Disusun Oleh :
Nama : Raisya Armelia Nur Azizah (193010053)
Rifky Andias Bagisa (193010054)
Elsa Fikilia Mega Widya P. (193010090)
Jatnika Salman Raspati (193010091)
Kelompok : 10
Shift : Senin / 10.00 – 12.00 WIB
` Kamis / 15.30 – 17.30 WIB
Nama Asisten : Fajar Yusup Maulana (PSI2-01)
LEMBAR PENGESAHAN
i
ABSTRAKSI
ii
KATA PENGANTAR
iii
Tim Penyusun
iv
DAFTAR ISI
LEMBAR PENGESAHAN.................................................................i
ABSTRAKSI.......................................................................................ii
KATA PENGANTAR........................................................................iii
DAFTAR ISI.......................................................................................iv
DAFTAR TABEL............................................................................viii
DAFTAR GAMBAR........................................................................xix
BAB I PENDAHULUAN...............................................................I-1
1.1 Latar Belakang........................................................................I-1
1.2 Perumusan Masalah................................................................I-3
1.3 Tujuan Pemecahan Masalah.....................................................I-4
1.4 Pembatasan Masalah...............................................................I-4
1.5 Sistematika Penulisan..............................................................I-5
BAB II ASPEK ORGANISASI.....................................................II-1
2.1 Company Profile........................................................................II-1
2.1.1 Sejarah Perusahaan........................................................................II-1
2.1.2 Logo Perusahaan............................................................................II-3
2.1.3 Arti Nama Perusahaan dan Logo Perusahaan................................II-3
2.1.4 Visi dan Misi Perusahaan...............................................................II-4
2.2 Struktur Organisasi....................................................................II-4
2.3 Job Description..........................................................................II-4
BAB III ASPEKTEKNIS.............................................................III-1
3.1 Aggregate Planning dan Forecasting.......................................III-7
3.1.1 Pengumpulan Data........................................................................III-7
3.1.2 Pengolahan Data...........................................................................III-9
3.1.3 Analisa Modul 1.........................................................................III-23
3.2 Rencana Produksi dan Sales & Operational Planning (S&OP).......
................................................................................................III-26
v
3.2.1 Pengumpulan Data......................................................................III-26
3.2.2 Pengolahan Data.........................................................................III-28
3.2.3 Analisa Modul 2.........................................................................III-39
3.3 Master Production Schedule (MPS) dan Rough Cut Capacity
Planning (RCCP)...............................................................................III-41
3.3.1 Pengumpulan Data......................................................................III-41
3.3.2 Pengolahan Data.........................................................................III-44
3.3.3 Analisa Modul 3.........................................................................III-68
3.4 Material Requirement Planning (MRP)..................................III-71
3.4.1 Pengumpulan Data......................................................................III-71
3.4.2 Pengolahan Data.........................................................................III-75
3.4.3 Analisa Modul 4.......................................................................III-111
3.5 Capacity Requirement Planning (CRP)................................III-115
3.5.1 Pengumpulan Data....................................................................III-115
3.5.2 Pengolahan Data.......................................................................III-119
3.5.3 Analisa Modul 5.......................................................................III-144
3.6 Routing Sheet dan Multi Product Process Chart..................III-147
3.6.1 Pengumpulan Data....................................................................III-147
3.6.2 Pengolahan Data.......................................................................III-151
3.6.3 Analisa Modul 6.......................................................................III-157
3.7 Luas Lantai Produksi dan Perkantoran..................................III-160
3.7.1 Pengumpulan Data....................................................................III-160
3.7.2 Pengolahan Data.......................................................................III-173
3.7.3 Analisa Modul 7.......................................................................III-205
3.8 Ongkos Material Handling (OMH) Awal.............................III-209
3.8.1 Pengumpulan Data....................................................................III-209
3.8.2 Pengolahan data........................................................................III-217
3.8.3 Analisa Modul 8.......................................................................III-226
3.9 Ongkos Material Handling (OMH) Revisi, Layout, dan Template. .
..............................................................................................III-229
3.9.1 Pengumpulan Data....................................................................III-229
vi
3.9.2 Pengolahan Data.......................................................................III-230
3.9.3 Analisa Modul 9.......................................................................III-239
3.10 Analisis Input Data Simulasi.................................................III-244
3.10.1 Pengumpulan Data....................................................................III-244
3.10.2 Pengolahan Data.......................................................................III-250
3.10.3 Analisa Modul 10.....................................................................III-292
3.11 Model Simulasi Proses Sistem Manufaktur..........................III-294
3.11.1 Modul Logika...........................................................................III-294
3.11.2 Modul Data...............................................................................III-479
3.11.3 Tampilan Model Logika...........................................................III-500
3.11.4 Tampilan Model Animasi.........................................................III-502
3.11.5 Analisa Modul 11.....................................................................III-504
3.12 Verifikasi dan Validasi.........................................................III-507
3.12.1 Pengumpulan Data....................................................................III-507
3.12.2 Pengolahan Data.......................................................................III-507
3.12.3 Analisa Modul 12.....................................................................III-517
BAB IVASPEK FINANSIAL.......................................................IV-1
4.1 Pengertian Finansial.................................................................IV-1
4.2 Pengumpulan Data....................................................................IV-1
4.3 Pengolahan Data.......................................................................IV-5
4.3.1 Perhitungan Biaya Bahan Baku....................................................IV-5
4.3.2 Perhitungan Daftar Gaji................................................................IV-9
4.3.3 Perhitungan Investasi dan Depresiasi.........................................IV-12
4.3.4 Harga Pokok Penjualan (HPP)...................................................IV-16
4.3.5 Laporan Rugi Laba.....................................................................IV-24
4.3.6 Cash Flow...................................................................................IV-29
4.3.7 Neraca.........................................................................................IV-31
4.3.8 Break Even Point (BEP).............................................................IV-34
4.3.9 Payback Period..........................................................................IV-38
4.3.10 Internal Rate of Return (IRR).....................................................IV-40
4.4 Hasil Simulasi Trading...........................................................IV-42
vii
4.4.1 Harga Pokok Penjualan (Trading)..............................................IV-42
4.4.2 Laporan Rugi Laba (Trading)....................................................IV-44
4.4.3 Cash Flow (Trading)..................................................................IV-45
4.4.4 Neraca (Trading)........................................................................IV-45
4.4.5 Break Even Point (Trading).......................................................IV-46
4.4.6 Payback Period (Trading)..........................................................IV-47
4.4.7 Internal Rate of Return (Trading)..............................................IV-47
4.5 Analisa BAB IV.....................................................................IV-48
BAB V ANALISA KESELURUHAN...........................................V-1
BAB VI PENUTUP........................................................................VI-1
6.1 Kesimpulan...............................................................................VI-1
6.2 Saran.........................................................................................VI-2
6.2.1 Saran Untuk Praktikum................................................................VI-2
6.2.2 Saran Untuk Perusahaan...............................................................VI-3
6.2.3 Saran Untuk Asisten.....................................................................VI-3
DAFTAR PUSTAKA
LAMPIRAN
viii
DAFTAR TABEL
ix
Tabel 3.31 Routing Sheet Case Tablet..............................................................III-50
Tabel 3.32 Bill of Capacity Case Handphone..................................................III-51
Tabel 3.33 Bill of Capacity Case Tablet...........................................................III-52
Tabel 3.34 Rough Cut Capacity Planning........................................................III-53
Tabel 3.35 Data Kapasitas Reguler Time WC 10.............................................III-54
Tabel 3.36 Data Kapasitas Over Time WC 10..................................................III-54
Tabel 3.37 Data Kapasitas Reguler Time WC 20.............................................III-56
Tabel 3.38 Data Kapasitas Over Time WC 20..................................................III-56
Tabel 3.39 Data Kapasitas Reguler Time WC 30.............................................III-57
Tabel 3.40 Data Kapasitas Over Time WC 30..................................................III-57
Tabel 3.41 Data Kapasitas Reguler Time WC 40.............................................III-59
Tabel 3.42 Data Kapasitas Over Time WC 40..................................................III-59
Tabel 3.43 Data Kapasitas Reguler Time WC 50.............................................III-60
Tabel 3.44 Data Kapasitas Over Time WC 50..................................................III-60
Tabel 3.45 Data Kapasitas Reguler Time WC 60.............................................III-62
Tabel 3.46 Data Kapasitas Over Time WC 60..................................................III-62
Tabel 3.47 Data Kapasitas Reguler Time WC 70.............................................III-63
Tabel 3.48 Data Kapasitas Over Time WC 70..................................................III-63
Tabel 3.49 Data Kapasitas Reguler Time WC 80.............................................III-64
Tabel 3.50 Data Kapasitas Over Time WC 80..................................................III-64
Tabel 3.51 Data Kapasitas Reguler Time WC 90.............................................III-66
Tabel 3.52 Data Kapasitas Over Time WC 90..................................................III-66
Tabel 3.53 Bill of Material (BOM) Produk Aircase Handphone.....................III-72
Tabel 3.54 Bill of Material (BOM) Produk Aircase Tablet..............................III-73
Tabel 3.55 Master Schedule (MS) Produk Aircase Handphone.......................III-73
Tabel 3.56 Master Schedule (MS) Produk Aircase Tablet...............................III-73
Tabel 3.57 Tabel Schedule Receipt (SR) Aircase Handphone.........................III-74
Tabel 3.58 Tabel Schedule Receipt (SR) Aircase Tablet..................................III-74
Tabel 3.59 Inventory Status Produk Aircase Handphone.................................III-74
Tabel 3.60 Inventory Status Produk Aircase Tablet.........................................III-75
Tabel 3.61 MRP Produk Aircase Handphone (Level 0)...................................III-75
Tabel 3.62 MRP Dus Packing Produk Aircase Handphone (Level 1).............III-77
x
Tabel 3.63 MRP Bubble Wrap Produk Aircase Handphone (Level 1)............III-78
Tabel 3.64 MRP Hasil Assembly 2 Produk Aircase Handphone (Level 1)......III-80
Tabel 3.65 MRP Airpods Receptacle Produk Aircase Handphone (Level 2). .III-81
Tabel 3.66 MRP Wireless Speaker Produk Aircase Handphone (Level 2)......III-83
Tabel 3.67 MRP Sticker Produk Aircase Handphone (Level 2)......................III-84
Tabel 3.68 MRP Hasil Assembly 1 Produk Aircase Handphone (Level 2)......III-86
Tabel 3.69 MRP Badan Case Produk Aircase Handphone (Level 3)..............III-87
Tabel 3.70 MRP Dudukan Speaker Produk Aircase Handphone (Level 3).....III-89
Tabel 3.71 MRP Produk Aircase Tablet (Level 0)...........................................III-90
Tabel 3.72 MRP Dus Packing Produk Aircase Tablet (Level 1).....................III-92
Tabel 3.73 MRP Bubble Wrap Produk Aircase Tablet (Level 1).....................III-93
Tabel 3.74 MRP Hasil Assembly 2 Produk Aircase Tablet (Level 1)..............III-95
Tabel 3.75 MRP Airpods Receptacle Produk Aircase Tablet (Level 2)...........III-96
Tabel 3.76 MRP Wireless Speaker Produk Aircase Tablet (Level 2)..............III-98
Tabel 3.77 MRP Sticker Produk Aircase Tablet (Level 2)...............................III-99
Tabel 3.78 MRP Hasil Assembly 1 Produk Aircase Tablet (Level 2)............III-101
Tabel 3.79 MRP Badan Case Produk Aircase Tablet (Level 3).....................III-102
Tabel 3.80 MRP Dudukan Speaker Produk Aircase Tablet (Level 3)...........III-104
Tabel 3.81 Pegging LEM UHU Produk Aircase Handphone........................III-105
Tabel 3.82 MRP Pegging LEM UHU Produk Aircase Handphone...............III-106
Tabel 3.83 Pegging LEM UHU Produk Aircase Tablet.................................III-107
Tabel 3.84 MRP Pegging LEM UHU Produk Aircase Tablet.......................III-108
Tabel 3.85 Planned Order Release (PORl) Produk Aircase Handphone.......III-110
Tabel 3.86 Planned Order Release (PORl) Produk Aircase Tablet...............III-110
Tabel 3.87 Routing Sheet Case Handphone...................................................III-117
Tabel 3.88 Routing Sheet Case Tablet............................................................III-118
Tabel 3.89 Planned Order Released Aircase Handphone..............................III-119
Tabel 3.90 Planned Order Released Aircase Tablet......................................III-119
Tabel 3.91 Kebutuhan Kapasitas WC 10 Produk Case Handphone..............III-119
Tabel 3.92 Kebutuhan Kapasitas WC 20 Produk Case Handphone..............III-120
Tabel 3.93 Kebutuhan Kapasitas WC 30 Produk Case Handphone..............III-120
Tabel 3.94 Kebutuhan Kapasitas WC 40 Produk Case Handphone..............III-121
xi
Tabel 3.95 Kebutuhan Kapasitas WC 50 Produk Case Handphone..............III-122
Tabel 3.96 Kebutuhan Kapasitas WC 60 Produk Case Handphone..............III-122
Tabel 3.97 Kebutuhan Kapasitas WC 70 Produk Case Handphone..............III-123
Tabel 3.98 Kebutuhan Kapasitas WC 80 Produk Case Handphone..............III-123
Tabel 3.99 Kebutuhan Kapasitas WC 90 Produk Case Handphone..............III-123
Tabel 3.100 Kebutuhan Kapasitas WC 10 Produk Case Tablet.....................III-124
Tabel 3.101 Kebutuhan Kapasitas WC 20 Produk Case Tablet.....................III-125
Tabel 3.102 Kebutuhan Kapasitas WC 30 Produk Case Tablet.....................III-125
Tabel 3.103 Kebutuhan Kapasitas WC 40 Produk Case Tablet.....................III-126
Tabel 3.104 Kebutuhan Kapasitas WC 50 Produk Case Tablet.....................III-127
Tabel 3.105 Kebutuhan Kapasitas WC 60 Produk Case Tablet.....................III-127
Tabel 3.106 Kebutuhan Kapasitas WC 70 Produk Case Tablet.....................III-128
Tabel 3.107 Kebutuhan Kapasitas WC 80 Produk Case Tablet.....................III-128
Tabel 3.108 Kebutuhan Kapasitas WC 90 Produk Case Tablet.....................III-128
Tabel 3.109 Total Kebutuhan Kapasitas.........................................................III-129
Tabel 3.110 Data Kapasitas Reguler Time WC 10.........................................III-130
Tabel 3.111 Data Kapasitas Over Time WC 10..............................................III-130
Tabel 3.112 Data Kapasitas Reguler Time WC 20.........................................III-131
Tabel 3.113 Data Kapasitas Over Time WC 20..............................................III-131
Tabel 3.114 Data Kapasitas Reguler Time WC 30.........................................III-133
Tabel 3.115 Data Kapasitas Over Time WC 30..............................................III-133
Tabel 3.116 Data Kapasitas Reguler Time WC 40.........................................III-134
Tabel 3.117 Data Kapasitas Over Time WC 40..............................................III-134
Tabel 3.118 Data Kapasitas Reguler Time WC 50.........................................III-136
Tabel 3.119 Data Kapasitas Over Time WC 50..............................................III-136
Tabel 3.120 Data Kapasitas Reguler Time WC 60.........................................III-137
Tabel 3.121 Data Kapasitas Over Time WC 60..............................................III-137
Tabel 3.122 Data Kapasitas Reguler Time WC 70.........................................III-139
Tabel 3.123 Data Kapasitas Over Time WC 70..............................................III-139
Tabel 3.124 Data Kapasitas Reguler Time WC 80.........................................III-140
Tabel 3.125 Data Kapasitas Over Time WC 80..............................................III-140
Tabel 3.126 Data Kapasitas Reguler Time WC 90.........................................III-142
xii
Tabel 3.127 Data Kapasitas Over Time WC 90..............................................III-142
Tabel 3.128 Master Schedule Produk Case Handphone................................III-149
Tabel 3.129 Master Schedule Produk Case Tablet.........................................III-149
Tabel 3.130 Routing Sheet Revisi Produk Case Handphone.........................III-149
Tabel 3.131 Routing Sheet Revisi Produk Case Tablet..................................III-150
Tabel 3.132 Routing Sheet Produk Case Handphone.....................................III-152
Tabel 3.133 Routing Sheet Produk Case Tablet.............................................III-154
Tabel 3.134 Multi Product Process Chart (MPPC).......................................III-156
Tabel 3.135 Material Costing Case Handphone Komponen Utama Diterima..........
........................................................................................................................III-160
Tabel 3.136 Material Costing Case Handphone Komponen Tambahan Diterima
........................................................................................................................III-161
Tabel 3.137 Material Costing Case Handphone Komponen Utama Dipakai III-162
Tabel 3.138 Material Costing Case Handphone Komponen Tambahan Dipakai.....
........................................................................................................................III-163
Tabel 3.139 Material Costing Case Tablet Komponen Utama Diterima.......III-164
Tabel 3.140 Material Costing Case Tablet Komponen Tambahan Diterima.III-165
Tabel 3.141 Material Costing Case Tablet Komponen Utama Dipakai........III-166
Tabel 3.142 Material Costing Case Tablet Komponen Tambahan Dipakai. .III-167
Tabel 3.143 BOM Produk Case Handphone..................................................III-168
Tabel 3.144 BOM Produk Case Tablet..........................................................III-169
Tabel 3.145 Routing Sheet Produk Case Handphone.....................................III-170
Tabel 3.146 Routing Sheet Produk Case Tablet.............................................III-171
Tabel 3.147 Multi Product Process Chart (MPPC).......................................III-172
Tabel 3.148 Ukuran Komponen Utama yang Diterima dan Dipakai Case
Handphone......................................................................................................III-173
Tabel 3.149 Ukuran Komponen Tambahan yang Diterima dan Dipakai Case
Handphone......................................................................................................III-173
Tabel 3.150 Ukuran Komponen Utama yang Diterima dan Dipakai Case Tablet
........................................................................................................................III-174
Tabel 3.151 Ukuran Komponen Tambahan yang Diterima dan Dipakai Case
Tablet..............................................................................................................III-174
xiii
Tabel 3.152 Ukuran Rak Receiving................................................................III-175
Tabel 3.153 Luas Lantai Komponen Utama Produk Case Handphone..........III-175
Tabel 3.154 Luas Lantai Komponen Tambahan Produk Case Handphone.. .III-177
Tabel 3.155 Luas Lantai Komponen Utama Produk Case Tablet..................III-180
Tabel 3.156 Luas Lantai Komponen Tambahan Produk Case Tablet............III-182
Tabel 3.157 Total Luas Lantai Komponen Utama.........................................III-185
Tabel 3.158 Total Luas Lantai Komponen Tambahan...................................III-186
Tabel 3.159 Luas Lantai Receiving................................................................III-187
Tabel 3.160 Luas Lantai Fabrikasi WC 10.....................................................III-188
Tabel 3.161 Luas Lantai Fabrikasi WC 20.....................................................III-189
Tabel 3.162 Luas Lantai Fabrikasi WC 30.....................................................III-189
Tabel 3.163 Luas Lantai Fabrikasi WC 40.....................................................III-190
Tabel 3.164 Luas Lantai Fabrikasi WC 50.....................................................III-191
Tabel 3.165 Luas Lantai Fabrikasi WC 60.....................................................III-192
Tabel 3.166 Luas Lantai Fabrikasi WC 70.....................................................III-193
Tabel 3.167 Luas Lantai Fabrikasi WC 80.....................................................III-194
Tabel 3.168 Luas Lantai Fabrikasi WC 90.....................................................III-194
Tabel 3.169 Total Luas Lantai Fabrikasi........................................................III-195
Tabel 3.170 Ukuran Rak Shipping..................................................................III-196
Tabel 3.171 Ukuran Kemasan Produk Case Handphone...............................III-196
Tabel 3.172 Ukuran Kemasan Produk Case Tablet........................................III-196
Tabel 3.173 Luas Lantai Shipping Produk Case Handphone.........................III-197
Tabel 3.174 Luas Lantai Shipping Produk Case Tablet.................................III-198
Tabel 3.175 Total Luas Lantai Shipping.........................................................III-199
Tabel 3.176 Luas Lantai Fasilitas Non Perkantoran (Dalam Pabrik).............III-200
Tabel 3.177 Luas Lantai Fasilitas Non Perkantoran (Luar Pabrik)................III-201
Tabel 3.178 Luas Lantai Fasilitas Perkantoran...............................................III-202
Tabel 3.179 Luas Lantai Fasilitas Ruang Perkantoran...................................III-203
Tabel 3.180 Luas Lantai Fasilitas dan Perkantoran........................................III-204
Tabel 3.181 Luas Lantai Fabrikasi dan Perkantoran......................................III-204
Tabel 3.182 Routing Sheet Revisi Produk Case Handphone.........................III-211
Tabel 3.183 Routing Sheet Revisi Produk Case Tablet..................................III-212
xiv
Tabel 3.184 Multi Product Process Chart (MPPC).......................................III-213
Tabel 3.185 Luas lantai Produksi...................................................................III-214
Tabel 3.186 Berat Pakai Komponen Utama Case Handphone.......................III-214
Tabel 3.187 Berat Pakai Komponen Utama Case Tablet...............................III-215
Tabel 3.188 Berat Pakai Komponen Tambahan Case Handphone................III-215
Tabel 3.189 Berat Pakai Komponen Tambahan Case Tablet.........................III-215
Tabel 3.190 Ongkos Material Handling (OMH) Awal Produk Case Handphone
........................................................................................................................III-217
Tabel 3.191 Ongkos Material Handling (OMH) Awal Produk Case Tablet. III-219
Tabel 3.192 From To Chart............................................................................III-221
Tabel 3.193 In Flow........................................................................................III-222
Tabel 3.194 Out Flow.....................................................................................III-223
Tabel 3.195 Tabel Skala Prioritas (TSP) In Flow...........................................III-224
Tabel 3.196 Tabel Skala Prioritas (TSP) Out Flow........................................III-224
Tabel 3.197 Koordinat (X,Y) Area Allocation Diagram (AAD)...................III-229
Tabel 3.198 Ongkos Material Handling (OMH) Revisi Produk Case Handphone
........................................................................................................................III-230
Tabel 3.199 Ongkos Material Handling (OMH) Revisi Produk Case TabletIII-232
Tabel 3.200 Data Reguler Time......................................................................III-244
Tabel 3.201 Ongkos Material Handling Revisi Produk Case Handphone....III-245
Tabel 3.202 Ongkos Material Handling Revisi Produk Case Tablet.............III-246
Tabel 3.203 Multi Product Process Chart (MPPC).......................................III-249
Tabel 3.204 Disaggregate Reguler Time Produk Case Handphone dan Case
Tablet..............................................................................................................III-250
Tabel 3.205 Faktor Konversi..........................................................................III-250
Tabel 3.206 Kedatangan Bahan Baku Per-Hari..............................................III-251
Tabel 3.207 Waktu Proses Pemotongan Badan Case Produk Case Handphone.......
........................................................................................................................III-252
Tabel 3.208 Waktu Proses Pencetakan Badan Case Produk Case Handphone.........
........................................................................................................................III-253
Tabel 3.209 Waktu Proses Pendinginan Badan Case Produk Case Handphone.......
........................................................................................................................III-254
xv
Tabel 3.210 Waktu Proses Penghalusan Badan Case Produk Case Handphone.......
........................................................................................................................III-255
Tabel 3.211 Waktu Proses Pemeriksaan 1 Badan Case Produk Case Handphone
........................................................................................................................III-256
Tabel 3.212 Waktu Proses Pemotongan Dudukan Speaker Produk Case
Handphone......................................................................................................III-257
Tabel 3.213 Waktu Proses Pencetakan Dudukan Speaker Produk Case
Handphone......................................................................................................III-258
Tabel 3.214 Waktu Proses Pendinginan Dudukan Speaker Produk Case
Handphone......................................................................................................III-259
Tabel 3.215 Waktu Proses Penghalusan Dudukan Speaker Produk Case
Handphone......................................................................................................III-260
Tabel 3.216 Waktu Proses Pemeriksaan 1 Dudukan Speaker Produk Case
Handphone......................................................................................................III-261
Tabel 3.217 Waktu Proses Pemotongan Airpods Receptacle Produk Case
Handphone......................................................................................................III-262
Tabel 3.218 Waktu Proses Pencetakan Airpods Receptacle Produk Case
Handphone......................................................................................................III-263
Tabel 3.219 Waktu Proses Pendinginan Airpods Receptacle Produk Case
Handphone......................................................................................................III-264
Tabel 3.220 Waktu Proses Penghalusan Airpods Receptacle Produk Case
Handphone......................................................................................................III-265
Tabel 3.221 Waktu Proses Pemeriksaan 1 Airpods Receptacle Produk Case
Handphone......................................................................................................III-266
Tabel 3.222 Waktu Proses Assembly 1 HASH 01-02 Produk Case Handphone.......
........................................................................................................................III-267
Tabel 3.223 Waktu Proses Assembly 2 HASH 02-01 Produk Case Handphone.......
........................................................................................................................III-268
Tabel 3.224 Waktu Proses Pemeriksaan 2 HASH 02-01 Produk Case Handphone
........................................................................................................................III-269
Tabel 3.225 Waktu Proses Pengemasan HASH 02-01 Produk Case Handphone.....
........................................................................................................................III-270
xvi
Tabel 3.226 Rangkuman Waktu Proses Berdasarkan Distribusi Produk Case
Handphone......................................................................................................III-270
Tabel 3.227 Waktu Proses Pemotongan Badan Case Produk Case Tablet....III-271
Tabel 3.228 Waktu Proses Pencetakan Badan Case Produk Case Tablet......III-272
Tabel 3.229 Waktu Proses Pendinginan Badan Case Produk Case Tablet....III-273
Tabel 3.230 Waktu Proses Penghalusan Badan Case Produk Case Tablet....III-274
Tabel 3.231 Waktu Proses Pemeriksaan 1 Badan Case Produk Case Tablet.III-275
Tabel 3.232 Waktu Proses Pemotongan Dudukan Speaker Produk Case Tablet......
........................................................................................................................III-276
Tabel 3.233 Waktu Proses Pencetakan Dudukan Speaker Produk Case Tablet........
........................................................................................................................III-277
Tabel 3.234 Waktu Proses Pendinginan Dudukan Speaker Produk Case Tablet......
........................................................................................................................III-278
Tabel 3.235 Waktu Proses Penghalusan Dudukan Speaker Produk Case Tablet.III-
279
Tabel 3.236 Waktu Proses Pemeriksaan 1 Dudukan Speaker Produk Case Tablet
........................................................................................................................III-280
Tabel 3.237 Waktu Proses Pemotongan Airpods Receptacle Produk Case Tablet
........................................................................................................................III-281
Tabel 3.238 Waktu Proses Pencetakan Airpods Receptacle Produk Case Tablet.....
........................................................................................................................III-282
Tabel 3.239 Waktu Proses Pendinginan Airpods Receptacle Produk Case Tablet
........................................................................................................................III-283
Tabel 3.240 Waktu Proses Penghalusan Airpods Receptacle Produk Case Tablet
........................................................................................................................III-284
Tabel 3.241 Waktu Proses Pemeriksaan 1 Airpods Receptacle Produk Case Tablet
........................................................................................................................III-285
Tabel 3.242 Waktu Proses Assembly 1 HAST 01-02 Produk Case Tablet....III-286
Tabel 3.243 Waktu Proses Assembly 2 HAST 02-01 Produk Case Tablet....III-287
Tabel 3.244 Waktu Proses Pemeriksaan 2 HAST 02-01 Produk Case Tablet..........
........................................................................................................................III-288
Tabel 3.245 Waktu Proses Pengemasan HAST 02-01 Produk Case Tablet...III-289
xvii
Tabel 3.246 Rangkuman Waktu Proses Berdasarkan Distribusi Produk Case
Tablet..............................................................................................................III-289
Tabel 3.247 Jarak Antar Departemen.............................................................III-290
Tabel 3.248 Waktu Tempuh Antar Departemen.............................................III-290
Tabel 3.249 Kedatangan Per-Hari Produk Case Handphone dan Case Tablet.........
........................................................................................................................III-507
Tabel 3.250 Rangkuman Validasi Case Handphone......................................III-515
Tabel 3.251 Rangkuman Validasi Case Tablet..............................................III-516
xviii
Tabel 4.23 Cash Flow.......................................................................................IV-29
Tabel 4.24 Neraca.............................................................................................IV-31
Tabel 4.25 Break Even Point (BEP) Case Handphone....................................IV-34
Tabel 4.26 Break Even Point (BEP) Case Tablet.............................................IV-36
Tabel 4.27 Payback Period..............................................................................IV-38
Tabel 4.28 Internal Rate of Return (IRR)........................................................IV-40
Tabel 4.29 Laporan Harga Pokok Penjualan Case Handphone (Trading).......IV-42
Tabel 4.30 Laporan Harga Pokok Penjualan Case Tablet (Trading)...............IV-43
Tabel 4.31 Laporan Rugi Laba Case Handphone (Trading)............................IV-44
Tabel 4.32 Laporan Rugi Laba Case Tablet(Trading).....................................IV-44
Tabel 4.33 Cash Flow (Trading)......................................................................IV-45
Tabel 4.34 Neraca (Trading)............................................................................IV-45
Tabel 4.35 Break Even Point Case Handphone (Trading)...............................IV-46
Tabel 4.36 Break Even Point Case Tablet (Trading).......................................IV-46
Tabel 4.37 Payback Period (Trading)..............................................................IV-47
Tabel 4.38 Internal Rate of Return (Trading)..................................................IV-47
xix
DAFTAR GAMBAR
Gambar 3.1 Operation Process Chart (OPC) Pabrik Produk Case HandphoneIII-7
Gambar 3.2 Operation Process Chart (OPC) Pabrik Produk Case Tablet........III-8
Gambar 3.3 Plot Data Demand Aggregate.......................................................III-12
Gambar 3.4 Grafik Kapasitas WC 10...............................................................III-55
Gambar 3.5 Grafik Kapasitas WC 20...............................................................III-56
Gambar 3.6 Grafik Kapasitas WC 30...............................................................III-58
Gambar 3.7 Grafik Kapasitas WC 40...............................................................III-59
Gambar 3.8 Grafik Kapasitas WC 50...............................................................III-61
Gambar 3.9 Grafik Kapasitas WC 60...............................................................III-62
Gambar 3.10 Grafik Kapasitas WC 70.............................................................III-64
Gambar 3.11 Grafik Kapasitas WC 80.............................................................III-65
Gambar 3.12 Grafik Kapasitas WC 90.............................................................III-66
Gambar 3.13 Struktur Produk Aircase Handphone..........................................III-71
Gambar 3.14 Struktur Produk Aircase Tablet..................................................III-71
Gambar 3.15 Flow Diagram Case Handphone..............................................III-115
Gambar 3.16 Flow Diagram Case Tablet.......................................................III-116
Gambar 3.17 Grafik Kapasitas WC 10...........................................................III-130
Gambar 3.18 Grafik Kapasitas WC 20...........................................................III-132
Gambar 3.19 Grafik Kapasitas WC 30...........................................................III-133
Gambar 3.20 Grafik Kapasitas WC 40...........................................................III-135
Gambar 3.21 Grafik Kapasitas WC 50...........................................................III-136
Gambar 3.22 Grafik Kapasitas WC 60...........................................................III-138
Gambar 3.23 Grafik Kapasitas WC 70...........................................................III-139
Gambar 3.24 Grafik Kapasitas WC 80...........................................................III-141
Gambar 3.25 Grafik Kapasitas WC 90...........................................................III-142
Gambar 3.26 Operation Process Chart (OPC) Produk Case Handphone.....III-147
Gambar 3.27 Operation Process Chart (OPC) Produk Case Tablet..............III-148
xx
Gambar 3.28 Operation Process Chart (OPC) Produk Case Handphone.....III-209
Gambar 3.29 Operation Process Chart (OPC) Produk Case Tablet..............III-210
Gambar 3.30 Activity Relation Diagram (ARD)............................................III-225
Gambar 3.31 Area Allocation Diagram (AAD).............................................III-225
Gambar 3.32 AAD Alternatif 1......................................................................III-229
Gambar 3.33 AAD Terpilih............................................................................III-234
Gambar 3.34 Layout.......................................................................................III-235
Gambar 3.35 Activity Relationship Chart (ARC) Perkantoran......................III-236
Gambar 3.36 Activity Relationship Chart (ARC) Non Perkantoran...............III-237
Gambar 3.37 Template....................................................................................III-238
Gambar 3.38 Operation Process Chart (OPC) Produk Case Handphone.....III-247
Gambar 3.39 Operation Process Chart (OPC) Produk Case Handphone.....III-248
Gambar 3.40 Distribusi Proses Pemotongan Badan Case Produk Case Handphone
........................................................................................................................III-252
Gambar 3.41 Distribusi Proses Pencetakan Badan Case Produk Case Handphone
........................................................................................................................III-253
Gambar 3.42 Distribusi Proses Pendinginan Badan Case Produk Case Handphone
........................................................................................................................III-254
Gambar 3.43 Distribusi Proses Penghalusan Badan Case Produk Case Handphone
........................................................................................................................III-255
Gambar 3.44 Distribusi Proses Pemeriksaan 1 Badan Case Produk Case
Handphone......................................................................................................III-256
Gambar 3.45 Distribusi Proses Pemotongan Dudukan Speaker Produk Case
Handphone......................................................................................................III-257
Gambar 3.46 Distribusi Proses Pencetakan Dudukan Speaker Produk Case
Handphone......................................................................................................III-258
Gambar 3.47 Distribusi Proses Pendinginan Dudukan Speaker Produk Case
Handphone......................................................................................................III-259
Gambar 3.48 Distribusi Proses Penghalusan Dudukan Speaker Produk Case
Handphone......................................................................................................III-260
Gambar 3.49 Distribusi Proses Pemeriksaan 1 Dudukan Speaker Produk Case
Handphone......................................................................................................III-261
xxi
Gambar 3.50 Distribusi Proses Pemotongan Airpods Receptacle Produk Case
Handphone......................................................................................................III-262
Gambar 3.51 Distribusi Proses Pencetakan Airpods Receptacle Produk Case
Handphone......................................................................................................III-263
Gambar 3.52 Distribusi Proses Pendinginan Airpods Receptacle Produk Case
Handphone......................................................................................................III-264
Gambar 3.53 Distribusi Proses Penghalusan Airpods Receptacle Produk Case
Handphone......................................................................................................III-265
Gambar 3.54 Distribusi Proses Pemeriksaan 1 Airpods Receptacle Produk Case
Handphone......................................................................................................III-266
Gambar 3.55 Distribusi Proses Assembly 1 HASH 01-02 Produk Case Handphone
........................................................................................................................III-267
Gambar 3.56 Distribusi Proses Assembly 2 HASH 02-01 Produk Case Handphone
........................................................................................................................III-268
Gambar 3.57 Distribusi Proses Pemeriksaan 2 HASH 02-01 Produk Case
Handphone......................................................................................................III-269
Gambar 3.58 Distribusi Proses Pengemasan HASH 02-01 Produk Case
Handphone......................................................................................................III-270
Gambar 3.59 Distribusi Proses Pemotongan Badan Case Produk Case Tablet.........
........................................................................................................................III-271
Gambar 3.60 Distribusi Proses Pencetakan Badan Case Produk Case Tablet..........
........................................................................................................................III-272
Gambar 3.61 Distribusi Proses Pendinginan Badan Case Produk Case Tablet.........
........................................................................................................................III-273
Gambar 3.62 Distribusi Proses Penghalusan Badan Case Produk Case Tablet........
........................................................................................................................III-274
Gambar 3.63 Distribusi Proses Pemeriksaan 1 Badan Case Produk Case Tablet.....
........................................................................................................................III-275
Gambar 3.64 Distribusi Proses Pemotongan Dudukan Speaker Produk Case
Tablet..............................................................................................................III-276
Gambar 3.65 Distribusi Proses Pencetakan Dudukan Speaker Produk Case Tablet
........................................................................................................................III-277
xxii
Gambar 3.66 Distribusi Proses Pendinginan Dudukan Speaker Produk Case
Tablet..............................................................................................................III-278
Gambar 3.67 Distribusi Proses Penghalusan Dudukan Speaker Produk Case
Tablet..............................................................................................................III-279
Gambar 3.68 Distribusi Proses Pemeriksaan 1 Dudukan Speaker Produk Case
Tablet..............................................................................................................III-280
Gambar 3.69 Distribusi Proses Pemotongan Airpods Receptacle Produk Case
Tablet..............................................................................................................III-281
Gambar 3.70 Distribusi Proses Pencetakan Airpods Receptacle Produk Case
Tablet..............................................................................................................III-282
Gambar 3.71 Distribusi Proses Pendinginan Airpods Receptacle Produk Case
Tablet..............................................................................................................III-283
Gambar 3.72 Distribusi Proses Penghalusan Airpods Receptacle Produk Case
Tablet..............................................................................................................III-284
Gambar 3.73 Distribusi Proses Pemeriksaan 1 Airpods Receptacle Produk Case
Tablet..............................................................................................................III-285
Gambar 3.74 Distribusi Proses Assembly 1 HAST 01-02 Produk Case Tablet.........
........................................................................................................................III-286
Gambar 3.75 Distribusi Proses Assembly 2 HAST 02-01 Produk Case Tablet.........
........................................................................................................................III-287
Gambar 3.76 Distribusi Proses Pemeriksaan 2 HAST 02-01 Produk Case Tablet
........................................................................................................................III-288
Gambar 3.77 Distribusi Proses Pengemasan HAST 02-01 Produk Case Tablet.......
........................................................................................................................III-289
Gambar 3.78 Modul Create Badan Case HP..................................................III-294
Gambar 3.79 Dialog Box Modul Create Badan Case HP..............................III-294
Gambar 3.80 Modul Create Dudukan Wireless Speaker HP.........................III-295
Gambar 3.81 Dialog Box Modul Create Dudukan Wireless Speaker HP......III-295
Gambar 3.82 Modul Create Airpods Receptacle HP......................................III-296
Gambar 3.83 Dialog Box Modul Create Airpods Receptacle HP..................III-296
Gambar 3.84 Modul Create Badan Case TABLET.......................................III-297
Gambar 3.85 Dialog Box Modul Create Badan Case TABLET....................III-297
xxiii
Gambar 3.86 Modul Create Dudukan Wireless Speaker TABLET...............III-298
Gambar 3.87 Dialog Box Modul Create Dudukan Wireless Speaker TABLET.......
........................................................................................................................III-298
Gambar 3.88 Modul Create Airpods Receptacle TABLET...........................III-299
Gambar 3.89 Dialog Box Modul Create Airpods Receptacle TABLET........III-299
Gambar 3.90 Data Modul Create Keseluruhan..............................................III-299
Gambar 3.91 Modul Assign Set BCH.............................................................III-300
Gambar 3.92 Dialog Box Modul Assign Set BCH.........................................III-300
Gambar 3.93 Modul Assign Set DSH.............................................................III-301
Gambar 3.94 Dialog Box Modul Assign Set DSH..........................................III-301
Gambar 3.95 Modul Assign Set ARH.............................................................III-302
Gambar 3.96 Dialog Box Modul Assign Set ARH.........................................III-302
Gambar 3.97 Modul Assign Set BCT.............................................................III-303
Gambar 3.98 Dialog Box Modul Assign Set BCT..........................................III-303
Gambar 3.99 Modul Assign Set DST.............................................................III-304
Gambar 3.100 Dialog Box Modul Assign Set DST........................................III-304
Gambar 3.101 Modul Assign Set ART...........................................................III-305
Gambar 3.102 Dialog Box Modul Assign Set ART........................................III-305
Gambar 3.103 Modul Assign Pengaturan Proses............................................III-306
Gambar 3.104 Dialog Box Modul Assign Pengaturan Proses........................III-306
Gambar 3.105 Modul Assign HASH0201 Packed.........................................III-307
Gambar 3.106 Dialog Box Modul Assign HASH0201 Packed......................III-307
Gambar 3.107 Modul Assign HAST0201 Packed..........................................III-308
Gambar 3.108 Dialog Box Modul Assign HAST0201 Packed.......................III-308
Gambar 3.109 Data Modul Assign Keseluruhan............................................III-308
Gambar 3.110 Modul Station Receiving.........................................................III-309
Gambar 3.111 Dialog Box Modul Station Receiving.....................................III-309
Gambar 3.112 Modul Station WC 10 Pemotongan BCH dan BCT...............III-310
Gambar 3.113 Dialog Box Modul Station WC 10 Pemotongan BCH dan BCT.......
........................................................................................................................III-310
Gambar 3.114 Modul Station WC 10 Pemotongan DSH dan DST................III-311
xxiv
Gambar 3.115 Dialog Box Modul Station WC 10 Pemotongan DSH dan DST........
........................................................................................................................III-311
Gambar 3.116 Modul Station WC 10 Pemotongan ARH dan ART...............III-312
Gambar 3.117 Dialog Box Modul Station WC 10 Pemotongan ARH dan ART.......
........................................................................................................................III-312
Gambar 3.118 Modul Station WC 20 Pencetakan BCH dan BCT.................III-313
Gambar 3.119 Dialog Box Modul Station WC 20 Pencetakan BCH dan BCT.........
........................................................................................................................III-313
Gambar 3.120 Modul Station WC 20 Pencetakan DSH dan DST.................III-314
Gambar 3.121 Dialog Box Modul Station WC 20 Pencetakan DSH dan DST.........
........................................................................................................................III-314
Gambar 3.122 Modul Station WC 20 Pencetakan ARH dan ART.................III-315
Gambar 3.123 Dialog Box Modul Station WC 20 Pencetakan ARH dan ART.........
........................................................................................................................III-315
Gambar 3.124 Modul Station WC 30 Pendinginan BCH dan BCT...............III-316
Gambar 3.125 Dialog Box Modul Station WC 30 Pendinginan BCH dan BCT.......
........................................................................................................................III-316
Gambar 3.126 Modul Station WC 30 Pendinginan DSH dan DST................III-317
Gambar 3.127 Dialog Box Modul Station WC 30 Pendinginan DSH dan DST........
........................................................................................................................III-317
Gambar 3.128 Modul Station WC 30 Pendinginan ARH dan ART...............III-318
Gambar 3.129 Dialog Box Modul Station WC 30 Pendinginan ARH dan ART.......
........................................................................................................................III-318
Gambar 3.130 Modul Station WC 40 Penghalusan BCH dan BCT...............III-319
Gambar 3.131 Dialog Box Modul Station WC 40 Penghalusan BCH dan BCT.......
........................................................................................................................III-319
Gambar 3.132 Modul Station WC 40 Penghalusan DSH dan DST...............III-320
Gambar 3.133 Dialog Box Modul Station WC 40 Penghalusan DSH dan DST.......
........................................................................................................................III-320
Gambar 3.134 Modul Station WC 40 Penghalusan ARH dan ART...............III-321
Gambar 3.135 Dialog Box Modul Station WC 40 Penghalusan ARH dan ART.......
........................................................................................................................III-321
xxv
Gambar 3.136 Modul Station WC 50 Pemeriksaan 1.....................................III-322
Gambar 3.137 Dialog Box Modul Station WC 50 Pemeriksaan 1.................III-322
Gambar 3.138 Modul Station WC 60 Assembly 1 BCH.................................III-323
Gambar 3.139 Dialog Box Modul Station WC 60 Assembly 1 BCH.............III-323
Gambar 3.140 Modul Station WC 60 Assembly 1 DSH.................................III-324
Gambar 3.141 Dialog Box Modul Station WC 60 Assembly 1 DSH..............III-324
Gambar 3.142 Modul Station WC 60 HASH0102.........................................III-325
Gambar 3.143 Dialog Box Modul Station WC 60 HASH0102......................III-325
Gambar 3.144 Modul Station WC 60 Assembly 1 BCT.................................III-326
Gambar 3.145 Dialog Box Modul Station WC 60 Assembly 1 BCT..............III-326
Gambar 3.146 Modul Station WC 60 Assembly 1 DST.................................III-327
Gambar 3.147 Dialog Box Modul Station WC 60 Assembly 1 DST..............III-327
Gambar 3.148 Modul Station WC 60 HAST0102..........................................III-328
Gambar 3.149 Dialog Box Modul Station WC 60 HAST0102......................III-328
Gambar 3.150 Modul Station WC 70 Assembly 2 HASH0102......................III-329
Gambar 3.151 Dialog Box Modul Station WC 70 Assembly 2 HASH0102...III-329
Gambar 3.152 Modul Station WC 70 Assembly 2 ARH................................III-330
Gambar 3.153 Dialog Box Modul Station WC 70 Assembly 2 ARH.............III-330
Gambar 3.154 Modul Station WC 70 HASH0201.........................................III-331
Gambar 3.155 Dialog Box Modul Station WC 70 HASH0201......................III-331
Gambar 3.156 Modul Station WC 70 Assembly 2 HAST0102......................III-332
Gambar 3.157 Dialog Box Modul Station WC 70 Assembly 2 HAST0102...III-332
Gambar 3.158 Modul Station WC 70 Assembly 2 ART.................................III-333
Gambar 3.159 Dialog Box Modul Station WC 70 Assembly 2 ART..............III-333
Gambar 3.160 Modul Station WC 70 HAST0201..........................................III-334
Gambar 3.161 Dialog Box Modul Station WC 70 HAST0201......................III-334
Gambar 3.162 Modul Station WC 80 Pemeriksaan 2 HASH0201.................III-335
Gambar 3.163 Dialog Box Modul Station WC 80 Pemeriksaan 2 HASH0201.........
........................................................................................................................III-335
Gambar 3.164 Modul Station WC 80 Pemeriksaan 2 HAST0201.................III-336
Gambar 3.165 Dialog Box Modul Station WC 80 Pemeriksaan 2 HAST0201.........
........................................................................................................................III-336
xxvi
Gambar 3.166 Modul Station WC 90 Pengemasan........................................III-337
Gambar 3.167 Dialog Box Modul Station WC 90 Pengemasan.....................III-337
Gambar 3.168 Modul Station Shipping HP....................................................III-338
Gambar 3.169 Dialog Box Modul Station Shipping HP.................................III-338
Gambar 3.170 Modul Station Shipping HP....................................................III-339
Gambar 3.171 Dialog Box Modul Station Shipping HP.................................III-339
Gambar 3.172 Data Modul Station Keseluruhan............................................III-340
Gambar 3.173 Modul Route Receiving...........................................................III-341
Gambar 3.174 Dialog Box Modul Route Receiving.......................................III-341
Gambar 3.175 Modul Route Dari WC 10 Pemotongan BCH dan BCT.........III-342
Gambar 3.176 Dialog Box Modul Route Dari WC 10 Pemotongan BCH dan BCT
........................................................................................................................III-342
Gambar 3.177 Modul Route Dari WC 10 Pemotongan DSH dan DST..........III-343
Gambar 3.178 Dialog Box Modul Route Dari WC 10 Pemotongan DSH dan DST
........................................................................................................................III-343
Gambar 3.179 Modul Route Dari WC 10 Pemotongan ARH dan ART.........III-344
Gambar 3.180 Dialog Box Modul Route Dari WC 10 Pemotongan ARH dan ART
........................................................................................................................III-344
Gambar 3.181 Modul Route Dari WC 20 Pencetakan BCH dan BCT...........III-345
Gambar 3.182 Dialog Box Modul Route Dari WC 20 Pencetakan BCH dan BCT
........................................................................................................................III-345
Gambar 3.183 Modul Route Dari WC 20 Pencetakan DSH dan DST...........III-346
Gambar 3.184 Dialog Box Modul Route Dari WC 20 Pencetakan DSH dan DST
........................................................................................................................III-346
Gambar 3.185 Modul Route Dari WC 20 Pencetakan ARH dan ART..........III-347
Gambar 3.186 Dialog Box Modul Route Dari WC 20 Pencetakan ARH dan ART
........................................................................................................................III-347
Gambar 3.187 Modul Route Dari WC 30 Pendinginan BCH dan BCT.........III-348
Gambar 3.188 Dialog Box Modul Route Dari WC 30 Pendinginan BCH dan BCT
........................................................................................................................III-348
Gambar 3.189 Modul Route Dari WC 30 Pendinginan DSH dan DST..........III-349
xxvii
Gambar 3.190 Dialog Box Modul Route Dari WC 30 Pendinginan DSH dan DST
........................................................................................................................III-349
Gambar 3.191 Modul Route Dari WC 30 Pendinginan ARH dan ART.........III-350
Gambar 3.192 Dialog Box Modul Route Dari WC 30 Pendinginan ARH dan ART
........................................................................................................................III-350
Gambar 3.193 Modul Route Dari WC 40 Penghalusan BCH dan BCT.........III-351
Gambar 3.194 Dialog Box Modul Route Dari WC 40 Penghalusan BCH dan BCT
........................................................................................................................III-351
Gambar 3.195 Modul Route Dari WC 40 Penghalusan DSH dan DST.........III-352
Gambar 3.196 Dialog Box Modul Route Dari WC 40 Penghalusan DSH dan DST
........................................................................................................................III-352
Gambar 3.197 Modul Route Dari WC 40 Penghalusan ARH dan ART........III-353
Gambar 3.198 Dialog Box Modul Route Dari WC 40 Penghalusan ARH dan ART
........................................................................................................................III-353
Gambar 3.199 Modul Route Dari WC 50 Pemeriksaan 1 HP........................III-354
Gambar 3.200 Dialog Box Modul Route Dari WC 50 Pemeriksaan 1 HP.....III-354
Gambar 3.201 Modul Route Dari WC 50 Pemeriksaan 1 Tablet...................III-355
Gambar 3.202 Dialog Box Modul Route Dari WC 50 Pemeriksaan 1 Tablet III-355
Gambar 3.203 Modul Route Dari WC 60 Assembly 1 HP..............................III-356
Gambar 3.204 Dialog Box Modul Route Dari WC 60 Assembly 1 HP..........III-356
Gambar 3.205 Modul Route Dari WC 60 Assembly 1 Tablet.........................III-357
Gambar 3.206 Dialog Box Modul Route Dari WC 60 Assembly 1 Tablet.....III-357
Gambar 3.207 Modul Route Dari WC 70 Assembly 2 HP..............................III-358
Gambar 3.208 Dialog Box Modul Route Dari WC 70 Assembly 2 HP..........III-358
Gambar 3.209 Modul Route Dari WC 70 Assembly 2 Tablet.........................III-359
Gambar 3.210 Dialog Box Modul Route Dari WC 70 Assembly 2 Tablet.....III-359
Gambar 3.211 Modul Route Dari WC 80 Pemeriksaan 2 HASH0201...........III-360
Gambar 3.212 Dialog Box Modul Route Dari WC 80 Pemeriksaan 2 HASH0201
........................................................................................................................III-360
Gambar 3.213 Modul Route Dari WC 80 Pemeriksaan 2 HAST0201...........III-361
Gambar 3.214 Dialog Box Modul Route Dari WC 80 Pemeriksaan 2 HAST0201
........................................................................................................................III-361
xxviii
Gambar 3.215 Modul Route Dari WC 90 Pengemasan HASH0201..............III-362
Gambar 3.216 Dialog Box Modul Route Dari WC 90 Pengemasan HASH0201......
........................................................................................................................III-362
Gambar 3.217 Modul Route Dari WC 90 Pengemasan HAST0201..............III-363
Gambar 3.218 Dialog Box Modul Route Dari WC 90 Pengemasan HAST0201......
........................................................................................................................III-363
Gambar 3.219 Data Modul Route Keseluruhan..............................................III-364
Gambar 3.220 Modul Process Pemotongan BCH..........................................III-365
Gambar 3.221 Dialog Box Modul Process Pemotongan BCH.......................III-365
Gambar 3.222 Modul Process Pemotongan BCT..........................................III-366
Gambar 3.223 Dialog Box Modul Process Pemotongan BCT.......................III-366
Gambar 3.224 Modul Process Pemotongan DSH..........................................III-367
Gambar 3.225 Dialog Box Modul Process Pemotongan DSH.......................III-367
Gambar 3.226 Modul Process Pemotongan DST...........................................III-368
Gambar 3.227 Dialog Box Modul Process Pemotongan DST.......................III-368
Gambar 3.228 Modul Process Pemotongan ARH..........................................III-369
Gambar 3.229 Dialog Box Modul Process Pemotongan ARH......................III-369
Gambar 3.230 Modul Process Pemotongan ART..........................................III-370
Gambar 3.231 Dialog Box Modul Process Pemotongan ART.......................III-370
Gambar 3.232 Modul Process Pencetakan BCH............................................III-371
Gambar 3.233 Dialog Box Modul Process Pencetakan BCH........................III-371
Gambar 3.234 Modul Process Pencetakan BCT............................................III-372
Gambar 3.235 Dialog Box Modul Process Pencetakan BCT.........................III-372
Gambar 3.236 Modul Process Pencetakan DSH............................................III-373
Gambar 3.237 Dialog Box Modul Process Pencetakan DSH.........................III-373
Gambar 3.238 Modul Process Pencetakan DST............................................III-374
Gambar 3.239 Dialog Box Modul Process Pencetakan DST.........................III-374
Gambar 3.240 Modul Process Pencetakan ARH...........................................III-375
Gambar 3.241 Dialog Box Modul Process Pencetakan ARH........................III-375
Gambar 3.242 Modul Process Pencetakan ART............................................III-376
Gambar 3.243 Dialog Box Modul Process Pencetakan ART.........................III-376
Gambar 3.244 Modul Process Pendinginan BCH..........................................III-377
xxix
Gambar 3.245 Dialog Box Modul Process Pendinginan BCH.......................III-377
Gambar 3.246 Modul Process Pendinginan BCT..........................................III-378
Gambar 3.247 Dialog Box Modul Process Pendinginan BCT.......................III-378
Gambar 3.248 Modul Process Pendinginan DSH..........................................III-379
Gambar 3.249 Dialog Box Modul Process Pendinginan DSH.......................III-379
Gambar 3.250 Modul Process Pendinginan DST...........................................III-380
Gambar 3.251 Dialog Box Modul Process Pendinginan DST.......................III-380
Gambar 3.252 Modul Process Pendinginan ARH..........................................III-381
Gambar 3.253 Dialog Box Modul Process Pendinginan ARH......................III-381
Gambar 3.254 Modul Process Pendinginan ART..........................................III-382
Gambar 3.255 Dialog Box Modul Process Pendinginan ART.......................III-382
Gambar 3.256 Modul Process Penghalusan BCH..........................................III-383
Gambar 3.257 Dialog Box Modul Process Penghalusan BCH......................III-383
Gambar 3.258 Modul Process Penghalusan BCT..........................................III-384
Gambar 3.259 Dialog Box Modul Process Penghalusan BCT.......................III-384
Gambar 3.260 Modul Process Penghalusan DSH..........................................III-385
Gambar 3.261 Dialog Box Modul Process Penghalusan DSH.......................III-385
Gambar 3.262 Modul Process Penghalusan DST..........................................III-386
Gambar 3.263 Dialog Box Modul Process Penghalusan DST.......................III-386
Gambar 3.264 Modul Process Penghalusan ARH.........................................III-387
Gambar 3.265 Dialog Box Modul Process Penghalusan ARH......................III-387
Gambar 3.266 Modul Process Penghalusan ART..........................................III-388
Gambar 3.267 Dialog Box Modul Process Penghalusan ART.......................III-388
Gambar 3.268 Modul Process Pemeriksaan 1 HP..........................................III-389
Gambar 3.269 Dialog Box Modul Process Pemeriksaan 1 HP......................III-389
Gambar 3.270 Modul Process Pemeriksaan 1 Tablet....................................III-390
Gambar 3.271 Dialog Box Modul Process Pemeriksaan 1 Tablet.................III-390
Gambar 3.272 Modul Process Assembly 1 HASH0102.................................III-391
Gambar 3.273 Dialog Box Modul Process Assembly 1 HASH0102..............III-391
Gambar 3.274 Modul Process Assembly 1 HAST0102..................................III-392
Gambar 3.275 Dialog Box Modul Process Assembly 1 HAST0102..............III-392
Gambar 3.276 Modul Process Assembly 2 HASH0201.................................III-393
xxx
Gambar 3.277 Dialog Box Modul Process Assembly 2 HASH0201..............III-393
Gambar 3.278 Modul Process Assembly 2 HAST0201..................................III-394
Gambar 3.279 Dialog Box Modul Process Assembly 2 HAST0201..............III-394
Gambar 3.280 Modul Process Pemeriksaan 2 HASH0201............................III-395
Gambar 3.281 Dialog Box Modul Process Pemeriksaan 2 HASH0201........III-395
Gambar 3.282 Modul Process Pemeriksaan 2 HAST0201............................III-396
Gambar 3.283 Dialog Box Modul Process Pemeriksaan 2 HAST0201.........III-396
Gambar 3.284 Modul Process Pengemasan HASH0201...............................III-397
Gambar 3.285 Dialog Box Modul Process Pengemasan HASH0201............III-397
Gambar 3.286 Modul Process Pengemasan HAST0201................................III-398
Gambar 3.287 Dialog Box Modul Process Pengemasan HAST0201............III-398
Gambar 3.288 Data Modul Process Keseluruhan..........................................III-399
Gambar 3.289 Lanjutan Data Modul Process Keseluruhan...........................III-399
Gambar 3.290 Modul Match Pemasangan BCH dan DSH.............................III-400
Gambar 3.291 Dialog Box Modul Match Pemasangan BCH dan DSH.........III-400
Gambar 3.292 Modul Match Pemasangan BCT dan DST.............................III-401
Gambar 3.293 Dialog Box Modul Match Pemasangan BCT dan DST..........III-401
Gambar 3.294 Modul Match Pemasangan HASH0102 dan ARH.................III-402
Gambar 3.295 Dialog Box Modul Match Pemasangan HASH0102 dan ARH.........
........................................................................................................................III-402
Gambar 3.296 Modul Match Pemasangan HAST0102 dan ART..................III-403
Gambar 3.297 Dialog Box Modul Match Pemasangan HAST0102 dan ART..........
