Anda di halaman 1dari 118

REVIEW DED - STRUCTURE

PEMBANGUNAN JALAN TOL SEMARANG - SOLO


SEKSI-5 : RUAS BOYOLALI - KARTOSURO
PAKET 5 : MOJOSONGO - BANYUDONO (STA 64+875 + 72+611)

STRUCTURAL DESIGN REPORT


JEMBATAN SUNGAI GRENJENG
STA 65+128.219
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

DAFTAR ISI

1 RANGKUMAN HASIL REVIEW JEMBATAN


2 GENERAL CONDITION / KONDISI UMUM
3 DESIGN CRITERIA / MATERIAL PROPERTIES
4 SECTION PROPERTIES
5 STRUCTURAL MODEL
6 RESPONSE SPECTRUM ANALYSIS
7 BRIDGE LOADING
8 PIER DESIGN CHECK
9 ABUTMENT DESIGN CHECK
10 FOUNDATION DESIGN CHECK
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

1. RANGKUMAN HASIL REVIEW STRUKTUR


REVIEW DED PEMBANGUNAN JALAN TOL SEMARANG – SOLO
SEKSI-5 : RUAS BOYOLALI – KARTOSURO
PAKET 5 : MOJOSONGO - BANYUDONO (STA 64+875 – 72+611)

JEMBATAN SUNGAI PUTIH


(STA 65+128.219)

A. KRITERIA DESAIN STRUKTUR

1. Pekerjaan DED ini dilakukan pada tahun 2009 dengan Kriteria Desain untuk Struktur mengacu pada
Peraturan Pembebanan Jembatan RSNI T-02-2005 dan Peraturan Gempa Jembatan SNI 2833 -2008.
Saat ini perencanaan jembatan seharusnya mengacu pada peraturan Pembebanan Jembatan terbaru
yaitu SNI 1725-2016 dan peraturan Gempa Jembatan terbaru RSNI 2833-2013. Sehubungan hal
tersebut maka Kriteria Desain dan Perencanaan Jembatan sebaiknya diperiksa apakah sudah
memenuhi persyaratan mengacu pada peraturan yang terbaru.

B. ANALISA DAN PERHITUNGAN STRUKTUR JEMBATAN

1. Laporan Analisa dan Perhitungan Struktur Jembatan tidak tersedia sehingga untuk review jembatan
dilakukan back calculation untuk memeriksa hasil DED struktur jembatan berdasarkan Peraturan
Pembebanan terbaru yaitu :
a. Peraturan Pembebanan Jembatan SNI 1725 – 2016
b. Peraturan Perencanaan Gempa Jembatan RSNI 2833 – 2013
2. Pemeriksaan terutama dilakukan untuk Struktur Bawah dan Pondasi dikarenakan untuk beban-beban
pada struktur atas tidak ada perubahan dari peraturan pembebanan yang lama.
3. Analisa struktur jembatan akibat Gempa dilakukan dengan metode Gaya gempa Statik Ekivalen dari
hasil penurunan Analisa Respon Spektrum berdasarkan Peta Gempa 1000 tahun dengan probabilitas
terlampaui 7% dalam 75 tahun. Kondisi tanah dikategorikan jenis Tanah Keras (SC) dan lokasi proyek
masuk ke dalam Zona Gempa dengan percepatan gempa sebagai berikut:
a. PGA = 0.3g
b. Periode 0.2 detik = 0.5g
c. Periode 1 detik = 0.3 g
d. Peak acceleration pada 0.2 detik adalah 0.6 dan koefisien gempa static equivalent Kh dengan R=4
adalah 0.15
4. Analisa back calculation struktur jembatan dilakukan dengan perhitungan menggunakan model
program SAP2000 dengan material, section properties dan dimensi-dimensi sesuai dengan DED yang
ada dengan mengaplikasikan pembebanan yang paling critical yaitu:
a. Beban pada kondisi Normal : DL+SDL+LL
b. Beban pada kondisi Gempa : DL+SDL+LL+EQ
5. Jembatan Sungai Grenjeng direncanakan dengan system :
a. Multi Span Bridge dengan 3 bentang, dengan panjang total jembatan 72.23m. Jembatan
merupakan jembatan Main Road melintas diatas Sungai Putih.
b. Struktur Atas merupaka composite PC-I Girder, bentang 20+30+20m, dengan system
artikulasi/sambungan Simple Supported Joint. Jarak ctc Girder 2.1m dengan mutu beton fc’ 42
MPa tidak memenuhi standard (jarak ctc max utk fc’ 42MPa adalah 1.85m). Sudut skew jembatan
= 90o
c. Pier merupakan tipe Dinding/Wall dengan tinggi P1=10.7m dan P2=10.0m. Lebar pierhead 12.2m
dan ukuran penampang kolom/wall adalah 8.2x1.2m2.
d. Pondasi Pier berupa pondasi tiang RC Bored Pile diameter 800mm dengan konfigurasi 4x4 = 16
pile dan kedalaman bored pile L=14m (P1 & P2). Ukuran pilecap/footing LxBxD =
9.2x9.2x(1.3+0.5)m3
e. Abutment berupa tipe Spill Through dengan ukuran tinggi 2.95m dan panjang pilecap 4.4m dan
lebar 12.55m.
f. Pondasi pada Abutment berupa pondasi tiang RC Bored Pile diameter 800mm dengan konfigurasi
2x4 pile dan kedalaman bor L=22m (A1) dan L=24m (A2).
6. Dari hasil analisa perhitungan maka dilakukan pemeriksaan struktur untuk Pier untuk memastikan
memadainya kekuatan dan stabilitas struktur terhadap pembebanan yang kritis.
7. Pemeriksaan Pondasi Pier dan Abutment dengan konfigurasi hasil DED untuk memastikan keamanan
terhadap reaksi dari sub-struktur dengan pembebanan yang kritis tersebut.

C. RANGKUMAN HASIL ANALISA STRUKTUR

1. Struktur Atas (PC-I Girder) dengan jarak ctc 2.1m menggunakan mutu beton fc’ 42MPa tidak
memenuhi standard yang ada. Sebaiknya digunakan fc’ 50 MPa.
2. Pier Jembatan
a. Hasil Analisa struktur pada struktur Pier menunjukkan bahwa komposisi dimensi dan penulangan
pada Pier sudah memadai.
b. Pemeriksaan Pilecap/footing dilakukan pada pier dengan menggunakan beban hasil reaksi tiang
yang terjadi. Hasil pemeriksaan penulangan pada Footing menunjukkan bahwa penulangan
sudah memadai namun mutu beton footing pada Pier disarankan untuk ditingkatkan dari 21MPa
menjadi 30MPa.
3. Abutment
a. Dari hasil pemeriksaan untuk abutment jembatan didapatkan dimensi dan penulangan abutment
sudah memadai
b. Hasil Analisa Pilecap/Footing Abutment menunjukkan bahwa penulangan utama dalam DED
sudah memadai.

4. Pondasi Tiang Bor (Bored Pile)


a. Konfigurasi pondasi tiang Bored Pile (dia.800mm) dan kedalaman tiang sudah memadai
b. Pemeriksaan RC Bored Pile akibat Gaya-gaya Dalam (Inner Forces) yang terjadi menyimpulkan
penulangan dari RC Bored Pile pada DED sudah memadai.

5. Kesimpulan :
a. Dimensi dan penulangan untuk Pier jembatan sudah memadai, namun mutu beton untuk
Footing Pier perlu ditingkatkan
b. Dimensi dan penulangan pada abutment sudah memadai

6. Revisi :
a. Revisi mutu beton untuk PC-I Girder dari 41 MPa menjadi 50 MPa untuk Girder dengan jarak ctc
> 1.85m
b. Revisi mutu beton untuk footing/pilecap Pier dari 20 MPa menjadi 30 MPa sehingga penulangan
Footing Pier tidak perlu direvisi lagi.
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

2. GENERAL CONDITION / KONDISI UMUM


GENERAL CONDITION OF BRIDGE

PROJECT : REVIEW DED PEMBANGUNAN JALAN TOL SEMARANG - SOLO


SEKSI-5 : RUAS BOYOLALI - KARTOSURO
STA : 65+128.219
Location / Name : Jembatan Sungai Grenjeng
Road Status : Main Toll Road
Bridge Type : Multispan Composite PC I Girder

BRIDGE DIMENSION

Lane Outter Inner Edge Barrier Median Sidewalk


Shoulder Shoulder Outter Inner Barrier

Width : 3.60 3.00 1.50 0.50 0.35 0.00 0.00


Number : 2.00 1.00 1.00 1.00 1.00 0.00 0.00
Total Width : 7.20 3.00 1.50 0.50 0.35 0.00 0.00

Carriageway Width = 11.7 m Girder End Type = Straight


Bridge Width = 12.55 m Bearing Distance = var m
Bridge Span = var m Girder Length = var m
o
Skew Angle = 90 1.570796327 Endblock Length = var m
Longitudinal Grade = 2.25'% Deck Slab Thickness = 0.22 m
Distance between Girders = 2.1 m Number of Segment = var
Number of Girder = 6 Girder Unit Weight = 25 kN/m3
Side Slab Cantilever = 1.025 m Reinf. Concrete Weight = 25 kN/m3
Girder Height = var m Asphalt Weight = 22 kN/m3
Water Weight = 10 kN/m3
Utility Load = 1.0 kN/m'

BRIDGE CROSS SECTION


Bridge Width
12.55

Carriageway Width
11.70 0.00 0.50

Sidewalk
Pavement thick = 50 mm t= 0 mm

2.10 1.025
BRIDGE CROSS SECTION IN SKEW DIRECTION

Bridge Width
12.55

Carriageway Width
11.70 0.00 0.50

Sidewalk

2.10 1.025
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

3. DESIGN CRITERIA / MATERIAL PROPERTIES


MATERIAL PROPERTIES
A. GIRDER
Concrete Class A
Compressive Strength at 28 days (Cylindrical Test) - fc' 50 MPa
Compressive Strength at Initial Condition (Cylindrical Test) - fc'i 40 MPa
Allowable Stress at Initial Prestress :
Extreme Fiber Stress in Compression 19 MPa
Extreme Fiber Stress in Tension 1.5 MPa
Allowable Stress at Service Load :
Extreme Fiber Stress in Compression 16.5 MPa
Extreme Fiber Stress in Tension 3 MPa
Allowable Shearing Stress 0.5 MPa
Allow Diagonal Tensile Stress at Service due to Shear Force 0.85 MPa
Unit Weight 25 kN/m3
Modulus Elasticity 33234 MPa
33234
B. PIER, DECK SLAB, CROSS BEAM, BORED PILE
Concrete Class B
Compressive Strength at 28 days (Cylindrical Test) - fc' 30 MPa
Allowable Compressive Stress due to Bending 12 MPa
Allowable Shearing Stress 0.4 MPa
Unit Weight 25 kN/m3
Modulus Elasticity 25743 MPa
25742.9602
C. ABUTMENT, RC PANEL, APPROACH SLAB AND BARRIER
Concrete Class C
Compressive Strength at 28 days (Cylindrical Test) 21 MPa
Allowable Compressive Stress due to Bending 8 MPa
Allowable Shearing Stress 0.35 MPa
Unit Weight 25 kN/m3
Modulus Elasticity 21538 MPa
21538.10577
D. PRESTRESSING STEEL
Type : PC-7 Wire Strand SWPR 7B T 12.7
Nominal Area
Breaking Stress (fpu) 1900 MPa
Yield Strength (fsy) 1600 MPa
Allowable Tensile Stress :
Jacking 1440 MPa
After Jacking 1330 MPa
Service Time 1140 MPa
Jacking Stress (fi) 1425 MPa
Relaxation
Modulus Elasticity 200000 MPa

E. STEEL REINFORCEMENT
Steel Quality BJTD - 40
Yield Strength (fy) 390 MPa
Allowable Tension Stress 173.5 MPa
Allowable Compression Stress 112 MPa
Modulus Elasticity 200000 MPa
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

4. SECTION PROPERTIES
Geometric properties of the cross-section
SPAN 20M DECK AT MID-SPAN

Parameter Value
A Cross sectional area 5.2 m^2
Av,y Conventional shearing area along Y-axis 1.47 m^2
Av,z Conventional shearing area along Z-axis 2.29 m^2
α Angle between Y-Z and U-V axes 89.977 deg
Iy Moment of inertia about axis parallel to Y passing through centroid 1.24 m^4
Iz Moment of inertia about axis parallel to Z passing through centroid 65.35 m^4
It Torsional moment of inertia (St. Venant) 0.1 m^4
Iw Warping constant 13.67 m^6
iy Radius of gyration about axis parallel to Y passing through centroid 0.49 m
iz Radius of gyration about axis parallel to Z passing through centroid 3.55 m
W u+ Max elastic modulus about U-axis 10.4 m^3
W u- Min elastic modulus about U-axis 10.43 m^3
W v+ Max elastic modulus about V-axis 1.23 m^3
W v- Min elastic modulus about V-axis 2.62 m^3
W pl,u Plastic modulus about U-axis 16.07 m^3
W pl,v Plastic modulus about V-axis 2.17 m^3
Iu Moment of inertia about U-axis 65.35 m^4
Iv Moment of inertia about V-axis 1.24 m^4
iu Radius of gyration about U-axis 3.55 m
iv Radius of gyration about V-axis 0.49 m
au+ Centroid to edge of compression zone along +ve U-axis 0.24 m
au- Centroid to edge of compression zone along -ve U-axis 0.5 m
av+ Centroid to edge of compression zone along +ve V-axis 2 m
av- Centroid to edge of compression zone along -ve V-axis 2.01 m
yM Distance to centroid along Y-axis -0.01 m
zM Distance to centroid along Z-axis -0 m
Sw Sectorial static moment 0 m^4
Yb Distance to shear centre along Y-axis -0.58 m
Zb Distance to shear centre along Z-axis 0.67 m
P Perimeter 46 m
Pi Internal perimeter 0 m
Pe External perimeter 46 m
I1 Moment of inertia about Y-axis 1.24 m^4
I2 Moment of inertia about Z-axis 65.35 m^4
I12 Product of inertia about the centroid -0.03 m^4
Ip Polar moment of inertia about centroid 66.59 m^4
ip Polar radius of gyration about centroid 3.58 m
Wp Polar elastic modulus about centroid 1.68 m

