20.0 C3 86 350.0 0.50 274.9 821.5 824.7 1646.2 192.4 575.1 25.5 600.6
-21.0 C3 90 350.0 0.50 274.9 1096.4 824.7 1921.1 192.4 767.5 26.8 794.3
-22.0 C3 50 300.0 0.50 235.6 1332.0 706.9 2038.9 164.9 932.4 28.1 960.5
-23.0 C3 50 300.0 0.50 235.6 1567.7 706.9 2274.5 164.9 1097.4 29.3 1126.7
-24.0 C3 82 350.0 0.50 274.9 1842.5 824.7 2667.2 192.4 1289.8 30.6 1320.4
-25.0 C3 82 350.0 0.50 274.9 2117.4 824.7 2942.1 192.4 1482.2 31.9 1514.1
-26.0 C3 82 350.0 0.50 274.9 2392.3 824.7 3217.0 192.4 1674.6 33.2 1707.8
-27.0 C3 52 312.0 0.50 245.0 2637.4 735.1 3372.5 171.5 1846.2 34.4 1880.6
-28.0 C3 26 156.0 0.50 122.5 2759.9 367.6 3127.5 85.8 1931.9 35.7 1967.6
-29.0 C3 26 156.0 0.50 122.5 2882.4 367.6 3250.0 85.8 2017.7 37.0 2054.7
-30.0 C3 68 350.0 0.50 274.9 3157.3 824.7 3982.0 192.4 2210.1 38.3 2248.4
-31.0 C3 68 350.0 0.50 274.9 3432.2 824.7 4256.9 192.4 2402.5 39.5 2442.1
-32.0 PT 1 6.0 1.00 9.4 3441.6 14.1 3455.8 6.6 2409.1 40.8 2449.9
-33.0 C4 40 240.0 0.50 188.5 3630.1 706.9 4337.0 131.9 2541.1 42.1 2583.2
-34.0 C4 100 350.0 0.50 274.9 3905.0 1030.8 4935.8 192.4 2733.5 43.4 2776.9
-35.0 C4 100 350.0 0.50 274.9 4179.9 1030.8 5210.7 192.4 2925.9 44.6 2970.6
-36.0 C4 100 350.0 0.50 274.9 4454.8 1030.8 5485.6 192.4 3118.4 45.9 3164.3
-37.0 C4 100 350.0 0.50 274.9 4729.7 1030.8 5760.5 192.4 3310.8 47.2 3358.0
-38.0 C4 100 350.0 0.50 274.9 5004.6 1030.8 6035.4 192.4 3503.2 48.5 3551.7
-39.0 C4 100 350.0 0.50 274.9 5279.5 1030.8 6310.3 192.4 3695.6 49.7 3745.4
-40.0 C4 100 350.0 0.50 274.9 5554.3 1030.8 6585.2 192.4 3888.0 51.0 3939.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-2 Diameter : 0.5 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
2
1
1
-10 -10 -10
1

-15 2 -15 -15

26
CH
14
Depth (m)

Depth (m)

Depth (m)
-20 86 -20 -20
90

50
82
-25 CH -25 -25
82
52

26
-30 68 -30 -30

1
PT
40
100
-35 CLAYSTONE -35 -35
100

100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-2

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.60 m cu = 6.00 *N-SPT
Thick. : 0.100 m Compression
Perimeter : 1.88 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.28 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.16 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 8.5 8.5 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 11.3 11.3 10.7 22.0 7.9 7.9 1.7 9.6
-2.0 C1 1 6.0 1.00 11.3 22.6 13.0 35.6 7.9 15.8 3.5 19.3
-3.0 C1 1 6.0 1.00 11.3 33.9 15.3 49.2 7.9 23.8 5.2 28.9
-4.0 C1 1 6.0 1.00 11.3 45.2 17.5 62.7 7.9 31.7 6.9 38.6
-5.0 C1 1 6.0 1.00 11.3 56.5 15.3 71.8 7.9 39.6 8.6 48.2
-6.0 C1 1 6.0 1.00 11.3 67.9 15.3 83.1 7.9 47.5 10.4 57.9
-7.0 C1 1 6.0 1.00 11.3 79.2 15.3 94.4 7.9 55.4 12.1 67.5
-8.0 C1 1 6.0 1.00 11.3 90.5 15.3 105.7 7.9 63.3 13.8 77.2
-9.0 C1 1 6.0 1.00 11.3 101.8 15.3 117.1 7.9 71.3 15.6 86.8
-10.0 C1 1 6.0 1.00 11.3 113.1 15.3 128.4 7.9 79.2 17.3 96.4
-11.0 C1 1 6.0 1.00 11.3 124.4 15.3 139.7 7.9 87.1 19.0 106.1
-12.0 C1 1 6.0 1.00 11.3 135.7 15.3 151.0 7.9 95.0 20.7 115.7
-13.0 C1 2 12.0 1.00 22.6 158.3 30.5 188.9 15.8 110.8 22.5 133.3
-14.0 C1 2 12.0 1.00 22.6 181.0 30.5 211.5 15.8 126.7 24.2 150.9
-15.0 C1 2 12.0 1.00 22.6 203.6 30.5 234.1 15.8 142.5 25.9 168.4
-16.0 C2 26 156.0 0.50 147.0 350.6 397.0 747.6 102.9 245.4 27.6 273.1
-17.0 C2 26 156.0 0.50 147.0 497.6 397.0 894.6 102.9 348.3 29.4 377.7
-18.0 C2 14 84.0 0.50 79.2 576.8 213.8 790.6 55.4 403.8 31.1 434.9
-19.0 C2 14 84.0 0.50 79.2 656.0 213.8 869.7 55.4 459.2 32.8 492.0
-20.0 C3 86 350.0 0.50 329.9 985.8 1187.5 2173.4 230.9 690.1 34.6 724.6
-21.0 C3 90 350.0 0.50 329.9 1315.7 1187.5 2503.2 230.9 921.0 36.3 957.3
-22.0 C3 50 300.0 0.50 282.7 1598.4 1017.9 2616.3 197.9 1118.9 38.0 1156.9
-23.0 C3 50 300.0 0.50 282.7 1881.2 1017.9 2899.1 197.9 1316.8 39.7 1356.6
-24.0 C3 82 350.0 0.50 329.9 2211.1 1187.5 3398.6 230.9 1547.7 41.5 1589.2
-25.0 C3 82 350.0 0.50 329.9 2540.9 1187.5 3728.4 230.9 1778.6 43.2 1821.8
-26.0 C3 82 350.0 0.50 329.9 2870.8 1187.5 4058.3 230.9 2009.6 44.9 2054.5
-27.0 C3 52 312.0 0.50 294.1 3164.8 1058.6 4223.4 205.8 2215.4 46.7 2262.0
-28.0 C3 26 156.0 0.50 147.0 3311.9 529.3 3841.2 102.9 2318.3 48.4 2366.7
-29.0 C3 26 156.0 0.50 147.0 3458.9 529.3 3988.2 102.9 2421.2 50.1 2471.3
-30.0 C3 68 350.0 0.50 329.9 3788.8 1187.5 4976.3 230.9 2652.1 51.8 2704.0
-31.0 C3 68 350.0 0.50 329.9 4118.6 1187.5 5306.2 230.9 2883.0 53.6 2936.6
-32.0 PT 1 6.0 1.00 11.3 4129.9 20.4 4150.3 7.9 2891.0 55.3 2946.3
-33.0 C4 40 240.0 0.50 226.2 4356.1 1017.9 5374.0 158.3 3049.3 57.0 3106.3
-34.0 C4 100 350.0 0.50 329.9 4686.0 1484.4 6170.4 230.9 3280.2 58.7 3339.0
-35.0 C4 100 350.0 0.50 329.9 5015.9 1484.4 6500.3 230.9 3511.1 60.5 3571.6
-36.0 C4 100 350.0 0.50 329.9 5345.7 1484.4 6830.1 230.9 3742.0 62.2 3804.2
-37.0 C4 100 350.0 0.50 329.9 5675.6 1484.4 7160.0 230.9 3972.9 63.9 4036.9
-38.0 C4 100 350.0 0.50 329.9 6005.5 1484.4 7489.9 230.9 4203.8 65.7 4269.5
-39.0 C4 100 350.0 0.50 329.9 6335.4 1484.4 7819.8 230.9 4434.7 67.4 4502.1
-40.0 C4 100 350.0 0.50 329.9 6665.2 1484.4 8149.6 230.9 4665.7 69.1 4734.8
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-2 Diameter : 0.6 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
2
1
1
-10 -10 -10
1