........................................................................................................................III-403
Gambar 3.298 Data Modul Match Keseluruhan.............................................III-403
Gambar 3.299 Modul Batch Penggabungan HASH0102...............................III-404
Gambar 3.300 Dialog Box Modul Batch Penggabungan HASH0102............III-404
Gambar 3.301 Modul Batch Penggabungan HAST0102...............................III-405
Gambar 3.302 Dialog Box Modul Batch Penggabungan HAST0102............III-405
Gambar 3.303 Modul Batch Penggabungan HASH0201...............................III-406
Gambar 3.304 Dialog Box Modul Batch Penggabungan HASH0201............III-406
Gambar 3.305 Modul Batch Penggabungan HAST0201...............................III-407
Gambar 3.306 Dialog Box Modul Batch Penggabungan HAST0201............III-407
xxxi
Gambar 3.307 Data Modul Batch Keseluruhan..............................................III-407
Gambar 3.308 Modul Decide Pemotongan BCH atau BCT...........................III-408
Gambar 3.309 Dialog Box Modul Decide Pemotongan BCH atau BCT.......III-408
Gambar 3. 310 Modul Decide Pemotongan DSH atau DST..........................III-409
Gambar 3.311 Dialog Box Modul Decide Pemotongan DSH atau DST........III-409
Gambar 3.312 Modul Decide Pemotongan ARH atau ART..........................III-410
Gambar 3.313 Dialog Box Modul Decide Pemotongan ARH atau ART.......III-410
Gambar 3.314 Modul Decide Pencetakan BCH atau BCT.............................III-411
Gambar 3.315 Dialog Box Modul Decide Pencetakan BCH atau BCT.........III-411
Gambar 3.316 Modul Decide Pencetakan DSH atau DST.............................III-412
Gambar 3.317 Dialog Box Modul Decide Pencetakan DSH atau DST..........III-412
Gambar 3.318 Modul Decide Pencetakan ARH atau ART............................III-413
Gambar 3.319 Dialog Box Modul Decide Pencetakan ARH atau ART.........III-413
Gambar 3.320 Modul Decide Pendinginan BCH atau BCT...........................III-414
Gambar 3.321 Dialog Box Modul Decide Pendinginan BCH atau BCT.......III-414
Gambar 3.322 Modul Decide Pendinginan DSH atau DST...........................III-415
Gambar 3.323 Dialog Box Modul Decide Pendinginan DSH atau DST........III-415
Gambar 3.324 Modul Decide Pendinginan ARH atau ART..........................III-416
Gambar 3.325 Dialog Box Modul Decide Pendinginan ARH atau ART.......III-416
Gambar 3.326 Modul Decide Penghalusan BCH atau BCT...........................III-417
Gambar 3.327 Dialog Box Modul Decide Penghalusan BCH atau BCT.......III-417
Gambar 3.328 Modul Decide Penghalusan DSH atau DST...........................III-418
Gambar 3.329 Dialog Box Modul Decide Penghalusan DSH atau DST........III-418
Gambar 3.330 Modul Decide Penghalusan ARH atau ART..........................III-419
Gambar 3.331 Dialog Box Modul Decide Penghalusan ARH atau ART.......III-419
Gambar 3.332 Modul Decide Pemeriksaan 1.................................................III-420
Gambar 3.333 Dialog Box Modul Decide Pemeriksaan 1..............................III-420
Gambar 3.334 Modul Decide Barang Bagus Pemeriksaan 1 HP...................III-421
Gambar 3.335 Dialog Box Modul Decide Barang Bagus Pemeriksaan 1 HP III-421
Gambar 3.336 Modul Decide Barang Bagus Pemeriksaan 1 Tablet..............III-422
Gambar 3.337 Dialog Box Modul Decide Barang Bagus Pemeriksaan 1 Tablet......
........................................................................................................................III-422
xxxii
Gambar 3.338 Modul Decide Barang Bagus Pemeriksaan 2 HASH0201......III-423
Gambar 3.339 Dialog Box Modul Decide Barang Bagus Pemeriksaan 2
HASH0201.....................................................................................................III-423
Gambar 3.340 Modul Decide Barang Bagus Pemeriksaan 2 HAST0201......III-424
Gambar 3.341 Dialog Box Modul Decide Barang Bagus Pemeriksaan 2
HAST0201......................................................................................................III-424
Gambar 3.342 Modul Decide Pengemasan HP atau Tablet...........................III-425
Gambar 3.343 Dialog Box Modul Decide Pengemasan HP atau Tablet........III-425
Gambar 3.344 Data Modul Decide Keseluruhan............................................III-426
Gambar 3.345 Modul Record Reject Pemeriksaan 1 HP................................III-427
Gambar 3.346 Dialog Box Modul Record Reject Pemeriksaan 1 HP............III-427
Gambar 3.347 Modul Record Reject Pemeriksaan 1 Tablet...........................III-428
Gambar 3.348 Dialog Box Modul Record Reject Pemeriksaan 1 Tablet.......III-428
Gambar 3.349 Modul Record Reject Pemeriksaan 2 HASH0201..................III-429
Gambar 3.350 Dialog Box Modul Record Reject Pemeriksaan 2 HASH0201..........
........................................................................................................................III-429
Gambar 3.351 Modul Record Reject Pemeriksaan 2 HAST0201..................III-430
Gambar 3.352 Dialog Box dul Record Reject Pemeriksaan 2 HAST0201.....III-430
Gambar 3.353 Modul Record Aircase HP Jadi..............................................III-431
Gambar 3.354 Dialog Box Modul Record Aircase HP Jadi...........................III-431
Gambar 3.355 Modul Record Aircase Tablet Jadi.........................................III-432
Gambar 3.356 Dialog Box Modul Record Aircase Tablet Jadi......................III-432
Gambar 3.357 Data Modul Record Keseluruhan...........................................III-432
Gambar 3.358 Modul Dispose Reject Pemeriksaan 1 HP..............................III-433
Gambar 3.359 Dialog Box Modul Dispose Reject Pemeriksaan 1 HP...........III-433
Gambar 3.360 Modul Dispose Reject Pemeriksaan 1 Tablet.........................III-434
Gambar 3.361 Dialog Box Modul Dispose Reject Pemeriksaan 1 Tablet......III-434
Gambar 3.362 Modul Dispose Reject Pemeriksaan 2 HASH0201.................III-435
Gambar 3.363 Dialog Box Modul Dispose Reject Pemeriksaan 2 HASH0201.........
........................................................................................................................III-435
Gambar 3.364 Modul Dispose Reject Pemeriksaan 2 HAST0201.................III-436
xxxiii
Gambar 3.365 Dialog Box Modul Dispose Reject Pemeriksaan 2 HAST0201.........
........................................................................................................................III-436
Gambar 3.366 Modul Dispose Aircase HP Jadi.............................................III-437
Gambar 3.367 Dialog Box Modul Dispose Aircase HP Jadi..........................III-437
Gambar 3.368 Modul Dispose Aircase Tablet Jadi........................................III-438
Gambar 3.369 Dialog Box Modul Dispose Aircase Tablet Jadi.....................III-438
Gambar 3.370 Data Modul Dispose Keseluruhan..........................................III-438
Gambar 3.371 Modul ReadWrite Write Kedatangan BCH............................III-439
Gambar 3.372 Dialog Box Modul ReadWrite Write Kedatangan BCH.........III-439
Gambar 3.373 Modul ReadWrite Write Kedatangan DSH.............................III-440
Gambar 3.374 Dialog Box Modul ReadWrite Write Kedatangan DSH.........III-440
Gambar 3.375 Modul ReadWrite Write Kedatangan ARH............................III-441
Gambar 3.376 Dialog Box Modul ReadWrite Write Kedatangan ARH.........III-441
Gambar 3.377 Modul ReadWrite Write Kedatangan BCT.............................III-442
Gambar 3.378 Dialog Box Modul ReadWrite Write Kedatangan BCT..........III-442
Gambar 3.379 Modul ReadWrite Write Kedatangan DST.............................III-443
Gambar 3.380 Dialog Box Modul ReadWrite Write Kedatangan DST..........III-443
Gambar 3.381 Modul ReadWrite Write Kedatangan ART.............................III-444
Gambar 3.382 Dialog Box Modul ReadWrite Write Kedatangan ART.........III-444
Gambar 3.383 Modul ReadWrite Write Proses Pemotongan BCH................III-445
Gambar 3.384 Dialog Box Modul ReadWrite Write Proses Pemotongan BCH........
........................................................................................................................III-445
Gambar 3.385 Modul ReadWrite Write Proses Pemotongan BCT.................III-446
Gambar 3.386 Dialog Box Modul ReadWrite Write Proses Pemotongan BCT.........
........................................................................................................................III-446
Gambar 3.387 Modul ReadWrite Write Proses Pemotongan DSH................III-447
Gambar 3.388 Dialog Box Modul ReadWrite Write Proses Pemotongan DSH........
........................................................................................................................III-447
Gambar 3.389 Modul ReadWrite Write Proses Pemotongan DST.................III-448
Gambar 3.390 Dialog Box Modul ReadWrite Write Proses Pemotongan DST.........
........................................................................................................................III-448
Gambar 3.391 Modul ReadWrite Write Proses Pemotongan ARH................III-449
xxxiv
Gambar 3.392 Dialog Box Modul ReadWrite Write Proses Pemotongan ARH........
........................................................................................................................III-449
Gambar 3.393 Modul ReadWrite Write Proses Pemotongan ART................III-450
Gambar 3.394 Dialog Box Modul ReadWrite Write Proses Pemotongan ART........
........................................................................................................................III-450
Gambar 3.395 Modul ReadWrite Write Proses Pencetakan BCH..................III-451
Gambar 3.396 Dialog Box Modul ReadWrite Write Proses Pencetakan BCH..........
........................................................................................................................III-451
Gambar 3.397 Modul ReadWrite Write Proses Pencetakan BCH..................III-452
Gambar 3.398 Dialog Box Modul ReadWrite Write Proses Pencetakan BCH..........
........................................................................................................................III-452
Gambar 3.399 Modul ReadWrite Write Proses Pencetakan DSH..................III-453
Gambar 3.400 Dialog Box Modul ReadWrite Write Proses Pencetakan DSH..........
........................................................................................................................III-453
Gambar 3.401 Modul ReadWrite Write Proses Pencetakan DST...................III-454
Gambar 3.402 Dialog Box Modul ReadWrite Write Proses Pencetakan DST...........
........................................................................................................................III-454
Gambar 3.403 Modul ReadWrite Write Proses Pencetakan ARH..................III-455
Gambar 3.404 Dialog Box Modul ReadWrite Write Proses Pencetakan ARH..........
........................................................................................................................III-455
Gambar 3.405 Modul ReadWrite Write Proses Pencetakan ART..................III-456
Gambar 3.406 Dialog Box Modul ReadWrite Write Proses Pencetakan ART..........
........................................................................................................................III-456
Gambar 3.407 Modul ReadWrite Write Proses Pendinginan BCH................III-457
Gambar 3.408 Dialog Box Modul ReadWrite Write Proses Pendinginan BCH........
........................................................................................................................III-457
Gambar 3.409 Modul ReadWrite Write Proses Pendinginan BCH................III-458
Gambar 3.410 Dialog Box Modul ReadWrite Write Proses Pendinginan BCH........
........................................................................................................................III-458
Gambar 3.411 Modul ReadWrite Write Proses Pendinginan DSH................III-459
Gambar 3.412 Dialog Box Modul ReadWrite Write Proses Pendinginan DSH........
........................................................................................................................III-459
xxxv
Gambar 3.413 Modul ReadWrite Write Proses Pendinginan DST.................III-460
Gambar 3.414 Dialog Box Modul ReadWrite Write Proses Pendinginan DST.........
........................................................................................................................III-460
Gambar 3.415 Modul ReadWrite Write Proses Pendinginan ARH................III-461
Gambar 3.416 Dialog Box Modul ReadWrite Write Proses Pendinginan ARH........
........................................................................................................................III-461
Gambar 3.417 Modul ReadWrite Write Proses Pendinginan ART................III-462
Gambar 3.418 Dialog Box Modul ReadWrite Write Proses Pendinginan ART........
........................................................................................................................III-462
Gambar 3.419 Modul ReadWrite Write Proses Penghalusan BCH................III-463
Gambar 3.420 Dialog Box Modul ReadWrite Write Proses Penghalusan BCH........
........................................................................................................................III-463
Gambar 3.421 Modul ReadWrite Write Proses Penghalusan BCT................III-464
Gambar 3.422 Dialog Box Modul ReadWrite Write Proses Penghalusan BCT........
........................................................................................................................III-464
Gambar 3.423 Modul ReadWrite Write Proses Penghalusan DSH................III-465
Gambar 3.424 Dialog Box Modul ReadWrite Write Proses Penghalusan DSH........
........................................................................................................................III-465
Gambar 3.425 Modul ReadWrite Write Proses Penghalusan DST.................III-466
Gambar 3.426 Dialog Box Modul ReadWrite Write Proses Penghalusan DST.........
........................................................................................................................III-466
Gambar 3.427 Modul ReadWrite Write Proses Penghalusan ARH................III-467
Gambar 3.428 Dialog Box Modul ReadWrite Write Proses Penghalusan ARH........
........................................................................................................................III-467
Gambar 3.429 Modul ReadWrite Write Proses Penghalusan ART................III-468
Gambar 3.430 Dialog Box Modul ReadWrite Write Proses Penghalusan ART........
........................................................................................................................III-468
Gambar 3.431 Modul ReadWrite Write Proses Pemeriksaan 1 HP................III-469
Gambar 3.432 Dialog Box Modul ReadWrite Write Proses Pemeriksaan 1 HP........
........................................................................................................................III-469
Gambar 3.433 Modul ReadWrite Write Proses Pemeriksaan 1 Tablet...........III-470
xxxvi
Gambar 3.434 Dialog Box Modul ReadWrite Write Proses Pemeriksaan 1 Tablet
........................................................................................................................III-470
Gambar 3.435 Modul ReadWrite Write Proses Assembly 1 HASH0102.......III-471
Gambar 3.436 Dialog Box Modul ReadWrite Write Proses Assembly 1
HASH0102.....................................................................................................III-471
Gambar 3.437 Modul ReadWrite Write Proses Assembly 1 HAST0102........III-472
Gambar 3.438 Dialog Box Modul ReadWrite Write Proses Assembly 1 HAST0102
........................................................................................................................III-472
Gambar 3.439 Modul ReadWrite Write Proses Assembly 2 HASH0201.......III-473
Gambar 3.440 Dialog Box Modul ReadWrite Write Proses Assembly 2
HASH0201.....................................................................................................III-473
Gambar 3.441 Modul ReadWrite Write Proses Assembly 2 HAST0201........III-474
Gambar 3.442 Dialog Box Modul ReadWrite Write Proses Assembly 2 HAST0201
........................................................................................................................III-474
Gambar 3.443 Modul ReadWrite Write Proses Pemeriksaan 2 HASH0201. .III-475
Gambar 3.444 Dialog Box Modul ReadWrite Write Proses Pemeriksaan 2
HASH0201.....................................................................................................III-475
Gambar 3.445 Modul ReadWrite Write Proses Pemeriksaan 2 HAST0201. .III-476
Gambar 3.446 Dialog Box Modul ReadWrite Write Proses Pemeriksaan 2
HAST0201......................................................................................................III-476
Gambar 3.447 Modul ReadWrite Write Proses Pengemasan HASH0201.....III-477
Gambar 3.448 Dialog Box Modul ReadWrite Write Proses Pengemasan
HASH0201.....................................................................................................III-477
Gambar 3.449 Modul ReadWrite Write Proses Pengemasan HAST0201......III-478
Gambar 3.450 Dialog Box Modul ReadWrite Write Proses Pengemasan
HAST0201......................................................................................................III-478
Gambar 3.451 Modul Data Attribute..............................................................III-479
Gambar 3.452 Lanjutan Modul Data Attribute...............................................III-479
Gambar 3.453 Modul Data Entity...................................................................III-480
Gambar 3.454 Modul Data Queue..................................................................III-480
Gambar 3.455 Lanjutan Modul Data Queue...................................................III-481
Gambar 3.456 Modul Data Resource.............................................................III-482
xxxvii
Gambar 3.457 Lanjutan Modul Data Resource..............................................III-482
Gambar 3.458 Modul Data Set.......................................................................III-483
Gambar 3.459 Mesin Pemotong 1..................................................................III-483
Gambar 3.460 Mesin Pemotong 2..................................................................III-483
Gambar 3.461 Mesin Pemotong 3..................................................................III-484
Gambar 3.462 Mesin Cetak 1.........................................................................III-484
Gambar 3.463 Mesin Cetak 2.........................................................................III-484
Gambar 3.464 Mesin Cetak 3.........................................................................III-484
Gambar 3.465 Mesin Pendingin 1..................................................................III-485
Gambar 3.466 Mesin Pendingin 2..................................................................III-485
Gambar 3.467 Mesin Pendingin 3..................................................................III-485
Gambar 3.468 Mesin Penghalus 1..................................................................III-485
Gambar 3.469 Mesin Penghalus 2..................................................................III-486
Gambar 3.470 Mesin Penghalus 3..................................................................III-486
Gambar 3.471 Meja Perakitan 1.....................................................................III-486
Gambar 3.472 Meja Perakitan 2.....................................................................III-487
Gambar 3.473 Meja Periksa1.........................................................................III-487
Gambar 3.474 Meja Periksa 2........................................................................III-487
Gambar 3.475 Meja Pengemasan...................................................................III-487
Gambar 3.476 Modul Data Sequence.............................................................III-488
Gambar 3.477 Step Modul Data Sequence BCH............................................III-488
Gambar 3.478 Assignment Step Modul Data Sequence Pemotongan BCH....III-488
Gambar 3.479 Assignment Step Modul Data Sequence Pencetakan BCH.....III-489
Gambar 3.480 Assignment Step Modul Data Sequence Pendinginan BCH....III-489
Gambar 3.481 Assignment Step Modul Data Sequence Penghalusan BCH.. .III-489
Gambar 3.482 Assignment Step Modul Data Sequence Pemeriksaan 1 BCH..........
........................................................................................................................III-489
Gambar 3.483 Assignment Step Modul Data Sequence Assembly 1 BCH.....III-490
Gambar 3.484 Step Modul Data Sequence DSH............................................III-490
Gambar 3.485 Assignment Step Modul Data Sequence Pemotongan DSH....III-490
Gambar 3.486 Assignment Step Modul Data Sequence Pencetakan DSH......III-491
Gambar 3.487 Assignment Step Modul Data Sequence Pendinginan DSH....III-491
xxxviii
Gambar 3.488 Assignment Step Modul Data Sequence Penghalusan DSH....III-491
Gambar 3.489 Assignment Step Modul Data Sequence Pemeriksaan 1 DSH...........
........................................................................................................................III-491
Gambar 3.490 Assignment Step Modul Data Sequence Assembly 1 DSH......III-492
Gambar 3.491 Step Modul Data Sequence ARH............................................III-492
Gambar 3.492 Assignment Step Modul Data Sequence Pemotongan ARH.. .III-492
Gambar 3.493 Assignment Step Modul Data Sequence Pencetakan ARH.....III-492
Gambar 3.494 Assignment Step Modul Data Sequence Pendinginan ARH.. .III-493
Gambar 3.495 Assignment Step Modul Data Sequence Penghalusan ARH.. .III-493
Gambar 3.496 Assignment Step Modul Data Sequence Pemeriksaan 1 ARH..........
........................................................................................................................III-493
Gambar 3.497 Assignment Step Modul Data Sequence Assembly 2 ARH.....III-493
Gambar 3.498 Step Modul Data Sequence BCT............................................III-494
Gambar 3.499 Assignment Step Modul Data Sequence Pemotongan BCT....III-494
Gambar 3.500 Assignment Step Modul Data Sequence Pencetakan BCT......III-494
Gambar 3.501 Assignment Step Modul Data Sequence Pendinginan BCT....III-494
Gambar 3.502 Assignment Step Modul Data Sequence Penghalusan BCT....III-495
Gambar 3.503 Assignment Step Modul Data Sequence Pemeriksaan 1 BCT...........
........................................................................................................................III-495
Gambar 3.504 Assignment Step Modul Data Sequence Assembly 1 BCT......III-495
Gambar 3.505 Step Modul Data Sequence DST.............................................III-495
Gambar 3.506 Assignment Step Modul Data Sequence Pemotongan DST....III-496
Gambar 3.507 Assignment Step Modul Data Sequence Pencetakan DST......III-496
Gambar 3.508 Assignment Step Modul Data Sequence Pendinginan DST....III-496
Gambar 3.509 Assignment Step Modul Data Sequence Penghalusan DST....III-496
Gambar 3.510 Assignment Step Modul Data Sequence Pemeriksaan 1 DST...........
........................................................................................................................III-497
Gambar 3.511 Assignment Step Modul Data Sequence Assembly 1 DST......III-497
Gambar 3.512 Step Modul Data Sequence ART............................................III-497
Gambar 3.513 Assignment Step Modul Data Sequence Pemotongan ART....III-497
Gambar 3.514 Assignment Step Modul Data Sequence Pencetakan ART......III-498
Gambar 3.515 Assignment Step Modul Data Sequence Pendinginan ART....III-498
xxxix
Gambar 3.516 Assignment Step Modul Data Sequence Penghalusan ART....III-498
Gambar 3.517 Assignment Step Modul Data Sequence Pemeriksaan 1 ART...........
........................................................................................................................III-498
Gambar 3.518 Assignment Step Modul Data Sequence Assembly 2 ART......III-499
Gambar 3.519 Modul Data Advanced Set.......................................................III-499
Gambar 3.520 Modul Data Members Advanced Set.......................................III-499
Gambar 3.521 Tampilan Model Logika Sebelum Running............................III-500
Gambar 3.522 Tampilan Model Logika Setelah Running..............................III-501
Gambar 3.523 Tampilan Model Animasi Sebelum Running..........................III-502
Gambar 3.524 Tampilan Model Animasi Setelah Running............................III-503
Gambar 3.525 Verifikasi: Check Model.........................................................III-507
Gambar 3.526 Verifikasi: Trace Bagian 1......................................................III-508
Gambar 3.527 Verifikasi: Trace Bagian 2......................................................III-508
Gambar 3.528 Verifikasi: Trace Bagian 3......................................................III-509
Gambar 3.529 Verifikasi: Trace Bagian 4......................................................III-509
Gambar 3.530 Verifikasi: Trace Bagian 5......................................................III-510
Gambar 3.531 Verifikasi: Trace Bagian 6......................................................III-510
Gambar 3.532 Verifikasi: Trace Bagian 7......................................................III-511
Gambar 3.533 Verifikasi: Trace Bagian 8......................................................III-511
Gambar 3.534 Verifikasi: Trace Bagian 9......................................................III-512
Gambar 3.535 Verifikasi: Trace Bagian 10....................................................III-513
Gambar 3.536 Verifikasi: Trace Bagian 11....................................................III-513
Gambar 3.537 Verifikasi: Trace Bagian 12....................................................III-514
xl
BAB I
PENDAHULUAN
1
PT. Adya Mavendra
riset Data Reportal itu menunjukkan kalau perangkat seluler di Indonesia setara
dengan 133,3 persen dari total populasi pada Januari 2022. Sebelumnya Data
Reportal juga merinci bahwa jumlah pengguna internet Indonesia 2022 sudah
mencapai 204,7 juta orang. Tingkat penetrasi internet Indonesia mencapai 73,7
persen dari total populasi pada awal tahun 2022.
Dewasa ini perkembangan teknologi semakin berkembang dan semakin
canggih, alat komunikasi seperti handphone dan tablet merupakan salah satu alat
yang hampir dimiliki oleh semua orang. Namun banyak dari orang diluar sana
yang belum bisa menjaga produk handphone atau tablet dari berbagai macam
kerusakan, baik sengaja ataupun tidak. Salah satu pelindung atau untuk menjaga
produk agar tetap baik serta terawat adalah case, yang dimana case sendiri
berfungsi untuk melindungi Handphone dan Tablet dari benturan, gesekan, dan
risiko kerusakan fisik lainnya. Tak cuma melindungi Handphone dan Tablet, case
juga bisa memberi tampilan menarik dan unik pada Handphone dan Tablet. Ada
berbagai macam jenis case Handphone dan Tablet yang bisa dipilih dengan
berbagai macam tambahan inovasi serta case juga punya beragam bentuk dan
bahan yang punya keunggulan tersendiri.
PT. Adya Mavendra merupakan perusahaan yang bergerak dalam bidang
manufaktur dengan berfokus pada produksi Case Handphone dan Tablet serta
melakukan terobosan inovasi dan tambahan fitur yang dapat membantu para
penggunanya. Produk inovasi case tersebut bernama Aircase, yang dimana
Aircase ini merupakan case yang memiliki fungsi utama sebagai pelindung
handphone dan tablet dari benturan. Selain fungsi utama yang ada dalam case
tersebut, terdapat pula fungsi tambahan dengan inovasi yang terdiri dari wireless
speaker dan airpods receptacle. Fungsi tambahan tersebut memberikan
kemudahan bagi para pengguna untuk menghubungkan suara handphone dan
tablet dengan wireless speaker yang bisa menghasilkan suara lebih maksimal dari
handphone dan tablet, selain itu terdapat airpods receptacle yang bisa menyimpan
airpods pada bagian belakang case handphone dan tablet agar mudah dibawa
tanpa harus membawanya secara terpisah.
Melihat dari inovasi produk case handphone dan tablet yang kita
kembangkan memiliki keunggulan tersendiri dari case yang lainnya, maka dari itu
Praktikum Perancangan Sistem Industri 2 2
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
kita perlu untuk melakukan perencanaan dalam kegiatan proses produksi agar bisa
berjalan dengan baik dan sesuai dengan yang diharapkan. Maka dari itu, PT. Adya
Mavendra melakukan Perancangan Sistem Industri meliputi aspek pertama yang
di perlukan ialah Sistem Produksi yang dimana kita perlu melakukan perhitungan
terkait rencana produksi yang harus dicapai oleh suatu perusahaan dengan
mempertimbangkan dari segi bahan baku, mesin dan juga sumber daya manusia.
Kemudian, aspek kedua terhadap Perancangan Tatat Letak dan Fasilitas yang
dimana untuk merancang lokasi kerja di suatu institusi atau industri dengan
fasiltas pendukung lainnya yang paling efektif efisien dan ekonomis sehingga
meningkatkan performansi dan produktivitas kerja. Selanjutnya, aspek ketiga
mengenai Simulasi Sistem yang dibuat dengan tujuan untuk mengamati
karakteristik sistem nyatanya. Terkadang simulasi dibuat untuk sesuatu yang
belum ada sistem nyatanya, sehingga pembuatan simulasi dalam hal ini adalah
untuk menguji sistem rancangan. Pada aspek terakhir atau keempat ialah
mengenai Analisis Kelayakan Investasi yang dimana untuk mengetahui secara
jelas prospek suatu proyek atau investasi, apakah perusahaan layak atau tidak.
Lebih lanjut, kita juga bisa memperkirakan apakah tingkat pengembalian atau
keuntungan sesuai dengan yang diharapkan di masa mendatang.
Penjualan (Trading), Laporan Rugi Laba (Trading), Cash Flow (Trading), Neraca
(Trading), Break Event Point (Trading), Payback Period (Trading) dan Internal
Rate of Return (Trading).
1
PT. Adya Mavendra
SEKRETARIS
MANAJER KEUANGAN MANAJER PURCHASING MANAJER R&D MANAJER PRODUKSI MANAJER QC MANAJER HRD MANAJER PEMASARAN
STAFF KEUANGAN STAFF PURCHASING STAFF R&D STAFF PRODUKSI STAFF QC STAFF HRD STAFF PEMASARAN
2. Sekretaris
a. Bertanggungjawab langsung kepada direktur utama.
b. Melakukan aktivitas administrasi dan pengarsipan perusahaan.
c. Mengkomunikasikan kebijakan perusahaan kepada pihak internal dan
eksternal perusahaan.
d. Mengatur jadwal atau agenda kegiatan direktur.
e. Menjadi perantara pihak-pihak internal maupun eksternal yang ingin
berhubungan dengan direktur utama.
f. Memfasilitasi komunikasi antara organ perusahaan, hubungan antara
perusahaan dengan stakeholders, serta kepatuhan terhadap peraturan dan
perundangan-undangan yang berlaku.
g. Menyusun laporan perusahaan dan mengkoordinasikan bahan – bahan
laporan untuk Rapat Umum Pemegang Saham (RUPS).
3. Manager Keuangan
a. Memutuskan segala sesuatu yang berhubungan dengan dana yang dimiliki
dengan pembelanjaan perusahaan dalam rangka operasionalnya.
b. Mengelola jalannya roda perekonomian perusahaan secara optimal dan
maksimal.
c. Berperan dalam pengambilan keputusan investasi dan pembiayaan modal
lainnya.
4. Manager Purchasing
a. Memprediksikan tingkat permintaan untuk produk.
b. Melakukan cek harian pada tingkat stok barang.
c. Membangun dan menjaga hubungan baik dengan supplier baru dan yang
sudah ada.
6. Manager Produksi
a. Membuat perencanaan dan jadwal proses produksi.
b. Mengawasi proses produksi agar kualitas, kuantitas dan waktunya sesuai
dengan perencanaan yang sudah dibuat.
c. Bertanggung jawab mengatur manajemen gudang persediaan bahan baku,
bahan penunjang maupun produk yang sudah jadi di Gudang.
Praktikum Perancangan Sistem Industri 2 8
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
9. Manager Pemasaran
a. Mengkoordinir dan memonitor proses perkembangan produk, riset dasar
dan riset konsumen yang dilakukan oleh unit-unit yang bersangkutan.
b. merencanakan, mengarahkan, atau mengkoordinasikan kebijakan dan
program pemasaran.
c. Mengidentifikasi, mengembangkan, atau mengevaluasi strategi
pemasaran, berdasarkan pengetahuan dari tujuan berdirinya perusahaan,
karakteristik pasar, biaya, dan faktor kenaikan harga.
d. Merumuskan, mengarahkan, atau mengkoordinasi kegiatan atau kebijakan
pemasaran untuk mempromosikan produk atau jasa.
e. Mengevaluasi aspek keuangan dari pengembangan produk, seperti
anggaran, pengeluaran, penelitian dan pengembangan alokasi, laba atas
investasi serta proyeksi laba-rugi.
f. Mengembangkan strategi harga, menyeimbangkan antara tujuan
perusahaan dan kepuasan pelanggan.
Dalam bab 3 ini membahas tentang aspek teknis. Yang dimana aspek
teknis ini digunakan untuk menilai kesiapan suatu usaha dalam menjalankan
kegiatannya dengan menilai ketepatan lokasi agar perusahaan dapat menentukkan
lokasi yang tepat, luas produksi, menentukkan layout yang sesuai dengan proses
produksi yang dipilih, kesiapan mesin dan menentukkan teknologi yang tepat
untuk perusahaan. PT. Adya Mavendra merupakan perusahaan yang bergerak
dalam bidang manufaktur dengan berfokus pada produksi Case Handphone dan
Case Tablet serta melakukan terobosan inovasi dan tambahan fitur yang dapat
membantu para penggunanya. Produk inovasi case tersebut bernama Air Case,
yang dimana Air Case ini merupakan case yang memiliki fungsi utama sebagai
pelindung handphone dan tablet dari benturan. Selain fungsi utama yang ada
dalam case tersebut, terdapat pula fungsi tambahan dengan inovasi yang terdiri
dari wireless speaker dan airpods receptacle. Agar perusahaan tersebut dapat
berkembang diperlukan beberapa prosedur serta tahapan-tahapan yang harus
dilakukan, dan tahapan tersebut terbagi menjadi 13 modul diantaranya, adalah :
Dalam modul 1 ini membahas mengenai Aggregate Planning dan
Forecasting yang berkaitan dengan melakukan perencanaan peramalan
menggunakan data demand historis untuk produk case handphone dan case tablet.
Selain itu digunakan juga data waktu proses produksi yang ada pada Operation
Process Chart (OPC) skala pabrik untuk produk Aircase Handphone dan Tablet.
Dalam modul ini digunakan 3 (tiga) metode peramalan yang mana metode
pengukuran kesalahan dengan tingkat error lebih kecil akan digunakan sebagai
acuan dalam membuat rencana produksi dan perhitungan biaya-biaya. Dalam
menentukan metode yang digunakan untuk melakukan peramalan dilakukan
terlebih dahulu perhitungan demand aggregate. Data dan perhitungan tabel akan
digunakan untuk mencari atau menghitung aggregate dan juga membuat diagram
demand aggragate. Setelah mendapatkan demand aggregate untuk 12 periode,
perhitungan berikutnya yaitu menentukan menggunakan metode peramalan
apakah yang nantinya akan digunakan. Metode yang terdapat dalam Peramalan
1
PT. Adya Mavendra
menggambarkan urutan prioritas antara departemen atau mesin dalam suatu lintas
atau layout produksi.
Dalam modul 9 ini membahas mengenai Activity Relationship Diagram
(ARD), Area Allocation Diagram (AAD), dan Ongkos Material Handling (OMH)
revisi. Activity Relationship Diagram (ARD) adalah diagram hubungan antar
aktivitas (departemen atau mesin) berdasarkan tingkat prioritas kedekatan,
sehingga diharapkan ongkos material handling yang minimum. Area Allocation
Diagram (AAD) merupakan gambaran layout secara global yang menggambarkan
hubungan kedekatan antar departemen dengan skala ukuran luas lantai yang
sebenarnya. Ongkos Material Handling (OMH) revisi adalah revisi dari Ongkos
Material Handling (OMH) yang dilakukan setelah pembuatan Activity
Relationship Diagram (ARD) dan Area Allocation Diagram (AAD), yang
menghasilkan ongkos lebih minimum karena jarak antar departemen yang
semakin dekat.
Dalam modul 10 ini membahas dan menjelaskan mengenai Analisis Input
Data Simulasi di perusahaan PT. Adya Mavendra yang memproduksi Case
Handphone dan Case Tablet. Analisis data digunakan untuk melihat karakterisitik
atau kecenderungan dari distribusi pola data pada waktu proses di setiap work
center yang nantinya akan digunakan dalam simulasi dengan bantuan software
ARENA. Simulasi dilakukan untuk mengetahui apakah alur produksi komponen
yang telah direncanakan mempunyai kesalahan atau tidak. Tujuan dari dibuatnya
simulasi sendiri adalah untuk mengamati karakteristik dari sistem yang
sebenarnya. Input yang akan dianalisis yaitu waktu proses pengerjaan dari tiap
mesin yang dilewati komponen.
Dalam modul 11 ini membahas mengenai Analisis Input Data Simulasi
Dan Simulasi Proses Sistem Manufaktur. Simulasi dalam sistem manufaktur
adalah penggunaan perangkat lunak untuk membuat model komputer dari sistem
manufaktur, sehingga dapat dianalisis dan dioptimasi. Simulasi sistem adalah
suatu sistem yang dipergunakan untuk menguraikan persoalan-persoalan di dunia
nyata yang penuh ketidakpastian, dimana model menjadi lebih sederhana agar
mampu dianalisis secara komputasi matematis. Simulasi dibuat dengan tujuan
untuk mengamati karakteristik sistem nyatanya, dan juga terkadang simulasi
Praktikum Perancangan Sistem Industri 2 5
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
dibuat untuk sesuatu yang belum ada sistem nyatanya, sehingga pembuatan
simulasi dalam hal ini adalah untuk menguji sistem rancangan yang akan dibuat.
Dan input data merupakan kegiatan untuk memasukan data, program yang akan
diproses dalam sistem, dan sebagai parameter dalam pemodelan simulasi, input
data yang akan dianalisis, antara lain waktu proses pengerjaan dari setiap mesin
yang dilewati komponen. Dalam merancang pemodelan simulasi sistem ini
dibantu dengan software ARENA 14.0.
Dalam modul 12 ini membahas mengenai Verifikasi dan Validasi pada
simulasi yang sudah dibuat modul logikanya pada ARENA dalam modul
sebelumnya, hal tersebut digunakan untuk memastikan bahwa model logika yang
dibuat sudah merepresentasikan sistem nyatanya, maka dari itu diperlukan proses
verifikasi dan validasi agar memudahkan dalam pengambilan keputusan.
Verifikasi merupakan proses menentukkan apakah model dapat beroperasi sesuai
dengan yang direncanakan melalui debugging terhadap program komputer yang
dibuat, verifikasi memeriksa penerjemahan model simulasi konseptual ke dalam
program yang berjalan dengan benar. Validasi adalah penentuan apakah model
konseptual simulasi yang merupakan representasi akurat dari sistem nyata yang
sedang dimodelkan atau tidak, dan proses validasi ini dilakukan dengan cara
membandingkan antara sampel hasil replikasi dengan hasil keluarnya data yang
dihasilkan.
Dalam modul 13 ini membahas mengenai Aspek Finansial, yang dimana
Finansial merupakan bagaimana dalam mempelajari kondisi keuangan suatu
bisnis, individu, organisasi, dan juga negara yang dimulai dari bagaimana cara
pengelolaannya, peningkatan, pengalokasian, pemberdayaan, perhitungan risiko,
dan juga prospek masa depan yang berkaitan dengan keuangan. Aspek Finansial
(keuangan) merupakan aspek yang digunakan untuk menilai keuangan
perusahaan, sehingga merupakan salah satu aspek yang sangat penting untuk
diteliti kelayakannya. Menurut Sutarman, Aspek finansial berkaitan dengan
penentuan kebutuhan jumlah dana dan sekaligus alokasinya serta mencari sumber
dana yang berkaitan secara efisien sehingga memberikan keuntungan maksimal.
Tujuan dari perhitungan aspek finansial adalah untuk mengetahui perkiraan
pendanaan dan aliran kas proyek atau bisnis, sehingga dapat diketahui layak atau
tidaknya rencana bisnis yang dibuat.
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 465
4 30
Total 16 495
Gambar 3.1 Operation Process Chart (OPC) Pabrik Produk Case Handphone
Praktikum Perancangan Sistem Industri 2 8
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 550
4 30
Total 16 580
Gambar 3.2 Operation Process Chart (OPC) Pabrik Produk Case Tablet
Praktikum Perancangan Sistem Industri 2 9
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Faktor Konversi (FK)
Standar Produk Item ke-i
- FK Case Handphone =
Standar Produksi Unit Agregat
495
FK Case Handphone =
580
Contoh Perhitungan:
1. Demand Aggregate
- DA P1 = (DH1 x FKH) + (DT1 x FKT)
DA P1 = (34415 x 0,85) + (14849 x 1)
DA P1 = 44221 Unit
- DA P2 = (DH2 x FKH) + (DT2 x FKT)
DA P2 = (33504 x 0,85) + (16472 x 1)
DA P2 = 45066 Unit
- DA P3 = (DH3 x FKH) + (DT3 x FKT)
DA P3 = (36451 x 0,85) + (11392 x 1)
DA P3 = 42502 Unit
Keterangan:
- DA = Demand Aggregate
- DH = Demand Case Handphone
- DT = Demand Case Tablet
- FKH = Faktor Konversi Case Handphone
- FKT = Faktor Konversi Case Tablet
- P = Periode
Demand Aggregate
60000
50000
40000
30000
20000
10000
0
1 2 3 4 5 6 7 8 9 10 11 12
Periode Agregat
Contoh Perhitungan:
1. Forecast (F(t))
∑Demand m periode sebelumnya
F(t) =
m
Moving (m) = 3
44221 + 45066 + 42502
- F(4) =
3
F(4) = 43930
45066 + 42502 + 41071
- F(5) =
3
F(5) = 42880
42502 + 41071 + 42802
- F(6) =
3
F(6) = 42125
2. Forecast Error (FE)
Forecast Error = FE(t) = Aktual (X(t)) – Forecast (F(t))
- FE(4) = 41071 – 43930
FE(4) = -2859
- FE(5) = 42802 – 42880
FE(5) = -78
- FE(6) = 49492 – 42125
FE(6) = 7367
3. Forecast Error – Absolute (FE-Abs)
FE-Abs (t) = |FE|
- FE-Abs (4) = |-2859| = 2859
- FE-Abs (5) = |-78| = 78
- FE-Abs (4) = |7367| = 7367
4. Forecast Error Kuadrat (FE2)
FE2 (t) = (|FE|)2
- FE2 (4) = 28592 =8171975
- FE2 (5) = 782 = 6032
- FE2 (6) = 73672 = 54272689
5. Proporsi Error (PE)
|FE|
PE(t) =
Aktual (X(t))
2859
- PE(4) =
41071
PE(4) = 0,07
78
- PE(5) =
42802
PE(5) = 0,002
7367
- PE(6) =
49492
PE(6) = 0,15
6. Mean Absolute Deviation (MAD)
MAD =
∑ |FE|
n
37407
MAD =
9
MAD = 4156,33
7. Mean Square Error (MSE)
MSE = ∑
FE2
n
245255297
MSE =
9
MSE = 27250588,56
8. Mean Absolute Precentage Error (MAPE)
MAPE = 100 x
∑ PE
n
0,83
MAPE = 100 x
9
MAPE = 9,19
Contoh Perhitungan:
1. Forecast (F(t))
F(t) = F(t-1) + α(X(t-1)- F(t-1))
Ketetapan Alpha (α) = 0,5
- F(2) = 44221 + 0,5(44221 - 44221)
F(2) = 44221
- F(3) = 44221 + 0,5(45066 - 44221)
F(3) = 44644
- F(4) = 44644 + 0,5(42502 - 44644)
F(4) = 43573
2. Forecast Error (FE)
Forecast Error = FE(t) = Aktual (X(t)) – Forecast (F(t))
- FE(2) = 45066 – 44221
FE(2) = 845
- FE(3) = 42502 – 44644
FE(3) = -2142
- FE(4) = 41071 – 43573
FE(4) = -2502
3. Forecast Error – Absolute (FE-abs)
FE-Abs (t) = |FE|
- FE-Abs (2) = |845| = 845
- FE-Abs (3) = |-2142| = 2142
- FE-Abs (4) = |-2502| = 2502
4. Forecast Error Kuadrat (FE2)
FE2 (t) = (|FE|)2
- FE2 (2) = 8452 =714025
- FE2 (3) = 21422 = 4586022
- FE2 (4) = 25022 = 6258753
5. Proporsi Error (PE)
|FE|
PE (t) =
Aktual (X(t))
845
- PE (2) =
45066
Praktikum Perancangan Sistem Industri 2 18
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
PE (2) = 0,02
2142
- PE (3) =
42502
PE (3) = 0,05
2502
- PE (4) =
41071
PE (4) = 0,06
6. Mean Absolute Deviation (MAD)
MAD =
∑ |FE|
n
34996
MAD =
11
MAD = 3181,42
7. Mean Square Error (MSE)
MSE = ∑ FE
2
n
205153255
MSE =
11
MSE = 18650295,95
8. Mean Absolute Precentage Error (MAPE)
MAPE = 100 x
∑ PE
n
0,77
MAPE = 100 x
11
MAPE = 7,04
Contoh Perhitungan:
1. X
X=
∑ x atau ∑ Periode
n n
1+2+3+4+5+6+7+8+9+10+11+12
X=
12
78
X=
12
X=6,5
2. Y
Y=
∑ y atau ∑ Aktua l
n n
528296
Y=
12
Y=44024,67
3. Slope (b)
Σ ( x.y ) - n( X. Y)
b=
Σ x2 - n( X2 )
3457513 - 12 x ( 6,5 x 44024,67)
b= 2
650 - 12 x ( 6,5 )
3457513 - 3433924
b=
650 - 507
b = 164,9581
4. Intercept (a)
a = Y – (bX ¿
a = 44024,67 – (164,9581 x 6,5)
a = 42952,44
5. Forecast (F(t))
F(t) = a + (bx)
- F(1) = 42952,44 + (164,9581 x 1)
F(1) = 43118
- F(2) = 42952,44 + (164,9581 x 2)
F(2) = 90132
- F(3) = 42952,44 + (164,9581 x 3)
Praktikum Perancangan Sistem Industri 2 21
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
F(3) = 127506
6. Forecast Error (FE)
Forecast Error = FE(t) = Aktual (X(t)) – Forecast (F(t))
- FE(1) = 44221 – 43118
FE(1) = 1103
- FE(2) = 45066 – 43283
FE(2) = 1783
- FE(3) = 42502 – 43448
FE(3) = -946
7. Forecast Error – Absolute (FE-abs)
FE-Abs (t) = |FE|
- FE-Abs (1) = |1103| = 1103
- FE-Abs (2) = |1783| = 1783
- FE-Abs (3) = |-946| = 946
8. Forecast Error Kuadrat (FE2)
FE2 (t) = (|FE|)2
- FE2 (2) = 11032 =1216609
- FE2 (3) = 17832 = 3179089
- FE2 (4) = 9462 = 894916
9. Proporsi Error (PE)
|FE|
PE (t) =
Aktual (X(t))
1103
- PE (1) =
44221
PE (1) = 0,02
1783
- PE (2) =
45066
PE (2) = 0,04
946
- PE (3) =
42502
PE (3) = 0,02
10. Mean Absolute Deviation (MAD)
MAD =
∑ |FE|
n
35190
MAD =
12
MAD = 2932,5
MSE = ∑
2
FE
n
142844778
MSE =
12
MSE = 11903731,50
12. Mean Absolute Precentage Error (MAPE)
MAPE = 100 x
∑ PE
n
0,80
MAPE = 100 x
12
MAPE = 6,66
Berdasarkan tabel 3.8 hasil yang diperoleh dari perhitungan nilai error
menggunakan metode Single Moving Average (SMA), Single
Exponential Smoothing (SES), dan Linear Regression (LR). Nilai error
terkecil yang diperoleh dari hasil perbandingan yaitu menggunakan
dengan nilai MAD yaitu sebesar 2932,5; MSE sebesar 11903731,50; dan MAPE
sebesar 6,66.
Contoh Perhitungan:
1. Rencana Produksi (RP)
RP = Demand Aggregate + Safety Stock – Inventory Awal
RP = 552054 + 500 – 0
RP = 552554 Unit / 12 Periode
2. Kecepatan Produksi (KP)
RP
KP =
∑ HK
552554
KP =
257
KP = 2150,02 Unit / Hari
3. Waktu Baku (WB)
(Total Waktu Proses/60)
WB =
60
(580/60)
WB =
60
WB = 0,16 Jam
4. Reguler Time (RT)
RT(t) = KP x HK(t)
- RT(1) = 2150,02 x 20 = 43001 Unit
- RT(2) = 2150,02 x 22 = 47301 Unit
- RT(3) = 2150,02 x 20 = 43001 Unit
5. Inventory Awal Bulan
Inventory Awal Bulan(t) = RT(t) + I(t-1) - DA(t)
- Inventory Awal Bulan(1) = 43001 + 0 – 45097 = -2096 Unit
- Inventory Awal Bulan(2) = 47301 + 500 – 45262 = 2539 Unit
- Inventory Awal Bulan(3) = 43001 + 2539 – 45427 = 113 Unit
6. Inventory Akhir Bulan
Inventory Akhir Bulan(t) = Inventory Awal Bulan(t) + OT(t)
- Inventory Akhir Bulan(1) = -2096 + 2569 = 500 Unit
- Inventory Akhir Bulan(2) = 2539 + 0 = 2539 Unit
- Inventory Akhir Bulan(3) = 113 + 0 = 113 Unit
Contoh Perhitungan:
1. Biaya Reguler Time (RT)
Biaya RT(t) = Biaya Produksi Reguler Time/Unit x RT(t)
- Biaya RT(1) = Rp 18.000 x 43001 = Rp 774.018.000
- Biaya RT(2) = Rp 18.000 x 47301 = Rp 851.418.000
- Biaya RT(3) = Rp 18.000 x 43001 = Rp 774.018.000
2. Biaya Inventory (Inv)
Biaya Inv(t) = Biaya Inventory/Unit x Inventory Akhir Bulan(t)
- Biaya Inv(1) = Rp 6.000 x 500 = Rp 3.000.000
- Biaya Inv(2) = Rp 6.000 x 2539 = Rp 15.234.000
- Biaya Inv(3) = Rp 6.000 x 113 = Rp 678.000
3. Biaya Hiring (H)
Biaya H(t) = Biaya Hiring/Orang x TK+(t)
- Biaya H(1) = Rp 275.000 x 25 Orang = Rp 6.875.000
4. Biaya Over Time (OT)
Biaya OT(t) = Biaya Produksi Over Time/Unit x OT(t)
- Biaya OT(1) = Rp 25.000 x 2596 = Rp 64.900.000
- Biaya OT(4) = Rp 25.000 x 2978 = Rp 74.450.000
- Biaya OT(5) = Rp 25.000 x 2756 = Rp 68.900.000
5. Total Biaya(t)
Total Biaya(t) = Biaya RT(t) + Biaya Inv(t) + Biaya H(t) + Biaya OT(t)
- Total Biaya(1) = Rp 774.018.000+ Rp 3.000.000+ Rp 6.875.000 +
Rp 64.900.000
Total Biaya(1) = Rp 848.793.000
- Total Biaya(2) = Rp 851.418.000 + Rp 15.234.000+ 0 + 0
Total Biaya(2) = Rp 866.652.000
- Total Biaya(3) = Rp 774.018.000 + Rp 678.000 + 0 + 0
Total Biaya(3) = Rp 774.696.000
6. Total Biaya (12 Periode)
Total Biaya (12 Periode) = Total Biaya(t)
Total Biaya (12 Periode) = Rp 10.409.185.000
Contoh Perhitungan:
- Selisih Biaya = Biaya yang didapat – Biaya yang diajukan Direksi
Selisih Biaya = Rp 10.409.185.000 - Rp 7.598.705.050
Selisih Biaya = Rp 2.810.479.950
- Selisih Demand Aggregate Forecast =
Selisih Biaya
Biaya Produksi REguler Time (RT)
Rp 2.810.479.950
Selisih Demand Aggregate Forecast =
Rp 18.000
Selisih Demand Aggregate Forecast = 156.138 Unit
Selisih Demand Aggregate Forecast
- Selisih DAf/Periode =
Total Periode
156.138
Selisih DAf/Periode =
12
Selisih DAf/Periode = 13.012 Unit
Contoh Perhitungan:
1. Demand S&OP
Demand S&OP(t) = Demand Aggregate(t) – Selisih DAf/Periode(t)
- Demand S&OP(1) = 45097 – 13.012 = 32085
- Demand S&OP(2) = 45262 – 13.012 = 32250
- Demand S&OP(3) = 45427 – 13.012 = 32415
2. Rencana Produksi (RP)
RP = Demand Aggregate + Safety Stock – Inventory Awal
RP = 395910 + 500 – 0
RP = 396410 Unit / 12 Periode
3. Kecepatan Produksi (KP)
RP
KP =
∑ HK
396410
KP =
257
KP = 1542,45 Unit / Hari
4. Waktu Baku (WB)
(Total Waktu Proses/60)
WB =
60
(580/60)
WB =
60
WB = 0,16 Jam
5. Reguler Time (RT)
RT(t) = KP x HK(t)
- RT(1) = 1542,45 x 20 = 30850 Unit
- RT(2) = 1542,45 x 22 = 33934 Unit
- RT(3) = 1542,45 x 20 = 30850 Unit
6. Inventory Awal Bulan
Inventory Awal Bulan(t) = RT(t) + I(t-1) - DA(t)
- Inventory Awal Bulan(1) = 30850 + 0 – 32085 = -1235 Unit
- Inventory Awal Bulan(2) = 33934 + 500 – 32250 = 2184 Unit
- Inventory Awal Bulan(3) = 30850 + 2184 – 32415= 619 Unit
7. Inventory Akhir Bulan
Contoh Perhitungan:
1. Biaya Reguler Time (RT)
Biaya RT(t) = Biaya Produksi Reguler Time/Unit x RT(t)
- Biaya RT(1) = Rp 18.000 x 30850 = Rp 555.300.000
- Biaya RT(2) = Rp 18.000 x 33934 = Rp 610.812.000
- Biaya RT(3) = Rp 18.000 x 30850 = Rp 555.300.000
2. Biaya Inventory (Inv)
Biaya Inv(t) = Biaya Inventory/Unit x Inventory Akhir Bulan(t)
- Biaya Inv(1) = Rp 6.000 x 500 = Rp 3.000.000
- Biaya Inv(2) = Rp 6.000 x 2184 = Rp 13.104.000
- Biaya Inv(3) = Rp 6.000 x 619 = Rp 3.714.000
3. Biaya Hiring (H)
Biaya H(t) = Biaya Hiring/Orang x TK+(t)
Biaya H(1) = Rp 275.000 x 13 Orang = Rp 3.575.000
4. Biaya Over Time (OT)
Biaya OT(t) = Biaya Produksi Over Time/Unit x OT(t)
- Biaya OT(1) = Rp 25.000 x 1735 = Rp 43.375.000
- Biaya OT(4) = Rp 25.000 x 1611 = Rp 40.275.000
- Biaya OT(5) = Rp 25.000 x 1895 = Rp 47.375.000
5. Total Biaya(t)
Total Biaya(t) = Biaya RT(t) + Biaya Inv(t) + Biaya H(t) + Biaya OT(t)
- Total Biaya(1) = Rp 555.300.000 + Rp 3.000.000 + Rp 3.575.000
+ Rp 43.375.000
Total Biaya(1) = Rp 605.250.000
- Total Biaya(2) = Rp 610.812.000 + Rp 13.104.000 + 0 + 0
Total Biaya(2) = Rp 623.916.000
- Total Biaya(3) = Rp 555.300.000 + Rp 3.714.000 + 0 + 0
Total Biaya(3) = Rp 559.014.000
6. Total Biaya (12 Periode)
Total Biaya (12 Periode) = Total Biaya(t)
Total Biaya (12 Periode) = Rp 7.452.068.000
Tabel 3.18 Lanjutan Tabel 3.17 Data Total Rencana Produksi Revisi
Periode Total Rencana Produksi
11 35477
12 35477
Contoh Perhitungan:
1. Disaggregate Total Rencana Produksi Case Handphone
Disaggregate TRP(t) = TRP(t) x %P Case Handphone
- Disaggregate TRP (1) = 32585 x 70,66% = 23026,04 Unit
- Disaggregate TRP (2) = 33934 x 70,66% = 23979,31 Unit
Praktikum Perancangan Sistem Industri 2 49
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Diketahui:
DTF: 1 Periode
PTF: 2 – 12 Periode
Contoh Perhitungan:
1. Project Available Balance (PAB) DTF
PAB DTF(t) = PAB(t-1) + MS(t) – AO(t)
PAB DTF(1) = PAB(1-1) + MS(1) – AO(1)
PAB DTF(1) = 0 + 23026,04 – 33658 = -10631,96 Unit
2. Project Available Balance (PAB) PTF
PAB PTF(t) = PAB(t-1) + MS(t) – Forecast/AO(t)
- PAB PTF(2) = PAB(2-1) + MS(2) – Forecast(2)
PAB PTF(2) = -10631,96 + 23979,31 – 22789,32 = -9441,97 Unit
- PAB PTF(3) = PAB(3-1) + MS(3) – AO(3)
PAB PTF(3) = -9441,97 + 21800,01 – 33995 = -21636,96 Unit
- PAB PTF(4) = PAB(4-1) + MS(4) – Forecast(4)
PAB PTF(4) = -21636,96 + 22938,42 – 23022,51 = -21721,05 Unit
3. Available to Promise (ATP) DTF
ATP DTF(t) = ATP(t-1) + MS(t) – AO(t)
ATP DTF(1) = ATP(1-1) + MS(1) – AO(1)
Diketahui:
DTF: 1 Periode
PTF: 2 – 12 Periode
Contoh Perhitungan:
1. Project Available Balance (PAB) DTF
PAB DTF(t) = PAB(t-1) + MS(t) – AO(t)
PAB DTF(1) = PAB(1-1) + MS(1) – AO(1)
PAB DTF(1) = 0 + 9558,96 – 0 = 9558,96 Unit
2. Project Available Balance (PAB) PTF
PAB PTF(t) = PAB(t-1) + MS(t) – Forecast/AO(t)
- PAB PTF(2) = PAB(2-1) + MS(2) – AO(2)
PAB PTF(2) = 9558,96 + 9954,69 – 12095 = 7418,65 Unit
- PAB PTF(3) = PAB(3-1) + MS(3) – AO(3)
PAB PTF(3) = 7418,65 + 9049,99 – 14463 = 2005,64 Unit
- PAB PTF(4) = PAB(4-1) + MS(4) – Forecast(4)
PAB PTF(4) = 2005,64 + 9522,58 – 9557,49 = 1970,73 Unit
Praktikum Perancangan Sistem Industri 2 51
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Standard Hours (SH)
satuan waktu
- SH BSH-03 Pemotongan =
(15 + ( 55100 ) ) = 0,0044
3600
- SH BSH-03 Pencetakan =
(20 + ( 77100 ) ) =¿0,0058
3600
- SH BSH-03 Pendinginan =
(25 + ( 81100 ) ) = 0,0072
3600
Tabel 3.31 Routing Sheet Case Tablet
Routing Sheet Case Tablet
Work Run Setup Lot Standar
Kode Nama
Center Time Time Size d Hours
Komponen Operasi
(WC) (RT) (ST) (LS) (SH)
Pemotongan 10 15 55 100 0,0044
Pencetakan 20 25 77 100 0,0072
BST-03 Pendinginan 30 30 81 100 0,0086
Penghalusan 40 30 71 100 0,0086
Pemeriksaan 1 50 5 72 100 0,0016
Pemotongan 10 15 55 100 0,0044
Pencetakan 20 25 77 100 0,0072
DST-03 Pendinginan 30 30 81 100 0,0086
Penghalusan 40 30 71 100 0,0086
Pemeriksaan 2 50 5 72 100 0,0016
Pemotongan 10 15 55 100 0,0044
Pencetakan 20 25 77 100 0,0072
ART-02 Pendinginan 30 30 81 100 0,0086
Penghalusan 40 30 71 100 0,0086
Pemeriksaan 3 50 5 72 100 0,0016
Perakitan
HAST 01- BCT-03, DST-
60 110 70 100 0,0308
02 03, dan LET-
03
HAST 02- Perakitan 70 120 74 100 0,0336
01 HAST 01-02,
WST-02, STT-
02, LET-02,
dan ART-02
satuan waktu
- SH BST-03 Pemotongan =
(15 + ( 55100 ) ) = 0,0044
3600
- SH BST-03 Pencetakan =
(25 +
77
100
) ( )
=¿
0,0072
3600
- SH BST-03 Pendinginan =
(30 + ( 81100 ) ) = 0,0086
3600
Contoh Perhitungan:
1. ∑ Standard Hours (SH)
- ∑SH WC 10 = 0,0044 + 0,0044 + 0,0044 = 0,0132
Contoh Perhitungan:
1. ∑ Standard Hours (SH)
- ∑SH WC 10 = 0,0044 + 0,0044 + 0,0044 = 0,0132
- ∑SH WC 20 = 0,0072 + 0,0072 + 0,0072 = 0,0216
- ∑SH WC 30 = 0,0086 + 0,0086 + 0,0086 = 0,0258
Contoh Perhitungan:
1. Rough Cut Capacity Planning (RCCP)
RCCP(t) = (MS CH(t) x ∑SH CH) + (MS CT(t) x ∑SH CT)
- RCCP WC 10(1) = (MS CH(1) x ∑SH CH) + (MS CT(1) x ∑SH CT)
RCCP WC 10(1) = (23026,04 x 0,0132) + (9558,96 x 0,0132)
RCCP WC 10(1) = 430,12 Unit
- RCCP WC 20(1) = (MS CH(1) x ∑SH CH) + (MS CT(1) x ∑SH CT)
RCCP WC 20(1) = (23026,04 x 0,0174) + (9558,96 x 0,0216)
RCCP WC 20(1) = 607,13 Unit
- RCCP WC 30(1) = (MS CH(1) x ∑SH CH) + (MS CT(1) x ∑SH CT)
RCCP WC 30(1) = (23026,04 x 0,0216) + (9558,96 x 0,0258)
RCCP WC 30(1) = 743,98 Unit
WC 10
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 3 = 480
- Kapasitas RT(2) = 8 x 22 x 3 = 528
- Kapasitas RT(3) = 8 x 20 x 3 = 480
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 3 = 120
- Kapasitas OT(2) = 2 x 22 x 3 = 132
- Kapasitas OT(3) = 2 x 20 x 3 = 120
WC 20
1000
900
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 4 = 640
- Kapasitas RT(2) = 8 x 22 x 4 = 704
- Kapasitas RT(3) = 8 x 20 x 4 = 640
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 4 = 160
- Kapasitas OT(2) = 2 x 22 x 4 = 176
- Kapasitas OT(3) = 2 x 20 x 4 = 160
WC 30
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 40
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 50
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 1 = 160
- Kapasitas RT(2) = 8 x 22 x 1 = 176
- Kapasitas RT(3) = 8 x 20 x 1 = 160
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 1 = 40
- Kapasitas OT(2) = 2 x 22 x 1 = 44
- Kapasitas OT(3) = 2 x 20 x 1 = 40
WC 60
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 70
1600
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
WC 80
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 1 = 160
- Kapasitas RT(2) = 8 x 22 x 1 = 176
- Kapasitas RT(3) = 8 x 20 x 1 = 160
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 1 = 40
- Kapasitas OT(2) = 2 x 22 x 1 = 44
- Kapasitas OT(3) = 2 x 20 x 1 = 40
WC 90
500
450
400
350
300
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 2 = 320
- Kapasitas RT(2) = 8 x 22 x 2 = 352
- Kapasitas RT(3) = 8 x 20 x 2 = 320
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 2 = 80
- Kapasitas OT(2) = 2 x 22 x 2 = 88
- Kapasitas OT(3) = 2 x 20 x 2 = 80
dan Case Tablet. Dalam tabel Master Production Schedule (MPS) terdapat nilai
Forecast yang didapat dari nilai Dissagregate dari tabel Demand Aggregate
Forecast, nilai Actual Order (AO) yang merupakan sudah ketentuan dari
laboratorium, Project Available Balance (PAB), Available to Promise (ATP), dan
Master Schedule (MS) yang didapat dari nilai Dissagregate dari tabel Total
Rencana Produksi, semua nilai tersebut dihitung selama 12 periode.
