4

5 1 5

< 0O - 30 O

1
4
2
3
5

5
5

Keterangan :
o o
Konstruksi suspension dapat dipakai pada sudut lintasan jaringan 0 sampai 30

`
NO NOMOR SNAP NAMA MATERIAL VOLUME JUMLAH
1 0003120361 Suspension Bracket Buah 1
2 0003120094 Suspension Clamp Buah 1
3 0003040305 Stainless Steel Strap Meter 1,2
4 0003120079 Stopping Buckle Buah 2
5 Plastic Strap Buah 2

13 OKTOBER 2019
STANDAR KONSTRUKSI TIANG PENUMPU SUSPENSION-SS
Dig : NURUL ANNISA
A4s 01
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
1

1 2

4
5
5

Tiang

5
1
4

2
Konstruksi FDE pada
tiang awal Penghantar Netral
5

Penghantar
Fasa
5

7 4
7

3
6

DETAIL dalam pipa PVC


`
NO NOMOR SNAP NAMA MATERIAL VOLUME JUMLAH
1 0003120324 Tension Clamp Buah 3
2 000310006.. Strain Clamp Buah 3
3 0003040305 Stainless Steel Strap Meter 1,2
4 0003120079 Stopping Buckle Buah 4
5 0004190081 Plastic Strap Buah 3
6 Pelindung Mekanis PVC 2 mm Buah 1
7 Link 25 x 50 mm Buah 2
8 Insulating-Tip/nd.cover bs 4

13 OKTOBER 2019
KONSTRUKSI FIXED DEAD END (FDE) PADA TIANG AKHIR
Dig : NURUL ANNISA
A4s 02
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
3

1 6 2

Tiang
Penghantar Netral
6
1
5
6

4 5

Kabel Pilin

Penghantar
Fasa
5

9
7
DETAIL dalam pipa PVC

`
NO NOMOR SNAP NAMA MATERIAL VOLUME JUMLAH
1 0003120324 Tension Clamp Buah 1
2 000310006.. Strain Clamp Buah 1
3 0003040305 Stainless Steel Strap Meter 1,2
4 0003120079 Stopping Buckle Buah 2
5 0004190081 Plastic Strap Buah 2
6 Turn Buckle Buah 1
7 Pelindung Mekanis PVC 2 mm Centimeter 60
8 Link 25 x 50 mm Buah 2
9 Insulating-Tip/nd.cover

13 OKTOBER 2019
KONSTRUKSI TIANG AKHIR ADJUSTABLE DEAD END-ADE
Dig : NURUL ANNISA
A4s 03
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
4

1 o o
30 - 90
2

Tampak Atas

Tiang Penghantar Netral


Kabel Pilin

3
1
Kabel Pilin
4

2
2
5
5

`
NO NOMOR SNAP NAMA MATERIAL VOLUME JUMLAH
1 0003120324 Tension Bracket Buah 1
2 000310006.. Strain Clamp Buah 1
3 Stainless Steel Strap Meter 1,2
4 0003120079 Stopping Buckle Buah 2
5 0004190081 Plastic Strap Buah 2

13 OKTOBER 2019
KONSTRUKSI TIANG SUDUT BESAR
Dig : NURUL ANNISA
A4s 04
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
2 1

7 3
7
8

5
7 10
6

4 TAMPAK ATAS TIANG H

10
5

9
9

400
250

R = 15 x diameter Kabel

Tampak Samping Tampak Depan

No. NOMOR SAP NAMA MATERIAL VOLUME JUMLAH


1 0003120324 Tension Bracket Buah 1
2 000310006.. Strain Clamp Buah 1
3 0003040305 Stainless Steel Strip Meter 7
4 0003120079 Stopping Buckle Buah 7
5 0004190081 Plastic Strap Buah 2
6 0003120061 Link 25 x 50 Buah 5
7 0031201...... Heat Shrink Terminal Set 1
8 0031600...... Bimetal Join Sleeve + Shrink Cover Buah 4
9 00419025.... Pipa Galvanis 3 Inch (3 m) Buah 1
10 00419019.... Protective Plastic Tabe Meter 1

14 OKTOBER 2019
KONSTRUKSI TIANG AWAL 1 JURUSAN
Dig : NURUL ANNISA
A4s 05
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
3
3