Overall dimensions 12.55x1.47 m


Geometric properties of the cross-section
SPAN 20M DECK AT END-SPAN

Parameter Value
A Cross sectional area 6.97 m^2
Av,y Conventional shearing area along Y-axis 3.05 m^2
Av,z Conventional shearing area along Z-axis 2.26 m^2
α Angle between Y-Z and U-V axes 89.978 deg
Iy Moment of inertia about axis parallel to Y passing through centroid 1.51 m^4
Iz Moment of inertia about axis parallel to Z passing through centroid 86.09 m^4
It Torsional moment of inertia (St. Venant) 0.36 m^4
Iw Warping constant 13.58 m^6
iy Radius of gyration about axis parallel to Y passing through centroid 0.47 m
iz Radius of gyration about axis parallel to Z passing through centroid 3.51 m
W u+ Max elastic modulus about U-axis 13.69 m^3
W u- Min elastic modulus about U-axis 13.75 m^3
W v+ Max elastic modulus about V-axis 1.67 m^3
W v- Min elastic modulus about V-axis 2.67 m^3
W pl,u Plastic modulus about U-axis 21.38 m^3
W pl,v Plastic modulus about V-axis 2.89 m^3
Iu Moment of inertia about U-axis 86.09 m^4
Iv Moment of inertia about V-axis 1.51 m^4
iu Radius of gyration about U-axis 3.51 m
iv Radius of gyration about V-axis 0.47 m
au+ Centroid to edge of compression zone along +ve U-axis 0.24 m
au- Centroid to edge of compression zone along -ve U-axis 0.38 m
av+ Centroid to edge of compression zone along +ve V-axis 1.96 m
av- Centroid to edge of compression zone along -ve V-axis 1.97 m
yM Distance to centroid along Y-axis -0.01 m
zM Distance to centroid along Z-axis -0 m
Sw Sectorial static moment 0 m^4
Yb Distance to shear centre along Y-axis -0.98 m
Zb Distance to shear centre along Z-axis 0.86 m
P Perimeter 42.93 m
Pi Internal perimeter 0 m
Pe External perimeter 42.93 m
I1 Moment of inertia about Y-axis 1.51 m^4
I2 Moment of inertia about Z-axis 86.09 m^4
I12 Product of inertia about the centroid -0.03 m^4
Ip Polar moment of inertia about centroid 87.6 m^4
ip Polar radius of gyration about centroid 3.54 m
Wp Polar elastic modulus about centroid 2.2 m

Overall dimensions 12.55x1.47 m


Geometric properties of the cross-section
SPAN 30M DECK AT MID SPAN

Parameter Value
A Cross sectional area 6.83 m^2
Av,y Conventional shearing area along Y-axis 2.32 m^2
Av,z Conventional shearing area along Z-axis 2.4 m^2
α Angle between Y-Z and U-V axes 89.97 deg
Iy Moment of inertia about axis parallel to Y passing through centroid 3.05 m^4
Iz Moment of inertia about axis parallel to Z passing through centroid 84.47 m^4
It Torsional moment of inertia (St. Venant) 0.22 m^4
Iw Warping constant 31.21 m^6
iy Radius of gyration about axis parallel to Y passing through centroid 0.67 m
iz Radius of gyration about axis parallel to Z passing through centroid 3.52 m
W u+ Max elastic modulus about U-axis 13.43 m^3
W u- Min elastic modulus about U-axis 13.49 m^3
W v+ Max elastic modulus about V-axis 2.49 m^3
W v- Min elastic modulus about V-axis 4.37 m^3
W pl,u Plastic modulus about U-axis 20.96 m^3
W pl,v Plastic modulus about V-axis 4.12 m^3
Iu Moment of inertia about U-axis 84.47 m^4
Iv Moment of inertia about V-axis 3.05 m^4
iu Radius of gyration about U-axis 3.52 m
iv Radius of gyration about V-axis 0.67 m
au+ Centroid to edge of compression zone along +ve U-axis 0.36 m
au- Centroid to edge of compression zone along -ve U-axis 0.64 m
av+ Centroid to edge of compression zone along +ve V-axis 1.97 m
av- Centroid to edge of compression zone along -ve V-axis 1.97 m
yM Distance to centroid along Y-axis -0.01 m
zM Distance to centroid along Z-axis -0 m
Sw Sectorial static moment 0 m^4
Yb Distance to shear centre along Y-axis -0.73 m
Zb Distance to shear centre along Z-axis 1.08 m
P Perimeter 50.41 m
Pi Internal perimeter 0 m
Pe External perimeter 50.41 m
I1 Moment of inertia about Y-axis 3.05 m^4
I2 Moment of inertia about Z-axis 84.47 m^4
I12 Product of inertia about the centroid -0.04 m^4
Ip Polar moment of inertia about centroid 87.52 m^4
ip Polar radius of gyration about centroid 3.58 m
Wp Polar elastic modulus about centroid 2.19 m

Overall dimensions 12.55x1.92 m


Geometric properties of the cross-section
SPAN 30M DECK AT END SPAN

Parameter Value
A Cross sectional area 10 m^2
Av,y Conventional shearing area along Y-axis 5.9 m^2
Av,z Conventional shearing area along Z-axis 2.4 m^2
α Angle between Y-Z and U-V axes 89.976 deg
Iy Moment of inertia about axis parallel to Y passing through centroid 3.59 m^4
Iz Moment of inertia about axis parallel to Z passing through centroid 121.58 m^4
It Torsional moment of inertia (St. Venant) 1 m^4
Iw Warping constant 27.35 m^6
iy Radius of gyration about axis parallel to Y passing through centroid 0.6 m
iz Radius of gyration about axis parallel to Z passing through centroid 3.49 m
W u+ Max elastic modulus about U-axis 19.32 m^3
W u- Min elastic modulus about U-axis 19.43 m^3
W v+ Max elastic modulus about V-axis 3.19 m^3
W v- Min elastic modulus about V-axis 4.48 m^3
W pl,u Plastic modulus about U-axis 30.46 m^3
W pl,v Plastic modulus about V-axis 5.29 m^3
Iu Moment of inertia about U-axis 121.58 m^4
Iv Moment of inertia about V-axis 3.59 m^4
iu Radius of gyration about U-axis 3.49 m
iv Radius of gyration about V-axis 0.6 m
au+ Centroid to edge of compression zone along +ve U-axis 0.32 m
au- Centroid to edge of compression zone along -ve U-axis 0.45 m
av+ Centroid to edge of compression zone along +ve V-axis 1.93 m
av- Centroid to edge of compression zone along -ve V-axis 1.94 m
yM Distance to centroid along Y-axis -0.01 m
zM Distance to centroid along Z-axis -0 m
Sw Sectorial static moment 0 m^4
Yb Distance to shear centre along Y-axis -1.07 m
Zb Distance to shear centre along Z-axis 1.28 m
P Perimeter 47.13 m
Pi Internal perimeter 0 m
Pe External perimeter 47.13 m
I1 Moment of inertia about Y-axis 3.59 m^4
I2 Moment of inertia about Z-axis 121.58 m^4
I12 Product of inertia about the centroid -0.05 m^4
Ip Polar moment of inertia about centroid 125.17 m^4
ip Polar radius of gyration about centroid 3.54 m
Wp Polar elastic modulus about centroid 3.11 m

Overall dimensions 12.55x1.92 m


STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

5. STRUCTURE MODEL
SAP2000 2-2-17 2:05:35

SAP2000 v14.0.0 - File:KBS SGRENJENG - Frame Section Properties - KN, m, C Units


SAP2000 2-2-17 2:06:13

SAP2000 v14.0.0 - File:KBS SGRENJENG - Frame Section Properties - KN, m, C Units


SAP2000 2-2-17 2:38:49

SAP2000 v14.0.0 - File:KBS SGRENJENG - Moment 3-3 Diagram (DEAD) - KN, m, C Units
SAP2000 2-2-17 2:39:29

SAP2000 v14.0.0 - File:KBS SGRENJENG - Shear Force 2-2 Diagram (DEAD) - KN, m, C Units
SAP2000 2-2-17 2:32:30

SAP2000 v14.0.0 - File:KBS SGRENJENG - Deformed Shape (DEAD) - KN, m, C Units


SAP2000 2-2-17 2:33:09

SAP2000 v14.0.0 - File:KBS SGRENJENG - Deformed Shape (EQ-X) - KN, m, C Units


STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

6. RESPONSE SPECTRUM ANALYSIS


& >= 2

! "! #

.@ ?@.2 > > A3 &2 2 ? 2? => >


.@ B .2 ;5 5 < 9 2
9 C B .2 ;5 5 <
# /

! "

# $ ! %
& ' $ ! () * % % ! + (, + - &#. " /
# $ ! / 0 * () * % % ! + (, + - " /,
# $ ! * () * % % ! + (, + - " /

. *! * - &#. " /
. *! / * - " /
. *! * - 1 " /,

* *
. " &#. &#. " / 2 " 3 " /(,
" " /; 2 " / 2 " / ,
" 1 " /:,

* 24 2 - " 5 . 232 6. " / 26 /


* 2 T Ts, " " /;
* 272 " 32 " /:, 3 2

* - " :/ 8$ 1 ! . !+

! - '9 " 3 " / ,

$ $ %&'

/(

/;

/,

/:

/
/ /, / /, / /, /
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

7. BRIDGE LOADINGS
Jembatan Sungai Grenjeng
LOADING - SPAN = 30 m

A. DEAD LOAD

1. Girder Selfweight
a. At Mid Span = 101.78 kN/m
b. At End Span = 180.91 kN/m

2. Slab Panel = 12.34 kN/m

70 mm

1410

3. Diaphragm
a. At Mid Span 3 x 57.6875 = 173.06 kN
distributed load = 6.46 kN/m

b. At End Span 2 x 131.5600 = 263.12 kN


(point load) 131.56 kN

4. Deck Slab 0.22x12.55x25 = 69.03 kN/m

5. Barrier (on both side edge) 2x0.4079x25 = 20.40 kN/m

B. SUPERIMPOSED LOAD

1. Asphalt (50mm) = 12.87 kN/m


2. Rain (10mm) = 11.7 kN/m
3. Utilities = 2 kN/m

C. LIVE LOAD

1. D-Load
a. UDL (2.75x4x9)+(0.7x4.5) = 102.15 kN/m
b. KEL (with impact) 11.7 x 68.6 = 802.62 kN 30.00
c. Brake 5% x D-Load = 6.41 kN/m

2. Truck Load

Front axle load 25 kN x 2


Rear axle load 112.5 kN x 2
Impact Factor (DLA) 1.3

223.36 223.36 49.64

11 4 5 10
30
Jembatan Sungai Grenjeng
LOADING - SPAN = 20 m

A. DEAD LOAD

1. Girder Selfweight
a. At Mid Span = 60.98 kN/m
b. At End Span = 105.23 kN/m

2. Slab Panel = 14.09 kN/m

70 mm

1610

3. Diaphragm
a. At Mid Span 3 x 54.6515 = 87.58 kN
distributed load = 5.12 kN/m

b. At End Span 2 x 128.2150 = 211.56 kN


(point load) 105.78 kN

4. Deck Slab 0.22x12.55x25 = 69.03 kN/m

5. Barrier (on both side edge) 2x0.4079x25 = 20.40 kN/m

B. SUPERIMPOSED LOAD

1. Asphalt (50mm) = 12.87 kN/m


2. Rain (10mm) = 11.7 kN/m
3. Utilities = 2 kN/m

C. LIVE LOAD

1. D-Load
a. UDL (2.75x4x9)+(0.7x4.5) = 102.15 kN/m
b. KEL (with impact) 11.7 x 68.6 = 802.62 kN 20.00
c. Brake 5% x D-Load = 7.06 kN/m

2. Truck Load

Front axle load 25 kN x 2


Rear axle load 112.5 kN x 2
Impact Factor (DLA) 1.3

223.36 223.36 49.64

11 4 5 10
30
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

8. PIER DESIGN
PIER COLUMN DESIGN
JEMBATAN SUNGAI GRENJENG
PIER COLUMN FORCES
TABLE: Element Forces - Frames
Frame Station OutputCase CaseType StepType P V2 V3 T M2 M3
Text m Text Text Text KN KN KN KN-m KN-m KN-m

COL P1 0 ULS:DL+SDL+LL Combination Max -11970 -108 0 0 0 -215


COL P1 6.69999 ULS:DL+SDL+LL Combination Max -9827 -92 0 0 0 727
COL P1 0 ULS:DL+SDL+LL Combination Min -18152 -544 0 0 0 -3610
COL P1 6.69999 ULS:DL+SDL+LL Combination Min -16009 -528 0 0 0 -289
COL P1 0 ULS:DL+SDL+LL+EQX Combination Max -12503 -1315 -360 0 -2733 -9179
COL P1 6.69999 ULS:DL+SDL+LL+EQX Combination Max -10362 -1052 -286 0 -566 -1111
COL P1 0 ULS:DL+SDL+LL+EQX Combination Min -15594 -1534 -360 0 -2733 -10877
COL P1 6.69999 ULS:DL+SDL+LL+EQX Combination Min -13453 -1270 -286 0 -566 -1619
COL P1 0 ULS:DL+SDL+LL+EQY Combination Max -12130 -470 -1202 0 -9110 -2904
COL P1 6.69999 ULS:DL+SDL+LL+EQY Combination Max -9988 -380 -954 0 -1887 80
COL P1 0 ULS:DL+SDL+LL+EQY Combination Min -15221 -688 -1202 0 -9110 -4602
COL P1 6.69999 ULS:DL+SDL+LL+EQY Combination Min -13079 -598 -954 0 -1887 -428

COL P2 0 ULS:DL+SDL+LL Combination Max -12611 432 0 0 0 3587


COL P2 6.2 ULS:DL+SDL+LL Combination Max -10629 432 0 0 0 916
COL P2 0 ULS:DL+SDL+LL Combination Min -19313 -31 0 0 0 -179
COL P2 6.2 ULS:DL+SDL+LL Combination Min -17330 -31 0 0 0 9
COL P2 0 ULS:DL+SDL+LL+EQX Combination Max -12177 1591 416 0 2956 11737
COL P2 6.2 ULS:DL+SDL+LL+EQX Combination Max -10194 1362 347 0 591 2587
COL P2 0 ULS:DL+SDL+LL+EQX Combination Min -15528 1359 416 0 2956 9854
COL P2 6.2 ULS:DL+SDL+LL+EQX Combination Min -13545 1130 347 0 591 2134
COL P2 0 ULS:DL+SDL+LL+EQY Combination Max -12556 622 1386 1 9853 4739
COL P2 6.2 ULS:DL+SDL+LL+EQY Combination Max -10574 553 1157 1 1969 1100
COL P2 0 ULS:DL+SDL+LL+EQY Combination Min -15907 390 1386 1 9853 2856
COL P2 6.2 ULS:DL+SDL+LL+EQY Combination Min -13924 322 1157 1 1969 647
P ( kN)
250000

