Anda di halaman 1dari 217

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A K YAT

D I R E K T O R A T J E N D E R A L B I N A M A R G A
S AT U A N K E R J A B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L V I I

LAPORAN PENYELIDIKAN
GEOTEK TRASE
PLANJAN - BARON - TEPUS
TAHUN

2020

KONSULTAN MANAJEMEN PROYEK


PROVINSI JAWA TENGAH & D.I.YOGYAKARTA
2020

KSO
PT. aria Jasa Reksatama PT. SARANA MULTI DAYA
DAFTAR ISI
DAFTAR ISI
Halaman :

DAFTAR ISI .................................................................................................... i


DAFTAR TABEL ............................................................................................ ii
DAFTAR GAMBAR ........................................................................................ iii

BAB I. PENDAHULUAN .......................................................................... I-1


1.1. Latar Belakang ..................................................................... I-1
1.2. Maksud dan Tujuan .............................................................. I-1
1.3. Lingkup Pekerjaan ................................................................. I-2
1.4. Lokasi Pekerjaan .................................................................. I-2
BAB II. PENYELIDIKAN GEOTEKNIK ..................................................... II - 1
2.1. Kondisi Geologi ..................................................................... II - 1
2.2. Penyelidikan Lapangan ....................................................... II - 3
2.3. Penyelidikan Laboratorium .................................................. II - 6
BAB III. ANALISA GEOTEKNIK ................................................................... III - 1
3.1. Kondisi Geoteknik .................................................................. III - 1
3.2. Jenis Galian Badan Jalan ...................................................... III - 1
3.2.1. Umum ........................................................................ III - 1
3.2.2. Galian Biasa ............................................................. III - 2
3.2.3. Galian Batu Lunak .................................................... III - 2
3.2.4. Galian Batu ................................................................ III - 2
BAB IV. KESIMPULAN DAN SARAN ........................................................ IV – 1
LAMPIRAN–LAMPIRAN

1. PETA LOKASI

2. BOR MESIN

3. DATA LABORATORIUM

4. JENIS GALIAN

5. FOTO KEGIATAN LAPANGAN

i
DAFTAR TABEL
DAFTAR TABEL

Halaman :

1. Tabel 1.1. Daftar Penyelidikan Tanah ................................................... I–2

2. Tabel 1.1. Lokasi Penyelidikan Tanah Berdasarkan Pengujian Bor ....... I–3

3. Tabel 2.1. Lokasi dan Ringkasan Hasil Peboran Mesin ..................... II – 6

4. Tabel 2.2. Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS
Planjan–Baron–Tepus Tahap 1. ........................................... II – 8

5. Tabel 2.3. Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS
Planjan–Baron–Tepus Tahap 2. ........................................... II – 9

6. Tabel 2.4. Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS
Planjan–Baron–Tepus Tahap 3. ........................................... II – 10

7. Tabel 3.1. Klasifikasi Jenis Galian BH 01 – BH 02. ............................... III –3

8. Tabel 3.2. Klasifikasi Jenis Galian BH 03 – BH 04. ............................... III –4

9. Tabel 3.3. Klasifikasi Jenis Galian BH 05A – BH 05B. ........................... III –5

10. Tabel 3.4. Klasifikasi Jenis Galian BH 06. ............................................. III –6

ii
DAFTAR GAMBAR

Halaman :

1. Gambar 1.1. Lokasi Penyelidikan Tanah di daerah Pekerjaan JJLS

Planjan - Tepus ............................................................... I–3

2. Gambar 2.1. Peta Geologi Lokasi Kegiatan Penyelidikan Tanah JJLS

Planjan–Baron–Tepus ..................................................... II – 2

3. Gambar 2.2. Contoh Split Barrel Sampler ............................................. II – 4

4. Gambar 2.3. Contoh Palu yang Biasa Digunakan dalam Uji SPT

(SNI 4153:2008). ........................................................ II – 5

5. Gambar 2.4. Skema Urutan Uji Penetrasi Standar (SPT) (SNI 4153:2008). II – 5

iii
BAB I
PENDAHULUAN
LAPORAN PENYELIDIKAN
GEOTEKNIK
Ruas Planjan–Baron–Tepus

BAB 1.
PENDAHULUAN

1
1.1 LATAR BELAKANG

Berdasarkan Surat Direktur Pembangunan Jalan Nomor: BM 0304-Bg/641


Tanggal 23 Desember 2019 Perihal Penyampaian Hasil Survei Geologi
Ruas Planjan–Baron–Tepus dan sekitarnya bahwa dalam pelaksanaan
desain JJLS Ruas Planjan–Baron–Tepus disarankan untuk melakukan
penyelidikan geoteknik tambahan dengan pengeboran teknik dan uji kuat
tekan batuan uniaksial untuk memastikan jenis dan kualitas massa batuan
pada lokasi rencana galian dan timbunan.
Pembangunan infrastruktur tidak terlepas dari aspek geoteknik. Dalam
mendukung proses desain pembangunan suatu infrastruktur di suatu
lokasi, maka diperlukan serangkaian pekerjaan survey di lokasi tersebut.

1.2 MAKSUD DAN TUJUAN

Maksud dari pekerjaan survey penyelidikan geoteknik ini adalah untuk


memperoleh informasi mengenai jenis dan kualitas massa batuan pada
lokasi galian dan timbunan yang telah ditentukan di sepanjang jalur rencana
jalan yang akan dibangun dengan cara pengeboran teknik serta melakukan
pengujian laboratorium terhadap sampel batuan yang diperoleh.

Adapun tujuan dari penyelidikan geoteknik ini adalah :

1) Mengetahui data-data karakteristik lapisan batuan pada lokasi galian


di sepanjang jalur rencana jalan yang akan di bangun.

I-1
LAPORAN PENYELIDIKAN
GEOTEKNIK
Ruas Planjan–Baron–Tepus

2) Mengetahui perlapisan tanah atau batuan dilokasi pekerjaan.


3) Menentukan stratifikasi tanah atau batuan pada rencana jalan yang
akan dibangun.
4) Memperoleh nilai kuat tekan uniaksial batuan pada lokasi galian dan
timbunan dari hasil pengujian UCS (Unconfined Compression Test)

1.3 LINGKUP PEKERJAAN


Lingkup pekerjaan survey geoteknik ini meliputi baik pekerjaan lapangan
maupun pekerjaan laboratorium seperti dibawah ini:
1) Pemboran mesin sebanyak 7 titik pada lokasi yang ditentukan.
2) Pengujian laboratorium yang dilakukan pada contoh terganggu yang
diambil dari pemboran mesin. Pengujian laboratorium mekanika batuan
ini meliputi index properties dan engineering properties seperti nilai kuat
tekan uniaksial batuan yang diperoleh dari pengujian UCS (Unconfined
Compression Test). Pengujian Mekanika Batuan ini dilakukan di Pusat
Litbang Sumber Daya Air Kementrian Pekerjaan Umum dan Perumahan
Rakyat, Jln.Ir.H.Juanda no: 139 Bandung.
Ringkasan pekerjaan survey penyelidikan geoteknik yang telah
dilaksanakan, terlihat pada tabel berikut ini.

Tabel 1. 1 Daftar Penyelidikan Geoteknik.

No K E G I A T AN JUMLAH

1 Pekerjaan Lapangan
Pemboran Mesin 7

2 Pengujian Laboratorium
Kadar air 22
Berat isi 22
Spesific Gravity 22
Kuat Tekan Uniaksial Batuan 22
(Unconfined Compression Test)

I-2
LAPORAN PENYELIDIKAN
GEOTEKNIK
Ruas Planjan–Baron–Tepus

1.4 LOKASI PEKERJAAN


Lokasi penyelidikan geoteknik ini berada di daerah Pekerjaan JJLS Planjan
– Tepus. Lokasi pekerjaan terlampir sebagai berikut :

Tabel 1. 2 Lokasi Penyelidikan geoteknik Berdasarkan Pengujian Bor Mesin.

Koordinat Titik Bor Mesin

No Titik
STA Lokasi
Bor X Y

BH-01 KM 0+475 Planjan - Tepus 450827 9102423


BH-02 KM 2+075 Planjan - Tepus 452178 9101979
BH-03 KM 6+350 Planjan - Tepus 456131 9101751
BH-04 KM 7+825 Planjan - Tepus 457089 9100710
BH-05A KM 8+425 Planjan - Tepus 457459 9100283
BH-05B KM 8+425 Planjan - Tepus 457473 9100294
BH-06 KM 8+525 Planjan - Tepus 457468 9100184

I-3
LAPORAN PENYELIDIKAN
GEOTEKNIK
Ruas Planjan - Tepus

Gambar 1. 1 Lokasi Penyelidikan Geoteknik di daerah Pekerjaan JJLS Planjan - Tepus.

I-4
BAB II
PENYELIDIKAN
GEOTEKNIK
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

BAB 2
PENYELIDIKAN
GEOTEKNIK

2.1. KONDISI GEOLOGI


Berdasarkan pengamatan lapangan dan Peta Geologi Lembar Surakarta -
Giritontro, Jawa, oleh Surono, B. Toha dan I. Sudarno, terbitan Pusat
Penelitian Dan Pengembangan Geologi, 1992, kondisi Geologi pada
Kegiatan Penyelidikan Tanah JJLS Planjan–Baron–Tepus dapat diuraikan
seperti berikut :

a.Stratigrafi
Lapisan tanah/batuan yang terdapat pada daerah penelitian dapat diuraikan
sebagai berikut:

- FORMASI WONOSARI - PUNUNG (Tmwl):


Batugamping, batugamping napalan - tufan, batugamping konglomerat,
batupasir tufan dan batulanau.

Penyebaran batuan pada daerah Kegiatan Penyelidikan Tanah JJLS


Planjan–Baron–Tepus terlihat seperti pada gambar berikut ini:

II - 1
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Gambar 2.1 Peta Geologi Lokasi Kegiatan Penyelidikan Tanah JJLS


Planjan–Baron–Tepus.

(Sumber : Pusat Penelitian dan Pengembangan Geologi oleh Surono, B. Toha dan I.
Sudarno, 1992).

LEGENDA :

Tmwl Batugamping, batugamping napalan - tufan, batugamping


konglomerat, batupasir tufan dan batulanau.

Lokasi Penyelidikan Tanah

b. Struktur Geologi
Struktur geologi yang terdapat pada daerah penyelidikan adalah perlapisan
batuan. Tidak terdapat gejala sesar pada Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus.

II - 2
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

2.2. PENYELIDIKAN LAPANGAN

Penyelidikan lapangan yang telah dilakukan pada daerah JJLS Planjan -


Tepus, adalah sebagai berikut :

- Bor Mesin

Pekerjaan pemboran teknik dilakukan dengan tujuan untuk mengetahui


pelapisan tanah (pengambilan coring), pengambilan contoh tanah, dan
mengetahui parameter tanah dari hasil uji lapangan (pengujian Standard
Penetration Test, SPT maupun uji lainnya). Pengambilan contoh tanah tak
terganggu (Disturbed Sample, DS) dilakukan sesuai dengan kondisi
lapisan. dan coring ditempatkan dalam suatu core box, kemudian
diidentifikasi untuk mengetahui jenis tanah yang dirangkum dalam suatu
borlog.

Pengeboran inti menggunakan mesin bor rotary. Untuk tabung tunggal tidak
memerlukan sirkulasi air dan untuk tabung ganda atau triple memerlukan
sirkulasi air. Kelebihan dari pengeboran inti adalah dapat digunakan pada
batuan dan dapat mengidentifikasi tanah secara langsung, sedangkan
kekurangannya adalah tidak sesuai untuk pengeboran pada tanah lunak
karena dapat mengganggu struktur tanah. Sebuah standar untuk
pencatatan dan interpretasi dari pemboran inti (core drilling) diberikan pada
SNI 2436:2008.

