Abstrak
Kata kunci: rancang bangun lengan ayun, pengerjaan lengan ayun, pengerjaan
lengan ayun dengan metode pengecoran.
Abstract
This study was conducted to meet the needs of the Electric Motors
Ganesha 1.0 which is special section of swing arm as well as to know the
production process of swing arm Ganesha 1.0. (1) determining swing arm design,
(2) determining swing arm size, (3) swinging swing mall, (4) swinging swing arm
mall, (5) swing arm process, (6) process Mall opening with completed swing arm,
(7) finishing process, (8) small bearing mounting process (9) swing arm swing
operation. This study is the performance of the Design of Swing Arm of Ganesha
Electric Motors 1.0.
http://berbahasa https://dhikaputra.com
10/metode-penelitian- 2013).
research-and.html (diakses
Ardiatna, dkk. 2010. “model
tanggal 25 April 2016).
danjenispengecoran”.
Motor,Yogyakarta :