(Pmax)

y
x

150000

8200 x 1200 mm

Code: ACI 318-02

Units: Metric
fs=0
Run axis: About X-axis

Run option: Investigation 50000 fs=0.5fy


Slenderness: Not considered

Column type: Structural

Bars: ASTM A615M 1


2
Date: 02/02/17

Time: 03:09:01 -50000


-40000-30000-20000-10000 10000200003000040000
Mx (kN-m)

-50000 (Pmin)

pcaColumn v3.63 - Licensed to: DSINC

File: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. ...\SGRENJENG-WALL PIER.col


Project: JEMBATAN SUNGAI GRENJENG
Column: PIER P1 Engineer: HW
f'c = 30 MPa fy = 390 MPa Ag = 9.84e+006 mm^2 150 #32 bars
Ec = 25743 MPa Es = 200000 MPa As = 122850 mm^2 Rho = 1.25%
fc = 25.5 MPa fc = 25.5 MPa Xo = 0 mm Iy = 1.18e+012 mm^4
e_u = 0.003 mm/mm Yo = 0 mm Iy = 5.51e+013 mm^4
Beta1 = 0.83245 Clear spacing = 83 mm Clear cover = 119 mm
Confinement: Spiral phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 1
03:08:46 Licensed to: DSINC SGRENJENG-WALL P

OOOOOOO OOOOO OOOOO OOOOO OOOOO OO


OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO
OO OO OO OOOOOOO OO OO OO OO
OOOOOOO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO
OO OOOOO OO OO OOOOO OOOOO OOOOO (TM)

========================================================================
Computer program for the Strength Design of Reinforced Concrete Sections
========================================================================

Licensee stated above acknowledges that Portland Cement Association


(PCA) is not and cannot be responsible for either the accuracy or
adequacy of the material supplied as input for processing by the
pcaColumn(tm) computer program. Furthermore, PCA neither makes any
warranty expressed nor implied with respect to the correctness of the
output prepared by the pcaColumn(tm) program.Although PCA has endeavored
to produce pcaColumn(tm) error free, the program is not and can't be
certified infallible. The final and only responsibility for analysis,
design and engineering documents is the licensees. Accordingly, PCA
disclaims all responsibility in contract, negligence or other tort for
any analysis, design or engineering documents prepared in connection
with the use of the pcaColumn(tm) program.
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 2
03:08:46 Licensed to: DSINC SGRENJENG-WALL P

General Information:
====================
File Name: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBATAN SUNGAI G
Project: JEMBATAN SUNGAI GRENJENG
Column: PIER P1 Engineer: HW
Code: ACI 318-02 Units: Metric

Run Option: Investigation Slenderness: Not considered


Run Axis: X-axis Column Type: Structural

Material Properties:
====================
f'c = 30 MPa fy = 390 MPa
Ec = 25743 MPa Es = 200000 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.83245

Section:
========
Rectangular: Width = 8200 mm Depth = 1200 mm

Gross section area, Ag = 9.84e+006 mm^2


Ix = 1.1808e+012 mm^4 Iy = 5.51368e+013 mm^4
Xo = 0 mm Yo = 0 mm

Reinforcement:
==============
Rebar Database: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581

Confinement: Spiral; #19 ties with #32 bars, #19 with larger bars.
phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7

Layout: Rectangular
Pattern: Sides Different (Cover to transverse reinforcement)
Total steel area, As = 122850 mm^2 at 1.25%
Top Bottom Left Right
-------- -------- -------- --------
Bars 70 #32 70 #32 5 #32 5 #32
Cover(mm) 100 100 100 100

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 19313.0 179.0 30567.4 170.767
2 12177.0 11737.0 27388.5 2.334

*** Program completed as requested! ***


PILECAP STRESS CONTROL
PILECAP STRESS CONTROL

A. Longitudinal Direction

1400
1500

100

b1
1000

fc' = 21 MPa
Allowable Stresses (Normal) : Allowable Stresses (E-quake) :
σcv-a = 8.30 Mpa (σch-a) σcv-a = 12.45 Mpa (σch-a)
τcv-a = 0.36 Mpa (τch-a) τcv-a = 0.54 Mpa (τch-a)

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 1236000 N σcv = 2.46 MPa < 8.3 (OK)
P-eq = 1638000 N σcv = 3.26 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 13167 N σch = 0.16 MPa < 8.3 (OK)
H-eq = 83111 N σch = 1.04 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1400 mm
P-norm = 1236000 N τcv = 0.13 MPa < 0.36 (OK)
P-eq = 1638000 N τcv = 0.17 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 13167 N τch = 0.01 MPa < 0.36 (OK)
H-eq = 83111 N τch = 0.06 MPa < 0.54 (OK)
B. Transversal Direction

1400
1500

100

b1
1000

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 1236000 N σcv = 2.46 MPa < 8.3 (OK)
P-eq = 1583000 N σcv = 3.15 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 13167 N σch = 0.16 MPa < 8.3 (OK)
H-eq = 77000 N σch = 0.96 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1400 mm
P-norm = 1236000 N τcv = 0.13 MPa < 0.36 (OK)
P-eq = 1583000 N τcv = 0.16 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 13167 N τch = 0.01 MPa < 0.36 (OK)
H-eq = 77000 N τch = 0.06 MPa < 0.54 (OK)
PILECAP DESIGN
PIER P1-S FOOTING DESIGN
PILECAP BOTTOM REINFORCEMENT - LONGITUDINAL DIRECTION
fc' = 30 Mpa Conc Dens = 2.50 t/m3
fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 9.20 m
PILECAP SECTION

1.00 a

b
0.50
1

1.30 2

O
P-3 P-2 P-1

0.00 0.00
2.90 1.00
3.90

PILE REACTION

Npile/row = 5 pile

Normal Equake
Row 3 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-max1 = 105.20 ton 142.70 ton
P-max2 = 105.20 ton 142.70 ton
o o
α= 0.00 0.00
P-1 = 526.00 ton 713.50 ton
Mo-1 = 1525.40 ton-m 2069.15 ton-m

P-tot = 526.00 ton 713.50 ton


M-tot = 1525.40 ton-m 2069.15 ton-m
SELFWEIGHT
A X Ax

1 0.98 1.30 1.27


2 5.07 1.95 9.89

6.05 11.15

Xo = 1.85 m
Self-W = 139.04 ton
Moment Mo = 256.54 ton-m

SOIL WEIGHT
A X Ax

a 3.90 1.95 7.61


b 0.98 2.60 2.54

4.88 10.14

Xo = 2.08 m
Soil-W = 80.73 ton
Moment Mo = 167.92 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.25 657.50 1906.75


2 Pile (Eq) 1.25 891.88 2586.44
3 Selfweight 1.30 180.75 333.50
4 Soil 1.30 104.95 218.29

Total 606.18 2034.64


6.06E+06 2.03E+10
Total in N-mm
N N-mm
MAIN REINFORCEMENT

1.70 m
As
0.10 m

9.20 m
d= 1684 mm
b= 9200 mm
β= 0.85
φ= 0.8
a= 52.31 mm

As req = 39336 mm2


Use Dia. = 32 mm (F1)
Numb req = 49 bars
Dist. S = 187.42 mm --> 100 mm (2 Layers D32-200)

Numb = 91 bars
As = 73187 mm2 > req --- OK !!

ρ act = 0.00472 ρ min A min


ρ min = 0.00359 --> < act --- OK !! 0.00359 55615
ρ max = 0.02690 --> > act --- OK !! 0.00288 44568

MOMENT CAPACITY CHECK


a= 121.67 mm
Mn = 3.7064E+10 Nmm = 3706.37 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 32 100 91 68
SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 6.06E+06 N
Vc = 1.42E+07 N
φVc = 9.92E+06 N > Vu --->No Stirrups required !!
Vs = 0.00E+00 N
Take S = 1200 mm (transverse dir.)
Av-req = 0 mm2
Use Dia. = 16 mm (F7)
Number req. = 2 bars
Av = 402 mm2 > req --- OK !!
Distance = 3900.0 mm take : 600 mm (longitudinal dir)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 14 7 600 1200

SKETCH OF REINFORCEMENT

F4 F2
D32-200 D32-200

F7
D16-600/1200
(Shear)

D32-200 (2 Layers)
D32-200 F1
F3

LONGITUDINAL DIRECTION
PILECAP BOTTOM REINFORCEMENT - TRANSVERSAL DIRECTION
fc' = 30 Mpa Conc Dens = 2.50 t/m3
fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 9.20 m
PILECAP SECTION

1.00 a

b
0.50
1

1.30 2

O
P-3 P-2 P-1

0.00 0.00
1.45 1.00
1.70

PILE REACTION

Npile/row = 4 pile

Normal Transient
Row 3 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-max1 = 105.20 ton 144.80 ton
P-max2 = 105.20 ton 144.80 ton
o o
α= 0.00 0.00
P-1 = 420.80 ton 579.20 ton
Mo-1 = 610.16 ton-m 839.84 ton-m

P-tot = 420.80 ton 579.20 ton


M-tot = 610.16 ton-m 839.84 ton-m
SELFWEIGHT
A X Ax

1.00 0.425 0.85 0.36


2.00 2.21 0.85 1.88

2.64 2.24

Xo = 0.85 m
Self-W = 60.61 ton
Moment Mo = 51.51 ton-m

SOIL WEIGHT
A X Ax

a 1.70 0.85 1.45


b 0.375 1.13 0.43

2.08 1.87

Xo = 0.90 m
Soil-W = 34.36 ton
Moment Mo = 30.97 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.25 526.00 762.70


2 Pile (Eq) 1.25 724.00 1049.80
3 Selfweight 1.30 78.79 66.97
4 Soil 1.30 44.67 40.26

Total 600.54 942.57


6.01E+06 9.43E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

1.70 m
As
0.10 m

9.20 m
d= 1684 mm
b= 9200 mm
β= 0.85
φ= 0.8
a= 24.03 mm

As req = 18069 mm2


Use Dia. = 32 mm (F3)
Numb req = 23 bars
Dist. S = 408.91 mm --> 200 mm

Numb = 46 bars
As = 36995 mm2 > req --- OK !!

ρ act = 0.00239 ρ min A min


ρ min = 0.00155 --> < act --- OK !! 0.00359 55615
ρ max = 0.02690 --> > act --- OK !! 0.00155 24086

MOMENT CAPACITY CHECK


a= 61.50 mm
Mn = 1.9083E+10 Nmm = 1908.27 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 32 200 46 168


SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 6.01E+06 N
Vc = 1.42E+07 N
φVc = 9.92E+06 N > Vu --->No Stirrups required !!

Take S = 600 mm (longitudinal dir)


Av-req = 0.000 mm2
Use Dia. = 16 mm (F7)
Number req. = 2 bars
Av = 402 mm2 > req --- OK !!
Distance = 4600 mm take : 1200 mm (transverse dir.)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 7 14 600 1200

SKETCH OF REINFORCEMENT

F2 F4
D32-200 D32-200

F7
D16-1200/600
(Shear)

D32-200
D32-200 (2 Layers) F3
F1

TRANSVERSAL DIRECTION
PILECAP TOP REINFORCEMENT - LONGITUDINAL DIRECTION

fc' = 30 Mpa Conc Dens = 2.5 t/m3


fy = 390 Mpa Soil Dens = 1.8 t/m3

Width B = 9.20 m
PILECAP SECTION

1.00 a

b
0.50
1

1.30 2

O
P-3 P-2 P-1

0.00 0.00
2.90 1.00
3.90

PILE REACTION

Npile/row = 5 pile

Normal Transient
Row 3 :
P-min1 = 0.00 ton 0.00 ton
P-min2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-min1 = 0.00 ton 0.00 ton
P-min2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-min1 = 104.00 ton 13.90 ton
P-min2 = 104.00 ton 13.90 ton
o o
α= 0.00 0.00
P-1 = 520.00 ton 69.50 ton
Mo-1 = 1508.00 ton-m 201.55 ton-m

P-tot = 520.00 ton 69.50 ton


M-tot = 1508.00 ton-m 201.55 ton-m
SELFWEIGHT
A X Ax

1.00 0.98 1.30 1.27


2.00 5.07 1.95 9.89

6.05 11.15

Xo = 1.85 m
Self-W = 139.04 ton
Moment Mo = 256.54 ton-m

SOIL WEIGHT
A X Ax

a 3.90 1.95 7.61


b 0.98 2.60 2.54

4.88 10.14

Xo = 2.08 m
Soil-W = 80.73 ton
Moment Mo = 167.92 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.00 520.00 1508.00


2 Pile (Eq) 1.00 69.50 201.55
3 Selfweight 1.30 180.75 333.50
4 Soil 1.30 104.95 218.29

Total -216.19 -350.25


2.16E+06 3.50E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

0.10 m
As
1.70 m

9.20 m
d= 1684 mm
b= 9200 mm
β= 0.85
φ= 0.8
a= 8.89 mm

As req = 6684 mm2


Use Dia. = 32 mm (F2)
Numb req = 9 bars
Dist. S = 1124.50 mm --> 200 mm

Numb = 46 bars
As = 36995.40 mm2 > req --- OK !!

ρ act = 0.00239 ρ min A min


ρ min = 0.00058 --> < act --- OK !! 0.00359 55615
ρ max = 0.02690 --> > act --- OK !! 0.00058 8910

MOMENT CAPACITY CHECK


a= 61.50 mm
Mn = 19082735242 Nmm = 1908.27 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Top 32 200 46 168


PILECAP TOP REINFORCEMENT - TRANSVERSAL DIRECTION

fc' = 30 Mpa Conc Dens = 2.5 t/m3


fy = 390 Mpa Soil Dens = 1.8 t/m3

Width B = 9.20 m
PILECAP SECTION

1.00 a

b
0.50
1

1.30 2

O
P-3 P-2 P-1

0.00 0.00
1.45 1.00
1.70

PILE REACTION

Npile/row = 4 pile

Normal Transient
Row 3 :
P-min1 = 0.00 ton 0.00 ton
P-min2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-min1 = 0.00 ton 0.00 ton
P-min2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-min1 = 104.00 ton 16.50 ton
P-min2 = 104.00 ton 16.50 ton
o o
α= 0.00 0.00
P-1 = 416.00 ton 66.00 ton
Mo-1 = 603.20 ton-m 95.70 ton-m

P-tot = 416.00 ton 66.00 ton


M-tot = 603.20 ton-m 95.70 ton-m
SELFWEIGHT
A X Ax

1.00 0.425 0.85 0.36


2.00 2.21 0.85 1.88

2.64 2.24

Xo = 0.85 m
Self-W = 60.61 ton
Moment Mo = 51.51 ton-m

SOIL WEIGHT
A X Ax

a 1.70 0.85 1.45


b 0.375 1.13 0.43

2.08 1.87

Xo = 0.90 m
Soil-W = 34.36 ton
Moment Mo = 30.97 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.00 416.00 603.20


2 Pile (Eq) 1.00 66.00 95.70
3 Selfweight 1.30 78.79 66.97
4 Soil 1.30 44.67 40.26

Total -57.46 -11.53


5.75E+05 1.15E+08
Total in N-mm
N N-mm
MAIN REINFORCEMENT

0.10 m
As
1.70 m

9.20 m
d= 1652 mm
b= 9200 mm
β= 0.85
φ= 0.8
a= 0.30 mm

As req = 224 mm2


Use Dia. = 32 mm (F4)
Numb req = 2 bars
Dist. S = 8996.00 mm --> 200 mm

Numb = 46 bars
As = 36995 mm2 > req --- OK !!

