BANGUNAN SUNGAI
Dian Indrawati,S.T.,M.T.
Fungsi Perbedaan
Perpindahan Air Panjang dan Debit
Kondisi Geologis
Pengendali Alur
Pengendali Debit
Pengendali Banjir
Tujuan
▪ Pengendali Erosi
▪ Pengaman Tebing Sungai
▪ Pengarah Arus ke Struktur
▪ Navigasi
▪ Pengendali Banjir
▪ Reklamasi Lahan
TUJUAN METODE
PAS.BETON K.225
0.20
0.50
1.00
0.20
2.00
sedimen di bagian hulu groundsill
A A
122.50 122.50 123.00
2.00
1 1
0.50 1
4 1.00
D16 - 150
D16 - 100 D16 - 100
1.00
D16 - 100 0.45 D16 - 150
0.15 0.15
2.10
0.30
2.00 0.30
BETON CYCLOP 0.50
PAS.BETON K.225 PAS.BETON K.225
0.50 0.25 5.00 1.00 1.10
0.50 0.50
1.00
0.20 0.20 0.10
5.00
B 1.00
C
10.00
3.25
0.50 2.00 0.50 1.50 0.50
Lantai Kerja 0.50
t = 0.10 m
Provinsi :
DETAIL TULANGAN GROUNDSILL
Skala 1 : 20
DENAH GROUNDSILL
PAPUA
Proyek :
Provinsi :
PAPUA
Proyek :
5
A.
K.225
PAS.BETON
K.225
PAS.BETON
20
B.
19
B.
18
B.
17
B.
16
B.
15
K.225
PAS.BETON
K.225
B.
PAS.BETON
14
B.
12
B.
10
BM.3 EXSISTING
B.
X= 539312.070
Y= 9615487.950
6
B.
Z= 24.628
R
A.
GA
10
A.
G
AN
12
A.
W
14
I
A.
A
UNG
S
REKAYASA SUNGAI DAN RAWA
PERUBAHAN KECEPATAN SEBELUM
DAN SESUDAH GROUNDSILL
Jembatan
Wanggar
2.00
Lantai Kerja
t = 0.10 m 2.00
Timbunan
Kembali
▪ Navigasi ▪ Tetap/Bergerak
▪ Irigasi, Penyediaan Air ▪ Diatur/Tanpa Diatur
▪ Pembagian setelah orde
terakhir
(distributaries/branches)
▪ Pengadaan Listrik
3.00
TALANG PIPA Ø 80 Cm
KE SAL.SEK.SINAMAR KANAN
1.60
1.50
6.30
2.00
Penstock Gate
1.23
0.60 0.80
Trashrack
0.85
13.00 7.30
2.50
2.00
0.80
6.00
3.70
3.70
1.60
1.60
0.85
1.00
Inspection
Ladder
Penstock Ø 2.00 m
1.88
1.63
35.000 kg
2.75
Tailrace stop lock
leakproof close for revision
Note : (local supply)
Provide waterproofing compound
material for sealing power house Hand Rail
3.93
floor against the flood level
9.69
Concrete Class A
EL + 143.07
EL + 2.00
Hand Rail
EL + 141.07
EL + 140.55 EL + 140.30
Trashrack
8.88 0.80
EL + 146.62
EL + 146.20
76
EL + 145.82 EL + 145.82
°
EL + 145.72
1.10
EL + 145.23
EL + 144.92 1
0.40
2
Penstock Ø 2.00 m
2.00
0
0.4
0.30
0.50
EL + 142.60
0.90
0.40
0.50
6.67
+52.87
+56.06
+56.06 D +52.87
+52.87
B C
A A
MAN. +53.54
MAB. +54.56
+53.54
+48.85
+50.30
+52.29
Rip rap
+48.85
+52.29 +52.29 +48.30
+52.87 +52.87
B C
+56.06 +52.87
+56.06
+52.87
DENAH
SKALA 1:100
+5
SKALA 1:100
6
+5
+5
2.2
4.5
9
6
+56.06 +56.06
6 +50.30 +50.30
4.5
+5
+48.65 +48.85 +48.85
9 +48.30
2.2
+5 Rip rap
6
4.5
+5
POTONGAN . A - A
KEGIATAN : SKALA 1:100
KEPRI
POTONGAN . B - B
SKALA 1:100
+56.06 +56.06
+50.30
+50.30 +48.85
Rip rap
+48.30
KEGIATAN :
POTONGAN . D - D
SKALA 1:100 KEPRI
SKALA 1:100
LOKASI : Kep. Anambas
NO. REGISTER : -
DIGAMBAR : ADJAT SUDRADJAT
NO/JML.LEMBAR : 01/01
DIPERIKSA : DR. IR. YADI SURYADI
TANGGAL NOMOR KONTRAK
DIPERIKSA : ERIS HENDRABUANA,ST
TUJUAN METODE
364.70
4.00
1
2:
E L.1587.50
1.752.00 40.00
20.00 20.00
1
2:
2.001.75
0.50
EL.1577.50 0.50 4.00
E L.1577.50
6.00
6.00
2:
1
2:
1
E L.1571.50 E L.1571.50
E L.1571.00
2.50
2.50
E L.1569.00 E L.1569.00
EL.1432.78
1.55
1.00
BETON B.0
4.00
EL.1426.23
1585.00
1581.78
1575.74
1575.74
1566.32
1553.07
1531.10
1526.74
1532.85
1538.82
1547.28
1556.51
1562.57
1567.98
1571.02
1573.10
1576.17
1584.17
1591.40
1591.40
1591.40
Elevasi Tanah Asli (m)
25. 00
POTONGAN MEMANJANG BENDUNGAN
0 10.0 20.0 30.0 40.0 50 m
SKALA 1 : 500
C
0+075
EL.1578.50
20. 00
20. 00
40. 00
2.50
2.50
C 3.00 1 : 2.0
3.00 0
1 : 3.0
4
4
1:0.35
2
EL.1543.00 3 1
2 1 : 2.0
0
3
35
1:0.
1:
2,0 4
2 4
1 : 3.0
3
4
4 4
EL.1514.19 EL.1514.19
EL.1511.19
PROPINSI :
JAWA BARAT
AK KABUPATEN : BANDUNG
C
0+050
AK
.0
1:3
GEL
PEN UNAN
BANG
2.50
3.00
2.50 3.00 1:2
.00
4 1 4
2
3 2
3
EL.1546.41 EL.1546.41
EL.1544.41
EL.1543.00
1:2
15.73 24.06 2.00 22.56 2.00 47.90 .00
82.82
1562.74
1560.91
1558.80
1555.22
1553.07
1551.23
1553.42
1558.59
1552.78
1545.58
1540.23
1532.98
1525.12
1523.77
1525.00
Elevasi Tanah Asli (m)
TUJUAN METODE
Intervensi Sementara
Intervensi Permanen
Pengurangan Gangguan
Constriction scour
Bend scour
Local scour