-15 2 -15 -15

26
CH
14
Depth (m)

Depth (m)

Depth (m)
-20 86 -20 -20
90

50
82
-25 CH -25 -25
82
52

26
-30 68 -30 -30

1
PT
40
100
-35 CLAYSTONE -35 -35
100

100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-3

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.40 m cu = 6.00 *N-SPT
Thick. : 0.075 m Compression
Perimeter : 1.26 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.13 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.08 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 3.8 3.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 7.5 7.5 4.8 12.3 5.3 5.3 0.8 6.1
-2.0 C1 1 6.0 1.00 7.5 15.1 5.8 20.9 5.3 10.6 1.7 12.2
-3.0 C1 1 6.0 1.00 7.5 22.6 6.8 29.4 5.3 15.8 2.5 18.4
-4.0 C1 2 12.0 1.00 15.1 37.7 15.6 53.3 10.6 26.4 3.4 29.8
-5.0 C1 2 12.0 1.00 15.1 52.8 13.6 66.4 10.6 36.9 4.2 41.2
-6.0 C1 1 6.0 1.00 7.5 60.3 6.8 67.1 5.3 42.2 5.1 47.3
-7.0 C1 1 6.0 1.00 7.5 67.9 6.8 74.6 5.3 47.5 5.9 53.4
-8.0 C1 1 6.0 1.00 7.5 75.4 6.8 82.2 5.3 52.8 6.7 59.5
-9.0 C1 2 12.0 1.00 15.1 90.5 13.6 104.0 10.6 63.3 7.6 70.9
-10.0 C1 2 12.0 1.00 15.1 105.6 13.6 119.1 10.6 73.9 8.4 82.3
-11.0 C1 2 12.0 1.00 15.1 120.6 13.6 134.2 10.6 84.4 9.3 93.7
-12.0 C1 2 12.0 1.00 15.1 135.7 13.6 149.3 10.6 95.0 10.1 105.1
-13.0 C1 5 30.0 0.95 35.8 171.5 33.9 205.5 25.1 120.1 11.0 131.0
-14.0 C2 12 72.0 0.53 48.0 219.5 81.4 300.9 33.6 153.6 11.8 165.4
-15.0 C2 12 72.0 0.53 48.0 267.4 81.4 348.9 33.6 187.2 12.6 199.8
-16.0 C3 100 350.0 0.50 219.9 487.4 659.7 1147.1 153.9 341.1 13.5 354.6
-17.0 C3 100 350.0 0.50 219.9 707.3 659.7 1367.0 153.9 495.1 14.3 509.4
-18.0 C3 100 350.0 0.50 219.9 927.2 659.7 1586.9 153.9 649.0 15.2 664.2
-19.0 C3 100 350.0 0.50 219.9 1147.1 659.7 1806.8 153.9 803.0 16.0 819.0
-20.0 C3 100 350.0 0.50 219.9 1367.0 659.7 2026.7 153.9 956.9 16.8 973.7
-21.0 C3 100 350.0 0.50 219.9 1586.9 659.7 2246.6 153.9 1110.8 17.7 1128.5
-22.0 C3 100 350.0 0.50 219.9 1806.8 659.7 2466.6 153.9 1264.8 18.5 1283.3
-23.0 C3 100 350.0 0.50 219.9 2026.7 659.7 2686.5 153.9 1418.7 19.4 1438.1
-24.0 C3 100 350.0 0.50 219.9 2246.6 659.7 2906.4 153.9 1572.7 20.2 1592.9
-25.0 C3 100 350.0 0.50 219.9 2466.6 659.7 3126.3 153.9 1726.6 21.1 1747.6
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-3 Diameter : 0.4 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
1
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

2
-10 -10 -10
Depth (m)

Depth (m)

Depth (m)
2

12 CH
-15 -15 -15

100
CLAYSTONE
100

100

-20 -20 -20


100

100

100

-25 100 -25 -25


Project : TANJUNG REDEP, BERAU
Ref. : BH-3

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.45 m cu = 6.00 *N-SPT
Thick. : 0.080 m Compression
Perimeter : 1.41 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.16 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.09 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 4.8 4.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 8.5 8.5 6.0 14.5 5.9 5.9 1.0 7.0
-2.0 C1 1 6.0 1.00 8.5 17.0 7.3 24.3 5.9 11.9 2.0 13.9
-3.0 C1 1 6.0 1.00 8.5 25.4 8.6 34.0 5.9 17.8 3.1 20.9
-4.0 C1 2 12.0 1.00 17.0 42.4 19.7 62.1 11.9 29.7 4.1 33.8
-5.0 C1 2 12.0 1.00 17.0 59.4 17.2 76.6 11.9 41.6 5.1 46.7
-6.0 C1 1 6.0 1.00 8.5 67.9 8.6 76.4 5.9 47.5 6.1 53.6
-7.0 C1 1 6.0 1.00 8.5 76.3 8.6 84.9 5.9 53.4 7.2 60.6
-8.0 C1 1 6.0 1.00 8.5 84.8 8.6 93.4 5.9 59.4 8.2 67.6
-9.0 C1 2 12.0 1.00 17.0 101.8 17.2 119.0 11.9 71.3 9.2 80.5
-10.0 C1 2 12.0 1.00 17.0 118.8 17.2 135.9 11.9 83.1 10.2 93.4
-11.0 C1 2 12.0 1.00 17.0 135.7 17.2 152.9 11.9 95.0 11.3 106.3
-12.0 C1 2 12.0 1.00 17.0 152.7 17.2 169.9 11.9 106.9 12.3 119.2
-13.0 C1 5 30.0 0.95 40.3 193.0 42.9 235.9 28.2 135.1 13.3 148.4
-14.0 C2 12 72.0 0.53 53.9 246.9 103.1 350.0 37.8 172.8 14.3 187.2
-15.0 C2 12 72.0 0.53 53.9 300.9 103.1 403.9 37.8 210.6 15.3 226.0
-16.0 C3 100 350.0 0.50 247.4 548.3 835.0 1383.2 173.2 383.8 16.4 400.2
-17.0 C3 100 350.0 0.50 247.4 795.7 835.0 1630.6 173.2 557.0 17.4 574.4
-18.0 C3 100 350.0 0.50 247.4 1043.1 835.0 1878.0 173.2 730.1 18.4 748.6
-19.0 C3 100 350.0 0.50 247.4 1290.5 835.0 2125.4 173.2 903.3 19.4 922.8
-20.0 C3 100 350.0 0.50 247.4 1537.9 835.0 2372.8 173.2 1076.5 20.5 1097.0
-21.0 C3 100 350.0 0.50 247.4 1785.3 835.0 2620.3 173.2 1249.7 21.5 1271.2
-22.0 C3 100 350.0 0.50 247.4 2032.7 835.0 2867.7 173.2 1422.9 22.5 1445.4
-23.0 C3 100 350.0 0.50 247.4 2280.1 835.0 3115.1 173.2 1596.1 23.5 1619.6
-24.0 C3 100 350.0 0.50 247.4 2527.5 835.0 3362.5 173.2 1769.2 24.5 1793.8
-25.0 C3 100 350.0 0.50 247.4 2774.9 835.0 3609.9 173.2 1942.4 25.6 1968.0
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-3 Diameter : 0.45 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
1
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

2
-10 -10 -10
Depth (m)

Depth (m)