ρ act = 0.00243 ρ min A min


ρ min = 0.00002 --> < act --- OK !! 0.00359 54558
ρ max = 0.02690 --> > act --- OK !! 0.00002 298

MOMENT CAPACITY CHECK


a= 61.50 mm
Mn = 18713373217 Nmm = 1871.34 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Top 32 200 46 168


STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

9. ABUTMENT DESIGN
ABUTMENT A1
ABUTMENT A1 DESIGN

1. FOUNDATION ANALYSIS

PILE ARRANGEMENT : 2 x 4

0.30 0.30 2.55 RC Unit Weight = 25 kN/m3


0.00 Soil Unit Weight = 18 kN/m3
Span = 20 m
0.53 Bridge Width = 12.55 m
o
0.35 1.62 Skew = 90
2 1 Wall Width = 12.55 m
o
Longitudinal Grade = 0.00

Ka = 0.2972
1.25 Kea = 0.4073
Eq-coef = 0.15
1.09 a
3
2.95 0.00 Pile Diameter = 0.80 m
0.60 Distance from Edge = 1.00 m
Pile Row = 2 pile
Pile per Row = 4 pile
Pile dist. (transv) = 3.38 m
0.00 Pilecap Width = 12.55 m
b
5.00

1.33 4 1.33 5 0.30


0.30
O 0.30
4.30 0.40
1.00 2.40 1.00 Approach Slab
Carriageway Width = 11.70 m
4.40 Approach Slab Area = 1.67 m2
Approach Slab Weight = 487.01 kN
Reaction = 243.51 kN
SELFWEIGHT
No Area Xi Yi AxX AxY

1 0.49 1.70 2.14 0.83 1.04


2 0.33 1.40 1.88 0.46 0.61
3 0.00 1.55 1.33 0.00 0.00
4 5.85 2.20 0.67 12.87 3.89
5 0.83 1.40 2.42 1.17 2.01

∑ 7.50 15.32 7.56

center gravity X = 2.044 m Xo = -0.156 m (eccentricity from center of pilecap)


center gravity Y = 1.008 m Yo = 1.008 m (eccentricity from bottom of pilecap)

selfweight SW = 2334.7 kN
eccintricity moment MoSW = -559.3 kN-m
SUPERSTRUCTURE (REACTION)

Support Type : Moved Distance from center of bottom pilecap


Exterior Girder : 2 Xo = 0.00 m
Interior Girder : 4 Yo = -0.53 m

Reaction Reaction (kN) Total Load (kN) Moment


Exterior Interior V H (kN-m)

RDL 340.2 340.2 2041.0 0.0 0.0


SDL 46.3 46.3 278.0 0.0 0.0
RLL 246.0 246.0 1476.0 0.0 0.0

SOIL WEIGHT

Section A X Y AxX AxY


m m m3 m3

a 1.36 0.63 1.88 0.85 2.55


b 0.00 3.13 1.33 0.00 0.00

1.36 0.85 2.55

center gravity of soil X = 0.63m Xo = -1.58 m (eccentricity from center of pilecap)


center gravity of soil Y = 1.88m Yo = 1.88 m (eccentricity from bottom of pilecap)

W-soil = 307.8 kN
eccentricity moment Mo-soil = -484.8 kN-m
EARTH PRESSURE

Ep1 = 292.1 kN
Mo-Ep1 = 287.2 kN-m

Earthquake Time :
Ep1 = 400.4 kN
Mo-Ep1 = 393.7 kN-m

SURCHARGE LOAD PRESSURE

Surcharge = 10.0 kN/m2


Ep2 = 110.0 kN
Mo-Ep2 = 162.3 kN-m

EARTHQUAKE (Horizontal Force)

1 H-Rdl = 306.2 kN Mo-Eq1 = -162.3 kN-m


2 H-Rsdl = 41.7 kN Mo-Eq2 = -22.1 kN-m
3 H-Self W = 350.2 kN Mo-Eq3 = 353.1 kN-m
SUMMARY OF FORCES AT THE BOTTOM CENTER OF PILECAP

1. NORMAL TIME
Load LF V HX MoX
kN kN kN-m

RDL 1.00 2041 0 0


RSDL 1.00 278 0 0
RLL 1.00 1476 0 0
SELF 1.00 2335 -559
SOIL 1.00 308 -485
EP 1.00 292 287
SRCHG 1.00 110 162

6437 402 -595

2. EARTHQUAKE TIME - X DIR (LONGITUDINAL)


Load LF V HX MoZ
kN kN kN-m

RDL 1.00 2041 0 0


RSDL 1.00 278 0 0
RLL 0.50 738 0 0
SELF 1.00 2335 -559
SOIL 1.00 308 -485
EP 1.00 400 394
EQDL 1.00 348 -184
EQSELF 1.00 350 353

5699 1098 -482

3. EARTHQUAKE TIME - Z DIR (TRANSVERSAL)


Load LF V HZ MoX
kN kN kN-m

RDL 1.00 2041 0 0


RSDL 1.00 278 0 0
RLL 0.50 738 0 0
SELF 1.00 2335 0
SOIL 1.00 308 0
EP 1.00 0
EQDL 1.00 348 -184
EQSELF 1.00 350 353

5699 698 169


PILE RESULTS (PILE-GROUP PROGRAM) :
A. Maximum Reactions (Ton)-(m)
Pnormal = 80.47 Hnormal = 5.03 Mnormal = 7.43 OK!!
Peq Long = 71.24 Heq Long = 13.73 Meq Long = 6.02 OK!!
Peq Trans = 71.24 Heq Trans = 8.73 Meq Trans = 2.11 OK!!

B. Minimum Reactions (Ton)-(m)


Pnormal = 80.47 Hnormal = 5.03 Mnormal = 7.43 OK!!
Peq Long = 71.24 Heq Long = 13.73 Meq Long = 6.02 OK!!
Peq Trans = Heq Trans = 8.73 Meq Trans = 2.11 OK!!

Bearing Capacity
Ps Pe Pu Pallowable (ton)
(ton) (ton) (ton) FS = 2 FS = 3
299 251 550 275 183

Pullout Capacity
Ps Pe Pu Pallowable (ton)
(ton) (ton) (ton) FS = 2 FS = 3
299 0 299 150 100

CONCRETE PILE DESIGN


Load Factor = 2 P (kN) H (kN) M (kN-m)
Factored Pile Forces :
Normal : 1609 101 149
EQ-Long : 1425 275 120 2683
EQ-Trans : 1425 175 42 1167

Main Reinforcement : 16D25


Status : OK

P ( kN)
12000

(Pmax)

8000

4000 fs=0

fs=0.5fy

3 21

-1200 -800 -400 0 400 800 1200

Mx (k N-m)

(Pmin)

-4000
2. COEFFICIENT OF EARTH PRESSURE

Coefficient of active earth-pressure by Coulomb's theory

1) Permanent Time

cos2 (φ - θ)
Ka = 2
cos2 θ cos (θ + δ) 1 + sin (φ + δ) sin (δ - α)

where ; φ : Internal friction angle = 30 degree


δ : Angle of wall friction
For stability calculation = φ = 30 degree
For sectional calculation = φ/3 = 10 degree
α : Refer to the following figure = 0 degree
θ : Refer to the following figure = 0 degree

- For stability calculation +α


Ka = 0.2972
- For sectional calculation +θ
Ka = 0.3085 δ N
N
N---N : Vertical face toward the wall

2) Transient Time

cos2 (φ - θ0 - θ )
Kea =
cos θ0 cos2 θ cos (θ + θ0 + δ) (1+ Xa) 2

where ;
δ : Angle of wall friction
For stability calculation = φ/2 = 15 degree
For sectional calculation = 0 degree
θ 0 = tan -1 kh = 8.531 degree
kh = 0.15

sin (φ + δ) sin (φ - α - θ0)


Xa =
cos(θ + θ0 + δ) cos(θ - α)

- For stability calculation


Kea = 0.4073 ( Xa = 0.5313 )
- For sectional calculation
Kea = 0.4329 ( Xa = 0.4302 )
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - ABUTMENT A1

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.4
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 20 10.00 10.00 10 10 17.5 175 25 88 113 57 38
3 4 clay 15 7.50 7.50 7.5 17.5 15.0 150 44 75 119 60 40
4 5 clay 15 7.50 7.50 7.5 25 17.5 175 63 88 151 75 50
5 6 clay 20 10.00 10.00 10 35 22.5 225 88 113 201 101 67
6 7 clay 25 12.50 12.00 12 47 27.5 275 118 138 256 128 85
7 8 clay 30 15.00 12.00 12 59 35.0 350 148 176 324 162 108
8 9 clay 40 20.00 12.00 12 71 40.0 400 178 201 380 190 127
9 10 sandy 40 13.20 12.00 12 83 42.5 425 209 214 422 211 141
10 11 sandy 45 14.85 12.00 12 95 45.0 450 239 226 465 232 155
11 12 sandy 45 14.85 12.00 12 107 47.5 475 269 239 508 254 169
12 13 sandy 50 16.50 12.00 12 119 50.0 500 299 251 550 275 183
13 14 sandy 50 16.50 12.00 12 131 50.0 500 329 251 581 290 194
14 15 sandy 50 16.50 12.00 12 143 50.0 500 359 251 611 305 204
15 16 sandy 50 16.50 12.00 12 155 50.0 500 390 251 641 320 214
16 17 sandy 50 16.50 12.00 12 167 50.0 500 420 251 671 336 224
17 18 sandy 50 16.50 12.00 12 179 50.0 500 450 251 701 351 234
18 19 sandy 50 16.50 12.00 12 191 50.0 500 480 251 731 366 244
19 20 sandy 50 16.50 12.00 12 203 50.0 500 510 251 762 381 254
20 21 sandy 50 16.50 12.00 12 215 50.0 500 540 251 792 396 264
21 22 sandy 50 16.50 12.00 12 227 50.0 500 571 251 822 411 274
22 23 sandy 50 16.50 12.00 12 239 50.0 500 601 251 852 426 284
23 24 sandy 50 16.50 12.00 12 251 50.0 500 631 251 882 441 294
24 25 sandy 50 16.50 12.00 12 263 50.0 500 661 251 912 456 304
25 26 sandy 50 16.50 12.00 12 275 50.0 500 691 251 942 471 314
26 27 sandy 50 16.50 12.00 12 287 50.0 500 721 251 973 486 324
27 28 sandy 50 16.50 12.00 12 299 50.0 500 751 251 1003 501 334
28 29 sandy 50 16.50 12.00 12 311 50.0 500 782 251 1033 516 344
29 30 sandy 50 16.50 12.00 12 323 50.0 500 812 251 1063 532 354
50
5. PILECAP STRESS CONTROL

5.1. Longitudinal Direction

1230
1330

100

b1
1000

fc' = 20.00 MPa


Allowable Stresses (Normal) : Allowable Stresses (E-quake) :
σcv-a = 8.30 Mpa (σch-a) σcv-a = 12.45 Mpa (σch-a)
τcv-a = 0.36 Mpa (τch-a) τcv-a = 0.54 Mpa (τch-a)

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 804680 N σcv = 1.60 MPa < 8.3 (OK)
P-eq = 712430 N σcv = 1.42 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 50266 N σch = 0.63 MPa < 8.3 (OK)
H-eq = 137305 N σch = 1.72 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1230 mm
P-norm = 804680 N τcv = 0.10 MPa < 0.36 (OK)
P-eq = 712430 N τcv = 0.09 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 50266 N τch = 0.04 MPa < 0.36 (OK)
H-eq = 137305 N τch = 0.10 MPa < 0.54 (OK)
5.2. Transversal Direction

1230
1330

100

b1
1000

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 804680 N σcv = 1.60 MPa < 8.3 (OK)
P-eq = 712429.8438 N σcv = 1.42 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 50265.77614 N σch = 0.63 MPa < 8.3 (OK)
H-eq = 87255.9375 N σch = 1.09 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1230 mm
P-norm = 804679.8438 N τcv = 0.10 MPa < 0.36 (OK)
P-eq = 712429.8438 N τcv = 0.09 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 50265.77614 N τch = 0.04 MPa < 0.36 (OK)
H-eq = 87255.9375 N τch = 0.07 MPa < 0.54 (OK)
6. PILECAP DESIGN

PILECAP BOTTOM REINFORCEMENT

fc' = 20 Mpa Conc Dens = 2.50 t/m3


fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 12.55 m
PILECAP SECTION

0.00 a

1
1.33

O
Pc Pb Pa

0.00 0.00
1.55 1.00
2.55

PILE REACTION

Npile/row = 4 pile

Normal Equake
Row 3 :
Pc-max1 = 0.00 ton 0.00 ton
Pc-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
Pb-max1 = 0.00 ton 0.00 ton
Pb-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
Pb = 0.00 ton 0.00 ton
Mo-b = 0.00 ton-m 0.00 ton-m

Row 1 :
Pa-max1 = 80.47 ton 71.24 ton
Pa-max2 = 80.47 ton 71.24 ton
o o
α= 0.00 0.00
Pa = 321.87 ton 284.97 ton
Mo-a = 498.90 ton-m 441.71 ton-m

P-tot = 321.87 ton 284.97 ton


M-tot = 498.90 ton-m 441.71 ton-m
SELFWEIGHT
Segment Area (m2) X (m) Ax

1 3.39 1.28 4.32

3.39 4.32

Xo = 1.28 m
Self-W = 106.41 ton
Moment Mo = 135.67 ton-m

SOIL WEIGHT
A X Ax

a 0.00 1.28 0.00

0.00 0.00

Xo = 0.00 m
Soil-W = 0.00 ton
Moment Mo = 0.00 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.50 482.81 748.35


2 Pile (Eq) 1.50 427.46 662.56
3 Selfweight 1.00 106.41 135.67
4 Soil 1.00 0.00 0.00

Total 376.40 612.68


3.76E+06 6.13E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

1.23 m
As
0.10 m

12.55 m
d= 1192.5 mm
b= 12550 mm
β= 0.85
φ= 0.8
a= 24.33 mm

As req = 16637 mm2


Use Dia. = 25 mm (A1)
Numb req = 34 bars
Dist. S = 374 mm --> 150 mm

Numb = 84 bars
As = 41233 mm2 > req --- OK !!