Pada Rough Cut Capacity Planning (RCCP) langkah pertama yang harus
dilakukan adalah dengan mengumpulkan data-data yang dibutuhkan diantaranya,
seperti data Routing Sheet produk Case Handphone dan Case Tablet, Work
Center (WC), Run Time (RT), data Set Up Time (ST) yang telah ditentukan oleh
laboratorium, dan Lot Size (LS) yang telah ditentukan oleh laboratorium yaitu
sebanyak 100 unit. Jumlah Work Center yang terdapat pada perusahaan PT. Adya
Mavendra ini sebanyak 9 Work Center dengan jumlah Tenaga Kerja yang
dibutuhkan sebanyak 32 orang. Setelah data tersebut disiapkan, maka dilanjutkan
dengan menghitung Standard Hours dari nilai Run Time (RT), data Set Up Time
(ST), dan Lot Size (LS). Kemudian membuat tabel Bill Of Capacity untuk produk
Case Handphone dan Case Tablet, pada Bill Of Capacity ini menghitung
frekuensi Work Center yang ada lalu menjumlahkan standard hours pada masing-
masing Work Center.
Selanjutnya membuat tabel data Kapasitas Regular Time dan data
Kapasitas Over Time, data-data yang dibutuhkan yaitu jumlah dari Work Center
sebanyak (9), lalu jumlah tenaga kerja yang dibutuhkan sebanyak 32 orang. Untuk
tabel data Kapasitas Regular Time dan data Kapasitas Over Time jumlahnya
dibuat menyesuaikan dengan jumlah Work Center. Isi dari tabel tersebut
diantaranya terdapat jam kerja untuk Reguler Time yaitu selama 8 jam dan Over
Time merupakan 25% dari jam kerja normal yaitu sebanyak 2 jam, Hari Kerja dan
Tenaga Kerja yang telah ditentukan untuk setiap Work Center. Tenaga kerja yang
ada pada seluruh Work Center berjumlah 32 Orang sesuai dengan tenaga kerja
yang dibutuhkannya. Sehingga pada setiap masing-masing Work Center telah
dialokasikan tenaga kerja untuk WC 10 berjumlah 3 Orang, WC 20 berjumlah 4
Orang, WC 30 berjumlah 5 Orang, WC 40 berjumlah 5 Orang, WC 50 berjumlah
1 Orang, WC 60 berjumlah 5 Orang, WC 70 berjumlah 6 Orang, WC 80
Praktikum Perancangan Sistem Industri 2 74
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
III.4.1.3 Data Master Schedule (MS) Produk Aircase Handphone dan Produk
Aircase Tablet
Tabel 3.55 Master Schedule (MS) Produk Aircase Handphone
Master Schedule Case Handphone
P 1 2 3 4 5 6 7 8 9 10 11 12
MS 23026,04 23979,31 21800,01 22938,42 23139,11 23979,31 23979,31 25069,66 23979,31 21800,01 25069,66 25069,66
Contoh Perhitungan:
1. Gross Requirement (GR)
GR(t) = MS HP(t)
- GR(1) = 23026,04 Unit
- GR(2) = 23979,31 Unit
- GR(3) = 21800,01 Unit
( NR
PORc(t) =
LS )
x LS
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 1: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 0 dari struktur produknya.
GR(t) = PORlinduk Level 0 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 1 = 18036 x 1 = 18036 Unit
- GR(2) = PORlinduk Level 0 (2-1) x 1 = 19036 x 1 = 19036 Unit
- GR(3) = PORlinduk Level 0 (3-1) x 1 = 21800 x 1 = 21800 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (732 – 0) + 0 = 732 Unit
- PAB1(1) = (732 – 18036) + 7452 = -9852 Unit
- PAB1(2) = (183 – 19036) + 9244 = -9609 Unit
- PAB1(3) = (156 – 21800) + 5452 = -16192 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-9852| + 140 = 9852 + 140 = 9992 Unit
- NR(2) = |-9609| + 140 = 9609 + 140 = 9749 Unit
- NR(3) = |-16192| + 140 = 16192 + 140 = 16332 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
PORc(t) = ( NR
LS )
x LS
Praktikum Perancangan Sistem Industri 2 82
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
- PORc(1) = (9992
45 )
x 45 = 10035 Unit
=(
45 )
9749
- PORc(2) x 45 = 9765 Unit
=( )x 45 = 16335 Unit
16332
- PORc(3)
45
5. Planned Order Release (PORl)
PORl: Berdasarkan Lead Time (LT)
PORl(t) = PORc(t+1) ; LT = 1
- Past Due: PORl(0) = PORc(0+1) = 10035 Unit
- PORl(1) = PORc(1+1) = 9765 Unit
- PORl(2) = PORc(2+1) = 16335 Unit
- PORl(3) = PORc(3+1) = 8370 Unit
6. Project Available Balance 2 (PAB 2)
PAB2(t) = PAB1(t) + PORc(t)
- Past Due: PAB2(0) = 732 + 0 = 732 Unit
- PAB2(t) = -9852 + 10035 = 183 Unit
- PAB2(t) = -9609 + 9765 = 156 Unit
- PAB2(t) = -16192 +16335 = 143 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 1: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 0 dari struktur produknya.
GR(t) = PORlinduk Level 0 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 1 = 18036 x 1 = 18036 Unit
- GR(2) = PORlinduk Level 0 (2-1) x 1 = 19036 x 1 = 19036 Unit
Praktikum Perancangan Sistem Industri 2 83
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
( NR
PORc(t) =
LS )
x LS
PORc = (
70 )
9772
- (2) x 70 = 9800 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 1: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 0 dari struktur produknya.
GR(t) = PORlinduk Level 0 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 1 = 18036 x 1 = 18036 Unit
- GR(2) = PORlinduk Level 0 (2-1) x 1 = 19036 x 1 = 19036 Unit
- GR(3) = PORlinduk Level 0 (3-1) x 1 = 21800 x 1 = 21800 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (490 – 0) + 0 = 490 Unit
- PAB1(1) = (490 – 18036) + 7452 = -10094 Unit
- PAB1(2) = (346 – 19036) + 9244 = -9446 Unit
- PAB1(3) = (414 – 21800) + 5452 = -15934 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-10094| + 290 = 10094 + 290 = 10384 Unit
- NR(2) = |-9446| + 290 = 9446 + 290 = 9736 Unit
- NR(3) = |-15934| + 290 = 15934 + 290 = 16224 Unit
PORc(t) = ( NR
LS )
x LS
PORc = (
145 )
10384
- (1) x 145 = 10440 Unit
PORc = (
145 )
9736
- (2)x 145 = 9860 Unit
PORc = (
145 )
16224
- (3) x 145 = 16240 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
( NR
PORc(t) =
LS )
x LS
PORc = (
150 )
7873
- (1) x 150 = 7950 Unit
PORc = (
150 )
5062
- (2) x 150 = 5100 Unit
PORc = (
150 )
16202
- (3) x 150 = 16350 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 10440 x 1 = 10440 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 9860 x 1 = 9860 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 16240 x 1 = 16240 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (10 – 0) + 0 = 10 Unit
- PAB1(1) = (10 – 10440) + 2464 = -7966 Unit
- PAB1(2) = (224 – 9860) + 4721 = -4915 Unit
- PAB1(3) = (285 – 16240) + 0 = -15955 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
PORc(t) = ( NR
LS )
x LS
PORc = (
130 )
8146
- (1)x 130 = 8190 Unit
PORc = (
130 )
5095
- (2)x 130 = 5200 Unit
PORc = (
130 )
16135
- (3) x 130 = 16250 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 10440 x 1 = 10440 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 9860 x 1 = 9860 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 16240 x 1 = 16240 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (146 – 0) + 0 = 146 Unit
- PAB1(1) = (146 – 10440) + 2464 = -7830 Unit
- PAB1(2) = (530 – 9860) + 4721 = -4609 Unit
- PAB1(3) = (451 – 16240) + 0 = -15789 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-7830| + 450 = 7830 + 450 = 8280 Unit
- NR(2) = |-4609| + 450 = 4609 + 450 = 5059 Unit
- NR(3) = |-15789| + 450 = 15789 + 450 = 16239 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
( NR
PORc(t) =
LS )
x LS
PORc = (
110 )
8280
- (1) x 110 = 8360 Unit
PORc = (
110 )
5059
- (2) x 110 = 5060 Unit
PORc = (
110 )
16239
- (3) x 110 = 16280 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 10440 x 1 = 10440 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 9860 x 1 = 9860 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 16240 x 1 = 16240 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (93 – 0) + 0 = 93 Unit
- PAB1(1) = (93 – 10440) + 2464 = -7883 Unit
- PAB1(2) = (372 – 9860) + 4721 = -4767 Unit
( NR
PORc(t) =
LS )
x LS
PORc = (
65 )
8233
- (1) x 65 = 8255 Unit
PORc = (
65 )
5117
- (2) x 65 = 5135 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 3: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 2 dari struktur produknya.
GR(t) = PORlinduk Level 2 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 2 (1-1) x 1 = 8255 x 1 = 8255 Unit
- GR(2) = PORlinduk Level 2 (2-1) x 1 = 5135 x 1 = 5135 Unit
- GR(3) = PORlinduk Level 2 (3-1) x 1 = 16250 x 1 = 16250 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (82 – 0) + 0 = 82 Unit
- PAB1(1) = (82 – 8255) + 7134 = -1039 Unit
- PAB1(2) = (491 – 5135) + 4257 = -387 Unit
- PAB1(3) = (468 – 16250) + 13565 = -2217 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-1039| + 460 = 1039 + 460 = 1499 Unit
- NR(2) = |-387| + 460= 387 + 460 = 847 Unit
- NR(3) = |-2217| + 460 = 2217 + 460 = 2677 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
PORc(t) = ( NR
LS )
x LS
PORc = (
45 )
1499
- (1) x 45 = 1530 Unit
PORc = (
45 )
847
- (2)x 45 = 855 Unit
- PORc(3) = (2677
45 )
x 45 = 2700 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 3: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 2 dari struktur produknya.
GR(t) = PORlinduk Level 2 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 2 (1-1) x 1 = 8255 x 1 = 8255 Unit
- GR(2) = PORlinduk Level 2 (2-1) x 1 = 5135 x 1 = 5135 Unit
- GR(3) = PORlinduk Level 2 (3-1) x 1 = 16250 x 1 = 16250 Unit
2. Project Available Balance 1 (PAB 1)
( NR
PORc(t) =
LS )
x LS
PORc = (
85 )
1312
- (1) x 85 = 1360 Unit
PORc = (
85 )
830
- (2) x 85 = 850 Unit
PORc = (
85 )
2665
- (3) x 85 = 2720 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR(t) = MS TAB(t)
- GR(1) = 9558,96 Unit
- GR(2) = 9954,69 Unit
- GR(3) = 9049,99 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (0 – 0) + 0 = 0 Unit
- PAB1(1) = (0 – 9558,96) + 4214 = -5344,96 Unit
- PAB1(2) = (255,04 – 9954,69) + 5324 = -4375,65 Unit
- PAB1(3) = (255,35 – 9049,99) + 0 = -8794,64 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-5344,96| + 255 = 5344,96 + 255 = 5599,96 Unit
- NR(2) = |-4375,65 | + 255 = 4375,65 + 255 = 4630,65 Unit
- NR(3) = |-8794,64 | + 255 = 8794,64 + 255 = 9049,64 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
PORc(t) = ( NR
LS )
x LS
- PORc(1) = (5599,96
1 )x 1 = 5600 Unit
=( )x 1 = 4631 Unit
4630,65
- PORc(2)
1
=( )x 1 = 9050 Unit
9049,64
- PORc(3)
1
5. Planned Order Release (PORl)
PORl: Berdasarkan Lead Time (LT)
PORl(t) = PORc(t+1) ; LT = 1
- Past Due: PORl(0) = PORc(0+1) = 5600 Unit
- PORl(1) = PORc(1+1) = 4631 Unit
- PORl(2) = PORc(2+1) = 9050 Unit
- PORl(3) = PORc(3+1) = 9523 Unit
6. Project Available Balance 2 (PAB 2)
PAB2(t) = PAB1(t) + PORc(t)
- Past Due: PAB2(0) = 0 + 0 = 0 Unit
- PAB2(t) = -5344,96 + 5600 = 255,04 Unit
- PAB2(t) = -4375,65 + 4631 = 255,35 Unit
- PAB2(t) = -8794,64 + 9050 = 255,36 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 1: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 0 dari struktur produknya.
GR(t) = PORlinduk Level 0 (t-1) x UOM/Quantity
Praktikum Perancangan Sistem Industri 2 97
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
( NR
PORc(t) =
LS )
x LS
PORc = (
45 )
5008
- (1) x 45 = 5040 Unit
PORc = (
45 )
1962
- (2) x 45 = 1980 Unit
PORc = (
45 )
4369
- (3) x 45 = 4365 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 1: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 0 dari struktur produknya.
GR(t) = PORlinduk Level 0 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 1 = 5600 x 1 = 5600 Unit
- GR(2) = PORlinduk Level 0 (2-1) x 1 = 4631 x 1 = 4631 Unit
- GR(3) = PORlinduk Level 0 (3-1) x 1 = 9050 x 1 = 9050 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (384 – 0) + 0 = 384 Unit
- PAB1(1) = (384 – 5600) + 0 = -5216 Unit
- PAB1(2) = (454 – 4631) + 2637 = -1540 Unit
- PAB1(3) = (420 – 9050) + 4683 = -3947 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-5216| + 420 = 5216 + 420 = 5636 Unit
- NR(2) = |-1540| + 420 = 1540 + 420 = 1960 Unit
- NR(3) = |-3947| + 420 = 3947 + 420 = 4367 Unit
PORc(t) =( NR
LS )
x LS
PORc = (
70 )
5636
- x 70 = 5670 Unit
(1)
PORc = (
70 )
1960
- x 70 = 1960 Unit
(2)
PORc = (
70 )
4367
- x 70 = 4410 Unit
(3)
Contoh Perhitungan:
1. Gross Requirement (GR)
Praktikum Perancangan Sistem Industri 2 100
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
( NR
PORc(t) =
LS )
x LS
PORc = (
145 )
5400
- (1) x 145 = 5510 Unit
PORc = (
145 )
1884
- (2) x 145 = 1885 Unit
PORc = (
145 )
4366
- (3) x 145 = 4495 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 5510 x 1 = 5510 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 1885 x 1 = 1885 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 4495 x 1 = 4495 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (253 – 0) + 0 = 253 Unit
- PAB1(1) = (253 – 5510) + 2453 = -2804 Unit
- PAB1(2) = (196 – 1885) + 0 = -1689 Unit
- PAB1(3) = (261 – 4495) + 3468 = -766 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
( NR
PORc(t) =
LS )
x LS
PORc = (
150 )
2954
- (1) x 150 = 3000 Unit
PORc = (
150 )
1839
- (2) x 150 = 1950 Unit
PORc = (
150 )
916
- (3) x 150 = 1050 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 5510 x 1 = 5510 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 1885 x 1 = 1885 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 4495 x 1 = 4495 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (10 – 0) + 0 = 10 Unit
- PAB1(1) = (10 – 5510) + 2453 = -3047 Unit
- PAB1(2) = (203 – 1885) + 0 = -1682 Unit
- PAB1(3) = (268 – 4495) + 3468 = -759 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-3047| + 180 = 3047 + 180 = 3227 Unit
- NR(2) = |-1682| + 180 = 1682 + 180 = 1862 Unit
- NR(3) = |-759| + 180 = 759 + 180 = 939 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
PORc(t) =( NR
LS )
x LS
PORc = (
130 )
3227
- x 130 = 3250 Unit
(1)
PORc = (
130 )
1862
- x 130 = 1950 Unit
(2)
- PORc(3) = (939
130 )
x 130 = 1040 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 5510 x 1 = 5510 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 1885 x 1 = 1885 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 4495 x 1 = 4495 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
( NR
PORc(t) =
LS )
x LS
PORc = (
110 )
3361
- (1) x 110 = 3410 Unit
PORc = (
110 )
1836
- (2) x 110 = 1870 Unit
PORc = (
110 )
993
- (3) x 110 = 1100 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 2: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 1 dari struktur produknya.
GR(t) = PORlinduk Level 1 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 1 = 5510 x 1 = 5510 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 1 = 1885 x 1 = 1885 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 1 = 4495 x 1 = 4495 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (93 – 0) + 0 = 93 Unit
- PAB1(1) = (93 – 5510) + 2453 = -2964 Unit
- PAB1(2) = (351 – 1885) + 0 = -1534 Unit
- PAB1(3) = (351 – 4495) + 3468 = -676 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-2964| + 350 = 2964+ 350 = 3314 Unit
- NR(2) = |-1534| + 350 = 1534 + 350 = 1884 Unit
- NR(3) = |-676| + 350 = 676+ 350 = 1026 Unit
4. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
PORc(t) = ( NR
LS )
x LS
- PORc(1) = (3314
65 )
x 65 = 3315 Unit
=(
65 )
1884
- PORc(2) x 65 = 1885 Unit
=(
65 )
1026
- PORc(3) x 65 = 1040 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 3: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 2 dari struktur produknya.
GR(t) = PORlinduk Level 2 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 2 (1-1) x 1 = 3315 x 1 = 3315 Unit
- GR(2) = PORlinduk Level 2 (2-1) x 1 = 1885 x 1 = 1885 Unit
Praktikum Perancangan Sistem Industri 2 108
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
( NR
PORc(t) =
LS )
x LS
PORc = (
45 )
1268
- (1) x 45 = 1305 Unit
PORc = ( )x 45 = 0 Unit
0
- (2)
45
PORc = (
45 )
1422
- (3) x 45 = 1440 Unit
Contoh Perhitungan:
1. Gross Requirement (GR)
GR Level 3: Berdasarkan pada Planned Order Release (PORl) dalam induk
item level 2 dari struktur produknya.
GR(t) = PORlinduk Level 2 (t-1) x UOM/Quantity
- GR(1) = PORlinduk Level 2 (1-1) x 1 = 3315 x 1 = 3315 Unit
- GR(2) = PORlinduk Level 2 (2-1) x 1 = 1885 x 1 = 1885 Unit
- GR(3) = PORlinduk Level 2 (3-1) x 1 = 1040 x 1 = 1040 Unit
2. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (174 – 0) + 0 = 174 Unit
- PAB1(1) = (174 – 3315) + 2425 = -716 Unit
- PAB1(2) = (389 – 1885) + 1466 = -30 Unit
- PAB1(3) = (395 – 1040) + 0 = -645 Unit
3. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = |-716| + 365 = 716 + 365 = 1081 Unit
- NR(2) = |-30| + 365 = 30 + 365 = 395 Unit
- NR(3) = |-645| + 365 = 645 + 365 = 1010 Unit
4. Planned Order Receipt (PORc)
PORc(t) = ( NR
LS )
x LS
PORc = (
85 )
1081
- (1) x 85 = 1105 Unit
PORc = (
85 )
395
- (2) x 85 = 425 Unit
PORc = (
85 )
1010
- (3) x 85 = 1020 Unit
Contoh Perhitungan:
1. Gross Requirement Pegging LEM UHU (LEH-01)
GR(t) = PORlinduk Level 0 (t-1) x Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 0,1 = 18036 x 0,1 = 1804 Unit
Contoh Perhitungan:
1. UOM/Quantity
UOM/Quantity = Total Quantity Lem UHU
UOM/Quantity = 0,1 + 0,1 + 0,1 = 0,3
2. Gross Requirement (GR)
GR(t) = Total GR Pegging Lem(t) x UOM/Quantity
- GR(1) = 3674 x 0,3 = 1102,2 Unit
- GR(2) = 3404 x 0,3 = 1021,2 Unit
- GR(3) = 5429 x 0,3 = 1628,7 Unit
3. Schedule Receipt (SR)
SR(t) = Total SR Level 1-3(t)
- SR(1) = 7452 + 2464 + 7134 = 17050 Unit
- SR(2) = 9244 + 4721 + 0 = 18222 Unit
- SR(3) = 7134 + 4257 + 13565 = 19017 Unit
Praktikum Perancangan Sistem Industri 2 112
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
( NR
PORc(t) =
LS )
x LS
PORc = ( )x 85 = 0 Unit
0
- (1)
85
PORc = ( )x 85 = 0 Unit
0
- (2)
85
PORc = ( )x 85 = 0 Unit
0
- (3)
85
7. Planned Order Release (PORl)
PORl: Berdasarkan Lead Time (LT)
PORl(t) = PORc(t+1) ; LT = 1
- Past Due: PORl(0) = PORc(0+1) = 0 Unit
- PORl(1) = PORc(1+1) = 0 Unit
- PORl(2) = PORc(2+1) = 0 Unit
- PORl(3) = PORc(3+1) = 0 Unit
8. Project Available Balance 2 (PAB 2)
PAB2(t) = PAB1(t) + PORc(t)
- Past Due: PAB2(0) = 189 + 0 = 189 Unit
Praktikum Perancangan Sistem Industri 2 113
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Gross Requirement Pegging LEM UHU (LET-01)
GR(t) = PORlinduk Level 0 (t-1) x Quantity
- GR(1) = PORlinduk Level 0 (1-1) x 0,1 = 5600 x 0,1 = 560 Unit
- GR(2) = PORlinduk Level 0 (2-1) x 0,1 = 4631 x 0,1 = 464 Unit
- GR(3) = PORlinduk Level 0 (3-1) x 0,1 = 9050 x 0,1 = 905 Unit
2. Gross Requirement Pegging LEM UHU (LET-02)
GR(t) = PORlinduk Level 1 (t-1) x Quantity
- GR(1) = PORlinduk Level 1 (1-1) x 0,1 = 5510 x 0,1 = 551 Unit
- GR(2) = PORlinduk Level 1 (2-1) x 0,1 = 1885 x 0,1 = 189 Unit
- GR(3) = PORlinduk Level 1 (3-1) x 0,1 = 4495 x 0,1 = 5 450 Unit
3. Gross Requirement Pegging LEM UHU (LET-03)
GR(t) = PORlinduk Level 2 (t-1) x Quantity
- GR(1) = PORlinduk Level 2 (1-1) x 0,1 = 3315 x 0,1 = 332 Unit
- GR(2) = PORlinduk Level 2 (2-1) x 0,1 = 1885 x 0,1 = 189 Unit
- GR(3) = PORlinduk Level 2 (3-1) x 0,1 = 1040 x 0,1 = 104 Unit
Contoh Perhitungan:
1. UOM/Quantity
UOM/Quantity = Total Quantity Lem UHU
UOM/Quantity = 0,1 + 0,1 + 0,1 = 0,3
2. Gross Requirement (GR)
GR(t) = Total GR Pegging Lem(t) x UOM/Quantity
- GR(1) = 1143 x 0,3 = 432,9 Unit
- GR(2) = 842 x 0,3 = 252,6 Unit
- GR(3) = 1459 x 0,3 = 437,7 Unit
3. Schedule Receipt (SR)
SR(t) = Total SR Level 1-3(t)
- SR(1) = 0 + 2453 + 2425 = 4878 Unit
- SR(2) = 2637 + 0 + 1466 = 4103 Unit
- SR(3) = 4683 + 3468 + 0 = 8151 Unit
4. Project Available Balance 1 (PAB 1)
Past Due: PAB1 = (On Hand (OH) – GR(t)) + SR(t)
Per Periode: PAB1(t) = (PAB2(t-1) – GR(t)) + SR(t)
- Past Due: PAB1(0) = (189 – 0) + 0 = 189 Unit
- PAB1(1) = (189 – 432,9) + 4878 = 4634,10 Unit
- PAB1(2) = (4634 – 252,6) + 4103 = 8484,50 Unit
- PAB1(3) = (8485 – 437,7) + 8151 = 16197,80 Unit
5. Net Requirement (NR)
NR(t) = |PAB1(t)| + Safety Stock (SS)
- NR(1) = 0 Unit
- NR(2) = 0 Unit
- NR(3) = 0 Unit
Keterangan: PAB1 bernilai positif, maka NR bernilai 0 Unit
6. Planned Order Receipt (PORc)
PORc: Berdasarkan pada Lot Size (LS)
( NR
PORc(t) =
LS )
x LS
PORc = ( )x 85 = 0 Unit
0
- (1)
85
tenggang pemesanan. Selain itu pun telah ditentukannya data Schedule Receipt
(SR) untuk 12 periode dari produk case handphone dan case tablet.
Untuk Material Requitment Planning Case Handphone dan Case Tablet
terdiri dari tiga induk item yang pertama Aircase Handphone dengan end item
antara lain Dus packing, Bubble Wrap, dan Lem UHU, yang kedua Hasil
assembly 2 dengan end item antara lain Airpods Receptacle, wireless speaker, dan
Lem UHU, dan yang ketiga Hasil Assembly 1 dengan end item antara lain Badan
Case, Dudukan Speaker, dan Lem UHU.
Setelah data yang dibutuhkan terkumpul, kemudian dilakukan pengolahan
data dengan melakukan perhitungan untuk Material Requirement Planning
(MRP). Perhitungan Material Requirement Planning (MRP) dibagi menjadi
Material Requirement Planning (MRP) Non Pegging dan Pegging. Yang dimana
Pegging ini dilakukan untuk mempermudah dalam menghitung komponen yang
berjumlah lebih dari satu seperti komponen lem baik untuk produk Case
Handphone dan Case Tablet. Pada pengolahan Material Requirement Planning
(MRP) ini dilakukan selama 12 periode dan dalam data MRP ini harus
menentukan Gross Requirement (GR) yang merupakan kebutuhan kasar
berdasarkan rencana produksi, Schedule Receipt (SR) merupakan penerimaan
yang dijadwalkan dan komponen yang akan diterima, Project Available Balance 1
(PAB 1) merupakan persediaan awal, Net Requirement (NR) merupakan
kebutuhan bersih, Planned Order Receipt (PORC) merupakan direncanakannya
penerimaan pesanan dan disesuaikan dengan lot size, Plan Order Release (PORL)
direncanakannya pelepasan pemesanan dan kapan harus tersediannya komponen
serta dipengaruhi oleh lead time, dan Project Available Balance 2 (PAB 2)
merupakan akhir persediaan dari produksi yang telah ditentukan oleh perusahaan.
Dalam pengolahan data dilakukan hal yang pertama yaitu menghitung
Gross Requirement ini yang diambil dari Master Schedule (MS) yang sudah
diolah sebelumnya pada perhitungan Material Requirement Planning (MRP) dari
Case Handphone dan Case Tablet. Kemudian, data schedule receipt setiap
periodenya berdasarkan level produk. Lalu dilakukan perhitungan untuk PAB 1
pada past due yang mana mempertimbangkan adanya On Hand dan data PAB 1
ini akan berguna untuk menghitung PAB 2 yang mana harus terdapat data PAB 1
Praktikum Perancangan Sistem Industri 2 119
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
dan PORc. Perhitungan PAB 1 untuk setiap periode berkaitan dengan nilai PAB 2,
GR, dan SR sehingga menghasilkan nilai yang digunakan untuk menghitung Net
Requirement (NR). Pada pengolahan NR, jika terdapat nilai PAB 1 positif maka
perhitungan tidak perlu dilakukan karena nilai NR akan sama dengan 0 yang
artinya tidak perlu adanya persediaan yang dibutuhkan untuk dilakukan
pemesanan karena tidak terjadi kekurangan persediaan. Namun jika terdapat nilai
NR yang negatif maka perlu adanya perhitungan dimana nilai absolut PAB 1
ditambahkan dengan safety stock yang berguna untuk menambah persediaan.
Selanjutnya, dilakukan perhitungan Planned Order Receipt (PORc) yang mana
berdasarkan pada lot size (LS) yang sudah ditentukan untuk masing-masing
komponen. setelah adanya perhitungan PORc, maka adanya kebutuhan persediaan
yang harus dipesan atau diterima sehingga dilakukan perhitungan Planned Order
Release (PORl) yang dihitung berdasarkan lead time, ketika LT bernilai satu
artinya kebutuhan persediaan harus dipesan satu periode sebelumnya agar ketika
periode berikutnya membutuhkan persediaan tersebut sudah tersedia. Pada
pengolahan data MRP ini dlakukan selama 12 periode. Dari hasil perhitungan
didapatkan Planned Order Realease (PORl) setiap komponen pada hampir setiap
periode dan past due.
Dalam komponen pembuatan produk Case Handphone dan Case Tablet
dari PT. Adya Mavendra menggunakan komponen Lem UHU pada level 1, level
2, dan level 3, sehingga perlu dilakukannya pegging. Pada proses pegging lem
ditentukan terlebih dahulu quantity pada setiap lem untuk kemudian dilakukan
perhitungan GR untuk masing-masing lem berdasarkan pada induk item level
tersebut. Lalu diakumulasikan data tersebut dan dilakukan proses MRP Pegging
Lem mulai dari menghitung GR yang didapat dari total pegging lem dengan total
UOM/Quantity dari lem tersebut. Kemudian data Schedule Receipt (SR) pun
dilakukan akumulasi nilai dari level 1-3 untuk setiap periodenya yang mana
nantinya menjadi nilai SR pada MRP Pegging Lem. Sama halnya dengan
pengolahan data MRP non pegging juga menghitung PAB, NR, PORc, dan PORl.
Dari hasil perhitungan didapatkan nilai PAB 1 yang bernilai positif selama 12
periode sehingga PORl pada setiap periode dan past due bernilai 0.
BCH-03
O-1 O-2 O-3 O-4 I-1
O-13
DSH-03
O-5 O-6 O-7 O-8 I-2 O-14 I-4 O-15
ARH-02
O-9 O-10 O-11 O-12 I-3
KETERANGAN:
: Badan Case Handphone (BCH-03)
: Dudukan Wireless Speaker Handphone (DSH-03)
: Airpods Receptacle Handphone (ARH-02)
: Assembly 1
: Assembly 2
: Pemeriksaan 2
: Pengemasan
FLOW DIAGRAM
NAMA OBJEK : Air Case Tablet
NOMOR PETA : 12 SEKARANG USULAN
DIPETAKAN OLEH : PT. ADYA MAVENDRA
TANGGAL DIPETAKAN : 19 APRIL 2022
Gudang Departemen Departemen Departemen Departemen Departemen Departemen Departemen Departemen Departemen Gudang
Baha Baku Pemotongan Pencetakan Pendinginan Penghalusan Pemeriksaan 1 Assembly 1 Assembly 2 Pemeriksaan 2 Pengemasan Bahan Jadi
(WC 10) (WC 20) (WC 30) (WC 40) (WC 50) (WC 60) (WC 70) (WC 80) (WC 90)
BCT-03
O-1 O-2 O-3 O-4 I-1
O-13
DST-03
O-5 O-6 O-7 O-8 I-2 O-14 I-4 O-15
ART-02
O-9 O-10 O-11 O-12 I-3
KETERANGAN:
: Badan Case Tablet (BCT-03)
: Dudukan Wireless Speaker Tablet (DST-03)
: Airpods Receptacle Tablet (ART-02)
: Assembly 1
: Assembly 2
: Pemeriksaan 2
: Pengemasan
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCH-03)
- CRP(1) = 855 x 0,0044 = 3,76
- CRP(2) = 2700 x 0,0044 = 11,88
- CRP(3) = 900 x 0,0044 = 3,96
Dudukan Speaker (DSH-03)
- CRP(1) = 850 x 0,0044 = 3,74
- CRP(2) = 2720 x 0,0044 = 11,97
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCH-03)
- CRP(1) = 855 x 0,0058 = 4,96
- CRP(2) = 2700 x 0,0058 = 15,66
- CRP(3) = 900 x 0,0058 = 5,22
Dudukan Speaker (DSH-03)
- CRP(1) = 850 x 0,0058 = 4,93
- CRP(2) = 2720 x 0,0058 = 15,78
- CRP(3) = 935 x 0,0058 = 5,42
Airpods Receptacle (ARH-02)
- CRP(1) = 5100 x 0,0058 = 29,58
- CRP(2) = 16350 x 0,0058 = 94,83
- CRP(3) = 750 x 0,0058 = 4,35
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCH-03)
- CRP(1) = 855 x 0,0072 = 6,16
- CRP(2) = 2700 x 0,0072 = 19,44
- CRP(3) = 900 x 0,0072 = 6,48
Dudukan Speaker (DSH-03)
- CRP(1) = 850 x 0,0072 = 6,12
- CRP(2) = 2720 x 0,0072 = 19,58
- CRP(3) = 935 x 0,0072 = 6,73
Airpods Receptacle (ARH-02)
- CRP(1) = 5100 x 0,0072 = 36,72
- CRP(2) = 16350 x 0,0072 = 117,72
- CRP(3) = 750 x 0,0072 = 5,40
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCH-03)
- CRP(1) = 855 x 0,0072 = 6,16
- CRP(2) = 2700 x 0,0072 = 19,44
- CRP(3) = 900 x 0,0072 = 6,48
Dudukan Speaker (DSH-03)
- CRP(1) = 850 x 0,0072 = 6,12
- CRP(2) = 2720 x 0,0072 = 19,58
- CRP(3) = 935 x 0,0072 = 6,73
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCH-03)
- CRP(1) = 855 x 0,0016 = 1,37
- CRP(2) = 2700 x 0,0016 = 4,32
- CRP(3) = 900 x 0,0016 = 1,44
Dudukan Speaker (DSH-03)
- CRP(1) = 850 x 0,0016 = 1,36
- CRP(2) = 2720 x 0,0016 = 4,35
- CRP(3) = 935 x 0,0016 = 1,50
Airpods Receptacle (ARH-02)
- CRP(1) = 5100 x 0,0016 = 8,16
- CRP(2) = 16350 x 0,0016 = 26,16
- CRP(3) = 750 x 0,0016 = 1,20
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Praktikum Perancangan Sistem Industri 2 129
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HASH 02-01)
- CRP(1) = 9860 x 0,0280 = 276,08
- CRP(2) = 16240 x 0,0280 = 454,72
- CRP(3) = 8410 x 0,0280 = 235,48
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HASH 02-01)
- CRP(1) = 9860 x 0,0044 = 43,38
- CRP(2) = 16240 x 0,0044 = 71,46
- CRP(3) = 8410 x 0,0044 = 37
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HASH 02-01)
- CRP(1) = 9860 x 0,0058 = 57,19
- CRP(2) = 16240 x 0,0058 = 94,19
- CRP(3) = 8410 x 0,0058 = 48,78
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCT-03)
- CRP(1) = 0 x 0,0044 = 0
- CRP(2) = 1440 x 0,0044 = 6,34
- CRP(3) = 0 x 0,0044 = 0
Dudukan Speaker (DST-03)
- CRP(1) = 425 x 0,0044 = 1,87
- CRP(2) = 1020 x 0,0044 = 4,49
- CRP(3) = 0 x 0,0044 = 0
Airpods Receptacle (ART-02)
- CRP(1) = 1950 x 0,0044 = 8,58
- CRP(2) = 1050 x 0,0044 = 4,62
- CRP(3) = 4200 x 0,0044 = 18,48
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCT-03)
- CRP(1) = 0 x 0,0072 = 0
- CRP(2) = 1440 x 0,0072 = 10,37
- CRP(3) = 0 x 0,0072 = 0
Dudukan Speaker (DST-03)
- CRP(1) = 425 x 0,0072 = 3,06
- CRP(2) = 1020 x 0,0072 = 7,34
- CRP(3) = 0 x 0,0072 = 0
Airpods Receptacle (ART-02)
- CRP(1) = 1950 x 0,0072 = 14,04
- CRP(2) = 1050 x 0,0072 = 7,56
- CRP(3) = 4200 x 0,0072 = 30,24
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCT-03)
- CRP(1) = 0 x 0,0086 = 0
- CRP(2) = 1440 x 0,0086 = 12,38
- CRP(3) = 0 x 0,0086 = 0
Praktikum Perancangan Sistem Industri 2 132
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCT-03)
- CRP(1) = 0 x 0,0086 = 0
- CRP(2) = 1440 x 0,0086 = 12,38
- CRP(3) = 0 x 0,0086 = 0
Dudukan Speaker (DST-03)
- CRP(1) = 425 x 0,0086 = 3,66
- CRP(2) = 1020 x 0,0086 = 8,77
- CRP(3) = 0 x 0,0086 = 0
Airpods Receptacle (ART-02)
- CRP(1) = 1950 x 0,0086 = 16,77
- CRP(2) = 1050 x 0,0086 = 9,03
- CRP(3) = 4200 x 0,0086 = 36,12
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Badan Case (BCT-03)
- CRP(1) = 0 x 0,0016 = 0
- CRP(2) = 1440 x 0,0016 = 2,30
- CRP(3) = 0 x 0,0016 = 0
Dudukan Speaker (DST-03)
- CRP(1) = 425 x 0,0016 = 0,68
- CRP(2) = 1020 x 0,0016 = 1,63
- CRP(3) = 0 x 0,0016 = 0
Airpods Receptacle (ART-02)
- CRP(1) = 1950 x 0,0016 = 3,12
- CRP(2) = 1050 x 0,0016 = 1,68
- CRP(3) = 4200 x 0,0016 = 6,72
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 1 (HAST 01-02)
- CRP(1) = 1885 x 0,0308 = 58,06
- CRP(2) = 1040 x 0,0308 = 32,03
- CRP(3) = 4225 x 0,0308 = 130,13
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HAST 02-01)
- CRP(1) = 1885 x 0,0336 = 63,34
- CRP(2) = 4495 x 0,0336 = 151,03
- CRP(3) = 4205 x 0,0336 = 141,29
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HAST 02-01)
- CRP(1) = 1885 x 0,0044 = 8,29
- CRP(2) = 4495 x 0,0044 = 119,78
- CRP(3) = 4205 x 0,0044 = 18,50
Contoh Perhitungan:
1. Capacity Requirement Planning (CRP)
CRP(t) = PORl(t) x SH
Hasil Assembly 2 (HAST 02-01)
- CRP(1) = 1885 x 0,0058 = 10,93
Praktikum Perancangan Sistem Industri 2 135
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Total Capacity Requirement Planning (CRP)
Total CRP(t) = CRP CH(t) + CRP CT(t)
WC 10
- CRP WC 10(1) = 29,94 + 10,45 = 40,39
- CRP WC 10(2) = 95,79 + 15,44 = 111,23
- CRP WC 10(3) = 11,37 + 18,48 = 29,85
WC 20
- CRP WC 20(1) = 39,47 + 17,10 = 56,57
- CRP WC 20(2) = 126,27 + 25,27 = 151,54
- CRP WC 20(3) = 14,99 + 30,24 = 45,23
WC 30
- CRP WC 30(1) = 49,00 + 20,43 = 69,42
- CRP WC 30(2) = 156,74 + 30,19 = 186,93
- CRP WC 30(3) = 18,61 + 36,12 = 54,73
WC 10
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 3 = 480
- Kapasitas RT(2) = 8 x 22 x 3 = 528
- Kapasitas RT(3) = 8 x 20 x 3 = 480
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 3 = 120
- Kapasitas OT(2) = 2 x 22 x 3 = 132
- Kapasitas OT(3) = 2 x 20 x 3 = 120
WC 20
1000
900
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 4 = 640
- Kapasitas RT(2) = 8 x 22 x 4 = 704
- Kapasitas RT(3) = 8 x 20 x 4 = 640
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 4 = 160
- Kapasitas OT(2) = 2 x 22 x 4 = 176
- Kapasitas OT(3) = 2 x 20 x 4 = 160
WC 30
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 40
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 50
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 1 = 160
- Kapasitas RT(2) = 8 x 22 x 1 = 176
- Kapasitas RT(3) = 8 x 20 x 1 = 160
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 1 = 40
- Kapasitas OT(2) = 2 x 22 x 1 = 44
- Kapasitas OT(3) = 2 x 20 x 1 = 40
WC 60
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 5 = 800
- Kapasitas RT(2) = 8 x 22 x 5 = 880
- Kapasitas RT(3) = 8 x 20 x 5 = 800
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 5 = 200
- Kapasitas OT(2) = 2 x 22 x 5 = 220
- Kapasitas OT(3) = 2 x 20 x 5 = 200
WC 70
1600
1400
1200
1000
800
600
400
200
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 6 = 960
- Kapasitas RT(2) = 8 x 22 x 6 = 1056
- Kapasitas RT(3) = 8 x 20 x 6 = 960
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 6 = 240
- Kapasitas OT(2) = 2 x 22 x 6 = 264
- Kapasitas OT(3) = 2 x 20 x 6 = 240
WC 80
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 1 = 160
- Kapasitas RT(2) = 8 x 22 x 1 = 176
- Kapasitas RT(3) = 8 x 20 x 1 = 160
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 1 = 40
- Kapasitas OT(2) = 2 x 22 x 1 = 44
- Kapasitas OT(3) = 2 x 20 x 1 = 40
WC 90
500
450
400
350
300
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12
Contoh Perhitungan:
1. Kapasitas Reguler Time (RT)
Kapasitas RT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas RT(1) = 8 x 20 x 2 = 320
- Kapasitas RT(2) = 8 x 22 x 2 = 352
- Kapasitas RT(3) = 8 x 20 x 2 = 320
2. Kapasitas Over Time (OT)
Kapasitas OT(t) = JK(t) x HK(t) x TK(t)
- Kapasitas OT(1) = 2 x 20 x 2 = 80
- Kapasitas OT(2) = 2 x 22 x 2 = 88
- Kapasitas OT(3) = 2 x 20 x 2 = 80
dari setiap Work Center (WC) selama 12 periode. Cara menghitung total
kebutuhan kapasitasnya yaitu dengan cara menambahkan nilai total Capacity
Requirement Planning (CRP) produk Case Handphone dan total Capacity
Requirement Planning (CRP) produk Case Tablet untuk setiap Work Center (WC)
dari setiap periodenya. Pada periode 12 terdapat kebutuhan kapasitas yang
bernilai 0 mulai dari Work Center (WC) 10 sampai Work Center (WC) 90, yang
artinya adalah pada Work Center (WC) tersebut tidak membutuhkan pengeluaran
atau pemesanan material untuk proses produksinya karena sudah dipenuhi dari
periode sebelumnya.
Selanjutnya melakukan perhitungan Reguler Time dan Over Time, yang
mana pada Reguler Time dan Over Time untuk Jam Kerja (JK) sudah ditentukan
oleh laboratorium sebanyak 8 jam dan 2 jam untuk setiap 12 periode, untuk Hari
Kerja (HK) pada setiap periodenya sudah ditentukan oleh laboratorium, dan
Tenaga Kerja yang dibutuhkan adalah hasil dari Tenaga Kerja yang dibutuhkan
dibagi dengan total Work Center (WC) dengan hasil 3.556 dan dibulatan menjadi
4 orang setiap Work Center (WC). Namun untuk penempatan dalam setiap Work
Center (WC) itu menyesuaikan dari kapasitas produksinya hingga tidak ada beban
yang melebihi Reguler Time dan Over Time (Dapat dilihat dari grafik jika
melebihi batas Reguler Time dan Over Time). Pengolahan data pada data kapasitas
Reguler Time dan Over Time dilakukan untuk semua Work Center (WC) dimulai
dari Work Center (WC) 10 sampai dengan Work Center (WC) 90 yang berisikan
data Jam Kerja, Hari Kerja, dan Tenaga Kerja selama 12 periode. Setelah itu, olah
menjadi sebuah grafik dengan menggabungkan data kapasitas Reguler Time dan
Over Time serta data Total Kebutuhan Kapasitas Capacity Requirement Planning
(CRP). Dapat dilihat dari hasil grafik tiap Work Center (WC), kebutuhan
kapasitas tidak ada yang melebihi batas beban Reguler Time dan Over Time
sehingga PT. Adya Mavendra tidak membutuhkan adanya subkontrak untuk
memenuhi rencana produksi dikarenakan semua alokasi dari tenaga kerja sudah
disesuaikan. Hampir seluruh kebutuhan kapasitas dilakukan pada Reguler Time,
hanya terdapat kebutuhan kapasitas yang perlu dilakukan pada Over Time pada
Work Center (WC) 60 pada periode 5 dan 10.
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 465
4 30
Total 16 495
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 550
4 30
Total 16 580
III.6.1.2 Master Schedule Produk Case Handphone dan Produk Case Tablet
Tabel 3.128 Master Schedule Produk Case Handphone
Master Schedule Case Handphone
P 1 2 3 4 5 6 7 8 9 10 11 12
MS 23026,04 23979,31 21800,01 22938,42 23139,11 23979,31 23979,31 25069,66 23979,31 21800,01 25069,66 25069,66
III.6.1.3 Routing Sheet Revisi Produk Case Handphone dan Case Tablet
Tabel 3.130 Routing Sheet Revisi Produk Case Handphone
Routing Sheet Case Handphone
No.
Kode Work Center Run Time
Operas Nama Operasi
Komponen (WC) (RT)
i
O-1 Pemotongan 10 15
O-2 Pencetakan 20 20
O-3 BCH-03 Pendinginan 30 25
O-4 Penghalusan 40 25
I-1 Pemeriksaan 1 50 5
O-5 Pemotongan 10 15
O-6 Pencetakan 20 20
O-7 DSH-03 Pendinginan 30 25
O-8 Penghalusan 40 25
I-2 Pemeriksaan 2 50 5
O-10 Pemotongan 10 15
O-11 Pencetakan 20 20
O-12 ARH-02 Pendinginan 30 25
O-13 Penghalusan 40 25
I-3 Pemeriksaan 3 50 5
Perakitan BCH-03,
O-9 HASH 01-02 DSH-03, dan LEH- 60 90
03
Perakitan HASH 01-
02, WSH-02, STH-
O-14 70 100
02, LEH-02, dan
HASH 02-01
ARH-02
I-4 Pemeriksaan 4 80 15
O-15 Pengemasan 90 20
Praktikum Perancangan Sistem Industri 2 157
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
III.6.2.2 Routing Sheet Produk Case Handphone dan Produk Case Tablet
Tabel 3.132 Routing Sheet Produk Case Handphone
Routing Sheet Aircase Handphone
Jumlah Jumlah
Waktu Kapasitas Efesiensi Jumlah
No. % Komponen Komponen
Operasi Nama Mesin Proses Mesin Mesin Mesin
Operasi Scrap yang yang
(Detik) (Unit/Jam) (75%) Toeritis
Diharapkan Disiapkan
BCH-03
O-1 Pemotongan Mesin Pemotongan 15 240 2% 163 167 180 0,93
O-2 Pencetakan Mesin Cetak 20 180 2% 159 163 135 1,21
O-3 Pendinginan Mesin Pendingin 25 144 0% 159 159 108 1,47
O-4 Penghalusan Mesin Penghalusan 25 144 1% 157 159 108 1,47
I-1 Pemeriksaan 1 Meja Periksa 5 720 0% 157 157 540 0,29
DSH-03
O-5 Pemotongan Mesin Pemotongan 15 240 2% 163 167 180 0,93
O-6 Pencetakan Mesin Cetak 20 180 2% 159 163 135 1,21
O-7 Pendinginan Mesin Pendingin 25 144 0% 159 159 108 1,47
O-8 Penghalusan Mesin Penghalusan 25 144 1% 157 159 108 1,47
I-2 Pemeriksaan 2 Meja Periksa 5 720 0% 157 157 540 0,29
ARH-02
O-10 Pemotongan Mesin Pemotongan 15 240 2% 163 167 180 0,93
O-11 Pencetakan Mesin Cetak 20 180 2% 159 163 135 1,21
O-12 Pendinginan Mesin Pendingin 25 144 0% 159 159 108 1,47
O-13 Penghalusan Mesin Penghalusan 25 144 1% 157 159 108 1,47
I-3 Pemeriksaan 3 Meja Periksa 5 720 0% 157 157 540 0,29
HASH 01-02
Perakitan BCH-03,
O-9 DSH-03, dan LEH- Meja Perakitan 90 40 0% 157 157 30 5,23
03
HASH 02-01
Perakitan HASH
01-02, WSH-02,
O-14 Meja Perakitan 100 36 0% 157 157 27 5,81
STH-02, LEH-02,
dan ARH-02
I-4 Pemeriksaan 4 Meja Periksa 15 240 0% 157 157 180 0,87
O-15 Pengemasan Meja Pengemasan 20 180 0% 157 157 135 1,16
Contoh Perhitungan:
1. Kapasitas Mesin
3600
Kapasitas Mesin =
Waktu Proses
3600
- Kapasitas Mesin (O-1) = = 240 Unit / Jam
15
3600
- Kapasitas Mesin (O-2) = = 180 Unit / Jam
20
3600
- Kapasitas Mesin (O-3) = = 144 Unit / Jam
25
2. Jumlah Komponen yang Disiapkan (DS)
DH
DS =
(1 - % Scrap )
163
- DS (O-1) = = 167 Unit / Jam
(1 - 2%)
159
- DS (O-2) = = 163 Unit / Jam
(1 - 2%)
159
- DS (O-3) = = 159 Unit / Jam
(1 - 0%)
Keterangan:
DS = Jumlah Komponen yang Disiapkan
DH = Jumlah Komponen yang Diharapkan
3. Efisiensi Mesin
Efisiensi Mesin = Kapasitas Mesin x % Efisiensi Mesin
- Efisiensi Mesin (O-1) = 240 x 75% = 180 Unit / Jam
- Efisiensi Mesin (O-2) = 180 x 75% = 135 Unit / Jam
- Efisiensi Mesin (O-3) = 144 x 75% = 108 Unit / Jam
Keterangan: % Efisiensi Mesin = 75%
4. Jumlah Mesin Teoritis
Jumlah Komponen yang Disiapkan
Jumlah Mesin Teoritis =
Efisiensi Mesin
167
- Jumlah Mesin Teoritis (O-1) = = 0,93
180
163
- Jumlah Mesin Teoritis (O-2) = = 1,21
135
159
- Jumlah Mesin Teoritis (O-3) = = 1,47
108
Contoh Perhitungan:
1. Kapasitas Mesin
3600
Kapasitas Mesin =
Waktu Proses
3600
- Kapasitas Mesin (O-1) = = 240 Unit / Jam
15
3600
- Kapasitas Mesin (O-2) = = 144 Unit / Jam
25
3600
- Kapasitas Mesin (O-3) = = 120 Unit / Jam
30
2. Jumlah Komponen yang Disiapkan (DS)
DH
DS =
(1 - % Scrap )
69
- DS (O-1) = = 71 Unit / Jam
(1 - 2%)
67
- DS (O-2) = = 69 Unit / Jam
(1 - 2%)
67
- DS (O-3) = = 67 Unit / Jam
(1 - 0%)
Keterangan:
DS = Jumlah Komponen yang Disiapkan
DH = Jumlah Komponen yang Diharapkan
3. Efisiensi Mesin
Efisiensi Mesin = Kapasitas Mesin x % Efisiensi Mesin
- Efisiensi Mesin (O-1) = 240 x 75% = 180 Unit / Jam
- Efisiensi Mesin (O-2) = 144 x 75% = 108 Unit / Jam
- Efisiensi Mesin (O-3) = 120 x 75% = 90 Unit / Jam
Keterangan: % Efisiensi Mesin = 75%
4. Jumlah Mesin Teoritis
Jumlah Komponen yang Disiapkan
Jumlah Mesin Teoritis =
Efisiensi Mesin
71
- Jumlah Mesin Teoritis (O-1) = = 0,39
180
69
- Jumlah Mesin Teoritis (O-2) = = 0,64
108
67
- Jumlah Mesin Teoritis (O-3) = = 0,74
90
7,92
60 O-9 Meja Perakitan = 7,92 8 8
Inspeksi dan
Assembly 8,75
70 O-14 Meja Perakitan = 8,75 9 9
1,24
80 I-4 Meja Periksa = 1,24 2 2
1,65
Packaging 90 O-15 Meja Pengemasan = 1,65 2 2
Storage
Total 47
Contoh Perhitungan:
1. Jumlah Mesin Teoritis
Jumlah Mesin Teoritis = Total Jumlah dari Nilai Mesin Teoritis dari Setiap
Work Center
- Jumlah Mesin Teoritis (Mesin Potong) = 1,32 + 1,32 + 1,32 = 3,97
- Jumlah Mesin Teoritis (Mesin Cetak) = 1,85 + 1,85 + 1,85 = 5,54
- Jumlah Mesin Teoritis (Mesin Pendingin) = 2,22 + 2,22 + 2,22 = 6,65
2. Jumlah Mesin Aktual
Jumlah Mesin Aktual = RoundUp (Jumlah Mesin Teoritis)
- Jumlah Mesin Aktual (Mesin Potong) = RoundUp (3,97) ≈ 4
- Jumlah Mesin Aktual (Mesin Cetak) = RoundUp (5,54) ≈ 6
- Jumlah Mesin Aktual (Mesin Pendingin) = RoundUp (6,65) ≈ 7
Efisiensi Mesin yang didapat dari perhitungan Kapasitas Mesin Teoritis dikali
dengan nilai efisiensi mesin sebesar 75%, angka 75 % ini dikarenakan setiap
mesin tidak akan bekerja secara terus-menerus dalam kondisi bagus (100%) dan
setiap mesin pasti akan mengalami kondisi yang tidak ideal atau perlu
maintenance, maka dari itu ditetapkan asumsi efisiensi mesin sebesar 75 %. Lalu
menghitung Jumlah Mesin Teoritis yang didapat dari perhitungan Jumlah
Komponen Disiapkan dibagi dengan Efisiensi Mesin. Terakhir dalam perhitungan
Routing Sheet ini adalah menghitung Total Mesin Teoritis Case Handphone dan
Case Tablet, dengan cara menjumlahkan Jumlah Mesin Teoritis Case Handphone
dan Jumlah Mesin Teoritis Case Tablet.
Selanjutnya masuk dalam perhitungan Multi Product Process Chart
(MPPC), pertama membuat tabel Multi Product Process Chart (MPPC) terlebih
dahulu. Tabel tersebut berisikan Proses, Work Center, Komponen, Jumlah Mesin
Teoritis, Jumlah Mesin Aktual, dan Total Mesin. Pada PT. Adya Mavendra
terdapat 9 Work Center, diantaranya WC-10 hingga WC-90. Dari keseluruhan
Work Center tersebut dibagi menjadi tiga bagian yaitu Fabrikasi dimulai dari WC-
10 sampai WC-40, lalu Inspeksi dan Assembly dimulai dari WC-50 sampai WC-
80, dan Packaging hanya pada WC-90. Tabel Multi Product Process Chart
(MPPC) urutan prosesnya diliat dari Operation Process Chart (OPC), dan Multi
Product Process Chart (MPPC) akan mencari Jumlah Mesin Teoritis yang
didapatkan dari hasil perhitungan dan pembulatan, untuk mendapatkan jumlah
mesin teoritis dengan menggunakan rumus total penjumlahan dari keseluruhan
nilai mesin teoritis dari setiap Work Center.