Depth (m)
2

12 CH
-15 -15 -15

100
CLAYSTONE
100

100

-20 -20 -20


100

100

100

-25 100 -25 -25


Project : TANJUNG REDEP, BERAU
Ref. : BH-3

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.50 m cu = 6.00 *N-SPT
Thick. : 0.090 m Compression
Perimeter : 1.57 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.20 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.12 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 5.9 5.9 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 9.4 9.4 7.5 16.9 6.6 6.6 1.3 7.9
-2.0 C1 1 6.0 1.00 9.4 18.8 9.0 27.9 6.6 13.2 2.6 15.7
-3.0 C1 1 6.0 1.00 9.4 28.3 10.6 38.9 6.6 19.8 3.8 23.6
-4.0 C1 2 12.0 1.00 18.8 47.1 24.3 71.4 13.2 33.0 5.1 38.1
-5.0 C1 2 12.0 1.00 18.8 66.0 21.2 87.2 13.2 46.2 6.4 52.6
-6.0 C1 1 6.0 1.00 9.4 75.4 10.6 86.0 6.6 52.8 7.7 60.4
-7.0 C1 1 6.0 1.00 9.4 84.8 10.6 95.4 6.6 59.4 8.9 68.3
-8.0 C1 1 6.0 1.00 9.4 94.2 10.6 104.9 6.6 66.0 10.2 76.2
-9.0 C1 2 12.0 1.00 18.8 113.1 21.2 134.3 13.2 79.2 11.5 90.6
-10.0 C1 2 12.0 1.00 18.8 131.9 21.2 153.2 13.2 92.4 12.8 105.1
-11.0 C1 2 12.0 1.00 18.8 150.8 21.2 172.0 13.2 105.6 14.0 119.6
-12.0 C1 2 12.0 1.00 18.8 169.6 21.2 190.9 13.2 118.8 15.3 134.1
-13.0 C1 5 30.0 0.95 44.8 214.4 53.0 267.4 31.3 150.1 16.6 166.7
-14.0 C2 12 72.0 0.53 59.9 274.4 127.2 401.6 42.0 192.0 17.9 209.9
-15.0 C2 12 72.0 0.53 59.9 334.3 127.2 461.5 42.0 234.0 19.1 253.1
-16.0 C3 100 350.0 0.50 274.9 609.2 1030.8 1640.0 192.4 426.4 20.4 446.8
-17.0 C3 100 350.0 0.50 274.9 884.1 1030.8 1914.9 192.4 618.9 21.7 640.5
-18.0 C3 100 350.0 0.50 274.9 1159.0 1030.8 2189.8 192.4 811.3 23.0 834.2
-19.0 C3 100 350.0 0.50 274.9 1433.9 1030.8 2464.7 192.4 1003.7 24.2 1027.9
-20.0 C3 100 350.0 0.50 274.9 1708.7 1030.8 2739.6 192.4 1196.1 25.5 1221.6
-21.0 C3 100 350.0 0.50 274.9 1983.6 1030.8 3014.5 192.4 1388.5 26.8 1415.3
-22.0 C3 100 350.0 0.50 274.9 2258.5 1030.8 3289.4 192.4 1581.0 28.1 1609.0
-23.0 C3 100 350.0 0.50 274.9 2533.4 1030.8 3564.3 192.4 1773.4 29.3 1802.7
-24.0 C3 100 350.0 0.50 274.9 2808.3 1030.8 3839.1 192.4 1965.8 30.6 1996.4
-25.0 C3 100 350.0 0.50 274.9 3083.2 1030.8 4114.0 192.4 2158.2 31.9 2190.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-3 Diameter : 0.5 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
1
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

2
-10 -10 -10
Depth (m)

Depth (m)

Depth (m)
2

12 CH
-15 -15 -15

100
CLAYSTONE
100

100

-20 -20 -20


100

100

100

-25 100 -25 -25


Project : TANJUNG REDEP, BERAU
Ref. : BH-3

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.60 m cu = 6.00 *N-SPT
Thick. : 0.100 m Compression
Perimeter : 1.88 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.28 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.16 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 8.5 8.5 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 11.3 11.3 10.7 22.0 7.9 7.9 1.7 9.6
-2.0 C1 1 6.0 1.00 11.3 22.6 13.0 35.6 7.9 15.8 3.5 19.3
-3.0 C1 1 6.0 1.00 11.3 33.9 15.3 49.2 7.9 23.8 5.2 28.9
-4.0 C1 2 12.0 1.00 22.6 56.5 35.0 91.6 15.8 39.6 6.9 46.5
-5.0 C1 2 12.0 1.00 22.6 79.2 30.5 109.7 15.8 55.4 8.6 64.1
-6.0 C1 1 6.0 1.00 11.3 90.5 15.3 105.7 7.9 63.3 10.4 73.7
-7.0 C1 1 6.0 1.00 11.3 101.8 15.3 117.1 7.9 71.3 12.1 83.3
-8.0 C1 1 6.0 1.00 11.3 113.1 15.3 128.4 7.9 79.2 13.8 93.0
-9.0 C1 2 12.0 1.00 22.6 135.7 30.5 166.3 15.8 95.0 15.6 110.6
-10.0 C1 2 12.0 1.00 22.6 158.3 30.5 188.9 15.8 110.8 17.3 128.1
-11.0 C1 2 12.0 1.00 22.6 181.0 30.5 211.5 15.8 126.7 19.0 145.7
-12.0 C1 2 12.0 1.00 22.6 203.6 30.5 234.1 15.8 142.5 20.7 163.2
-13.0 C1 5 30.0 0.95 53.7 257.3 76.3 333.6 37.6 180.1 22.5 202.6
-14.0 C2 12 72.0 0.53 71.9 329.2 183.2 512.4 50.4 230.5 24.2 254.6
-15.0 C2 12 72.0 0.53 71.9 401.2 183.2 584.4 50.4 280.8 25.9 306.7
-16.0 C3 100 350.0 0.50 329.9 731.0 1484.4 2215.4 230.9 511.7 27.6 539.4
-17.0 C3 100 350.0 0.50 329.9 1060.9 1484.4 2545.3 230.9 742.6 29.4 772.0
-18.0 C3 100 350.0 0.50 329.9 1390.8 1484.4 2875.2 230.9 973.5 31.1 1004.6
-19.0 C3 100 350.0 0.50 329.9 1720.6 1484.4 3205.0 230.9 1204.4 32.8 1237.3
-20.0 C3 100 350.0 0.50 329.9 2050.5 1484.4 3534.9 230.9 1435.3 34.6 1469.9
-21.0 C3 100 350.0 0.50 329.9 2380.4 1484.4 3864.8 230.9 1666.3 36.3 1702.5
-22.0 C3 100 350.0 0.50 329.9 2710.2 1484.4 4194.6 230.9 1897.2 38.0 1935.2
-23.0 C3 100 350.0 0.50 329.9 3040.1 1484.4 4524.5 230.9 2128.1 39.7 2167.8
-24.0 C3 100 350.0 0.50 329.9 3370.0 1484.4 4854.4 230.9 2359.0 41.5 2400.4
-25.0 C3 100 350.0 0.50 329.9 3699.8 1484.4 5184.2 230.9 2589.9 43.2 2633.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-3 Diameter : 0.6 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
1
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

2
-10 -10 -10
Depth (m)

Depth (m)