- Standard Penetration Test (SPT)

Standard Penetration Test (SPT) dilakukan berdasarkan SNI 4153 : 2008


dilaksanakan bersamaan dengan pengeboran untuk mengetahui, baik
perlawanan dinamik tanah maupun pengambilan contoh terganggu dengan
teknik penumbukan. Uji SPT merupakan metode pengujian di lapangan
dengan memasukkan (memancang) sebuah Split Spoon Sampler (tabung
pengambilan contoh tanah yang dapat dibuka dalam arah memanjang)
dengan diameter 50 mm dan panjang 457 mm, disertai pengukuran jumlah
pukulan untuk memasukkan tabung belah sedalam 300 mm vertikal. Dalam

II - 3
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

sistem beban jatuh ini digunakan palu dengan berat 63,5 kg, yang
dijatuhkan secara berulang dengan tinggi jatuh 0,76 m. Pelaksanaan
pengujian dibagi dalam tiga tahap, yaitu berturut-turut setebal 150 mm
untuk masing-masing tahap. Tahap pertama dicatat sebagai dudukan,
sementara jumlah pukulan untuk memasukkan tahap ke-dua dan ke-tiga
dijumlahkan untuk memperoleh nilai pukulan N atau perlawanan SPT
(dinyatakan dalam pukulan/0,3 m).

Gambar 2. 2 Contoh Split Barrel Sampler.

II - 4
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Gambar 2. 3 Contoh Palu yang Biasa Digunakan dalam Uji SPT (SNI
4153:2008).

Gambar 2. 4 Skema Urutan Uji Penetrasi Standar (SPT) (SNI 4153:2008).

II - 5
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Lokasi pemboran mesin, terlihat pada tabel berikut ini.

Tabel 2.1 Lokasi dan Ringkasan Hasil Pemboran mesin.


Total
No. Lokasi Kedalaman
No UDS DS Kedalaman
Bor Bor Mesin Spt ≥ 60
(M)
1 BH-01 Planjan - Tepus - 3 2 18
2 BH-02 Planjan - Tepus - 3 2 17
3 BH-03 Planjan - Tepus - 4 2 23
4 BH-04 Planjan - Tepus - 3 2 24
5 BH-05A Planjan - Tepus - 3 2 36
6 BH-05B Planjan - Tepus - 3 4 36
7 BH-06 Planjan - Tepus - 3 3 30

2.3. PENGUJIAN LABORATORIUM


Pengujian laboratorium mekanika tanah dilakukan pada sampel batuan
yang diambil dari pemboran mesin. Metoda pengujian yang dilakukan
mengikuti standar SNI. Jenis pengujian dan kegunaan parameter tanah
dalam perencanaan diuraikan sebagai berikut :

- Sifat Fisika Batuan

Pengujian ini untuk bertujuan untuk mengetahui sifat-sifat fisika contoh batu
(index properties) antara lain yaitu kepadatan asli, kadar air asli, kepadatan
jenuh, penyerapan kepadatan kering, derajat kejenuhan, porositas, berat jenis
semu, berat jenis sebenarnya dan angka pori berdasarkan hasil pengkajian dan
perhitungan laboratorium. Pengujian laboratorium ini dilaksanakan dengan
mengikuti ketentuan pada SNI 03-2437-1991.

- Kuat Tekan Uniaksial Batuan


Kuat tekan uniaksial batuan diperoleh dengan pengujian (Unconfined
Compression Test) yang bertujuan untuk mengetahui kekuatan
maksimum dari batu tersebut untuk menahan tekanan atau beban hingga

II - 6
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

mengalami keruntuhan. Pengujian laboratorium ini dilaksanakan dengan


mengikuti ketentuan pada SNI 2825:2008.

Ringkasan hasil pengujian laboratorium mekanika tanah disajikan dalam


tabel berikut ini:

II - 7
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 2.2 Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS Planjan–Baron–Tepus Tahap 1
SUMMARY OF ROCK MECHANICAL TESTING MATERIAL

PENYELIDIKAN GEOTEK - P2JN Yogyakarta

SAMPLE INDEX PROPERTIES


UNCONFINED COMPRESSIVE STRENGTH

Natural Natural Saturat Dry Deg. Of Ap. True


No. DEPTH Absorpt / Porosity Void
Location Density Water Density Density Saturated Spec. Sepc. Natural
ID (m) St. Water (n) Ratio (e)
(d) Content (s) (d) (S) Gravity Gravity Poisson
sC E (Axial) E (Diametral)
Ratio
From To - gr/cm³ % gr/cm³ % gr/cm³ % % - - - kg/cm² kg/cm² kg/cm² -

JJLS PLANJAN-TEPUS /
1 BH-01/ DS-01 06.30 06.43 2.317 1.53 2.393 4.85 2.282 31.61 11.07 2.2821 2.5663 0.124 147.212 7.34E+03 1.69E+04 0.435
STA 0+475

JJLS PLANJAN-TEPUS /
2 BH-01/ DS-02 14.58 14.70 1.431 5.90 1.722 27.40 1.351 21.53 37.03 1.3514 2.1461 0.588 31.058 8.00E+03 1.89E+04 0.423
STA 0+475

JJLS PLANJAN-TEPUS /
3 BH-01/ DS-03 15.19 15.32 2.197 10.14 2.221 11.33 1.995 89.43 22.61 1.9949 2.5777 0.292 82.675 1.09E+04 2.67E+04 0.407
STA 0+475

JJLS PLANJAN-TEPUS STA


4 BH-03/ DS-01 03.76 04.00 2.296 5.46 2.355 8.15 2.177 67.05 17.74 2.1774 2.6471 0.216 175.162 3.20E+04 7.95E+04 0.402
6+350

JJLS PLANJAN-TEPUS STA


5 BH-03/ DS-02 07.74 08.00 2.638 6.66 2.548 3.03 2.473 219.44 7.50 2.4729 2.6734 0.081 372.509 5.43E+04 1.49E+05 0.365
6+350

JJLS PLANJAN-TEPUS STA


6 BH-03/ DS-03 15.82 16.00 2.596 5.06 2.547 3.08 2.471 164.10 7.62 2.4707 2.6744 0.082 196.300 2.14E+04 5.57E+04 0.385
6+350

JJLS PLANJAN-TEPUS STA


7 BH-03/ DS-04 20.72 20.89 2.545 3.59 2.538 3.31 2.457 108.51 8.13 2.4567 2.6742 0.089 200.567 2.78E+04 7.80E+04 0.356
6+350

JJLS PLANJAN-TEPUS /
8 BH-04/ DS-01 11.87 12.00 2.410 6.71 2.401 6.31 2.258 106.25 14.26 2.2585 2.6341 0.166 188.754 1.85E+04 4.28E+04 0.433
STA 7+825

JJLS PLANJAN-TEPUS /
9 BH-04/ DS-02 17.35 17.48 2.121 4.85 2.245 11.01 2.023 44.07 22.26 2.0226 2.6019 0.286 30.671 6.68E+03 1.55E+04 0.430
STA 7+825

JJLS PLANJAN-TEPUS /
10 BH-04/ DS-03 20.82 21.00 2.260 7.90 2.288 9.23 2.095 85.61 19.33 2.0946 2.5966 0.240 133.221 2.71E+04 6.10E+04 0.444
STA 7+825

II - 8
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 2.3 Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS Planjan–Baron–Tepus Tahap 2.

II - 9
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 2.4 Data Laboratorium Bor Mesin di Kegiatan Penyelidikan Tanah JJLS Planjan–Baron–Tepus Tahap 3

II - 10
BAB III
ANALISA
GEOTEKNIK
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

BAB 3
ANALISA GEOTEKNIK

3.1. KONDISI GEOTEKNIK

Berdasarkan hasil penyelidikan tanah yaitu pemboran mesin sebanyak 7


titik, dengan kedalaman maksimum mencapai 36 m dapat diketahui jenis
lapisan tanah di bawah permukaan tanah. Pada umumnya lapisan tanah
dan batuan yang terdapat pada Kegiatan Penyelidikan Tanah JJLS
Planjan–Baron–Tepus dapat diuraikan mulai dari lapisan paling atas
sampai paling bawah sebagai berikut :

- Clay, Dark Brown, High Plasticity, Very Stiff. Ketebalan lapisan ini
14,00 m. Hasil pengujian penetrasi (NSPT) sekitar 17– 39
pukulan/30 cm.
- Limestone Clay, Brownish White, Medium Hard Rock, Dry Very
Dense, Moderately Weathered Medium Compact, There is some
Fossils. Ketebalan lapisan ini berkisar dari 5,00– 24,00 m.
- Crystalline Limestone, Reddish White, Very Hard Rock,Dry Very
Dense, Moderately Weathered Medium Compact, There is some
Calcite Mineral. Lapisan ini mempunyai ketebalan berkisar dari
10,0–31,0 m. Hasil pengujian penetrasi menunjukkan (NSPT) >60
pukulan/30 cm.

3.2. JENIS GALIAN BADAN JALAN


3.2.1. Umum

Dalam konstruksi jalan diklasifikasi menjadi beberapa jenis galian sesuai


Spesifikasi Umum Bina Marga 2018 untuk Pekerjaan Konstruksi Jalan
dan Jembatan. Jenis galian yang dinyatakan dalam Spesifikasi tersebut

III - 1
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

adalah sebagai berikut : Galian Biasa, Galian Batu Lunak, Galian Batu,
Galian Struktur, Galian Sumber Bahan, Galian Perkerasan Aspal, Galian
Perkerasan Berbutir dan Galian Perkerasan Beton. Jenis galian ini
ditentukan dengan batasan karakteristik bahan yang digali dan mengacu
pada hasil pengujian laboratorium tanah dan batuan.

3.2.2. Galian Biasa

Galian biasa adalah seluruh galian yang tidak bisa dimasukkan kedalam
galian yang telah ditentukan, serta galian dalam membuang bahan yang
tidak terpakai sesuai gambar rencana.

3.2.3. Galian Batu Lunak

Galian batu lunak dan galian batu merupakan galian pada lapisan
batuan yang mempunyai kekekuatan tertentu, yang ditentukan oleh
karakteristik batuan hasil pengamatan lapangan dan uji laboratorium..
Galian Batu Lunakmencakup galian pada batuan yang mempunyai kuat
tekan uniaksial : 0,6 – 12,5 MPa ( 6 – 125 kg/cm2 ). Kuat tekan uniaxial
ini diuji sesuai dengan SNI 2825 – 2008.

3.2.4. Galian Batu

Galian batu mencakup galian bongkahan batu yang mempunyai kuat


tekan uniaksial >12,5 MPa ( > 125 kg/cm2 ), yang diuji sesuai dengan
SNI 2825 – 2008, dengan volume 1 meter kubik atau lebih. Seluruh batu
atau bahan lainnya dinyatakan oleh Pengawas Pekerjaan adalah tidak
praktis menggali tanpa menggunakan alat bertekanan udara atau
pemboran dan peledakan. Galian batu tidak termasuk galian yang
menurut Pengawas Pekerjaan dapat dibongkar dengan penggaru (ripper)
tunggal yang ditarik oleh traktor dengan berat maksimumf 15 ton dan
daya neto maksimum sebesar 180 PK (Tenaga Kuda).

III - 2
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 3. 1 Klasifikasi Jenis Galian BH 01 – BH 02.

JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
KEDALAMAN Klasifikasi Galian
No. Batuan Batuan utuh
SAMPEL Natural
Lokasi
(m)
sC E (Axial)
3
From To kg/cm² kg/cm² m
1 BH.1 STA 0 + 475 Planjan - Tepus 6,30 6,43 147,212 7,34E+03 Gamping >1 Batu

2 BH.1 STA 0 + 475 Planjan - Tepus 14,58 14,70 31,058 8,00E+03 Gamping Batu lunak

3 BH.1 STA 0 + 475 Planjan - Tepus 15,19 15,32 82,675 1,09E+04 Gamping Batu lunak

4 BH.2 STA 2 + 075 Planjan - Tepus 9,80 10,00 195,600 1,41E+04 Gamping >1 Batu

5 BH.2 STA 2 + 075 Planjan - Tepus 11,80 12,00 168,500 1,83E+04 Gamping >1 Batu

6 BH.2 STA 2 + 075 Planjan - Tepus 15,32 15,47 231,910 3,01E+04 Gamping >1 Batu

III - 3
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 3. 2 Klasifikasi Jenis Galian BH 03 – BH 04.

JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3
1 BH.3 STA 6 + 350 Planjan - Tepus 03,76 04,00 175,162 3,20E+04 Gamping >1 Batu

2 BH.3 STA 6 + 350 Planjan - Tepus 07,74 08,00 372,509 5,43E+04 Gamping >1 Batu

3 BH.3 STA 6 + 350 Planjan - Tepus 15,82 16,00 196,300 2,14E+04 Gamping >1 Batu

4 BH.3 STA 6 + 350 Planjan - Tepus 20,72 20,89 200,567 2,78E+04 Gamping >1 Batu

5 BH.4 STA 7+ 825 Planjan - Tepus 11,87 12,00 188,754 1,85E+04 Gamping >1 Batu

6 BH.4 STA 7+ 825 Planjan - Tepus 17,35 17,48 30,671 6,68E+03 Gamping Batu lunak

7 BH.4 STA 7+ 825 Planjan - Tepus 20,82 21,00 133,221 2,71E+04 Gamping >1 Batu

III - 4
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 3. 3 Klasifikasi Jenis Galian BH 05A – BH 05B.

JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3
1 BH.5A STA 8 + 425 Planjan - Tepus 03,36 03,51 201,590 2,80E+04 Gamping >1 Batu

2 BH.5A STA 8 + 425 Planjan - Tepus 05,85 06,00 431,280 3,75E+04 Gamping >1 Batu

3 BH.5A STA 8 + 425 Planjan - Tepus 31,54 31,65 242,700 2,08E+04 Gamping >1 Batu

4 BH.5B STA 8 + 425 Planjan - Tepus 06,70 06,86 358,060 5,00E+04 Gamping >1 Batu

5 BH.5B STA 8 + 425 Planjan - Tepus 13,71 13,84 265,940 3,32E+04 Gamping >1 Batu

6 BH.5B STA 8 + 425 Planjan - Tepus 17,84 18,00 544,710 5,36E+04 Gamping >1 Batu

III - 5
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

Tabel 3. 4 Klasifikasi Jenis Galian BH 06.

JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3
1 BH.6 STA 8 + 525 Planjan - Tepus 16,83 17,00 49,170 9,44E+03 Gamping Batu lunak

2 BH.6 STA 8 + 525 Planjan - Tepus 25,72 26,00 218,280 3,23E+04 Gamping >1 Batu

3 BH.6 STA 8 + 525 Planjan - Tepus 29,43 29,57 496,850 4,37E+04 Gamping >1 Batu

III - 6
BAB IV
KESIMPULAN DAN
SARAN
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

BAB 4
KESIMPULAN
DAN SARAN

Setelah dilakukan analisa geoteknik, dapat diambil saran dan rekomendasi


sebagai berikut:

• Telah dilakukan pengujian lapangan berupa bor mesin sebanyak 7 titik


pada pekerjaan Kegiatan Penyelidikan Tanah JJLS Planjan–Baron–
Tepus berdasarkan SNI 2436:2008 “Tata Cara Pencatatan dan
Identifikasi hasil Pengeboran Inti”.
• Berdasarkan pengamatan geologi dan Peta Geologi Lembar Surakarta -
Giritontro, Jawa. Penyebaran batuan pada daerah lokasi pekerjaan yaitu
berupa Batugamping, batugamping napalan - tufan, batugamping
konglomerat, batupasir tufan dan batulanau.
• Hasil penyelidikan tanah yang berupa bor mesin menunjukkan lapisan
tanah yang terdapat di daerah Kegiatan Penyelidikan Tanah JJLS Planjan
- Tepus dapat diuraikan mulai dari lapisan paling atas sampai paling
bawah sebagai berikut :
- Clay, Dark Brown, High Plasticity, Very Stiff. Ketebalan lapisan ini
14,00 m. Hasil pengujian penetrasi (NSPT) sekitar 17 – 39
pukulan/30 cm.
- Limestone Clay, Brownish White, Medium Hard Rock, Dry Very
Dense, Moderately Weathered Medium Compact, There is some
Fossils. Ketebalan lapisan ini berkisar dari 5,00 - 24,00 m.

IV - 1
LAPORAN PENYELIDIKAN GEOTEKNIK
Ruas Planjan–Baron–Tepus

- Crystalline Limestone, Reddish White, Very Hard Rock,Dry Very


Dense, Moderately Weathered Medium Compact, There is some
Calcite Mineral. Lapisan ini mempunyai ketebalan berkisar dari 10,0
– 31,0 m. Hasil pengujian penetrasi menunjukkan (NSPT) >60
pukulan/30 cm.
• Berdasarkan hasil laboratorium diperoleh analisa klasifikasi jenis galian
yaitu berupa batu lunak dan batu.

IV - 2
LAMPIRAN 1
PETA LOKASI
Laporan Survey Geoteknik
Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus
LAMPIRAN 2
BOR MESIN
Laporan Survey Geoteknik
Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 18.00 m


Location : Desa Kemadang-Wonosari STA 0+475 Start Date : 15-04-2020
Client : P2JN Yogyakarta End Date : 18-04-2020 BORE LOG
Coord. X : 450827.8 Cor Dia. : Nx, 73 mm
Coord. Y : 9102430,000 Jenis bor : Putar Kering
Elevasi : 91 m Driller : Didik Prasetyo HOLE: BH -01
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVER

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description
Y

(m) C Φ
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0 91,00
Limestone Clay, Brownish White
100 - Medium Hard Rock, Dry
0.50 Very Dense, Moderately Weathered
Medium Compact, There is some Fossils
100 -
1 00.00 - 02.60 M
90,00

100 30
1.50
100 42
2
89,00
SPT 01 ( 02.00 - 02.45 ) 35 30/8 - >60
2,45 spt spt

100 21.8
3 88,00
02.60 - 05.80 M
100 24 Limestone, Brownish White
3.50 Hard Rock, Dry
Very Dense, Moderately Weathered
100 -
Medium Compact, There is some Fossils
4 87,00
SPT 02 ( 04.00 - 04.45 ) 42 42 30/8 >60
spt spt
4.45

100 -
5 86,00
100 -
5.50
100 -
SPT 03 ( 06.00 - 06.45 )
6 85,00
Limestone, Yellowish White, Very Hard 35/2 - - >60
spt spt
6.02 Rock, Dry Very Dense, Moderately
Weathered Medium Compact,
68.6 69.9 There is some Fossils
05.80 - 06.70 M
7 84,00
Sample 01 : 06.30 - 06.41 ( 11 cm )
63.3 83.1
Sample 02 : 07.27 - 07.41 ( 14 cm )
8 83,00
SPT 04 ( 08.00 - 08.45 ) 60/13 - - >60
spt spt
8.13 Coring mulai dari 8.13

Limestone Clay, White


94.6 99.2 Very Hard Rock, Wet
9 82,00
Very Dense, Slightly Weathered
9.55 Medium Compact, There is some Fossils
06.70 - 10.00 M
90 37.7
10 81,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 02
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 18.00 m


Location : Desa Kemadang-Wonosari STA 0+475 Start Date : 15-04-2020
Client : P2JN Yogyakarta End Date : 18-04-2020 BORE LOG
Coord. X : 450827.8 Cor Dia. : Nx, 73 mm
Coord. Y : 9102430,00 Jenis bor : Putar Kering
Elevasi : 91,00 m Driller : Didik Prasetyo HOLE: BH -01
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
10 81,00
10.05 spt spt SPT 05 ( 10.00 - 10.45 ) 30/5 - - >60
Coring Mulai 10.05 M
30 22.2
10.50
10.83 22 - Limestone, White
11 Very Hard Rock, Dry
65 58.9 80,00
11.22 Very Dense, Slightly Weathered
11.51 72.5 - Medium Compact, There is some Fossils
10.00 - 12.50 M
72.5 34
11.80
12 66.6 -
79,00
12.01 spt spt SPT 06 ( 12.00 - 12.45 ) 30/1 - - >60
12.21 13.3 - Coring Mulai 12.01 M
12.50 - 13.44 M
13 52.6 51.8 Limestone Clay, Yellowish White
Hard Rock, Wet
78,00
Very Dense, Moderately Weathered
73.3 61.3
13.44 Medium Compact, There is some Fossils
77.5 51.6
13.75
14 83.3 - 13.44 - 15.20 M
77,00
14.03 spt spt SPT 07 ( 14.00 - 14.45 ) 35/3 - - >60
14.41 76 28.9 Coring dari Mulai 14.03 M
14.88 78.3 53.1 Sample 03 : 14.58 - 14.70 ( 12 cm )
15 Limestone, Yellowish White
100 46 76,00
15.38 Very Hard Rock, Dry
Very Dense, Moderately Weathered
15.95 95 80.7 Medium Compact, There is some Fossils

16 16.6 - Sample 04 : 15.19 - 15.32 ( 13 cm )


75,00
16.02 spt spt SPT 08 ( 16.00 - 16.45 ) 35/2 - - >60
Coring dari mulai 16.02
35.3 83
16.55 Limestone Clay, White, Hard Rock, Wet
16.96 68.3 - Very Dense, Slightly Weathered
17 Medium Compact, There are Fossils
55 63.6 74,00
17.18 15.20 - 16.50 M
Limeston, White, Very Hard Rock, Dry
17.46 70 53.57
Very Dense, Slightly Weathered
17.71 62.5 60 Medium Compact, There is some Fossils
18 72.5 37.9 16.50 - 18.00 M
73,00
FINISH BORING

19 72,00

20 71,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 02
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 17.00 M


Ladang Porangan 19-04-2020
Location
Client
:
: P2JN Yogyakarta
Start Date
End Date
:
: 21-04-2020
BORE LOG
Coord. X : 452178.8 Cor Dia. : Nx, 73 mm
Coord. Y : 9101979,000 Jenis bor : Putar Kering
Elevasi :: 79 m Driller : Didik Prasetyo HOLE: BH -02
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
o N - Blows N 10 20 30 40 50 60
(Kpa) ( )
0 79,00
Soil, Dark Brown, Moist, Soft (00.00 - 00.24)
100 -
0.50
Limestone Clay, Brownish White
Hard Rock,Dry
100 -
1,00 Very Dense, Moderately Weathered 78,00
Medium Compact, There is some Fossils
1.50 - 00.24 - 02.00 M
100
100 -
2,00 SPT 01 (02.00 - 02.45) 77,00 25/0 - - >60
Coring Mulai 02.00 M
2.40 80 50

Limestone, White
Hard Rock,Dry, Very Dense,
100 -
3,00 Slightly Weathered, Compact, 76,00
3.10 There is some Fossils
02.00 - 03.60 M
3.59 81.66 20.40

82 -
4,00 SPT 02 (04.00 - 04.45) 13/15 16/15 18/15 34/30
75,00
Coring Mulai 04.45 M
4.45 spt spt

Limestone Clay, Brownish White


91.66 - Hard Rock,Dry
5,00 Very Dense, Moderately Weathered 74,00
Medium Compact, There is some Fossils
5.40 100 -
03.60 - 09.00 M

85.71 18.33
6,00 SPT 03 (06.00 - 06.45) 73,00 16/15 21/15 28/15 49/30
Coring Mulai 06.45 M
6.45 spt spt
6.76 77.5 48.38 Limestone Clay, Brownish White
Hard Rock,Dry
7,00 Very Dense, Moderately Weathered 72,00
100 -
Medium Compact, There is some Fossils
7.26
03.60 - 09.00 M
7.69
77.5 77.4
8,00 SPT 04 (08.00 - 08.45) 71,00 18/15 25/15 30/2 >60
Coring Mulai 08.32 M
8.32 spt spt

8.89 95 71.92
9,00 Limestone, Brownish White, Very Hard Rock,Dry, 70,00
70 -
9.17 Very Dense, Moderately Weathered, Medium
Compact, There is some Fossils
9.52 87.5 -
Sample 1 : 09.80 - 10.00 (20 cm)
09.00 - 12.30 M
96 64.5
10,00 69,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 02
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 17.00 M


Location : Ladang Porangan Start Date : 19-04-2020
Client : P2JN Yogyakarta End Date : 21-04-2020 BORE LOG
Coord. X : 452178.8 Cor Dia. : Nx, 73 mm
Coord. Y : 9101979,00 Jenis bor : Putar Kering
Elevasi : 79,00 m Driller : Didik Prasetyo HOLE: BH -02
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description
(m) C Φ (
o N - Blows N 10 20 30 40 50 60
(Kpa) )
10,00 spt spt SPT 05 (10.00 - 10.45) 69,00 30/1 - - >60
Coring Mulai 10.00 M
10.50 100 -

Limestone Clay, Brownish White


10.82 80 -
Hard Rock,Dry
11,00 Very Dense, Moderately Weathered 68,00
97.1 14.7 Medium Compact, There is some Fossils
11.50

100 40 Sample 2 : 11.80 - 12.00 (20 cm)


12,00 SPT 06 (12.00 - 12.45) 67,00 28/1 - - >60
spt spt Coring Mulai 12.00 M
12.50
100 -
Limestone Clay, Brownish White
Hard Rock,Dry
94.2 30.3
13,00 Very Dense, Moderately Weathered 66,00
13.16 Medium Compact, There is some Fossils
12.30 - 15.32 M
13.66 100 70