ρ act = 0.00276 ρ min A min


ρ min = 0.00148 --> < act --- OK !! 0.00359 53724
ρ max = 0.01794 --> > act --- OK !! 0.00148 22177

MOMENT CAPACITY CHECK


a= 75.37 mm
Mn = 14856464059 Nmm = 1485.65 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 25 150 84 125

SHRINKAGE REINFORCEMENT

As req = 265 mm2/m


Use Dia. = 25 mm (A3)
Numb req = 2 bars/m
Max Dist. S = 500 mm ---- Take 150 mm

Numb = 7 bars/m
As = 3436 mm2/m > As-req ---> OK !!

SHRINKAGE BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 25 150 7 125


SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 3.76E+06 N
Vc = 1.12E+07 N
φVc = 7.82E+06 N > Vu --->No Stirrups required !!
Vs = -4.06E+06 N
Take S = 1200 mm (transverse dir.)
Av-req = 0 mm2
Use Dia. = 16 mm (A6)
Number req. = 2 bars
Av = 402 mm2 > req --- OK !!
Distance = 2550.00 mm take : 600 mm (longitudinal dir)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 6 10 600 1200

SKETCH OF REINFORCEMENT

A4 A2
D19-150 D19-150

A6
D16-600/1200
(Shear)

D25-150
D25-150 A1
A3

LONGITUDINAL DIRECTION
PILECAP TOP REINFORCEMENT

fc' = 20 Mpa Conc Dens = 2.50 t/m3


fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 12.55 m
PILECAP SECTION

0.00 a

1
1.33

O
Pf Pe Pd

0.00 0.00
0.78 1.00
1.25

PILE REACTION

Npile/row = 4 pile

Normal Transient
Row 3 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-max1 = 80.47 ton 71.24 ton
P-max2 = 80.47 ton 71.24 ton
o o
α= 0.00 0.00
P-1 = 321.87 ton 284.97 ton
Mo-1 = 249.45 ton-m 220.85 ton-m

P-tot = 321.87 ton 284.97 ton


M-tot = 249.45 ton-m 220.85 ton-m
SELFWEIGHT
Segment Area (m2) X (m) Ax

1 1.66 0.63 1.04

1.66 1.04

Xo = 0.63 m
Self-W = 52.16 ton
Moment Mo = 32.60 ton-m

SOIL WEIGHT
A X Ax

a 0.00 0.63 0.00

0.00 0.00

Xo = 0.00 m
Soil-W = 0.00 ton
Moment Mo = 0.00 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.50 482.81 374.18


2 Pile (Eq) 1.50 427.46 331.28
3 Selfweight 1.00 52.16 32.60
4 Soil 1.00 0.00 0.00

Total 430.65 341.58


4.31E+06 3.42E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

0.10 m

As 1.23 m

12.55 m
d= 1195.5 mm
b= 12550 mm
β= 0.85
φ= 0.8
a= 13.47 mm

As req = 9209.49 mm2


Use Dia. = 19 mm (A2)
Numb req = 33 bars
Dist. S = 386.22 mm --> 150 mm

Numb = 84 bars
As = 23816.41 mm2 > req --- OK !!

ρ act = 0.00159 ρ min A min


ρ min = 0.00082 --> < act --- OK !! 0.00359 53858.81
ρ max = 0.01794 --> > act --- OK !! 0.00082 12276.26

MOMENT CAPACITY CHECK


a= 43.54 mm
Mn = 8721675257 Nmm = 872.17 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 19 150 84 131

SHRINKAGE REINFORCEMENT

As req = 147 mm2/m


Use Dia. = 19 mm (A4)
Numb req = 2 bars/m
Max Dist. S = 500 mm --> Take 150 mm

Numb = 7 bars/m
As = 1985 mm2/m > As-req ---> OK !!

SHRINKAGE BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Top 19 150 7 131


SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 4.31E+06 N
Vc = 1.12E+07 N
φVc = 7.84E+06 N > Vu --->No Stirrups required !!

Take S = 1200 mm (transverse dir.)


Av-req = 0.000 mm2
Use Dia. = 16 mm (A6)
Number req. = 2 bars
Av = 402.124 mm2 > req --- OK !!
Distance = 6275.00 mm take : 600 mm (longitudinal dir)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 20 10 600 1200

SKETCH OF REINFORCEMENT

A2 A4
D19-150 D19-150

A6
D16-1200/600
(Shear)

D25-150
D25-150 A3
A1

TRANSVERSAL DIRECTION
ABUTMENT A2
ABUTMENT A2 DESIGN

1. FOUNDATION ANALYSIS

PILE ARRANGEMENT : 2 x 4

0.30 0.30 2.55 RC Unit Weight = 25 kN/m3


0.00 Soil Unit Weight = 18 kN/m3
Span = 20 m
0.53 Bridge Width = 12.55 m
o
0.35 1.62 Skew = 90
2 1 Wall Width = 12.55 m
o
Longitudinal Grade = 0.00

Ka = 0.2972
1.25 Kea = 0.4073
Eq-coef = 0.15
1.09 a
3
2.95 0.00 Pile Diameter = 0.80 m
0.60 Distance from Edge = 1.00 m
Pile Row = 2 pile
Pile per Row = 4 pile
Pile dist. (transv) = 7.55 m
0.00 Pilecap Width = 12.55 m
b
5.00

1.33 4 1.33 5 0.30


0.30
O 0.30
4.30 0.40
1.00 2.40 1.00 Approach Slab
Carriageway Width = 11.70 m
4.40 Approach Slab Area = 1.67 m2
Approach Slab Weight = 487.01 kN
Reaction = 243.51 kN
SELFWEIGHT
No Area Xi Yi AxX AxY

1 0.49 1.70 2.14 0.83 1.04


2 0.33 1.40 1.88 0.46 0.61
3 0.00 1.55 1.33 0.00 0.00
4 5.85 2.20 0.67 12.87 3.89
5 0.83 1.40 2.42 1.17 2.01

∑ 7.50 15.32 7.56

center gravity X = 2.044 m Xo = -0.156 m (eccentricity from center of pilecap)


center gravity Y = 1.008 m Yo = 1.008 m (eccentricity from bottom of pilecap)

selfweight SW = 2334.7 kN
eccintricity moment MoSW = -559.3 kN-m
SUPERSTRUCTURE (REACTION)

Support Type : Moved Distance from center of bottom pilecap


Exterior Girder : 2 Xo = 0.00 m
Interior Girder : 4 Yo = -0.53 m

Reaction Reaction (kN) Total Load (kN) Moment


Exterior Interior V H (kN-m)

RDL 345.8 345.8 2075.0 0.0 0.0


SDL 46.3 46.3 278.0 0.0 0.0
RLL 241.3 241.3 1448.0 0.0 0.0

SOIL WEIGHT

Section A X Y AxX AxY


m m m3 m3

a 1.36 0.63 1.88 0.85 2.55


b 0.00 3.13 1.33 0.00 0.00

1.36 0.85 2.55

center gravity of soil X = 0.63m Xo = -1.58 m (eccentricity from center of pilecap)


center gravity of soil Y = 1.88m Yo = 1.88 m (eccentricity from bottom of pilecap)

W-soil = 307.8 kN
eccentricity moment Mo-soil = -484.8 kN-m
EARTH PRESSURE

Ep1 = 292.1 kN
Mo-Ep1 = 287.2 kN-m

Earthquake Time :
Ep1 = 400.4 kN
Mo-Ep1 = 393.7 kN-m

SURCHARGE LOAD PRESSURE

Surcharge = 10.0 kN/m2


Ep2 = 110.0 kN
Mo-Ep2 = 162.3 kN-m

EARTHQUAKE (Horizontal Force)

1 H-Rdl = 311.3 kN Mo-Eq1 = -165.0 kN-m


2 H-Rsdl = 41.7 kN Mo-Eq2 = -22.1 kN-m
3 H-Self W = 350.2 kN Mo-Eq3 = 353.1 kN-m
SUMMARY OF FORCES AT THE BOTTOM CENTER OF PILECAP

1. NORMAL TIME
Load LF V HX MoX
kN kN kN-m

RDL 1.00 2075 0 0


RSDL 1.00 278 0 0
RLL 1.00 1448 0 0
SELF 1.00 2335 -559
SOIL 1.00 308 -485
EP 1.00 292 287
SRCHG 1.00 110 162

6443 402 -595

2. EARTHQUAKE TIME - X DIR (LONGITUDINAL)


Load LF V HX MoZ
kN kN kN-m

RDL 1.00 2075 0 0


RSDL 1.00 278 0 0
RLL 0.50 724 0 0
SELF 1.00 2335 -559
SOIL 1.00 308 -485
EP 1.00 400 394
EQDL 1.00 353 -187
EQSELF 1.00 350 353

5719 1104 -484

3. EARTHQUAKE TIME - Z DIR (TRANSVERSAL)


Load LF V HZ MoX
kN kN kN-m

RDL 1.00 2075 0 0


RSDL 1.00 278 0 0
RLL 0.50 724 0 0
SELF 1.00 2335 0
SOIL 1.00 308 0
EP 1.00 0
EQDL 1.00 353 -187
EQSELF 1.00 350 353

5719 703 166


PILE RESULTS (PILE-GROUP PROGRAM) :
A. Maximum Reactions (Ton)-(m)
Pnormal = 80.54 Hnormal = 5.03 Mnormal = 7.43 OK!!
Peq Long = 71.49 Heq Long = 13.79 Meq Long = 6.05 OK!!
Peq Trans = 71.49 Heq Trans = 8.79 Meq Trans = 2.08 OK!!

B. Minimum Reactions (Ton)-(m)


Pnormal = 80.54 Hnormal = 5.03 Mnormal = 7.43 OK!!
Peq Long = 71.49 Heq Long = 13.79 Meq Long = 6.05 OK!!
Peq Trans = 71.49 Heq Trans = 8.79 Meq Trans = 2.08 OK!!

Bearing Capacity
Ps Pe Pu Pallowable (ton)
(ton) (ton) (ton) FS = 2 FS = 3
466 251 718 359 239

Pullout Capacity
Ps Pe Pu Pallowable (ton)
(ton) (ton) (ton) FS = 2 FS = 3
466 0 466 233 155

CONCRETE PILE DESIGN


Load Factor = 2 P (kN) H (kN) M (kN-m)
Factored Pile Forces :
Normal : 1611 101 149
EQ-Long : 1430 276 121 2683
EQ-Trans : 1430 176 42 1167

Main Reinforcement : 16D25


Status : OK
P ( kN)
12000

(Pmax)

8000

4000 fs=0

fs=0.5fy

3 21

-1200 -800 -400 0 400 800 1200

M x (k N -m)

(Pmin)

-4000
2. COEFFICIENT OF EARTH PRESSURE

Coefficient of active earth-pressure by Coulomb's theory

1) Permanent Time

cos2 (φ - θ)
Ka = 2
cos2 θ cos (θ + δ) 1 + sin (φ + δ) sin (δ - α)

where ; φ : Internal friction angle = 30 degree


δ : Angle of wall friction
For stability calculation = φ = 30 degree
For sectional calculation = φ/3 = 10 degree
α : Refer to the following figure = 0 degree
θ : Refer to the following figure = 0 degree

- For stability calculation +α


Ka = 0.2972
- For sectional calculation +θ
Ka = 0.3085 δ N
N
N---N : Vertical face toward the wall

2) Transient Time

cos2 (φ - θ0 - θ )
Kea =
cos θ0 cos2 θ cos (θ + θ0 + δ) (1+ Xa) 2

where ;
δ : Angle of wall friction
For stability calculation = φ/2 = 15 degree
For sectional calculation = 0 degree
θ 0 = tan -1 kh = 8.531 degree
kh = 0.15

sin (φ + δ) sin (φ - α - θ0)


Xa =
cos(θ + θ0 + δ) cos(θ - α)

- For stability calculation


Kea = 0.4073 ( Xa = 0.5313 )
- For sectional calculation
Kea = 0.4329 ( Xa = 0.4302 )
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - ABUTMENT A2

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.5
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 5 2.50 2.50 2.5 2.5 10.0 100 6 50 57 28 19
3 4 clay 15 7.50 7.50 7.5 10 14.5 145 25 73 98 49 33
4 5 clay 14 7.00 7.00 7 17 14.0 140 43 70 113 57 38
5 6 clay 14 7.00 7.00 7 24 14.5 145 60 73 133 67 44
6 7 clay 15 7.50 7.50 7.5 31.5 16.0 160 79 80 160 80 53
7 8 clay 17 8.50 8.50 8.5 40 17.5 175 101 88 188 94 63
8 9 clay 18 9.00 9.00 9 49 19.0 190 123 96 219 109 73
9 10 sandy 20 6.60 6.60 6.6 55.6 25.0 250 140 126 265 133 88
10 11 sandy 30 9.90 9.90 9.9 65.5 36.5 365 165 183 348 174 116
11 12 sandy 43 14.19 12.00 12 77.5 46.5 465 195 234 429 214 143
12 13 sandy 50 16.50 12.00 12 89.5 50.0 500 225 251 476 238 159
13 14 sandy 50 16.50 12.00 12 101.5 50.0 500 255 251 506 253 169
14 15 sandy 50 16.50 12.00 12 113.5 50.0 500 285 251 537 268 179
15 16 sandy 50 16.50 12.00 12 125.5 50.0 500 315 251 567 283 189
16 17 sandy 50 16.50 12.00 12 137.5 50.0 500 346 251 597 298 199
17 18 sandy 50 16.50 12.00 12 149.5 50.0 500 376 251 627 314 209
18 19 sandy 50 16.50 12.00 12 161.5 50.0 500 406 251 657 329 219
19 20 sandy 50 16.50 12.00 12 173.5 50.0 500 436 251 687 344 229
20 21 sandy 50 16.50 12.00 12 185.5 50.0 500 466 251 718 359 239
21 22 sandy 50 16.50 12.00 12 197.5 50.0 500 496 251 748 374 249
22 23 sandy 50 16.50 12.00 12 209.5 50.0 500 527 251 778 389 259
23 24 sandy 50 16.50 12.00 12 221.5 50.0 500 557 251 808 404 269
24 25 sandy 50 16.50 12.00 12 233.5 50.0 500 587 251 838 419 279
25 26 sandy 50 16.50 12.00 12 245.5 50.0 500 617 251 868 434 289
26 27 sandy 50 16.50 12.00 12 257.5 50.0 500 647 251 898 449 299
27 28 sandy 50 16.50 12.00 12 269.5 50.0 500 677 251 929 464 310
28 29 sandy 50 16.50 12.00 12 281.5 50.0 500 707 251 959 479 320
29 30 sandy 50 16.50 12.00 12 293.5 50.0 500 738 251 989 494 330
50
5. PILECAP STRESS CONTROL