Depth (m)
2

12 CH
-15 -15 -15

100
CLAYSTONE
100

100

-20 -20 -20


100

100

100

-25 100 -25 -25


Project : TANJUNG REDEP, BERAU
Ref. : BH-4

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.40 m cu = 6.00 *N-SPT
Thick. : 0.075 m Compression
Perimeter : 1.26 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.13 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.08 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 3.8 3.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 7.5 7.5 4.8 12.3 5.3 5.3 0.8 6.1
-2.0 C1 1 6.0 1.00 7.5 15.1 5.8 20.9 5.3 10.6 1.7 12.2
-3.0 C1 1 6.0 1.00 7.5 22.6 6.8 29.4 5.3 15.8 2.5 18.4
-4.0 C1 1 6.0 1.00 7.5 30.2 7.8 37.9 5.3 21.1 3.4 24.5
-5.0 C1 1 6.0 1.00 7.5 37.7 6.8 44.5 5.3 26.4 4.2 30.6
-6.0 C1 1 6.0 1.00 7.5 45.2 6.8 52.0 5.3 31.7 5.1 36.7
-7.0 C1 1 6.0 1.00 7.5 52.8 6.8 59.6 5.3 36.9 5.9 42.8
-8.0 C1 1 6.0 1.00 7.5 60.3 6.8 67.1 5.3 42.2 6.7 49.0
-9.0 C1 1 6.0 1.00 7.5 67.9 6.8 74.6 5.3 47.5 7.6 55.1
-10.0 C1 1 6.0 1.00 7.5 75.4 6.8 82.2 5.3 52.8 8.4 61.2
-11.0 C1 1 6.0 1.00 7.5 82.9 6.8 89.7 5.3 58.1 9.3 67.3
-12.0 C1 1 6.0 1.00 7.5 90.5 6.8 97.3 5.3 63.3 10.1 73.4
-13.0 C2 8 48.0 0.77 46.4 136.9 54.3 191.2 32.5 95.8 11.0 106.8
-14.0 C2 25 150.0 0.50 94.2 231.2 169.6 400.8 66.0 161.8 11.8 173.6
-15.0 C2 25 150.0 0.50 94.2 325.4 169.6 495.1 66.0 227.8 12.6 240.4
-16.0 C2 25 150.0 0.50 94.2 419.7 169.6 589.3 66.0 293.8 13.5 307.2
-17.0 C3 45 270.0 0.50 169.6 589.3 305.4 894.7 118.8 412.5 14.3 426.8
-18.0 C3 50 300.0 0.50 188.5 777.8 339.3 1117.1 131.9 544.5 15.2 559.6
-19.0 C3 55 330.0 0.50 207.3 985.2 373.2 1358.4 145.1 689.6 16.0 705.6
-20.0 C3 55 330.0 0.50 207.3 1192.5 373.2 1565.7 145.1 834.8 16.8 851.6
-21.0 C3 50 300.0 0.50 188.5 1381.0 339.3 1720.3 131.9 966.7 17.7 984.4
-22.0 C3 50 300.0 0.50 188.5 1569.5 339.3 1908.8 131.9 1098.6 18.5 1117.2
-23.0 C3 50 300.0 0.50 188.5 1758.0 339.3 2097.3 131.9 1230.6 19.4 1250.0
-24.0 C3 50 300.0 0.50 188.5 1946.5 339.3 2285.8 131.9 1362.5 20.2 1382.8
-25.0 C4 19 114.0 0.50 71.6 2018.1 128.9 2147.0 50.1 1412.7 21.1 1433.7
-26.0 C4 19 114.0 0.50 71.6 2089.7 128.9 2218.7 50.1 1462.8 21.9 1484.7
-27.0 C4 20 120.0 0.50 75.4 2165.1 135.7 2300.9 52.8 1515.6 22.7 1538.3
-28.0 C4 20 120.0 0.50 75.4 2240.5 135.7 2376.3 52.8 1568.4 23.6 1592.0
-29.0 PT 40 240.0 0.50 150.8 2391.3 452.4 2843.7 105.6 1673.9 24.4 1698.4
-30.0 PT 100 350.0 0.50 219.9 2611.2 659.7 3271.0 153.9 1827.9 25.3 1853.1
-31.0 PT 100 350.0 0.50 219.9 2831.2 659.7 3490.9 153.9 1981.8 26.1 2007.9
-32.0 PT 100 350.0 0.50 219.9 3051.1 659.7 3710.8 153.9 2135.8 27.0 2162.7
-33.0 PT 100 350.0 0.50 219.9 3271.0 659.7 3930.7 153.9 2289.7 27.8 2317.5
-34.0 C5 100 350.0 0.50 219.9 3490.9 659.7 4150.6 153.9 2443.6 28.6 2472.3
-35.0 C5 100 350.0 0.50 219.9 3710.8 659.7 4370.5 153.9 2597.6 29.5 2627.0
-36.0 C5 100 350.0 0.50 219.9 3930.7 659.7 4590.5 153.9 2751.5 30.3 2781.8
-37.0 C5 100 350.0 0.50 219.9 4150.6 659.7 4810.4 153.9 2905.4 31.2 2936.6
-38.0 C5 100 350.0 0.50 219.9 4370.5 659.7 5030.3 153.9 3059.4 32.0 3091.4
-39.0 C5 100 350.0 0.50 219.9 4590.5 659.7 5250.2 153.9 3213.3 32.9 3246.2
-40.0 C5 100 350.0 0.50 219.9 4810.4 659.7 5470.1 153.9 3367.3 33.7 3401.0
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-4 Diameter : 0.4 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
1
1
1
-10 -10 -10
1

-15 25 CH -15 -15

45
50
Depth (m)

Depth (m)

Depth (m)
-20 55 -20 -20
CH
50
50

50
-25 -25 -25
19
CH
20
40
-30 -30 -30
100
PT
100

100
-35 100 -35 -35
CLAYSTONE
100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-4

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.45 m cu = 6.00 *N-SPT
Thick. : 0.080 m Compression
Perimeter : 1.41 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.16 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.09 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 4.8 4.8 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 8.5 8.5 6.0 14.5 5.9 5.9 1.0 7.0
-2.0 C1 1 6.0 1.00 8.5 17.0 7.3 24.3 5.9 11.9 2.0 13.9
-3.0 C1 1 6.0 1.00 8.5 25.4 8.6 34.0 5.9 17.8 3.1 20.9
-4.0 C1 1 6.0 1.00 8.5 33.9 9.8 43.8 5.9 23.8 4.1 27.8
-5.0 C1 1 6.0 1.00 8.5 42.4 8.6 51.0 5.9 29.7 5.1 34.8
-6.0 C1 1 6.0 1.00 8.5 50.9 8.6 59.5 5.9 35.6 6.1 41.8
-7.0 C1 1 6.0 1.00 8.5 59.4 8.6 68.0 5.9 41.6 7.2 48.7
-8.0 C1 1 6.0 1.00 8.5 67.9 8.6 76.4 5.9 47.5 8.2 55.7
-9.0 C1 1 6.0 1.00 8.5 76.3 8.6 84.9 5.9 53.4 9.2 62.6
-10.0 C1 1 6.0 1.00 8.5 84.8 8.6 93.4 5.9 59.4 10.2 69.6
-11.0 C1 1 6.0 1.00 8.5 93.3 8.6 101.9 5.9 65.3 11.3 76.6
-12.0 C1 1 6.0 1.00 8.5 101.8 8.6 110.4 5.9 71.3 12.3 83.5
-13.0 C2 8 48.0 0.77 52.3 154.0 68.7 222.7 36.6 107.8 13.3 121.1
-14.0 C2 25 150.0 0.50 106.0 260.1 214.7 474.8 74.2 182.0 14.3 196.4
-15.0 C2 25 150.0 0.50 106.0 366.1 214.7 580.8 74.2 256.3 15.3 271.6
-16.0 C2 25 150.0 0.50 106.0 472.1 214.7 686.8 74.2 330.5 16.4 346.9
-17.0 C3 45 270.0 0.50 190.9 663.0 386.5 1049.5 133.6 464.1 17.4 481.5
-18.0 C3 50 300.0 0.50 212.1 875.0 429.4 1304.5 148.4 612.5 18.4 630.9
-19.0 C3 55 330.0 0.50 233.3 1108.3 472.4 1580.7 163.3 775.8 19.4 795.2
-20.0 C3 55 330.0 0.50 233.3 1341.6 472.4 1813.9 163.3 939.1 20.5 959.6
-21.0 C3 50 300.0 0.50 212.1 1553.6 429.4 1983.0 148.4 1087.5 21.5 1109.0
-22.0 C3 50 300.0 0.50 212.1 1765.7 429.4 2195.1 148.4 1236.0 22.5 1258.5
-23.0 C3 50 300.0 0.50 212.1 1977.7 429.4 2407.2 148.4 1384.4 23.5 1407.9
-24.0 C3 50 300.0 0.50 212.1 2189.8 429.4 2619.2 148.4 1532.9 24.5 1557.4
-25.0 C4 19 114.0 0.50 80.6 2270.4 163.2 2433.6 56.4 1589.3 25.6 1614.8
-26.0 C4 19 114.0 0.50 80.6 2351.0 163.2 2514.1 56.4 1645.7 26.6 1672.3
-27.0 C4 20 120.0 0.50 84.8 2435.8 171.8 2607.5 59.4 1705.0 27.6 1732.7
-28.0 C4 20 120.0 0.50 84.8 2520.6 171.8 2692.4 59.4 1764.4 28.6 1793.1
-29.0 PT 40 240.0 0.50 169.6 2690.3 572.6 3262.8 118.8 1883.2 29.7 1912.8
-30.0 PT 100 350.0 0.50 247.4 2937.7 835.0 3772.6 173.2 2056.4 30.7 2087.0
-31.0 PT 100 350.0 0.50 247.4 3185.1 835.0 4020.0 173.2 2229.5 31.7 2261.2
-32.0 PT 100 350.0 0.50 247.4 3432.5 835.0 4267.4 173.2 2402.7 32.7 2435.5
-33.0 PT 100 350.0 0.50 247.4 3679.9 835.0 4514.8 173.2 2575.9 33.8 2609.7
-34.0 C5 100 350.0 0.50 247.4 3927.3 835.0 4762.2 173.2 2749.1 34.8 2783.9
-35.0 C5 100 350.0 0.50 247.4 4174.7 835.0 5009.6 173.2 2922.3 35.8 2958.1
-36.0 C5 100 350.0 0.50 247.4 4422.1 835.0 5257.0 173.2 3095.4 36.8 3132.3
-37.0 C5 100 350.0 0.50 247.4 4669.5 835.0 5504.4 173.2 3268.6 37.8 3306.5
-38.0 C5 100 350.0 0.50 247.4 4916.9 835.0 5751.8 173.2 3441.8 38.9 3480.7
-39.0 C5 100 350.0 0.50 247.4 5164.3 835.0 5999.2 173.2 3615.0 39.9 3654.9
-40.0 C5 100 350.0 0.50 247.4 5411.7 835.0 6246.6 173.2 3788.2 40.9 3829.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-4 Diameter : 0.45 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
1
1
1
-10 -10 -10
1