85 -
14,00 SPT 07 (14.00 - 14.45) 65,00 35/2 - - >60
spt spt Coring Mulai 14.00 M
14.77 96.25 -

15,00 64,00
100 37.14
15.47
Sample 3 : 15.32 - 15.47 (15 cm)

88.33 -
16,00 SPT 08 (16.00 - 16.45) 63,00 40/3 - - >60
spt spt Coring Mulai 16.00 M
16.50
100 - Limestone, Brownish White
Very Hard Rock, Dry, Very Dense,
Moderately Weathered, Medium Compact,
There is some Fossils
100 -
17,00 15.32 - 17.00 M 62,00

FINISH BORING

18,00 61,00

19,00 60,00

20,00 59,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 02
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 m


Ladang Banyusmurup-Wonosari STA 8+425 28-04-2020
Location
Client
:
: P2JN Yogyakarta
Start Date
End Date
:
: 01-05-2020
BORE LOG
Coord. X : 457456,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100292,000 Jenis bor : Putar Kering
Elevasi : : 73 m Driller : Didik Prasetyo HOLE: BH -05A
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0 73,00
100 - Soil, Dark Brown, Moist, Soft (00.00 - 00.30)
0.30

-
0.80 100 Limestone, Brownish White
Hard Rock,Dry
1,00 100 30 Very Dense, Moderately Weathered 72,00
1.20 Medium Compact, There is some Fossils
1.46 52 - 00.30 - 06.00 M
1.62 53.3 62.5
95 55.2
71,00
2,00
spt spt SPT 01 (02.00 - 02.45) 37/2 - - >60
2.10 100 - Coring Mulai 02.00 M
2.48 95 76.3
2.98 100 50
3,00 Sample 1 :03.36 - 03.51 (15 cm) 70,00
100 38.5
3.68

80 -
SPT 02 (04.00 - 04.45) 28/1 - - >60
4,00 69,00
spt spt Coring Mulai 04.00 M
4.22 73.3 59
4.45 76.6 43.4

5,00 80 - 68,00
5.25
87.5 -
5.60
Sample 2 :05.85 - 06.00 (15 cm)
80 70
SPT 03 (06.00 - 06.45) 67,00 48/3 - - >60
6,00
spt spt Coring Mulai 06.00 M
6.40 80 37.5 Limestone, Brownish White
6.70 75 43.3 Hard Rock,Dry
Very Dense, Moderately Weathered
75 -
7,00 Compact, There is some Fossils 66,00
7.30 100 46.6 06.00 - 06.94 M
7.58 93.3 -
7.80 73.3 -
66.6 60 SPT 04 (08.00 - 08.45) 65,00 35/1 - - >60
8,00
spt spt Coring Mulai 08.00 M
8.30 100 43.3 Limestone, Reddish White
8.62 80 40.6 Very Hard Rock,Dry
8.88 86.6 38.4 Very Dense, Moderately Weathered
9,00 Compact, There is some Fossils 64,00
53.3 -
9.20 06.94 - 10.30 M
9.50 100 -
9.67 85 58.8
82.5 -
10,00 63,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 m


Location : Ladang Banyusmurup-Wonosari STA 8+425 Start Date : 28-04-2020
Client : P2JN Yogyakarta End Date : 01-05-2020 BORE LOG
Coord. X : 457456,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100292,00 Jenis bor : Putar Kering
Elevasi : 73,00 m Driller : Didik Prasetyo HOLE: BH -05A
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVER

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core
Y (%)

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
10,00 spt spt SPT 05 (10.00 - 10.45) 63,00
Coring Mulai 10.00 M 43/2 - - >60
10.30 100 -

- -
11,00 62,00

Lose Core 2.00 M ( 10.30 - 12.30 M )


- -

12,00 61,00
SPT 06 (12.00 - 12.30) ( Lost SPT ) - - - -
12.30 Lost spt Lost spt
Coring Mulai 12.30 M
12.65 70 -
12.89 80 - Crystalline Limestone, Brownish White
13,00 Hard Rock,Dry 60,00
80 -
13.29 Very Dense, Moderately Weathered
Medium Compact, There is some Calcite Mineral
75 22.2
13.74 12.30 - 15.47 M
72.5 -
14,00 SPT 07 (14.00 - 14.45) 59,00 32/15 42/5 - >60
Coring Mulai 14.20 M
14.20 spt spt

100 -
15,00 58,00
15.20 100 -
90 -
15.47
Lose Core 2.40 M ( 15.47 - 17.87 M )
16,00 SPT 08 (16.00 - 16.45) ( Lost SPT ) 57,00 - - - -

- -
Lose Core 2.40 M ( 15.47 - 17.87 M )
17,00 56,00

17.87
43.3 -
SPT 09 (18.00 - 18.45) 55,00 36/15 47/8 - >60
18,00
spt spt Coring Mulai 18.23 M
18.23
100 -
18.63 Crystalline Limestone, Brownish White
Hard Rock,Dry
19,00 100 - Very Dense, Moderately Weathered 54,00
19.13 Medium Compact, There is some Calcite Mineral
17.87 - 25.30 M
100 -
19.73
45 40
20,00 53,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 m


Location : Ladang Banyusmurup-Wonosari STA 8+425 Start Date : 28-04-2020
Client : P2JN Yogyakarta End Date : 01-05-2020
BORE LOG
Coord. X : 457456,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100292,00 Jenis bor : Putar Kering
Elevasi : 73,00 m Driller : Didik Prasetyo HOLE: BH -05A
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(%)
(m)

Description
(m) C Φ
o N - Blows N 10 20 30 40 50 60
(Kpa) ( )
20,00 spt spt SPT 10 (20.00 - 20.45) 53,00 38/1 - - >60
20.40 66.6 - Coring Mulai 20.00 M
20.65 83.3 -
Crystalline Limestone, Brownish White
20.95 75 -
Hard Rock,Dry
21,00 Very Dense, Moderately Weathered 52,00
66.6 -
21.35 Medium Compact, There is some Calcite Mineral
17.87 - 25.30 M
21.60 83.3 -

100 -
SPT 11 (22.00 - 22.45) 51,00 40/2 - - >60
22,00
spt spt Coring Mulai 22.00 M
22.30 100 -
22.90 100 -

23,00 50,00
100 -
23.40

66.6 -
24,00 SPT 12 (24.00 - 24.45) 49,00 47/6 - - >60
24.06 spt spt Coring Mulai 24.06 M

Crystalline Limestone, Brownish White


100 - Hard Rock,Dry
25,00 Very Dense, Moderately Weathered 48,00
25.06 Not Compact, There is some Calcite Mineral
25.30 - 30.00 M
94 -

SPT 13 (26.00 - 26.45) 47,00 40/2 - - >60


26,00
spt spt Coring Mulai 26.00 M
26.80 100 -

27,00 46,00
85.7 -
27.40

85.7 -
28,00 SPT 14 (28.00 - 28.45) 45,00 48/9 - - >60
28.09 spt spt Coring Mulai 28.09 M

100 - Crystalline Limestone, Brownish White


28.99 Hard Rock,Dry
29,00 Very Dense, Moderately Weathered 44,00
Not Compact, There is some Calcite Mineral
25.30 - 30.00 M
84.1 -

30,00 43,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 03
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 m


Location : Ladang Banyusmurup-Wonosari STA 8+425 Start Date : 28-04-2020
Client : P2JN Yogyakarta End Date : 01-05-2020
BORE LOG
Coord. X : 457456,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100292,00 Jenis bor : Putar Kering
Elevasi : 73,00 m Driller : Didik Prasetyo HOLE: BH -05A
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(%)
(m)

Description
(m) C Φ (
o N - Blows N 10 20 30 40 50 60
(Kpa) )
30,00 spt spt SPT 15 (30.00 - 30.45) 43,00
Coring Mulai 30.45 M 17/15 25/15 27/15 52/60
30.45 - -
Crystalline Limestone, Brownish White
Hard Rock,Dry
Very Dense, Moderately Weathered
31,00 100 - Slightly Compact, There is some Calcite Mineral 42,00
30.00 - 34.39 M
31.45

Sample 3 :31.54 - 31.65 (11 cm)


91.6 20
32,00 SPT 16 (32.00 - 32.45) 41,00 15/15 28/15 31/15 59/60
Coring Mulai 32.45 M
32.45 spt spt

Crystalline Limestone, Brownish White


91.6 - Hard Rock,Dry
33,00 Very Dense, Moderately Weathered 40,00
Slightly Compact, There is some Calcite Mineral
33.80 100 - 30.00 - 34.39 M

100 -
34,00 SPT 17 (34.00 - 34.45) 39,00 30/7 - - >60
34.07 spt spt Coring Mulai 34.07 M

Limestone Clay, Brownish White


91 67.7
Hard Rock,Dry, Very Dense,
35,00 Moderately Weathered, Medium Compact, 38,00
There is some Crystalline Calcite Mineral
34.39 - 36.00 M
100 92

36,00 37,00

FINISH BORING

37,00 36,00

38,00 35,00

39,00 34,00

40,00 33,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 04
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 23.00 m


22-04-2020
Location
Client
:
:
Ladang Sadang-Wonosari STA 7+825
P2JN Yogyakarta
Start Date
End Date
:
: 24-04-2020 BORE LOG
Coord. X : 456131.5 Cor Dia. : Nx, 73 mm
Coord. Y : 9101751,000 Jenis bor : Putar Kering
Elevasi : : 153 m Driller : Didik Prasetyo HOLE: BH -03
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0
153,00
0.32 80 43.75 Limestone, Brownish White
0.67 70 40 Very Hard Rock,Dry
0.96 72.5 41.3 Very Dense, Moderately Weathered
1 Medium Compact, There is some Fossils
62.75 84 152,00
1.21 00.00 - 07.00 M
1.35 70 100
1.75 100 60
2 83.3 - SPT 01 ( 02.00 - 02.45 ) 45/5 - - >60
151,00
2.05 spt spt Coring mulai dari 02.05
2.55 100 -
2.95 100 30
3
88.5 72.5 150,00
3.57 Sample 01 : 03.76 - 04.00 ( 24 cm )
86 55.8 SPT 02 ( 04.00 - 04.45 ) 30/4 - - >60
4 149,00
spt spt Coring mulai dari 04.00
4.18 90 100
4.51 66 30.3
4.73 73.33 72.72
5
91.6 34.5 148,00
5.28
5.79 85 49
6 spt spt SPT 03 ( 06.00 - 06.45 ) 40/3 - - >60
147,00
6.14 70 - Coring mulai dari 06.00
6.62 80 29.1
7
91.6 58.1 146,00
7.17
7.62 90 37.7 Sample 02 : 07.74 - 08.00 ( 26 cm )
95 68.4 SPT 04 ( 08.00 - 08.45 ) 38/2 - - >60
8 145,00
spt spt Coring mulai dari 08.00
8.78 97.5 88.4 Limestone, Brownish White
9 Very Hard Rock,Dry
83.3 48 144,00
9.03 Very Dense, Moderately Weathered
9.81 86.6 97.4 Compact, There is some Fossils
07.00 - 11.00 M
10 63.3 100 143,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 23.00 m


Location : Ladang Sadang-Wonosari STA 7+825 Start Date : 22-04-2020
Client : P2JN Yogyakarta End Date : 24-04-2020 BORE LOG
Coord. X : 456131.5 Cor Dia. : Nx, 73 mm
Coord. Y : 9101751,00 Jenis bor : Putar Kering
Elevasi : 153,00 m Driller : Didik Prasetyo HOLE: BH -03
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
SPT 05 ( 10.00 - 10.45 )
10 spt spt 143,00
Coring mulai dari 10.00 37/1 - - >60
Limestone, Brownish White, Very Hard Rock,Dry
10.36 72 72.2
Very Dense, Moderately Weathered
10.69 82.5 100 Compact, There is some Fossils
11 07.00 - 11.00 M
100 20 142,00
11.19
11.55 90 -
12 64.2 53.3 SPT 06 ( 12.00 - 12.45 ) 30/15 30/2 - >60
141,00
12.17 spt spt Coring mulai dari 12.17
12.43 86.6 38.4 Limestone, Reddish Grey
12.71 77.5 64.5 Very Hard Rock,Dry
12.87 53.3 87.5 Very Dense, Moderately Weathered
Medium Compact, There is some Fossils
13 140,00
100 43.3 11.00 - 13.17 M
13.17
13.59 70 54.7