2 1
3 3

TAMPAK DEPAN
6

1 1

3 3

1 4
3

TAMPAK ATAS
3

`
NO NOMOR SNAP NAMA MATERIAL VOLUME JUMLAH
1 Tension Clamp Buah 3
2 000310006.. Strain Clamp Buah 3
3 000304032.. Turn Buckle Buah 1
4 0003040305 Stainless Steel Strap Buah 4
5 0004190081 Plastic Strap Buah 3
6 00070103.. Compression Type Connector Buah 4
7 Stopping Buckle Buah 4

KONSTRUKSI PENCABANGAN KABEL PILIHAN TEGANGAN 14 OKTOBER 2019


O O
RENDAH PADA TIANG SUDUT BESAR ( 30 – 90 )
Dig : NURUL ANNISA
A4s 06
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
b

c e

g f

Elevation Side Elevation

Plan

No. Nama Material Kode Jumlah Satuan


1. Line Post Insulator 20 kV a 3 bh
2. Distribution Tie For AAAC b 3 nitr
3. Travers Tumpu TM 3 Pole UNP c 1 btg
4. Tupang Travers 36 x 6 650 mm d 2 btg
5. Moer Bolt M16 x 200 mm e 1 bh
6. Moer Bolt M16 x 250 mm f 1 bh
7. Moer Bolt M12 x 45 mm g 2 bh
8. Tiang Beton h 1 btg

14 OKTOBER 2019
SINGLE ARM POST INSULATOR ASSEMBLY
Dig : NURUL ANNISA
A4s 07
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
b

c
g

Elevation Side Elevation

o
> 45
d

Plan

No. Nama Material Kode Jumlah Satuan


1. Line Post Insulator 20 kV a 6 bh
2. Bare Bending Wire b 9 nitr
3. Travers Tumpu TM 3 Pole UNP c 2 btg
4. Double Arming Bolt M16 x 300 mm d 3 btg
5. Tupang Travers e 4 bh
6. Moer Bolt M16 x 250 mm f 1 bh
7. Moer Bolt M12 x 45 mm g 4 bh
8. Tiang Beton h 1 btg

14 OKTOBER 2019
DOUBLE ARM POST INSULATOR ASSEMBLY
Dig : NURUL ANNISA
A4s 08
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
c a

g h
f
e
e

Side Elevation Side Elevation

Plan

No. Nama Material Kode Jumlah Satuan


1. Isolator Tank 20 kV a 3 btg
2. Strain Clamp b 3 set
3. Travers Aspan TM 3 Pole UNP c 2 bh
4. Double Arming Bolt M16 x 300 mm d 5 bh
5. Moer Bolt M16 x 250 mm e 1 psg
6. Tupang Travers 36 x 6 650 mm f 4 psg
7. Moer Bolt M12 x 45 mm g 4 psg
8. Eye Bolt M16 h 3 bh
9. Tiang Beton h 1 mtr

15 OKTOBER 2019
DOUBLE ARM TERMINATION ASSEMBLY
Dig : NURUL ANNISA
A4s 09
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
j c j

c a

g b

f h

g
e

Elevation Side Elevation

Plan No. Nama Material Kode Jumlah Satuan


1. Isolator Tank 20 kV a 6 set
2. Strain Clamp b 6 bh
3. Travers Aspan TM 3 Pole UNP c 2 bh
4. Double Arming Bolt M16 x 300 mm d 5 bh
5. Moer Bolt M16 x 250 mm e 1 bh
6. Tupang Travers 36 x 6 650 mm f 4 bh
7. Moer Bolt M12 x 45 mm g 4 bh
8. Eye Bolt M16 h 6 bh
9. Tiang Beton i 1 btg
10. Line Post Insulator j 1 bh

15 OKTOBER 2019
SECTION POLE ASSEMBLY
Dig : NURUL ANNISA
A4s 10
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
c
a

Elevation Side Elevation

Plan
No. Nama Material Kode Jumlah Satuan
1. Isolator Tank 20 kV a 6 set
2. Strain Clamp b 6 bh
3. Travers Aspan TM 3 Pole UNP c 4 bh
4. Double Arming Bolt M16 x 300 mm d 10 bh
5. Moer Bolt M16 x 250 mm e 1 bh
6. Tupang Travers 36 x 6 650 mm f 8 bh
7. Moer Bolt M12 x 45 mm g 8 bh
8. Eye Bolt M16 h 6 bh
9. Tiang Beton i 1 btg