-15 25 CH -15 -15

45
50
Depth (m)

Depth (m)

Depth (m)
-20 55 -20 -20
CH
50
50

50
-25 -25 -25
19
CH
20
40
-30 -30 -30
100
PT
100

100
-35 100 -35 -35
CLAYSTONE
100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-4

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.50 m cu = 6.00 *N-SPT
Thick. : 0.090 m Compression
Perimeter : 1.57 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.20 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.12 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 5.9 5.9 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 9.4 9.4 7.5 16.9 6.6 6.6 1.3 7.9
-2.0 C1 1 6.0 1.00 9.4 18.8 9.0 27.9 6.6 13.2 2.6 15.7
-3.0 C1 1 6.0 1.00 9.4 28.3 10.6 38.9 6.6 19.8 3.8 23.6
-4.0 C1 1 6.0 1.00 9.4 37.7 12.2 49.9 6.6 26.4 5.1 31.5
-5.0 C1 1 6.0 1.00 9.4 47.1 10.6 57.7 6.6 33.0 6.4 39.4
-6.0 C1 1 6.0 1.00 9.4 56.5 10.6 67.2 6.6 39.6 7.7 47.2
-7.0 C1 1 6.0 1.00 9.4 66.0 10.6 76.6 6.6 46.2 8.9 55.1
-8.0 C1 1 6.0 1.00 9.4 75.4 10.6 86.0 6.6 52.8 10.2 63.0
-9.0 C1 1 6.0 1.00 9.4 84.8 10.6 95.4 6.6 59.4 11.5 70.9
-10.0 C1 1 6.0 1.00 9.4 94.2 10.6 104.9 6.6 66.0 12.8 78.7
-11.0 C1 1 6.0 1.00 9.4 103.7 10.6 114.3 6.6 72.6 14.0 86.6
-12.0 C1 1 6.0 1.00 9.4 113.1 10.6 123.7 6.6 79.2 15.3 94.5
-13.0 C2 8 48.0 0.77 58.1 171.2 84.8 256.0 40.6 119.8 16.6 136.4
-14.0 C2 25 150.0 0.50 117.8 289.0 265.1 554.0 82.5 202.3 17.9 220.1
-15.0 C2 25 150.0 0.50 117.8 406.8 265.1 671.8 82.5 284.7 19.1 303.9
-16.0 C2 25 150.0 0.50 117.8 524.6 265.1 789.7 82.5 367.2 20.4 387.6
-17.0 C3 45 270.0 0.50 212.1 736.6 477.1 1213.8 148.4 515.6 21.7 537.3
-18.0 C3 50 300.0 0.50 235.6 972.3 530.1 1502.4 164.9 680.6 23.0 703.5
-19.0 C3 55 330.0 0.50 259.2 1231.4 583.2 1814.6 181.4 862.0 24.2 886.2
-20.0 C3 55 330.0 0.50 259.2 1490.6 583.2 2073.8 181.4 1043.4 25.5 1068.9
-21.0 C3 50 300.0 0.50 235.6 1726.2 530.1 2256.4 164.9 1208.4 26.8 1235.2
-22.0 C3 50 300.0 0.50 235.6 1961.9 530.1 2492.0 164.9 1373.3 28.1 1401.4
-23.0 C3 50 300.0 0.50 235.6 2197.5 530.1 2727.6 164.9 1538.2 29.3 1567.6
-24.0 C3 50 300.0 0.50 235.6 2433.1 530.1 2963.3 164.9 1703.2 30.6 1733.8
-25.0 C4 19 114.0 0.50 89.5 2522.6 201.5 2724.1 62.7 1765.8 31.9 1797.7
-26.0 C4 19 114.0 0.50 89.5 2612.2 201.5 2813.6 62.7 1828.5 33.2 1861.7
-27.0 C4 20 120.0 0.50 94.2 2706.4 212.1 2918.5 66.0 1894.5 34.4 1928.9
-28.0 C4 20 120.0 0.50 94.2 2800.7 212.1 3012.7 66.0 1960.5 35.7 1996.2
-29.0 PT 40 240.0 0.50 188.5 2989.2 706.9 3696.0 131.9 2092.4 37.0 2129.4
-30.0 PT 100 350.0 0.50 274.9 3264.1 1030.8 4294.9 192.4 2284.8 38.3 2323.1
-31.0 PT 100 350.0 0.50 274.9 3538.9 1030.8 4569.8 192.4 2477.3 39.5 2516.8
-32.0 PT 100 350.0 0.50 274.9 3813.8 1030.8 4844.7 192.4 2669.7 40.8 2710.5
-33.0 PT 100 350.0 0.50 274.9 4088.7 1030.8 5119.6 192.4 2862.1 42.1 2904.2
-34.0 C5 100 350.0 0.50 274.9 4363.6 1030.8 5394.5 192.4 3054.5 43.4 3097.9
-35.0 C5 100 350.0 0.50 274.9 4638.5 1030.8 5669.3 192.4 3247.0 44.6 3291.6
-36.0 C5 100 350.0 0.50 274.9 4913.4 1030.8 5944.2 192.4 3439.4 45.9 3485.3
-37.0 C5 100 350.0 0.50 274.9 5188.3 1030.8 6219.1 192.4 3631.8 47.2 3679.0
-38.0 C5 100 350.0 0.50 274.9 5463.2 1030.8 6494.0 192.4 3824.2 48.5 3872.7
-39.0 C5 100 350.0 0.50 274.9 5738.1 1030.8 6768.9 192.4 4016.6 49.7 4066.4
-40.0 C5 100 350.0 0.50 274.9 6013.0 1030.8 7043.8 192.4 4209.1 51.0 4260.1
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-4 Diameter : 0.5 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
1
1
1
-10 -10 -10
1

-15 25 CH -15 -15

45
50
Depth (m)

Depth (m)

Depth (m)
-20 55 -20 -20
CH
50
50

50
-25 -25 -25
19
CH
20
40
-30 -30 -30
100
PT
100

100
-35 100 -35 -35
CLAYSTONE
100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-4