82 26.8 SPT 07 ( 14.00 - 14.45 ) 42/3 - - >60


14 139,00
spt spt Coring dari Mulai 14.00 M
14.26 86.6 -
14.86 100 18.3
15
91.4 37.5 138,00
15.50 Sample 03 : 15.82 - 16.00 ( 18 cm )
100 36 SPT 08 ( 16.00 - 16.45 )
16 137,00
spt spt Coring dari mulai 16.00 M 30/1 - - >60
16.28 70 50
16.86 82.8 20.6
17
100 - 136,00
17.46
SPT 09 ( 18.00 - 18.45 ) 40/4 - - >60
18 90 - 135,00
Coring dari mulai 18.00 M
18.80 80 13.75 Crystalline Limestone, Reddish White
19 Very Hard Rock,Dry
100 - 134,00
19.40 Very Dense, Moderately Weathered
Medium Compact, There is some Calcite Mineral
20 100 70 133,00
13.17 - 20.00 M

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 23.00 m


Location : Ladang Sadang-Wonosari STA 7+825 Start Date : 22-04-2020
Client : P2JN Yogyakarta End Date : 24-04-2020 BORE LOG
Coord. X : 456131.5 Cor Dia. : Nx, 73 mm
Coord. Y : 9101751,00 Jenis bor : Putar Kering
Elevasi : 153,00 m Driller : Didik Prasetyo HOLE: BH -03
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
SPT 10 ( 20.00 - 20.45 ) 45/6 - - >60
20 spt spt 133,00
Sample 04 : 20.72 - 20.89 ( 17 cm )
Coring dari mulai 20.00 M
20.64 91.4 96.8
Crystalline Limestone, Yellowish White
21 Very Hard Rock,Dry
81 54.3 132,00
21.45 Very Dense, Slighty Weathered
Medium Compact, There is some Calcite Mineral
21.72 67.5 59.2
20.00 - 23.00 M
SPT 11 ( 22.00 - 22.45 ) 35/2 - - >60
22 spt spt 131,00
Coring dari mulai 22.00 M
23 83.3 16 130,00

FINISH BORING

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 24.00 m


Location : Ladang Sadang-Wonosari STA 7+825 Start Date : 25-04-2020
Client : P2JN Yogyakarta End Date : 27-04-2020
BORE LOG
Coord. X : 457089,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100710,000 Jenis bor : Putar Kering
Elevasi : : 177 m Driller : Didik Prasetyo HOLE: BH -04
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0 177,00
Limestone, Brownish White
100 48 Medium Hard Rock,Dry
0.50 Very Dense, Moderately Weathered
Medium Compact, There is some Fossils
100 -
1 00.00 - 02.70 M
176,00
100 -
1.50
100 - SPT 01 ( 02.00 - 02.45 ) 30/7 - - >60
2 175,00
spt spt Coring mulai dari 02.07
2.07 Limestone Clay, Brownish White, Medium
2.27 50 - Wet Hard Rock, Very Dense, Moderately
2.65 95 65 Weathered, Medium Compact, There is
some Fossils
3 174,00
02.70 - 11.30 M
90 62.9

4 SPT 02 ( 04.00 - 04.45 ) 12 30/11 - >60


173,00
4.45 spt spt Coring mulai dari 04.45
4.70 62 92

172,00
5

86.6 72.3 SPT 03 ( 06.00 - 06.45 ) 30/10 - - >60


6 Coring mulai dari 6.10
171,00
Limestone Clay, Brownish White
6.10 spt spt
Medium Hard Rock, Wet
6.48 95 97.3 Very Dense, Moderately Weathered
Medium Compact, There is some Fossils
7 170,00
02.70 - 11.30 M
7.25
7.62 92.5 -
SPT 04 ( 08.00 - 08.45 ) 20/5 - - >60
8 95 31.5 169,00
Coring mulai dari 8.00
8.60 100 100
9 168,00
100 75
9.20
9.55 100 91.4
10 90 60 167,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 24.00 m


25-04-2020
Location
Client
:
:
Ladang Sadang-Wonosari STA 7+825
P2JN Yogyakarta
Start Date
End Date
:
: 27-04-2020 BORE LOG
Coord. X : 457089,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100710,00 Jenis bor : Putar Kering
Elevasi : 177,00 m Driller : Didik Prasetyo HOLE: BH -04
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
SPT 05 ( 10.00 - 10.45 ) 30/8 - - >60
10 spt spt 167,00
Coring mulai dari 10.00
10.40 100 42.5
Limestone Clay, Brownish White
10.88 91 91.6 Medium Hard Rock, Wet
11 Very Dense, Moderately Weathered
166,00
66 48.48 Medium Compact, There is some Fossils
11.21
02.70 - 11.30 M
65.8 16.45 Sample 01 : 11.87 - 12.00 ( 13 cm )
12 165,00
spt spt SPT 06 ( 12.00 - 12.45 ) 30/3 - - >60
12.15 75 100 Coring mulai dari 12.00
Limestone, Brownish White
13
85.8 77.1 Hard Rock,Dry
13.18 Very Dense, Moderately Weathered
164,00
Medium Compact, There is some Fossils
13.57 97.5 30.7
11.30 - 16.00 M
86 - SPT 07 ( 14.00 - 14.45 ) 35/5 - - >60
14 163,00
spt spt Coring dari Mulai 14.03 M
100 30
14.80
15
98 53 162,00
15.29
71 53.5
16 161,00
spt spt SPT 08 ( 16.00 - 16.45 ) 30/4 - - >60
16.16 80 - Coring dari mulai 16.02
16.62 92 32.6 Limestone, White
17 Very Hard Rock,Dry
100 22 160,00
17.12 Very Dense, Slightly Weathered
Medium Compact, There is some Fossils
17.35 76.6 95.6
16.00 - 19.00 M
Sample 02 : 17.35 - 17.48 ( 13 cm )
18 81.25 43
SPT 09 ( 18.00 - 18.45 ) 35/2 - - >60
159,00
18.40 100 - Coring dari mulai 18.00
18.84 62.8 -
19
88 - 158,00
19.28 Limestone, Yellowish White
Hard Rock,Dry
19.54 86.6 -
Very Dense, Medium Weathered
Medium Compact, There is some Fossils
20 92 - 157,00
19.00 - 22.00 M
0 to 10 % Trace UDS - Shelby Tube SPT Sample
10 to 20 % Some UDS - Piston PMT Test P. 02 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 24.00 m


Location : Ladang Sadang-Wonosari STA 7+825 Start Date : 25-04-2020
Client : P2JN Yogyakarta End Date : 27-04-2020
BORE LOG
Coord. X : 457089,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100710,00 Jenis bor : Putar Kering
Elevasi : 177,00 m Driller : Didik Prasetyo HOLE: BH -04
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
SPT 10 ( 20.00 - 20.45 )
20 spt spt 157,00
Coring dari mulai 20.00 35/3 - - >60
20.30 100 -
Sample 03 : 20.82 - 21.00 ( 12 cm )
21 87.5 47.1 156,00

21.31 77.5 -
86.25 86.9 SPT 11 ( 22.00 - 22.45 )
22 155,00
spt spt Coring dari mulai 22.00 25/1 - - >60
22.40 100 30
22.70 100 - Limestone, Reddish White
Very Hard Rock,Dry
23 100 46.6 154,00
Very Dense, Medium Weathered
Medium Compact, There is some Fossils
23.50 100 -
22.00 - 24.00 M
24 100 90
153,00
FINISH BORING

25
152,00

26
151,00

27
150,00

28
149,00

29 148,00

30 147,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 03
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 M


Location : Ladang Banyusmurup-Wonosari STA 8+425 Start Date : 02-05-2020
Client : P2JN Yogyakarta End Date : 04-05-2020 BORE LOG
Coord. X : 457473,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100294,000 Jenis bor : Putar Kering
Elevasi : : 111 m Driller : Didik Prasetyo HOLE: BH -05B
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0 111,00
100 - Soil, Dark Brown, Moist, Soft (00.00 - 00.50)
0.50

Limestone Clay, Brownish White


100 78 Hard Rock,Dry
1,00 Medium Dense, Moderately Weathered 110,00
Medium Compact, There is some Fossils
1.50 100 84
00.50 - 02.55 M

100 60
2,00 SPT 01 : 02.00 - 02.45 109,00 20/15 8/15 8/15 16/30
Coring Mulai 02.45 M
2.45 spt spt
Limestone Clay, Reddish White
2.95 100 22
Hard Rock,Dry, Very Dense,
3,00 Moderately Weathered, Medium Compact, 108,00
100 34 There is some Crystalline Calcite Mineral
3.45
02.55 - 05.58 M
3.80 70 28.5

66.6 - SPT 02 : 04.00 - 04.45 38/3 - - >60


4,00 107,00
spt spt Coring Mulai 04.00 M
4.30 100 -
Limestone Clay, Reddish White
Hard Rock,Dry, Very Dense,
100 -
5,00 Moderately Weathered, Medium Compact, 106,00
There is some Crystalline Calcite Mineral
5.32 80 -
02.55 - 05.58 M
5.72 100 52.5

93.33 - SPT 03 : 06.00 - 06.45 105,00 40/2 - - >60


6,00
spt spt Coring Mulai 06.00 M
6.70 100 14.2
Sample 1 : 06.70 - 06.86 (16 cm)
7,00 Crystalline Limestone, Reddish White 104,00
78.75 25.3
Hard Rock,Dry, Very Dense,
7.33
Moderately Weathered, Compact,
There is some Calcite Mineral
95.7 - 05.58 - 07.70 M
SPT 04 : 08.00 - 08.45 103,00 30/2 - - >60
8,00
spt spt Coring Mulai 08.00 M
8.42 84 23.8
Crystalline Limestone, Brownish White
8.76 68 -
Hard Rock,Dry, Very Dense,
9,00 Moderately Weathered, Compact, 102,00
73.33 52.27 There is some Calcite Mineral
9.64
07.70 - 09.61 M

90 27.77
10,00 101,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 M


Location : Ladang Banyusmurup-Wonosari STA 8+425 Start Date : 02-05-2020
Client : P2JN Yogyakarta End Date : 04-05-2020 BORE LOG
Coord. X : 457473,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100294,00 Jenis bor : Putar Kering
Elevasi : 111,00 m Driller : Didik Prasetyo HOLE: BH -05B
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVER

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Y (%)

Core

Elev.
(m)

Description Φ (
(m) C
o N - Blows N 10 20 30 40 50 60
(Kpa) )
10,00 SPT 05 : 10.00 - 10.45 101,00 15/15 21/15 28/15 49/30
spt spt
10.45 Coring Mulai 10.00 M
Limestone Clay, Brownish White
10.81 90 -
Hard Rock,Dry, Very Dense,
Moderately Weathered, Compact,
11,00 There is some Crystalline Calcite Mineral 100,00
59.1 -
09.61 - 11.13 M
11.52
Crystalline Limestone, Reddish White
Very Hard Rock,Dry, Very Dense,
Moderately Weathered, Medium Compact,
96 -
There is some Calcite Mineral
11.13 - 12.00 M
12,00 99,00 4/15 5/30 - >60
SPT 06 : 12.00 - 12.45 (Lost Spt)
12.45 lost spt lost spt
Lost Core 1 M (12.45 - 13.00 M)
lost core lost core
13,00 98,00
Crystalline Limestone, Reddish White
Hard Rock,Dry, Very Dense,
13.60 100 18.3 Moderately Weathered, Medium Compact,
There is some Calcite Mineral
13.00 - 20.50 M
Sample 2 : 13.71 - 13.84 (13 cm)
100 32.5
SPT 07 : 14.00 - 14.45 97,00 30/2 - - >60
14,00
spt spt Coring Mulai 14.00 M
14.50 83.3 20
14.90 100 -
15,00 96,00
100 -
15.30
15.70 80 -

75 -
16,00 SPT 08 : 16.00 - 16.45 95,00 21/15 40/8 - >60
16.23 spt spt Coring Mulai 16.23 M
16.67 73.3 -

17,00 100 - 94,00


17.17
17.43 86.6 69.2
Sample 3 : 17.84 - 18.00 (16 cm)
95 70.1
SPT 09 : 18.00 - 18.45 93,00 30/1 - - >60
18,00
spt spt Coring Mulai 18.00 M
18.45 90 -
Crystalline Limestone, Reddish White
18.80 87.5 28.5
Hard Rock,Dry, Very Dense,
19,00 Moderately Weathered, Medium Compact, 92,00
65 18.4 There is some Calcite Mineral
19.45
13.00 - 20.50 M