15 OKTOBER 2019
RIGHT ANGLE TERMINATION ASSEMBLY
Dig : NURUL ANNISA
A4s 11
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
3
1
`

DETAIL

No. Nama Material Bahan Material Volume Jumlah


1. Beugel Besi Streep Buah 1
2. Double Beugel Besi Streep Pasang 2
3. Sangga Tupang Tekan 10 x 10 cm Besi Siku Buah 1
4. Anti Climbing Device Besi Buah 1
5. Mur Baut ½” x 2" Besi Pasang 7
6. Plat Beton Bertulang Beton Bertulang Buah 1

15 OKTOBER 2019
TOPANG TEKAN (STRUT POLE)
Dig : NURUL ANNISA
A4s 12
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
1
2
250

4 Optional Pole Connection


30 o
1. Guy wire pole binder
Minimum 2. Turnbuckle
3. Preformed Termination (4)
4. Oval guy insulator (MV)
5. Guy wire (As specified)
Minimum
6. Stay rod (As specified)
1000 7. Guy wire foundation plate (As specified)
Minimum 2500

8. Concreate pad

3
30 o
Minimum 6

150mm
Maximum

8 8

15 OKTOBER 2019
GUY WIRE INSTALLATION FOR MV POLE
Dig : NURUL ANNISA
A4s 13
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
2
3 5 4 3

100
250

1 1
2
3
1000 Minimum
4
5.0m Minimum

1. Guy wire pole binder


2. Turnbuckle
3. Preformed Fermination(8)
5
4. Oval insulator (MV)
5. Guy wire 8
6. Stay rod
7. Guy wire foundation plate
8. 7m pole
9. Concrete pad 30 o
Minimum

1125 Widht of village road 1125


7
9

15 OKTOBER 2019
INDIRECT TYPE GUY WIRE INSTALLATION (FLYING GUY)
Dig : NURUL ANNISA
A4s 14
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
180

70
100
100
150
50
200

300

300

200

300

200

300

300

500

200

GL GL
300

363

17 OKTOBER 2019
CONCRETE POLE 13.0 m
Dig : NURUL ANNISA
A4s 15
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
15 OKTOBER 2019
DIAGRAM SATU GARIS GARDU PORTAL
Dig : NURUL ANNISA
A4s 16
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
1

1100
4
3 4 3

1200
6

1730
12 5 12

11 11
10
13

4000
6

900
2000
9

KETERANGAN :

1. PARALLEL GROOVE (LIVE – LINE – CONNECTOR) 7. ELEKTRODA BUMI TITIK NETRAL TRANSFORMATOR
2. BIMETAL AL – CU – LUG 8. ELEKTRODA BUMI DAN LA
3. LIGHTING ARRESTER – LA 9. ELEKTRODA BKT
4. FUSED CUT OUT – FCO 10. PIPA GALVANIS O 41 MCI
5. TRANSFORMATOR 11. PIPA GALVANIS O 5/8 MCI
6. PHB - TR 12. JARINGAN TR
13. RANJAU PANJAT

MONOGRAM KONSTRUKSI GARDU TIPE PORTAL 15 OKTOBER 2019

DENGAN PHB-TR 4 JURUSAN


Dig : NURUL ANNISA
A4s 17
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
120

1030 1450

200
940
1000
400

KETERANGAN :
- MATERIAL PANEL BESI PLAT TEBAL 3mm GALVANIZED
- SEKURANG – KURANGNYA IP 45
- TIPE 4 JURUSAN 800 AMPERE
- NFB 630 AM PADA SIRKIT MASUK
- NH/NT-FUSE 160 AMPERE PADA JURUSAN KELUAR
- BKT DIBUMIKAN

NFB

NH/NT

17 OKTOBER 2019
PERLENGKAPAN HUBUNG BAGI-TR GARDU PORTAL
Dig : NURUL ANNISA
A4s 18
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042
17 OKTOBER 2019
SINGLE ARM POST INSULATOR ASSEMBLY
Dig : NURUL ANNISA
A4s 19
POLITEKNIK NEGERI UJUNG PANDANG
Dip : Ir. H. HAMMA, M.T. 3B D3 LISTRIK / 321 17042