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.60 m cu = 6.00 *N-SPT
Thick. : 0.100 m Compression
Perimeter : 1.88 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.28 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.16 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 1 6.0 1.00 0.0 0.0 8.5 8.5 0.0 0.0 0.0 0.0
-1.0 C1 1 6.0 1.00 11.3 11.3 10.7 22.0 7.9 7.9 1.7 9.6
-2.0 C1 1 6.0 1.00 11.3 22.6 13.0 35.6 7.9 15.8 3.5 19.3
-3.0 C1 1 6.0 1.00 11.3 33.9 15.3 49.2 7.9 23.8 5.2 28.9
-4.0 C1 1 6.0 1.00 11.3 45.2 17.5 62.7 7.9 31.7 6.9 38.6
-5.0 C1 1 6.0 1.00 11.3 56.5 15.3 71.8 7.9 39.6 8.6 48.2
-6.0 C1 1 6.0 1.00 11.3 67.9 15.3 83.1 7.9 47.5 10.4 57.9
-7.0 C1 1 6.0 1.00 11.3 79.2 15.3 94.4 7.9 55.4 12.1 67.5
-8.0 C1 1 6.0 1.00 11.3 90.5 15.3 105.7 7.9 63.3 13.8 77.2
-9.0 C1 1 6.0 1.00 11.3 101.8 15.3 117.1 7.9 71.3 15.6 86.8
-10.0 C1 1 6.0 1.00 11.3 113.1 15.3 128.4 7.9 79.2 17.3 96.4
-11.0 C1 1 6.0 1.00 11.3 124.4 15.3 139.7 7.9 87.1 19.0 106.1
-12.0 C1 1 6.0 1.00 11.3 135.7 15.3 151.0 7.9 95.0 20.7 115.7
-13.0 C2 8 48.0 0.77 69.7 205.4 122.1 327.5 48.8 143.8 22.5 166.2
-14.0 C2 25 150.0 0.50 141.4 346.8 381.7 728.5 99.0 242.7 24.2 266.9
-15.0 C2 25 150.0 0.50 141.4 488.1 381.7 869.8 99.0 341.7 25.9 367.6
-16.0 C2 25 150.0 0.50 141.4 629.5 381.7 1011.2 99.0 440.7 27.6 468.3
-17.0 C3 45 270.0 0.50 254.5 884.0 687.1 1571.0 178.1 618.8 29.4 648.2
-18.0 C3 50 300.0 0.50 282.7 1166.7 763.4 1930.1 197.9 816.7 31.1 847.8
-19.0 C3 55 330.0 0.50 311.0 1477.7 839.7 2317.5 217.7 1034.4 32.8 1067.2
-20.0 C3 55 330.0 0.50 311.0 1788.8 839.7 2628.5 217.7 1252.1 34.6 1286.7
-21.0 C3 50 300.0 0.50 282.7 2071.5 763.4 2834.9 197.9 1450.0 36.3 1486.3
-22.0 C3 50 300.0 0.50 282.7 2354.2 763.4 3117.6 197.9 1648.0 38.0 1686.0
-23.0 C3 50 300.0 0.50 282.7 2637.0 763.4 3400.4 197.9 1845.9 39.7 1885.6
-24.0 C3 50 300.0 0.50 282.7 2919.7 763.4 3683.1 197.9 2043.8 41.5 2085.3
-25.0 C4 19 114.0 0.50 107.4 3027.2 290.1 3317.3 75.2 2119.0 43.2 2162.2
-26.0 C4 19 114.0 0.50 107.4 3134.6 290.1 3424.7 75.2 2194.2 44.9 2239.2
-27.0 C4 20 120.0 0.50 113.1 3247.7 305.4 3553.1 79.2 2273.4 46.7 2320.1
-28.0 C4 20 120.0 0.50 113.1 3360.8 305.4 3666.2 79.2 2352.6 48.4 2400.9
-29.0 PT 40 240.0 0.50 226.2 3587.0 1017.9 4604.9 158.3 2510.9 50.1 2561.0
-30.0 PT 100 350.0 0.50 329.9 3916.9 1484.4 5401.3 230.9 2741.8 51.8 2793.6
-31.0 PT 100 350.0 0.50 329.9 4246.7 1484.4 5731.1 230.9 2972.7 53.6 3026.3
-32.0 PT 100 350.0 0.50 329.9 4576.6 1484.4 6061.0 230.9 3203.6 55.3 3258.9
-33.0 PT 100 350.0 0.50 329.9 4906.5 1484.4 6390.9 230.9 3434.5 57.0 3491.6
-34.0 C5 100 350.0 0.50 329.9 5236.3 1484.4 6720.7 230.9 3665.4 58.7 3724.2
-35.0 C5 100 350.0 0.50 329.9 5566.2 1484.4 7050.6 230.9 3896.3 60.5 3956.8
-36.0 C5 100 350.0 0.50 329.9 5896.1 1484.4 7380.5 230.9 4127.3 62.2 4189.5
-37.0 C5 100 350.0 0.50 329.9 6225.9 1484.4 7710.4 230.9 4358.2 63.9 4422.1
-38.0 C5 100 350.0 0.50 329.9 6555.8 1484.4 8040.2 230.9 4589.1 65.7 4654.7
-39.0 C5 100 350.0 0.50 329.9 6885.7 1484.4 8370.1 230.9 4820.0 67.4 4887.4
-40.0 C5 100 350.0 0.50 329.9 7215.6 1484.4 8700.0 230.9 5050.9 69.1 5120.0
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-4 Diameter : 0.6 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000
0 0 0
1 Friction Friction*
End Wp
1 Qu Qpu
1 CH
-5 -5 -5
1
1
1
-10 -10 -10
1

-15 25 CH -15 -15

45
50
Depth (m)

Depth (m)

Depth (m)
-20 55 -20 -20
CH
50
50

50
-25 -25 -25
19
CH
20
40
-30 -30 -30
100
PT
100

100
-35 100 -35 -35
CLAYSTONE
100
100

100
-40 -40 -40
Project : TANJUNG REDEP, BERAU
Ref. : BH-5

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.40 m cu = 6.00 *N-SPT
Thick. : 0.075 m Compression
Perimeter : 1.26 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.13 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.08 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 7.5 7.5 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 15.1 15.1 9.5 24.6 10.6 10.6 0.8 11.4
-2.0 C1 2 12.0 1.00 15.1 30.2 11.6 41.7 10.6 21.1 1.7 22.8
-3.0 C1 1 6.0 1.00 7.5 37.7 6.8 44.5 5.3 26.4 2.5 28.9
-4.0 C1 2 12.0 1.00 15.1 52.8 15.6 68.3 10.6 36.9 3.4 40.3
-5.0 C1 2 12.0 1.00 15.1 67.9 13.6 81.4 10.6 47.5 4.2 51.7
-6.0 C1 1 6.0 1.00 7.5 75.4 6.8 82.2 5.3 52.8 5.1 57.8
-7.0 C1 1 6.0 1.00 7.5 82.9 6.8 89.7 5.3 58.1 5.9 64.0
-8.0 C1 1 6.0 1.00 7.5 90.5 6.8 97.3 5.3 63.3 6.7 70.1
-9.0 C1 1 6.0 1.00 7.5 98.0 6.8 104.8 5.3 68.6 7.6 76.2
-10.0 C1 1 6.0 1.00 7.5 105.6 6.8 112.3 5.3 73.9 8.4 82.3
-11.0 C1 2 12.0 1.00 15.1 120.6 13.6 134.2 10.6 84.4 9.3 93.7
-12.0 C1 2 12.0 1.00 15.1 135.7 13.6 149.3 10.6 95.0 10.1 105.1
-13.0 C2 5 30.0 0.95 35.8 171.5 33.9 205.5 25.1 120.1 11.0 131.0
-14.0 C2 4 24.0 1.00 30.2 201.7 27.1 228.8 21.1 141.2 11.8 153.0
-15.0 C2 4 24.0 1.00 30.2 231.9 27.1 259.0 21.1 162.3 12.6 174.9
-16.0 C2 5 30.0 0.95 35.8 267.7 33.9 301.6 25.1 187.4 13.5 200.8
-17.0 C2 5 30.0 0.95 35.8 303.5 33.9 337.4 25.1 212.4 14.3 226.8
-18.0 C2 5 30.0 0.95 35.8 339.3 33.9 373.2 25.1 237.5 15.2 252.7
-19.0 C2 7 42.0 0.83 43.8 383.1 47.5 430.6 30.7 268.2 16.0 284.2
-20.0 C2 7 42.0 0.83 43.8 426.9 47.5 474.4 30.7 298.8 16.8 315.7
-21.0 C3 100 350.0 0.50 219.9 646.8 659.7 1306.6 153.9 452.8 17.7 470.5
-22.0 C3 100 350.0 0.50 219.9 866.7 659.7 1526.5 153.9 606.7 18.5 625.2
-23.0 C3 100 350.0 0.50 219.9 1086.6 659.7 1746.4 153.9 760.6 19.4 780.0
-24.0 C3 100 350.0 0.50 219.9 1306.6 659.7 1966.3 153.9 914.6 20.2 934.8
-25.0 C3 100 350.0 0.50 219.9 1526.5 659.7 2186.2 153.9 1068.5 21.1 1089.6
-26.0 C3 100 350.0 0.50 219.9 1746.4 659.7 2406.1 153.9 1222.5 21.9 1244.4
-27.0 C3 100 350.0 0.50 219.9 1966.3 659.7 2626.0 153.9 1376.4 22.7 1399.1
-28.0 C3 100 350.0 0.50 219.9 2186.2 659.7 2845.9 153.9 1530.3 23.6 1553.9
-29.0 C3 100 350.0 0.50 219.9 2406.1 659.7 3065.8 153.9 1684.3 24.4 1708.7
-30.0 C3 100 350.0 0.50 219.9 2626.0 659.7 3285.8 153.9 1838.2 25.3 1863.5
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-5 Diameter : 0.4 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
2
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