Dari tabel Multi Product Process Chart (MPPC) didapat hasil Jumlah
Mesin Aktual yang dibutuhkan dari setiap Work Center. Setelah dihitung dan
dibulatkan ke atas didapatkan hasil, diantaranya pada WC-10 membutuhkan 4
Mesin Potong, pada WC-20 membutuhkan 6 Mesin Cetak, pada WC-30
membutuhkan 7 Mesin Pendingin, pada WC-40 membutuhkan 7 Mesin
Penghalusan, pada WC-50 dan WC-80 masing-masing membutuhkan 2 Meja
Periksa, pada WC-60 membutuhkan 8 Meja Perakitan, pada WC-70
membutuhkan 9 Meja Perakitan, dan pada WC-90 membutuhkan 2 Meja
Pengemasan. Setelah itu ditotalkan dan mendapatkan hasil dengan Jumlah Mesin
Praktikum Perancangan Sistem Industri 2 167
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
7,92
60 O-9 Meja Perakitan = 7,92 8 8
Inspeksi dan
Assembly 8,75
70 O-14 Meja Perakitan = 8,75 9 9
1,24
80 I-4 Meja Periksa = 1,24 2 2
1,65
Packaging 90 O-15 Meja Pengemasan = 1,65 2 2
Storage
Total 47
Contoh Perhitungan:
1. Berat Pakai
Ukuran T erima ( p x l x t ) x Berat T erima
Berat Pakai =
Ukuran Pakai ( p x l x t )
- Badan Case (BCH-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,04 Kg
( 15,2 x 7,65 x 0,2 )
- Dudukan Speaker (DSH-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,01 Kg
3 x 3 x 0,2
- Airpods Receptacle (ARH-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,01 Kg
( 5,55 x 4,85 x 0,2 )
Tabel 3.149 Ukuran Komponen Tambahan yang Diterima dan Dipakai Case Handphone
Ukuran Komponen Tambahan Aircase Handphone
Kode Ukuran Terima (cm) Berat Berat Pakai Komponen / Unit /
Nama Komponen Tipe Bahan
Komponen P L T Ø Terima (Kg) (Kg/Produk) Produk Kemasan
WSH-02 Wireless Speaker Bluetooth Speaker 15 15 4,5 1 0,1 1 10
STH-02 Sticker Vynil 29,7 21 1 0,25 0,025 1 10
DPH-01 Dus Packing Kardus 40 40 20 2,5 0,05 1 50
BWH-01 Bubble Wrap Bubble Wrap 100 30 0,2 0,5 0,05 1 10
LEH-01 Lem UHU Lem UHU 20,5 7,5 2,5 0,3 0,1 3 10
Contoh Perhitungan:
1. Berat Pakai (Kg/Produk)
Berat Terima
Berat Pakai = x Komponen / Produk
Unit / Kemasan
- Wireless Speaker (WSH-02)
1
Berat Pakai = x 1 = 0,1 Kg/Produk
10
Tabel 3.150 Ukuran Komponen Utama yang Diterima dan Dipakai Case Tablet
Ukuran Komponen Utama Aircase Tablet
Berat
Kode Ukuran Terima (cm) Ukuran Pakai (cm) Berat
Nama Komponen Tipe Bahan Terima
Komponen Pakai
P L T Ø P L T Ø (Kg)
BCT-03 Badan Case Polycarbonate 20 20 2 19,65 13,6 0,2 1,2 0,09
DST-03 Dudukan Speaker Polycarbonate 20 20 2 3 3 0,2 1,2 0,01
ART-02 Airpods Receptacle Polycarbonate 20 20 2 5,55 4,85 0,2 1,2 0,01
Contoh Perhitungan:
1. Berat Pakai
Ukuran T erima ( p x l x t ) x Berat T erima
Berat Pakai =
Ukuran Pakai ( p x l x t )
- Badan Case (BCT-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,09 Kg
( 19,65 x 13,6 x 0,2)
- Dudukan Speaker (DST-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,01 Kg
3 x 3 x 0,2
- Airpods Receptacle (ART-03)
( 20 x 20 x 2 ) x 1,2
Berat Pakai = = 0,01 Kg
( 5,55 x 4,85 x 0,2 )
Tabel 3.151 Ukuran Komponen Tambahan yang Diterima dan Dipakai Case Tablet
Ukuran Komponen Tambahan Aircase Tablet
Kode Ukuran Terima (cm) Berat Berat Pakai Komponen / Unit /
Nama Komponen Tipe Bahan
Komponen P L T Ø Terima (Kg) (Kg/Produk) Produk Kemasan
WST-02 Wireless Speaker Bluetooth Speaker 15 15 4,5 1 0,1 1 10
STT-02 Sticker Vynil 29,7 21 1 0,25 0,025 1 10
DPT-01 Dus Packing Kardus 50 50 20 2,5 0,05 1 50
BWT-01 Bubble Wrap Bubble Wrap 100 30 0,2 0,5 0,05 1 10
LET-01 Lem UHU Lem UHU 20,5 7,5 2,5 0,3 0,1 3 10
Contoh Perhitungan:
1. Berat Pakai (Kg/Produk)
Berat Terima
Berat Pakai = x Komponen / Produk
Unit / Kemasan
Contoh Perhitungan:
1. Jumlah Potongan
( PP (Rak Receiving )
(Ukuran Terima ) ) x(
L (Rak Receiving )
L (Ukuran Terima ) ) x(
T (Ukuran Terima ) )
T (Rak Receiving )
4. Kebutuhan Rak
Material 2 M inggu
Kebutuhan Rak =
Kapasitas Rak
Total Luas = 3 + 12 = 15 m2
- Airpods Receptacle (ARH-02)
Total Luas = 3 + 12 = 15 m2
Contoh Perhitungan:
1. Jumlah Potongan
Unit / Kemasan
Jumlah Potongan =
Komponen / Produk
- Wireless Speaker (WSH-02)
10
Jumlah Potongan = =10 Unit
1
- Sticker (STH-02)
10
Jumlah Potongan = =10 Unit
1
- Dus Packing (DPH-01)
50
Jumlah Potongan = =50 Unit
1
2. Material 2 Minggu
Komponen Disiapkan / J am
Material 2 Minggu = x (8 x 5 x 2)
Jumlah Potongan
- Wireless Speaker (WSH-02)
157
Material 2 Minggu = x ( 8 x 5 x 2 ) = 1280 Unit
10
- Sticker (STH-02)
157
Material 2 Minggu = x ( 8 x 5 x 2 ) = 1280 Unit
10
- Dus Packing (DPH-01)
157
Material 2 Minggu = x ( 8 x 5 x 2 ) = 320 Unit
50
Keterangan:
( PP (Rak
(Ukuran Terima ) ) (L (Ukuran Terima ) ) ( T (Ukuran Terima ) )
Receiving )
x
L (Rak Receiving )
x
T (Rak Receiving )
- Sticker (STH-02)
4. Kebutuhan Rak
Material 2 M inggu
Kebutuhan Rak =
Kapasitas Rak
- Wireless Speaker (WSH-02)
1280
Kebutuhan Rak = = 1 Rak
2816
- Sticker (STH-02)
1280
Kebutuhan Rak = = 1 Rak
4000
- Dus Packing (DPH-01)
320
Kebutuhan Rak = = 4 Rak
90
5. Luas Lantai
Kebutuhan Rak
Luas Lantai = x Luas Rak Receiving
Tump u kan Rak
- Wireless Speaker (WSH-02)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Sticker (STH-02)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Dus Packing (DPH-01)
4
Luas Lantai = x 2,9768 = 6 m 2
3
6. Allowance Luas (400%)
Allowance Luas = Luas Lantai x Allowance
- Wireless Speaker (WSH-02)
Allowance Luas = 3 x 400 % = 12 m2
- Sticker (STH-02)
Allowance Luas = 3 x 400 % = 12 m2
- Dus Packing (DPH-01)
Allowance Luas = 6 x 400 % = 24 m2
7. Total Luas
Total Luas = Luas Lantai + Allowance Luas
- Wireless Speaker (WSH-02)
Total Luas = 3 + 12 = 15 m2
- Sticker (STH-02)
Total Luas = 3 + 12 = 15 m2
- Dus Packing (DPH-01)
Total Luas = 6 + 24 = 30 m2
Contoh Perhitungan:
1. Jumlah Potongan
( PP (Rak Receiving )
(Ukuran Terima ) ) x(
L (Rak Receiving )
L (Ukuran Terima ) ) x(
T (Ukuran Terima ) )
T (Rak Receiving )
4. Kebutuhan Rak
Material 2 M inggu
Kebutuhan Rak =
Kapasitas Rak
- Badan Case (BCT-03)
640
Kebutuhan Rak = = 1 Rak
3600
- Dudukan Speaker (DST-03)
80
Kebutuhan Rak = = 1 Rak
3600
- Airpods Receptacle (ART-02)
80
Kebutuhan Rak = = 1 Rak
3600
5. Luas Lantai
Kebutuhan Rak
Luas Lantai = x Luas Rak Receiving
Tump u kan Rak
- Badan Case (BCT-03)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Dudukan Speaker (DST-03)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Airpods Receptacle (ART-02)
1
Luas Lantai = x 2,9768 = 3 m 2
3
6. Allowance Luas (400%)
Allowance Luas = Luas Lantai x Allowance
- Badan Case (BCT-03)
Allowance Luas = 3 x 400 % = 12 m2
- Dudukan Speaker (DST-03)
Allowance Luas = 3 x 400 % = 12 m2
Praktikum Perancangan Sistem Industri 2 191
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Jumlah Potongan
Unit / Kemasan
Jumlah Potongan =
Komponen / Produk
- Wireless Speaker (WST-02)
10
Jumlah Potongan = =10 Unit
1
- Sticker (STT-02)
10
Jumlah Potongan = =10 Unit
1
- Dus Packing (DPT-01)
50
Jumlah Potongan = =50 Unit
1
2. Material 2 Minggu
Komponen Disiapkan / J am
Material 2 Minggu = x (8 x 5 x 2)
Jumlah Potongan
- Wireless Speaker (WST-02)
66
Material 2 Minggu = x ( 8 x 5 x 2 ) = 560 Unit
10
- Sticker (STT-02)
66
Material 2 Minggu = x ( 8 x 5 x 2 ) = 560 Unit
10
- Dus Packing (DPT-01)
66
Material 2 Minggu = x ( 8 x 5 x 2 ) = 160 Unit
50
Keterangan:
- Jam Kerja = 8 Jam
- Hari Kerja (Minggu) = 5 Hari
- Minggu = 2 Minggu
3. Kapasitas Rak
Kapasitas Rak =
( PP (Rak
(Ukuran Terima ) ) (L (Ukuran Terima ) ) ( T (Ukuran Terima ) )
Receiving )
x
L (Rak Receiving )
x
T (Rak Receiving )
- Sticker (STT-02)
4. Kebutuhan Rak
Material 2 M inggu
Kebutuhan Rak =
Kapasitas Rak
- Wireless Speaker (WST-02)
560
Kebutuhan Rak = = 1 Rak
2816
- Sticker (STT-02)
560
Kebutuhan Rak = = 1 Rak
4000
5. Luas Lantai
Kebutuhan Rak
Luas Lantai = x Luas Rak Receiving
Tump u kan Rak
- Wireless Speaker (WST-02)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Sticker (STT-02)
1
Luas Lantai = x 2,9768 = 3 m 2
3
- Dus Packing (DPT-01)
4
Luas Lantai = x 2,9768 = 6 m 2
3
6. Allowance Luas (400%)
Allowance Luas = Luas Lantai x Allowance
- Wireless Speaker (WST-02)
Allowance Luas = 3 x 400 % = 12 m2
- Sticker (STT-02)
Allowance Luas = 3 x 400 % = 12 m2
- Dus Packing (DPT-01)
Allowance Luas = 6 x 400 % = 24 m2
7. Total Luas
Total Luas = Luas Lantai + Allowance Luas
- Wireless Speaker (WST-02)
Total Luas = 3 + 12 = 15 m2
- Sticker (STH-02)
Total Luas = 3 + 12 = 15 m2
- Dus Packing (DPT-01)
Total Luas = 6 + 24 = 30 m2
Contoh Perhitungan:
1. Kebutuhan Rak
Kebutuhan Rak = Kebutuhan Rak Produk Case Handphone + Kebutuhan Rak
Produk Case Tablet
- Badan Case (BCH-03 & BCT-03)
Kebutuhan Rak = 1 + 1 = 2 Unit
- Dudukan Speaker (DSH-03 & DST-03)
Kebutuhan Rak = 1 + 1 = 2 Unit
- Airpods Receptacle (ARH-02 & ART-03)
Kebutuhan Rak = 1 + 1 = 2 Unit
2. Luas Lantai
Luas Lantai = Luas Lantai Produk Case Handphone + Luas Lantai Produk
Case Tablet
- Badan Case (BCH-03 & BCT-03)
Luas Lantai = 3 + 3 = 6 m2
- Dudukan Speaker (DSH-03 & DST-03)
Luas Lantai = 3 + 3 = 6 m2
- Airpods Receptacle (ARH-02 & ART-03)
Luas Lantai = 3 + 3 = 6 m2
3. Allowance Luas (400%)
Allowance Luas = Allowance Luas Produk Case Handphone + Allowance
Luas Produk Case Tablet
- Badan Case (BCH-03 & BCT-03)
Allowance Luas = 12 + 12 = 24 m2
- Dudukan Speaker (DSH-03 & DST-03)
Allowance Luas = 12 + 12 = 24 m2
- Airpods Receptacle (ARH-02 & ART-03)
Praktikum Perancangan Sistem Industri 2 196
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Allowance Luas = 12 + 12 = 24 m2
4. Total Luas
Total Luas = Total Luas Produk Case Handphone + Total Luas Produk Case
Tablet
- Badan Case (BCH-03 & BCT-03)
Total Luas = 15 + 15 = 30 m2
- Dudukan Speaker (DSH-03 & DST-03)
Total Luas = 15 + 15 = 30 m2
- Airpods Receptacle (ARH-02 & ART-03)
Total Luas = 15 + 15 = 30 m2
5. Total Luas Lantai Komponen Utama
Total Luas Lantai = Jumlah Total Luas
Total Luas Lantai = 30 + 30 + 30
Total Luas Lantai = 90 m2
Contoh Perhitungan:
1. Kebutuhan Rak
Kebutuhan Rak = Kebutuhan Rak Produk Case Handphone + Kebutuhan Rak
Produk Case Tablet
- Wireless Speaker (WSH-02 & WST-02)
Kebutuhan Rak = 1 + 1 = 2 Unit
- Sticker (STH-02 & STT-02)
Kebutuhan Rak = 1 + 1 = 2 Unit
- Dus Packing (DPH-01 & DPT-01)
Kebutuhan Rak = 4 + 4 = 2 Unit
2. Luas Lantai
Praktikum Perancangan Sistem Industri 2 197
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Luas Lantai = Luas Lantai Produk Case Handphone + Luas Lantai Produk
Case Tablet
- Wireless Speaker (WSH-02 & WST-02)
Luas Lantai = 3 + 3 = 6 m2
- Sticker (STH-02 & STT-02)
Luas Lantai = 3 + 3 = 6 m2
- Dus Packing (DPH-01 & DPT-01)
Luas Lantai = 6 + 6 = 12 m2
3. Allowance Luas (400%)
Allowance Luas = Allowance Luas Produk Case Handphone + Allowance
Luas Produk Case Tablet
- Wireless Speaker (WSH-02 & WST-02)
Allowance Luas = 12 + 12 = 24 m2
- Sticker (STH-02 & STT-02)
Allowance Luas = 12 + 12 = 24 m2
- Dus Packing (DPH-01 & DPT-01)
Allowance Luas = 24 + 24 = 48 m2
4. Total Luas
Total Luas = Total Luas Produk Case Handphone + Total Luas Produk Case
Tablet
- Wireless Speaker (WSH-02 & WST-02)
Total Luas = 15 + 15 = 30 m2
- Sticker (STH-02 & STT-02)
Total Luas = 15 + 15 = 30 m2
- Dus Packing (DPH-01 & DPT-01)
Total Luas = 30 + 30 = 60 m2
5. Total Luas Lantai Komponen Tambahan
Total Luas Lantai = Jumlah Total Luas
Total Luas Lantai = 30 + 30 + 60 + 30 + 30
Total Luas Lantai = 180 m2
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pencetakan x 2
Jumlah Mesin = 4 x 2 = 8 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Pemotongan) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Pemotongan) = 4 x 4 = 16 m2
- Luas Mesin Keseluruhan (Disimpan) = 8 x 1 = 8 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (16 + 8) x 700%
Luas Allowance (700%) = 168 m2
5. Total Luas
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pencetakan x 2
Jumlah Mesin = 6 x 2 = 12 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Pencetakan) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Pencetakan) = 6 x 4 = 24 m2
- Luas Mesin Keseluruhan (Disimpan) = 12 x 1 = 12 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (24 + 12) x 700%
Luas Allowance (700%) = 252 m2
5. Total Luas
Total Luas = Luas Mesin Keseluruhan + Luas Allowance
Total Luas = (24 + 12) + 252
Total Luas = 288 m2
WC 30
Luas Mesin Luas
Nomor Operasi Operasi Nama Mesin Jumlah Mesin Ukuran (m2) Luas Mesin Allowance Total Luas
Keseluruhan Allowance
O-3, O-7, & O-12 Pendinginan Mesin Pendingin 7 2 x 2 4 28
700% 294 336
Disimpan Storage 14 1 x 1 1 14
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pendinginan x 2
Jumlah Mesin = 7 x 2 = 14 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Pendinginan) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Pendinginan) = 7 x 4 = 28 m2
- Luas Mesin Keseluruhan (Disimpan) = 14 x 1 = 14 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (28 + 14) x 700%
Luas Allowance (700%) = 294 m2
5. Total Luas
Total Luas = Luas Mesin Keseluruhan + Luas Allowance
Total Luas = (28 + 14) + 294
Total Luas = 336 m2
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Penghalusan x 2
Jumlah Mesin = 7 x 2 = 14 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Penghalusan) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Penghalusan) = 7 x 4 = 28 m2
- Luas Mesin Keseluruhan (Disimpan) = 14 x 1 = 14 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (28 + 14) x 700%
Luas Allowance (700%) = 294 m2
5. Total Luas
Total Luas = Luas Mesin Keseluruhan + Luas Allowance
Total Luas = (28 + 14) + 294
Total Luas = 336 m2
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pemeriksaan 1 x 2
Jumlah Mesin = 2 x 2 = 4 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Pemeriksaan 1) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Pemeriksaan 1) = 2 x 4 = 8 m2
Praktikum Perancangan Sistem Industri 2 202
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Assembly 1 x 2
Jumlah Mesin = 8 x 2 = 16 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Assembly 1) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Assembly 1) = 8 x 4 = 32 m2
- Luas Mesin Keseluruhan (Disimpan) = 16 x 1 = 16 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (32 + 16) x 700%
Luas Allowance (700%) = 336 m2
5. Total Luas
Praktikum Perancangan Sistem Industri 2 203
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Assembly 2 x 2
Jumlah Mesin = 9 x 2 = 18 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Assembly 2) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Assembly 2) = 9 x 4 = 36 m2
- Luas Mesin Keseluruhan (Disimpan) = 18 x 1 = 18 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (36 + 18) x 700%
Luas Allowance (700%) = 378 m2
5. Total Luas
Total Luas = Luas Mesin Keseluruhan + Luas Allowance
Total Luas = (36 + 18) + 378
Total Luas = 432 m2
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pemeriksaan 1 x 2
Jumlah Mesin = 2 x 2 = 4 Unit
Keterangan: Storage In dan Storage Out = 2 Buah
2. Luas Mesin
Luas Mesin (Operasi) = Ukuran P x L
- Luas Mesin (Pemeriksaan 2) = 2 x 2 = 4 m2
- Luas Mesin (Disimpan) = 1 x 1 = 2 m2
3. Luas Mesin Keseluruhan
Luas Mesin Keseluruhan (Operasi) = Jumlah Mesin x Luas Mesin
- Luas Mesin Keseluruhan (Pemeriksaan 2) = 2 x 4 = 8 m2
- Luas Mesin Keseluruhan (Disimpan) = 4 x 1 = 4 m2
4. Luas Allowance (700%)
Luas Allowance (700%) = Luas Mesin Keseluruhan x Allowance
Luas Allowance (700%) = (8 + 4) x 700%
Luas Allowance (700%) = 84 m2
5. Total Luas
Total Luas = Luas Mesin Keseluruhan + Luas Allowance
Total Luas = (8 + 4) + 84
Total Luas = 96 m2
Contoh Perhitungan:
1. Jumlah Mesin (Storage)
Jumlah Mesin = Jumlah Mesin Pemeriksaan 1 x 2
Jumlah Mesin = 2 x 2 = 4 Unit
Praktikum Perancangan Sistem Industri 2 205
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Produk 4 Minggu
Produk 4 Minggu = KPT Case Handphone x (8 x 5 x 4)
Produk 4 Minggu = 157 x (8 x 5 x 4)
Produk 4 Minggu = 25120 Unit
Keterangan:
- Jam Kerja = 8 Jam
- Hari Kerja (Minggu) = 5 Hari
- Minggu = 4 Minggu
2. Jumlah Kemasan 4 Minggu
Jumlah Kemasan 4 Minggu = Produk 4 Minggu x Jumlah Produk / Kemasan
Jumlah Kemasan 4 Minggu = 25120 x 1
Jumlah Kemasan 4 Minggu = 25120 Unit
3. Kapasitas Rak
Kapasitas Rak =
( PP (Rak Shipping )
(Ukuran Kemasan ) ) x(
L (Rak Shipping )
L (Ukuran Kemasan ) ) x(
T (Ukuran Kemasan ) )
T (Rak Shipping )
Kapasitas Rak = ( ) x( ) x(
5 )
488 122 100
16 10,5
Kapasitas Rak = 6600 Unit
4. Kebutuhan Rak
Jumlah Kemasan 4 Minggu
Kebutuhan Rak =
Kapasitas Rak
25120
Kebutuhan Rak =
6600
Kebutuhan Rak = 4 Rak
5. Luas Lantai
Kebutuhan Rak
Luas Lantai = x Luas Rak Shipping
Tump u kan Rak
4
Luas Lantai = x 5,9536
3
Luas Lantai = 12 m2
6. Luas Allowance (400%)
Luas Allowance = Luas Lantai x Allowance
Luas Allowance = 12 x 400%
Luas Allowance = 48 m2
7. Total Luas
Total Luas = Luas Lantai + Luas Allowance
Total Luas = 12 + 48
Total Luas = 60 m2
Contoh Perhitungan:
1. Produk 4 Minggu
Produk 4 Minggu = KPT Case Tablet x (8 x 5 x 4)
Produk 4 Minggu = 157 x (8 x 5 x 4)
Produk 4 Minggu = 10560 Unit
Keterangan:
- Jam Kerja = 8 Jam
- Hari Kerja (Minggu) = 5 Hari
- Minggu = 4 Minggu
2. Jumlah Kemasan 4 Minggu
Jumlah Kemasan 4 Minggu = Produk 4 Minggu x Jumlah Produk / Kemasan
Jumlah Kemasan 4 Minggu = 10560 x 1
Jumlah Kemasan 4 Minggu = 10560 Unit
3. Kapasitas Rak
Kapasitas Rak =
( PP (Rak Shipping )
(Ukuran Kemasan ) ) x(
L (Rak Shipping )
L (Ukuran Kemasan ) ) x(
T (Ukuran Kemasan ) )
T (Rak Shipping )
Kapasitas Rak = ( ) x( ) x(
5 )
488 122 100
20 20
Kapasitas Rak = 2880 Unit
4. Kebutuhan Rak
Jumlah Kemasan 4 Minggu
Kebutuhan Rak =
Kapasitas Rak
10560
Kebutuhan Rak =
2880
Kebutuhan Rak = 4 Rak
5. Luas Lantai
Kebutuhan Rak
Luas Lantai = x Luas Rak Shipping
Tump u kan Rak
4
Luas Lantai = x 5,9536
3
Luas Lantai = 12 m2
6. Luas Allowance (400%)
Luas Allowance = Luas Lantai x Allowance
Luas Allowance = 12 x 400%
Luas Allowance = 48 m2
7. Total Luas
Total Luas = Luas Lantai + Luas Allowance
Total Luas = 12 + 48
Total Luas = 60 m2
Contoh Perhitungan:
1. Total Luas Shipping Case Handphone dan Case Tablet
Total Luas Shipping = Total Luas Case Handphone + Total Luas Case Tablet
Total Luas Shipping = 60 + 60
Total Luas Shipping = 120 m2
Contoh Perhitungan:
1. Luas
Luas = Jumlah Ruangan x P x L
- Toilet Pria
Luas = 4 x 2 x 1 = 8 m2
- Toilet Wanita
Luas = 4 x 2 x 1 = 8 m2
- Locker Room Pria
Luas = 1 x 3 x 2 = 6 m2
2. Luas Allowance
Luas Allowance = Luas x Allowance
- Toilet Pria
Luas Allowance = 8 x 50% = 4 m2
- Toilet Wanita
Luas Allowance = 8 x 50% = 4 m2
- Locker Room Pria
Luas Allowance = 6 x 50% = 3 m2
3. Total Luas
Total Luas = Luas + Luas Allowance
- Toilet Pria
Total Luas = 8 + 4 = 12 m2
- Toilet Wanita
Total Luas = 8 + 4 = 12 m2
- Locker Room Pria
Total Luas = 6 + 3 = 9 m2
Praktikum Perancangan Sistem Industri 2 212
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Luas
Luas = Jumlah Ruangan x P x L
- Toilet Wanita
Luas = 3 x 2 x 1 = 6 m2
- Toilet Pria
Luas = 3 x 2 x 1 = 6 m2
- Masjid
Luas = 1 x 12 x 10 = 120 m2
2. Luas Allowance
Luas Allowance = Luas x Allowance
- Toilet Wanita
Luas Allowance = 6 x 50% = 3 m2
- Toilet Pria
Luas Allowance = 6 x 50% = 3 m2
- Masjid
Luas Allowance = 120 x 50% = 60 m2
3. Total Luas
Total Luas = Luas + Luas Allowance
- Toilet Wanita
Total Luas = 6 + 3 = 9 m2
- Toilet Pria
Total Luas = 6 + 3 = 9 m2
Praktikum Perancangan Sistem Industri 2 213
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
- Masjid
Total Luas = 120 + 60 = 180 m2
Contoh Perhitungan:
1. Luas
Luas = Jumlah Ruangan x P x L
- Lobby & Receptionist
Luas = 1 x 6 x 5 = 30 m2
- Ruang Meeting / Rapat
Luas = 2 x 5 x 4 = 40 m2
- Toilet Pria
Luas = 2 x 2 x 1 = 4 m2
2. Luas Allowance
Luas Allowance = Luas x Allowance
- Lobby & Receptionist
Luas Allowance = 30 x 50% = 15 m2
- Ruang Meeting / Rapat
Luas Allowance = 40 x 50% = 20 m2
- Toilet Pria
Luas Allowance = 4 x 50% = 2 m2
3. Total Luas
Total Luas = Luas + Luas Allowance
- Lobby & Receptionist
Total Luas = 30 + 15 = 45 m2
- Ruang Meeting / Rapat
Total Luas = 40 + 20 = 60 m2
- Toilet Pria
Total Luas = 4 + 2 = 6 m2
Contoh Perhitungan:
1. Luas
Luas = Jumlah Ruangan x P x L
- Ruang Direktur Utama
Luas = 1 x 9 x 9 = 81 m2
- Ruang Sekretaris
Luas = 1 x 5 x 4 = 20 m2
- Ruang Manager Keuangan
Luas = 1 x 7 x 5 = 35 m2
2. Luas Allowance
Luas Allowance = Luas x Allowance
- Ruang Direktur Utama
Luas Allowance = 81 x 50% = 40,5 m2
- Ruang Sekretaris
Luas Allowance = 20 x 50% = 10 m2
- Ruang Manager Keuangan
Luas Allowance = 35 x 50% = 17,5 m2
3. Total Luas
Total Luas = Luas + Luas Allowance
Praktikum Perancangan Sistem Industri 2 215
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Case Handphone sebesar 25120 unit, jumlah produk atau kemasan sebanyak 1
unit, jumlah kemasan 4 minggu sebesar 25120 unit dengan kapasitas rak sebesar
6600 unit, kebutuhan rak sebesar 4 rak, luas lantai 12 m2, luas allowance sebesar
48 m2 dari 400 % dan didapatkan total luas sebesar 60 m 2. Setelah perhitungan
selesai, selanjutnya membuat tabel Total Luas Shipping Case Handphone dan
Case Tablet, maka dari itu didapatkan hasil untuk Aircase Handphone sebesar 60
m2 dan Aircase Tablet sebesar 60 m2, dijumlahkan menjadi sebesar 120 m2.
Selanjutnya menghitung Luas Lantai Fasilitas dan Perkantoran, terdapat 4
jenis luas lantai. Pertama Luas Lantai Fasilitas Non Perkantoran (Dalam Pabrik),
kedua Luas Lantai Fasilitas Non Perkantoran (Luar Pabrik), ketiga Luas Lantai
Fasilitas Perkantoran, dan keempat Luas Lantai Fasilitas Ruangan Perkantoran.
Setelah itu, menentukan ruangan-ruangan yang dibutuhkan, jumlah ruangan,
ukuran ruangan, allowance, luas allowance, dan total luasnya. Setelah melakukan
perhitungan didapatkan hasil, untuk luas lantai fasilitas non perkantoran (dalam
pabrik) didapatkan total luas sebesar 70.5 m2, luas lantai fasilitas non perkantoran
(luar pabrik) didapatkan total luas sebesar 2298 m2, luas lantai fasilitas
perkantoran didapatkan total luas sebesar 183 m2, dan luas lantai fasilitas ruangan
perkantoran didapatkan total luas sebesar 735 m2. Jadi, total keseluruhannya
sebesar 3277,5 m2.
Langkah terakhir membuat rekapan hasil perhitungan setiap luas lantai,
untuk Luas Lantai Receiving didapatkan total luasnya sebesar 270 m2, untuk Luas
Lantai Fabrikasi didapatkan total luasnya sebesar 2256 m2, untuk Luas Lantai
Shipping didapatkan total luasnya sebesar 120 m2, untuk Luas Lantai Fasilitas dan
Perkantoran didapatkan total luasnya sebesar 3277,5 m2, dan menurut kebijakan
PEMPRES No. 6 setiap pabrik itu harus mempunyai lahan hijau sebesar 30%,
maka dari itu untuk perhitungan lahan hijau yaitu total keseluruhan Luas Lantai
Taman dan Lahan Hijau didapatkan total luasnya sebesar 1777,05 m2. Jadi, Luas
Lantai yang dibutuhkan oleh perusahaan PT. Adya Mavendra adalah sebanyak
7700,55 m2.
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 465
4 30
Total 16 495
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 550
4 30
Total 16 580
7,92
60 O-9 Meja Perakitan = 7,92 8 8
Inspeksi dan
Assembly 8,75
70 O-14 Meja Perakitan = 8,75 9 9
1,24
80 I-4 Meja Periksa = 1,24 2 2
1,65
Packaging 90 O-15 Meja Pengemasan = 1,65 2 2
Storage
Total 47
Contoh Perhitungan:
1. Berat Total
- Dari Receiving ke Work Center 10 (Badan Case)
Tabel 3.191 Ongkos Material Handling (OMH) Awal Produk Case Tablet
Total Ongkos Material Handling Awal Case Tablet
Produksi /
Dari Ke Nama Komponen Berat Pakai Berat Total Alat Angkut OMH Jarak (m) Total Ongkos
Jam
Badan Case 71 0,09 7,2
WC-10 Dudukan Speaker 71 0,01 1,2
Tenaga Manusia Rp 100 15,14 Rp 1.514
Airpods Receptacle 71 0,01 1,2
Total 9,6
WC-60 Lem UHU 66 0,1 6
Tenaga Manusia Rp 100 18,01 Rp 1.801
Total 6
Wireless Speaker 66 0,1 7
Receiving
WC-70 Sticker 66 0,03 1,75
Tenaga Manusia Rp 100 18,61 Rp 1.861
Lem UHU 66 0,1 6
Total 14,75
Dus Packing 66 0,05 5
WC-90 Bubble Wrap 66 0,05 3,5
Tenaga Manusia Rp 100 13,11 Rp 1.311
Lem UHU 66 0,1 6
Total 14,5
Badan Case 71 0,09 6,39
WC-20 Dudukan Speaker 71 0,01 0,71
WC-10 Tenaga Manusia Rp 100 15,41 Rp 1.541
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-30 Dudukan Speaker 71 0,01 0,71
WC-20 Tenaga Manusia Rp 100 17,65 Rp 1.765
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-40 Dudukan Speaker 71 0,01 0,71
WC-30 Tenaga Manusia Rp 100 18,33 Rp 1.833
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-50 Dudukan Speaker 71 0,01 0,71
WC-40 Tenaga Manusia Rp 100 18,33 Rp 1.833
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-60
Dudukan Speaker 71 0,01 0,71 Tenaga Manusia Rp 100 14,70 Rp 1.470
WC-50 Total 7,1
WC-70 Airpods Receptacle 71 0,01 0,71
Tenaga Manusia Rp 100 15,29 Rp 1.529
Total 0,71
Hasil Assembly 1 66 0,1 6,6
WC-70
WC-60 Lem UHU 66 0,1 5,94 Tenaga Manusia Rp 100 20,19 Rp 2.019
Total 12,54
Hasil Assembly 2 66 0,2 12,54
Wireless Speaker 66 0,1 6,6
WC-80
WC-70 Sticker 66 0,025 1,65 Walkey Fallet Rp 200 15,29 Rp 3.058
Lem UHU 66 0,1 5,94
Total 26,73
WC-90 Hasil Assembly 2 66 0,4 27,39
WC-80 Walkey Fallet Rp 200 9,80 Rp 1.960
Total 27,39
Dus Packing 66 0,05 3,3
Bubble Wrap 66 0,05 3,3
Shipping
WC-90 Lem UHU 66 0,1 5,94 Forklift Rp 250 10,38 Rp 2.594
Aircase Handphone 66 0,6 39,93
Total 52,47
Contoh Perhitungan:
1. Berat Total
- Dari Receiving ke Work Center 10 (Badan Case)
Contoh Perhitungan:
1. From To Chart
- Dari Receiving ke Work Center 10
FTC = Total Ongkos OMH Case Handphone dari Receiving ke Work
Center 10 + Total Ongkos OMH Case Tablet dari Receiving ke
Work Center 10
FTC = Rp 1.514 + Rp 1.514
FTC = Rp 3.029
- Dari Receiving ke Work Center 60
FTC = Total Ongkos OMH Case Handphone dari Receiving ke Work
Center 60 + Total Ongkos OMH Case Tablet dari Receiving ke
Work Center 60
FTC = Rp 1.801 + Rp 1.801
FTC = Rp 3.603
- Dari Receiving ke Work Center 70
Contoh Perhitungan:
1. In Flow
- Dari Receiving ke Work Center 10
Ongkos Penimbangan FTC
In Flow =
Total Ongkos Penimbangan Horizontal
Rp 3.029
In Flow =
Rp 3.029
In Flow = 1
- Dari Receiving ke Work Center 60
Ongkos Penimbangan FTC
In Flow =
Total Ongkos Penimbangan Horizontal
Rp 3.603
In Flow =
Rp 6.542
In Flow = 0,55
- Dari Receiving ke Work Center 70
Ongkos Penimbangan FTC
In Flow =
Total Ongkos Penimbangan Horizontal
Rp 5.582
In Flow =
Rp 14.968
In Flow = 0,38
1. Out Flow
- Dari Receiving ke Work Center 10
Ongkos Penimbangan FTC
Out Flow =
Total Ongkos Penimbangan Vertikal
Rp 3.029
Out Flow =
Rp 3.083
Out Flow = 1
- Dari Receiving ke Work Center 60
Ongkos Penimbangan FTC
Out Flow =
Total Ongkos Penimbangan Vertikal
Rp 3.603
Out Flow =
Rp 6.057
Out Flow = 0,59
- Dari Receiving ke Work Center 70
Ongkos Penimbangan FTC
Out Flow =
Total Ongkos Penimbangan Vertikal
Rp 5.582
Out Flow =
Rp 6.881
Out Flow = 0,81
A B C
F E D K
G H I J
Contoh Perhitungan:
Ongkos Material Handling (OMH) Alternatif 1
1. Berat Total
- Dari Receiving ke Work Center 10 (Badan Case)
Tabel 3.199 Ongkos Material Handling (OMH) Revisi Produk Case Tablet
Total Ongkos Material Handling Revisi Case Tablet
Produksi / Berat Berat Outflow
Dari Ke Nama Komponen Alat Angkut OMH
Jam Pakai Total Jarak (m) Total Ongkos
Badan Case 71 0,09 7,2
WC-10 Dudukan Speaker 71 0,01 1,2
Tenaga Manusia Rp 100 16,80 Rp 1.680
Airpods Receptacle 71 0,01 1,2
Total 9,6
WC-60 Lem UHU 66 0,1 6
Tenaga Manusia Rp 100 28,68 Rp 2.868
Total 6
Wireless Speaker 66 0,10 7
Receiving
WC-70 Sticker 66 0,03 1,75
Tenaga Manusia Rp 100 4,54 Rp 454
Lem UHU 66 0,1 6
Total 14,75
Dus Packing 66 0,05 5
WC-90 Bubble Wrap 66 0,05 3,5
Tenaga Manusia Rp 100 16,71 Rp 1.671
Lem UHU 66 0,1 6
Total 14,5
Badan Case 71 0,09 6,39
WC-20 Dudukan Speaker 71 0,01 0,71
WC-10 Tenaga Manusia Rp 100 17,41 Rp 1.741
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-30 Dudukan Speaker 71 0,01 0,71
WC-20 Tenaga Manusia Rp 100 18,14 Rp 1.814
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-40 Dudukan Speaker 71 0,01 0,71
WC-30 Tenaga Manusia Rp 100 22,58 Rp 2.258
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-50 Dudukan Speaker 71 0,01 0,71
WC-40 Tenaga Manusia Rp 100 14,41 Rp 1.441
Airpods Receptacle 71 0,01 0,71
Total 7,81
Badan Case 71 0,09 6,39
WC-60
Dudukan Speaker 71 0,01 0,71 Tenaga Manusia Rp 100 7,76 Rp 776
WC-50 Total 7,1
WC-70 Airpods Receptacle 71 0,01 0,71
Tenaga Manusia Rp 100 16,38 Rp 1.638
Total 0,71
Hasil Assembly 1 66 0,1 6,6
WC-70
WC-60 Lem UHU 66 0,1 5,94 Tenaga Manusia Rp 100 24,14 Rp 2.414
Total 12,54
Hasil Assembly 2 66 0,19 12,54
Wireless Speaker 66 0,1 6,6
WC-80
WC-70 Sticker 66 0,025 1,65 Walkey Fallet Rp 200 15,54 Rp 3.108
Lem UHU 66 0,1 5,94
Total 26,73
WC-90 Hasil Assembly 2 66 0,415 27,39
WC-80 Walkey Fallet Rp 200 5,70 Rp 1.140
Total 27,39
Dus Packing 66 0,05 3,3
Bubble Wrap 66 0,05 3,3
Shipping
WC-90 Lem UHU 66 0,1 5,94 Forklift Rp 250 14,69 Rp 3.671
Aircase Handphone 66 0,605 39,93
Total 52,47
Total Rp 26.671
Contoh Perhitungan:
Ongkos Material Handling (OMH) Alternatif 1
Praktikum Perancangan Sistem Industri 2 245
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
1. Berat Total
- Dari Receiving ke Work Center 10 (Badan Case)
III.9.2.3 Layout
A B C
DPT-01 DPT-01
ART-02 ARH-02
O-10
O-11
O-11
O-5
O-6
DPT-01 DPT-01 DST-03 DSH-03
F1 F2
BCT-03 BCH-03
DPH-01 DPH-01
F3 F4
DPH-01 DPH-01 F6
HYDRANT
F5
F7
BWH-01 BWT-01
O-1
O-1
O-2
O-2
O-6
STH-02 STT-02 WSH-02 WST-02
F E D K
Aircase Handphone
O-4
O-4
O-4
O-3
O-3
O-3
Aircase Handphone
I-1
I-2 Aircase Handphone
Aircase Handphone
O-8
O-8
O-7
O-7
Aircase Tablet
Aircase Tablet
I-3
Aircase Tablet
O-13
O-13
O-12
O-12
Aircase Tablet
I J
G H
O-14
O-14
O-14
O-15
I-4
O-9
O-9
O-9
O-9
O-14
O-14
O-14
O-9
O-9
O-9
O-9
O-15
I-4
O-14
O-14
O-14
KETERANGAN
ALIRAN MATERIAL
III.9.2.5 Template
TEMPLATE PT. ADYA MAVENDRA
Jalan Raya Wantilan-Cipeundeuy No.247, Cipeundeuy, Kec.
Cipeundeuy, Kabupaten Subang, Jawa Barat 41272
E-mail : ptadyamavendra@gmail.com
DPH-01
DPH-01
DPT-01
DPT-01
I-1
I-3 I-2
DPH-01
DPH-01
DPT-01
DPT-01
O-9 O-9
BWH-01
LEH-01
STH-02
O-9 O-9
O-13 O-8 O-4
LEH-01
BWT-01
STT-02
BCT-03
ART-02
DST-03
O-9 O-9
WSH-02
LET-01
ARH-02
BCH-03
DSH-03
O-4
WST -02
O-9 O-9
A B
G
O-10
O-13 O-8 O-4
H
O-1
ED
O-5
O-1
O-12 O-3
C
O-14 O-14 O-14
O-7 O-11
O-2
O-3
O-12 O-3
O-6
I-4 I-4 O-6
K
I
Aircase Handphone
Aircase Handphone
Aircase Tablet
Aircase Tablet
Aircase Tablet
HYDRANT
F5
F3
O-15 O-15
F1 F2
F7
F6
F4
H
S8
J
S13
S15
S6
S7
MASJID
S10
KANTIN
NIK
KLI
S14
S12 S4 S3
S5
2- S 2- S 2- S
Ps
S11
didapatkan total ongkosnya sebesar Rp. 3.671. Jadi, didapatkan hasil akhirnya
untuk total ongkos material handling (OMH), untuk Aircase Handphone alternatif
1 sebesar Rp. 32.271, untuk Aircase Tablet alternatif 1 sebesar Rp. 26.671, dan
totalnya sebesar Rp. 58.943. Sehingga, Area Allocation Diagram (AAD) yang
terpilih menggunakan alternatif 1.
Layout merupakan sebuah tata letak dari suatu elemen desain yang
ditempatkan dalam sebuah media bidang yang telah di konsep sedemikian rupa
sehingga membentuk penataan yang artistik. Layout digunakan untuk
menempatkan menempatkan fasilitas-fasilitas produksi sehingga mendapatkan
susunan tata letak yang paling optimal dan memperlancar proses produksi yang
efektif dan efisien di dalam perusahaan.
Activity Relationship Chart (ARC) atau Peta Hubungan Kerja kegiatan
adalah peta yang menggambarkan derajat tingkat hubungan penting tidaknya
kedekatan antar bagian-bagian atau kegiatan pada departemen dalam perkantoran
atau pabrik. Activity Relationship Chart (ARC) memiliki tujuan untuk mengetahui
aktivitas antar departemen dan mengetahui hubungan kedekatan antar setiap
departemen. Pada Activity Relationship Chart (ARC) pabrik terdapat departemen
pabrik yang terdiri dari receiving, fabrikasi, dan shipping, fasilitas ruang
perkantoran, Toilet Wanita, Toilet Pria, Masjid, Kantin, Klinik Kesehatan,
Tempat Pembuangan Sampah, Tempat Pembuangan Limbah, Lapangan Parkir
Mobil, Lapangan Parkir Motor, Lapangan Parkir Truk, Pos Satpam, Assembly
Point / Titik Kumpul, Hydrant Pemadam Kebakaran, ATM, dan Parkiran
Material Handling. Pada Activity Relationship Chart (ARC) kantor terdapat
Ruang Direktur Utama, Ruang Sekretaris, Ruang Manager Keuangan, Ruang Staff
Keuangan, Ruang Manager Purchasing, Ruang Staff Purchasing, Ruang
Manager Research & Development (R&D), Ruang Staff Research &
Development (R&D), Ruang Manager Produksi, Ruang Manager Quality Control,
Ruang Staff Quality Control, Ruang Manager Human Resourch & Development,
Ruang Staff Human Resourch & Development, Ruang Manager Pemasaran,
Ruang Staff Pemasaran. Pada Activity Relationship Chart (ARC) terdapat 6
macam hubungan yang digambarkan dalam bentuk segitiga dengan warna yang
berbeda-beda dan memiliki makna atau arti yaitu merah berarti hubungan bersifat
Praktikum Perancangan Sistem Industri 2 255
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
mutlak, kuning berarti hubungan sangat penting, hijau berarti hubungan cukup
penting, biru berarti hubungan biasa-biasa saja, putih berarti hubungan tidak
diinginkan dan orange berarti hubungan sangat tidak diinginkan. Selain itu,
terdapat juga bentuk hubungan dalam bentuk angka yang masing-masing angka
memiliki makna atau arti yaitu “1” berarti menggunakan catatan yang sama, “2”
berarti menggunakan personil yang sama, “3” berarti ruang yang sama, “4” berarti
tingkat hubungan personil, “5” berarti tingkat hubungan kertas kerja, “6” berarti
urutan aliran kertas, “7” berarti melakukan aliran kerja yang sama, “8” berarti
menggunakan peralatan dan fasilitas yang sama, “9” berarti ribut, kotor, debu,
dsb, dan “10” berarti lain-lain yang mungkin perlu.
Template merupakan suatu gambaran yang lebih jelas dari tata letak pabrik
yang akan dibuat dan merupakan gambaran detail dari ARD yang telah dibuat. Di
dalam pembuatan template ini mengacu pada ARC (Activity Relationship Chart),
data yang digunakan yaitu luas lantai fasilitas non-perkantoran (luar pabrik), luas
lantai fasilitas perkantoran dan luas lantai fasilitas ruang perkantoran.