-
20,00 91.6 91,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 M


Ladang Banyusmurup-Wonosari STA 8+425 02-05-2020
Location
Client
:
: P2JN Yogyakarta
Start Date
End Date
:
: 04-05-2020 BORE LOG
Coord. X : 457473,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100294,00 Jenis bor : Putar Kering
Elevasi : 111,00 m Driller : Didik Prasetyo HOLE: BH -05B
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVER

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Y (%)

Core

Elev.
(m)

Description Φ (
(m) C
o N - Blows N 10 20 30 40 50 60
(Kpa) )
20,00 spt spt SPT 10 : 20.00 - 20.45 91,00 37/2 - - >60
Coring Mulai 20.00 M
20.50 83.33 22

21,00 lost core lost core Lost Core 1 M (20.50 - 21.50 M) 90,00
21.50

100 -
SPT 11 : 22.00 - 22.45 89,00 30/1 - - >60
22,00
spt spt Coring Mulai 22.00 M
22.65 65 15.38
Crystalline Limestone, Reddish White
Hard Rock,Dry, Very Dense,
23,00 Moderately Weathered, Medium Compact, 88,00
70 -
There is some Calcite Mineral
23.35
21.50 - 25.15 M

92.8 -
24,00 SPT 12 : 24.00 - 24.45 87,00 19/15 43/5 - >60
24.20 spt spt Coring Mulai 24.20 M
Crystalline Limestone, Reddish White
24.70 100 22
Hard Rock,Dry, Very Dense,
Moderately Weathered, Slightly Compact,
25,00 100 - There is some Calcite Mineral 86,00
25.20
25.15 - 34.00 M
25.70 100 -

75 -
26,00 SPT 13 : 26.00 - 26.45 85,00 19/15 23/15 28/15 51/30
26.45 spt spt Coring Mulai 26.45 M

75 -
27,00 84,00
27.35

92.8 -
28,00 SPT 14 : 28.00 - 28.45 83,00 15/15 27/15 31/15 58/30
28.45 spt spt Coring Mulai 28.45 M

Crystalline Limestone, Reddish White


93.75 - Hard Rock,Dry, Very Dense,
29,00 Moderately Weathered, Slightly Compact, 82,00
29.20 There is some Calcite Mineral
25.15 - 34.00 M
29.53 66 33.33

94 -
30,00 81,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 03 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 36.00 M


Ladang Banyusmurup-Wonosari STA 8+425 02-05-2020
Location
Client
:
: P2JN Yogyakarta
Start Date
End Date
:
: 04-05-2020
BORE LOG
Coord. X : 457473,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100294,00 Jenis bor : Putar Kering
Elevasi : 111,00 m Driller : Didik Prasetyo HOLE: BH -05B
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
30,00 spt spt SPT 15 : 30.00 - 30.45 81,00 38/4 - - >60
Coring Mulai 30.00 M
30.40 80 -
Crystalline Limestone, Reddish White
30.90 100 -
Hard Rock,Dry, Very Dense,
31,00 Moderately Weathered, Slightly Compact, 80,00
100 - There is some Calcite Mineral
31.50
25.15 - 34.00 M

100 -
32,00 SPT 16 : 32.00 - 32.45 79,00 18/15 28/15 40/3 >60
Coring Mulai 32.33 M
32.33 spt spt
Crystalline Limestone, Reddish White
95.7 - Hard Rock,Dry, Very Dense,
33,00 Moderately Weathered, Slightly Compact, 78,00
There is some Calcite Mineral
33.50 100 -
25.15 - 34.00 M

100 -
34,00 SPT 17 : 34.00 - 34.45 77,00 38/3 - - >60
Coring Mulai 34.00 M
34.50 100 -
Crystalline Limestone, Reddish White
100 - Very Hard Rock,Dry, Very Dense,
35,00 Moderately Weathered, Medium Compact, 76,00
There is some Calcite Mineral
35.50 100 -
34.00 - 36.00 M

100 -
36,00 75,00

FINISH BORING
37,00 74,00

38,00 73,00

39,00 72,00

40,00 71,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 04 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 04
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 30.45 M


Location : Ladang Rowoari-Wonosari STA 8+525 Start Date : 05-05-2020
Client : P2JN Yogyakarta End Date : 06-05-2020 BORE LOG
Coord. X : 457468,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100184,000 Jenis bor : Putar Kering
Elevasi : : 33 m Driller : Didik Prasetyo HOLE: BH -06
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

Description Φ
(m) C
N - Blows N 10 20 30 40 50 60
(Kpa) ( o)
0 33,00
100 -
0.50
Clay
Dark Brown, Dry
High Plasticity, Very Stiff
100 -
1,00 00.00 - 12.45 32,00
1.07

1.62 91.6 -

95 -
2,00 SPT 01 : 02.00 - 02.45 31,00 5/15 7/15 10/15 17/30
Coring Mulai 02.45 M
2.45 spt spt

Clay
100 -
3,00 Dark Brown, Dry 30,00
3.15 High Plasticity, Very Stiff
00.00 - 12.45
3.75 100 -

83.33 -
4,00 SPT 02 : 04.00 - 04.45 6/15 8/15 12/15 20/30
29,00
Coring Mulai 04.45 M
4.45 spt spt

Clay
95.7 -
5,00 Dark Brown, Dry 28,00
5.12 High Plasticity, Very Stiff
00.00 - 12.45
5.82 100 -

90 -
6,00 SPT 03 : 06.00 - 06.45 27,00 5/15 7/15 13/15 20/30
6.45 spt spt Coring Mulai 06.45 M

6.70 50 -

Clay
7,00 100 - Dark Brown, Dry 26,00
7.30 High Plasticity, Very Stiff
00.00 - 12.45
7.68 76 -

80 -
8,00 SPT 04 : 08.00 - 08.45 25,00 6/15 8/15 12/15 20/30
8.45 spt spt Coring Mulai 08.45 M
8.85 100 -

Clay
9,00 Dark Brown, Dry 24,00
75 -
High Plasticity, Very Stiff
9.45
00.00 - 12.45

91.66 -
10,00 23,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 30.45 M


Location : Ladang Rowoari-Wonosari STA 8+525 Start Date : 05-05-2020
Client : P2JN Yogyakarta End Date : 06-05-2020
BORE LOG
Coord. X : 457468,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100184,00 Jenis bor : Putar Kering
Elevasi : 33,00 m Driller : Didik Prasetyo HOLE: BH -06
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ (
(m) C
o N - Blows N 10 20 30 40 50 60
(Kpa) )
10,00 SPT 05 : 10.00 - 10.45 23,00 6/15 9/15 13/15 22/30
spt spt
10.45 Coring Mulai 10.45 M
10.80 87.5 -

Clay
11,00 Dark Brown, Dry 22,00
100 -
High Plasticity, Very Stiff
11.40
00.00 - 12.45

100 -
12,00 SPT 06 : 12.00 - 12.45 21,00 8/15 11/15 14/15 25/30
Coring Mulai 12.45 M
12.45 spt spt

Clay
13,00 93.75 - Dark Brown, Dry 20,00
High Plasticity, Hard
13.20
12.45 - 14.45

100 -
14,00 SPT 7 : 14.00 - 14.45 19,00 13/15 18/15 21/15 39/30
Coring Mulai 14.45 M
14.45 spt spt

Limestone Clay, Brownish White


68.75 65.4 Hard Rock,Dry, Very Dense,
15,00 Moderately Weathered, Medium Compact, 18,00
15.30 75 66.66 There is some Crystalline Calcite Mineral
14.45 - 15.40 M
15.73 86 55.8

90 44.44
16,00 SPT 8 : 16.00 - 16.45 17,00 16/15 42/5 - >60
16.20 spt spt Coring Mulai 16.20 M
16.50 100 -

17,00 60 43.3 Sample 1 : 16.83 - 17.00 (17 cm) 16,00


17.40 Crystalline Limestone, Brownish White
Hard Rock,Dry, Very Dense,
17.65 83.33 - Moderately Weathered, Medium Compact,
There is some Calcite Mineral
15.40 - 17.68 M
87.5 65.71
18,00 SPT 9 : 18.00 - 18.45 15,00 18/15 24/15 36/7 >60
Coring Mulai 18.37 M
18.37 spt spt
Limestone Clay, Reddish White
Hard Rock,Dry, Very Dense,
79 100
19,00 Moderately Weathered, Medium Compact, 14,00
19.16 There is some Crystalline Calcite Mineral
17.68 - 20.00 M
19.50 85 -

100 82
20,00 13,00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02 OF
20 to 35 % Adjective UDS - Pitcher Disturbed Sample 03
35 to 50 % And
0

Project : Penyelidikan Geotek JJLS Planjan Tepus Depth : 30.45 M


Ladang Rowoari-Wonosari STA 8+525 05-05-2020
Location
Client
:
: P2JN Yogyakarta
Start Date
End Date
:
: 06-05-2020
BORE LOG
Coord. X : 457468,000 Cor Dia. : Nx, 73 mm
Coord. Y : 9100184,00 Jenis bor : Putar Kering
Elevasi : 33,00 m Driller : Didik Prasetyo HOLE: BH -06
Jenis Penginti : Single Core Barrel Logged by : Rezky Muhamad Wildan
RECOVERY

RQD (%)

Shear Strength SPT Test

Remark
Depth
Water

CORE

Core

Elev.
(m)

(%)

Description Φ (
(m) C
o N - Blows N 10 20 30 40 50 60
(Kpa) )
20,00 SPT 10 : 20.00 - 20.45 13,00 8/15 15/15 15/15 30/30
spt spt Coring Mulai 20.45 M
20.45
Limestone Clay, Reddish White
91.66 67.27 Medium Hard Rock,Dry, Dense,
21,00 Moderately Weathered, Medium Compact, 12,00
There is some Crystalline Calcite Mineral
21.50 100 100
20.00 - 23.00 M

100 100
22,00 SPT 11 : 22.00 - 22.45 11,00 9/15 17/15 21/15 28/30
Coring Mulai 22.45 M
22.45 spt spt
Limestone Clay, Reddish White
Hard Rock,Dry, Dense,
91.66 80 Moderately Weathered, Slightly Compact,
23,00 There is some Crystalline Calcite Mineral 10,00
23.50 100 -
23.00 - 25.00 M

100 -
24,00 SPT 12 : 24.00 - 24.45 9,00 14/15 19/15 25/15 44/30
24.45 spt spt Coring Mulai 24.45 M
Crystalline Limestone, Reddish White
24.83 95 -
Hard Rock,Dry, Dense,
Moderately Weathered, Medium Compact,
25,00 There is some Calcite Mineral 8,00
94 -
25.30
25.00 - 26.90 M

100 77.1 Sample 2 : 25.72 - 26.00 (28 cm)


SPT 13 : 26.00 - 26.45 7,00 30/2 - - >60
26,00
spt spt Coring Mulai 26.45 M
26.90 90 27.77
Limestone Clay, Reddish White
Hard Rock,Dry, Very Dense,
27,00 Moderately Weathered, Slightly Compact, 6,00
97 100
There is some Crystalline Calcite Mineral
27.87
26.90 - 28.73 M

65 100
28,00 SPT 14 : 28.00 - 28.45 5,00 14/15 28/15 32/5 >60
28.35 spt spt Coring Mulai 28.35 M
Crystalline Limestone, Yellowish White
28.75 100 -
Very Hard Rock,Dry, Very Dense,
Moderately Weathered, Medium Compact,
29,00 58.33 40 There is some Calcite Mineral 4,00
29.10 28.73 - 30.45 M

Sample 3 : 29.43 - 29.57 (14 cm)


90 32.22
30,00 SPT 15 : 30.00 - 30.45 3,00 28/1 - - >60

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 03
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 03
35 to 50 % And
LAMPIRAN 3
DATA LABORATORIUM
Laporan Survey Geoteknik
Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus
29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


26 April 2020

Penanggung Jawab Pengujian,


07 Mei 2020

Penanggung Jawab Pengujian,


07 Mei 2020

Penanggung Jawab Pengujian,


07 Mei 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


30 April 2020

Penanggung Jawab Pengujian,


Penanggung Jawab Pengujian,
29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei April
2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