5.1. Longitudinal Direction

1230
1330

100

b1
1000

fc' = 20.00 MPa


Allowable Stresses (Normal) : Allowable Stresses (E-quake) :
σcv-a = 8.30 Mpa (σch-a) σcv-a = 12.45 Mpa (σch-a)
τcv-a = 0.36 Mpa (τch-a) τcv-a = 0.54 Mpa (τch-a)

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 805429.8438 N σcv = 1.60 MPa < 8.3 (OK)
P-eq = 714929.8438 N σcv = 1.42 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 50265.77614 N σch = 0.63 MPa < 8.3 (OK)
H-eq = 137942.6456 N σch = 1.72 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1230 mm
P-norm = 805429.8438 N τcv = 0.10 MPa < 0.36 (OK)
P-eq = 714929.8438 N τcv = 0.09 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 50265.77614 N τch = 0.04 MPa < 0.36 (OK)
H-eq = 137942.6456 N τch = 0.10 MPa < 0.54 (OK)
5.2. Transversal Direction

1230
1330

100

b1
1000

a. Vertical compressive stress


σcv = P/Apile
A pile = 502655 mm2
P-norm = 805430 N σcv = 1.60 MPa < 8.3 (OK)
P-eq = 714929.8438 N σcv = 1.42 MPa < 12.45 (OK)

b. Horizontal compressive stress


σch = H/(Dxh)
D pile = 800 mm h pile = 100 mm
H-norm = 50265.77614 N σch = 0.63 MPa < 8.3 (OK)
H-eq = 87893.4375 N σch = 1.10 MPa < 12.45 (OK)

c. Punching shear stress (Vertical)


τcv = P/(phi*(D+h1)*h1) h1 pile = 1230 mm
P-norm = 805429.8438 N τcv = 0.10 MPa < 0.36 (OK)
P-eq = 714929.8438 N τcv = 0.09 MPa < 0.54 (OK)

d. Punching shear stress (Horizontal)


τch = H/(b1*(2xL+D+2xb1)) b1 = 600 mm
H-norm = 50265.77614 N τch = 0.04 MPa < 0.36 (OK)
H-eq = 87893.4375 N τch = 0.07 MPa < 0.54 (OK)
6. PILECAP DESIGN

PILECAP BOTTOM REINFORCEMENT

fc' = 20 Mpa Conc Dens = 2.50 t/m3


fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 12.55 m
PILECAP SECTION

0.00 a

1
1.33

O
Pc Pb Pa

0.00 0.00
1.55 1.00
2.55

PILE REACTION

Npile/row = 4 pile

Normal Equake
Row 3 :
Pc-max1 = 0.00 ton 0.00 ton
Pc-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
Pb-max1 = 0.00 ton 0.00 ton
Pb-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
Pb = 0.00 ton 0.00 ton
Mo-b = 0.00 ton-m 0.00 ton-m

Row 1 :
Pa-max1 = 80.54 ton 71.49 ton
Pa-max2 = 80.54 ton 71.49 ton
o o
α= 0.00 0.00
Pa = 322.17 ton 285.97 ton
Mo-a = 499.37 ton-m 443.26 ton-m

P-tot = 322.17 ton 285.97 ton


M-tot = 499.37 ton-m 443.26 ton-m
SELFWEIGHT
Segment Area (m2) X (m) Ax

1 3.39 1.28 4.32

3.39 4.32

Xo = 1.28 m
Self-W = 106.41 ton
Moment Mo = 135.67 ton-m

SOIL WEIGHT
A X Ax

a 0.00 1.28 0.00

0.00 0.00

Xo = 0.00 m
Soil-W = 0.00 ton
Moment Mo = 0.00 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.50 483.26 749.05


2 Pile (Eq) 1.50 428.96 664.88
3 Selfweight 1.00 106.41 135.67
4 Soil 1.00 0.00 0.00

Total 376.85 613.38


3.77E+06 6.13E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

1.23 m
As
0.10 m

12.55 m
d= 1192.5 mm
b= 12550 mm
β= 0.85
φ= 0.8
a= 24.36 mm

As req = 16656 mm2


Use Dia. = 25 mm (A1)
Numb req = 34 bars
Dist. S = 374 mm --> 150 mm

Numb = 84 bars
As = 41233 mm2 > req --- OK !!

ρ act = 0.00276 ρ min A min


ρ min = 0.00148 --> < act --- OK !! 0.00359 53724
ρ max = 0.01794 --> > act --- OK !! 0.00148 22203

MOMENT CAPACITY CHECK


a= 75.37 mm
Mn = 14856464059 Nmm = 1485.65 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 25 150 84 125

SHRINKAGE REINFORCEMENT

As req = 265 mm2/m


Use Dia. = 25 mm (A3)
Numb req = 2 bars/m
Max Dist. S = 500 mm ---- Take 150 mm

Numb = 7 bars/m
As = 3436 mm2/m > As-req ---> OK !!

SHRINKAGE BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 25 150 7 125


SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 3.77E+06 N
Vc = 1.12E+07 N
φVc = 7.82E+06 N > Vu --->No Stirrups required !!
Vs = -4.06E+06 N
Take S = 1200 mm (transverse dir.)
Av-req = 0 mm2
Use Dia. = 16 mm (A6)
Number req. = 2 bars
Av = 402 mm2 > req --- OK !!
Distance = 2550.00 mm take : 600 mm (longitudinal dir)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 6 10 600 1200

SKETCH OF REINFORCEMENT

A4 A2
D19-150 D19-150

A6
D16-600/1200
(Shear)

D25-150
D25-150 A1
A3

LONGITUDINAL DIRECTION
PILECAP TOP REINFORCEMENT

fc' = 20 Mpa Conc Dens = 2.50 t/m3


fy = 390 Mpa Soil Dens = 1.80 t/m3

Width B = 12.55 m
PILECAP SECTION

0.00 a

1
1.33

O
Pf Pe Pd

0.00 0.00
0.78 1.00
1.25

PILE REACTION

Npile/row = 4 pile

Normal Transient
Row 3 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-3 = 0.00 ton 0.00 ton
Mo-3 = 0.00 ton-m 0.00 ton-m

Row 2 :
P-max1 = 0.00 ton 0.00 ton
P-max2 = 0.00 ton 0.00 ton
o o
α= 0.00 0.00
P-2 = 0.00 ton 0.00 ton
Mo-2 = 0.00 ton-m 0.00 ton-m

Row 1 :
P-max1 = 80.54 ton 71.49 ton
P-max2 = 80.54 ton 71.49 ton
o o
α= 0.00 0.00
P-1 = 322.17 ton 285.97 ton
Mo-1 = 249.68 ton-m 221.63 ton-m

P-tot = 322.17 ton 285.97 ton


M-tot = 249.68 ton-m 221.63 ton-m
SELFWEIGHT
Segment Area (m2) X (m) Ax

1 1.66 0.63 1.04

1.66 1.04

Xo = 0.63 m
Self-W = 52.16 ton
Moment Mo = 32.60 ton-m

SOIL WEIGHT
A X Ax

a 0.00 0.63 0.00

0.00 0.00

Xo = 0.00 m
Soil-W = 0.00 ton
Moment Mo = 0.00 ton-m

SUMMARY OF FORCES
V Mo
No. Load LF
ton tm

1 Pile (Normal) 1.50 483.26 374.52


2 Pile (Eq) 1.50 428.96 332.44
3 Selfweight 1.00 52.16 32.60
4 Soil 1.00 0.00 0.00

Total 431.10 341.92


4.31E+06 3.42E+09
Total in N-mm
N N-mm
MAIN REINFORCEMENT

0.10 m

As 1.23 m

12.55 m
d= 1195.5 mm
b= 12550 mm
β= 0.85
φ= 0.8
a= 13.48 mm

As req = 9218.95 mm2


Use Dia. = 19 mm (A2)
Numb req = 33 bars
Dist. S = 386.22 mm --> 150 mm

Numb = 84 bars
As = 23816.41 mm2 > req --- OK !!

ρ act = 0.00159 ρ min A min


ρ min = 0.00082 --> < act --- OK !! 0.00359 53858.81
ρ max = 0.01794 --> > act --- OK !! 0.00082 12288.86

MOMENT CAPACITY CHECK


a= 43.54 mm
Mn = 8721675257 Nmm = 872.17 ton-m > Mu ---> OK !!

MAIN BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Bott 19 150 84 131

SHRINKAGE REINFORCEMENT

As req = 147 mm2/m


Use Dia. = 19 mm (A4)
Numb req = 2 bars/m
Max Dist. S = 500 mm --> Take 150 mm

Numb = 7 bars/m
As = 1985 mm2/m > As-req ---> OK !!

SHRINKAGE BAR RESUME


Position Dia. mm Dist. mm Number Spacing mm

Top 19 150 7 131


SHEAR REINFORCEMENT

φ= 0.7
Shear Vu = 4.31E+06 N
Vc = 1.12E+07 N
φVc = 7.84E+06 N > Vu --->No Stirrups required !!

Take S = 1200 mm (transverse dir.)


Av-req = 0.000 mm2
Use Dia. = 16 mm (A6)
Number req. = 2 bars
Av = 402.124 mm2 > req --- OK !!
Distance = 6275.00 mm take : 600 mm (longitudinal dir)

STIRRUPS
Position Diameter Number bars Distance mm
mm Perpnd. Paralel Longt. Transv

Vertical 16 20 10 600 1200

SKETCH OF REINFORCEMENT

A2 A4
D19-150 D19-150

A6
D16-1200/600
(Shear)

D25-150
D25-150 A3
A1

TRANSVERSAL DIRECTION
STRUCTURAL DESIGN REVIEW REPORT
JEMBATAN SUNGAI GRENJENG

10. FOUNDATION DESIGN


JEMBATAN SUNGAI GRENJENG
PILE ANALYSIS SUMMARY
PILE DESIGN FROM PREVIOUS DED REVIEW RECOMMENDATION
Pile Pile Reaction Allowable Pile Reaction Allowable
Pile Length Pile Length
No. Sub Structure Bore Hole Diameter Condition Status Status
(m) Max KN Min KN Max KN Min KN (m) Max KN Min KN Max KN Min KN
(m)

1 Abutment A1 DB-4 0.8 22 Normal 805 805 2240 -837 OK 16 730 805 1600 -767 OK
Earthquake 712 712 3360 -1255 OK 637 712 2400 -1150 OK

2 Abutment A2 DB-5 0.8 24 Normal 805 805 2390 -1553 OK 16 704 805 1940 -1103 OK
Earthquake 715 715 3585 -2330 OK 614 715 2910 -1655 OK

3 Pier P1 DB-4 0.8 14 Normal 1178 990 2190 -1353 OK 12 1153 990 1970 -1137 OK
Earthquake 1576 231 3285 -2030 OK 1551 231 2955 -1705 OK

4 Pier P2 DB-5 0.8 14 Normal 1228 1040 2010 -1170 OK 12 1203 1040 1970 -1137 OK
Earthquake 1624 139 3015 -1755 OK 1599 139 2955 -1705 OK

CATATAN:
Review single pile capacity dilakukan dengan cara merencanakan ulang kedalaman tiang
yang digunakan pada setiap sub structure untuk mendapatkan kapasitas daya dukung
tiang yang memadai
PILE GROUP ANALYSIS
JEMBATAN SUNGAI GRENJENG
FOUNDATION REACTION
TABLE: Joint Reactions
Joint OutputCase CaseType StepType F1 F2 F3 M1 M2 M3
Text Text Text Text KN KN KN KN-m KN-m KN-m

FOUND P1 SLS:DL+SDL+LL Combination Max 14 0 -16097 0 186 0


FOUND P1 SLS:DL+SDL+LL Combination Min 230 0 -12661 0 2506 0
FOUND P1 SLS:DL+SDL+LL+EQX Combination Max 1217 360 -14921 -3454 11557 20
FOUND P1 SLS:DL+SDL+LL+EQX Combination Min 1326 360 -13203 -3454 12717 20
FOUND P1 SLS:DL+SDL+LL+EQY Combination Max 375 1202 -14542 -11512 3597 68
FOUND P1 SLS:DL+SDL+LL+EQY Combination Min 483 1202 -12824 -11512 4757 68
0 0 0 0 0 0
FOUND P2 SLS:DL+SDL+LL Combination Max -21 0 -16893 0 -159 0
FOUND P2 SLS:DL+SDL+LL Combination Min 237 0 -13170 0 2448 0
FOUND P2 SLS:DL+SDL+LL+EQX Combination Max 1367 416 -14549 -3787 12633 0
FOUND P2 SLS:DL+SDL+LL+EQX Combination Min 1496 416 -12687 -3787 13936 0
FOUND P2 SLS:DL+SDL+LL+EQY Combination Max 398 1386 -14928 -12625 3698 1
FOUND P2 SLS:DL+SDL+LL+EQY Combination Min 527 1386 -13067 -12625 5001 1
JEMBATAN SUNGAI GRENJENG
PILE GROUP ANALYSIS - PIER P1

PILE L 14 M
PILE DIA. 0.8 M
PILE AREA 0.5027 M2
PILE SW 12.57 KN/M

BOTTOM OF PILE REACTION TOP OF PILE REACTION


TABLE: Joint Reactions TABLE: Joint Reactions
COMB COMB
Pile OutputCase A B C Pile OutputCase A B C
Text Text KN KN-m KN-m Text Text KN KN-m KN-m
A1 COMB 1165 656 1212 A1 COMB 990 480 1036
A2 COMB 1165 573 935 A2 COMB 990 397 759
A3 COMB 1165 490 657 A3 COMB 990 314 481
A4 COMB 1165 407 380 A4 COMB 990 231 204
B1 COMB 1170 963 1326 B1 COMB 994 787 1151
B2 COMB 1170 879 1049 B2 COMB 994 703 873
B3 COMB 1170 796 772 B3 COMB 994 620 596
B4 COMB 1170 713 494 B4 COMB 994 537 318
C1 COMB 1174 1269 1441 C1 COMB 998 1093 1265
C2 COMB 1174 1186 1163 C2 COMB 998 1010 987
C3 COMB 1174 1103 886 C3 COMB 998 927 710
C4 COMB 1174 1019 608 C4 COMB 998 843 432
D1 COMB 1178 1576 1555 D1 COMB 1002 1400 1379
D2 COMB 1178 1492 1277 D2 COMB 1002 1316 1101
D3 COMB 1178 1409 1000 D3 COMB 1002 1233 824
D4 COMB 1178 1326 722 D4 COMB 1002 1150 546