P Hari kerja RT
1 20 30850
2 22 33934
3 20 30850
4 20 30850
5 20 30850
6 22 33934
7 22 33934
8 23 35477
9 22 33934
10 20 30850
11 23 35477
12 23 35477
Total 257 396417
Ringkasan
Waktu
Kegiatan Jumlah
(Detik)
15 550
4 30
Total 16 580
7,92
60 O-9 Meja Perakitan = 7,92 8 8
Inspeksi dan
Assembly 8,75
70 O-14 Meja Perakitan = 8,75 9 9
1,24
80 I-4 Meja Periksa = 1,24 2 2
1,65
Packaging 90 O-15 Meja Pengemasan = 1,65 2 2
Storage
Total 47
Contoh Perhitungan:
1. Faktor Konversi (FK)
Standar Produk Item ke-i
- FK Case Handphone =
Standar Produksi Unit Agregat
495
FK Case Handphone =
580
FK Case Handphone = 0,85
- %P Case Tablet =
∑ Demand Case Tablet
x
∑ ( Demand Case HP + Demand Case Tablet )
100%
172880
%P Case Tablet = x 100%
416441 + 172880
172880
%P Case Tablet = x 100%
589321
%P Case Tablet = 29,34 %
3. Disaggregate Total Rencana Produksi Case Handphone
Disaggregate TRP(t) = TRP(t) x %P Case Handphone
- Disaggregate TRP (1) = 32585 x 70,66% = 23026,04 Unit
- Disaggregate TRP (2) = 33934 x 70,66% = 23979,31 Unit
- Disaggregate TRP (3) = 30850 x 70,66% = 21800,01 Unit
4. Disaggregate Total Rencana Produksi Case Tablet
Disaggregate TRP (t) = TRP (t) x %P Case Tablet
- Disaggregate TRP (1) = 32585 x 29,34% = 9558,96 Unit
- Disaggregate TRP (2) = 33934 x 29,34% = 9954,69 Unit
- Disaggregate TRP (3) = 30850 x 29,34% = 9509,09 Unit
Gambar 3.40 Distribusi Proses Pemotongan Badan Case Produk Case Handphone
Tabel 3.208 Waktu Proses Pencetakan Badan Case Produk Case Handphone
Waktu Proses Pencetakan
20,0215 20,3727 20,2259 19,5896 21,2698 20,2696 19,7468 20,2214 20,9989 20,1602
20,3945 22,4147 20,0274 20,749 20,7089 19,433 19,5276 20,4957 20,8131 19,8745
19,2917 18,7881 20,4407 19,3544 20,9332 19,421 20,0081 19,7745 19,7996 19,5769
20,948 21,3629 20,347 18,3147 18,4193 21,1856 20,2067 19,1887 21,2577 19,7354
21,4205 20,3369 18,1023 20,1967 19,3478 18,7259 20,9981 20,1346 21,1704 19,2932
19,9027 19,844 19,8187 20,4312 21,3621 17,8857 19,9471 19,6462 20,3795 19,3941
20,2294 20,3576 19,2984 19,7633 21,0423 20,3688 20,1112 20,0764 19,8661 20,7143
18,3962 20,418 19,4374 21,1515 20,8524 19,1454 19,2275 20,9802 20,076 20,0086
21,1051 18,7234 19,8326 20,8709 20,2471 21,2679 19,3839 17,692 20,5554 21,0806
18,6446 20,2576 19,4666 20,042 19,718 19,562 21,1205 20,1245 21,8732 20,7762
Gambar 3.41 Distribusi Proses Pencetakan Badan Case Produk Case Handphone
Tabel 3.209 Waktu Proses Pendinginan Badan Case Produk Case Handphone
Waktu Proses Pendinginan
26,9243 26,3459 25,8321 24,3762 24,4274 23,1088 25,4987 25,3498 25,3103 26,0586
23,8367 24,5363 25,04 25,4509 23,8506 23,3153 25,8745 24,7361 23,962 24,7965
24,4648 24,3903 23,2448 25,3241 25,735 24,697 25,4782 23,7377 23,8418 26,5272
24,3137 24,9082 25,5005 26,3683 24,707 24,9377 24,8663 23,4518 24,6414 24,6286
24,3058 25,8353 24,8601 24,0335 25,669 23,4589 25,0919 25,2637 24,1996 25,2503
24,7107 26,5517 25,6706 25,7195 24,5783 24,8063 24,3926 24,5824 27,405 26,3133
25,6463 24,7565 25,5625 26,9296 26,1977 25,879 24,6195 24,6822 23,3128 24,3448
23,8504 22,9688 24,5159 25,0575 23,2582 24,5649 25,2395 26,2272 25,7588 24,2502
25,751 24,3674 24,7954 25,0662 25,3493 23,3263 26,9885 23,3723 25,5061 24,4492
23,4236 24,168 25,1763 23,9414 25,3415 24,4635 23,8099 23,9702 24,445 24,8583
Gambar 3.42 Distribusi Proses Pendinginan Badan Case Produk Case Handphone
Tabel 3.210 Waktu Proses Penghalusan Badan Case Produk Case Handphone
Waktu Proses Penghalusan
25,0998 24,1659 25,1423 24,359 26,8533 25,0477 26,6494 25,2381 25,7609 25,2713
24,5539 27,5451 25,2877 23,5922 25,4552 25,0379 25,7582 24,0469 24,7773 23,3395
25,3751 23,4172 25,0884 25,0101 24,4199 25,5596 24,1475 25,5687 25,9062 24,5102
25,2655 24,6279 26,0414 25,6146 25,4156 25,3661 24,843 23,978 24,314 23,8503
26,1788 24,5975 25,121 24,4955 26,7311 25,2222 24,6094 24,7994 25,6547 26,0603
25,4353 23,7657 25,4682 24,165 25,4862 24,4914 23,4689 26,6229 24,5443 23,7004
25,2145 25,4235 24,7868 25,988 23,747 24,9897 26,0885 24,523 24,4517 26,0569
25,4657 24,2655 24,4765 22,7155 24,6023 25,7766 23,9191 25,305 24,6156 25,3466
26,2061 25,5428 24,64 23,5238 24,7345 23,9609 26,2456 25,1295 25,4605 24,1122
26,5021 25,1274 25,2096 27,0954 24,6247 26,0991 26,7627 25,7382 25,2363 24,2539
Gambar 3.43 Distribusi Proses Penghalusan Badan Case Produk Case Handphone
Tabel 3.211 Waktu Proses Pemeriksaan 1 Badan Case Produk Case Handphone
Waktu Proses Pemeriksaan 1
4,16929 3,61947 3,28745 5,42832 6,15434 5,73778 5,67552 5,30552 5,47021 5,44913
3,80259 4,14297 4,28739 4,33377 4,51762 5,57793 5,03707 4,39767 5,11281 5,28665
5,49004 4,61538 3,08349 5,04863 4,80122 4,28927 5,69487 4,07364 5,99342 3,20257
5,04748 4,95259 7,13256 6,62287 4,24961 5,30464 2,95105 5,74312 3,60282 5,51924
8,29717 5,71014 5,28426 5,69156 4,82084 3,01752 3,77972 5,19699 4,88458 3,73655
5,00876 4,23349 6,42577 6,35941 4,07035 5,36239 3,80961 5,43613 5,8609 4,59205
4,81828 7,0446 5,54072 4,87016 5,7235 5,68952 5,63869 3,78597 6,91126 3,59136
4,49524 5,38165 3,13945 5,57902 4,92431 4,52679 4,60672 4,75685 5,54551 3,99726
6,15196 5,1493 4,65821 5,73377 4,72925 5,31515 4,53337 4,8962 5,47449 5,3166
6,14192 5,41837 6,33795 3,99992 4,84195 3,04151 7,20482 4,85333 2,92411 3,55906
Gambar 3.44 Distribusi Proses Pemeriksaan 1 Badan Case Produk Case Handphone
Gambar 3.45 Distribusi Proses Pemotongan Dudukan Speaker Produk Case Handphone
Tabel 3.213 Waktu Proses Pencetakan Dudukan Speaker Produk Case Handphone
Waktu Proses Pencetakan
20,0215 20,3727 20,2259 19,5896 21,2698 20,2696 19,7468 20,2214 20,9989 20,1602
20,3945 22,4147 20,0274 20,749 20,7089 19,433 19,5276 20,4957 20,8131 19,8745
19,2917 18,7881 20,4407 19,3544 20,9332 19,421 20,0081 19,7745 19,7996 19,5769
20,948 21,3629 20,347 18,3147 18,4193 21,1856 20,2067 19,1887 21,2577 19,7354
21,4205 20,3369 18,1023 20,1967 19,3478 18,7259 20,9981 20,1346 21,1704 19,2932
19,9027 19,844 19,8187 20,4312 21,3621 17,8857 19,9471 19,6462 20,3795 19,3941
20,2294 20,3576 19,2984 19,7633 21,0423 20,3688 20,1112 20,0764 19,8661 20,7143
18,3962 20,418 19,4374 21,1515 20,8524 19,1454 19,2275 20,9802 20,076 20,0086
21,1051 18,7234 19,8326 20,8709 20,2471 21,2679 19,3839 17,692 20,5554 21,0806
18,6446 20,2576 19,4666 20,042 19,718 19,562 21,1205 20,1245 21,8732 20,7762
Gambar 3.46 Distribusi Proses Pencetakan Dudukan Speaker Produk Case Handphone
Tabel 3.214 Waktu Proses Pendinginan Dudukan Speaker Produk Case Handphone
Waktu Proses Pendinginan
26,9243 26,3459 25,8321 24,3762 24,4274 23,1088 25,4987 25,3498 25,3103 26,0586
23,8367 24,5363 25,04 25,4509 23,8506 23,3153 25,8745 24,7361 23,962 24,7965
24,4648 24,3903 23,2448 25,3241 25,735 24,697 25,4782 23,7377 23,8418 26,5272
24,3137 24,9082 25,5005 26,3683 24,707 24,9377 24,8663 23,4518 24,6414 24,6286
24,3058 25,8353 24,8601 24,0335 25,669 23,4589 25,0919 25,2637 24,1996 25,2503
24,7107 26,5517 25,6706 25,7195 24,5783 24,8063 24,3926 24,5824 27,405 26,3133
25,6463 24,7565 25,5625 26,9296 26,1977 25,879 24,6195 24,6822 23,3128 24,3448
23,8504 22,9688 24,5159 25,0575 23,2582 24,5649 25,2395 26,2272 25,7588 24,2502
25,751 24,3674 24,7954 25,0662 25,3493 23,3263 26,9885 23,3723 25,5061 24,4492
23,4236 24,168 25,1763 23,9414 25,3415 24,4635 23,8099 23,9702 24,445 24,8583
Gambar 3.47 Distribusi Proses Pendinginan Dudukan Speaker Produk Case Handphone
Tabel 3.215 Waktu Proses Penghalusan Dudukan Speaker Produk Case Handphone
Waktu Proses Penghalusan
25,0998 24,1659 25,1423 24,359 26,8533 25,0477 26,6494 25,2381 25,7609 25,2713
24,5539 27,5451 25,2877 23,5922 25,4552 25,0379 25,7582 24,0469 24,7773 23,3395
25,3751 23,4172 25,0884 25,0101 24,4199 25,5596 24,1475 25,5687 25,9062 24,5102
25,2655 24,6279 26,0414 25,6146 25,4156 25,3661 24,843 23,978 24,314 23,8503
26,1788 24,5975 25,121 24,4955 26,7311 25,2222 24,6094 24,7994 25,6547 26,0603
25,4353 23,7657 25,4682 24,165 25,4862 24,4914 23,4689 26,6229 24,5443 23,7004
25,2145 25,4235 24,7868 25,988 23,747 24,9897 26,0885 24,523 24,4517 26,0569
25,4657 24,2655 24,4765 22,7155 24,6023 25,7766 23,9191 25,305 24,6156 25,3466
26,2061 25,5428 24,64 23,5238 24,7345 23,9609 26,2456 25,1295 25,4605 24,1122
26,5021 25,1274 25,2096 27,0954 24,6247 26,0991 26,7627 25,7382 25,2363 24,2539
Gambar 3.48 Distribusi Proses Penghalusan Dudukan Speaker Produk Case Handphone
Tabel 3.216 Waktu Proses Pemeriksaan 1 Dudukan Speaker Produk Case Handphone
Waktu Proses Pemeriksaan 1
4,16929 3,61947 3,28745 5,42832 6,15434 5,73778 5,67552 5,30552 5,47021 5,44913
3,80259 4,14297 4,28739 4,33377 4,51762 5,57793 5,03707 4,39767 5,11281 5,28665
5,49004 4,61538 3,08349 5,04863 4,80122 4,28927 5,69487 4,07364 5,99342 3,20257
5,04748 4,95259 7,13256 6,62287 4,24961 5,30464 2,95105 5,74312 3,60282 5,51924
8,29717 5,71014 5,28426 5,69156 4,82084 3,01752 3,77972 5,19699 4,88458 3,73655
5,00876 4,23349 6,42577 6,35941 4,07035 5,36239 3,80961 5,43613 5,8609 4,59205
4,81828 7,0446 5,54072 4,87016 5,7235 5,68952 5,63869 3,78597 6,91126 3,59136
4,49524 5,38165 3,13945 5,57902 4,92431 4,52679 4,60672 4,75685 5,54551 3,99726
6,15196 5,1493 4,65821 5,73377 4,72925 5,31515 4,53337 4,8962 5,47449 5,3166
6,14192 5,41837 6,33795 3,99992 4,84195 3,04151 7,20482 4,85333 2,92411 3,55906
Gambar 3.50 Distribusi Proses Pemotongan Airpods Receptacle Produk Case Handphone
Tabel 3.218 Waktu Proses Pencetakan Airpods Receptacle Produk Case Handphone
Waktu Proses Pencetakan
20,0215 20,3727 20,2259 19,5896 21,2698 20,2696 19,7468 20,2214 20,9989 20,1602
20,3945 22,4147 20,0274 20,749 20,7089 19,433 19,5276 20,4957 20,8131 19,8745
19,2917 18,7881 20,4407 19,3544 20,9332 19,421 20,0081 19,7745 19,7996 19,5769
20,948 21,3629 20,347 18,3147 18,4193 21,1856 20,2067 19,1887 21,2577 19,7354
21,4205 20,3369 18,1023 20,1967 19,3478 18,7259 20,9981 20,1346 21,1704 19,2932
19,9027 19,844 19,8187 20,4312 21,3621 17,8857 19,9471 19,6462 20,3795 19,3941
20,2294 20,3576 19,2984 19,7633 21,0423 20,3688 20,1112 20,0764 19,8661 20,7143
18,3962 20,418 19,4374 21,1515 20,8524 19,1454 19,2275 20,9802 20,076 20,0086
21,1051 18,7234 19,8326 20,8709 20,2471 21,2679 19,3839 17,692 20,5554 21,0806
18,6446 20,2576 19,4666 20,042 19,718 19,562 21,1205 20,1245 21,8732 20,7762
Gambar 3.51 Distribusi Proses Pencetakan Airpods Receptacle Produk Case Handphone
Tabel 3.219 Waktu Proses Pendinginan Airpods Receptacle Produk Case Handphone
Waktu Proses Pendinginan
26,9243 26,3459 25,8321 24,3762 24,4274 23,1088 25,4987 25,3498 25,3103 26,0586
23,8367 24,5363 25,04 25,4509 23,8506 23,3153 25,8745 24,7361 23,962 24,7965
24,4648 24,3903 23,2448 25,3241 25,735 24,697 25,4782 23,7377 23,8418 26,5272
24,3137 24,9082 25,5005 26,3683 24,707 24,9377 24,8663 23,4518 24,6414 24,6286
24,3058 25,8353 24,8601 24,0335 25,669 23,4589 25,0919 25,2637 24,1996 25,2503
24,7107 26,5517 25,6706 25,7195 24,5783 24,8063 24,3926 24,5824 27,405 26,3133
25,6463 24,7565 25,5625 26,9296 26,1977 25,879 24,6195 24,6822 23,3128 24,3448
23,8504 22,9688 24,5159 25,0575 23,2582 24,5649 25,2395 26,2272 25,7588 24,2502
25,751 24,3674 24,7954 25,0662 25,3493 23,3263 26,9885 23,3723 25,5061 24,4492
23,4236 24,168 25,1763 23,9414 25,3415 24,4635 23,8099 23,9702 24,445 24,8583
Gambar 3.52 Distribusi Proses Pendinginan Airpods Receptacle Produk Case Handphone
Tabel 3.220 Waktu Proses Penghalusan Airpods Receptacle Produk Case Handphone
Waktu Proses Penghalusan
25,0998 24,1659 25,1423 24,359 26,8533 25,0477 26,6494 25,2381 25,7609 25,2713
24,5539 27,5451 25,2877 23,5922 25,4552 25,0379 25,7582 24,0469 24,7773 23,3395
25,3751 23,4172 25,0884 25,0101 24,4199 25,5596 24,1475 25,5687 25,9062 24,5102
25,2655 24,6279 26,0414 25,6146 25,4156 25,3661 24,843 23,978 24,314 23,8503
26,1788 24,5975 25,121 24,4955 26,7311 25,2222 24,6094 24,7994 25,6547 26,0603
25,4353 23,7657 25,4682 24,165 25,4862 24,4914 23,4689 26,6229 24,5443 23,7004
25,2145 25,4235 24,7868 25,988 23,747 24,9897 26,0885 24,523 24,4517 26,0569
25,4657 24,2655 24,4765 22,7155 24,6023 25,7766 23,9191 25,305 24,6156 25,3466
26,2061 25,5428 24,64 23,5238 24,7345 23,9609 26,2456 25,1295 25,4605 24,1122
26,5021 25,1274 25,2096 27,0954 24,6247 26,0991 26,7627 25,7382 25,2363 24,2539
Gambar 3.53 Distribusi Proses Penghalusan Airpods Receptacle Produk Case Handphone
Tabel 3.221 Waktu Proses Pemeriksaan 1 Airpods Receptacle Produk Case Handphone
Waktu Proses Pemeriksaan 1
4,16929 3,61947 3,28745 5,42832 6,15434 5,73778 5,67552 5,30552 5,47021 5,44913
3,80259 4,14297 4,28739 4,33377 4,51762 5,57793 5,03707 4,39767 5,11281 5,28665
5,49004 4,61538 3,08349 5,04863 4,80122 4,28927 5,69487 4,07364 5,99342 3,20257
5,04748 4,95259 7,13256 6,62287 4,24961 5,30464 2,95105 5,74312 3,60282 5,51924
8,29717 5,71014 5,28426 5,69156 4,82084 3,01752 3,77972 5,19699 4,88458 3,73655
5,00876 4,23349 6,42577 6,35941 4,07035 5,36239 3,80961 5,43613 5,8609 4,59205
4,81828 7,0446 5,54072 4,87016 5,7235 5,68952 5,63869 3,78597 6,91126 3,59136
4,49524 5,38165 3,13945 5,57902 4,92431 4,52679 4,60672 4,75685 5,54551 3,99726
6,15196 5,1493 4,65821 5,73377 4,72925 5,31515 4,53337 4,8962 5,47449 5,3166
6,14192 5,41837 6,33795 3,99992 4,84195 3,04151 7,20482 4,85333 2,92411 3,55906
Gambar 3.55 Distribusi Proses Assembly 1 HASH 01-02 Produk Case Handphone
Gambar 3.56 Distribusi Proses Assembly 2 HASH 02-01 Produk Case Handphone
Tabel 3.224 Waktu Proses Pemeriksaan 2 HASH 02-01 Produk Case Handphone
Waktu Proses Pemeriksaan 2
15,4853 14,9009 16,63 14,4764 15,1395 13,6328 14,806 15,4638 14,8822 16,9896
16,6869 15,2767 15,4868 14,7827 15,2233 15,7855 14,0901 13,8029 14,1369 13,1506
15,3812 16,0548 14,2712 13,8696 15,7725 18,0706 15,7086 16,4126 15,0012 16,2104
16,5187 16,4115 15,8589 14,8279 15,9176 13,1219 14,2186 16,143 15,6938 15,1124
14,7464 13,5858 13,6379 13,7159 16,5735 14,4598 15,0555 15,5518 16,1015 15,7219
16,378 15,1553 16,1065 13,7911 15,6392 15,5734 16,0134 16,2883 13,1531 14,6781
15,6129 14,3688 13,84 16,0624 13,9546 13,1956 16,1483 16,9487 16,7206 14,3704
15,7236 16,4262 14,1114 15,0716 15,1711 14,6566 14,7576 16,7004 16,3629 16,1065
13,3051 14,6254 15,0572 14,5341 15,6446 14,6499 14,7038 15,1323 14,0322 13,0394
15,4044 15,5676 14,8806 15,4892 15,2388 15,4341 15,4536 15,3707 14,3048 17,1303
Gambar 3.57 Distribusi Proses Pemeriksaan 2 HASH 02-01 Produk Case Handphone
Tabel 3.225 Waktu Proses Pengemasan HASH 02-01 Produk Case Handphone
Waktu Proses Pengemasan
19,5694 20,1206 20,6811 19,275 18,6591 19,641 19,4988 21,189 19,5363 20,6851
17,5146 20,5921 19,4094 20,2665 20,9993 19,7535 20,3248 20,1793 19,6156 19,4404
20,95 18,7587 19,088 21,2575 19,8971 20,2541 19,5296 19,5504 20,0985 20,0438
19,3817 21,0611 19,7112 22,0324 21,6991 19,5861 17,9454 20,415 20,3776 20,2318
20,4057 19,8364 20,4046 19,7128 19,5566 20,3853 18,8501 19,3191 18,9218 19,9057
20,3855 20,4429 19,2378 18,8377 18,4278 21,6306 21,223 20,3092 18,6293 19,3012
18,2354 20,2673 19,357 18,496 19,576 21,8075 20,712 20,9637 19,1407 17,1335
20,1 20,3004 18,7489 20,222 19,936 20,8797 19,5381 19,1829 21,0771 20,7848
19,898 19,4916 22,2189 19,3743 17,8454 21,0054 18,8232 20,128 19,6424 19,8797
20,3258 19,2084 19,2137 18,844 20,1802 19,9613 19,0231 20,8676 20,0386 21,4837
Gambar 3.58 Distribusi Proses Pengemasan HASH 02-01 Produk Case Handphone
Tabel 3.226 Rangkuman Waktu Proses Berdasarkan Distribusi Produk Case Handphone
Case Handphone
Komponen WC 10 WC 20 WC 30 WC 40 WC 50 WC 60 WC 70 WC 80 WC 90
BCH-03 12.3 + GAMM(0.357, 7.9) 17.2 + WEIB(3.17, 3.72) 22.5 + WEIB(2.65, 2.66) NORM (25.1, 0.906) NORM(4.97, 1.03)
DSH-03 12.3 + GAMM(0.357, 7.9) 17.2 + WEIB(3.17, 3.72) 22.5 + WEIB(2.65, 2.66) NORM (25.1, 0.906) NORM(4.97, 1.03)
ARH-02 12.3 + GAMM(0.357, 7.9) 17.2 + WEIB(3.17, 3.72) 22.5 + WEIB(2.65, 2.66) NORM (25.1, 0.906) NORM(4.97, 1.03)
HASH 01-02 87 + 5.49 * BETA (2.54, 2.22)
HASH 02-01 97 + 5.54 * BETA(3.62, 3.17) NORM (15.2, 1.04) 17 + 5.73 * BETA(6.84, 6.54)
Gambar 3.59 Distribusi Proses Pemotongan Badan Case Produk Case Tablet
Tabel 3.228 Waktu Proses Pencetakan Badan Case Produk Case Tablet
Waktu Proses Pencetakan
24,5289 24,554 24,6462 23,6359 26,316 25,1275 25,1372 24,949 23,9207 25,2895
23,2159 23,7354 25,8149 26,1834 24,1143 26,3301 24,3172 26,9991 24,4857 22,4349
25,4516 24,74 24,6947 24,8623 24,4753 25,9055 25,9338 24,1952 23,5063 24,2939
25,3343 25,8911 24,9023 25,3815 23,3253 24,7877 25,7589 24,5217 24,3905 26,122
25,3067 24,8267 24,1656 25,2183 26,436 24,1293 25,7664 25,3889 24,2977 23,1092
26,5243 23,5068 25,3059 23,7849 25,5789 25,1495 25,9677 25,8144 25,163 25,9339
24,2855 23,942 24,5136 25,3925 23,3627 24,3627 26,6453 25,8609 24,555 24,8786
25,3311 23,5704 24,7835 22,416 22,4868 24,8179 23,9913 25,4696 24,7414 25,2873
25,4104 25,174 25,9419 24,1384 26,0786 24,9687 24,8803 24,6345 25,5475 25,1665
24,8517 24,825 24,2679 24,0815 25,8332 25,0442 24,3804 26,1663 24,1225 23,9479
Gambar 3.60 Distribusi Proses Pencetakan Badan Case Produk Case Tablet
Tabel 3.229 Waktu Proses Pendinginan Badan Case Produk Case Tablet
Waktu Proses Pendinginan
29,7135 28,3615 29,2767 31,0988 30,9065 30,7508 31,4883 29,8784 29,1371 30,5402
30,0425 31,0789 30,1461 30,2767 30,1023 29,8055 29,8765 30,5948 29,1308 29,6069
29,8322 29,5692 29,2526 28,389 30,4616 28,7837 30,113 30,182 29,781 31,3787
29,8653 31,2255 30,0154 29,0337 28,7595 30,4115 31,7033 29,9697 29,4572 29,0802
30,2231 30,6695 31,0466 28,2383 30,6091 29,058 27,6774 29,6356 28,8865 30,445
27,6307 32,6225 31,7397 28,3147 28,7786 30,43 28,4835 29,2562 30,0106 29,6035
29,7565 29,2047 28,9165 31,2039 30,8805 30,9537 28,1124 29,2888 31,6367 27,967
28,3044 29,1618 30,5509 30,763 30,6186 28,5959 30,9623 29,7125 29,1174 29,1235
28,308 28,9896 30,0762 30,2177 29,9713 29,3466 31,8944 31,5381 30,5582 31,0626
28,4241 31,7109 28,0599 29,1113 28,6307 29,3934 29,9812 30,5668 29,2479 29,0694
Gambar 3.61 Distribusi Proses Pendinginan Badan Case Produk Case Tablet
Tabel 3.230 Waktu Proses Penghalusan Badan Case Produk Case Tablet
Waktu Proses Penghalusan
29,0612 30,2188 30,4246 29,4349 31,6385 30,2411 30,2255 30,8204 29,0609 31,2221
29,0315 30,2581 29,7051 30,257 29,3827 30,7584 30,9489 28,9315 30,5061 29,5682
30,5992 30,1385 30,6055 30,4597 30,1897 30,5149 29,217 30,0205 28,4671 30,4174
31,4874 31,0616 30,1957 29,5991 30,0036 29,7411 31,2034 30,1237 30,5382 30,5766
32,0719 30,1515 29,7273 30,4073 30,3898 30,1704 30,9474 29,8096 30,8069 31,1006
30,5983 30,2543 31,9991 29,2143 30,7134 30,594 29,6798 29,5043 31,077 30,2176
29,8834 30,5033 32,5043 31,3272 30,2417 28,7006 30,9943 30,1163 28,6528 30,1785
27,6774 31,2528 30,1557 29,503 29,0952 30,3206 29,68 30,253 31,2545 29,8398
27,5724 30,7757 29,4282 31,6734 31,9717 30,3339 30,1335 29,8714 29,4652 28,5979
29,8857 30,0857 28,3443 30,4316 30,14 29,9274 28,3574 30,3238 30,2083 29,3979
Gambar 3.62 Distribusi Proses Penghalusan Badan Case Produk Case Tablet
Tabel 3.231 Waktu Proses Pemeriksaan 1 Badan Case Produk Case Tablet
Waktu Proses Pemeriksaan 1
5,03286 5,55031 5,08582 7,79513 5,70415 5,29016 4,5933 5,35252 5,64772 5,44271
3,01369 4,88381 4,91157 5,61587 6,41071 4,25173 5,40363 6,2473 4,72003 4,8147
5,85913 5,04457 4,72885 5,1266 5,67976 5,15116 3,74467 4,85309 4,68766 5,39543
4,48557 4,25507 4,75196 5,94222 5,99844 3,3315 5,98419 4,39105 6,76783 4,19548
3,83124 3,48473 5,69721 6,75341 4,90903 4,34727 5,09942 4,95933 4,84597 4,22897
4,76716 4,56504 4,61489 5,45956 5,82758 6,29518 4,75763 4,48897 4,41491 3,94532
4,23339 4,55594 4,80364 3,94719 5,57215 2,53265 6,63121 5,63251 6,15852 4,78402
2,83352 5,85064 4,94194 4,82869 6,12534 4,83195 4,3332 4,6025 5,45599 5,18359
5,17418 6,80988 5,7847 4,56126 3,8107 5,42581 4,26473 5,26686 5,41945 4,34907
5,68352 4,0902 4,71023 3,71641 3,60707 6,6551 5,99882 4,59711 5,92308 4,79482
Gambar 3.63 Distribusi Proses Pemeriksaan 1 Badan Case Produk Case Tablet
Gambar 3.64 Distribusi Proses Pemotongan Dudukan Speaker Produk Case Tablet
Tabel 3.233 Waktu Proses Pencetakan Dudukan Speaker Produk Case Tablet
Waktu Proses Pencetakan
24,5289 24,554 24,6462 23,6359 26,316 25,1275 25,1372 24,949 23,9207 25,2895
23,2159 23,7354 25,8149 26,1834 24,1143 26,3301 24,3172 26,9991 24,4857 22,4349
25,4516 24,74 24,6947 24,8623 24,4753 25,9055 25,9338 24,1952 23,5063 24,2939
25,3343 25,8911 24,9023 25,3815 23,3253 24,7877 25,7589 24,5217 24,3905 26,122
25,3067 24,8267 24,1656 25,2183 26,436 24,1293 25,7664 25,3889 24,2977 23,1092
26,5243 23,5068 25,3059 23,7849 25,5789 25,1495 25,9677 25,8144 25,163 25,9339
24,2855 23,942 24,5136 25,3925 23,3627 24,3627 26,6453 25,8609 24,555 24,8786
25,3311 23,5704 24,7835 22,416 22,4868 24,8179 23,9913 25,4696 24,7414 25,2873
25,4104 25,174 25,9419 24,1384 26,0786 24,9687 24,8803 24,6345 25,5475 25,1665
24,8517 24,825 24,2679 24,0815 25,8332 25,0442 24,3804 26,1663 24,1225 23,9479
Gambar 3.65 Distribusi Proses Pencetakan Dudukan Speaker Produk Case Tablet
Tabel 3.234 Waktu Proses Pendinginan Dudukan Speaker Produk Case Tablet
Waktu Proses Pendinginan
29,7135 28,3615 29,2767 31,0988 30,9065 30,7508 31,4883 29,8784 29,1371 30,5402
30,0425 31,0789 30,1461 30,2767 30,1023 29,8055 29,8765 30,5948 29,1308 29,6069
29,8322 29,5692 29,2526 28,389 30,4616 28,7837 30,113 30,182 29,781 31,3787
29,8653 31,2255 30,0154 29,0337 28,7595 30,4115 31,7033 29,9697 29,4572 29,0802
30,2231 30,6695 31,0466 28,2383 30,6091 29,058 27,6774 29,6356 28,8865 30,445
27,6307 32,6225 31,7397 28,3147 28,7786 30,43 28,4835 29,2562 30,0106 29,6035
29,7565 29,2047 28,9165 31,2039 30,8805 30,9537 28,1124 29,2888 31,6367 27,967
28,3044 29,1618 30,5509 30,763 30,6186 28,5959 30,9623 29,7125 29,1174 29,1235
28,308 28,9896 30,0762 30,2177 29,9713 29,3466 31,8944 31,5381 30,5582 31,0626
28,4241 31,7109 28,0599 29,1113 28,6307 29,3934 29,9812 30,5668 29,2479 29,0694
Gambar 3.66 Distribusi Proses Pendinginan Dudukan Speaker Produk Case Tablet
Tabel 3.235 Waktu Proses Penghalusan Dudukan Speaker Produk Case Tablet
Waktu Proses Penghalusan
29,0612 30,2188 30,4246 29,4349 31,6385 30,2411 30,2255 30,8204 29,0609 31,2221
29,0315 30,2581 29,7051 30,257 29,3827 30,7584 30,9489 28,9315 30,5061 29,5682
30,5992 30,1385 30,6055 30,4597 30,1897 30,5149 29,217 30,0205 28,4671 30,4174
31,4874 31,0616 30,1957 29,5991 30,0036 29,7411 31,2034 30,1237 30,5382 30,5766
32,0719 30,1515 29,7273 30,4073 30,3898 30,1704 30,9474 29,8096 30,8069 31,1006
30,5983 30,2543 31,9991 29,2143 30,7134 30,594 29,6798 29,5043 31,077 30,2176
29,8834 30,5033 32,5043 31,3272 30,2417 28,7006 30,9943 30,1163 28,6528 30,1785
27,6774 31,2528 30,1557 29,503 29,0952 30,3206 29,68 30,253 31,2545 29,8398
27,5724 30,7757 29,4282 31,6734 31,9717 30,3339 30,1335 29,8714 29,4652 28,5979
29,8857 30,0857 28,3443 30,4316 30,14 29,9274 28,3574 30,3238 30,2083 29,3979
Gambar 3.67 Distribusi Proses Penghalusan Dudukan Speaker Produk Case Tablet
Tabel 3.236 Waktu Proses Pemeriksaan 1 Dudukan Speaker Produk Case Tablet
Waktu Proses Pemeriksaan 1
5,03286 5,55031 5,08582 7,79513 5,70415 5,29016 4,5933 5,35252 5,64772 5,44271
3,01369 4,88381 4,91157 5,61587 6,41071 4,25173 5,40363 6,2473 4,72003 4,8147
5,85913 5,04457 4,72885 5,1266 5,67976 5,15116 3,74467 4,85309 4,68766 5,39543
4,48557 4,25507 4,75196 5,94222 5,99844 3,3315 5,98419 4,39105 6,76783 4,19548
3,83124 3,48473 5,69721 6,75341 4,90903 4,34727 5,09942 4,95933 4,84597 4,22897
4,76716 4,56504 4,61489 5,45956 5,82758 6,29518 4,75763 4,48897 4,41491 3,94532
4,23339 4,55594 4,80364 3,94719 5,57215 2,53265 6,63121 5,63251 6,15852 4,78402
2,83352 5,85064 4,94194 4,82869 6,12534 4,83195 4,3332 4,6025 5,45599 5,18359
5,17418 6,80988 5,7847 4,56126 3,8107 5,42581 4,26473 5,26686 5,41945 4,34907
5,68352 4,0902 4,71023 3,71641 3,60707 6,6551 5,99882 4,59711 5,92308 4,79482
Gambar 3.68 Distribusi Proses Pemeriksaan 1 Dudukan Speaker Produk Case Tablet
Gambar 3.69 Distribusi Proses Pemotongan Airpods Receptacle Produk Case Tablet
Tabel 3.238 Waktu Proses Pencetakan Airpods Receptacle Produk Case Tablet
Waktu Proses Pencetakan
24,5289 24,554 24,6462 23,6359 26,316 25,1275 25,1372 24,949 23,9207 25,2895
23,2159 23,7354 25,8149 26,1834 24,1143 26,3301 24,3172 26,9991 24,4857 22,4349
25,4516 24,74 24,6947 24,8623 24,4753 25,9055 25,9338 24,1952 23,5063 24,2939
25,3343 25,8911 24,9023 25,3815 23,3253 24,7877 25,7589 24,5217 24,3905 26,122
25,3067 24,8267 24,1656 25,2183 26,436 24,1293 25,7664 25,3889 24,2977 23,1092
26,5243 23,5068 25,3059 23,7849 25,5789 25,1495 25,9677 25,8144 25,163 25,9339
24,2855 23,942 24,5136 25,3925 23,3627 24,3627 26,6453 25,8609 24,555 24,8786
25,3311 23,5704 24,7835 22,416 22,4868 24,8179 23,9913 25,4696 24,7414 25,2873
25,4104 25,174 25,9419 24,1384 26,0786 24,9687 24,8803 24,6345 25,5475 25,1665
24,8517 24,825 24,2679 24,0815 25,8332 25,0442 24,3804 26,1663 24,1225 23,9479
Gambar 3.70 Distribusi Proses Pencetakan Airpods Receptacle Produk Case Tablet
Tabel 3.239 Waktu Proses Pendinginan Airpods Receptacle Produk Case Tablet
Waktu Proses Pendinginan
29,7135 28,3615 29,2767 31,0988 30,9065 30,7508 31,4883 29,8784 29,1371 30,5402
30,0425 31,0789 30,1461 30,2767 30,1023 29,8055 29,8765 30,5948 29,1308 29,6069
29,8322 29,5692 29,2526 28,389 30,4616 28,7837 30,113 30,182 29,781 31,3787
29,8653 31,2255 30,0154 29,0337 28,7595 30,4115 31,7033 29,9697 29,4572 29,0802
30,2231 30,6695 31,0466 28,2383 30,6091 29,058 27,6774 29,6356 28,8865 30,445
27,6307 32,6225 31,7397 28,3147 28,7786 30,43 28,4835 29,2562 30,0106 29,6035
29,7565 29,2047 28,9165 31,2039 30,8805 30,9537 28,1124 29,2888 31,6367 27,967
28,3044 29,1618 30,5509 30,763 30,6186 28,5959 30,9623 29,7125 29,1174 29,1235
28,308 28,9896 30,0762 30,2177 29,9713 29,3466 31,8944 31,5381 30,5582 31,0626
28,4241 31,7109 28,0599 29,1113 28,6307 29,3934 29,9812 30,5668 29,2479 29,0694
Gambar 3.71 Distribusi Proses Pendinginan Airpods Receptacle Produk Case Tablet
Tabel 3.240 Waktu Proses Penghalusan Airpods Receptacle Produk Case Tablet
Waktu Proses Penghalusan
29,0612 30,2188 30,4246 29,4349 31,6385 30,2411 30,2255 30,8204 29,0609 31,2221
29,0315 30,2581 29,7051 30,257 29,3827 30,7584 30,9489 28,9315 30,5061 29,5682
30,5992 30,1385 30,6055 30,4597 30,1897 30,5149 29,217 30,0205 28,4671 30,4174
31,4874 31,0616 30,1957 29,5991 30,0036 29,7411 31,2034 30,1237 30,5382 30,5766
32,0719 30,1515 29,7273 30,4073 30,3898 30,1704 30,9474 29,8096 30,8069 31,1006
30,5983 30,2543 31,9991 29,2143 30,7134 30,594 29,6798 29,5043 31,077 30,2176
29,8834 30,5033 32,5043 31,3272 30,2417 28,7006 30,9943 30,1163 28,6528 30,1785
27,6774 31,2528 30,1557 29,503 29,0952 30,3206 29,68 30,253 31,2545 29,8398
27,5724 30,7757 29,4282 31,6734 31,9717 30,3339 30,1335 29,8714 29,4652 28,5979
29,8857 30,0857 28,3443 30,4316 30,14 29,9274 28,3574 30,3238 30,2083 29,3979
Gambar 3.72 Distribusi Proses Penghalusan Airpods Receptacle Produk Case Tablet
Tabel 3.241 Waktu Proses Pemeriksaan 1 Airpods Receptacle Produk Case Tablet
Waktu Proses Pemeriksaan 1
5,03286 5,55031 5,08582 7,79513 5,70415 5,29016 4,5933 5,35252 5,64772 5,44271
3,01369 4,88381 4,91157 5,61587 6,41071 4,25173 5,40363 6,2473 4,72003 4,8147
5,85913 5,04457 4,72885 5,1266 5,67976 5,15116 3,74467 4,85309 4,68766 5,39543
4,48557 4,25507 4,75196 5,94222 5,99844 3,3315 5,98419 4,39105 6,76783 4,19548
3,83124 3,48473 5,69721 6,75341 4,90903 4,34727 5,09942 4,95933 4,84597 4,22897
4,76716 4,56504 4,61489 5,45956 5,82758 6,29518 4,75763 4,48897 4,41491 3,94532
4,23339 4,55594 4,80364 3,94719 5,57215 2,53265 6,63121 5,63251 6,15852 4,78402
2,83352 5,85064 4,94194 4,82869 6,12534 4,83195 4,3332 4,6025 5,45599 5,18359
5,17418 6,80988 5,7847 4,56126 3,8107 5,42581 4,26473 5,26686 5,41945 4,34907
5,68352 4,0902 4,71023 3,71641 3,60707 6,6551 5,99882 4,59711 5,92308 4,79482
Gambar 3.73 Distribusi Proses Pemeriksaan 1 Airpods Receptacle Produk Case Tablet
Gambar 3.74 Distribusi Proses Assembly 1 HAST 01-02 Produk Case Tablet
Gambar 3.75 Distribusi Proses Assembly 2 HAST 02-01 Produk Case Tablet
Tabel 3.244 Waktu Proses Pemeriksaan 2 HAST 02-01 Produk Case Tablet
Waktu Proses Pemeriksaan 2
14,6013 14,5745 13,6511 13,8857 14,006 16,1993 16,5133 15,4514 15,2578 14,8517
14,7013 15,5308 14,2998 15,9682 15,868 18,0882 15,0204 16,727 14,9673 14,5728
15,7647 13,8167 15,5277 15,8228 15,0528 14,237 14,3866 15,8033 14,746 13,7881
15,4892 14,398 15,6014 15,8797 15,0261 14,215 14,1263 16,7664 13,9616 15,9868
14,3693 14,3459 15,6164 15,4174 14,065 13,7983 14,0686 16,265 16,1793 14,7587
13,9849 14,1428 16,4523 14,9758 13,603 14,496 15,2635 14,693 15,7964 15,4276
14,5145 14,347 13,3609 14,8474 15,1079 14,0996 15,3107 13,567 14,6332 14,3097
16,3329 16,1287 15,8985 16,4224 16,9701 15,2336 14,2294 17,1003 12,8164 15,5221
15,248 15,3808 16,5748 14,0451 14,5446 14,6222 14,4197 14,9696 14,4784 15,9782
16,998 15,8667 15,2096 16,194 14,5293 15,9489 16,1298 14,9485 15,2595 14,8105
Gambar 3.76 Distribusi Proses Pemeriksaan 2 HAST 02-01 Produk Case Tablet
Tabel 3.245 Waktu Proses Pengemasan HAST 02-01 Produk Case Tablet
Waktu Proses Pengemasan
20,6398 19,0096 19,3826 18,6437 21,3827 21,5492 20,6282 18,5545 19,8089 18,8865
20,3811 21,442 21,177 19,7098 18,5508 21,6444 19,6013 18,4283 20,8908 20,2428
19,7637 18,6463 19,8526 19,9377 20,6179 19,9205 20,0029 21,23 18,7693 19,2901
18,9773 17,9742 20,0505 19,7546 18,3562 19,8042 19,3662 20,4525 20,5859 22,549
20,4364 19,9006 19,319 18,6111 19,8302 22,2198 20,0343 21,0552 18,7124 21,9282
20,8548 20,3122 20,5999 20,7119 18,2751 19,3528 19,3643 19,5011 19,8629 19,6467
20,448 21,5815 21,1281 19,5707 19,5661 19,4671 20,3677 17,9352 20,6164 19,5335
18,9586 18,5089 17,9175 20,7662 21,7179 20,4414 19,7791 18,9296 20,7604 20,96
17,7308 19,4199 17,5909 20,9501 18,2325 21,0564 19,1026 17,97 18,3191 20,9231
18,5791 20,3975 18,8181 21,8017 20,6689 20,9541 20,2407 20,9643 19,56 19,4299
Gambar 3.77 Distribusi Proses Pengemasan HAST 02-01 Produk Case Tablet
Tabel 3.246 Rangkuman Waktu Proses Berdasarkan Distribusi Produk Case Tablet
Case Tablet
Komponen WC 10 WC 20 WC 30 WC 40 WC 50 WC 60 WC 70 WC 80 WC 90
BCT-03 12.3 + WEIB (2.95, 2.95) NORM(24.9, 0.939) 27.1 + 5.87 * BETA(3.4, 3.94) NORM(30.2, 0.892) NORM(5.02, 0.907)
DST-03 12.3 + WEIB (2.95, 2.95) NORM(24.9, 0.939) 27.1 + 5.87 * BETA(3.4, 3.94) NORM(30.2, 0.892) NORM(5.02, 0.907)
ART-02 12.3 + WEIB (2.95, 2.95) NORM(24.9, 0.939) 27.1 + 5.87 * BETA(3.4, 3.94) NORM(30.2, 0.892) NORM(5.02, 0.907)
HAST 01-02 NORM(110, 1)
HAST 02-01 NORM (120, 1.01) 12.3 + GAMM(0.357, 7.9) 17.1 + 5.91 * BETA(2.87, 3.2)
Contoh Perhitungan:
1. Waktu Tempuh
Keterangan:
Waktu Tempuh = (
5000 )
16,80
x 3600
Waktu Tempuh = (
5000 )
28,68
x 3600
Waktu Tempuh = (
3750 )
4,54
x 3600
Badan Case HP
0
Gambar 3.78 Modul Create Badan Case HP
Dudukan Wireless
Speaker HP
0
Gambar 3.80 Modul Create Dudukan Wireless Speaker HP
Airpods
Receptacle HP
0
Gambar 3.82 Modul Create Airpods Receptacle HP
Badan Case
TABLET
0
Gambar 3.84 Modul Create Badan Case TABLET
Dudukan Wireless
Speaker TABLET
0
Gambar 3.86 Modul Create Dudukan Wireless Speaker TABLET
Gambar 3.87 Dialog Box Modul Create Dudukan Wireless Speaker TABLET
Airpods
Receptacle
TABLET
0
Gambar 3.88 Modul Create Airpods Receptacle TABLET
2. Modul Assign
SET BCH
SET DSH
SET ARH
SET BCT
SET DST
SET ART
Pengaturan
Proses
HASH0201
Packed
HAST0201
Packed
3. Modul Station
Receiving
WC 10 Pemotongan
BCH dan BCT
Gambar 3.113 Dialog Box Modul Station WC 10 Pemotongan BCH dan BCT
WC 10 Pemotongan
DSH dan DST
Gambar 3.115 Dialog Box Modul Station WC 10 Pemotongan DSH dan DST
WC 10
Pemotongan ARH
dan ART
Gambar 3.116 Modul Station WC 10 Pemotongan ARH dan ART
Gambar 3.117 Dialog Box Modul Station WC 10 Pemotongan ARH dan ART
WC 20 Pencetakan
BCH dan BCT
Gambar 3.119 Dialog Box Modul Station WC 20 Pencetakan BCH dan BCT
WC 20 Pencetakan
DSH dan DST
Gambar 3.121 Dialog Box Modul Station WC 20 Pencetakan DSH dan DST
WC 20 Pencetakan
ARH dan ART
Gambar 3.123 Dialog Box Modul Station WC 20 Pencetakan ARH dan ART
WC 30
Pendinginan BCH
dan BCT
Gambar 3.124 Modul Station WC 30 Pendinginan BCH dan BCT
Gambar 3.125 Dialog Box Modul Station WC 30 Pendinginan BCH dan BCT
WC 30 Pendinginan
DSH dan DST
Gambar 3.127 Dialog Box Modul Station WC 30 Pendinginan DSH dan DST
WC 30 Pendinginan
ARH dan ART
Gambar 3.129 Dialog Box Modul Station WC 30 Pendinginan ARH dan ART
WC 40
Penghalusan BCH
dan BCT
Gambar 3.130 Modul Station WC 40 Penghalusan BCH dan BCT
Gambar 3.131 Dialog Box Modul Station WC 40 Penghalusan BCH dan BCT
WC 40
Penghalusan DSH
dan DST
Gambar 3.132 Modul Station WC 40 Penghalusan DSH dan DST
Gambar 3.133 Dialog Box Modul Station WC 40 Penghalusan DSH dan DST
WC 40
Penghalusan ARH
dan ART
Gambar 3.134 Modul Station WC 40 Penghalusan ARH dan ART
Gambar 3.135 Dialog Box Modul Station WC 40 Penghalusan ARH dan ART
WC 50
Pemeriksaan 1
WC 60 Assembly
1 BCH
WC 60 Assembly
1 DSH
WC 60
HASH0102
WC 60 Assembly
1 BCT
WC 60 Assembly
1 DST
WC 60
HAST0102
WC 70 Assembly
2 HASH0102
WC 70 Assembly
2 ARH
WC 70
HASH0201
WC 70 Assembly
2 HAST0102
WC 70 Assembly
2 ART
WC 70
HAST0201
WC 80
Pemeriksaan 2
HASH0201
Gambar 3.162 Modul Station WC 80 Pemeriksaan 2 HASH0201
WC 80
Pemeriksaan 2
HAST0201
Gambar 3.164 Modul Station WC 80 Pemeriksaan 2 HAST0201
WC 90
Pengemasan
Shipping HP
Shipping Tablet
4. Modul Route
Dari Receiving
Dari WC 10
Pemotongan
BCH dan BCT
Gambar 3.175 Modul Route Dari WC 10 Pemotongan BCH dan BCT
Gambar 3.176 Dialog Box Modul Route Dari WC 10 Pemotongan BCH dan BCT
Dari WC 10
Pemotongan
DSH dan DST
Gambar 3.177 Modul Route Dari WC 10 Pemotongan DSH dan DST
Gambar 3.178 Dialog Box Modul Route Dari WC 10 Pemotongan DSH dan DST
Dari WC 10
Pemotongan
ARH dan ART
Gambar 3.179 Modul Route Dari WC 10 Pemotongan ARH dan ART
Gambar 3.180 Dialog Box Modul Route Dari WC 10 Pemotongan ARH dan ART
Dari WC 20
Pencetakan BCH
dan BCT
Gambar 3.181 Modul Route Dari WC 20 Pencetakan BCH dan BCT
Gambar 3.182 Dialog Box Modul Route Dari WC 20 Pencetakan BCH dan BCT
Dari WC 20
Pencetakan DSH
dan DST
Gambar 3.183 Modul Route Dari WC 20 Pencetakan DSH dan DST
Gambar 3.184 Dialog Box Modul Route Dari WC 20 Pencetakan DSH dan DST
Dari WC 20
Pencetakan ARH
dan ART
Gambar 3.185 Modul Route Dari WC 20 Pencetakan ARH dan ART
Gambar 3.186 Dialog Box Modul Route Dari WC 20 Pencetakan ARH dan ART
Dari WC 30
Pendinginan
BCH dan BCT
Gambar 3.187 Modul Route Dari WC 30 Pendinginan BCH dan BCT
Gambar 3.188 Dialog Box Modul Route Dari WC 30 Pendinginan BCH dan BCT
Dari WC 30
Pendinginan
DSH dan DST
Gambar 3.189 Modul Route Dari WC 30 Pendinginan DSH dan DST
Gambar 3.190 Dialog Box Modul Route Dari WC 30 Pendinginan DSH dan DST
Dari WC 30
Pendinginan
ARH dan ART
Gambar 3.191 Modul Route Dari WC 30 Pendinginan ARH dan ART
Gambar 3.192 Dialog Box Modul Route Dari WC 30 Pendinginan ARH dan ART
Dari WC 40
Penghalusan
BCH dan BCT
Gambar 3.193 Modul Route Dari WC 40 Penghalusan BCH dan BCT
Gambar 3.194 Dialog Box Modul Route Dari WC 40 Penghalusan BCH dan BCT
Dari WC 40
Penghalusan
DSH dan DST
Gambar 3.195 Modul Route Dari WC 40 Penghalusan DSH dan DST
Gambar 3.196 Dialog Box Modul Route Dari WC 40 Penghalusan DSH dan DST
Dari WC 40
Penghalusan
ARH dan ART
Gambar 3.197 Modul Route Dari WC 40 Penghalusan ARH dan ART
Gambar 3.198 Dialog Box Modul Route Dari WC 40 Penghalusan ARH dan ART
Dari WC 50
Pemeriksaan 1
HP
Gambar 3.199 Modul Route Dari WC 50 Pemeriksaan 1 HP
Dari WC 50
Pemeriksaan 1
Tablet
Gambar 3.201 Modul Route Dari WC 50 Pemeriksaan 1 Tablet
Dari WC 60
Assembly 1 HP
Dari WC 60
Assembly 1
Tablet
Gambar 3.205 Modul Route Dari WC 60 Assembly 1 Tablet
Dari WC 70
Assembly 2 HP
Dari WC 70
Assembly 2
Tablet
Gambar 3.209 Modul Route Dari WC 70 Assembly 2 Tablet
Dari WC 80
Pemeriksaan 2
HASH0201
Gambar 3.211 Modul Route Dari WC 80 Pemeriksaan 2 HASH0201
Dari WC 80
Pemeriksaan 2
HAST0201
Gambar 3.213 Modul Route Dari WC 80 Pemeriksaan 2 HAST0201
Dari WC 90
Pengemasan
HASH0201
Gambar 3.215 Modul Route Dari WC 90 Pengemasan HASH0201
Dari WC 90
Pengemasan
HAST0201
Gambar 3.217 Modul Route Dari WC 90 Pengemasan HAST0201
5. Modul Process
Pemotongan
BCH
0
Gambar 3.220 Modul Process Pemotongan BCH
Pemotongan
BCT
0
Gambar 3.222 Modul Process Pemotongan BCT
Pemotongan
DSH
0
Gambar 3.224 Modul Process Pemotongan DSH
Pemotongan
DST
0
Gambar 3.226 Modul Process Pemotongan DST
Pemotongan
ARH
0
Gambar 3.228 Modul Process Pemotongan ARH
Pemotongan
ART
0
Gambar 3.230 Modul Process Pemotongan ART
Pencetakan BCH
0
Gambar 3.232 Modul Process Pencetakan BCH
Pencetakan BCT
0
Gambar 3.234 Modul Process Pencetakan BCT
Pencetakan DSH
0
Gambar 3.236 Modul Process Pencetakan DSH
Pencetakan DST
0
Gambar 3.238 Modul Process Pencetakan DST
Pencetakan ARH
0
Gambar 3.240 Modul Process Pencetakan ARH
Pencetakan ART
0
Gambar 3.242 Modul Process Pencetakan ART
Pendinginan
BCH
0
Gambar 3.244 Modul Process Pendinginan BCH
Pendinginan
BCT
0
Gambar 3.246 Modul Process Pendinginan BCT
Pendinginan
DSH
0
Gambar 3.248 Modul Process Pendinginan DSH
Pendinginan
DST
0
Gambar 3.250 Modul Process Pendinginan DST
Pendinginan
ARH
0
Gambar 3.252 Modul Process Pendinginan ARH
Pendinginan
ART
0
Gambar 3.254 Modul Process Pendinginan ART
Penghalusan
BCH
0
Gambar 3.256 Modul Process Penghalusan BCH
Penghalusan
BCT
0
Gambar 3.258 Modul Process Penghalusan BCT
Penghalusan
DSH
0
Gambar 3.260 Modul Process Penghalusan DSH
Penghalusan
DST
0
Gambar 3.262 Modul Process Penghalusan DST
Penghalusan
ARH
0
Gambar 3.264 Modul Process Penghalusan ARH
Penghalusan
ART
0
Gambar 3.266 Modul Process Penghalusan ART
Pemeriksaan 1
HP
0
Gambar 3.268 Modul Process Pemeriksaan 1 HP
Pemeriksaan 1
Tablet
0
Gambar 3.270 Modul Process Pemeriksaan 1 Tablet
Assembly 1
HASH0102
0
Gambar 3.272 Modul Process Assembly 1 HASH0102
Assembly 1
HAST0102
0
Gambar 3.274 Modul Process Assembly 1 HAST0102
Assembly 2
HASH0201
0
Gambar 3.276 Modul Process Assembly 2 HASH0201
Assembly 2
HAST0201
0
Gambar 3.278 Modul Process Assembly 2 HAST0201
Pemeriksaan 2
HASH0201
0
Gambar 3.280 Modul Process Pemeriksaan 2 HASH0201
Pemeriksaan 2
HAST0201
0
Gambar 3.282 Modul Process Pemeriksaan 2 HAST0201
Pengemasan
HASH0201
0
Gambar 3.284 Modul Process Pengemasan HASH0201
Pengemasan
HAST0201
0
Gambar 3.286 Modul Process Pengemasan HAST0201
6. Modul Match
Pemasangan
BCH dan DSH
Gambar 3.291 Dialog Box Modul Match Pemasangan BCH dan DSH
Pemasangan
BCT dan DST
Gambar 3.293 Dialog Box Modul Match Pemasangan BCT dan DST
Pemasangan
HASH0102 dan
ARH
Gambar 3.294 Modul Match Pemasangan HASH0102 dan ARH
Gambar 3.295 Dialog Box Modul Match Pemasangan HASH0102 dan ARH
Pemasangan
HAST0102 dan
ART
Gambar 3.296 Modul Match Pemasangan HAST0102 dan ART
Gambar 3.297 Dialog Box Modul Match Pemasangan HAST0102 dan ART
7. Modul Batch
Penggabungan
HASH0102
0
Gambar 3.299 Modul Batch Penggabungan HASH0102
Penggabungan
HAST0102
0
Gambar 3.301 Modul Batch Penggabungan HAST0102
Penggabungan
HASH0201
0
Gambar 3.303 Modul Batch Penggabungan HASH0201
Penggabungan
HAST0201
0
Gambar 3.305 Modul Batch Penggabungan HAST0201
8. Modul Decide
0
Pemotongan BCH atau True
BCT
0 False
Gambar 3.309 Dialog Box Modul Decide Pemotongan BCH atau BCT
0
Pemotongan DSH atau True
DST
0 False
Gambar 3.311 Dialog Box Modul Decide Pemotongan DSH atau DST
0
Pemotongan ARH atau True
ART
0 False
Gambar 3.313 Dialog Box Modul Decide Pemotongan ARH atau ART
0
Pencetakan BCH atau True
BCT
0 False
Gambar 3.315 Dialog Box Modul Decide Pencetakan BCH atau BCT
0
Pencetakan DSH atau True
DST
0 False
Gambar 3.317 Dialog Box Modul Decide Pencetakan DSH atau DST
0
Pencetakan ARH atau True
ART
0 False
Gambar 3.319 Dialog Box Modul Decide Pencetakan ARH atau ART
0
Pendinginan BCH atau True
BCT
0 False
Gambar 3.321 Dialog Box Modul Decide Pendinginan BCH atau BCT
0
Pendinginan DSH atau True
DST
0 False
Gambar 3.323 Dialog Box Modul Decide Pendinginan DSH atau DST
0
Pendinginan ARH atau True
ART
0 False
Gambar 3.325 Dialog Box Modul Decide Pendinginan ARH atau ART
0
Penghalusan BCH True
atau BCT
0 False
Gambar 3.327 Dialog Box Modul Decide Penghalusan BCH atau BCT
0
Penghalusan DSH True
atau DST
0 False
Gambar 3.329 Dialog Box Modul Decide Penghalusan DSH atau DST
0
Penghalusan ARH True
atau ART
0 False
Gambar 3.331 Dialog Box Modul Decide Penghalusan ARH atau ART
Pemeriksaan 1
Else
Entity.Type==BCH
Entity.Type==DSH
Entity.Type==ARH
Entity.Type==BCT
Entity.Type==DST
0
Barang Bagus True
Pemeriksaan 1 HP
0 False
0
Barang Bagus True
Pemeriksaan 1 Tablet
0 False
Gambar 3.337 Dialog Box Modul Decide Barang Bagus Pemeriksaan 1 Tablet
0 False
Gambar 3.339 Dialog Box Modul Decide Barang Bagus Pemeriksaan 2 HASH0201
0 False
Gambar 3.341 Dialog Box Modul Decide Barang Bagus Pemeriksaan 2 HAST0201
0
Pengemasan HP atau True
Tablet
0 False
9. Modul Record
Record Reject
Pemeriksaan 1
HP
Record Reject
Pemeriksaan
1Tablet
Record Reject
Pemeriksaan 2
HASH0201
Record Reject
Pemeriksaan 2
HAST0201
Record Aircase
HP Jadi
Record Aircase
Tablet Jadi
Reject
Pemeriksaan 1
HP
0
Gambar 3.358 Modul Dispose Reject Pemeriksaan 1 HP
Reject
Pemeriksaan 1
Tablet
0
Gambar 3.360 Modul Dispose Reject Pemeriksaan 1 Tablet
Reject
Pemeriksaan 2
HASH0201
0
Gambar 3.362 Modul Dispose Reject Pemeriksaan 2 HASH0201
Reject
Pemeriksaan 2
HAST0201
0
Gambar 3.364 Modul Dispose Reject Pemeriksaan 2 HAST0201
Aircase HP Jadi
0
Gambar 3.366 Modul Dispose Aircase HP Jadi
Aircase Tablet
Jadi
0
Gambar 3.368 Modul Dispose Aircase Tablet Jadi
Write
Kedatangan
BCH
Gambar 3.371 Modul ReadWrite Write Kedatangan BCH
Write
Kedatangan
DSH
Gambar 3.373 Modul ReadWrite Write Kedatangan DSH
Write
Kedatangan
ARH
Gambar 3.375 Modul ReadWrite Write Kedatangan ARH
Write
Kedatangan
BCT
Gambar 3.377 Modul ReadWrite Write Kedatangan BCT
Write
Kedatangan
DST
Gambar 3.379 Modul ReadWrite Write Kedatangan DST
Write
Kedatangan
ART
Gambar 3.381 Modul ReadWrite Write Kedatangan ART
Write Proses
Pemotongan
BCH
Gambar 3.383 Modul ReadWrite Write Proses Pemotongan BCH
Gambar 3.384 Dialog Box Modul ReadWrite Write Proses Pemotongan BCH
Write Proses
Pemotongan
BCT
Gambar 3.385 Modul ReadWrite Write Proses Pemotongan BCT
Gambar 3.386 Dialog Box Modul ReadWrite Write Proses Pemotongan BCT
Write Proses
Pemotongan
DSH
Gambar 3.387 Modul ReadWrite Write Proses Pemotongan DSH
Gambar 3.388 Dialog Box Modul ReadWrite Write Proses Pemotongan DSH
Write Proses
Pemotongan
DST
Gambar 3.389 Modul ReadWrite Write Proses Pemotongan DST
Gambar 3.390 Dialog Box Modul ReadWrite Write Proses Pemotongan DST
Write Proses
Pemotongan
ARH
Gambar 3.391 Modul ReadWrite Write Proses Pemotongan ARH
Gambar 3.392 Dialog Box Modul ReadWrite Write Proses Pemotongan ARH
Write Proses
Pemotongan
ART
Gambar 3.393 Modul ReadWrite Write Proses Pemotongan ART
Gambar 3.394 Dialog Box Modul ReadWrite Write Proses Pemotongan ART
Write Proses
Pencetakan
BCH
Gambar 3.395 Modul ReadWrite Write Proses Pencetakan BCH
Gambar 3.396 Dialog Box Modul ReadWrite Write Proses Pencetakan BCH
Write Proses
Pencetakan
BCT
Gambar 3.397 Modul ReadWrite Write Proses Pencetakan BCH
Gambar 3.398 Dialog Box Modul ReadWrite Write Proses Pencetakan BCH
Write Proses
Pencetakan
DSH
Gambar 3.399 Modul ReadWrite Write Proses Pencetakan DSH
Gambar 3.400 Dialog Box Modul ReadWrite Write Proses Pencetakan DSH
Write Proses
Pencetakan
DST
Gambar 3.401 Modul ReadWrite Write Proses Pencetakan DST
Gambar 3.402 Dialog Box Modul ReadWrite Write Proses Pencetakan DST
Write Proses
Pencetakan
ARH
Gambar 3.403 Modul ReadWrite Write Proses Pencetakan ARH
Gambar 3.404 Dialog Box Modul ReadWrite Write Proses Pencetakan ARH
Write Proses
Pencetakan ART
Gambar 3.406 Dialog Box Modul ReadWrite Write Proses Pencetakan ART
Write Proses
Pendinginan
BCH
Gambar 3.407 Modul ReadWrite Write Proses Pendinginan BCH
Gambar 3.408 Dialog Box Modul ReadWrite Write Proses Pendinginan BCH
Write Proses
Pendinginan
BCT
Gambar 3.409 Modul ReadWrite Write Proses Pendinginan BCH
Gambar 3.410 Dialog Box Modul ReadWrite Write Proses Pendinginan BCH
Write Proses
Pendinginan
DSH
Gambar 3.411 Modul ReadWrite Write Proses Pendinginan DSH
Gambar 3.412 Dialog Box Modul ReadWrite Write Proses Pendinginan DSH
Write Proses
Pendinginan
DST
Gambar 3.413 Modul ReadWrite Write Proses Pendinginan DST
Gambar 3.414 Dialog Box Modul ReadWrite Write Proses Pendinginan DST
Write Proses
Pendinginan
ARH
Gambar 3.415 Modul ReadWrite Write Proses Pendinginan ARH
Gambar 3.416 Dialog Box Modul ReadWrite Write Proses Pendinginan ARH
Write Proses
Pendinginan
ART
Gambar 3.417 Modul ReadWrite Write Proses Pendinginan ART
Gambar 3.418 Dialog Box Modul ReadWrite Write Proses Pendinginan ART
Write Proses
Penghalusan
BCH
Gambar 3.419 Modul ReadWrite Write Proses Penghalusan BCH
Gambar 3.420 Dialog Box Modul ReadWrite Write Proses Penghalusan BCH
Write Proses
Penghalusan
BCT
Gambar 3.421 Modul ReadWrite Write Proses Penghalusan BCT
Gambar 3.422 Dialog Box Modul ReadWrite Write Proses Penghalusan BCT
Write Proses
Penghalusan
DSH
Gambar 3.423 Modul ReadWrite Write Proses Penghalusan DSH
Gambar 3.424 Dialog Box Modul ReadWrite Write Proses Penghalusan DSH
Write Proses
Penghalusan
DST
Gambar 3.425 Modul ReadWrite Write Proses Penghalusan DST
Gambar 3.426 Dialog Box Modul ReadWrite Write Proses Penghalusan DST
Write Proses
Penghalusan
ARH
Gambar 3.427 Modul ReadWrite Write Proses Penghalusan ARH
Gambar 3.428 Dialog Box Modul ReadWrite Write Proses Penghalusan ARH
Write Proses
Penghalusan
ART
Gambar 3.429 Modul ReadWrite Write Proses Penghalusan ART
Gambar 3.430 Dialog Box Modul ReadWrite Write Proses Penghalusan ART
Write Proses
Pemeriksaan 1
HP
Gambar 3.431 Modul ReadWrite Write Proses Pemeriksaan 1 HP
Write Proses
Pemeriksaan 1
Tablet
Gambar 3.433 Modul ReadWrite Write Proses Pemeriksaan 1 Tablet
Gambar 3.434 Dialog Box Modul ReadWrite Write Proses Pemeriksaan 1 Tablet
Write Proses
Assembly 1
HASH0102
Gambar 3.435 Modul ReadWrite Write Proses Assembly 1 HASH0102
Write Proses
Assembly 1
HAST0102
Gambar 3.437 Modul ReadWrite Write Proses Assembly 1 HAST0102
Gambar 3.438 Dialog Box Modul ReadWrite Write Proses Assembly 1 HAST0102
Write Proses
Assembly 2
HASH0201
Gambar 3.439 Modul ReadWrite Write Proses Assembly 2 HASH0201
Write Proses
Assembly 2
HAST0201
Gambar 3.441 Modul ReadWrite Write Proses Assembly 2 HAST0201
Gambar 3.442 Dialog Box Modul ReadWrite Write Proses Assembly 2 HAST0201
Write Proses
Pemeriksaan 2
HASH0201
Gambar 3.443 Modul ReadWrite Write Proses Pemeriksaan 2 HASH0201
Write Proses
Pemeriksaan 2
HAST0201
Gambar 3.445 Modul ReadWrite Write Proses Pemeriksaan 2 HAST0201
Write Proses
Pengemasan
HASH0201
Gambar 3.447 Modul ReadWrite Write Proses Pengemasan HASH0201
Write Proses
Pengemasan
HAST0201
Gambar 3.449 Modul ReadWrite Write Proses Pengemasan HAST0201
Mesin Pemotong
Mesin Cetak
Mesin Pendingin
Mesin Penghalus
Meja Perakitan
Meja Periksa
Meja Pengemasan
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 1
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 1
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 2
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 1
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 1
a. Pemotongan
b. Pencetakan
c. Pendinginan
d. Penghalusan
e. Pemeriksaan 1
f. Assembly 2
b. Setelah Running
b. Setelah Running
digunakan untuk merekam data yang masuk dan melewati pada setiap prosesnya.
Lalu yang terakhir, modul dispose digunakan untuk titik akhir dari produk yang
reject dan produk aircase handphone dan tablet jadi.
2. Trace
III.12.2.2 Validasi
III.12.2.2.1 Hasil Perekaman Data Simulasi
1. Rangkuman Validasi Case Handphone
Tabel 3.250 Rangkuman Validasi Case Handphone
HP
Aktivitas Unit
Kedatangan BCH 1105
Kedatangan DSH 1105
Kedatangan ARH 1105
Proses Pemotongan BCH 1105
Proses Pemotongan DSH 1105
Proses Pemotongan ARH 1105
Proses Pencetakan BCH 1105
Proses Pencetakan DSH 1105
Proses Pencetakan ARH 1105
Proses Pendinginan BCH 1105
Proses Pendinginan DSH 1105
Proses Pendinginan ARH 1105
Proses Penghalusan BCH 1105
Proses Penghalusan DSH 1105
Proses Penghalusan ARH 1105
Proses Pemeriksaan 1 HP 1105
Proses Assembly 1 HASH0102 708
Proses Assembly 2 HASH0201 705
Proses Pemeriksaan 2 HASH0201 705
Proses Pengemasan HASH0201 703
diurutkan aktivitas entity dari setiap waktunya dan setelah itu dapat dilihat apakah
program yang direncanakan sudah sesuai atau belum.
Selanjutnya, dengan melakukan validasi yang tentunya berfungsi untuk
meningkatkan keakuratan yang nantinya akan mengurangi resiko kesalahan dalam
data yang dimasukkan dan mempermudah dalam penggunaan yang lebih banyak
dengan hanya menampilkan pilihan yang terpenting dari yang disajikan. Dalam
melakukan validasi hal pertama yang harus dilakukan adalah dengan merekap
data komponen-komponen setiap kedatangan bahan baku sampai pengemasan
yang didapatkan dari modul readwrite, karena modul readwrite ini berfungsi
sebagai pembaca atau penulis untuk setiap waktu pada dari dimulainya
kedatangan komponen dan waktu proses komponen dari setiap workcenter nya,
hasil dari data ini nantinya akan tersimpan sesuai dengan penyimpanan file yang
terdapat pada modul data file yang sudah dibuat. Data yang diperoleh untuk
memvalidasikan model dimasukan kedalam Microsoft Excel untuk kemudian
direkap sehingga mendapatkan jumlah produk yang selesai di produksi untuk
setiap prosesnya.
Pada proses validasi dari produk case handphone diketahui bahwa
kedatangan bahan baku per harinya sebanyak 1105 unit, lalu untuk case tablet
diketahui bahwa kedatangan bahan baku per harinya sebanyak 459 unit. Namun,
setelah berjalannya simulasi didapatkan hasil dimana total unit yang keluar dari
setiap proses untuk produk case handphone didapatkan sebanyak 703 unit dan
untuk produk case tablet didapatkan sebanyak 458 Unit. Sehingga total jumlah
unit yang keluar dari proses sebanyak 1161 unit. Dari hasil tersebut terdapat
kondisi dimana produk hasil assembly 2 (HASH0201) yang telah melakukan
proses pengemasan belum mencapai departemen shipping sehingga yang tercatat
pada hasil hanya sejumlah 702 unit. Selain itu, terdapat kondisi dimana belum
termasuk didalamnya produk yang mengalami reject diantaranya pada proses
pemeriksaan 1 untuk case handphone terdapat 1 (satu) produk yang mengalami
reject dan pada proses pemeriksaan 2 untuk case tablet terdapat pula 1 (satu)
produk yang mengalami reject. Sehingga total produk yang telah keluar sebanyak
1162 unit.