1
-10 -10 -10

5
Depth (m)

Depth (m)

Depth (m)
4
-15 -15 -15

5
CH
5

7
-20 -20 -20
100

100
CLAYSTONE
100
-25 -25 -25
100

100

100

-30 100 -30 -30


Project : TANJUNG REDEP, BERAU
Ref. : BH-5

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.45 m cu = 6.00 *N-SPT
Thick. : 0.080 m Compression
Perimeter : 1.41 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.16 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.09 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 9.5 9.5 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 17.0 17.0 12.1 29.0 11.9 11.9 1.0 12.9
-2.0 C1 2 12.0 1.00 17.0 33.9 14.6 48.5 11.9 23.8 2.0 25.8
-3.0 C1 1 6.0 1.00 8.5 42.4 8.6 51.0 5.9 29.7 3.1 32.8
-4.0 C1 2 12.0 1.00 17.0 59.4 19.7 79.1 11.9 41.6 4.1 45.7
-5.0 C1 2 12.0 1.00 17.0 76.3 17.2 93.5 11.9 53.4 5.1 58.6
-6.0 C1 1 6.0 1.00 8.5 84.8 8.6 93.4 5.9 59.4 6.1 65.5
-7.0 C1 1 6.0 1.00 8.5 93.3 8.6 101.9 5.9 65.3 7.2 72.5
-8.0 C1 1 6.0 1.00 8.5 101.8 8.6 110.4 5.9 71.3 8.2 79.4
-9.0 C1 1 6.0 1.00 8.5 110.3 8.6 118.9 5.9 77.2 9.2 86.4
-10.0 C1 1 6.0 1.00 8.5 118.8 8.6 127.3 5.9 83.1 10.2 93.4
-11.0 C1 2 12.0 1.00 17.0 135.7 17.2 152.9 11.9 95.0 11.3 106.3
-12.0 C1 2 12.0 1.00 17.0 152.7 17.2 169.9 11.9 106.9 12.3 119.2
-13.0 C2 5 30.0 0.95 40.3 193.0 42.9 235.9 28.2 135.1 13.3 148.4
-14.0 C2 4 24.0 1.00 33.9 226.9 34.4 261.3 23.8 158.8 14.3 173.2
-15.0 C2 4 24.0 1.00 33.9 260.8 34.4 295.2 23.8 182.6 15.3 197.9
-16.0 C2 5 30.0 0.95 40.3 301.1 42.9 344.1 28.2 210.8 16.4 227.2
-17.0 C2 5 30.0 0.95 40.3 341.4 42.9 384.4 28.2 239.0 17.4 256.4
-18.0 C2 5 30.0 0.95 40.3 381.7 42.9 424.6 28.2 267.2 18.4 285.6
-19.0 C2 7 42.0 0.83 49.3 431.0 60.1 491.1 34.5 301.7 19.4 321.1
-20.0 C2 7 42.0 0.83 49.3 480.3 60.1 540.4 34.5 336.2 20.5 356.6
-21.0 C3 100 350.0 0.50 247.4 727.7 835.0 1562.6 173.2 509.4 21.5 530.8
-22.0 C3 100 350.0 0.50 247.4 975.1 835.0 1810.0 173.2 682.5 22.5 705.1
-23.0 C3 100 350.0 0.50 247.4 1222.5 835.0 2057.4 173.2 855.7 23.5 879.3
-24.0 C3 100 350.0 0.50 247.4 1469.9 835.0 2304.8 173.2 1028.9 24.5 1053.5
-25.0 C3 100 350.0 0.50 247.4 1717.3 835.0 2552.3 173.2 1202.1 25.6 1227.7
-26.0 C3 100 350.0 0.50 247.4 1964.7 835.0 2799.7 173.2 1375.3 26.6 1401.9
-27.0 C3 100 350.0 0.50 247.4 2212.1 835.0 3047.1 173.2 1548.5 27.6 1576.1
-28.0 C3 100 350.0 0.50 247.4 2459.5 835.0 3294.5 173.2 1721.6 28.6 1750.3
-29.0 C3 100 350.0 0.50 247.4 2706.9 835.0 3541.9 173.2 1894.8 29.7 1924.5
-30.0 C3 100 350.0 0.50 247.4 2954.3 835.0 3789.3 173.2 2068.0 30.7 2098.7
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-5 Diameter : 0.45 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
2
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

1
-10 -10 -10

5
Depth (m)

Depth (m)