MAX 1178 1576 1555 MAX 1002 1400 1379


MIN 1165 407 380 MIN 990 231 204

NOTE:
COMB A = DL+SDL+LL
D COMB B = DL+SDL+LL+EQX
COMB C = DL+SDL+LL+EQY

1 2 3 4

MAX PILE MOMENT


M3 125 KN-m
M2 113 KN-m
JEMBATAN SUNGAI GRENJENG
PILE GROUP ANALYSIS - PIER P2

PILE L 14 M
PILE DIA. 0.8 M
PILE AREA 0.5027 M2
PILE SW 12.57 KN/M

BOTTOM OF PILE REACTION TOP OF PILE REACTION


TABLE: Joint Reactions TABLE: Joint Reactions
COMB COMB
Pile OutputCase A B C Pile OutputCase A B C
Text Text KN KN-m KN-m Text Text KN KN-m KN-m
A1 COMB 1228 591 1262 A1 COMB 1052 415 1086
A2 COMB 1228 499 955 A2 COMB 1052 323 779
A3 COMB 1228 407 648 A3 COMB 1052 231 472
A4 COMB 1228 315 341 A4 COMB 1052 139 165
B1 COMB 1224 928 1382 B1 COMB 1048 752 1206
B2 COMB 1224 836 1076 B2 COMB 1048 660 900
B3 COMB 1224 744 769 B3 COMB 1048 568 593
B4 COMB 1224 652 462 B4 COMB 1048 476 286
C1 COMB 1220 1265 1503 C1 COMB 1044 1090 1327
C2 COMB 1220 1173 1196 C2 COMB 1044 998 1020
C3 COMB 1220 1081 890 C3 COMB 1044 905 714
C4 COMB 1220 989 583 C4 COMB 1044 813 407
D1 COMB 1216 1603 1624 D1 COMB 1040 1427 1448
D2 COMB 1216 1511 1317 D2 COMB 1040 1335 1141
D3 COMB 1216 1419 1010 D3 COMB 1040 1243 834
D4 COMB 1216 1327 703 D4 COMB 1040 1151 528

MAX 1228 1603 1624 MAX 1052 1427 1448


MIN 1216 315 341 MIN 1040 139 165

NOTE:
COMB A = DL+SDL+LL
D COMB B = DL+SDL+LL+EQX
COMB C = DL+SDL+LL+EQY

1 2 3 4

MAX PILE MOMENT


M3 141 KN-m
M2 131 KN-m
SINGLE PILE CAPACITY
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - ABUTMENT A1

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.4
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 20 10.00 10.00 10 10 17.5 175 25 88 113 57 38
3 4 clay 15 7.50 7.50 7.5 17.5 15.0 150 44 75 119 60 40
4 5 clay 15 7.50 7.50 7.5 25 17.5 175 63 88 151 75 50
5 6 clay 20 10.00 10.00 10 35 22.5 225 88 113 201 101 67
6 7 clay 25 12.50 12.00 12 47 27.5 275 118 138 256 128 85
7 8 clay 30 15.00 12.00 12 59 35.0 350 148 176 324 162 108
8 9 clay 40 20.00 12.00 12 71 40.0 400 178 201 380 190 127
9 10 sandy 40 13.20 12.00 12 83 42.5 425 209 214 422 211 141
10 11 sandy 45 14.85 12.00 12 95 45.0 450 239 226 465 232 155
11 12 sandy 45 14.85 12.00 12 107 47.5 475 269 239 508 254 169
12 13 sandy 50 16.50 12.00 12 119 50.0 500 299 251 550 275 183
13 14 sandy 50 16.50 12.00 12 131 50.0 500 329 251 581 290 194
14 15 sandy 50 16.50 12.00 12 143 50.0 500 359 251 611 305 204
15 16 sandy 50 16.50 12.00 12 155 50.0 500 390 251 641 320 214
16 17 sandy 50 16.50 12.00 12 167 50.0 500 420 251 671 336 224
17 18 sandy 50 16.50 12.00 12 179 50.0 500 450 251 701 351 234
18 19 sandy 50 16.50 12.00 12 191 50.0 500 480 251 731 366 244
19 20 sandy 50 16.50 12.00 12 203 50.0 500 510 251 762 381 254
20 21 sandy 50 16.50 12.00 12 215 50.0 500 540 251 792 396 264
21 22 sandy 50 16.50 12.00 12 227 50.0 500 571 251 822 411 274
22 23 sandy 50 16.50 12.00 12 239 50.0 500 601 251 852 426 284
23 24 sandy 50 16.50 12.00 12 251 50.0 500 631 251 882 441 294
24 25 sandy 50 16.50 12.00 12 263 50.0 500 661 251 912 456 304
25 26 sandy 50 16.50 12.00 12 275 50.0 500 691 251 942 471 314
26 27 sandy 50 16.50 12.00 12 287 50.0 500 721 251 973 486 324
27 28 sandy 50 16.50 12.00 12 299 50.0 500 751 251 1003 501 334
28 29 sandy 50 16.50 12.00 12 311 50.0 500 782 251 1033 516 344
29 30 sandy 50 16.50 12.00 12 323 50.0 500 812 251 1063 532 354
50
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - ABUTMENT A2

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.5
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 5 2.50 2.50 2.5 2.5 10.0 100 6 50 57 28 19
3 4 clay 15 7.50 7.50 7.5 10 14.5 145 25 73 98 49 33
4 5 clay 14 7.00 7.00 7 17 14.0 140 43 70 113 57 38
5 6 clay 14 7.00 7.00 7 24 14.5 145 60 73 133 67 44
6 7 clay 15 7.50 7.50 7.5 31.5 16.0 160 79 80 160 80 53
7 8 clay 17 8.50 8.50 8.5 40 17.5 175 101 88 188 94 63
8 9 clay 18 9.00 9.00 9 49 19.0 190 123 96 219 109 73
9 10 sandy 20 6.60 6.60 6.6 55.6 25.0 250 140 126 265 133 88
10 11 sandy 30 9.90 9.90 9.9 65.5 36.5 365 165 183 348 174 116
11 12 sandy 43 14.19 12.00 12 77.5 46.5 465 195 234 429 214 143
12 13 sandy 50 16.50 12.00 12 89.5 50.0 500 225 251 476 238 159
13 14 sandy 50 16.50 12.00 12 101.5 50.0 500 255 251 506 253 169
14 15 sandy 50 16.50 12.00 12 113.5 50.0 500 285 251 537 268 179
15 16 sandy 50 16.50 12.00 12 125.5 50.0 500 315 251 567 283 189
16 17 sandy 50 16.50 12.00 12 137.5 50.0 500 346 251 597 298 199
17 18 sandy 50 16.50 12.00 12 149.5 50.0 500 376 251 627 314 209
18 19 sandy 50 16.50 12.00 12 161.5 50.0 500 406 251 657 329 219
19 20 sandy 50 16.50 12.00 12 173.5 50.0 500 436 251 687 344 229
20 21 sandy 50 16.50 12.00 12 185.5 50.0 500 466 251 718 359 239
21 22 sandy 50 16.50 12.00 12 197.5 50.0 500 496 251 748 374 249
22 23 sandy 50 16.50 12.00 12 209.5 50.0 500 527 251 778 389 259
23 24 sandy 50 16.50 12.00 12 221.5 50.0 500 557 251 808 404 269
24 25 sandy 50 16.50 12.00 12 233.5 50.0 500 587 251 838 419 279
25 26 sandy 50 16.50 12.00 12 245.5 50.0 500 617 251 868 434 289
26 27 sandy 50 16.50 12.00 12 257.5 50.0 500 647 251 898 449 299
27 28 sandy 50 16.50 12.00 12 269.5 50.0 500 677 251 929 464 310
28 29 sandy 50 16.50 12.00 12 281.5 50.0 500 707 251 959 479 320
29 30 sandy 50 16.50 12.00 12 293.5 50.0 500 738 251 989 494 330
50
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - PIER P1

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.4
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 0 0.00 0.00 0 0 0.0 0 0 0 0 0 0
3 4 clay 0 0.00 0.00 0 0 7.5 75 0 38 38 19 13
4 5 clay 15 7.50 7.50 7.5 7.5 17.5 175 19 88 107 53 36
5 6 clay 20 10.00 10.00 10 17.5 22.5 225 44 113 157 79 52
6 7 clay 25 12.50 12.00 12 29.5 27.5 275 74 138 212 106 71
7 8 clay 30 15.00 12.00 12 41.5 35.0 350 104 176 280 140 93
8 9 clay 40 20.00 12.00 12 53.5 40.0 400 134 201 336 168 112
9 10 sandy 40 13.20 12.00 12 65.5 42.5 425 165 214 378 189 126
10 11 sandy 45 14.85 12.00 12 77.5 45.0 450 195 226 421 210 140
11 12 sandy 45 14.85 12.00 12 89.5 47.5 475 225 239 464 232 155
12 13 sandy 50 16.50 12.00 12 101.5 50.0 500 255 251 506 253 169
13 14 sandy 50 16.50 12.00 12 113.5 50.0 500 285 251 537 268 179
14 15 sandy 50 16.50 12.00 12 125.5 50.0 500 315 251 567 283 189
15 16 sandy 50 16.50 12.00 12 137.5 50.0 500 346 251 597 298 199
16 17 sandy 50 16.50 12.00 12 149.5 50.0 500 376 251 627 314 209
17 18 sandy 50 16.50 12.00 12 161.5 50.0 500 406 251 657 329 219
18 19 sandy 50 16.50 12.00 12 173.5 50.0 500 436 251 687 344 229
19 20 sandy 50 16.50 12.00 12 185.5 50.0 500 466 251 718 359 239
20 21 sandy 50 16.50 12.00 12 197.5 50.0 500 496 251 748 374 249
21 22 sandy 50 16.50 12.00 12 209.5 50.0 500 527 251 778 389 259
22 23 sandy 50 16.50 12.00 12 221.5 50.0 500 557 251 808 404 269
23 24 sandy 50 16.50 12.00 12 233.5 50.0 500 587 251 838 419 279
24 25 sandy 50 16.50 12.00 12 245.5 50.0 500 617 251 868 434 289
25 26 sandy 50 16.50 12.00 12 257.5 50.0 500 647 251 898 449 299
26 27 sandy 50 16.50 12.00 12 269.5 50.0 500 677 251 929 464 310
27 28 sandy 50 16.50 12.00 12 281.5 50.0 500 707 251 959 479 320
28 29 sandy 50 16.50 12.00 12 293.5 50.0 500 738 251 989 494 330
29 30 sandy 50 16.50 12.00 12 305.5 50.0 500 768 251 1019 510 340
50
PILE CAPACITY OF BORED PILE

PROJECT : JEMBATAN SUNGAI GRENJENG - PIER P2

Dimension of bored pile :


PILE DIA. = 0.8 m
PILE PERI. = 2.513 m BORING NO : DB.5
2
PILE TIP AR. = 0.503 m
Kedalaman Soil N fs fs' l.fs Σ l.fs N qb Ps Pe Pu Pall (ton)
Dari Ke type shaft (t/m 2 ) (t/m 2 ) (t/m) (t/m) tip t/m2 (ton) (ton) (ton) FS = 2 FS = 3
0 2 0
2 3 clay 0 0.00 0.00 0 0 0.0 0 0 0 0 0 0
3 4 clay 0 0.00 0.00 0 0 7.0 70 0 35 35 18 12
4 5 clay 14 7.00 7.00 7 7 14.0 140 18 70 88 44 29
5 6 clay 14 7.00 7.00 7 14 14.5 145 35 73 108 54 36
6 7 clay 15 7.50 7.50 7.5 21.5 16.0 160 54 80 134 67 45
7 8 clay 17 8.50 8.50 8.5 30 17.5 175 75 88 163 82 54
8 9 clay 18 9.00 9.00 9 39 19.0 190 98 96 194 97 65
9 10 sandy 20 6.60 6.60 6.6 45.6 25.0 250 115 126 240 120 80
10 11 sandy 30 9.90 9.90 9.9 55.5 36.5 365 139 183 323 161 108
11 12 sandy 43 14.19 12.00 12 67.5 46.5 465 170 234 403 202 134
12 13 sandy 50 16.50 12.00 12 79.5 50.0 500 200 251 451 226 150
13 14 sandy 50 16.50 12.00 12 91.5 50.0 500 230 251 481 241 160
14 15 sandy 50 16.50 12.00 12 103.5 50.0 500 260 251 511 256 170
15 16 sandy 50 16.50 12.00 12 115.5 50.0 500 290 251 542 271 181
16 17 sandy 50 16.50 12.00 12 127.5 50.0 500 320 251 572 286 191
17 18 sandy 50 16.50 12.00 12 139.5 50.0 500 351 251 602 301 201
18 19 sandy 50 16.50 12.00 12 151.5 50.0 500 381 251 632 316 211
19 20 sandy 50 16.50 12.00 12 163.5 50.0 500 411 251 662 331 221
20 21 sandy 50 16.50 12.00 12 175.5 50.0 500 441 251 692 346 231
21 22 sandy 50 16.50 12.00 12 187.5 50.0 500 471 251 723 361 241
22 23 sandy 50 16.50 12.00 12 199.5 50.0 500 501 251 753 376 251
23 24 sandy 50 16.50 12.00 12 211.5 50.0 500 532 251 783 391 261
24 25 sandy 50 16.50 12.00 12 223.5 50.0 500 562 251 813 407 271
25 26 sandy 50 16.50 12.00 12 235.5 50.0 500 592 251 843 422 281
26 27 sandy 50 16.50 12.00 12 247.5 50.0 500 622 251 873 437 291
27 28 sandy 50 16.50 12.00 12 259.5 50.0 500 652 251 904 452 301
28 29 sandy 50 16.50 12.00 12 271.5 50.0 500 682 251 934 467 311
29 30 sandy 50 16.50 12.00 12 283.5 50.0 500 713 251 964 482 321
50
RC BORED PILE DESIGN
P ( kN)
12000