Contoh Perhitungan:
1. Biaya Bahan Baku Komponen Utama
Biaya Bahan Polycarbonate (BCH-03) – Tahun 1
- Prod/Tahun = 9 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 17.280 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 17.280 = Rp 380.160.000
Biaya Bahan Polycarbonate (DSH-03) – Tahun 1
- Prod/Tahun = 1 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 1.920 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 1.920 = Rp 42.240.000
Biaya Bahan Polycarbonate (ARH-02) – Tahun 1
- Prod/Tahun = 2 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 3.840 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 3.840 = Rp 84.480.000
Contoh Perhitungan:
1. Biaya Bahan Baku Komponen Tambahan
Biaya Bahan Bluetooth Speaker – Tahun 1
- Prod/Tahun = 16 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 30.720 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 211.000 x 30.720 = Rp 6.481.920.000
Biaya Bahan Vynil – Tahun 1
- Prod/Tahun = 16 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 30.720 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 8.700 x 30.720 = Rp 267.264.000
Biaya Bahan Kardus – Tahun 1
- Prod/Tahun = 4 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 7.680 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 15.000 x 7.680 = Rp 115.200.000
Contoh Perhitungan:
1. Biaya Bahan Baku Komponen Utama
Biaya Bahan Polycarbonate (BCH-03) – Tahun 1
- Prod/Tahun = 8 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 15.360 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 15.360 = Rp 337.920.000
Biaya Bahan Polycarbonate (DSH-03) – Tahun 1
- Prod/Tahun = 1 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 1.920 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 1.920 = Rp 42.240.000
Biaya Bahan Polycarbonate (ARH-02) – Tahun 1
- Prod/Tahun = 1 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 1.920 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 22.000 x 1.920 = Rp 42.240.000
Contoh Perhitungan:
1. Biaya Bahan Baku Komponen Utama
Biaya Bahan Bluetooth Speaker – Tahun 1
- Prod/Tahun = 7 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 13.440 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 211.000 x 13.440 = Rp 2.835.840.000
Biaya Bahan Vynil – Tahun 1
- Prod/Tahun = 7 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 13.440 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 8.700 x 13.440 = Rp 116.928.000
Biaya Bahan Kardus – Tahun 1
- Prod/Tahun = 2 Unit x 8 Jam x 5 Hari x 4 Minggu x 12 Bulan = 3.840 Unit
- Biaya = Harga Ukuran Terima x Prod/Tahun = Rp. 15.000 x 3.840 = Rp 76.800.000
Contoh Perhitungan:
1. Gaji Tenaga Kerja Langsung
Operator Mesin Potong
- Upah/Bulan = Rp 3.444.825
- Upah/Hari = Upah/Bulan ÷ Hari Kerja
Upah/Hari = Rp 3.444.825 ÷ 20 Hari
Upah/Hari = Rp. 172.241
- Upah/Minggu = Upah/Hari x Jumlah Minggu dalam Satu Bulan
Upah/Minggu = Rp 172.241 x 4 Minggu
Upah/Minggu = Rp 861.206
- Upah/Tahun = Upah/Bulan x Jumlah Bulan dalam Satu Tahun
Upah/Tahun = Rp 3.444.825 x 12 Bulan
Upah/Tahun = Rp 41.337.900
- Total Biaya = Upah/Tahun x Jumlah Tenga Kerja
Total Biaya = Rp 41.337.900 x 4 Orang
Total Biaya = Rp 165.351.600
Contoh Perhitungan:
1. Gaji Tenaga Kerja Langsung
Direktur Utama
- Upah/Bulan = Rp 25.000.000
- Upah/Hari = Upah/Bulan ÷ Hari Kerja
Upah/Hari = Rp 25.000.000 ÷ 20 Hari
Upah/Hari = Rp. 1.250.000
- Upah/Minggu = Upah/Hari x Jumlah Minggu dalam Satu Bulan
Upah/Minggu = Rp. 1.250.000 x 4 Minggu
Upah/Minggu = Rp 6.250.000
- Upah/Tahun = Upah/Bulan x Jumlah Bulan dalam Satu Tahun
Upah/Tahun = Rp 6.250.000 x 12 Bulan
Upah/Tahun = Rp 300.000.000
- Total Biaya = Upah/Tahun x Jumlah Tenga Kerja
Total Biaya = Rp 300.000.000 x 1 Orang
Total Biaya = Rp 300.000.000
Tabel 4.15 Rekapitulasi Total Biaya Tenaga Kerja dan Bahan Baku
Periode TH1 TH2 TH3 TH4 TH5
Biaya Tenaga Kerja (Langsung dan Tidak Langsung) Rp 5.191.573.354 Rp 5.191.573.354 Rp 5.191.573.354 Rp 5.191.573.354 Rp 5.191.573.354
Biaya Bahan Baku Rp 16.939.392.000 Rp 18.972.119.040 Rp 21.248.773.325 Rp 23.798.626.124 Rp 26.654.461.259
Total Rp 22.130.965.354 Rp 24.163.692.394 Rp 26.440.346.679 Rp 28.990.199.478 Rp 31.846.034.613
Contoh Perhitungan:
1. Total Biaya Tenaga Kerja dan Bahan Baku
Tahun Ke-1
- Total Biaya = Biaya Tenaga Kerja + Total Biaya Bahan
Total Biaya = Rp 5.191.573.354 + Rp 16.939.392.000
Total Biaya = Rp 22.130.965.354
Tahun Ke-2
- Total Biaya = Biaya Tenaga Kerja + Total Biaya Bahan
Total Biaya = Rp 5.191.573.354 + Rp 18.972.119.040
Total Biaya = Rp 24.163.692.394
Tahun Ke-3
- Total Biaya = Biaya Tenaga Kerja + Total Biaya Bahan
Total Biaya = Rp 5.191.573.354 + Rp 21.248.773.325
Total Biaya = Rp 26.440.346.679
Contoh Perhitungan:
1. Investasi dan Depresiasi
Tanah
- Harga = Rp 450.000
- Total Harga = Jumlah/STD x Harga
Total Harga = 7700,55x Rp 450.000
Total Harga = Rp 3.465.247.500
Bangunan Tertutup
- Harga = Rp 225.000
- Nilai Sisa = Harga x 15% per tahun
Nilai Sisa = Rp 225.000 x 15%
Contoh Perhitungan:
1. Jumlah Investasi
Jumlah Investasi = Rp 5. 717.977.184
2. Modal Kerja
Modal Kerja = Total Biaya Bahan Baku dan Tenaga Kerja
Modal Kerja = Rp 22.130.965.354
- Perputaran Modal per 2 Bulan
Modal Kerja per 2 Bulan = (Modal Kerja / 12) x 2 Bulan
Modal Kerja per 2 Bulan = (Rp 22.130.965.354 / 12) x 2
Modal Kerja per 2 Bulan = Rp 3.688.494.226
3. Kebutuhan Modal = Jumlah Investasi + Modal Kerja
Kebutuhan Modal = Rp 5. 717.977.184 + Rp 22.130.965.354
Kebutuhan Modal = Rp 27.848.942.538
4. Plafon Pinjaman = 40%
5. Jumlah Pinjaman = Plafon Pinjaman x Kebutuhan Modal
Jumlah Pinjaman = 40% x Rp 27.848.942.538
Jumlah Pinjaman = Rp 11.139.577.015
6. Modal Sendiri = Kebutuhan Modal – Jumlah Pinjaman
Modal Sendiri = Rp 27.848.942.538– Rp 11.139.577.015
Modal Sendiri = Rp 16.709.365.523
Contoh Perhitungan:
1. Bunga Kredit
Bunga Kredit (i)= 6,06%
2. Pinjaman
Pinjaman (P) = Rp 11.139.577.015
3. Pembayaran
i x (1 + i) n 6,06 x (1 + 6,06)5
A/P = P x = Rp 11.139.577.015 x = Rp
(1 + i)n - 1 (1 + 6,06) 5 - 1
2.648.813.408
4. Bunga Kredit, Angsuran Pokok, dan Sisa Pinjaman Per Tahun
Tahun Ke-1
- Bunga Kredit = Pinjaman x Bunga Kredit
Bunga Kredit = Rp 11.139.577.015 x 6,06%
Bunga Kredit = Rp 675.058.367
- Angsuran Pokok = Pembayaran – Bunga Kredit
Angsuran Pokok = Rp 2.648.813.408 – Rp 675.058.367
Angsuran Pokok = Rp 1.973.755.041
- Sisa Pinjaman = Pinjaman – Angsuran Pokok
Sisa Pinjaman = Rp 11.139.577.015 – 1.973.755.041
Sisa Pinjaman = Rp 9.165.821.974
Tahun Ke-2
- Bunga Kredit = Pinjaman x Bunga Kredit
Bunga Kredit = Rp 9.165.821.974 x 6,06%
Bunga Kredit = Rp 555.448.812
- Angsuran Pokok = Pembayaran – Bunga Kredit
Angsuran Pokok = Rp 2.648.813.408 – Rp 555.448.812
Angsuran Pokok = Rp 2.093.364.596
3 Overhead Pabrik
Bahan Tak Langsung Rp 11.493.504.000 Rp 12.872.724.480 Rp 14.417.451.418 Rp 16.147.545.588 Rp 18.085.251.058
Buruh Tak Langsung Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640
Listrik dan Penerangan Rp 2.543.749 Rp 2.848.999 Rp 3.190.879 Rp 3.573.785 Rp 4.002.639
Listrik Mesin Rp 9.641.964 Rp 10.798.999 Rp 12.094.879 Rp 13.546.265 Rp 15.171.816
PAM Rp 3.906.000 Rp 4.374.720 Rp 4.899.686 Rp 5.487.649 Rp 6.146.167
Bahan Bakar Rp 4.080.000 Rp 4.569.600 Rp 5.117.952 Rp 5.732.106 Rp 6.419.959
Asuransi Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920
PBB Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579
Maintenance Rp 14.294.943 Rp 16.010.336 Rp 17.931.576 Rp 20.083.366 Rp 22.493.369
Telepon Rp 3.000.000 Rp 3.360.000 Rp 3.763.200 Rp 4.214.784 Rp 4.720.558
Lain-Lain Rp 2.500.000 Rp 2.800.000 Rp 3.136.000 Rp 3.512.320 Rp 3.933.798
Depresiasi Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267
Ongkos Material Handling Rp 61.960.800 Rp 61.960.800 Rp 61.960.800 Rp 61.960.800 Rp 61.960.800
Total Biaya Overhead Rp 12.798.691.862 Rp 14.182.708.341 Rp 15.732.806.797 Rp 17.468.917.068 Rp 19.413.360.572
Total Biaya Fabrikasi Rp 14.795.745.900 Rp 16.240.587.978 Rp 17.858.811.106 Rp 19.671.221.010 Rp 21.701.120.102
Contoh Perhitungan:
1. Tahun Ke-1
- Harga Pokok Penjualan (HPP)
Harga Pokok Penjualan = Total Fabrikasi
Harga Pokok Penjualan = Bahan Langsung + Buruh Langsung +
Overhead Pabrik
Harga Pokok Penjualan = Rp 506.880.000 + Rp 1.490.174.037 +
Rp 12.798.691.862
Harga Pokok Penjualan = Rp 14.795.745.900
- PPN
PPN = 10% x HPP
PPN = 10% x Rp 14.795.745.900
PPN = Rp 1.479.574.590
- Profit
Profit = 40% x HPP
Profit = 40% x Rp 14.795.745.900
Profit = Rp 5.918.298.360
- Harga Jual (Penjualan)
Harga Jual = HPP + PPN + Profit
Harga Jual = Rp 14.795.745.900 + Rp 1.479.574.590 + Rp 5.918.298.360
Harga Jual = Rp 22.193.618.849
- Jumlah Produksi/Tahun
Jumlah Produksi/Tahun = KPT HP x Jam Kerja x Jumlah Hari dalam 1
Minggu x Jumlah Minggu dalam 1 Bulan x
Jumlah Bulan dalam 1 Tahun
Jumlah Produksi/Tahun = 157 Jam x 8 x 5 x 4 x 12
Jumlah Produksi/Tahun = 301440 Unit
- Harga Pokok Penjualan/Unit
Harga Pokok Penjualan/Unit = HPP ÷ Jumlah Produksi / Tahun
Harga Pokok Penjualan/Unit = Rp 14.795.745.900 ÷ 301440
Harga Pokok Penjualan/Unit = Rp 49.084
- Harga Jual/Unit
Harga Jual/Unit = Harga Jual (Penjualan) ÷ Jumlah Produksi/Tahun
Harga Jual/Unit = Rp 22.193.618.849 ÷ 301440
Harga Jual/Unit = Rp 73.625
2. Tahun Ke 2
- Harga Pokok Penjualan (HPP)
Harga Pokok Penjualan = Total Fabrikasi
Harga Pokok Penjualan = Bahan Langsung + Buruh Langsung +
Overhead Pabrik
Harga Pokok Penjualan = Rp 567.705.600 + Rp 1.490.174.037 +
Rp 14.182.708.341
Harga Pokok Penjualan = Rp 16.240.587.978
- PPN
PPN = 10% x HPP
PPN = 10% x Rp 16.240.587.978
PPN = Rp 1.624.058.798
- Profit
Profit = 40% x HPP
Profit = 40% x Rp 16.240.587.978
Profit = Rp 6.496.235.191
- Harga Jual (Penjualan)
Harga Jual = HPP + PPN + Profit
Harga Jual = Rp 16.240.587.978 + Rp 1.624.058.798 + Rp 6.496.235.191
Harga Jual = Rp 24.360.881.967
- Jumlah Produksi/Tahun
Jumlah Produksi/Tahun = KPT HP x Jam Kerja x Jumlah Hari dalam 1
Minggu x Jumlah Minggu dalam 1 Bulan x
Jumlah Bulan dalam 1 Tahun
Jumlah Produksi/Tahun = 157 Jam x 8 x 5 x 4 x 12
Jumlah Produksi/Tahun = 301440 Unit
- Harga Pokok Penjualan/Unit
Harga Pokok Penjualan/Unit = HPP ÷ Jumlah Produksi / Tahun
Praktikum Perancangan Sistem Industri 2 18
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
3 Overhead Pabrik
Bahan Tak Langsung Rp 4.516.608.000 Rp 5.058.600.960 Rp 5.665.633.075 Rp 6.345.509.044 Rp 7.106.970.130
Buruh Tak Langsung Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640
Listrik dan Penerangan Rp 2.543.749 Rp 2.848.999 Rp 3.190.879 Rp 3.573.785 Rp 4.002.639
Listrik Mesin Rp 9.641.964 Rp 10.798.999 Rp 12.094.879 Rp 13.546.265 Rp 15.171.816
PAM Rp 3.906.000 Rp 4.374.720 Rp 4.899.686 Rp 5.487.649 Rp 6.146.167
Bahan Bakar Rp 4.080.000 Rp 4.569.600 Rp 5.117.952 Rp 5.732.106 Rp 6.419.959
Asuransi Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920
PBB Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579
Maintenance Rp 14.294.943 Rp 16.010.336 Rp 17.931.576 Rp 20.083.366 Rp 22.493.369
Telepon Rp 3.000.000 Rp 3.360.000 Rp 3.763.200 Rp 4.214.784 Rp 4.720.558
Lain-Lain Rp 2.500.000 Rp 2.800.000 Rp 3.136.000 Rp 3.512.320 Rp 3.933.798
Depresiasi Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267
Ongkos Material Handling Rp 51.208.800 Rp 51.208.800 Rp 51.208.800 Rp 51.208.800 Rp 51.208.800
Total Biaya Overhead Rp 5.811.043.862 Rp 6.357.832.821 Rp 6.970.236.455 Rp 7.656.128.525 Rp 8.424.327.643
Total Biaya Fabrikasi Rp 7.723.617.900 Rp 8.321.094.858 Rp 8.990.269.052 Rp 9.739.744.149 Rp 10.579.156.258
Contoh Perhitungan:
1. Tahun Ke-1
- Harga Pokok Penjualan (HPP)
Harga Pokok Penjualan = Total Fabrikasi
Harga Pokok Penjualan = Bahan Langsung + Buruh Langsung +
Overhead Pabrik
Harga Pokok Penjualan = Rp 442.400.000 + Rp 1.490.174.037 +
Rp 5.811.043.862
Harga Pokok Penjualan = Rp 7.723.617.900
Praktikum Perancangan Sistem Industri 2 20
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
- PPN
PPN = 10% x HPP
PPN = 10% x Rp 7.723.617.900
PPN = Rp 772.361.790
- Profit
Profit = 40% x HPP
Profit = 40% x Rp 7.723.617.900
Profit = Rp 3.089.447.160
- Harga Jual (Penjualan)
Harga Jual = HPP + PPN + Profit
Harga Jual = Rp 7.723.617.900 + Rp 772.361.790 + Rp 3.089.447.160
Harga Jual = Rp 11.585.426.849
- Jumlah Produksi/Tahun
Jumlah Produksi/Tahun = KPT TAB x Jam Kerja x Jumlah Hari dalam 1
Minggu x Jumlah Minggu dalam 1 Bulan x
Jumlah Bulan dalam 1 Tahun
Jumlah Produksi/Tahun = 66 Jam x 8 x 5 x 4 x 12
Jumlah Produksi/Tahun = 126720 Unit
- Harga Pokok Penjualan/Unit
Harga Pokok Penjualan/Unit = HPP ÷ Jumlah Produksi / Tahun
Harga Pokok Penjualan/Unit = Rp 7.723.617.900 ÷ 126720
Harga Pokok Penjualan/Unit = Rp 60.950
- Harga Jual/Unit
Harga Jual/Unit = Harga Jual (Penjualan) ÷ Jumlah Produksi/Tahun
Harga Jual/Unit = Rp 11.585.426.849 ÷ 126720
Harga Jual/Unit = Rp 91.425
2. Tahun Ke 2
- Harga Pokok Penjualan (HPP)
Harga Pokok Penjualan = Total Fabrikasi
Harga Pokok Penjualan = Bahan Langsung + Buruh Langsung +
Overhead Pabrik
Harga Pokok Penjualan = Rp 473.088.000 + Rp 1.490.174.037 +
Praktikum Perancangan Sistem Industri 2 21
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Rp 6.357.832.821
Harga Pokok Penjualan = Rp 8.321.094.858
- PPN
PPN = 10% x HPP
PPN = 10% x Rp 8.321.094.858
PPN = Rp 832.109.486
- Profit
Profit = 40% x HPP
Profit = 40% x Rp 8.321.094.858
Profit = Rp 3.328.437.943
- Harga Jual (Penjualan)
Harga Jual = HPP + PPN + Profit
Harga Jual = Rp 8.321.094.858+ Rp 832.109.486 + Rp 3.328.437.943
Harga Jual = Rp 12.481.642.287
- Jumlah Produksi/Tahun
Jumlah Produksi/Tahun = KPT HP x Jam Kerja x Jumlah Hari dalam 1
Minggu x Jumlah Minggu dalam 1 Bulan x
Jumlah Bulan dalam 1 Tahun
Jumlah Produksi/Tahun = 66 Jam x 8 x 5 x 4 x 12
Jumlah Produksi/Tahun = 126720 Unit
- Harga Pokok Penjualan/Unit
Harga Pokok Penjualan/Unit = HPP ÷ Jumlah Produksi / Tahun
Harga Pokok Penjualan/Unit = Rp 8.321.094.858 ÷ 126720
Harga Pokok Penjualan/Unit = Rp 65.665
- Harga Jual/Unit
Harga Jual/Unit = Harga Jual (Penjualan) ÷ Jumlah Produksi/Tahun
Harga Jual/Unit = Rp 12.481.642.287 ÷ 126720
Harga Jual/Unit = Rp 98.498
3. Tahun Ke-3
- Harga Pokok Penjualan (HPP)
Harga Pokok Penjualan = Total Fabrikasi
Harga Pokok Penjualan = Bahan Langsung + Buruh Langsung +
Praktikum Perancangan Sistem Industri 2 22
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Overhead Pabrik
Harga Pokok Penjualan = Rp 529.858.560 + Rp 1.490.174.037 +
Rp 6.970.236.455
Harga Pokok Penjualan = Rp 8.990.269.052
- PPN
PPN = 10% x HPP
PPN = 10% x Rp 8.990.269.052
PPN = Rp 899.026.905
- Profit
Profit = 40% x HPP
Profit = 40% x Rp 8.990.269.052
Profit = Rp 3.596.107.621
- Harga Jual (Penjualan)
Harga Jual = HPP + PPN + Profit
Harga Jual = Rp 8.990.269.052 + Rp 899.026.905 + Rp 3.596.107.621
Harga Jual = Rp 13.485.403.578
- Jumlah Produksi/Tahun
Jumlah Produksi/Tahun = KPT HP x Jam Kerja x Jumlah Hari dalam 1
Minggu x Jumlah Minggu dalam 1 Bulan x
Jumlah Bulan dalam 1 Tahun
Jumlah Produksi/Tahun = 66 Jam x 8 x 5 x 4 x 12
Jumlah Produksi/Tahun = 126720 Unit
- Harga Pokok Penjualan/Unit
Harga Pokok Penjualan/Unit = HPP ÷ Jumlah Produksi / Tahun
Harga Pokok Penjualan/Unit = Rp 8.990.269.052 ÷ 126720
Harga Pokok Penjualan/Unit = Rp 70.946
- Harga Jual/Unit
Harga Jual/Unit = Harga Jual (Penjualan) ÷ Jumlah Produksi/Tahun
Harga Jual/Unit = Rp 13.484.842.781÷ 126720
Harga Jual/Unit = Rp 106.419
Contoh Perhitungan:
1. Tahun Ke-1
- PPN (10% Penjualan)
PPN (10% Penjualan) = 10% x Penjualan
PPN (10% Penjualan) = 10% x Rp 22.193.618.849
PPN (10% Penjualan) = Rp 2.219.361.885
- Laba Kotor
Laba Kotor = Penjualan – HPP – PPN
Laba Kotor = Rp 22.193.618.849 – Rp 14.795.745.900 –
Rp 2.219. 361.885
Laba Kotor= Rp 5.178.511.065
- Laba Operasi
Laba Operasi = Laba Kotor – Total Komersial
Laba Operasi = Rp 5.178.511.065 – Rp 518.762.104
Laba Operasi = Rp 4.659.748.961
- Pajak Penghasilan
Pajak Penghasilan = 5% x Laba Operasi
Pajak Penghasilan = 5% x Rp 4.659.748.961
Pajak Penghasilan = Rp 232.987.448
- Laba Bersih
Laba Bersih = Laba Operasi – Pajak Penghasilan
Laba Bersih = Rp 4.659.748.961 – Rp 232.987.448
Contoh Perhitungan:
1. Tahun Ke-1
- PPN (10% Penjualan)
PPN (10% Penjualan) = 10% x Penjualan
PPN (10% Penjualan) = 10% x Rp 11.585.426.849
PPN (10% Penjualan) = Rp 1.158.542.685
- Laba Kotor
Laba Kotor = Penjualan – HPP – PPN
Laba Kotor = Rp 11.585.426.849 – Rp 7.723.617.900 –
Rp 1.158.542.685
Praktikum Perancangan Sistem Industri 2 26
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Tahun Ke–0
- Total Pemasukan
Total Pemasukan = Pinjaman Bank + Modal Sendiri
Total Pemasukan = Rp 11.139.577.015 + Rp 16.709.365.523
Total Pemasukan = Rp 27.848.942.538
- Total Pengeluaran
Total Pengeluaran = Investasi + Angsuran Pokok Kredit
Total Pengeluaran = Rp 5.717.977.184 + 0
Total Pengeluaran = Rp 5.717.977.184
- Pemasukan – Pengeluaran
Pemasukan – Pengeluaran = Rp 27.848.942.538 – Rp 5.717.977.184
Pemasukan – Pengeluaran = Rp 22.130.965.354
- Kas Awal Tahun
Kas Awal Tahun = Kas Akhir Tahun(n-1) = 0
- Kas Akhir Tahun
Kas Akhir Tahun = (Pemasukan – Pengeluaran) + Kas Awal Tahun
Kas Akhir Tahun = Rp 22.130.965.354 + 0
Kas Akhir Tahun = Rp 22.130.965.354
2. Tahun Ke–1
- Total Pemasukan
Total Pemasukan = Laba Bersih + Depresiasi
Total Pemasukan = Rp 6.585.032.466 + Rp 132.052.535
Total Pemasukan = Rp 6.717.085.001
- Total Pengeluaran
Praktikum Perancangan Sistem Industri 2 29
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
IV.3.7 Neraca
Tabel 4.24 Neraca
Tahun ke-1 Tahun ke-2 Tahun ke-3 Tahun ke-4 Tahun ke-5
Deskripsi
Harta Harta Harta Harta Harta
AKTIVA LANCAR
Laba Rp 6.584.947.177 Rp 13.962.001.289 Rp 22.219.466.917 Rp 31.455.836.246 Rp 41.780.986.799
Modal Rp 22.130.965.354 Rp 22.130.965.354 Rp 22.130.965.354 Rp 22.130.965.354 Rp 22.130.965.354
Bank (Despresiasi) Rp 131.376.820 Rp 131.376.820 Rp 131.376.820 Rp 131.376.820 Rp 131.376.820
AKTIVA TETAP
Tanah Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500
Bangunan Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150
Mesin dan Peralatan Rp 1.069.119.434 Rp 1.069.119.434 Rp 1.069.119.434 Rp 1.069.119.434 Rp 1.069.119.434
Total Rp 5.712.551.084 Rp 5.712.551.084 Rp 5.712.551.084 Rp 5.712.551.084 Rp 5.712.551.084
Dikurangi Akumulasi Depresiasi Rp 131.376.820 Rp 131.376.820 Rp 131.376.820 Rp 131.376.820 Rp 131.376.820
Total Aktiva Tetap Rp 5.581.174.264 Rp 5.581.174.264 Rp 5.581.174.264 Rp 5.581.174.264 Rp 5.581.174.264
MODAL
Modal Usaha Rp 16.706.109.863 Rp 23.291.057.040 Rp 30.668.111.152 Rp 38.925.576.780 Rp 48.161.946.109
Laba Ditahan(Depresiasi) Rp 6.584.947.177 Rp 7.377.054.112 Rp 8.257.465.628 Rp 9.236.369.329 Rp 10.325.150.553
TOTAL MODAL Rp 23.291.057.040 Rp 30.668.111.152 Rp 38.925.576.780 Rp 48.161.946.109 Rp 58.487.096.662
Contoh Perhitungan:
1. Tahun Ke-1
- Total Aktiva Lancar
Total Aktiva Lancar = Kas
Total Aktiva Lancar = Laba + Modal + Bank (Depresiasi)
Total Aktiva Lancar = Rp 6.584.032.466 + Rp 22.130.965.354+
Rp 131.052.535
Total Aktiva Lancar = Rp 28.848.050.355
- Total Aktiva Tetap
Total Aktiva Tetap = Tanah + Bangunan + Mesin dan Peralatan –
Akumulasi Depresiasi
Total Aktiva Tetap = Rp 3.465.347.500 + Rp 1.178.184.150 +
Rp 1.074.545.534 – Rp 132.052.535
Total Aktiva Tetap = Rp 5.585.924.650
- Total Aktiva
Total Aktiva = Total Aktiva Lancar + Total Aktiva Tetap
Total Aktiva = Rp 28.848.050.355 + Rp 5.585.924.650
Total Aktiva = Rp 34.433.975.650
- Total Kewajiban
Total Kewajiban = Hutang Lancar + Hutang Usaha
Total Kewajiban = Rp 1.973.755.041 + Rp 9.165.821.974
Total Kewajiban = Rp 11.139.577.015
- Total Modal
Total Modal = Modal Usaha + Laba Ditahan
Total Modal = Rp 16.709.365.523 + Rp 6.585.032.466
Total Modal = Rp 23.294.397.989
- Total Kewajiban dan Modal
Total Kewajiban dan Modal = Total Kewajiban + Total Modal
Total Kewajiban dan Modal = Rp 11.139.577.015 + Rp 23.294.397.989
Total Kewajiban dan Modal = Rp 34.433.975.004
2. Tahun Ke-2
- Total Aktiva Lancar
Total Aktiva Lancar = Kas
Total Aktiva Lancar = Laba + Modal + Bank (Depresiasi)
Total Aktiva Lancar = Rp 13.962.195.900 + Rp 22.130.965.354 +
Rp 132.052.535
Total Aktiva Lancar = Rp 36.225.212.979
- Total Aktiva Tetap
Total Aktiva Tetap = Tanah + Bangunan + Mesin dan Peralatan –
Akumulasi Depresiasi
Total Aktiva Tetap = Rp 3.465.347.500 + Rp 1.178.184.150 +
Rp 1.074.545.534 – Rp 132.052.535
Total Aktiva Tetap = Rp 5.585.924.650
- Total Aktiva
Total Aktiva = Total Aktiva Lancar + Total Aktiva Tetap
Total Aktiva = Rp 36.225.212.979 + Rp 5.585.924.650
Total Aktiva = Rp 41.811.137.628
- Total Kewajiban
Total Kewajiban = Hutang Lancar + Hutang Usaha
Total Kewajiban = Rp 4.067.119.637 + Rp 7.072.457.378
Praktikum Perancangan Sistem Industri 2 32
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Contoh Perhitungan:
1. Tahun Ke-1
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.581.614.282
=
BEP Rp 22.193.618.849 - Rp 14.675.056.097
Rp 22.193.618.849
BEP = Rp 4.668.677.473
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 4.668.677.473 / Rp 73.625
Unit BEP = 63412 Unit
Praktikum Perancangan Sistem Industri 2 34
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
2. Tahun Ke-2
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.525.748.468
=
BEP Rp 24.360.881.967 - Rp 16.361.245.499
Rp 24.360.881.967
BEP = Rp 4.646.283.426
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 4.646.283.426 / Rp 80.815
Unit BEP = 57493 Unit
3. Tahun Ke-3
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.466.731.159
=
BEP Rp 26.788.216.660 - Rp 18.249.600.010
Rp 26.788.216.660
BEP = Rp 4.601.578.181
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 4.601.578.181 / Rp 88.867
Unit BEP = 51781 Unit
RP
Total Fixed Cost
Rp. 1.581.614.282
Rp. 14.675.056.097
Rp. 4.668.677.473
UNIT
Contoh Perhitungan:
1. Tahun Ke-1
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.581.614.282
=
BEP Rp 11.585.426.849 - Rp 6.335.354.657
Rp 11.585.426.849
BEP = Rp 3.490.176.116
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 3.490.176.116 / Rp 91.425
Unit BEP = 38176 Unit
2. Tahun Ke-2
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.525.748.468
=
BEP Rp 12.481.642.287 - Rp 7.032.245.282
Rp 12.481.642.287
BEP = Rp 3.494.670.433
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 3.494.670.433 / Rp 98.498
Unit BEP = 35480 Unit
3. Tahun Ke-3
- BEP
Total Fixed Cost HP
BEP =
Penjualan-Total Variabel Cost
Penjualan
Rp 1.466.731.159
=
BEP Rp 13.485.403.578 - Rp 7.812.585.162
Rp 13.485.403.578
BEP = Rp 3.486.708.047
- Unit BEP
Unit BEP = BEP / Harga Jual
Unit BEP = Rp 3.486.708.047 / Rp 106.419
Unit BEP = 32764 Unit
RP
Total Fixed Cost
Rp. 1.581.614.282
Rp. 6.335.354.657
Rp. 3.490.176.116
UNIT
Tahu
Bulan
n
Payback Period 3 5
Contoh Perhitungan:
1. Tahun Ke – 1
- Net Cash Flow
Praktikum Perancangan Sistem Industri 2 39
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
MARR = 6,06%
Contoh Perhitungan:
1. Tahun Ke-1
1
- Discounted Cash Flow (42%) = P/F = F x
(1 + i) n
1
Discounted Cash Flow (42%) = P/F = Rp 4.743.329.960 x 1
(1 + 42%)
Discounted Cash Flow (42%) = P/F = Rp 3.340.373.211
1
- Discounted Cash Flow (43%) = P/F = F x n
(1 + i)
1
Discounted Cash Flow (43%) = P/F = Rp 4.743.329.960 x
(1 + 43%)1
Discounted Cash Flow (43%) = P/F = Rp 3.317.013.958
2. Tahun Ke-2
1
- Discounted Cash Flow (42%) = P/F = F x n
(1 + i)
1
Discounted Cash Flow (42%) = P/F = Rp 5.415.850.562 x
(1 + 42%)2
Discounted Cash Flow (42%) = P/F = Rp 2.685.900.894
1
- Discounted Cash Flow (43%) = P/F = F x
(1 + i) n
1
Discounted Cash Flow (43%) = P/F = Rp 5.415.850.562 x 2
(1 + 43%)
Discounted Cash Flow (43%) = P/F = Rp 2.648.467.193
3. Tahun Ke-3
1
- Discounted Cash Flow (42%) = P/F = F x
(1 + i) n
1
Discounted Cash Flow (42%) = P/F = Rp 6.169.428.877 x
(1 + 42%)3
Discounted Cash Flow (42%) = P/F = Rp 2.154.665.852
1
- Discounted Cash Flow (43%) = P/F = F x
(1 + i) n
1
Discounted Cash Flow (43%) = P/F = Rp 6.169.428.877 x 3
(1 + 43%)
Discounted Cash Flow (43%) = P/F = Rp 2.109.778.438
Perhitungan IRR:
IRR = 42% + (43%-42%) * Total DCF 42% / (Total DCF 42% - Total DCF 43%)
IRR = 42% + (43%-42%) * (Rp 145.101.272 / (Rp 145.101.272 +
(- Rp 55.864.845)
IRR = 43%
Dari hasil tersebut diketahui bahwa IRR>MARR yaitu 43% > 6,06%, maka
proyek ini layak untuk dijalankan.
3 Overhead Pabrik
Bahan Tak Langsung Rp 11.493.504.000 Rp 12.872.724.480 Rp 14.417.451.418 Rp 16.147.545.588 Rp 18.085.251.058
Buruh Tak Langsung Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640
Listrik dan Penerangan Rp 2.543.749 Rp 2.848.999 Rp 3.190.879 Rp 3.573.785 Rp 4.002.639
Listrik Mesin Rp 9.641.964 Rp 10.798.999 Rp 12.094.879 Rp 13.546.265 Rp 15.171.816
PAM Rp 3.906.000 Rp 4.374.720 Rp 4.899.686 Rp 5.487.649 Rp 6.146.167
Bahan Bakar Rp 4.080.000 Rp 4.569.600 Rp 5.117.952 Rp 5.732.106 Rp 6.419.959
Asuransi Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920
PBB Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579
Maintenance Rp 14.294.943 Rp 16.010.336 Rp 17.931.576 Rp 20.083.366 Rp 22.493.369
Telepon Rp 3.000.000 Rp 3.360.000 Rp 3.763.200 Rp 4.214.784 Rp 4.720.558
Lain-Lain Rp 2.500.000 Rp 2.800.000 Rp 3.136.000 Rp 3.512.320 Rp 3.933.798
Depresiasi Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267
Ongkos Material Handling Rp 61.960.800 Rp 61.960.800 Rp 61.960.800 Rp 61.960.800 Rp 61.960.800
Total Biaya Overhead Rp 12.798.691.862 Rp 14.182.708.341 Rp 15.732.806.797 Rp 17.468.917.068 Rp 19.413.360.572
Total Biaya Fabrikasi Rp 15.465.920.400 Rp 16.460.382.378 Rp 19.443.886.834 Rp 23.059.091.105 Rp 20.903.534.609
3 Overhead Pabrik
Bahan Tak Langsung Rp 4.516.608.000 Rp 5.058.600.960 Rp 5.665.633.075 Rp 6.345.509.044 Rp 7.106.970.130
Buruh Tak Langsung Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640 Rp 1.105.612.640
Listrik dan Penerangan Rp 2.543.749 Rp 2.848.999 Rp 3.190.879 Rp 3.573.785 Rp 4.002.639
Listrik Mesin Rp 9.641.964 Rp 10.798.999 Rp 12.094.879 Rp 13.546.265 Rp 15.171.816
PAM Rp 3.906.000 Rp 4.374.720 Rp 4.899.686 Rp 5.487.649 Rp 6.146.167
Bahan Bakar Rp 4.080.000 Rp 4.569.600 Rp 5.117.952 Rp 5.732.106 Rp 6.419.959
Asuransi Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920 Rp 20.012.920
PBB Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579 Rp 11.608.579
Maintenance Rp 14.294.943 Rp 16.010.336 Rp 17.931.576 Rp 20.083.366 Rp 22.493.369
Telepon Rp 3.000.000 Rp 3.360.000 Rp 3.763.200 Rp 4.214.784 Rp 4.720.558
Lain-Lain Rp 2.500.000 Rp 2.800.000 Rp 3.136.000 Rp 3.512.320 Rp 3.933.798
Depresiasi Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267 Rp 66.026.267
Ongkos Material Handling Rp 51.208.800 Rp 51.208.800 Rp 51.208.800 Rp 51.208.800 Rp 51.208.800
Total Biaya Overhead Rp 5.811.043.862 Rp 6.357.832.821 Rp 6.970.236.455 Rp 7.656.128.525 Rp 8.424.327.643
Total Biaya Fabrikasi Rp 7.773.521.900 Rp 7.848.006.858 Rp 15.444.610.492 Rp 9.999.102.562 Rp 9.914.501.680
AKTIVA TETAP
Tanah Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500 Rp 3.465.247.500
Bangunan Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150 Rp 1.178.184.150
Mesin dan Peralatan Rp 1.074.545.534 Rp 1.074.545.534 Rp 1.074.545.534 Rp 1.074.545.534 Rp 1.074.545.534
Total Rp 5.717.977.184 Rp 5.717.977.184 Rp 5.717.977.184 Rp 5.717.977.184 Rp 5.717.977.184
Dikurangi Akumulasi Depresiasi Rp 132.052.535 Rp 132.052.535 Rp 132.052.535 Rp 132.052.535 Rp 132.052.535
Total Aktiva Tetap Rp 5.585.924.650 Rp 5.585.924.650 Rp 5.585.924.650 Rp 5.585.924.650 Rp 5.585.924.650
MODAL
Modal Usaha Rp 16.709.365.523 Rp 23.533.824.090 Rp 30.826.766.592 Rp 41.757.471.634 Rp 52.206.703.909
Laba Ditahan(Depresiasi) Rp 6.824.458.567 Rp 7.292.942.502 Rp 10.930.705.041 Rp 10.449.232.276 Rp 9.839.143.131
TOTAL MODAL Rp 23.533.824.090 Rp 30.826.766.592 Rp 41.757.471.634 Rp 52.206.703.909 Rp 62.045.847.040
Tahun Bulan
Payback
3 6
Period
Perhitungan IRR:
IRR = 48% + (49%-48%) * Total DCF 48% / (Total DCF 48% - Total DCF 49%)
IRR = 48% + (49%-48%) * (Rp 156.049.805 / (Rp 156.049.805 +
(- Rp 34.077.428)
IRR = 49%
Dari hasil tersebut diketahui bahwa IRR>MARR yaitu 49% > 6,06%, maka
proyek ini layak untuk dijalankan.
50.000 per meter, Profit sebesar 40% per tahun, OMH Revisi Handphone sebesar
Rp. 32.271 per jam, OMH Revisi Tablet sebesar Rp. 26.671 per jam, KPT
Handphone sebesar 157 unit per jam, dan KPT Tablet sebesar 66 unit per jam.
Selanjutnya menghitung biaya bahan baku dari Case Handphone dan Case
Tablet. Dalam menghitung biaya bahan baku Case Handphone dan Case Tablet,
langkah pertama yang harus dilakukan adalah mencari harga bahan baku dari
setiap komponennya, untuk bahan baku utama Case Handphone dan Case Tablet
menggunakan bahan Polycarbonate Solid seharga Rp. 22.000 per lembar, dan
untuk bahan baku tambahan Case Handphone dan Case Tablet yang pertama ada
Bluetooth Speaker seharga Rp. 211.000 per pack, yang kedua ada Kertas Vynil
seharga Rp. 8.700 per pack, yang ketiga ada Kardus seharga Rp. 15.000 per pack,
yang keempat ada Bubble Wrap Seharga Rp. 3500 per pack, dan ada Lem UHU
seharga Rp. 15.000 per pack. Untuk harga ukuran terima tersebut memiliki harga
yang sama yang dan nantinya hanya berbeda dengan harga ditahun pertama,
kedua, sampai kelima.
Selanjutnya menghitung upah tenaga kerja, yang dimana ada upah untuk
tenaga kerja langsung dan tenaga kerja tidak langsung. Tenaga kerja langsung
diantaranya, terdapat operator dari mesin potong, mesin cetak, mesin pendingin,
mesin penghalus, meja periksa, meja perakitan, meja pengemasan, forklift, walkey
fallet, dan manusia (helper). Tenaga kerja tidak langsung pada perkantoran
diantaranya, terdapat Direktur Utama, Sekretaris, Manager Keuangan, Staff
Keuangan, Manager Purchasing, Staff Purchasing, Manager Research &
Development (R&D), Staff Research & Development (R&D), Manager Produksi,
Staff Produksi Manager Quality Control, Staff Quality Control, Manager Human
Resourch & Development, Staff Human Resourch & Development, Manager
Pemasaran, Staff Pemasaran. Dan tenaga kerja tidak langsung pada non
perkantoran diantaranya, terdapat Satuan Pengamanan, Cleaning Service, Office
Boy, Sopir, Petugas Klinik Kesehatan, Receptionist, Teknisi Kelistrikan, Teknisi
Komputer dan Jaringan. Dalam menghitung upah untuk tenaga kerja yaitu dengan
cara, yang pertama untuk upah per hari itu didapatkan dari upah per bulan dibagi
dengan hari kerja dalam satu bulan, untuk upah per minggu itu didapatkan dari
upah per bulan dibagi dengan minggunya dalam satu bulan, untuk upah per tahun
Praktikum Perancangan Sistem Industri 2 50
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
itu didapatkan dari upah per bulan dikali dengan jumlah bulan dan satu tahun.
Setelah dilakukan perhitungan didapatkan hasil, untuk total biaya langsung
dengan jumlah tenaga kerja sebanyak 75 orang mendapatkan hasil sebesar Rp.
2.980.348.074, dan untuk total biaya tidak langsung dengan jumlah tenaga kerja
sebanyak 25 orang mendapatkan hasil sebesar Rp. 2.211.225.280. Dan bukan
hanya upah dalam satu tahun saja, melainkan harus menghitung kenaikan upah
untuk tahun berikutnya sampai lima tahun kedepan.
Selanjutnya, menghitung investasi dan kredit dan juga terdapat
perhitungan depresiasi. Dalam menghitung investasi dan kredit hal pertama yang
harus dilakukan adalah menghitung investasi dan depresiasi, terdapat 69 jenis
aktiva diantaranya, seperti Tanah, Bangunan Tertutup, Paving Blok, Bangunan
terbuka, Jalan Aspal, Kendaraan (Mobil), Kendaraan (Truk), Meja Kursi Direktur
dan Manager, Meja Kursi Sekretaris, Staf, dan Satpam, Sofa dan Meja Direktur,
Sofa dan Meja Sekretaris, Manager, Air Conditioner, Perangkat Komputer,
Laptop, Printer, Cabinet, Telepon, Meja Kursi Meeting, Meja Kursi Receptionist,
Sofa Receptionist, TV & Monitor CCTV, Tempah Sampah Kecil, Kloset Duduk,
Tempat Tisu, Lemari Penyimpanan, Keset, Karpet Masjid, Microwave, Kulkas,
Wastafel, Coffee Maker, Dispenser, Alat Kebersihan, Etalase, Meja Kursi Kantin,
Hydrant, Hanger Stand, Karpet, Kotak P3K, APAR, Lampu Jalan, Lampu
Ruangan, Barrier Gate, Meja Kursi Taman, Tempat Pembuangan Limbah,
Tempat Pembuangan Sampah, Tempat Sampah Besar, Sign Stand, CCTV,
Pengeras Suara, Mukena, Sarung, Lampu Taman, Jam Dinding, Mimbar,
Generator Set, Alat Kesehatan, Mesin Potong, Mesin Cetak, Mesin Pendingin,
Mesin Penghalus, Meja Periksa, Meja Perakitan, Meja Pengemasan, Rak
Receiving, Rak Shipping, Storage In/Out, Forklift, Walkey Fallet. Untuk
perhitungannya yaitu dengan cara menghitung nilai sisa yang didapatkan dari
harga lalu dikalikan dengan 15% per tahun yang sudah menjadi ketentuan, lalu
menghitung total harga yang didapatkan dari jumlah/STD dan dikalikan dengan
harga, setelah itu menghitung total nilai sisa yang didapatkan dari jumlah/STD
lalu dikalikan dengan nilai sisa, dan menghitung depresiasi yang didapatkan dari
total harga dikurangi dengan total nilai sisa lalu dibagi dengan umur, didapatkan
hasil sebesar Rp. 132.052.535. Setelah itu, maka akan didapatkan sumber modal
Praktikum Perancangan Sistem Industri 2 51
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
yang akan digunakan diantaranya, terdapat hasil jumlah investasi sebesar Rp.
5.717.977.184 per tahun, modal kerja sebesar Rp. 22.130.965.354, plafon
pinjaman sebesar 40% jadi jumlah pinjaman sebesar Rp. 11.139.577.015.
Selanjutnya, menghitung harga pokok penjualan (HPP). Dalam
menghitung HPP hal yang harus dilakukan adalah menghitung bahan langsung,
buruh langsung, overhead pabrik, persediaan WIP satu januari, dan persediaan
barang jadi. Setelah dihitung dan didapatkan hasilnya, selanjutnya menghitung
PPN yaitu sebesar 10% sesuai dengan ketentuan dari setiap periode per tahunnya,
dengan cara mengkalikan HPP dengan 10%. Lalu menghitung profit sebesar 40%
yang sudah ditentukan, dengan cara mengkalikan HPP dengan 40%. Selanjutnya,
menghitung jumlah HPP per unit, dengan cara HPP dibagi dengan jumlah
produksi per tahun. Dan terakhir menghitung harga jual per unitnya, dengan cara
harga jual dibagi dengan jumlah produksi. Setelah melakukan perhitungan akan
diketahui berapa harga jual yang akan didapat untuk setiap periode per tahunnya.
Didapatkan hasil untuk handphone pada tahun pertama harga jualnya sebesar Rp.
73.625 per unit, dan untuk tablet pada tahun pertama harga jualnya sebesar Rp.
91.425 per unit.
Selanjutnya, menghitung nilai laba rugi. Laba rugi merupakan informasi
pengeluaran, pendapatan, serta keuntungan dan kerugian yang dihasilkan
perusahaan selama periode tertentu. Dalam menghitung nilai laba rugi hal yang
pertama dilakukan adalah menghitung laba kotornya, dengan cara hasil penjualan
dikurangi HPP dikurangi PPN 10% pada tahun pertama untuk handphone
didapatkan hasil sebesar Rp. 5.178.511.065 dan untuk tablet didapatkan hasil
sebesar Rp. 2.703.266.265 dilanjutkan sampai tahun kelima. Setelah itu,
menghitung laba operasi, dengan cara laba kotor dikurangi total biaya komersial
pada tahun pertama untuk handphone didapatkan hasil sebesar Rp. 4.659.748.961,
dan untuk tablet didapatkan hasil sebesar Rp. 2.271.864.161 dilanjutkan sampai
tahun kelima. Lalu menghitung pajak penghasilan, dengan cara laba operasi dikali
dengan 5% yang sudah menjadi ketentuan laboraturium pada tahun pertama untuk
handphone didapatkan hasil sebesar Rp. 232.987.448, dan untuk tablet didapatkan
hasil sebesar Rp. 113.593.208 dilanjutkan sampai tahun kelima. Dan menghitung
laba bersihnya, dengan cara laba operasi dikurangi pajak penghasilan pada tahun
Praktikum Perancangan Sistem Industri 2 52
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
pertama untuk handphone didapatkan hasil sebesar Rp. 4.426.761.513, dan untuk
tablet didapatkan hasil sebesar Rp. 2.158.270.953 dilanjutkan sampai tahun
kelima.
Selanjutnya, menghitung cash flow yang dimana proyeksi aliran kas
menunjukkan penyajian yang sistematis tentang penerimaan dan pengeluaran kas
selama periode operasi tertentu. Cash flow bertujuan untuk memberikan informasi
agar perusahaan dapat membuat strategi keuangan, seperti evaluasi terhadap
aktiva bersih sebuah perusahaan, struktur keuangan sebuah perusahaan (likuiditas
dan solvabilitas), serta menyesuaikannya dengan perubahan keadaan dan peluang.
Dalam menghitung cash flow ini hal pertama yang harus dilakukan adalah
menghitung total pemasukan, dengan cara pinjaman bank ditambah modal sendiri
ditambah laba bersih ditambah depresiasi pada tahun ke-0 didapatkan hasil
sebesar Rp. 27.848.942.538 pada tahun pertama didapatkan hasil sebesar
6.717.085.001 dilanjutkan sampai tahun kelima. Setelah itu, menghitung total
pengeluarannya, dengan cara investasi ditambahkan dengan angsuran pokok pada
tahun ke-0 didapatkan hasil sebesar Rp. 5.717.977.184 pada tahun pertama
didapatkan hasil sebesar Rp. 1.973.755.041 dilanjutkan sampai tahun kelima. Lalu
menghitung kas awal tahun, dengan cara total pemasukan ditambahkan dengan
total pengeluaran pada tahun pertama didapatkan hasil sebesar Rp.
22.130.965.354 dilanjutkan sampai tahun kelima. Dan menghitung kas akhir
tahunnya, dengan cara kas awal tahun ditambah pemasukan dikurangi
pengeluaran pada tahun ke-0 didapatkan hasil sebesar Rp. 22.130.965.354 pada
tahun pertama didapatkan hasil sebesar Rp. 26.874.295.314dilanjutkan sampai
tahun kelima.
Selanjutnya, menghitung balance sheet yang merupakan bagian dalam
laporan finansial dalam akuntansi yang mencatat informasi terkait aset, kewajiban
pembayaran pada pihak terkait dalam operasional perusahaan dan modal pada
waktu tertentu. Tidak hanya memberi gambaran kondisi keuangan perusahaan,
balance sheet juga berfungsi untuk mengetahui kondisi kesehatan finansial usaha.
Fungsi tersebut juga mencakup prediksi kondisi arus kas di masa mendatang,
fleksibilitas anggaran perusahaan, dan likuiditas. Dalam menghitung balance
sheet ini hal pertama yang harus dilakukan adalah menghitung total aktiva lancar,
Praktikum Perancangan Sistem Industri 2 53
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
dengan cara kas sama dengan laba ditambah modal ditambahkan dengan bank
(depresiasi) pada tahun pertama didapatkan hasil sebesar Rp. 28.848.050.255
dilanjutkan sampai tahun kelima. Lalu menghitung total aktiva tetap, dengan cara
tanah ditambah bangunan ditambah mesin dan peralatan dikurangi akumulasi
depresiasi pada tahun pertama didapatkan hasil sebesar Rp. 5.585.924.650
dilanjutkan sampai tahun kelima. Setelah itu, menghitung total kewajiban dengan
cara hutang lancar ditambah dengan hutang usaha pada tahun pertama didapatkan
hasil sebesar Rp. 11.139.577.015 dilanjutkan sampai tahun kelima. Lalu
menghitung total modal, dengan cara modal usaha ditambahkan dengan laba
ditahan pada tahun pertama didapatkan hasil sebesar Rp. 23.294.397.989
dilanjutkan sampai tahun kelima. Setelah itu, menghitung total aktiva dengan cara
total aktiva lancar ditambahkan dengan total aktiva tetap pada tahun pertama
didapatkan hasil sebesar Rp. 34.433.975.004 dilanjutkan sampai tahun kelima.
Lalu menghitung total kewajiban dan modal, dengan cara total kewajiban
ditambahkan dengan total modal pada tahun pertama didapatkan hasil sebesar Rp.
34.433.975.004 dilanjutkan sampai tahun kelima. Dalam perhitungan balance
sheet ini sendiri nilai total aktiva dengan nilai total kewajiban dan modal itu
nilainya harus sama.
Selanjutnya, menghitung break event point yang dimana keadaan
perusahaan dalam operasinya tidak mendapatkan keuntungan dan tidak menderita
kerugian (impas). Analisis ini dapat diterapkan secara efektif apabila biaya dapat
dipisah menjadi biaya tetap (fixed cost) dan biaya variabel (variabel cost), unit
yang terjual sama dengan unit yang diproduksi produk yang dijual satu jenis atau
jika lebih dari satu jenis komposisi masing-masing jenis dianggap tetap. Dalam
menghitung break event point ini hal pertama yang harus dilakukan adalah
menghitung ongkos tetap (fixed Cost) diantaranya, seperti ongkos Buruh Tak
Langsung, Listrik dan Penerangan, PAM, Bahan Bakar, Asuransi, PBB,
Maintenance, Telepon, Lain-Lain, Depresiasi, Beban Administrasi, Beban
Pemasaran. Salah satu contohnya pada tahun pertama untuk handphone
didapatkan hasil total fixed cost nya sebesar Rp. 1.581.614.282, pada tahun kedua
sebesar Rp. 1.525.748.468, pada tahun ketiga sebesar Rp. 1.466.713.159, pada
tahun keempat sebesar Rp. 1.404.399.453, dan pada tahun kelima sebesar Rp.
Praktikum Perancangan Sistem Industri 2 54
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
dikenal sebagai metode untuk menghitung tingkat bunga suatu investasi dan
menyamakannya dengan nilai investasi saat ini berdasarkan penghitungan kas
bersih di masa mendatang. Fungsi utama penghitungan IRR adalah untuk
mengukur suatu aset, apakah aset tersebut akan mengalami peningkatan atau
tidak. Manfaat lain menghitung IRR adalah untuk mengetahui laju pengembalian
investasi sehingga kegiatan operasional dalam bentuk apapun bisa dievaluasi
tingkatan pada laju pengembalian secara akurat. Dalam menghitung IRR Dalam
diketahui data pengeluaran dari tahun ke-0 sampai dengan tahun kelima, lalu
terdapat nilai net profit dari tahun pertama sampai dengan tahun kelima, terdapat
juga nilai depresiasi dari tahun pertama sampai dengan tahun kelima, dan terdapat
nilai net cash flow dari tahun pertama sampai dengan tahun kelima. Setelah itu,
menyesuaikan nilai discounted pay period nya dan didapatkan hasil sebesar 42%
dengan total nilai sebesar Rp. 145.101.272 dan sebesar 43% dengan total nilai
sebesar -Rp. 55.864.845. Lalu didapatkan hasil, untuk IRR sebesar 42% dan
MARR nya sebesar 6.06% yang artinya perusahaan PT. Adya Mavendra ini dapat
dikatakan layak.
Selanjutnya, pada pada tahap terakhir yaitu melakukan kegiatan trading.
Yang dimana Trading adalah proses transaksi yang berlangsung dalam pasar
finansial di mana sistem kerjanya adalah sering-sering menjual dan membeli aset
dalam waktu yang singkat. Tujuan aktivitas ekonomi ini adalah melakukan jual
beli dalam waktu singkat untuk mendapatkan keuntungan sebesar-besarnya.
Dalam kegiatan ini, dilakukan selama 8 periode yang dimana untuk periode 1
sampai 4 untuk Case Handphone dan untuk periode 5 sampai 8 untuk Case
Tablet. Pada penjualan Case Tablet di periode 2, PT. Adya Mavendra tidak
melakukan transaksi jual beli karena tidak mendapatkan bahan baku. Dan setelah
melakukan perhitungan, didapatkan nilai Internal Rate of Return (IRR) sebesar
49% dan untuk MARR nya sebesar 6.06% yang artinya perusahaan PT. Adya
Mavendra ini dapat dikatakan layak.
hasil waktu proses Case Handphone senilai 495 detik dan waktu proses Case
Tablet senilai 580 detik, faktor konversi untuk Case Handphone senilai 0,85 dan
faktor konversi untuk Case Tablet senilai 1, serta %P untuk Case Handphone
senilai 70,66% dan %P untuk Case Tablet senilai 29,34%. Setelah didapatkan
nilai waktu proses, faktor konversi, dan %P dilakukan perhitungan untuk
menghitung demand aggregate untuk 12 periode. Hasil dari perhitungan demand
aggregate didsajikan dalam diagram garis dalam 12 periode,
Setelah mendapatkan demand aggregate untuk 12 periode, perhitungan
berikutnya yaitu menentukan menggunakan metode peramalan apakah yang
nantinya akan digunakan. Metode yang terdapat dalam Peramalan (Forecasting)
yaitu Metode Single Moving Average (SMA), Single Exponential Smoothing
(SES), dan Linier Regression (LR). Untuk menentukan metode apa yang akan
digunakan, maka perlu menentukan tingkat error yang lebih kecil dengan
melakukan perhitungan dari ukuran statistik dengan menggunakan Mean Absolute
Deviation (MAD) dan Mean Square Error (MSE) serta ukuran relatf dengan
menggunakan Mean Absolute Percentage Error (MAPE).
Dalam pengolahan data Single Moving Average (SMA) dengan jumlah
periode sebanyak 12 periode diambil dari data demand aggregate yang kemudian
dijadikan sebagai data aktual. Untuk menghitung Forecast ditetapkan moving
periodenya sebanyak 3, maka forecast didapatkan dari rata-rata demand
aggregate atau data aktual 3 periode sebelumnya. Sehingga data forecast yang
dapat terhitung dari sebelumnya 12 periode menjadi 9 periode yang mana ramalan
permintaan pertama keluar pada periode ke-4. Kemudian dalam menghitung
Forecast Error yang didapatkan dari pengurangan data actual dengan data
forecast. Karena dari hasil perhitungan Forecast Error masih terdapat data yang
bernilai negatif, maka perlu dilakukan perhitungan dengan melakukan Forecast
Error Absolute yang mana memutlakan data yang bernilai negatif agar dapat
dijadikan dasar perhitungan untuk menentukan MAD. Setelah itu, dilakukan
perhitungan Forecast Error yang dikuadratkan yang digunakan untuk menghitung
MSE. Kemudian yang terakhir menghitung proposi error yang didapatkan dari
permbagian Forecast Error dengan data aktual yang digunakan juga nantinya
untuk menghitung MAPE. Setelah semua perhitungan forecast dan forecast error
Praktikum Perancangan Sistem Industri 2 2
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
didapatkan hasil, dilanjutkan dengan menghitung MAD, MSE, dan MAPE. Untuk
nilai MAD pada SMA ini didapatkan dari perhitungan Forecat Error dibagi
jumlah periode yaitu 9 periode maka nilai yang dihasilkan sejumlah 4156,33.
Selanjutnya adalah mencari nilai MSE yang mana nilai MSE ini didapat dari
forecast error kuadrat dibagi dengan 9 periode maka didapat nilai MSE adalah
27250588,56. Yang terakhir adalah mencari nilai MAPE yang didapat dari 100
dikali dengan hasil bagi antara PE dengan 9 periode maka didapat hasil 9,19.
Dalam pengolahan data Single Eksponential Smooting (SES) dengan
jumlah periode sebanyak 12 periode diambil dari data demand aggregate yang
kemudian dijadikan sebagai data aktual. Terdapat juga perhitungan forecast yang
dimana pada forecast periode pertama didapat dari nilai aktual periode pertama
dan untuk forecast periode kedua didapat dari perhitungan forecast periode
pertama ditambah dengan ketetapan alpha sebesar 0,5 dikali dengan nilai aktual
periode pertama dikurangi nilai forecast periode pertama begitupun seterusnya
mengikuti periode selanjutnya Pada Single Eksponential Smooting (SES) ini
perhitungannya sama seperti SMA hanya saja periode yang dihitung berjumlah 11
dikarenakan perhitungan dimulai dari periode ke-2. Setelah semua perhitungan
forecast dan forecast error didapatkan hasil, dilanjutkan dengan menghitung
MAD, MSE, dan MAPE. Untuk nilai MAD pada SMA ini didapatkan dari
perhitungan Forecat Error dibagi jumlah periode yaitu 11 periode maka nilai
yang dihasilkan sejumlah 3181,42. Selanjutnya adalah mencari nilai MSE yang
mana nilai MSE ini didapat dari forecast error kuadrat dibagi dengan 11 periode
maka didapat nilai MSE adalah 18650295,95. Yang terakhir adalah mencari nilai
MAPE yang didapat dari 100 dikali dengan hasil bagi antara PE dengan 11
periode maka didapat hasil 7,04.
Dalam pengolahan data Linear Regression (LR) dengan jumlah periode
sebanyak 12 periode diambil dari data demand aggregate yang kemudian
dijadikan sebagai data aktual. Data Forecast didapat dari hasil nilai intercept
ditambah dengan nilai Slope dikali periode terkait. Nilai intercept yang diperoleh
senilai 42952,44 dan juga nilai slope yang diperoleh senilai 164,9581. Pada
perhitungan peramalan tersebut dimulai dari periode ke-1. Untuk selanjutnya
perhitungan forecast error yang sama dengan metode SMA dan SES. Setelah itu
Praktikum Perancangan Sistem Industri 2 3
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
hitung ukuran kesalahan (error) dengan menggunakan MAD, MSE, dan MAPE
untuk 12 periode. Untuk nilai MAD pada SMA ini didapatkan dari perhitungan
Forecast Error dibagi jumlah periode yaitu 12 periode maka nilai yang dihasilkan
sejumlah 2932,5. Selanjutnya adalah mencari nilai MSE yang mana nilai MSE ini
didapat dari forecast error kuadrat dibagi dengan 12 periode maka didapat nilai
MSE adalah 11903731,50. Yang terakhir adalah mencari nilai MAPE yang
didapat dari 100 dikali dengan hasil bagi antara PE dengan 12 periode maka
didapat hasil 6,66.
Perhitungan MAD, MSE dan MAPE tersebut dilakukan perhitungan untuk
menentukan metode apa yang nantinya akan digunakan dalam melakukan
Forecasting, dengan memilih nilai error yang paling kecil dari perbandingan tiga
metode pengukuran kesalahan. Setelah melakukan perhitungan tersebut kami telah
mendapatkan hasil yang terpilih untuk diterapkan yaitu menggunakan metode
Linier Regression (LR) yang mana mendapatkan hasil nilai MAD, MSE dan
MAPE paling kecil dibandingkan dengan metode lainnya yaitu dengan nilai MAD
yaitu sebesar 2932,5; MSE sebesar 11903731,50; dan MAPE sebesar 6,66.
Pada modul 2 ini membahas mengenai Rencana Produksi dan Sales &
Operation Planning (S&OP). Yang pertama yaitu terdapat Rencana Produksi, hal
ini dilakukan untuk mengetahui kebutuhan dari produk yang akan diproduksi oleh
perusahaan seperti jumlah produk yang akan diproduksi dan biaya produksi yang
dibutuhkan perusahaan. Kemudian yang kedua yaitu terdapat Sales &
Operational Planning (SOP), hal ini dilakukan kesepakatan terhadap rencana
penjualan dan rencana operasional oleh perusahaan. Sales & Operation Planning
ini melibatkan area fungsional utama, diantaranya organisasi yang termasuk
marketing, sales, manufaktur, distribusi, dan finance.