07 Mei 2020

Penanggung Jawab Pengujian,


Penanggung Jawab Pengujian
9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


9 Mei 2020

Penanggung Jawab Pengujian,


Penanggung Jawab Pengujian,
09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


07 Mei 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian


29 April 2020

Penanggung Jawab Pengujian


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


29 April 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


09 Mei 2020

Penanggung Jawab Pengujian,


Pengujian UCS BH – 01 (DS 01) Sebelum Pengujian

Pengujian UCS BH – 01 (DS 01) Setelah Pengujian


Pengujian UCS BH – 01 (DS 03) Sebelum Pengujian

Pengujian UCS BH – 01 (DS 03) Setelah Pengujian


Pengujian UCS BH – 01 (DS 04) Sebelum Pengujian

Pengujian UCS BH – 01 (DS 04) Setelah Pengujian


Pengujian UCS BH – 03 (DS 01) Sebelum Pengujian

Pengujian UCS BH – 03 (DS 01) Setelah Pengujian


Pengujian UCS BH – 03 (DS 02) Sebelum Pengujian

Pengujian UCS BH – 03 (DS 02) Setelah Pengujian


Pengujian UCS BH – 03 (DS 03) Sebelum Pengujian

Pengujian UCS BH – 03 (DS 03) Setelah Pengujian


Pengujian UCS BH – 03 (DS 04) Sebelum Pengujian

Pengujian UCS BH – 03 (DS 04) Setelah Pengujian


Pengujian UCS BH – 04 (DS 01) Sebelum Pengujian

Pengujian UCS BH – 04 (DS 01) Setelah Pengujian


Pengujian UCS BH – 04 (DS 02) Sebelum Pengujian

Pengujian UCS BH – 04 (DS 02) Setelah Pengujian


Pengujian UCS BH – 04 (DS 03) Sebelum Pengujian

Pengujian UCS BH – 04 (DS 03) Setelah Pengujian


Pengujian UCS BH – 05A (DS 01) Sebelum Pengujian

Pengujian UCS BH – 05A (DS 01) Setelah Pengujian


Pengujian UCS BH – 05A (DS 02) Sebelum Pengujian

Pengujian UCS BH – 05A (DS 02) Sesudah Pengujian


Pengujian UCS BH – 05A (DS 04) Sebelum Pengujian

Pengujian UCS BH – 05A (DS 04) Sesudah Pengujian


Pengujian UCS BH – 05B (DS 01) Sebelum Pengujian

Pengujian UCS BH – 05B (DS 01) Sesudah Pengujian


Pengujian UCS BH – 05B (DS 2) Sebelum Pengujian

Pengujian UCS BH – 05B (DS 2) Sesudah Pengujian


Pengujian UCS BH – 05B (DS 3) Sebelum Pengujian

Pengujian UCS BH – 05B (DS 3) Sesudah Pengujian


LAMPIRAN 4
JENIS GALIAN
Laporan Survey Geoteknik
Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus
JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
KEDALAMAN Klasifikasi Galian
No. Batuan Batuan utuh
SAMPEL Natural
Lokasi
(m)
sC E (Axial)
From To kg/cm² kg/cm² m3

1 BH.1 STA 0 + 475 Planjan - Tepus 6,30 6,43 147,212 7,34E+03 Gamping >1 Batu

2 BH.1 STA 0 + 475 Planjan - Tepus 14,58 14,70 31,058 8,00E+03 Gamping Batu lunak

3 BH.1 STA 0 + 475 Planjan - Tepus 15,19 15,32 82,675 1,09E+04 Gamping Batu lunak

4 BH.2 STA 2 + 075 Planjan - Tepus 9,80 10,00 195,600 1,41E+04 Gamping >1 Batu

5 BH.2 STA 2 + 075 Planjan - Tepus 11,80 12,00 168,500 1,83E+04 Gamping >1 Batu

6 BH.2 STA 2 + 075 Planjan - Tepus 15,32 15,47 231,910 3,01E+04 Gamping >1 Batu
JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3

1 BH.3 STA 6 + 350 Planjan - Tepus 03,76 04,00 175,162 3,20E+04 Gamping >1 Batu

2 BH.3 STA 6 + 350 Planjan - Tepus 07,74 08,00 372,509 5,43E+04 Gamping >1 Batu

3 BH.3 STA 6 + 350 Planjan - Tepus 15,82 16,00 196,300 2,14E+04 Gamping >1 Batu

4 BH.3 STA 6 + 350 Planjan - Tepus 20,72 20,89 200,567 2,78E+04 Gamping >1 Batu

5 BH.4 STA 7+ 825 Planjan - Tepus 11,87 12,00 188,754 1,85E+04 Gamping >1 Batu

6 BH.4 STA 7+ 825 Planjan - Tepus 17,35 17,48 30,671 6,68E+03 Gamping Batu lunak

7 BH.4 STA 7+ 825 Planjan - Tepus 20,82 21,00 133,221 2,71E+04 Gamping >1 Batu
JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3

1 BH.5A STA 8 + 425 Planjan - Tepus 03,36 03,51 201,590 2,80E+04 Gamping >1 Batu

2 BH.5A STA 8 + 425 Planjan - Tepus 05,85 06,00 431,280 3,75E+04 Gamping >1 Batu

3 BH.5A STA 8 + 425 Planjan - Tepus 31,54 31,65 242,700 2,08E+04 Gamping >1 Batu

4 BH.5B STA 8 + 425 Planjan - Tepus 06,70 06,86 358,060 5,00E+04 Gamping >1 Batu

5 BH.5B STA 8 + 425 Planjan - Tepus 13,71 13,84 265,940 3,32E+04 Gamping >1 Batu

6 BH.5B STA 8 + 425 Planjan - Tepus 17,84 18,00 544,710 5,36E+04 Gamping >1 Batu
JENIS GALIAN

SAMPLE UNCONFINED
COMPRESSIVE
STRENGTH
Jenis Volume
Klasifikasi Galian
No. DEPTH Batuan Batuan utuh
Natural
Lokasi (m)

sC E (Axial)
From To kg/cm² kg/cm² m3

1 BH.6 STA 8 + 525 Planjan - Tepus 16,83 17,00 49,170 9,44E+03 Gamping Batu lunak

2 BH.6 STA 8 + 525 Planjan - Tepus 25,72 26,00 218,280 3,23E+04 Gamping >1 Batu

3 BH.6 STA 8 + 525 Planjan - Tepus 29,43 29,57 496,850 4,37E+04 Gamping >1 Batu
LAMPIRAN 5
FOTO KEGIATAN
LAPANGAN
Laporan Survey Geoteknik
Kegiatan Penyelidikan Tanah
JJLS Planjan–Baron–Tepus
LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Rabu, 15 April 2020


Memulai Pengeboran di Titik 0+475

Memulai Pengeboran di BH-01 (15 – 04 – 2020)


Rabu, 15 April 2020
Memulai Pengeboran di Titik 0+475

Memulai Pengeboran di BH-01 (15 – 04 – 2020)

Rabu, 15 April 2020


Memulai Pengeboran di Titik 0+475

Mengukur SPT di BH-01 (15 – 04 – 2020)


Rabu, 15 April 2020
Memulai Pengeboran di Titik 0+475

SPT di BH-01 (15 – 04 – 2020)

Housekeeping di BH-01 (15 – 04 – 2020)


Kamis, 16 April 2020
Memulai Pengeboran di Titik 0+475

Melanjutkan Pengeboran di BH-01 (16 – 04 – 2020)

Kamis, 16 April 2020


Memulai Pengeboran di Titik 0+475

Melanjutkan Pengeboran di BH-01 (16 – 04 – 2020)


Kamis, 16 April 2020
Memulai Pengeboran di Titik 0+475

Mengukur SPT di BH-01 (16 – 04 – 2020)

Kamis, 16 April 2020


Memulai Pengeboran di Titik 0+475

SPT di BH-01 (16 – 04 – 2020)


Melanjutkan Pengeboran di BH-01 (06 – 03 – 2020)

Jumat, 17 April 2020


Memulai Pengeboran di Titik 0+475

Melanjutkan Pengeboran di BH-01 (17 – 04 – 2020)


Jumat, 17 April 2020
Memulai Pengeboran di Titik 0+475

Mengukur SPT di BH-01 (17 – 04 – 2020)

Jumat, 17 April 2020


Memulai Pengeboran di Titik 0+475

SPT di BH-01 (17 – 04 – 2020)


Jumat, 17 April 2020
Memulai Pengeboran di Titik 0+475

Housekeeping di BH-01 (17 – 04 – 2020)

Jumat, 17 April 2020


Memulai Pengeboran di Titik 0+475

Melanjutkan Pengeboran di BH-01 (17 – 04 – 2020)


Sabtu, 18 April 2020
Memulai Pengeboran di Titik 0+475

Melanjutkan Pengeboran di BH-01 (18 – 04 – 2020)

Sabtu, 18 April 2020


Memulai Pengeboran di Titik 0+475

Mengukur SPT di BH-01 (18 – 04 – 2020)


Sabtu, 18 April 2020
Memulai Pengeboran di Titik 0+475

SPT di BH-01 (18 – 04 – 2020)

CORE BOX BH 01 STA 0+475 KEDALAMAN 00.00 - 05.00 M


CORE BOX BH 01 STA 0+475 KEDALAMAN 05.00 - 10.00 M

CORE BOX BH 01 STA 0+475 KEDALAMAN 10.00 - 15.00 M


CORE BOX BH 01 STA 0+475 KEDALAMAN 15.00 - 18.00 M
LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Sabtu, 2 Mei 2020


Cek lokasi di Titik 8+425 (BH-05B)

Cek Lokasi di BH-05B (02 – 05 – 2020)


Sabtu, 2 Mei 2020
Moving mesin dan alat keTitik 8+425

Moving Mesin & Alat di BH-05B (02 – 05 – 2020)

Sabtu, 2 Mei 2020


Setting mesin di Titik 8+425

Setting Mesin & Alat di BH-05B (02 – 05 – 2020)


Sabtu, 2 Mei 2020
Memulai pengeboran di Titik 8+425

Memulai Pengeboran di BH-05B (02 – 05 – 2020)

Sabtu, 2 Mei 2020


SPT di Titik 8+425

SPT di BH-05B (02 – 05 – 2020)


Sabtu, 2 Mei 2020
SPT di Titik 8+425

SPT di BH-05B (02 – 05 – 2020)

Sabtu, 2 Mei 2020


Housekeeping di Titik 8+425

Housekeeping di BH-05B (02 – 05 – 2020)


Minggu, 3 Mei 2020
Pemasangan casing di Titik 8+425

Pemasangan Casing di BH-05B (03 – 05 – 2020)

Minggu, 3 Mei 2020


Melanjutkan pengeboran di Titik 8+425

Melanjutkan Pengeboran di BH-05B (03 – 05 – 2020)


Minggu, 3 Mei 2020
SPT di Titik 8+425

SPT di BH-05B (03 – 05 – 2020)

Minggu, 3 Mei 2020


SPT di Titik 8+425

SPT di BH-05B (03 – 05 – 2020)


Minggu, 3 Mei 2020
Housekeeping di Titik 8+425

Housekeeping di BH-05B (03 – 05 – 2020)

Senin, 4 Mei 2020


Pemasangan casing di Titik 8+425

Pemasangan Casing di BH-05B (04 – 05 – 2020)


Senin, 4 Mei 2020
Melanjutkan pengeboran di Titik 8+425

Melanjutkan Pengeboran di BH-05B (04 – 05 – 2020)

Senin, 4 Mei 2020


SPT di Titik 8+425

SPT di BH-05B (04 – 05 – 2020)


Senin, 4 Mei 2020
SPT di Titik 8+425

SPT di BH-05B (04 – 05 – 2020)

CORE BOX BH 05B STA 8+425 KEDALAMAN 00.00 - 05.00 M


CORE BOX BH 05B STA 8+425 KEDALAMAN 05.00 - 10.00 M

CORE BOX BH 05B STA 8+425 KEDALAMAN 10.00 - 15.00 M


CORE BOX BH 05B STA 8+425 KEDALAMAN 15.00 - 20.00 M

CORE BOX BH 05B STA 8+425 KEDALAMAN 20.00 - 25.00 M


CORE BOX BH 05B STA 8+425 KEDALAMAN 25.00 - 30.00 M

CORE BOX BH 05B STA 8+425 KEDALAMAN 30.00 - 35.00 M


CORE BOX BH 05B STA 8+425 KEDALAMAN 35.00 - 36.00 M
LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Minggu, 19 April 2020