Depth (m)
4
-15 -15 -15

5
CH
5

7
-20 -20 -20
100

100
CLAYSTONE
100
-25 -25 -25
100

100

100

-30 100 -30 -30


Project : TANJUNG REDEP, BERAU
Ref. : BH-5

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.50 m cu = 6.00 *N-SPT
Thick. : 0.090 m Compression
Perimeter : 1.57 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.20 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.12 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 11.8 11.8 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 18.8 18.8 14.9 33.8 13.2 13.2 1.3 14.5
-2.0 C1 2 12.0 1.00 18.8 37.7 18.0 55.7 13.2 26.4 2.6 28.9
-3.0 C1 1 6.0 1.00 9.4 47.1 10.6 57.7 6.6 33.0 3.8 36.8
-4.0 C1 2 12.0 1.00 18.8 66.0 24.3 90.3 13.2 46.2 5.1 51.3
-5.0 C1 2 12.0 1.00 18.8 84.8 21.2 106.0 13.2 59.4 6.4 65.8
-6.0 C1 1 6.0 1.00 9.4 94.2 10.6 104.9 6.6 66.0 7.7 73.6
-7.0 C1 1 6.0 1.00 9.4 103.7 10.6 114.3 6.6 72.6 8.9 81.5
-8.0 C1 1 6.0 1.00 9.4 113.1 10.6 123.7 6.6 79.2 10.2 89.4
-9.0 C1 1 6.0 1.00 9.4 122.5 10.6 133.1 6.6 85.8 11.5 97.2
-10.0 C1 1 6.0 1.00 9.4 131.9 10.6 142.6 6.6 92.4 12.8 105.1
-11.0 C1 2 12.0 1.00 18.8 150.8 21.2 172.0 13.2 105.6 14.0 119.6
-12.0 C1 2 12.0 1.00 18.8 169.6 21.2 190.9 13.2 118.8 15.3 134.1
-13.0 C2 5 30.0 0.95 44.8 214.4 53.0 267.4 31.3 150.1 16.6 166.7
-14.0 C2 4 24.0 1.00 37.7 252.1 42.4 294.5 26.4 176.5 17.9 194.3
-15.0 C2 4 24.0 1.00 37.7 289.8 42.4 332.2 26.4 202.9 19.1 222.0
-16.0 C2 5 30.0 0.95 44.8 334.6 53.0 387.6 31.3 234.2 20.4 254.6
-17.0 C2 5 30.0 0.95 44.8 379.3 53.0 432.4 31.3 265.5 21.7 287.2
-18.0 C2 5 30.0 0.95 44.8 424.1 53.0 477.1 31.3 296.9 23.0 319.8
-19.0 C2 7 42.0 0.83 54.8 478.9 74.2 553.1 38.3 335.2 24.2 359.4
-20.0 C2 7 42.0 0.83 54.8 533.6 74.2 607.9 38.3 373.5 25.5 399.0
-21.0 C3 100 350.0 0.50 274.9 808.5 1030.8 1839.4 192.4 566.0 26.8 592.7
-22.0 C3 100 350.0 0.50 274.9 1083.4 1030.8 2114.2 192.4 758.4 28.1 786.4
-23.0 C3 100 350.0 0.50 274.9 1358.3 1030.8 2389.1 192.4 950.8 29.3 980.1
-24.0 C3 100 350.0 0.50 274.9 1633.2 1030.8 2664.0 192.4 1143.2 30.6 1173.8
-25.0 C3 100 350.0 0.50 274.9 1908.1 1030.8 2938.9 192.4 1335.7 31.9 1367.5
-26.0 C3 100 350.0 0.50 274.9 2183.0 1030.8 3213.8 192.4 1528.1 33.2 1561.2
-27.0 C3 100 350.0 0.50 274.9 2457.9 1030.8 3488.7 192.4 1720.5 34.4 1754.9
-28.0 C3 100 350.0 0.50 274.9 2732.8 1030.8 3763.6 192.4 1912.9 35.7 1948.6
-29.0 C3 100 350.0 0.50 274.9 3007.6 1030.8 4038.5 192.4 2105.3 37.0 2142.3
-30.0 C3 100 350.0 0.50 274.9 3282.5 1030.8 4313.4 192.4 2297.8 38.3 2336.0
Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-5 Diameter : 0.5 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
2
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

1
-10 -10 -10

5
Depth (m)

Depth (m)

Depth (m)
4
-15 -15 -15

5
CH
5

7
-20 -20 -20
100

100
CLAYSTONE
100
-25 -25 -25
100

100

100

-30 100 -30 -30


Project : TANJUNG REDEP, BERAU Pile type : PC PILE Calculation method: NOTE:
Ref. : BH-5 Diameter : 0.6 m Based on N-SPT

N-SPT Ult. Compression (kN) Ult. Pull Out (kN)


0 20 40 60 80 100 0 1000 2000 3000 4000 5000 6000 0 1000 2000 3000 4000 5000 6000
0 0 0
Friction Friction*
2
End Wp
Qu Qpu
1 CH

2
-5 -5 -5

1
-10 -10 -10

5
Depth (m)

Depth (m)

Depth (m)
4
-15 -15 -15

5
CH
5

7
-20 -20 -20
100

100
CLAYSTONE
100
-25 -25 -25
100

100

100

-30 100 -30 -30


Project : TANJUNG REDEP, BERAU
Ref. : BH-5

Pile Properties
Type : PC PILE Calc. Method : Based on N-SPT
Diameter : 0.60 m cu = 6.00 *N-SPT
Thick. : 0.100 m Compression
Perimeter : 1.88 m Skin Friction (Qs) = α*cu*perimeter*l (c-soil)
Areaout : 0.28 m2 = 2*N-SPT*perimeter*l (φ-soil)
Areapile : 0.16 m2 End Bearing (Qp) = Nc*cu*area (c-soil)
Unit weight : 21.00 kN = 40*N-SPTav*l/D (φ-soil)
≤ 400*N-SPTav
Ultimate (Qu) = Qs + Qp

Pull out
Skin Friction (Qs) = 0.7 *Qs (Compression)
Pile weight (Wp) = Areapile * Unit weight of Pile * l
Ultimate (Qpu) = Qs + Wp

Depth Soil Properties Compression Capacity (kN) Pull Out Capacity (kN)
(m) cu Friction Friction*
Layer N-SPT 2 α End Qu Wp Qpu
(kN/m ) Local Cumm. Local Cumm.
0.0 C1 2 12.0 1.00 0.0 0.0 17.0 17.0 0.0 0.0 0.0 0.0
-1.0 C1 2 12.0 1.00 22.6 22.6 21.5 44.1 15.8 15.8 1.7 17.6
-2.0 C1 2 12.0 1.00 22.6 45.2 26.0 71.2 15.8 31.7 3.5 35.1
-3.0 C1 1 6.0 1.00 11.3 56.5 15.3 71.8 7.9 39.6 5.2 44.8
-4.0 C1 2 12.0 1.00 22.6 79.2 35.0 114.2 15.8 55.4 6.9 62.3
-5.0 C1 2 12.0 1.00 22.6 101.8 30.5 132.3 15.8 71.3 8.6 79.9
-6.0 C1 1 6.0 1.00 11.3 113.1 15.3 128.4 7.9 79.2 10.4 89.5
-7.0 C1 1 6.0 1.00 11.3 124.4 15.3 139.7 7.9 87.1 12.1 99.2
-8.0 C1 1 6.0 1.00 11.3 135.7 15.3 151.0 7.9 95.0 13.8 108.8
-9.0 C1 1 6.0 1.00 11.3 147.0 15.3 162.3 7.9 102.9 15.6 118.5
-10.0 C1 1 6.0 1.00 11.3 158.3 15.3 173.6 7.9 110.8 17.3 128.1
-11.0 C1 2 12.0 1.00 22.6 181.0 30.5 211.5 15.8 126.7 19.0 145.7
-12.0 C1 2 12.0 1.00 22.6 203.6 30.5 234.1 15.8 142.5 20.7 163.2
-13.0 C2 5 30.0 0.95 53.7 257.3 76.3 333.6 37.6 180.1 22.5 202.6
-14.0 C2 4 24.0 1.00 45.2 302.5 61.1 363.6 31.7 211.8 24.2 236.0
-15.0 C2 4 24.0 1.00 45.2 347.8 61.1 408.8 31.7 243.4 25.9 269.4
-16.0 C2 5 30.0 0.95 53.7 401.5 76.3 477.8 37.6 281.0 27.6 308.7
-17.0 C2 5 30.0 0.95 53.7 455.2 76.3 531.6 37.6 318.7 29.4 348.0
-18.0 C2 5 30.0 0.95 53.7 508.9 76.3 585.3 37.6 356.3 31.1 387.4
-19.0 C2 7 42.0 0.83 65.7 574.6 106.9 681.5 46.0 402.3 32.8 435.1
-20.0 C2 7 42.0 0.83 65.7 640.4 106.9 747.2 46.0 448.3 34.6 482.8
-21.0 C3 100 350.0 0.50 329.9 970.2 1484.4 2454.6 230.9 679.2 36.3 715.4
-22.0 C3 100 350.0 0.50 329.9 1300.1 1484.4 2784.5 230.9 910.1 38.0 948.1
-23.0 C3 100 350.0 0.50 329.9 1630.0 1484.4 3114.4 230.9 1141.0 39.7 1180.7
-24.0 C3 100 350.0 0.50 329.9 1959.8 1484.4 3444.2 230.9 1371.9 41.5 1413.4
-25.0 C3 100 350.0 0.50 329.9 2289.7 1484.4 3774.1 230.9 1602.8 43.2 1646.0
-26.0 C3 100 350.0 0.50 329.9 2619.6 1484.4 4104.0 230.9 1833.7 44.9 1878.6
-27.0 C3 100 350.0 0.50 329.9 2949.4 1484.4 4433.8 230.9 2064.6 46.7 2111.3
-28.0 C3 100 350.0 0.50 329.9 3279.3 1484.4 4763.7 230.9 2295.5 48.4 2343.9
-29.0 C3 100 350.0 0.50 329.9 3609.2 1484.4 5093.6 230.9 2526.4 50.1 2576.5
-30.0 C3 100 350.0 0.50 329.9 3939.0 1484.4 5423.4 230.9 2757.3 51.8 2809.2