Pada Rencana Produksi, langkah pertama yang harus dilakukan yaitu
melakukan pengumpulan data diantaranya menghitung Demand Aggregate karena
hal tersebut merupakan jumlah barang yang dihasilkan untuk mengetahui end
item. Tujuan dari Demand Aggregate ini adalah untuk mempermudah operator
dengan manajemen untuk saling berkomunikasi mengenai produk yang
dihasilkan. Dan juga terdapat data-data yang sudah diketahui, hal tersebut
merupakan ketentuan dari laboratorium yang diantaranya, Biaya Produksi Reguler
Praktikum Perancangan Sistem Industri 2 4
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Time senilai Rp. 18.000,-, Biaya Produksi Over Time senilai Rp. 22.000,-, Biaya
Subkontrak senilai Rp. 35.000,-, Biaya Inventory senilai Rp. 6.000,-, Biaya
Hiring senilai Rp. 275.000,-, Biaya Lay Off senilai Rp. 525.000,-, Waktu Baku
senilai 0,16 / Jam, Jam Kerja senilai 8 Jam, Tenaga Kerja Awal sejumlah 19
Orang, Inventory Awal sejumlah 0 Unit, dan Safety Stock sejumlah 500 Unit.
Setelah itu data yang telah diketahui lalu dikumpulkan yang kemudian akan
diolah.
Selanjutnya membuat Rencana Produksi selama 12 periode dan didapatkan
hasil yaitu sebanyak 552.554 Unit/12 Periode. Setelah itu menghitung Kecepatan
Produksi didapatkan hasil 2150,02 Unit/Hari. Kemudian menghitung total cost
rencana produksi selama 12 periode, diantaranya terdapat Biaya Regular Time,
Biaya Inventory, Biaya Hiring, Biaya Lay Off, Biaya Overtime, dan Biaya
Subkontrak. Sehingga didapatkan hasil total Rencana Biaya Produksi dari PT.
Adya Mavendra selama 12 periode adalah sebesar Rp. 10.409.185.000,-.
Setelah didapatkan Total Rencana Biaya Produksi, kemudian dilakukan
pertemuan dengan Para Direksi Perusahaan untuk menentukan dan melakukan
kesepakatan terhadap dana yang akan diajukan oleh para Direksi kepada PT. Adya
Mavendra. Dari hasil pertemuan dan perundingan tersebut didapatkan kesepakatan
untuk dana yang diajukan dari para Direksi kepada PT. Adya Mavendra adalah
sebesar 73% dari Rencana Biaya Produksi yang telah dibuat selama 12 periode
yaitu sebesar Rp. 10.409.185.000, setelah diakumulasikan didapatkan hasil
sebesar Rp. 7.598.705.050. Dikarenakan melihat dana yang didapat ini lebih kecil
dibandingkan dengan Rencana Biaya yang sudah dibuat oleh PT. Adya Mavendra,
masih terdapat selisih biaya sebesar Rp. 2.810.479.950 dan selisih Demand
Aggregate Forecast sebanyak 156.138 Unit. Dilihat dari selisih biaya tersebut,
total Demand Aggregate yang dapat dipenuhi oleh PT. Adya Mavendra adalah
sebanyak 395.910 Unit, sehingga PT. Adya Mavendra terdapat kekurangan
sebanyak 13.012 Unit pada setiap periodenya.
Dengan hasil yang sudah didapatkan tersebut diketahui bahwa terdapat
perbedaan antara cost yang direncanakan dengan cost yang diberikan oleh para
Direksi. Karena hal tersebut perlu melakukan revisi dengan perhitungan
menggunakan Microsoft Excel. Namun, jika pada perhitungan Sales & Operation
Praktikum Perancangan Sistem Industri 2 5
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Planning sudah mendapatkan jumlah total lebih kecil dari pada biaya yang
diberikan oleh para Direksi, maka tidak perlu melakukan revisi kembali. Setelah
dilakukannya perhitungan revisi maka mendapatkan nilai sebanyak 396.410 Unit.
Lalu nilai kecepatan produksi sebesar 1542,45 Unit/Hari.
Dikarenakan adanya perubahan tersebut, hal ini berpengaruh terhadap
perubahan pada tenaga kerja yang awalnya dibutuhkan 44 orang menjadi 32
orang. Dengan adanya perubahan tersebut tentunya sangat mempengaruhi Biaya
Regular Time, Inventory, Overtime, dan total keseluruhan. Setelah melakukan
perhitungan didapatkan hasil total dari Regular Time sebesar Rp. 7.135.506.000
dalam 12 periode, Biaya Inventory sebesar Rp. 181,962,000 selama 12 periode,
Biaya Overtime sebesar Rp. 131,025,000. Dan total biaya menjadi sebesar Rp.
7.452.068.000 selama 12 periode.
Pada modul 3 ini membahas mengenai Master Production Schedule
(MPS) dan Rought Cut Capacity Planning (RCCP). Pertama yaitu mengenai
Master Production Schedule (MPS) yang merupakan penjadwalan lanjutan setelah
perencanaan agregat. Master Production Schedule (MPS) adalah perencanaan
produksi jangka pendek pada suatu perusahaan yang berisi tentang rencana
menyeluruh dan perinciannya dalam menghasilkan produk akhir (produk jadi).
Kedua yaitu mengenai Rought Cut Capacity Planning (RCCP) atau diseebut juga
perencanaan kapasitas kasar. Rought Cut Capacity Planning (RCCP) ini
merupakan urutan kedua dari hierarki perencanaan kapasitas yang berperan dalam
pengujian Master Production Schedule (MPS). Rought Cut Capacity Planning
(RCCP) melakukan validasi terhadap Master Production Schedule (MPS) karena
untuk menetapkan sumber-sumber tertentu yang spesifik. Hal ini termasuk ke
dalam perencanaan kapasitas jangka panjang.
Pada Master Production Schedule (MPS) terdapat Demand Aggregate
Forecast yang didapat dari Sales & Operational Planning (SOP). Dalam Master
Production Schedule (MPS) dilakukan disaggregate, hal tersebut dilakukan
karena berguna untuk pemisahan berdasarkan proposi demand antara Case
Handphone dan Case Tablet. Hal pertama yang dilakukan untuk menghitung
Master Production Schedule (MPS) yaitu mengumpulkan data-data, diantaranya
seperti data Demand Aggregate Forecast Revisi, Total Rencana Produksi Revisi,
Praktikum Perancangan Sistem Industri 2 6
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Data Actual Order, Data Hari Kerja dan Data Faktor Konversi. Terdapat Data
Actual Order dan Data Hari Kerja yang merupakan sudah ketentuan dari
laboratorium. Selanjutnya, mengolah data tersebut ke dalam tabel Disaggregate
Demand Aggregate Forecast selama 12 periode.
Yang pertama menghitung Disaggregate Demand Aggregate Forecast
selama 12 periode untuk produk Case Handphone dengan % Proporsi Demand
senilai 70,66% dan Case Tablet dengan % Proporsi Demand senilai 29,34%.
Kedua menghitung Disaggregate Total Rencana Produksi selama 12 periode
untuk produk Case Handphone dengan % Proporsi Demand senilai 70,66% dan
Case Tablet dengan % Proporsi Demand senilai 29,34%. Setelah itu diolah ke
dalam tabel Master Production Schedule (MPS) untuk produk Case Handphone
dan Case Tablet. Dalam tabel Master Production Schedule (MPS) terdapat nilai
Forecast yang didapat dari nilai Dissagregate dari tabel Demand Aggregate
Forecast, nilai Actual Order (AO) yang merupakan sudah ketentuan dari
laboratorium, Project Available Balance (PAB), Available to Promise (ATP), dan
Master Schedule (MS) yang didapat dari nilai Dissagregate dari tabel Total
Rencana Produksi, semua nilai tersebut dihitung selama 12 periode.
Pada Rough Cut Capacity Planning (RCCP) langkah pertama yang harus
dilakukan adalah dengan mengumpulkan data-data yang dibutuhkan diantaranya,
seperti data Routing Sheet produk Case Handphone dan Case Tablet, Work
Center (WC), Run Time (RT), data Set Up Time (ST) yang telah ditentukan oleh
laboratorium, dan Lot Size (LS) yang telah ditentukan oleh laboratorium yaitu
sebanyak 100 unit. Jumlah Work Center yang terdapat pada perusahaan PT. Adya
Mavendra ini sebanyak 9 Work Center dengan jumlah Tenaga Kerja yang
dibutuhkan sebanyak 32 orang. Setelah data tersebut disiapkan, maka dilanjutkan
dengan menghitung Standard Hours dari nilai Run Time (RT), data Set Up Time
(ST), dan Lot Size (LS). Kemudian membuat tabel Bill Of Capacity untuk produk
Case Handphone dan Case Tablet, pada Bill Of Capacity ini menghitung
frekuensi Work Center yang ada lalu menjumlahkan standard hours pada masing-
masing Work Center.
Selanjutnya membuat tabel data Kapasitas Regular Time dan data
Kapasitas Over Time, data-data yang dibutuhkan yaitu jumlah dari Work Center
Praktikum Perancangan Sistem Industri 2 7
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
sebanyak (9), lalu jumlah tenaga kerja yang dibutuhkan sebanyak 32 orang. Untuk
tabel data Kapasitas Regular Time dan data Kapasitas Over Time jumlahnya
dibuat menyesuaikan dengan jumlah Work Center. Isi dari tabel tersebut
diantaranya terdapat jam kerja untuk Reguler Time yaitu selama 8 jam dan Over
Time merupakan 25% dari jam kerja normal yaitu sebanyak 2 jam, Hari Kerja dan
Tenaga Kerja yang telah ditentukan untuk setiap Work Center. Tenaga kerja yang
ada pada seluruh Work Center berjumlah 32 Orang sesuai dengan tenaga kerja
yang dibutuhkannya. Sehingga pada setiap masing-masing Work Center telah
dialokasikan tenaga kerja untuk WC 10 berjumlah 3 Orang, WC 20 berjumlah 4
Orang, WC 30 berjumlah 5 Orang, WC 40 berjumlah 5 Orang, WC 50 berjumlah
1 Orang, WC 60 berjumlah 5 Orang, WC 70 berjumlah 6 Orang, WC 80
berjumlah 1 Orang dan WC 90 berjumlah 2 Orang. Pengalokasian tenaga kerja ini
dibuat dengan mempertimbangkan kebutuhan tenaga kerja tiap Work Center agar
masih dalam batas kerja Reguler Time (RT) atau Over Time (OT).
Setelah itu melakukan perhitungan pada tabel Rought Cut Capacity
Planning (RCCP) yang mana melakukan perencanaan kapasitas kasar dari data
Master Production Schedule (MPS) untuk produk Case Handphone dan Case
Tablet dan Standard Hours dari masing-masing Work Center yang dilakukan
selama 12 periode. Setelah perhitungan semuanya sudah dikerjakan, selanjutnya
melakukan pembuatan grafik dari setiap Work Station. Yang kemudian dibuat
tabel rekapan dari setiap Work Center selama 12 periode. Dalam pembuatan
grafik tersebut, terdapat grafik yang bernilai Regular Time ditandai dengan warna
biru, lalu grafik yang bernilai Over Time ditandai dengan warna orange, dan
terakhir terdapat grafik RCCP ditandai dengan warna abu. Dalam grafik tersebut
juga menunjukan apakah pekerja tersebut memiliki waktu luang dan jika ada
seberapa lama waktu luang tersebut. Jika grafik Rought Cut Capacity Planning
(RCCP) tersebut melebihi grafik dari nilai Regular Time dengan Over Time maka
akan dibutuhkan kembali tambahan untuk tenaga pekerja atau bisa dilakukan
dengan subkontrak yang mana akan sangat merugikan perusahaan.
Selanjutnya, dari tabel-tabel yang sudah dibuat kemudian dilihat agar mengetahui
apakah tenaga kerja pada setiap Work Center mampu menyelesaikan pekerjaannya
sesuai dengan jam kerja yang telah ditentukan. Jika terdapat grafik Work Center
Praktikum Perancangan Sistem Industri 2 8
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
yang melebihi batas maksimal, maka harus melakukan alokasi tenaga kerja
terhadap Work Center yang bersangkutan. Dan dapat dilihat pada perhitungan
Rought Cut Capacity Planning (RCCP) PT. Adya Mevndra ini bahwa tidak ada
data yang melebihi batas maksimal yang artinya perusahaan tidak membutuhkan
tambahan tenaga kerja atau subkontak dan juga perusahaan dapat melakukan
proses produksi pada setiap Work Center dengan baik.
Pada modul 4 ini membahas mengenai Material Requirement Planning
(MRP). Material Requirement Planning (MRP) merupakan sistem yang berguna
untuk menghitung berapa jumlah bahan baku atau komponen yang perusahaan
butuhkan untuk memproduksi sebuah produk. Material Requirement Planning
(MRP) berguna untuk mengurangi jumlah persediaan bahan baku yang tersimpan
pada perusahaan dan meningkatkan efisiensi produksi perusahaan.
Pada Material Requirement Planning (MRP) ini terdapat input salah
satunya yaitu Bill of Material (BOM). Bill Of Material (BOM) adalah produk
akhir mencakup yang daftar item atau bahan yang diperlukan untuk menghasilkan
produk akhir. Dalam Bill Of Material (BOM) terdapat keterangan seperti Kode
Komponen, Nama Komponen, Quantity dan keterangan dari material yang
digunakan untuk membuat sebuah produk jadi. Dalam Bill Of Material sendiri
terdapat struktur dari komponen yang digunakan dalam pembuatan Case
Handphone dan Case Tablet yang diklasifikasikan menjadi level 0, 1, 2 dan 3.
Selain dari data Bill Of Material yang dibutuhkan dalam perhitungan Material
Requirement Planning (MRP), adapun Master Production Schedule (MPS) atau
Jadwal Induk Produksi yang dimana Master Production Schedule (MPS)
merupakan proses alokasi untuk membuat sejumlah produk yang di inginkan
dengan waktu yang akan diproduksi oleh sebuah perusahaan Manufacturing
dengan memperhatikan kapasitas yang dipunyai mesin, peralatan, dan tenaga
kerja.
Pertama, yang harus dilakukan adalah dengan mengumpulkan data-data
yang dibutuhkan, diantaranya struktur dari produk yang akan diproduksi yang
berupa produk Case Handphone dan Case Tablet dengan inovasi Wireless
Speaker & Airpods Receptacle, Bill of Material (BOM) dari produk tersebut, Data
Master Schedule (MS), dan Inventory Status. Adapun data-data yang telah
Praktikum Perancangan Sistem Industri 2 9
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Case Handphone dan Case Tablet. Kemudian, data schedule receipt setiap
periodenya berdasarkan level produk. Lalu dilakukan perhitungan untuk PAB 1
pada past due yang mana mempertimbangkan adanya On Hand dan data PAB 1
ini akan berguna untuk menghitung PAB 2 yang mana harus terdapat data PAB 1
dan PORc. Perhitungan PAB 1 untuk setiap periode berkaitan dengan nilai PAB 2,
GR, dan SR sehingga menghasilkan nilai yang digunakan untuk menghitung Net
Requirement (NR). Pada pengolahan NR, jika terdapat nilai PAB 1 positif maka
perhitungan tidak perlu dilakukan karena nilai NR akan sama dengan 0 yang
artinya tidak perlu adanya persediaan yang dibutuhkan untuk dilakukan
pemesanan karena tidak terjadi kekurangan persediaan. Namun jika terdapat nilai
NR yang negatif maka perlu adanya perhitungan dimana nilai absolut PAB 1
ditambahkan dengan safety stock yang berguna untuk menambah persediaan.
Selanjutnya, dilakukan perhitungan Planned Order Receipt (PORc) yang mana
berdasarkan pada lot size (LS) yang sudah ditentukan untuk masing-masing
komponen. setelah adanya perhitungan PORc, maka adanya kebutuhan persediaan
yang harus dipesan atau diterima sehingga dilakukan perhitungan Planned Order
Release (PORl) yang dihitung berdasarkan lead time, ketika LT bernilai satu
artinya kebutuhan persediaan harus dipesan satu periode sebelumnya agar ketika
periode berikutnya membutuhkan persediaan tersebut sudah tersedia. Pada
pengolahan data MRP ini dlakukan selama 12 periode. Dari hasil perhitungan
didapatkan Planned Order Realease (PORl) setiap komponen pada hampir setiap
periode dan past due.
Dalam komponen pembuatan produk Case Handphone dan Case Tablet
dari PT. Adya Mavendra menggunakan komponen Lem UHU pada level 1, level
2, dan level 3, sehingga perlu dilakukannya pegging. Pada proses pegging lem
ditentukan terlebih dahulu quantity pada setiap lem untuk kemudian dilakukan
perhitungan GR untuk masing-masing lem berdasarkan pada induk item level
tersebut. Lalu diakumulasikan data tersebut dan dilakukan proses MRP Pegging
Lem mulai dari menghitung GR yang didapat dari total pegging lem dengan total
UOM/Quantity dari lem tersebut. Kemudian data Schedule Receipt (SR) pun
dilakukan akumulasi nilai dari level 1-3 untuk setiap periodenya yang mana
nantinya menjadi nilai SR pada MRP Pegging Lem. Sama halnya dengan
Praktikum Perancangan Sistem Industri 2 11
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
pengolahan data MRP non pegging juga menghitung PAB, NR, PORc, dan PORl.
Dari hasil perhitungan didapatkan nilai PAB 1 yang bernilai positif selama 12
periode sehingga PORl pada setiap periode dan past due bernilai 0.
Setelah melakukan perhitungan setiap komponen disetiap levelnya, maka
dapat diketahui hasil perhitungan diatas untuk jumlah kebutuhan setiap
komponen, serta kapan item harus dikirim yang mana ada pada data Planned
Order Release (PORl) sendiri yaitu sebagai gambaran atau acuan untuk berapa
banyak order yang harus dilakukan untuk diperiode depan dengan melihat atau
mengacu pada periode sebelumnya yang telah didapat atau dihitung dalam
Planned Order Release (PORl). Nilai dari MRP ini nantinya dipergunakan untuk
melakukan pemesanan kedepannya. Agar pada setiap kebutuhan pemesanan yang
akan datang dapat terpenuhi dan terencana dengan baik oleh perusahaan.
Pada modul 5 ini membahas mengenai Capacity Requirement Planning
(CRP). Capacity Requirement Planning (CRP) ini merupakan metode perhitungan
yang digunakan untuk menentukan kapasitas yang lebih terperinci yang
diperlukan oleh Perencanaan Kebutuhan Material atau Material Requirement
Planning (MRP) pada setiap Work Center (WC) dan digunakan untuk proses
penentuan jumlah pekerja dan mesin yang dibutuhkan untuk menyelesaikan suatu
kegiatan produksi. Capacity Requirement Planning (CRP) digunakan untuk
memvalidasi nilai Material Requirement Planning (MRP), sama seperti Rough
Cut Capasity Planning (RCCP) yang berguna untuk memvalidasi Jadwal Induk
Produksi atau Master Production Schedule (MPS). Perbedaannya yaitu jika
Rough Cut Capasity Planning (RCCP) ini untuk memvalidasi Material
Production Planning (MPS), sedangkan Capacity Requirement Planning (CRP)
untuk memvalidasi Plan Order Release dari Material Requirement Planning
(MRP).
Dalam menghitung Capacity Requirement Planning (CRP) ini dibutuhkan
beberapa data untuk dikumpulkan, diantaranya terdapat Flow Diagram, Routing
Sheet, dan Planned Order Release (PORL) dari hasil perhitungan Material
Requirement Planning (MRP). Data-data tersebut dipergunakan untuk produk
Case Handphone dan Case Tablet selama 12 periode. Flow Diagram merupakan
diagram alir yang menunjukan aliran proses pembuatan suatu produk dari mulai
Praktikum Perancangan Sistem Industri 2 12
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
bahan baku sampai barang jadi, selain itu dalam Flow Diagram juga terdapat
keterangan dari Work Center (WC) untuk setiap lokasi proses produksi dari
komponen produknya. Selanjutnya, Routing Sheet yang merupakan sebuah tabel
untuk pengawasan produk karena tabel tersebut adalah penentu mutu yang akan
dibuat dan juga agar mengetahui berapa lama waktu yang dibutuhkan untuk
mengerjakan setiap kegiatan pada produk tersebut, lalu pada Routing Sheet
tersebut terdapat beberapa data yaitu Kode Komponen, Nama Operasi, Work
Center (WC), Run Time (RT), Setup Time (ST), Lot Size (LS), dan Standard
Hours (SH). Planned Order Release (PORL) merupakan kuantitas order yang
dikeluarkan pada periode tertentu dan pada setiap komponen produk selama 12
periode.
Dalam perhitungan Capacity Requirement Planning (CRP), langkah
pertama yang harus dilakukan adalah dengan membuat tabel kebutuhan kapasitas
(Capacity Requirement Planning) dari setiap Work Center (WC), mulai dari Work
Center (WC) 10 hingga Work Center (WC) 90 tetapi hanya untuk setiap
komponen induk atau utama saja pada produk Case Handphone dan Case Tablet.
Komponen induk atau utama ini terdiri dari Badan Case, Dudukan Speaker, dan
Airpods Receptacle, yang mana terdiri dari proses Pemotongan, Pencetakan,
Pendinginan, Penghalusan, untuk kemudian di Assembly, lalu dilakukan
pemeriksaan, dan terakhir pengemasan. Cara untuk menghitung nilai kebutuhan
kapasitas Capacity Requirement Planning (CRP) ini dengan mengalikan Planned
Order Release (PORL) yang terdapat pada Material Requirement Planning
(MRP) dengan Standard Hours (SH) pada setiap Work Center (WC) yang
terdapat pada data Routing Sheet produk Case Handphone dan Case Tablet.
Perhitungan kebutuhan kapasitas Capacity Requirement Planning (CRP) ini
dilakukan untuk produk Case Handphone dan Case Tablet selama 12 periode
pada setiap Work Center (WC)
Nilai Standard Hours (SH) yang didapatkan dari Routing Sheet Case
Handphone dan Case Tablet. Untuk Case Handphone pada WC-10 memiliki nilai
SH 0.0044, pada WC-20 memiliki nilai SH 0.0058, pada WC-30 memiliki nilai
SH 0.0072, pada WC-40 memiliki nilai SH 0.0072, pada WC-50 memiliki nilai
SH 0.0016, pada WC-60 memiliki nilai SH 0.0252, pada WC-70 memiliki nilai
Praktikum Perancangan Sistem Industri 2 13
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
SH 0.0280, pada WC-80 memiliki nilai SH 0.0044, dan pada WC-90 memiliki
nilai SH 0.0058. Sedangkan, untuk Case Tablet pada WC-10 memiliki nilai SH
0.0044, pada WC-20 memiliki nilai SH 0.0072, pada WC-30 memiliki nilai SH
0.0086, pada WC-40 memiliki nilai SH 0.0086, pada WC-50 memiliki nilai SH
0.0016, pada WC-60 memiliki nilai SH 0.0308, pada WC-70 memiliki nilai SH
0.0336, pada WC-80 memiliki nilai SH 0.0044, dan pada WC-90 memiliki nilai
SH 0.0058.
Setelah perhitungan Capacity Requirement Planning (CRP) selesai, data
yang didapatkan akan dimasukan kedalam tabel rekap total kebutuhan kapasitas
pada setiap periode dan Work Center (WC), dengan menggunakan data total
kebutuhan kapasitas Case Handphone dan total kebutuhan kapasitas Case Tablet
dari setiap Work Center (WC) selama 12 periode. Cara menghitung total
kebutuhan kapasitasnya yaitu dengan cara menambahkan nilai total Capacity
Requirement Planning (CRP) produk Case Handphone dan total Capacity
Requirement Planning (CRP) produk Case Tablet untuk setiap Work Center (WC)
dari setiap periodenya. Pada periode 12 terdapat kebutuhan kapasitas yang
bernilai 0 mulai dari Work Center (WC) 10 sampai Work Center (WC) 90, yang
artinya adalah pada Work Center (WC) tersebut tidak membutuhkan pengeluaran
atau pemesanan material untuk proses produksinya karena sudah dipenuhi dari
periode sebelumnya.
Selanjutnya melakukan perhitungan Reguler Time dan Over Time, yang
mana pada Reguler Time dan Over Time untuk Jam Kerja (JK) sudah ditentukan
oleh laboratorium sebanyak 8 jam dan 2 jam untuk setiap 12 periode, untuk Hari
Kerja (HK) pada setiap periodenya sudah ditentukan oleh laboratorium, dan
Tenaga Kerja yang dibutuhkan adalah hasil dari Tenaga Kerja yang dibutuhkan
dibagi dengan total Work Center (WC) dengan hasil 3.556 dan dibulatan menjadi
4 orang setiap Work Center (WC). Namun untuk penempatan dalam setiap Work
Center (WC) itu menyesuaikan dari kapasitas produksinya hingga tidak ada beban
yang melebihi Reguler Time dan Over Time (Dapat dilihat dari grafik jika
melebihi batas Reguler Time dan Over Time). Pengolahan data pada data kapasitas
Reguler Time dan Over Time dilakukan untuk semua Work Center (WC) dimulai
dari Work Center (WC) 10 sampai dengan Work Center (WC) 90 yang berisikan
Praktikum Perancangan Sistem Industri 2 14
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
data Jam Kerja, Hari Kerja, dan Tenaga Kerja selama 12 periode. Setelah itu, olah
menjadi sebuah grafik dengan menggabungkan data kapasitas Reguler Time dan
Over Time serta data Total Kebutuhan Kapasitas Capacity Requirement Planning
(CRP). Dapat dilihat dari hasil grafik tiap Work Center (WC), kebutuhan
kapasitas tidak ada yang melebihi batas beban Reguler Time dan Over Time
sehingga PT. Adya Mavendra tidak membutuhkan adanya subkontrak untuk
memenuhi rencana produksi dikarenakan semua alokasi dari tenaga kerja sudah
disesuaikan. Hampir seluruh kebutuhan kapasitas dilakukan pada Reguler Time,
hanya terdapat kebutuhan kapasitas yang perlu dilakukan pada Over Time pada
Work Center (WC) 60 pada periode 5 dan 10.
Pada modul 6 ini membahas mengenai Routing Sheet dan Multi Product
Process Chart (MPPC), kedua hal tersebut merupakan proses awal dalam
melakukan perhitungan Perancangan Tata Letak Fasilitas. Routing Sheet atau
lembar pengurutan produksi merupakan langkah- langkah yang dicakup dalam
memproduksi komponen tertentu dan rincian yang perlu diketahui dari hal-hal
yang saling berkaitan satu sama lain. Routing Sheet ini digunakan untuk
menghitung jumlah komponen yang harus dipersiapkan dan menghitung jumlah
mesin yang dibutuhkan untuk perusahaan memperoleh sejumlah produk yang
diinginkan. Sedangkan, Multi Product Process Chart (MPPC) adalah sebuah peta
yang digunakan untuk menggambarkan aliran atau urutan operasi kerja yang
menghasilkan produk dengan banyak jenis, atau produk dengan banyak part.
Multi Product Process Chart (MPPC) menampilkan suatu diagram dengan
urutan-urutan proses untuk setiap komponen yang akan diproduksi. Multi Product
Process Chart (MPPC) memberikan informasi mengenai jumlah mesin aktual
yang dibutuhkan dalam proses produksi.
Sebelum menghitung Routing Sheet Revisi dan Multi Product Process
Chart (MPPC) harus melakukan perhitungan Kapasitas Produk Terpasang (KPT)
terlebih dahulu. Dalam menghitung Kapasitas Produk Terpasang (KPT)
diperlukan data dari Master Schedule selama 12 periode, hal ini bertujuan untuk
mengetahui jumlah unit produk untuk kesanggupan dalam target produksi
perusahaan. Setelah mendapatkan nilainya melalui tabel Master Schedule, diambil
data yang paling maksimal untuk dilakukan perhitungan lebih lanjut. Selain itu,
Praktikum Perancangan Sistem Industri 2 15
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
data yang diperlukan adalah hari kerja selama 12 periode, yang kemudian dicari
data paling minimumnya dan konversikan dalam satuan jam dengan jam kerja per
hari yaitu selama 8 jam untuk mengetahui kapasitas pabrik tersebut. Setelah kedua
data tersebut didapat, perhitungan KPT dilakukan dengan cara membagi nilai
maksimum Master Schedule dengan nilai perhitungan waktu kerja dan hari kerja
yang terendah. Setelah melakukan perhitungan didapatkan nilai Kapasitas Produk
Terpasang (KPT) untuk Case Handphone sebesar 157 unit/jam, sedangkan untuk
Case Tablet sebesar 66 unit/jam. Tujuan dari diperlukannya data Master Schedule
yang maksimum dan hari kerja yang minimum yaitu karena perusahaan
membutuhkan produksi yang mampu memproduksi produk sebanyak-banyaknya
dengan waktu kerja yang sesingkat-singkatnya.
Dalam menghitung Routing Sheet Revisi ada beberapa data yang
diperlukan, antara lain Operation Process Chart (OPC) dari produk Case
Handphone dan Case Tablet, data Kapasitas Mesin Terpakai (KMT), data
Efisiensi Mesin yang sudah ditentukan dari laboratorium yaitu sebesar 75%, dan
data Kapasitas Produk Terpasang (KPT) dari produk Case Handphone dan Case
Tablet.
Selanjutnya masuk dalam perhitungan Routing Sheet Revisi, pertama
membuat tabel Routing Sheet terlebih dahulu. Tabel tersebut berisikan Nomor
Operasi, Operasi, Nama Mesin, Waktu Operasi, Kapasitas Mesin, % Scrap,
Jumlah Komponen yang Diharapkan, Jumlah Komponen yang Disiapkan,
Efisiensi Mesin, dan Jumlah Mesin Teoritis. Beberapa data yang sudah tersedia,
antara lain Nomor Operasi dan Operasi pada Case Handphone dan Case Tablet
salah satu contohnya pada komponen BCH-03 terdapat Pemotongan (O-1),
Pencetakan (O-2), Pendinginan (O-3), Penghalusan (O-4), Pemeriksaan 1 (I-1).
Kemudian terdapat Nama Mesin antara lain Mesin Pemotongan, Mesin Cetak,
Mesin Pendingin, Mesin Penghalusan, Meja Periksa, Meja Perakitan, dan Meja
Pengemasan. Lalu Waktu Operasi, dan % Scrap sudah tersedia pada Operation
Process Chart (OPC) yang sudah dibuat sebelumnya.
Selanjutnya menghitung Kapasitas Mesin pada setiap operasi diperlukan
data waktu proses dan Kapasitas Mesin Terpakai untuk mengetahui berapa
kapasitas dalam memproduksi produk setiap jamnya. Perhitungan dilakukan
Praktikum Perancangan Sistem Industri 2 16
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
dengan membagi nilai KMT dengan Waktu Proses. Lalu menghitung Jumlah
Komponen Diharapkan dengan melakukan perhitungan dari mulai proses yang
paling akhir dengan memasukan nilai KPT Case Handphone atau Case Tablet
yang artinya pada akhir proses produksi diharapkan mampu memproduksi sesuai
unit yang diharapkan. Namun untuk perhitungan operasi diatasnya nilai jumlah
komponen yang diharapkan akan sama dengan jumlah komponen yang disiapkan
pada operasi berikutnya. Setelah itu menghitung Jumlah Komponen Disiapkan
yang mana didapatkan dari jumlah komponen yang diharapkan dengan
mempertimbangkan % Scrap dari operasi tersebut. Selanjutnya menghitung
Efisiensi Mesin yang didapat dari perhitungan Kapasitas Mesin Teoritis dikali
dengan nilai efisiensi mesin sebesar 75%, angka 75 % ini dikarenakan setiap
mesin tidak akan bekerja secara terus-menerus dalam kondisi bagus (100%) dan
setiap mesin pasti akan mengalami kondisi yang tidak ideal atau perlu
maintenance, maka dari itu ditetapkan asumsi efisiensi mesin sebesar 75 %. Lalu
menghitung Jumlah Mesin Teoritis yang didapat dari perhitungan Jumlah
Komponen Disiapkan dibagi dengan Efisiensi Mesin. Terakhir dalam perhitungan
Routing Sheet ini adalah menghitung Total Mesin Teoritis Case Handphone dan
Case Tablet, dengan cara menjumlahkan Jumlah Mesin Teoritis Case Handphone
dan Jumlah Mesin Teoritis Case Tablet.
Selanjutnya masuk dalam perhitungan Multi Product Process Chart
(MPPC), pertama membuat tabel Multi Product Process Chart (MPPC) terlebih
dahulu. Tabel tersebut berisikan Proses, Work Center, Komponen, Jumlah Mesin
Teoritis, Jumlah Mesin Aktual, dan Total Mesin. Pada PT. Adya Mavendra
terdapat 9 Work Center, diantaranya WC-10 hingga WC-90. Dari keseluruhan
Work Center tersebut dibagi menjadi tiga bagian yaitu Fabrikasi dimulai dari WC-
10 sampai WC-40, lalu Inspeksi dan Assembly dimulai dari WC-50 sampai WC-
80, dan Packaging hanya pada WC-90. Tabel Multi Product Process Chart
(MPPC) urutan prosesnya diliat dari Operation Process Chart (OPC), dan Multi
Product Process Chart (MPPC) akan mencari Jumlah Mesin Teoritis yang
didapatkan dari hasil perhitungan dan pembulatan, untuk mendapatkan jumlah
mesin teoritis dengan menggunakan rumus total penjumlahan dari keseluruhan
nilai mesin teoritis dari setiap Work Center.
Praktikum Perancangan Sistem Industri 2 17
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Dari tabel Multi Product Process Chart (MPPC) didapat hasil Jumlah Mesin
Aktual yang dibutuhkan dari setiap Work Center. Setelah dihitung dan dibulatkan
ke atas didapatkan hasil, diantaranya pada WC-10 membutuhkan 4 Mesin Potong,
pada WC-20 membutuhkan 6 Mesin Cetak, pada WC-30 membutuhkan 7 Mesin
Pendingin, pada WC-40 membutuhkan 7 Mesin Penghalusan, pada WC-50 dan
WC-80 masing-masing membutuhkan 2 Meja Periksa, pada WC-60
membutuhkan 8 Meja Perakitan, pada WC-70 membutuhkan 9 Meja Perakitan,
dan pada WC-90 membutuhkan 2 Meja Pengemasan. Setelah itu ditotalkan dan
mendapatkan hasil dengan Jumlah Mesin Aktual yang dibutuhkan sebanyak 47
mesin untuk memproduksi Case Handphone dan Case Tablet.
Pada modul 7 ini membahas mengenai Luas Lantai Produksi. Luas lantai
adalah suatu tabel yang berisi rincian kebutuhan luas tanah atau luas pabrik untuk
aktivitas dari bagian produksi, bagian penyimpanan atau penerimaan gudang
bahan baku dan produk jadi (gudang), kantor, taman, dan kelengkapan lain.
Perhitungan dari luas lantai produksi digunakan untuk mengetahui luas lahan yang
akan digunakan dalam perencanaan tata letak fasilitas dan perusahaan yang akan
didirikan. Pada perhitungan luas lantai ini terbagi menjadi empat bagian, antara
lain ada Luas Lantai Receiving yang dimana Receiving ini merupakan tempat yang
digunakan untuk menyimpan bahan baku untuk produksi. Lalu, Luas Lantai
Fabrikasi yang dimana Fabrikasi ini digunakan untuk tempat proses produksi yang
dihitung berdasarkan jumlah dan luas mesin. Selanjutnya terdapat Luas Lantai
Shipping yang dimana Shipping merupakan tempat yang digunakan untuk
menyimpan barang jadi. Terakhir terdapat Luas Lantai Fasilitas dan Perkantoran
yang dimana untuk menghitung ruangan- ruangan dan fasilitas pendukung yang
akan diterapkan di perusahaan.
Dalam menentukan Luas Lantai Produksi dan Perkantoran, membutuhkan
beberapa data, antara lain Material Costing, Bill of Material (BOM), Routing
Sheet, dan Multi Product Process Chart (MPPC) dari produk Case Handphone
dan Case Tablet. Perhitungan data luas lantai produksi dan perkantoran, dimulai
dengan menghitung luas lantai gudang bahan baku (receiving). Terdapat
komponen utama dari Case Handphone dan Case Tablet, diantaranya terdapat
Badan Case (BHC-03 & BCT-03), Dudukan Speaker (DSH-03 & DST-03), dan
Praktikum Perancangan Sistem Industri 2 18
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Airpods Receptacle (ARH-02 & ART-02). Dan juga terdapat komponen tambahan
antara lain Wireless Speaker (WSH-02 & WST-02), Sticker (STH-02 & STT-02),
Dus Packing (DPH-01 & DPT-01), Bubble Wrap (BWH-01 & BWT-01), dan
Lem UHU (LEH-01 & LET-01). Lalu terdapat data yang sudah menjadi ketentuan
laboraturium, antara lain Ukuran Rak Receiving Komponen Utama dan
Komponen Tambahan yaitu Panjang sebesar 244 cm atau 2.44 m, Lebar sebesar
122 cm atau 1.22 m, Tinggi sebesar 100 cm atau 1 m, Luas sebesar 29768 cm atau
2.9768, dan Volume sebesar 2976800 cm atau 2.9768 m.
Pada perhitungan Receiving, hal pertama yang harus dilakukan adalah
menghitung terlebih dahulu ukuran komponen utama yang diterima dan dipakai
pada produk Case Handphone dan Case Tablet, serta ukuran komponen tambahan
yang diterima dan dipakai pada produk Case Handphone dan Case Tablet. Setelah
itu, menghitung ukuran rak receiving untuk komponen utama dan komponen
tambahan, dengan adanya ukuran terima dan ukuran pakai salah satu contohnya
seperti Badan Case Handphone yang berbahan Polycarbonate Solid tersebut
memiliki ukuran terima dengan Panjang 20 cm, Lebar 20 cm, dan Tinggi 2 cm,
lalu untuk ukuran pakai dari Badan Case Handphone yaitu Panjang 15.2 cm,
Lebar 7.65 cm, dan Tinggi 0,2 cm. Terdapat juga berat yang diterima untuk Badan
Case Handphone yaitu sebesar 1.2 kg dan berat yang dipakai sebesar 0,04 kg.
Kemudian menghitung Luas Lantai Komponen Utama dan Komponen Tambahan
dari produk Case Handphone dan Case Tablet. Terdapat data yang sudah
ditentukan dari laboraturium diantaranya untuk Tinggi Rak sebesar 1 m dan untuk
Tumpukan Rak sebanyak 3 rak. Salah satu contoh perhitungannya terdapat pada
Badan Case Handphone, komponen yang disiapkan per jamnya sebesar 167
dengan jumlah potongan 20 unit yang mana data tersebut diambil dari Routing
Sheet Aircase Handphone, kebutuhan material selama 2 minggu sebesar 720 unit
dengan kapasitas rak 3600 unit dan kebutuhan untuk kebutuhan rak sebanyak 1
rak, luas lantainya yaitu sebesar 3 m2 dengan allowance luas sebesar 12 m2, lalu
diperoleh total luasnya sebesar 15 m2. Setelah melakukan perhitungan tersebut,
didapatkan nilai total luas lantai komponen utama dari produk Case Handphone
dan Case Tablet yaitu sebesar 90 m2 dan total luas lantai komponen tambahan dari
produk Case Handphone dan Case Tablet yaitu sebesar 180 m2. Total
Keseluruhannya sebesar 360 m2.
Selanjutnya menghitung Luas Lantai Fabrikasi, dalam menentukan luas
lantai fabrikasi dipengaruhi oleh beberapa faktor diantaranya Nomor Operasi,
Operasi, Nama Mesin, Jumlah Mesin, Luas Mesin, Luas Mesin Keseluruhan,
Allowance, Luas Allowance, dan Total Luas. PT. Adya Mavendra memiliki 90
total Work Center yang dimana setiap work center terdiri dari WC-10 dengan
Operasi Pemotongan, pemotongan ini menggunakan mesin pemotong. Pada WC-
20 Operasi Pencetakan, pencetakan ini menggunakan mesin cetak. Pada WC-30
Operasi Pendinginan, pendinginan ini menggunakan mesin pendingin. Pada WC-
40 Operasi Penghalusan, penghalusan ini menggunakan mesin penghalusan. Pada
WC-50 Operasi Pemeriksaan 1, pemeriksaan 1 ini menggunakan meja periksa.
Pada WC-60 Operasi Assembly 1, assembly ini menggunakan meja perakitan.
Pada WC-70 Operasi Assembly 2, assembly ini menggunakan meja perakitan.
Pada WC-80 Operasi Pemeriksaan 2, Pemeriksaan 2 ini menggunakan meja
periksa. Lalu yang terakhir pada WC-90 Operasi Pengemasan, pengemasan ini
menggunakan meja pengemasan. Dalam work center pun terdapat Storage atau
tempat penyimpanan untuk setiap operasi yang dimana ditetapkan sebanyak 2
buah (Storage In dan Storage Out) dengan ukuran sebesar 1 x 1 m. Salah satu
contoh perhitungannya adalah pada operasi pemotongan yang menggunakan
mesin pemotong dengan jumlah mesin 4 berukuran 2 x 2 m2 dengan luas mesin
sebesar 4 m2, kemudian bagian disimpan didapatkan jumlah sebanyak 8 dan luas
penyimpnan sebesar 1 m2. Sehingga didapatkan luas mesin keseluruhan sebesar
16 m2 dan luas penyimpanan sebesar 8 m2 dengan allowance sebesar 700% dan
didapatkan luas allowance sebesar 168 m2 sehingga total luasnya sebesar 192 m2.
Setelah semua selesai dilakukan perhitungan, selanjutnya melakukan rekapan dari
setiap work center nya dan didapatkan total luas lantai fabrikasi sebesar 2256 m2.
Selanjutnya menghitung Luas Lantai Shipping (Gudang Bahan Jadi), yang
dimana pada luas lantai shipping ini akan menghitung ukuran kemasan produk
yang sudah jadi dan produk yang perusahaan akan gunakan yaitu kardus untuk
Case Handphone dan Case Tablet, karena dari kemasan tersebut membutuhkan
tempat penyimpanan, maka dari itu perusahaan membuat rak tumpukkan untuk
Praktikum Perancangan Sistem Industri 2 20
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
menyimpan produk jadi. Lalu terdapat data ukuran rak shipping yang sudah sudah
ditentukkan oleh laboraturium, diantaranya Panjang sebesar 4.88 m atau 488 cm,
Lebar sebesar 1.22 m atau 122 cm, Tinggi sebesar 1 m atau 100 cm, dan Volume
sebesar 5.9536 m atau 5953600 cm, lalu untuk Tinggi Rak sebesar 1 m dan
Tumpukkan Rak sebanyak 3 rak. Pertama yang harus dilakukan ketika
menghitung luas shipping adalah menghitung ukuran kemasan produk salah satu
contohnya pada ukuran kardus Case Handphone memiliki panjang 16 cm, lebar
10.5 cm, tinggi 5 cm, dan volume kemasan sebesar 840 cm 3. Setelah itu, dalam
perhitungannya terdapat data produk selama 4 minggu salah satu contohnya untuk
Case Handphone sebesar 25120 unit, jumlah produk atau kemasan sebanyak 1
unit, jumlah kemasan 4 minggu sebesar 25120 unit dengan kapasitas rak sebesar
6600 unit, kebutuhan rak sebesar 4 rak, luas lantai 12 m2, luas allowance sebesar
48 m2 dari 400 % dan didapatkan total luas sebesar 60 m 2. Setelah perhitungan
selesai, selanjutnya membuat tabel Total Luas Shipping Case Handphone dan
Case Tablet, maka dari itu didapatkan hasil untuk Aircase Handphone sebesar 60
m2 dan Aircase Tablet sebesar 60 m2, dijumlahkan menjadi sebesar 120 m2.
Sealnjutnya menghitung Luas Lantai Fasilitas dan Perkantoran, terdapat 4
jenis luas lantai. Pertama Luas Lantai Fasilitas Non Perkantoran (Dalam Pabrik),
kedua Luas Lantai Fasilitas Non Perkantoran (Luar Pabrik), ketiga Luas Lantai
Fasilitas Perkantoran, dan keempat Luas Lantai Fasilitas Ruangan Perkantoran.
Setelah itu, menentukan ruangan-ruangan yang dibutuhkan, jumlah ruangan,
ukuran ruangan, allowance, luas allowance, dan total luasnya. Setelah melakukan
perhitungan didapatkan hasil, untuk luas lantai fasilitas non perkantoran (dalam
pabrik) didapatkan total luas sebesar 70.5 m2, luas lantai fasilitas non perkantoran
(luar pabrik) didapatkan total luas sebesar 2298 m2, luas lantai fasilitas
perkantoran didapatkan total luas sebesar 183 m2, dan luas lantai fasilitas ruangan
perkantoran didapatkan total luas sebesar 735 m2. Jadi, total keseluruhannya
sebesar 3277,5 m2.
Langkah terakhir membuat rekapan hasil perhitungan setiap luas lantai,
untuk Luas Lantai Receiving didapatkan total luasnya sebesar 270 m2, untuk Luas
Lantai Fabrikasi didapatkan total luasnya sebesar 2256 m2, untuk Luas Lantai
Shipping didapatkan total luasnya sebesar 120 m2, untuk Luas Lantai Fasilitas dan
Praktikum Perancangan Sistem Industri 2 21
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Perkantoran didapatkan total luasnya sebesar 3277,5 m2, dan menurut kebijakan
PEMPRES No. 6 setiap pabrik itu harus mempunyai lahan hijau sebesar 30%,
maka dari itu untuk perhitungan lahan hijau yaitu total keseluruhan Luas Lantai
Taman dan Lahan Hijau didapatkan total luasnya sebesar 1777,05 m2. Jadi, Luas
Lantai yang dibutuhkan oleh perusahaan kami adalah sebanyak 7700,55 m2.
Pada modul 8 ini membahas mengenai Ongkos Material Handling (OMH)
Awal yang dimana Ongkos Material Handling (OMH) merupakan suatu ongkos
yang timbul akibat adanya aktivitas material dari satu mesin ke mesin lain atau
dari satu departemen kedepartemen lain yang besarnya ditentukan sampai pada
suatu tertentu, dan Material Handling ini adalah kegiatan tidak produktif karena
pada kegiatan ini bahan tidaklah mendapat perubahan bentuk atau perubahan nilai
sehingga akan mengurangi kegiatan yang tidak efektif dan mencari Ongkos
Material Handling (OMH) terkecil. Lalu membahas, From To Chart yang dimana
itu merupakan suatu teknik konvensional yang umum digunakan untuk
perencanaan tata letak pabrik dan pemindahan bahan dalam suatu proses produksi.
Kemudian, In Flow kegunaannya untuk mencari koefisien ongkos yang masuk ke
suatu area dari beberapa area lain dan Out Flow untuk mencari koefisien ongkos
yang keluar dari suatu area ke beberapa area lain. Dan membahas, Tabel Skala
Prioritas yang merupakan suatu tabel yang menggambarkan urutan prioritas antara
departemen atau mesin dalam suatu lintas atau layout produksi.
Pada perhitungan Ongkos Material Handling (OMH) hal yang pertama
harus dilakukan adalah melakukan pengumpulan data terlebih dahulu, data yang
perlu dikumpulkan diantaranya Operation Process Chart (OPC), Routing Sheet
Revisi, Multi Product Process Chart (MPPC), Luas Lantai Produksi, Berat Pakai
Komponen, dan Jenis Alat Angkut yang digunakan dari produk Case Handphone
dan Case Tablet. Dalam perhitungan Ongkos Material Handling (OMH) ini
terdapat data alat angkut yang sudah ditentukan laboraturium diantaranya, Tenaga
Manusia dengan berat 0 – 15 kg memiliki ongkos sebesar Rp. 100/meter, Walkey
Fallet dengan berat 16 – 49 kg memiliki ongkos sebesar Rp. 200/meter, dan
Forklift dengan berat lebih dari 50 kg memiliki ongkos sebesar Rp. 250/meter.
Setelah data terkumpul, dilanjut untuk mengolah data tersebut pada tabel
Ongkos Material Handling (OMH) dengan permulaan menghitung berat total dari
Praktikum Perancangan Sistem Industri 2 22
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
jumlah rekapan dari nilai tertinggi ke nilai terendah yang menggunakan kode
abjad sehingga dapat diketahui bahwa layout dari pabrik akan dipertimbangkan
berdasarkan urutan prioritas dari departemen tersebut. Pada Tabel Skala Prioritas
(TSP) inflow dan outflow kode tersebut diantaranya, untuk departemen Receiving
menggunakan kode A, untuk WC-10 menggunakan kode B, untuk WC-20
menggunakan kode C, untuk WC-30 menggunakan kode D, untuk WC-40
menggunakan kode E, untuk WC-50 menggunakan kode F, untuk WC-60
menggunakan kode G, untuk WC-70 menggunakan kode H, untuk WC-80
menggunakan kode I, untuk WC-90 menggunakan kode J, dan untuk departemen
shipping menggunakan kode K. Pada Tabel Skala Prioritas (TSP) inflow untuk
departemen Receiving prioritasnya adalah kode B, G, J, dan H , WC-10
prioritasnya adalah kode C, WC-20 prioritasnya adalah kode D, WC-30
prioritasnya adalah kode E, WC-40 prioritasnya adalah kode F, WC-50
prioritasnya adalah kode G dan H, WC-60 prioritasnya adalah kode H, WC-80
prioritasnya adalah kode J, dan WC-90 prioritasnya adalah kode K. Pada Tabel
Skala Prioritas (TSP) outflow untuk departemen Receiving prioritasnya adalah
kode B, H, J, dan G, WC-10 prioritasnya adalah kode C, WC-20 prioritasnya
adalah kode D, WC-30 prioritasnya adalah kode E, WC-40 prioritasnya adalah
kode F, WC-50 prioritasnya adalah kode G dan H, WC-60 prioritasnya adalah
kode H, WC-80 prioritasnya adalah kode J, dan WC-90 prioritasnya adalah kode
K. Jadi, karena perusahaan PT. Adya Mavendra merupakan perusahaan
manufaktur yang mana mengeluarkan produk jadi berdasarkan hasil produksi,
maka data yang digunakan memakai data outflow. Setelah melakukan perhitungan
Ongkos Material Handling (OMH) Awal dan mendapatkan hasil dari Tabel Skala
Prioritas, maka langkah selanjutnya akan membuat Activity Relationship Diagram
(ARD) dan Area Allocation Diagram (AAD), yang dimana Activity Relationship
Diagram (ARD) adalah diagram hubungan antar aktivitas (departemen atau
mesin) berdasarkan tingkat prioritas kedekatan, sehingga diharapkan ongkos
material handling yang minimum. Sedangkan untuk Area Allocation Diagram
(AAD) merupakan gambaran layout secara global yang menggambarkan
hubungan kedekatan antar departemen dengan skala ukuran luas lantai yang
sebenarnya.
Praktikum Perancangan Sistem Industri 2 24
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Diagram yang berguna untuk mengetahui apakah ukuran tersebut simetris dengan
minimal senilai 0,3333 dan maksimal senilai 3 yang diberikan dari laboratorium,
dalam menentukan koefisien untuk ukuran simetris atau tidaknya dapat dilihat jika
hasilnya 0.1 maka artinya itu tidak simetris. Perhitungan koefisien tersebut
didapatkan dari pembagian panjang dan lebar, hasilnya menjadi penentu ukuran
panjang dan lebar dari setiap ruangan karena koefisien tersebut harus berada pada
rentang ketentuannya. Kemudian, dilakukan perhitungan panjang dan lebar untuk
seluruh departemen didapatkan hasil luas keseluruhan sebesar 2716.50 meter,
untuk lebar keseluruhan sebesar 59.64 meter, dan untuk panjang keseluruhan
sebesar 45.54 meter. Panjang keseluruhan dan panjang tabel diharuskan sama
namun diberikan allowance 0,05. Setelah itu, ukuran panjang dan lebar
keseluruhan dan tiap departemen yang sudah didapatkan digunakan untuk
membuat Area Allocation Diagram (AAD) menggunakan aplikasi Microsoft
Visio.
Selanjutnya pembuatan Area Allocation Diagram (AAD), hal ini
dilakukan supaya layout yang dibuat terlihat lebih nyata, karena dalam pembuatan
layout harus memperhatikan luas dari setiap departemennya dan luas pabrik yang
tersedia. Area Allocation Diagram (AAD) merupakan penggambaran awal pabrik
dari keseluruhan yang mempunyai perbandingan antara ukuran yang sesuai
dengan ukuran yang sebenarnya. Dalam pembuatan Area Allocation Diagram
(AAD) harus diperhatikan dari bentuk setiap ruangannya, dimulai dari ukuran
ruangan setiap departemen dengan ruangan kosong untuk fasilitas dalam pabrik.
Pembuatan Area Allocation Diagram (AAD) ini dibantu menggunakan software
Microsoft Visio yang mana dibuatkan daerah keseluruhan pabrik dengan
memasukan ukuran-ukuran panjang dan lebar keseluruhan, kemudian membuat
bentuk ruangan setiap departemen dengan memasukan ukuran panjang dan lebar
yang sudah ditentukan dan ditempatkan sesuai dengan rancangan tata letak dalam
Activity Relationship Diagram (ARD). Setelah selesai, didapatkan ukuran sumbu
X dan Y yang digunakan untuk melakukan perhitungan Ongkos Material
Handling (OMH) revisi.
Selanjutnya perhitungan Ongkos Material Handling (OMH) revisi, dalam
perhitungan Ongkos Material Handling (OMH) revisi ini inputnya menggunakan
Praktikum Perancangan Sistem Industri 2 26
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
data nama komponen, jumlah produksi/jam, dan berat pakai sehingga dihasilkan
berat total dari perpindahan material antar departemen, jenis alat angkut, harga
perpindahan alat angkut, dan koordinat sumbu X dan sumbu Y yang digunakan
untuk menghitung jarak. Dari perhitungan Ongkos Material Handling (OMH)
revisi ini dilakukan revisi pada bagian jarak berdasarkan koordinat sumbu X dan
sumbu Y dari Area Allocation Diagram (AAD) sehingga mempengaruhi total
ongkos material handling (OMH). Setelah melakukan perhitungan kembali,
didapatkan hasil diambil salah satu contohnya pada perhitungan Case
Handphone, dari receiving ke WC-10 menggunakan tenaga manusia dengan jarak
16.80 meter didapatkan total ongkosnya sebesar Rp. 1.680, dari receiving ke WC-
60 menggunakan tenaga manusia dengan jarak 28.68 meter didapatkan total
ongkosnya sebesar 2.868, dari receiving ke WC-70 menggunakan walkey fallet
dengan jarak 4.54 meter didapatkan total ongkosnya sebesar Rp. 907, dari
receiving ke WC-90 menggunakan walkey fallet dengan jarak 16.71 meter
didapatkan total ongkosnya sebesar Rp. 3.341, dari WC-10 ke WC-20
menggunakan tenaga manusia dengan jarak 17.41 meter didapatkan total
ongkosnya sebesar Rp. 1.741, dari WC-20 ke WC-30 menggunakan tenaga
manusia dengan jarak 18.14 meter didapatkan total ongkosnya sebesar Rp. 1.814,
dari WC-30 ke WC-40 menggunakan tenaga manusia dengan jarak 22.58 meter
didapatkan total ongkosnya sebesar Rp. 2.258, dari WC-40 ke WC-50
menggunakan tenaga manusia dengan jarak 14.41 meter didapatkan total
ongkosnya sebesar Rp. 1.441, dari WC-50 ke WC-60 menggunakan tenaga
manusia dengan jarak 7.76 meter didapatkan total ongkosnya sebesar Rp. 776,
dari WC-50 ke WC-70 menggunakan tenaga manusia dengan jarak 16.38 meter
didapatkan total ongkosnya sebesar Rp. 1.638, dari WC-60 ke WC-70
menggunakan walkey fallet dengan jarak 24.14 meter didapatkan total ongkosnya
sebesar Rp. 4.828, dari WC-70 ke WC-80 menggunakan forklift dengan jarak
15.54 meter didapatkan total ongkosnya sebesar Rp. 3.885, dari WC-80 ke WC-90
menggunakan forklift dengan jarak 5.70 meter didapatkan total ongkosnya sebesar
Rp. 1.425, dan dari WC-90 ke shipping menggunakan forklift dengan jarak 14.69
didapatkan total ongkosnya sebesar Rp. 3.671. Jadi, didapatkan hasil akhirnya
untuk total ongkos material handling (OMH), untuk Aircase Handphone alternatif
Praktikum Perancangan Sistem Industri 2 27
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
1 sebesar Rp. 32.271, untuk Aircase Tablet alternatif 1 sebesar Rp. 26.671, dan
totalnya sebesar Rp. 58.943. Sehingga, Area Allocation Diagram (AAD) yang
terpilih menggunakan alternatif 1.
Layout merupakan sebuah tata letak dari suatu elemen desain yang
ditempatkan dalam sebuah media bidang yang telah di konsep sedemikian rupa
sehingga membentuk penataan yang artistik. Layout digunakan untuk
menempatkan menempatkan fasilitas-fasilitas produksi sehingga mendapatkan
susunan tata letak yang paling optimal dan memperlancar proses produksi yang
efektif dan efisien di dalam perusahaan.
Activity Relationship Chart (ARC) atau Peta Hubungan Kerja kegiatan
adalah peta yang menggambarkan derajat tingkat hubungan penting tidaknya
kedekatan antar bagian-bagian atau kegiatan pada departemen dalam perkantoran
atau pabrik. Activity Relationship Chart (ARC) memiliki tujuan untuk mengetahui
aktivitas antar departemen dan mengetahui hubungan kedekatan antar setiap
departemen. Pada Activity Relationship Chart (ARC) pabrik terdapat departemen
pabrik yang terdiri dari receiving, fabrikasi, dan shipping, fasilitas ruang
perkantoran, Toilet Wanita, Toilet Pria, Masjid, Kantin, Klinik Kesehatan,
Tempat Pembuangan Sampah, Tempat Pembuangan Limbah, Lapangan Parkir
Mobil, Lapangan Parkir Motor, Lapangan Parkir Truk, Pos Satpam, Assembly
Point / Titik Kumpul, Hydrant Pemadam Kebakaran, ATM, dan Parkiran
Material Handling. Pada Activity Relationship Chart (ARC) kantor terdapat
Ruang Direktur Utama, Ruang Sekretaris, Ruang Manager Keuangan, Ruang Staff
Keuangan, Ruang Manager Purchasing, Ruang Staff Purchasing, Ruang
Manager Research & Development (R&D), Ruang Staff Research &
Development (R&D), Ruang Manager Produksi, Ruang Manager Quality Control,
Ruang Staff Quality Control, Ruang Manager Human Resourch & Development,
Ruang Staff Human Resourch & Development, Ruang Manager Pemasaran,
Ruang Staff Pemasaran. Pada Activity Relationship Chart (ARC) terdapat 6
macam hubungan yang digambarkan dalam bentuk segitiga dengan warna yang
berbeda-beda dan memiliki makna atau arti yaitu merah berarti hubungan bersifat
mutlak, kuning berarti hubungan sangat penting, hijau berarti hubungan cukup
penting, biru berarti hubungan biasa-biasa saja, putih berarti hubungan tidak
Praktikum Perancangan Sistem Industri 2 28
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
diinginkan dan orange berarti hubungan sangat tidak diinginkan. Selain itu,
terdapat juga bentuk hubungan dalam bentuk angka yang masing-masing angka
memiliki makna atau arti yaitu “1” berarti menggunakan catatan yang sama, “2”
berarti menggunakan personil yang sama, “3” berarti ruang yang sama, “4” berarti
tingkat hubungan personil, “5” berarti tingkat hubungan kertas kerja, “6” berarti
urutan aliran kertas, “7” berarti melakukan aliran kerja yang sama, “8” berarti
menggunakan peralatan dan fasilitas yang sama, “9” berarti ribut, kotor, debu,
dsb, dan “10” berarti lain-lain yang mungkin perlu.