(Pmax)

y
x
8000

800 mm diam.
4000 fs=0
Code: ACI 318-02

Units: Metric fs=0.5fy


Run axis: About X-axis

Run option: Investigation 3 21


Slenderness: Not considered

Column type: Structural

Bars: ASTM A615M -1200 -800 -400 0 400 800 1200


Date: 02/02/17 Mx (kN-m)
Time: 19:21:56

(Pmin)

-4000

pcaColumn v3.63 - Licensed to: DSINC

File: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBAT...\SGRJ-BP800 A1.col


Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_A1 Engineer: HW
f'c = 29 MPa fy = 390 MPa Ag = 502655 mm^2 16 #25 bars
Ec = 25310 MPa Es = 200000 MPa As = 8160 mm^2 Rho = 1.62%
fc = 24.65 MPa fc = 24.65 MPa Xo = 0 mm Iy = 2.01e+010 mm^4
e_u = 0.003 mm/mm Yo = 0 mm Iy = 2.01e+010 mm^4
Beta1 = 0.839702 Clear spacing = 82 mm Clear cover = 113 mm
Confinement: Spiral phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 1
19:21:51 Licensed to: DSINC SGRJ-BP800 A1

OOOOOOO OOOOO OOOOO OOOOO OOOOO OO


OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO
OO OO OO OOOOOOO OO OO OO OO
OOOOOOO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO
OO OOOOO OO OO OOOOO OOOOO OOOOO (TM)

========================================================================
Computer program for the Strength Design of Reinforced Concrete Sections
========================================================================

Licensee stated above acknowledges that Portland Cement Association


(PCA) is not and cannot be responsible for either the accuracy or
adequacy of the material supplied as input for processing by the
pcaColumn(tm) computer program. Furthermore, PCA neither makes any
warranty expressed nor implied with respect to the correctness of the
output prepared by the pcaColumn(tm) program.Although PCA has endeavored
to produce pcaColumn(tm) error free, the program is not and can't be
certified infallible. The final and only responsibility for analysis,
design and engineering documents is the licensees. Accordingly, PCA
disclaims all responsibility in contract, negligence or other tort for
any analysis, design or engineering documents prepared in connection
with the use of the pcaColumn(tm) program.
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 2
19:21:51 Licensed to: DSINC SGRJ-BP800 A1

General Information:
====================
File Name: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBATAN SUNGAI G
Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_A1 Engineer: HW
Code: ACI 318-02 Units: Metric

Run Option: Investigation Slenderness: Not considered


Run Axis: X-axis Column Type: Structural

Material Properties:
====================
f'c = 29 MPa fy = 390 MPa
Ec = 25310.3 MPa Es = 200000 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.839702

Section:
========
Circular: Diameter = 800 mm

Gross section area, Ag = 502655 mm^2


Ix = 2.01062e+010 mm^4 Iy = 2.01062e+010 mm^4
Xo = 0 mm Yo = 0 mm

Reinforcement:
==============
Rebar Database: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581

Confinement: Spiral; #13 ties with #25 bars, #13 with larger bars.
phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7

Layout: Circular
Pattern: All Sides Equal (Cover to transverse reinforcement)
Total steel area, As = 8160 mm^2 at 1.62%
16 #25 Cover = 100 mm

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1609.0 149.0 1021.7 6.857
2 1425.0 120.0 1011.5 8.429
3 1425.0 42.0 1011.5 24.083

*** Program completed as requested! ***


P ( kN)
12000

(Pmax)

y
x
8000

800 mm diam.
4000 fs=0
Code: ACI 318-02

Units: Metric fs=0.5fy


Run axis: About X-axis

Run option: Investigation 3 21


Slenderness: Not considered

Column type: Structural

Bars: ASTM A615M -1200 -800 -400 0 400 800 1200


Date: 02/02/17 Mx (kN-m)
Time: 19:20:03

(Pmin)

-4000

pcaColumn v3.63 - Licensed to: DSINC

File: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBAT...\SGRJ-BP800 A2.col


Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_A2 Engineer: HW
f'c = 29 MPa fy = 390 MPa Ag = 502655 mm^2 16 #25 bars
Ec = 25310 MPa Es = 200000 MPa As = 8160 mm^2 Rho = 1.62%
fc = 24.65 MPa fc = 24.65 MPa Xo = 0 mm Iy = 2.01e+010 mm^4
e_u = 0.003 mm/mm Yo = 0 mm Iy = 2.01e+010 mm^4
Beta1 = 0.839702 Clear spacing = 82 mm Clear cover = 113 mm
Confinement: Spiral phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 1
19:16:41 Licensed to: DSINC SGRJ-BP800 A2

OOOOOOO OOOOO OOOOO OOOOO OOOOO OO


OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO
OO OO OO OOOOOOO OO OO OO OO
OOOOOOO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO
OO OOOOO OO OO OOOOO OOOOO OOOOO (TM)

========================================================================
Computer program for the Strength Design of Reinforced Concrete Sections
========================================================================

Licensee stated above acknowledges that Portland Cement Association


(PCA) is not and cannot be responsible for either the accuracy or
adequacy of the material supplied as input for processing by the
pcaColumn(tm) computer program. Furthermore, PCA neither makes any
warranty expressed nor implied with respect to the correctness of the
output prepared by the pcaColumn(tm) program.Although PCA has endeavored
to produce pcaColumn(tm) error free, the program is not and can't be
certified infallible. The final and only responsibility for analysis,
design and engineering documents is the licensees. Accordingly, PCA
disclaims all responsibility in contract, negligence or other tort for
any analysis, design or engineering documents prepared in connection
with the use of the pcaColumn(tm) program.
02/02/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 2
19:16:41 Licensed to: DSINC SGRJ-BP800 A2

General Information:
====================
File Name: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBATAN SUNGAI G
Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_A2 Engineer: HW
Code: ACI 318-02 Units: Metric

Run Option: Investigation Slenderness: Not considered


Run Axis: X-axis Column Type: Structural

Material Properties:
====================
f'c = 29 MPa fy = 390 MPa
Ec = 25310.3 MPa Es = 200000 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.839702

Section:
========
Circular: Diameter = 800 mm

Gross section area, Ag = 502655 mm^2


Ix = 2.01062e+010 mm^4 Iy = 2.01062e+010 mm^4
Xo = 0 mm Yo = 0 mm

Reinforcement:
==============
Rebar Database: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581

Confinement: Spiral; #13 ties with #25 bars, #13 with larger bars.
phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7

Layout: Circular
Pattern: All Sides Equal (Cover to transverse reinforcement)
Total steel area, As = 8160 mm^2 at 1.62%
16 #25 Cover = 100 mm

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1611.0 149.0 1021.8 6.858
2 1430.0 121.0 1011.8 8.362
3 1430.0 42.0 1011.8 24.090

*** Program completed as requested! ***


P ( kN)
12000

(Pmax)

y
x
8000

800 mm diam.
4000 fs=0
Code: ACI 318-02

Units: Metric fs=0.5fy


Run axis: About X-axis

Run option: Investigation 1


Slenderness: Not considered

Column type: Structural 2


Bars: ASTM A615M -1200 -800 -400 0 400 800 1200
Date: 02/03/17 Mx (kN-m)
Time: 07:55:07

(Pmin)

-4000

pcaColumn v3.63 - Licensed to: DSINC

File: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBAT...\SGRH-BP800 P1.col


Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_P1 Engineer: HW
f'c = 29 MPa fy = 390 MPa Ag = 502655 mm^2 16 #25 bars
Ec = 25310 MPa Es = 200000 MPa As = 8160 mm^2 Rho = 1.62%
fc = 24.65 MPa fc = 24.65 MPa Xo = 0 mm Iy = 2.01e+010 mm^4
e_u = 0.003 mm/mm Yo = 0 mm Iy = 2.01e+010 mm^4
Beta1 = 0.839702 Clear spacing = 82 mm Clear cover = 113 mm
Confinement: Spiral phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7
02/03/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 1
07:54:49 Licensed to: DSINC SGRH-BP800 P1

OOOOOOO OOOOO OOOOO OOOOO OOOOO OO


OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO
OO OO OO OOOOOOO OO OO OO OO
OOOOOOO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO
OO OOOOO OO OO OOOOO OOOOO OOOOO (TM)

========================================================================
Computer program for the Strength Design of Reinforced Concrete Sections
========================================================================

Licensee stated above acknowledges that Portland Cement Association


(PCA) is not and cannot be responsible for either the accuracy or
adequacy of the material supplied as input for processing by the
pcaColumn(tm) computer program. Furthermore, PCA neither makes any
warranty expressed nor implied with respect to the correctness of the
output prepared by the pcaColumn(tm) program.Although PCA has endeavored
to produce pcaColumn(tm) error free, the program is not and can't be
certified infallible. The final and only responsibility for analysis,
design and engineering documents is the licensees. Accordingly, PCA
disclaims all responsibility in contract, negligence or other tort for
any analysis, design or engineering documents prepared in connection
with the use of the pcaColumn(tm) program.
02/03/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 2
07:54:49 Licensed to: DSINC SGRH-BP800 P1

General Information:
====================
File Name: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBATAN SUNGAI G
Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_P1 Engineer: HW
Code: ACI 318-02 Units: Metric

Run Option: Investigation Slenderness: Not considered


Run Axis: X-axis Column Type: Structural

Material Properties:
====================
f'c = 29 MPa fy = 390 MPa
Ec = 25310.3 MPa Es = 200000 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.839702

Section:
========
Circular: Diameter = 800 mm

Gross section area, Ag = 502655 mm^2


Ix = 2.01062e+010 mm^4 Iy = 2.01062e+010 mm^4
Xo = 0 mm Yo = 0 mm

Reinforcement:
==============
Rebar Database: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581

Confinement: Spiral; #13 ties with #25 bars, #13 with larger bars.
phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7

Layout: Circular
Pattern: All Sides Equal (Cover to transverse reinforcement)
Total steel area, As = 8160 mm^2 at 1.62%
16 #25 Cover = 100 mm

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1576.0 125.0 1019.9 8.160
2 204.0 125.0 821.1 6.569

*** Program completed as requested! ***


P ( kN)
12000

(Pmax)

y
x
8000

800 mm diam.
4000 fs=0
Code: ACI 318-02

Units: Metric fs=0.5fy


Run axis: About X-axis

Run option: Investigation 1


Slenderness: Not considered

Column type: Structural 2


Bars: ASTM A615M -1200 -800 -400 0 400 800 1200
Date: 02/03/17 Mx (kN-m)
Time: 07:57:24

(Pmin)

-4000

pcaColumn v3.63 - Licensed to: DSINC

File: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBAT...\SGRH-BP800 P2.col


Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_P2 Engineer: HW
f'c = 29 MPa fy = 390 MPa Ag = 502655 mm^2 16 #25 bars
Ec = 25310 MPa Es = 200000 MPa As = 8160 mm^2 Rho = 1.62%
fc = 24.65 MPa fc = 24.65 MPa Xo = 0 mm Iy = 2.01e+010 mm^4
e_u = 0.003 mm/mm Yo = 0 mm Iy = 2.01e+010 mm^4
Beta1 = 0.839702 Clear spacing = 82 mm Clear cover = 113 mm
Confinement: Spiral phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7
02/03/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 1
07:57:19 Licensed to: DSINC SGRH-BP800 P2

OOOOOOO OOOOO OOOOO OOOOO OOOOO OO


OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO
OO OO OO OOOOOOO OO OO OO OO
OOOOOOO OO OO OO OO OO OO OO OO OO
OO OO OO OO OO OO OO OO OO OO
OO OOOOO OO OO OOOOO OOOOO OOOOO (TM)

========================================================================
Computer program for the Strength Design of Reinforced Concrete Sections
========================================================================

Licensee stated above acknowledges that Portland Cement Association


(PCA) is not and cannot be responsible for either the accuracy or
adequacy of the material supplied as input for processing by the
pcaColumn(tm) computer program. Furthermore, PCA neither makes any
warranty expressed nor implied with respect to the correctness of the
output prepared by the pcaColumn(tm) program.Although PCA has endeavored
to produce pcaColumn(tm) error free, the program is not and can't be
certified infallible. The final and only responsibility for analysis,
design and engineering documents is the licensees. Accordingly, PCA
disclaims all responsibility in contract, negligence or other tort for
any analysis, design or engineering documents prepared in connection
with the use of the pcaColumn(tm) program.
02/03/17 pcaColumn V3.63 - PORTLAND CEMENT ASSOCIATION - Page 2
07:57:19 Licensed to: DSINC SGRH-BP800 P2

General Information:
====================
File Name: C:\Users\dwise\Documents\DSDOCS\CALCULATION\JEMBATAN\SEKSI-5\5.1. JEMBATAN SUNGAI G
Project: JEMBATAN SUNGAI GRENJENG
Column: BP800_P2 Engineer: HW
Code: ACI 318-02 Units: Metric

Run Option: Investigation Slenderness: Not considered


Run Axis: X-axis Column Type: Structural

Material Properties:
====================
f'c = 29 MPa fy = 390 MPa
Ec = 25310.3 MPa Es = 200000 MPa
Ultimate strain = 0.003 mm/mm
Beta1 = 0.839702

Section:
========
Circular: Diameter = 800 mm

Gross section area, Ag = 502655 mm^2


Ix = 2.01062e+010 mm^4 Iy = 2.01062e+010 mm^4
Xo = 0 mm Yo = 0 mm

Reinforcement:
==============
Rebar Database: ASTM A615M
Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2) Size Diam (mm) Area (mm^2)
---- --------- ----------- ---- --------- ----------- ---- --------- -----------
# 10 10 71 # 13 13 129 # 16 16 199
# 19 19 284 # 22 22 387 # 25 25 510
# 29 29 645 # 32 32 819 # 36 36 1006
# 43 43 1452 # 57 57 2581

Confinement: Spiral; #13 ties with #25 bars, #13 with larger bars.
phi(a) = 0.85, phi(b) = 0.9, phi(c) = 0.7

Layout: Circular
Pattern: All Sides Equal (Cover to transverse reinforcement)
Total steel area, As = 8160 mm^2 at 1.62%
16 #25 Cover = 100 mm

Factored Loads and Moments with Corresponding Capacities: (see user's manual for notation)
=========================================================
Pu Mux fMnx
No. kN kN-m kN-m fMn/Mu
--- ------------ ------------ ------------ --------
1 1624.0 141.0 1022.5 7.252
2 139.0 141.0 807.8 5.729

*** Program completed as requested! ***