Moving alat ke Titik 2+075

Moving Mesin & Alat ke BH-02 (19 – 04 – 2020)


Minggu, 19 April 2020
Moving alat ke Titik 2+075

Moving Mesin & Alat ke BH-02 (19 – 04 – 2020)

Minggu, 19 April 2020


Cek lokasi di Titik 2+075

Cek Lokasi di BH-02 (19 – 04 – 2020)


Minggu, 19 April 2020
Cek lokasi di Titik 2+075

Cek Lokasi di BH-02 (17 – 04 – 2020)

Minggu, 19 April 2020


Moving mesin dan alat ke Titik 2+075

Moving Mesin & Alat ke BH-02 (19 – 04 – 2020)


Senin, 20 April 2020
Setting alat di Titik 2+075

Setting Mesin & Alat ke BH-02 (20 – 04 – 2020)

Senin, 20 April 2020


Memulai pengeboran di Titik 2+075

Memulai Pengeboran di BH-02 (20 – 04 – 2020)


Senin, 20 April 2020
SPT di Titik 2+075

SPT di BH-02 (20 – 04 – 2020)

Senin, 20 April 2020


Housekeeping di Titik 2+075

Housekeeping di BH-02 (20 – 04 – 2020)


Selasa, 21 April 2020
Melanjutkan pengeboran di Titik 2+075

Melanjutkan Pengeboran di BH-02 (21 – 04 – 2020)

Selasa, 21 April 2020


Melanjutkan pengeboran di Titik 2+075

Melanjutkan Pengeboran di BH-02 (21 – 04 – 2020)


CORE BOX BH 02 STA 2+075 KEDALAMAN 00.00 - 05.00 M

CORE BOX BH 02 STA 2+075 KEDALAMAN 05.00 - 10.00 M


CORE BOX BH 02 STA 2+075 KEDALAMAN 10.00 - 15.00 M

CORE BOX BH 02 STA 2+075 KEDALAMAN 15.00 - 17.00 M


LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Rabu, 22 April 2020


Moving alat ke Titik 6+350

Moving Mesin & Alat di BH-03 (22 – 04 – 2020)


Rabu, 22 April 2020
Setting alat di Titik 6+350

Setting Mesin & Alat di BH-03 (22 – 04 – 2020)

Rabu, 22 April 2020


Mulai pengeboran di Titik 6+350

Memulai Pengeboran di BH-03 (22 – 04 – 2020)


Rabu, 22 April 2020
Housekeeping di Titik 6+350

Housekeeping di BH-03 (17 – 03 – 2020)

Kamis, 23 April 2020


Pemasangan casing di Titik 6+350

Pemasangan Casing di BH-03 (23 – 04 – 2020)


Kamis, 23 April 2020
Melanjutkan pengeboran di Titik 6+350

Melanjutkan Pengeboran di BH-03 (23 – 04 – 2020)

Kamis, 23 April 2020


Melanjutkan pengeboran di Titik 6+350

Melanjutkan Pengeboran di BH-03 (23 – 04 – 2020)


Kamis, 23 April 2020
SPT di Titik 6+350

SPT di BH-03 (23 – 04 – 2020)

Kamis, 23 April 2020


Housekeeping di Titik 6+350

Housekeeping di BH-03 (23 – 04 – 2020)


Jumat, 24 April 2020
Pemasangan casing di Titik 6+350

Pemasangan Casing di BH-03 (19 – 03 – 2020)

Jumat, 24 April 2020


Melanjutkan pengeboran di Titik 6+350

Melanjutkan Pengeboran di BH-03 (24 – 04 – 2020)


Jumat, 24 April 2020
SPT di Titik 6+350

SPT di BH-03 (24 – 04 – 2020)

CORE BOX BH 03 STA 6+350 KEDALAMAN 00.00 - 05.00 M


CORE BOX BH 03 STA 6+350 KEDALAMAN 05.00 - 10.00 M

CORE BOX BH 03 STA 6+350 KEDALAMAN 10.00 - 15.00 M


CORE BOX BH 03 STA 6+350 KEDALAMAN 15.00 - 20.00 M

CORE BOX BH 03 STA 6+350 KEDALAMAN 20.00 - 23.00 M


LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Sabtu, 25 April 2020


Moving alat ke Titik 7+825 (BH-04)

Moving Alat ke BH-04 (25 – 04 – 2020)


Sabtu, 25 April 2020
Moving alat ke Titik 7+825

Moving Alat ke BH-04 (08 – 03 – 2020)

Sabtu, 25 April 2020


Setting alat ke Titik 7+825

Setting Alat di BH-04 (25 – 04 – 2020)


Sabtu, 25 April 2020
Pemasangan casing di Titik 7+825

Pemasangan Casing di BH-04 (09 – 03 – 2020)

Sabtu, 25 April 2020


Memulai pengeboran di Titik 7+825

Memulai Pengeboran di BH-04 (25 – 04 – 2020)


Sabtu, 25 April 2020
SPT di Titik 7+825

SPT di BH-04 (25 – 04 – 2020)

Sabtu, 25 April 2020


Housekeeping Titik 7+825

Housekeeping di BH-04 (25 – 04 – 2020)


Minggu, 26 April 2020
Pemassangan casing di Titik 7+825

Pemasangan Casing di BH-04 (26 – 04 – 2020)

Minggu, 26 April 2020


Melanjutkan pengeboran di Titik 7+825

Melanjutkan Pengeboran di BH-04 (26 – 04 – 2020)


Minggu, 26 April 2020
SPT di Titik 7+825

SPT di BH-04 (10 – 03 – 2020)

Minggu, 26 April 2020


SPT di Titik 7+825

SPT di BH-04 (26 – 04 – 2020)


Minggu, 26 April 2020
Housekeeping di Titik 7+825

Housekeeping di BH-04 (26 – 04 – 2020)

Senin, 27 April 2020


Melanjutkan pengeboran di Titik 7+825

Melanjutkan Pengeboran di BH-04 (27 – 04 – 2020)


Senin, 27 April 2020
SPT di Titik 7+825

SPT di BH-04 (27 – 04 – 2020)

CORE BOX BH 04 STA 7+825 KEDALAMAN 00.00 - 05.00 M


CORE BOX BH 04 STA 7+825 KEDALAMAN 05.00 - 10.00 M

CORE BOX BH 04 STA 7+825 KEDALAMAN 10.00 - 15.00 M


CORE BOX BH 04 STA 7+825 KEDALAMAN 15.00 - 20.00 M

CORE BOX BH 04 STA 7+825 KEDALAMAN 20.00 - 24.00 M


LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Selasa, 28 April 2020


Moving alat ke Titik 8+425 (BH-05A)

Moving Mesin & Alat ke BH-05A (28 – 04 – 2020)


Selasa, 28 April 2020
Cek lokasi di Titik 8+425 (BH-05A)

Moving Mesin & Alat di BH-05A (28 – 04 – 2020)

Selasa, 28 April 2020


Cek lokasi di Titik 8+425 (BH-05A)

Cek Lokasi di BH-05A (28 – 04 – 2020)


Selasa, 28 April 2020
Setting alat di Titik 8+425 (BH-05A)

Setting alat di BH-05A (28 – 04 – 2020)

Selasa, 28 April 2020


Housekeeping di Titik 8+425 (BH-05A)

Housekeeping di BH-05A (28 – 04 – 2020)


Rabu, 29 April 2020
Memulai pengeboran di Titik 8+425

Memulai Pengeboran di BH-05A (29 – 04 – 2020)

Rabu, 29 April 2020


SPT di Titik 8+425

SPT di BH-05A (29 – 04 – 2020)


Rabu, 29 April 2020
SPT di Titik 8+425

SPT di BH-05A (29 – 04 – 2020)

Rabu, 29 April 2020


Housekeeping di Titik 8+425

Housekeeping di BH-05A (29 – 04 – 2020)


Kamis, 30 April 2020
Melanjutan pengeboran di Titik 8+425

Melanjutkan pengeboran di BH-05A (30 – 04 – 2020)

Kamis, 30 April 2020


SPT di Titik 8+425

SPT di BH-05A (30 – 04 – 2020)


Kamis, 30 April 2020
SPT di Titik 8+425

SPT di BH-05A (30 – 04 – 2020)

Kamis, 30 April 2020


Pemasangan casing di Titik 8+425

Pemasangan Casing di BH-05A (30 – 04 – 2020)


Kamis, 30 April 2020
Melanjutkan pengeboran di Titik 8+425

Melanjutkan pengeboran di BH-05A (30 – 04 – 2020)

Kamis, 30 April 2020


SPT di Titik 8+425

SPT di BH-05A (30 – 04 – 2020)


Kamis, 30 April 2020
SPT di Titik 8+425

SPT di BH-05A (30 – 04 – 2020)

Kamis, 30 April 2020


Melanjutkan pengeboran di Titik 8+425

Melanjutkan Pengeboran di BH-05A (30 – 04 – 2020)


Kamis, 30 April 2020
Pemasangan casing di Titik 8+425

Pemasangan Casing di BH-05A (30 – 04 – 2020)

Kamis, 30 April 2020


Housekeeping di Titik 8+425

Housekeeping di BH-05A (30 – 04 – 2020)


Jumat, 1 Mei 2020
Melanjutkan pengeboran di Titik 8+425

Melanjutkan Pengeboran di BH-05A (01 – 05 – 2020)

CORE BOX BH 05A STA 8+425 KEDALAMAN 00.00 - 05.00 M


CORE BOX BH 05A STA 8+425 KEDALAMAN 05.00 - 10.00 M

CORE BOX BH 05A STA 8+425 KEDALAMAN 10.00 - 15.00 M


CORE BOX BH 05A STA 8+425 KEDALAMAN 15.00 - 20.00 M

CORE BOX BH 05A STA 8+425 KEDALAMAN 20.00 - 25.00 M


CORE BOX BH 05A STA 8+425 KEDALAMAN 25.00 - 30.00 M

CORE BOX BH 05A STA 8+425 KEDALAMAN 30.00 - 35.00 M


CORE BOX BH 05A STA 8+425 KEDALAMAN 35.00 - 36.00 M
LAPORAN PROGRESS PEKERJAAN
Lokasi : Wonosari

PENYELIDIKAN GEOTEK JJLS PLANJAN–BARON–TEPUS


2020
-------------------------------------------------------

1 Koordinator Lapangan : Sandi Adiputra

2 Geologist : Rezky Muhamad Wildan

3 Operator Bor 1 : Didik Prasetyo

4 Helper : Budi Rosidi

5 Helper : Iwan Gunawan

Selasa, 5 Mei 2020


Moving mesin & alat ke Titik 8+525 (BH-06)

Moving Mesin & Alat ke BH-6 (05 – 05 – 2020)


Selasa, 5 Mei 2020
Cek lokasi di Titik 8+525

Cek lokasi di BH-6 (05 – 05 – 2020)

Selasa, 5 Mei 2020


Setting mesin & alat di Titik 8+525

Setting Mesin & Alat di BH-6 (05 – 05 – 2020)


Selasa, 5 Mei 2020
Housekeeping di Titik 8+525

Memulai Pengeboran di BH-6 (05 – 05 – 2020)

Rabu, 6 Mei 2020


Melanjutkan pengeboran di Titik 8+525

Memulai Pengeboran di BH-6 (06 – 05 – 2020)


Rabu, 6 Mei 2020
Pemasangan casing di Titik 8+525

Pemasangan Casing di BH-6 (06 – 05 – 2020)

Rabu, 6 Mei 2020


Melanjutkan pengeboran di Titik 8+525

Melanjutkan Pengeboran di BH-6 (06 – 05 – 2020)


Rabu, 6 Mei 2020
SPT di Titik 8+525

SPT di BH-6 (06 – 05 – 2020)


CORE BOX BH 06 STA 8+525 KEDALAMAN 00.00 - 05.00 M

CORE BOX BH 06 STA 8+525 KEDALAMAN 05.00 - 10.00 M


CORE BOX BH 06 STA 8+525 KEDALAMAN 10.00 - 15.00 M

CORE BOX BH 06 STA 8+525 KEDALAMAN 15.00 - 20.00 M


CORE BOX BH 06 STA 8+525 KEDALAMAN 20.00 - 25.00 M

CORE BOX BH 06 STA 8+525 KEDALAMAN 25.00 - 30.00 M

Anda mungkin juga menyukai