Template merupakan suatu gambaran yang lebih jelas dari tata letak pabrik
yang akan dibuat dan merupakan gambaran detail dari ARD yang telah dibuat. Di
dalam pembuatan template ini mengacu pada ARC (Activity Relationship Chart),
data yang digunakan yaitu luas lantai fasilitas non-perkantoran (luar pabrik), luas
lantai fasilitas perkantoran dan luas lantai fasilitas ruang perkantoran.
Pada modul 10 ini membahas dan menjelaskan mengenai Analisis Input
Data Simulasi di perusahaan PT. Adya Mavendra yang memproduksi Case
Handphone dan Case Tablet. Analisis data digunakan untuk melihat karakterisitik
atau kecenderungan dari distribusi pola data pada waktu proses di setiap work
center yang nantinya akan digunakan dalam simulasi dengan bantuan software
ARENA.
Simulasi dilakukan untuk mengetahui apakah alur produksi komponen
yang telah direncanakan mempunyai kesalahan atau tidak. Tujuan dari dibuatnya
simulasi sendiri adalah untuk mengamati karakteristik dari sistem yang
sebenarnya. Input yang akan dianalisis yaitu waktu proses pengerjaan dari tiap
mesin yang dilewati komponen.
Dalam melakukan pemodelan sistem ini hal pertama yang dilakukan
adalah pengumpulan data, diantaranya data Regular Time, Ongkos Material
Handling (OMH) Revisi, Operation Process Chart (OPC), dan Multi Product
Process Chart (MPPC). Setelah itu, menghitung kedatangan bahan baku setiap
harinya, dengan cara membagi dissagregate case handphone dan case tablet
dengan hari kerja, dan didapatkan hasil untuk jumlah kedatangan bahan baku per
harinya, untuk case handphone didapatkan hasil sebanyak 1105 unit dan untuk
case tablet didapatkan hasil sebanyak 459 unit. Selanjutnya, melakukan analisis
Praktikum Perancangan Sistem Industri 2 29
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
pada waktu proses pengerjaan dari setiap mesin yang dilewati setiap
komponennya dengan menggunakan tools yang terdapat di ARENA yaitu
menggunakan input analyzer yang berfungsi untuk menguji data distribusi.
Dikarenakan pada proses ini tidak memiliki data distribusi statistiknya,
maka sebelum menggunakan input analyzer diharuskan membuat data distribusi
dari setiap prosesnya terlebih dahulu. Dalam membuat data distribusi ini software
yang digunakan untuk menggenerate data distribusi statistiknya adalah random
number generation yang terdapat pada analysis tools pack yang ada pada
Microsoft Office Excel. Langkah pertama yaitu dengan membuat tabel
pengamatan, setelah itu digenerate data pada menu tools data analysis dan
pilihlah random number generation. Setelah data yang digenerate terkumpul,
lakukanlah fitting distribusi dengan menggunakan input analyzer yang terdapat
pada ARENA.
Dari hasil Input Analyzer didapatkan hasil untuk distribusi dari setiap
waktu prosesnya. Pada Case Handphone, waktu proses pemotongan berdistibusi
12.3 + GAMM(0.357, 7.9), waktu proses pencetakan berdistribusi 17.2 +
WEIB(3.17, 3.72), waktu proses pendinginan berdistribusi 22.5 + WEIB(2.65,
2.66), waktu proses penghalusan berdistribusi NORM (25.1, 0.906), waktu proses
pemeriksaan 1 berdistribusi NORM(4.97, 1.03), waktu proses Assembly 1
berdistibusi 87 + 5.49 * BETA (2.54, 2.22), waktu proses Assembly 2 berdistibusi
97 + 5.54 * BETA(3.62, 3.17), waktu proses pemeriksaan 2 berdistribusi NORM
(15.2, 1.04), dan untuk waktu proses pengemasan berdistribusi 17 + 5.73 *
BETA(6.84, 6.54). Sedangkan pada Case Tablet, waktu proses pemotongan
berdistibusi 12.3 + WEIB (2.95, 2.95), waktu proses pencetakan berdistribusi
NORM(24.9, 0.939), waktu proses pendinginan berdistribusi 27.1 + 5.87 *
BETA(3.4, 3.94), waktu proses penghalusan berdistribusi NORM(30.2, 0.892),
waktu proses pemeriksaan 1 berdistribusi NORM(5.02, 0.907), waktu proses
Assembly 1 berdistibusi NORM(110, 1), waktu proses Assembly 2 berdistibusi
NORM (120, 1.01), waktu proses pemeriksaan 2 berdistribusi 12.3 +
GAMM(0.357, 7.9), dan untuk waktu proses pengemasan berdistribusi 17.1 +
5.91 * BETA(2.87, 3.2).
Modul station digunakan sebagai titik kedatangan dari setiap entity yang
masuk ke setiap work center. Lalu, modul route digunakan untuk mengarahkan
entity yang telah diproses pada work center selanjutnya sesuai dengan operation
process chart (OPC) dari produk case handphone dan case tablet, serta
dimasukan waktu tempuh yang digunakan adalah rata-rata waktu tempuh yang
sebelumnya telah dihitung sesuai dengan alat angkut yang digunakan, serta
destination type yang digunakan yaitu by sequence untuk work center sebelum
Assembly karena tidak semua komponen memiliki alur yang sama.
Modul match digunakan agar barang yang dipasangkan sesuai dengan
pasangannya sebelum nantinya akan diproses dan digabungkan seutuhnya dalam
assembly. Setelah itu, modul batch digunakan untuk menggabungkan komponen
yang telah mengalami proses assembly dan juga bersifat permanen.
Modul decide digunakan untuk memisahkan entity antara komponen Case
Handphone dan Case Tablet, dan juga untuk membuat keputusan pada bagian
pemeriksaan menggunakan persentase sebesar 99,95%. Setelah itu, modul record
digunakan untuk merekam data yang masuk dan melewati pada setiap prosesnya.
Lalu yang terakhir, modul dispose digunakan untuk titik akhir dari produk yang
reject dan produk aircase handphone dan tablet jadi.
Pada modul 12 ini membahas mengenai Verifikasi dan Validasi pada
simulasi yang sudah dibuat modul logikanya pada ARENA dalam modul
sebelumnya, hal tersebut digunakan untuk memastikan bahwa model logika yang
dibuat sudah merepresentasikan sistem nyatanya, maka dari itu diperlukan proses
verifikasi dan validasi agar memudahkan dalam pengambilan keputusan.
Verifikasi merupakan proses menentukkan apakah model dapat beroperasi sesuai
dengan yang direncanakan melalui debugging terhadap program komputer yang
dibuat, verifikasi memeriksa penerjemahan model simulasi konseptual ke dalam
program yang berjalan dengan benar. Validasi adalah penentuan apakah model
konseptual simulasi yang merupakan representasi akurat dari sistem nyata yang
sedang dimodelkan atau tidak, dan proses validasi ini dilakukan dengan cara
membandingkan antara sampel hasil replikasi dengan hasil keluarnya data yang
dihasilkan.
diakibatkan oleh kurangnya waktu kerja yang dibutuhkan untuk melakukan proses
assembly 1 atau kurangnya mesin yang dibutuhkan untuk mampu memproduksi
seluruh unit produk yang masuk atau kurangnya tenaga kerja. Sehingga, perlu
adanya penambahan waktu kerja yang dibutuhkan pada proses assembly 1 ataupun
melakukan penambahan mesin pada work center 60 agar mampu memproduksi
sesuai dengan unit yang masuk. Oleh karena itu setelah dilakukan percobaan
untuk melakukan penambahan waktu atau mesin didapatkan alternatif perbaikan
yang dapat diketahui pada model simulasi. Alternatif tersebut yakni dengan
melakukan penambahan waktu kerja maka waktu kerja yang ideal dilakukan agar
seluruh unit produk terproduksi semua menjadi 11 jam, dari waktu tersebut dapat
dilakukan dengan melakukan over time (jam lembur). Sedangkan alternatif
lainnya dengan melakukan penambahan mesin maka mesin yang perlu
ditambahkan untuk mampu memproduksi seluruh unit produk sebanyak 3 mesin
tambahan. Selain dengan adanya penambahan mesin dan jam kerja, dapat
dilakukan pula penambahan tenaga kerja untuk membantu pekerjaan proses
tersebut atau melakukan training pada tenaga kerja agar meningkatkan skill atau
performa dalam mengerjakan proses menjadi lebih cepat.
Pada Bab IV modul 13 ini membahas mengenai Aspek Finansial, yang
dimana Finansial merupakan bagaimana dalam mempelajari kondisi keuangan
suatu bisnis, individu, organisasi, dan juga negara yang dimulai dari bagaimana
cara pengelolaannya, peningkatan, pengalokasian, pemberdayaan, perhitungan
risiko, dan juga prospek masa depan yang berkaitan dengan keuangan. Aspek
Finansial (keuangan) merupakan aspek yang digunakan untuk menilai keuangan
perusahaan, sehingga merupakan salah satu aspek yang sangat penting untuk
diteliti kelayakannya. Menurut Sutarman, Aspek finansial berkaitan dengan
penentuan kebutuhan jumlah dana dan sekaligus alokasinya serta mencari sumber
dana yang berkaitan secara efisien sehingga memberikan keuntungan maksimal.
Tujuan dari perhitungan aspek finansial adalah untuk mengetahui perkiraan
pendanaan dan aliran kas proyek atau bisnis, sehingga dapat diketahui layak atau
tidaknya rencana bisnis yang dibuat.
Pada perhitungan aspek finansial ini yaitu melakukan analisis kelayakan
untuk PT. Adya Mavendra pada pembuatan Case Handphone dan Case Tablet.
Praktikum Perancangan Sistem Industri 2 36
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Hal pertama yang harus diperhatikan dalam melakukan analisis ini adalah
mengumpulkan data-data diantaranya, seperti menghitung komponen utama dan
komponen tambahan dari Case Handphone dan Case Tablet, lalu menghitung
jumlah dan harga mesin atau alat yang dibutuhkan sesuaikan dengan Multi
Product Process Chart (MPPC) atau Operation Process Chart (OPC) yang sudah
ditentukan pada modul sebelumnya, setelah itu mencari dan menghitung harga
tanah serta harga bangunan yang akan dibangun dilokasi tersebut, selanjutnya
menghitung upah minimum (UMR) untuk para karyawan dari lokasi yang akan
digunakan dan lokasi tersebut sudah ditentukan oleh PT. Adya Mavendra yaitu
terdapat pada Kabupaten Subang. Setelah data-data tersebut terkumpul, terdapat
juga data-data pendukung lainnya yang sudah ditentukan antara lain, Kenaikan
Harga Bahan Baku sebesar 12% per tahun, Nilai Sisa sebesar 15% per tahun,
MARR sebesar 6.06% per tahun (Bank BJB), Pinjaman Kredit sebesar 40% dari
total investasi, Bunga Kredit sebesar 6.06% per tahun, Pajak Penghasilan sebesar
5% per tahun, Pajak Pendapatan sebesar 10% per tahun, Pajak Bumi dan
Bangunan (PBB) sebesar 0.50% dari bangunan, Harga Jalan (Aspal) sebesar Rp.
50.000 per meter, Profit sebesar 40% per tahun, OMH Revisi Handphone sebesar
Rp. 32.271 per jam, OMH Revisi Tablet sebesar Rp. 26.671 per jam, KPT
Handphone sebesar 157 unit per jam, dan KPT Tablet sebesar 66 unit per jam.
Selanjutnya menghitung biaya bahan baku dari Case Handphone dan Case
Tablet. Dalam menghitung biaya bahan baku Case Handphone dan Case Tablet,
langkah pertama yang harus dilakukan adalah mencari harga bahan baku dari
setiap komponennya, untuk bahan baku utama Case Handphone dan Case Tablet
menggunakan bahan Polycarbonate Solid seharga Rp. 22.000 per lembar, dan
untuk bahan baku tambahan Case Handphone dan Case Tablet yang pertama ada
Bluetooth Speaker seharga Rp. 211.000 per pack, yang kedua ada Kertas Vynil
seharga Rp. 8.700 per pack, yang ketiga ada Kardus seharga Rp. 15.000 per pack,
yang keempat ada Bubble Wrap Seharga Rp. 3500 per roll, dan ada Lem UHU
seharga Rp. 15.000 per pack. Untuk harga ukuran terima tersebut memiliki harga
yang sama yang dan nantinya hanya berbeda dengan harga ditahun pertama,
kedua, sampai kelima.
Selanjutnya menghitung upah tenaga kerja, yang dimana ada upah untuk
tenaga kerja langsung dan tenaga kerja tidak langsung. Tenaga kerja langsung
diantaranya, terdapat operator dari mesin potong, mesin cetak, mesin pendingin,
mesin penghalus, meja periksa, meja perakitan, meja pengemasan, forklift, walkey
fallet, dan manusia (helper). Tenaga kerja tidak langsung pada perkantoran
diantaranya, terdapat Direktur Utama, Sekretaris, Manager Keuangan, Staff
Keuangan, Manager Purchasing, Staff Purchasing, Manager Research &
Development (R&D), Staff Research & Development (R&D), Manager Produksi,
Manager Quality Control, Staff Quality Control, Manager Human Resourch &
Development, Staff Human Resourch & Development, Manager Pemasaran, Staff
Pemasaran. Dan tenaga kerja tidak langsung pada non perkantoran diantaranya,
terdapat Satuan Pengamanan, Cleaning Service, Office Boy, Sopir, Petugas Klinik
Kesehatan, Receptionist, Teknisi Kelistrikan, Teknisi Komputer dan Jaringan.
Dalam menghitung upah untuk tenaga kerja yaitu dengan cara, yang pertama
untuk upah per hari itu didapatkan dari upah per bulan dibagi dengan hari kerja
dalam satu bulan, untuk upah per minggu itu didapatkan dari upah per bulan
dibagi dengan minggunya dalam satu bulan, untuk upah per tahun itu didapatkan
dari upah per bulan dikali dengan jumlah bulan dan satu tahun. Setelah dilakukan
perhitungan didapatkan hasil, untuk total biaya langsung dengan jumlah tenaga
kerja sebanyak 75 orang mendapatkan hasil sebesar Rp. 2.980.348.074, dan untuk
total biaya tidak langsung dengan jumlah tenaga kerja sebanyak 24 orang
mendapatkan hasil sebesar Rp. 2.211.225.280. Dan bukan hanya upah dalam satu
tahun saja, melainkan harus menghitung kenaikan upah untuk tahun berikutnya
sampai lima tahun kedepan.
Selanjutnya, menghitung investasi dan kredit dan juga terdapat
perhitungan depresiasi. Dalam menghitung investasi dan kredit hal pertama yang
harus dilakukan adalah menghitung investasi dan depresiasi, terdapat 69 jenis
aktiva diantaranya, seperti Tanah, Bangunan Tertutup, Paving Blok, Bangunan
terbuka, Jalan Aspal, Kendaraan (Mobil), Kendaraan (Truk), Meja Kursi Direktur
dan Manager, Meja Kursi Sekretaris, Staf, dan Satpam, Sofa dan Meja Direktur,
Sofa dan Meja Sekretaris, Manager, dan Staf, Air Conditioner, Perangkat
Komputer, Laptop, Printer, Cabinet, Telepon, Meja Kursi Meeting, Meja Kursi
Praktikum Perancangan Sistem Industri 2 38
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
73.623 per unit, dan untuk tablet pada tahun pertama harga jualnya sebesar Rp.
91.412 per unit.
Selanjutnya, menghitung nilai laba rugi. Laba rugi merupakan informasi
pengeluaran, pendapatan, serta keuntungan dan kerugian yang dihasilkan
perusahaan selama periode tertentu. Dalam menghitung nilai laba rugi hal yang
pertama dilakukan adalah menghitung laba kotornya, dengan cara hasil penjualan
dikurangi HPP dikurangi PPN 10% pada tahun pertama untuk handphone
didapatkan hasil sebesar Rp. 5.178.381.420 dan untuk tablet didapatkan hasil
sebesar Rp. 2.703.136.620 dilanjutkan sampai tahun kelima. Setelah itu,
menghitung laba operasi, dengan cara laba kotor dikurangi total biaya komersial
pada tahun pertama untuk handphone didapatkan hasil sebesar Rp. 4.659.704.072,
dan untuk tablet didapatkan hasil sebesar Rp. 2.271.819.272 dilanjutkan sampai
tahun kelima. Lalu menghitung pajak penghasilan, dengan cara laba operasi dikali
dengan 5% yang sudah menjadi ketentuan laboraturium pada tahun pertama untuk
handphone didapatkan hasil sebesar Rp. 232.985.204, dan untuk tablet didapatkan
hasil sebesar Rp. 113.590.964 dilanjutkan sampai tahun kelima. Dan menghitung
laba bersihnya, dengan cara laba operasi dikurangi pajak penghasilan pada tahun
pertama untuk handphone didapatkan hasil sebesar Rp. 4.426.718.868, dan untuk
tablet didapatkan hasil sebesar Rp. 2.158.228.308 dilanjutkan sampai tahun
kelima.
Selanjutnya, menghitung cash flow yang dimana proyeksi aliran kas
menunjukkan penyajian yang sistematis tentang penerimaan dan pengeluaran kas
selama periode operasi tertentu. Cash flow bertujuan untuk memberikan informasi
agar perusahaan dapat membuat strategi keuangan, seperti evaluasi terhadap
aktiva bersih sebuah perusahaan, struktur keuangan sebuah perusahaan (likuiditas
dan solvabilitas), serta menyesuaikannya dengan perubahan keadaan dan peluang.
Dalam menghitung cash flow ini hal pertama yang harus dilakukan adalah
menghitung total pemasukan, dengan cara pinjaman bank ditambah modal sendiri
ditambah laba bersih ditambah depresiasi pada tahun ke-0 didapatkan hasil
sebesar Rp. 27.843.516.438 pada tahun pertama didapatkan hasil sebesar
6.716.323.997 dilanjutkan sampai tahun kelima. Setelah itu, menghitung total
pengeluarannya, dengan cara investasi ditambahkan dengan angsuran pokok pada
Praktikum Perancangan Sistem Industri 2 40
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
tahun ke-0 didapatkan hasil sebesar Rp. 5.712.551.084 pada tahun pertama
didapatkan hasil sebesar Rp. 1.973.370.474 dilanjutkan sampai tahun kelima. Lalu
menghitung kas awal tahun, dengan cara total pemasukan ditambahkan dengan
total pengeluaran pada tahun pertama didapatkan hasil sebesar Rp.
22.130.965.354 dilanjutkan sampai tahun kelima. Dan menghitung kas akhir
tahunnya, dengan cara kas awal tahun ditambah pemasukan dikurangi
pengeluaran pada tahun ke-0 didapatkan hasil sebesar Rp. 22.130.965.354 pada
tahun pertama didapatkan hasil sebesar Rp. 26.873.918.877 dilanjutkan sampai
tahun kelima.
Selanjutnya, menghitung balance sheet yang merupakan bagian dalam
laporan finansial dalam akuntansi yang mencatat informasi terkait aset, kewajiban
pembayaran pada pihak terkait dalam operasional perusahaan dan modal pada
waktu tertentu. Tidak hanya memberi gambaran kondisi keuangan
perusahaan, balance sheet juga berfungsi untuk mengetahui kondisi kesehatan
finansial usaha. Fungsi tersebut juga mencakup prediksi kondisi arus kas di masa
mendatang, fleksibilitas anggaran perusahaan, dan likuiditas. Dalam menghitung
balance sheet ini hal pertama yang harus dilakukan adalah menghitung total
aktiva lancar, dengan cara kas sama dengan laba ditambah modal ditambahkan
dengan bank (depresiasi) pada tahun pertama didapatkan hasil sebesar Rp.
28.847.289.351 dilanjutkan sampai tahun kelima. Lalu menghitung total aktiva
tetap, dengan cara tanah ditambah bangunan ditambah mesin dan peralatan
dikurangi akumulasi depresiasi pada tahun pertama didapatkan hasil sebesar Rp.
5.581.174.264 dilanjutkan sampai tahun kelima. Setelah itu, menghitung total
kewajiban dengan cara hutang lancar ditambah dengan hutang usaha pada tahun
pertama didapatkan hasil sebesar Rp. 11.137.406.575 dilanjutkan sampai tahun
kelima. Lalu menghitung total modal, dengan cara modal usaha ditambahkan
dengan laba ditahan pada tahun pertama didapatkan hasil sebesar Rp.
23.291.057.040 dilanjutkan sampai tahun kelima. Setelah itu, menghitung total
aktiva dengan cara total aktiva lancar ditambahkan dengan total aktiva tetap pada
tahun pertama didapatkan hasil sebesar Rp. 34.428.463.615 dilanjutkan sampai
tahun kelima. Lalu menghitung total kewajiban dan modal, dengan cara total
kewajiban ditambahkan dengan total modal pada tahun pertama didapatkan hasil
Praktikum Perancangan Sistem Industri 2 41
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
MARR nya sebesar 6.06% yang artinya perusahaan PT. Adya Mavendra ini dapat
dikatakan layak.
Selanjutnya, pada pada tahap terakhir yaitu melakukan kegiatan trading.
Yang dimana Trading adalah proses transaksi yang berlangsung dalam pasar
finansial di mana sistem kerjanya adalah sering-sering menjual dan membeli aset
dalam waktu yang singkat. Tujuan aktivitas ekonomi ini adalah melakukan jual
beli dalam waktu singkat untuk mendapatkan keuntungan sebesar-besarnya.
Dalam kegiatan ini, dilakukan selama 8 periode yang dimana untuk periode 1
sampai 4 untuk Case Handphone dan untuk periode 5 sampai 8 untuk Case
Tablet. Pada penjualan Case Tablet di periode 2, PT. Adya Mavendra tidak
melakukan transaksi jual beli karena tidak mendapatkan bahan baku. Dan setelah
melakukan perhitungan, didapatkan nilai Internal Rate of Return (IRR) sebesar
49% dan untuk MARR nya sebesar 6.06% yang artinya perusahaan PT. Adya
Mavendra ini dapat dikatakan layak.
VI.1 Kesimpulan
PT Adya Mavendra merupakan perusahaan yang bergerak di bidang
manufaktur yang memproduksi Case Handphone dan Case Tablet dengan
menambahkan inovasi pada case-nya. Produk case ini diberi nama AIRCASE
yang memiliki penambahan inovasi fitur Wireless Speaker untuk menambah
jangkauan suara menjadi lebih besar dan Airpods Receptacle untuk menyimpan
airpods Gen 3 agar mudah dibawa kemana-mana. Berdasarkan hasil dari
pembahasan yang telah dilakukan pada Bab 3 dan Bab 4, maka dapat ditarik
kesimpulan sebagai berikut:
1. Dalam perencanaan produksi AIRCASE, PT. Adya Mavendra melakukan
Forecasting terlebih dahulu yang tentunya adalah metode yang terbaik dan
cocok yaitu menggunakan metode Linier Regression untuk mengetahui
potensi minat dari konsumen juga untuk melihat kemungkinan jumlah
produksinya atau Aggregate Planning. Selanjutnya dari data yang didapatkan
akan digunakan untuk menentukan Rencana Produksi, Sales & Production
Planning (SOP), Master Production Schedule (MPS) dan Rough Cut Capacity
Planning (RCCP), Material Requirement Planning (MRP), Capacity
Requirement Planning (CRP), KPT, Routing Sheet dan Multi Product Process
Chart (MPPC) untuk produksi case handphone maupun case tablet.
2. Dalam perancangan tata letak fasilitas dari proses produksi AIRCASE, PT.
Adya Mavendra menentukan Luas Lantai Produksi & Perkantoran yang
dibutuhkan dan akan digunakan di perusahaan. Adapun luas lantainya yaitu
sebesar 7700,55 m2 yang didalamnya mencakup area perkantoran, fabrikasi,
dan ruang terbuka. Setelah mengetahui perhitungan untuk luas lantai,
kemudian mencari biaya yang diperlukan untuk melakukan perpindahan bahan
baku atau Ongkos Material Handling (OMH) awal. Selanjutnya, membuat
terlebih dahulu Activity Relation Diagram (ARD) dan Area Allocation
Diagram (AAD) agar mempermudah dalam proses pembuatan layout maupun
template, kemudian menghitung Ongkos Material Handling (OMH) Revisi
PT. Adya Mavendra
agar biaya yang keluar lebih kecil. Setelah itu buat Area Allocation Chart
(ARC) terlebih dahulu guna melihat ruang mana yang harus diprioritaskan
lebih dekat atau harus berdampingan apakah ruangan tersebut harus berjauhan
atau berdekatan. Setelah itu, membuat Layout fabrikasi dan perkantoran
hingga dirasa sudah optimal, kemudian membuat Template untuk perusahaan
PT. Adya Mavendra guna melihat posisi keseluruhan pabrik secara detail.
Adapun bentuk dari perusahan PT. Adya Mavendra adalah letter L.
3. Dalam model simulasi untuk proses produksi AIRCASE, PT. Adya Mavendra
melakukan simulasi agar dapat menggambarkan bagaimana proses produksi
secara ril yaitu dengan membuat model simulasi dengan menggunakan
software ARENA Dimulai dengan merancang simulasi menggunakan modul
logika dan setelah itu dibuat menjadi suatu animasi, kemudian melakukan
verifikasi dan validasi untuk memastikan apakah model simulasi tersebut
sudah mempresentasikan sistem nyata atau belum.
4. Dalam menentukan kelayakan usaha dari proses produksi AIRCASE, PT.
Adya Mavendra melakukan analisis kelayakan investasi dimana keuangan
perusahaan akan dihitung. Kemudian dihitung juga biaya-biaya yang
dibutuhkan dalam pembuatan perusahaan seperti mesin yang digunakan,
jumlah tenaga kerja, perlengkapan, harga tanah, lahan, bangunan dan lain
sebagainya. Dari hasil perhitungan Internal Rate of Return (IRR) dan MARR
yang dilakukan untuk menentukan dan mengetahui suatu perusahaan
dikatakan layak dengan ketentuan jika nilai IRR lebih besar daripada nilai
MARR. Pada PT. Adya Mavendra didapatkan nilai IRR sebesar 43% lebih
besar dari nilai MARR sebesar 6,06% sehingga perushaan PT. Adya
Mavendra layak untuk dijalankan.
VI.2 Saran
VI.2.1 Saran Untuk Praktikum
Untuk kedepannya diharapkan praktikum dalam merawat fasilitas
penunjang kegiatan seperti PC juga mengganti yang rusak, sehingga jalannya
praktikum dapat lebih nyaman, fokus dan semua praktikan dapat mendapatkan
hak yang sama.
Praktikum Perancangan Sistem Industri 2 2
Program Studi Teknik Industri
Universitas Pasundan Bandung
2022
PT. Adya Mavendra
Assalamualaikum Wr. Wb
Alhamdulillah, serangkaian kegiatan praktikum PSI 2 telah tuntas
dilewati. Banyak hal penting yang saya rasakan, kalo pengetahuan baru sih
pasti yaaa, ini lebih dari itu, perasaan dekat dengan angkatan 2019 dan
perasaan dekat dengan kating-kating terkhusus para asisten menjadi poin
utama bagi diri saya. Banyak cerita-cerita menyeramkan tentang PSI 2 ini
sebelumnya, tetapi ternyata setelah dijalani semuanya masih bisa dinikmati
dengan porsi bebannya masing-masing. Beberapa bagian yang memang
cukup menguras tenaga dan fikiran yaitu di modul PTLF dengan layout dan
templatenya, juga trading dengan egoisme PT dan aktingnya xixi.
Terimakasih saya ucapkan sebesar-besarnya kepada rekan kerja sekaligus
sahabat seperjuangan atas kerjasamanya mengaktualisasikan PT Adya
Mavendra agar dapat dibangun dan dioperasikan xixi. Kepada asisten kami
kang jess atas bimbingan dan ACC satsetsatsetnya xixi, terimakasih juga
kepada para asisten laboratorium yang setiap waktu bertemu dan
bercengkrama atas kehangatan yang diberikannya. Semoga silaturahmi ini
akan tetap berjalan meski tanpa ikatan asisten - praktikan melainkan lebih
dari itu. Saya masih ingat kata-kata motivasi dari rekan saya,
ความแตกต่างระหว่างคนทีล ้ เหลวและประสบความสำเร็จคือคนทีล
่ ม ่ ม
้ เหลว
ในการมองหาปัญหาจากการแก้ปญ
ั หาแต่ละครงและคนที
ั้ ป ่ ระสบความส ำเร็จ
ม ักจะมองหาวิธก
ี ารแก้ปญ
ั หาแต่ละปัญหา jadi seberat apapun masalahmu,
hadapi, rasakan, kepedihanmu itu. Berani mengambil pilihan dan resikonya,
cari solusi dari permasalahannya.
Soni Wakwak, Wiz Khalifa, Si Kabayan jeung Kabayan Parkour, Wowo
Alien, Setan Film Munafik, Mas Adam Mba Inul, Pargoy, Upin Ipin, Goyang
Kalibrasi, Bunda Corla, dan gerakan tiktok lainnya pamit undur diri.
Wassalamu'alaikum Wr. Wb.
MEMORABILIA
ELSA FIKILIA MEGA WIDYA PUTRI
Assalamualaikum Wr.Wb.
Segala puji dan syukur saya panjatkan kepada Allah SWT Sang Maha
Pencipta Aalam Semesta dan isinya ini, karena atas berkah, rahmat, hidayah dan
karunia yang diberikan saya dan teman teman mampu menyelesaikan praktikum
ini dengan tepat waktu. Sholawat serta salam saya curah limpahkan kepada
jujungan alam yaitu Nabi Besar Muhammad SAW, kepada para keluarganya, para
sahabatnya, serta mudah-mudahan kita selaku umatnya yang Insha Allah akan
mendapatkan Syafaat dari Beliau kelak di akhir zaman. Alhamdulillahi Rabbil
'Alamin akhirnya saya dan kawan-kawan dipertemukan pada akhir dari kegiatan
Praktikum Perancangan Sistem Industri 2 ini, dengan segala banyak Hambatan,
Tantangan, Ancaman dan Gangguan yang selama ini dihadapi dan dilewati,
namun dengan kekuatan dan kegigihan kami berempat, akhirnya kita dapat
melewati dan menjalankan dengan baik serta tepat waktu.
Dari Praktikum PSI 2 ini, saya banyak mendapatkan momen dan cerita
sejak dimulai dari technical meeting, tugas pendahuluan, praktikum yang
dilaksanakan offline, penyusunan laporan serta permasalahan yang terjadi antara
praktikan dan asisten. Keringat, letih, lelah dan rasa gelisah menghiasi sebuah
cerita panjang dari perjalanan saya mengikuti praktikum ini, banyak sekali
rintangan yang saya hadapi namun dengan ketekunan dan dorongan dari
semuanya, akhirnya saya bisa berjalan dengan baik dan sesuai rencana.
Praktikum PSI 2 sangat menarik karena banyak ilmu dan hal baru yang
saya pelajari. Perancangan yang membutuhkan konsentrasi dan imajinasi dalam
pelaksanaannya. Saya bisa lebih memahami bagaimana sebuah produk bisa
diciptakan dari awal hingga pada akhirnya diproduksi oleh sebuah pabrik. Saya
merasakan sangat bermanfaat sekali karena bidang desain dan finansial sangat
saya sukai. Waktu untuk istirahat, keluarga dan yang lainnya memang sangat
berkurang tapi semoga usaha yang sudah saya jalani bisa dituai hasilnya suatu saat
nanti. Terima Kasih Praktikum Perancangan Sistem Industri 2 dan segala cerita
didalamnya yang akan saya kenang selalu.
Data Sistem Produksi
- Data Demand Historis
Kelompok 10
Demand Historis Hari
Periode
HP Tab Kerja
1 34415 14849 20
2 33504 16472 22
3 36451 11392 20
4 34747 11416 20
5 31117 16245 20
6 38916 16279 22
7 33961 16215 22
8 32410 12025 23
9 34663 11322 22
10 32364 11966 20
11 37850 18361 23
12 36043 16338 23
- Data Setup Time
Data Setup Time
N
Proses Waktu (Detik)
o
1 Dilebur 60
2 Dihaluskan 71
3 Dicetak 77
4 Dipola 65
5 Dijahit 50
6 Diwarnai 63
7 Didinginkan 81
8 Dilubangi 46
9 Ditimbang 40
10 Dikeringkan 62
11 Dipotong 55
12 Diukur 39
13 Ditempel 38
14 Dicampurkan 52
15 Dirapihkan 35
16 Assembling 1 70
17 Assembling 2 74
18 Assembling 3 74
19 Diperiksa 72
20 Dikemas 67
- Data Schedule Receipt
Schedule Receipt Case Handphone
Periode 1 2 3 4 5 6 7 8 9 10 11 12
Level 0 5246 4943 0 0 0 0 0 0 0 0 0 0
Level 1 7452 9244 5452 14573 8243 0 7952 14034 3528 9241 4457 6325
Level 2 2464 4721 0 7532 12953 6134 0 4236 13463 4578 6623 8542
Level 3 7134 4257 13565 0 1358 17324 15333 0 4876 9214 13634 12435
Link: https://www.bukalapak.com/p/industrial/industrial-lainnya/2yjtwet-
jual-polycarbonate-2mm-20x20cm-sheet-lembaran-polikarbonat?
blca=GDNMP-PMAX-APPDR&blpt=GDNMP-PMAX-
APPDR&campaigncode=GGLTGTMPL-GDNMP-PMAX-
APPDR&gclid=Cj0KCQjw5-
WRBhCKARIsAAId9FlgMcLf7NXLECCy3hhZ4spOKAvfyvpafKwSE
AXmaeE8s93WJMPLzUQaAs1NEALw_wcB&omcampaignid=1602066
1198&utm_campaign=GGLTGTMPL-GDNMP-PMAX-
APPDR&utm_medium=sem&utm_source=google
2. Speaker Bluetooth
Harga: Rp. 21.100
Link:
https://fjb.kaskus.co.id/product/554ff18a1ee5dfb8548b4576/smartbox-
mini-bluetooth-speaker/
3. Stiker Vynil
Harga: Rp 8.700
Link: https://shopee.co.id/STICKER-VINYL-INKJET-PLASTIK-120-
gsm-A4-10-lembar-i.66008569.4956017281?
gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUndiKviPr4pPHXBD8M8xZD
KjLsUGB78MRO7VBoiTlaScNNrdM2_xwsaAuO4EALw_wcB
4. Lem
Harga: Rp. 1.500
Link: https://www.tokopedia.com/alysoy-shop/lem-uhu-7-ml-ecer-satuan
5. Dus Packing HP
Harga: Rp. 300
Link: https://shopee.co.id/Kardus---Karton---Kardus-Packing-Ukuran-16-
x-10.5-x-5-cm-i.23078461.5849120578?
gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUlzN2KpNA5ZZfXUyO_J2md
TFtjsRVEtFoKPzUKUly2rv0r7V5WMDpEaAg65EALw_wcB
6. Dus Packing TAB
Harga: Rp. 400
Link: https://shopee.co.id/Box-Kraft-Coklat-Packaging-Souvenir-Baju-
Kotak-Kado-Roti-Kue-Cake-Snack-Hampers-20x20x5-
i.309583462.8106168255?sp_atk=81c1aefc-947f-4a90-9a5b-
fa6fece939a2&xptdk=81c1aefc-947f-4a90-9a5b-fa6fece939a2
7. Bubble Wrap
Harga: Rp. 3.500
Link: https://shopee.co.id/BUBBLE-WRAP-10-METER-x-30-CM*-
i.302022511.7251403168
Screenshot Keseluruhan Harga Mesin
1. Mesin Pemotong (Mesin Laser CNC CO2)
Harga : Rp. 9.800.000,-
Link : https://www.tokopedia.com/mentariputri/mesin-laser-acrylic-mesin-
laser-cnc-co2-garansi-ambil-di-tempat
Link : https://indonesian.alibaba.com/p-detail/Best-60560770667.html
3. Mesin Pendingin (Cold Storage Room)
Harga : Rp. 6.259.480,-
Link : https://www.alibaba.com/product-detail/DC-Mini-Portable-Cold-
Storage-Room_62050543981.html?
spm=a2700.details.0.0.7b1e20e6rrW2Vo
Link : https://www.alibaba.com/product-detail/belt-disc-bench-sanders-
wide-sander_1600073159439.html?
spm=a2700.details.0.0.29784266qKz3VZ
5. Meja Pemeriksaan
Harga : Rp. 250.000,-
Link : https://www.tokopedia.com/kursikantordepok/meja-kerja-serba-
guna-122-x-122-x-75
6. Meja Perakitan
Harga : Rp. 255.500,-
Link : https://www.tokopedia.com/fu-furniture/meja-kerja-kantor-uk-140-
60-70
7. Meja Pengemasan
Harga : Rp. 250.000
Link : https://www.olx.co.id/item/meja-kerja-harga-promo-iid-876014711
8. Rak Receiving
Harga : Rp. 553.700,-
Link : https://shopee.co.id/Rak-besi-siku-kokoh-uk-200x100x40---5-
susun---i.235841687.6385120643?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYMaovIfxZo4m6ZFa_zu-
RPRFkFmKB9XcovoDqlNJNELbpjVmlZAuxxoCusIQAvD_BwE
9. Rak Shipping
Harga : Rp. 650.000,-
Link : https://www.tokopedia.com/drumtong-rakbesisusun/rak-besi-siku-
lobang-5-susun-merah-hitam
Link : https://www.tokopedia.com/furniturstore/rak-meja-meja-tingkat-
rak-tv-meja-kompor-tempat-penyimpanan
11. Forklift
Harga : Rp. 47.002.427,-
Link: https://indonesian.alibaba.com/p-detail/Forklift-60393646947.html?
spm=a2700.pccps_detail.normal_offer.d_title.2d3340adUI6cZf&s=p
Link : https://www.tokopedia.com/glodokdiesel/westco-hand-pallet-truck-
3-ton-cp-3000s?src=topads
Screenshot Keseluruhan Harga Investasi
1. Tanah
Harga : Rp. 450.000/m2
Link:
https://www.rumah123.com/jual/subang/cipeundeuy/tanah/#qid~7e1606c
8-13e8-46b3-b65d-7872611846b6
2. Jalan Aspal
Harga: Rp 50.000,-
Link: https://jasapengaspalanhotmix.com/biaya-pembuatan-jalan-aspal-
per-meter-persegi/
3. Paving Block
Harga: Rp. 55.000
Link: https://artikel.rumah123.com/harga-paving-block-per-m2-terbaru
4. Kendaraan (Mobil)
Harga : Rp. 132.000.000,-
Link : https://www.carsome.id/beli-mobil-bekas/daihatsu/xenia/2017-
daihatsu-xenia-r-std-1.3/cpq4000
5. Kendaraan (Truk)
Harga : Rp. 170.000.000,-
Link : https://www.olx.co.id/item/isuzu-elf-lwb-nkr-55-engkel-long-box-
2014-iid-878974423
Link : https://shopee.co.id/Paket-Set-Meja-kantor-%2B-Kursi-kantor-
LMK1260---SBF8901-i.34544959.7580047923?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYOziLutGeCgrBxxdAr_F9RLw
slWyr2uPYiaPL9Lx10FXvnF4FLCqQBoCO1cQAvD_BwE
7. Meja Kursi Sekretaris, Staf, dan Satpam
Harga : Rp. 575.000,-
Link : https://shopee.co.id/Paket-Hemat-Kursi-meja-kantor-murah-
Furniture-khusus-luar-bandung-i.48788191.10160148741?
sp_atk=3e73ba07-66dd-4c23-a27b-a41730171dc2&xptdk=3e73ba07-
66dd-4c23-a27b-a41730171dc2
Link : https://shopee.co.id/FREE-ONGKIR-JABODEETABEK-SOFA-
L-PUTUS-MINIMALIS-MEJA-GARANSI-3-TAHUN-
i.33258353.6225456869?sp_atk=46c04aad-2ed4-4ef2-80df-
3964fb630b17&xptdk=46c04aad-2ed4-4ef2-80df-3964fb630b17
9. Sofa dan Meja Sekretaris, Manager
Harga : Rp. 700.000,-
Link : https://shopee.co.id/SOFA-L-PUTUS-i.499473896.11824500941?
sp_atk=5f8dda92-7d90-4898-acd8-55baaa12e28a&xptdk=5f8dda92-
7d90-4898-acd8-55baaa12e28a
Link : https://shopee.co.id/INDOOR-AC--1-PK-SHARP-AH-A9UCY-
i.167066829.11403807494?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYHnnDlksgMR_9bTTFeUVON
sOGStQjhv9H1fDZxD5d6F80-3GshseghoC2CQQAvD_BwE
11. Perangkat Komputer
Harga : Rp. 2.790.000,-
Link : https://shopee.co.id/Paket-Komputer-Lengkap-Siap-Kerja-untuk-
Kantor-Anda-i.44683040.3303707045?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYLEbLbVFTn3OhBNETIsxJmj
jO4ZgWnzF22ZqSafLZz8-KdUysGd6pBoCiNQQAvD_BwE
12. Laptop
Harga : Rp. 3.199.000,-
Link : https://shopee.co.id/LAPTOP-MURAH-BARU-LENOVO-
IDEAPAD-SLIM-3i-15-N5030-RAM-4GB-512GB-SSD-FHD-
WIN11HOME-GREY-i.401207104.10811850777?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYDUBvF8mETtxv1d2E06PR3h
0xW7jrJALXJs8kSYoyylZq0tOea1bwRoCCCkQAvD_BwE
13. Printer
Harga : Rp. 599.000,-
Link : https://shopee.co.id/PRINTER-PALING-MURAH-CANON-
TS207-i.666954722.10497217276?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYGMqVbCrOHqjclloJJ6p6VGy
_WK-tUhqmaJ_9j0fmiiVGeo9WhZG3xoCc4IQAvD_BwE
14. Cabinet
Harga : Rp. 193.200,-
Link : https://www.tokopedia.com/lice-store/kunci-kabinet-kunci-kotak-
surat-2-kunci-4-kunci-lemari-kabinet
15. Telepon
Harga : Rp. 50.000,-
Link : https://www.lazada.co.id/products/telepon-rumah-dan-kantor-
panasonic-kx-ts505-i6078064700-s11649408582.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:17487213281!!!
!!c!!11649408582!
139363768&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYH9IODEcY-
froGmpWvvOrT69KTX_6_EMQbdtzaZztKZ9sLPkObAlfRoCWZUQA
vD_BwE
Link : https://shopee.co.id/Meeting-Meja-Kantor---Untuk-8---12org--
Super-mewah--Bahan-Menggunakan-High-Quality--Multiplek-
i.303412127.12464825816?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYBRGYYnKQyG6MNMD4jcK
RN4fD19CE0XjnBiIQMt1F7qifua-tG84QBoC1a4QAvD_BwE
17. Meja Kursi Receptionist
Harga : Rp. 675.000,-
Link : https://shopee.co.id/Paket-Meja-dan-Kursi-Kantor-Minimalis-
Meja-Tulis-Kantor-Kursi-Putar-Jaring-Kerja-Paket-Meja-Kursi-Kerja-
i.406050574.17975468542?sp_atk=0e94323c-2842-4fc0-a1fe-
7c70d3d5a5e5&xptdk=0e94323c-2842-4fc0-a1fe-7c70d3d5a5e5
Link : https://shopee.co.id/SOFA-ODA-2-SEATER-TERMURAH!-
CHECK-OUT-SEBELUM-HARGANYA-NAIK!!-
i.253400053.3653879703?sp_atk=d6a418d2-bb69-433b-9d7f-
e275b5c62bd6&xptdk=d6a418d2-bb69-433b-9d7f-e275b5c62bd6
19. TV dan Monitor CCTV
Harga : Rp. 2.440.000,-
Link : https://www.lazada.co.id/products/sivatel-tv-led-smart-4043inch-
fhd-tv-murah-promo-support-usb-hdmi-vga-av-dapat-digunakan-sebagai-
monitor-komputer-cctvtclgs40dt2-i6190764862-s13395688091.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:18812300612!!!
!!c!!13395688091!
504236023&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYBW_HN3qqyiHy
8b96X0Ls20WkcZcPMogvY14uvuQ3gPv_Mc7zY4VSxoCTJEQAvD_B
wE
Link :
https://www.ikea.co.id/in/produk/solusi-pemilah/tempat-sampah/fniss-
art-00295441?
gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUmd_DWDeVoWdig0pnkcLb0
4LQqOn5lkOxUlg-
wPy1sJuuw5EDW5jgAaApDoEALw_wcB&gclsrc=aw.ds
21. Kloset Duduk
Harga : Rp. 495.000,-
Link : https://shopee.co.id/PROMO-Closet-Duduk-Volk-509-FREE-
ONGKIR-KHUSUS-PONTIANAK-i.165729780.5839652577?
gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUmYB0mEC__mADWpO5QV
UznXNm1ClMre7rjMJRrA8blGSzyMyxCs00gaAkhzEALw_wcB
Link : https://shopee.co.id/-TTP01--Tempat-Tissue-Kotak-Tissue-
Plastik-Panjang-Diana---Random-Colour-i.5929574.7259267579?
gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUlv5s0V8LBay8qf-
fmrsCweJBkBDVYIywXeXgcuu4lU3kU-bnIqRSAaAhODEALw_wcB
23. Lemari Penyimpanan
Harga : Rp. 678.000,-
Link : https://shopee.co.id/CARGO-Lemari-Arsip-Besi-2-Pintu-Swing-
besi-Lemari-File-kantor-Pintu-ayun-i.274764765.17131735727?
sp_atk=7ef83723-e5af-4553-962e-c7572dbee4fd&xptdk=7ef83723-e5af-
4553-962e-c7572dbee4fd
24. Keset
Harga: Rp 16.390
Link: https://www.tokopedia.com/viola21/keset-welcome-alas-kaki-
karet-keset-bihun-mie-anti-slip-licin-40x60cm-abu-abu?extParam=whid
%3D551%26src%3Dpdp%3Futm_campaign%3DPDP-0-2087584549-
131222&utm_source=whatsapp&utm_medium=share&_branch_match_i
d=892374547759642403&utm_campaign=PDP-0-2087584549-
131222&_branch_referrer=H4sIAAAAAAAAA8soKSkottLXL8nPzi9IT
clM1MvJzMvWr6j0S64sMnD3LEsCAEIezpkiAAAA
25. Sarung
Harga: Rp 14.999
Link: https://shopee.co.id/HC-Sarung-Tenun-Dewasa-Murah-Al-Batavia-
Buat-Oleh-Oleh-Lebaran-7000-Benang-i.26177891.12488562651?
sp_atk=899af29b-5b7e-4bec-b643-86a164907671&xptdk=899af29b-
5b7e-4bec-b643-86a164907671
26. Mukena
Harga: Rp. 34.000
Link: https://shopee.co.id/Mukena-Renda-Katun-Travel-Hyget-Premium-
Ukuran-Dewasa-Adem-Berkualitas-i.18426314.13882500519?
sp_atk=7a774c4a-d60a-4fe5-a4b0-2298190fffb8&xptdk=7a774c4a-
d60a-4fe5-a4b0-2298190fffb8
27. APAR
Harga: Rp. 170.000
Link: https://shopee.co.id/APAR-3KG-TONATA-FOAM-3-KG-Set-
Komplit-i.215881847.7917419311?sp_atk=4ab3771a-6859-432d-a66d-
2aef796b28e7&xptdk=4ab3771a-6859-432d-a66d-2aef796b28e7
Link: https://www.tokopedia.com/wewe-electric/lampu-led-50w-lampu-
jalan-led-50watt-pju-led-50-watt-pju-cobra-50-w?extParam=ivf%3Dfalse
%26src%3Dsearch36-60
29. Lampu Ruangan
Harga: Rp. 68.250
Link: https://www.tokopedia.com/mitrashopelectrical/ecolink-led-bulb-
capsule-40w-e27-cool-day-light?extParam=ivf%3Dfalse&src=topads
Link: https://shopee.co.id/LAMPU-TAMAN-TANCAP-TENAGA-
SURYA-LED-ENERGI-SOLAR-PANEL-LAMPU-TAMAN-HIAS-
TENAGA-MATAHARI-Warm-white-i.82387242.5452845333?
sp_atk=08612dcd-5dad-49da-b0da-a9b47548d79e&xptdk=08612dcd-
5dad-49da-b0da-a9b47548d79e
31. Karpet
Harga: Rp. 165.000
Link: https://www.tokopedia.com/omkarpet/karpet-kantor-karpet-hotel-
karpet-apartemen-karpetrumah?extParam=ivf%3Dfalse&src=topads
Link: https://shopee.co.id/Tersedia-Aneka-Meja--Kursi---Rak---Meja-
Belajar---Meja-Cafe---Meja-Lipat---Kursi-Cafe---Kursi-Taman---Kursi-
Bar---Rak-minimalis---Rak-Aquarium---Rak-Dispenser---Meja-Taman---
Meja-Teras-i.85519.16083195835?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYNReh3U6BnDDyleb8sLvIFj-
zf4g4T-_YoZ7l05VBbJMAIAmSDMq_hoCPSQQAvD_BwE
33. Hanger Stand
Harga: Rp. 26.478
Link: https://www.lazada.co.id/products/terlaris-cod-stand-hanger-
gantungan-berdirigantungan-tasgantungan-topigantungan-multifungsi-
stand-hanger-kayu-rak-gantungan-bajuwooden-rack-flat-coat-hanger-
tinggi-150-cm-i7046700375-s13321086738.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:18812300612!!!
!!c!!13321086738!
641202643&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYNtEd9gNzRI_U
QfTVuljB52ZYIVBzh2Cx7tPELgWqobPaGvrO3EFNxoCX4cQAvD_B
wE
Link: https://syaf.co.id/shop/kotak-p3k-aa-onemed/?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYNXmr381y___r2tBLU88aAM
Es3YGzyKxxclmm00QpkFAtwHRfw-AIxoC0swQAvD_BwE
35. Meja Kursi Taman
Harga: Rp. 450.000
Link: https://shopee.co.id/Kursi-Magic---Kursi-Lipat---Kursi-Taman-
i.106580516.4491487816?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYN3HCNzWL8iz3nxC-
Hb5VQMfVlq2kMP1Xp373vhKWN8F4lGkhE3GXhoCaboQAvD_BwE
Link: https://www.bukalapak.com/p/komputer/aksesoris-226/aksesoris-
lainnya-241/4h79a3y-jual-paket-sound-system-toa-musholla-atau-
masjid-speaker-horn-toa-zh5025
37. Jam Dinding
Harga: Rp. 17.073
Link: https://www.lazada.co.id/products/jam-dinding-polos-diameter-
25cm-grosir-termurah-monza-888-i7024042640-s13281768598.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:16624474250!
134910752059!!!pla-300198231052!c!300198231052!13281768598!
657043818&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYGrRWz4RxESbk
a5jsbdxGTG41yuW3OW5BEHEls8Cf6HRx6VgJEXdoRoCX5UQAvD_
BwE
Link : https://www.tokopedia.com/hildan-official/alat-perlengkapan-uks-
kit-lengkap
39. CCTV
Harga: Rp. 129.000
Link: https://www.lazada.co.id/products/kamera-cctv-outdoor-ahd-5mp-
full-hd-1080p-4-in-1-i770230084-s1069594018.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:18812300612!!!
!!c!!1069594018!
136017035&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYPNKfMV9PGD
KDWuEebIuodkjnU3zUHrhO30ndO-
hhVvp40xTXg00tRoCb20QAvD_BwEhttps://www.lazada.co.id/
products/kamera-cctv-outdoor-ahd-5mp-full-hd-1080p-4-in-1-
i770230084-s1069594018.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:18812300612!!!
!!c!!1069594018!
136017035&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYPNKfMV9PGD
KDWuEebIuodkjnU3zUHrhO30ndO-
hhVvp40xTXg00tRoCb20QAvD_BwE
41. Hydrant
Harga : Rp. 1.100.000,-
Link : https://www.tokopedia.com/jaya-abadi/hydrant-box-pemadam-
type-c?
txsc=google&ref=googleshopping&c=17608745418&m=670258441&p=
6789846393&gclid=Cj0KCQiA4uCcBhDdARIsAH5jyUkBdeyGp1qJRv
-
R9Nw1DPfBCoLRBLH1VEctXsJZzf_JL1O2Da2KHtIaAlorEALw_wcB
&gclsrc=aw.ds
Link : https://www.tokopedia.com/solusi-parking/paket-2-rfid-barrier-
gate-mx50-dc-palang-parkir?src=topads
Link: https://www.tokopedia.com/rekomendasi/596288246?
srsltid=AYJSbAeHb_s7MTYf79KHEPO78GmOOcvqiHD3W72KarsZw
vOkaeRDbC0_W4U
Link: https://shopee.co.id/Etalase-Kaca-Kunci-%7C-Etalase-Aluminium-
Kunci-%7C-Etalase-Roda-%7C-Kaca-Tebal-%7C-Uk-1-Meter-%7C-Uk-
1-5-Meter-%7C-Uk-2-Meter-i.261816139.20154536700?
gclid=CjwKCAiAv9ucBhBXEiwA6N8nYI-
U8AOsTt_PmsgCVFCp9USJxQUoYVcji_iCHKwbJ347ZDDF8XdxAho
CHDQQAvD_BwE
48. Dispenser
Harga : Rp. 390.000,-
Link: https://www.lazada.co.id/products/dispenser-gld21-i6762530820-
s12837804078.html?spm=a2o4j.tm80150940.similar-
items.d_3.1620eQmSeQmSjl.1620eQmSeQmSjl
49. Karpet Masjid
Harga : Rp. 55.000
Link: https://shopee.co.id/product/15264912/9841145590?
smtt=0.104415864-1670917209.3
50. Microwave
Harga : Rp. 191.950,-
Link: https://shopee.co.id/product/458932197/12823064941?
smtt=0.104415864-1670917841.3
51. Kulkas
Harga : Rp. 1.609.000,-
Link: https://shopee.co.id/product/436536134/2959236293?
smtt=0.104415864-1670918196.3
Link: https://www.lazada.co.id/products/samono-18l-mesin-kopi-
otomatis-coffee-maker-800w-desain-ergonomis-sw-cmeb18-hitam-
i6536568998-s12426996458.html?
exlaz=d_1:mm_150050845_51350205_2010350205::12:17487213281!!!
!!c!!12426996458!
470748342&gclid=CjwKCAiAv9ucBhBXEiwA6N8nYCKjJZ7O_6ZJ7f
Lp6GyuNceZrzIEX5Au5scI2l_LW7-uaxy2IxQXlRoCrvkQAvD_BwE
53. Wastafel
Harga : Rp. 193.000,-
Link: https://m.bukalapak.com/p/rumah-tangga/dapur/perlengkapan-cuci-
piring/4h8d01j-jual-paket-bak-cuci-piring-75cm-kran-angsa-stainless-
kitchen-sink-wastafel-set?from=list-product&pos=0
54. Mimbar
Harga : Rp. 350.000,-
Link : https://www.lazada.co.id/products/podium-mimbar-masjid-
minimalis-kayu-jati-i6531010632-s12417524501.html?
&search=pdp_v2v?
spm=a2o4j.pdp_revamp.recommendation_2.1.28882adfQodwjh&mp=1
&scm=1007.16389.286994.0&clickTrackInfo=288cc39c-da2d-44ce-
9144-
698039710e2f__6531010632__16412__trigger2i__287002__1.0__1.0__
0.0__0.0__0.0__1.0__0__null__null__null__null__null__null____50000
0.0__0.0__0.0__0__500000.0__127620__null__null__null__3650.16544
_955.3632__null__32104__null__0.0__0.0________null__null__0
55. Generator Set
Harga : Rp. 34.700.000,-
Link : https://www.tokopedia.com/proffesor/genset-yanmar-30-kva-35-
kva-made-in-japan-tyg35-by-tsuzumi-original-dp
Screenshot Lain-Lain
- Kredit Bank
Suku Bunga Dasar Kredit: 6,06 %
Pinjaman <75%
- Listrik
https://flip.id/blog/tarif-tetap-ini-daftar-harga-listrik-per-k-wh-oktober-
desember
https://simebtke.esdm.go.id/sinergi/assets/content/
20210527150029_Laporan_Akhir_SEC-130120.pdf
- PDAM
- Bahan Bakar
- Maintanance
- UMR Kabupaten Subang
https://regional.kontan.co.id/news/daftar-umk-kota-bandung-
2022-dan-26-daerah-lain-di-jawa-barat
- Operator mesin
https://id.indeed.com/career/operator-mesin/salaries
- Gaji Manager
https://riliv.co/rilivstory/gaji-manajer-indonesia/#:~:text=Manajer
%3A%20Kisaran%20gaji%20Rp10%E2%80%9315%20juta
%20per%20bulan&text=Kenaikan%20gaji%20saat%20menjadi
%20manajer,tunjangan%20lain%2C%20termasuk%20kendaraan
%20pribadi.
- Gaji Sekretaris
https://gajimu.com/tips-karir/indonesia-pekerjaan-dan-gaji/
indonesia-sekertaris-eksekutif-dan-administrasi#:~:text=Kisaran
%20gaji%20sebagian%20besar%20pekerja,per%20bulan
%20pada%20awal%20pekerjaan.
- Gaji Direktur
https://id.quora.com/Berapa-kisaran-gaji-seorang-direktur
- Gaji Satpam
https://id.indeed.com/career/satpam/salaries
- Gaji Receptionist
https://id.indeed.com/career/resepsionis/salaries
Case Tablet
Modal Bahan Baku Pembelian Bahan Baku Penjualan Bahan Baku Penjualan Produk
Periode Keuntungan Net Profit
Kas Awal Tahun Unit Harga Total Harga Unit Harga Total Harga Unit Harga Total Harga
1 Rp 22.130.965.354 29519 Rp 16.000 Rp 472.304.000 0 Rp - Rp - 29519 Rp 160.000 Rp 4.723.040.000 Rp 26.381.701.354 Rp 4.250.736.000
2 Rp 26.381.701.354 0 Rp - Rp - 0 Rp - Rp - 0 Rp - Rp - Rp 26.381.701.354 Rp -
0 Rp - Rp - 0 Rp - Rp -
180000 Rp 200.000 Rp 36.000.000.000
3 Rp 26.381.701.354 297200 Rp 23.500 Rp 6.984.200.000 0 Rp - Rp - Rp 55.397.501.354 Rp 29.015.800.000
Total Rp 6.984.200.000 0 Rp - Rp - Total Rp 36.000.000.000
117200 Rp - Rp - 0 Rp - Rp - 100000 Rp300.000 Rp 30.000.000.000
4 Rp 55.397.501.354 32800 Rp 26.000 Rp 852.800.000 0 Rp - Rp - 50000 Rp 200.000 Rp 10.000.000.000 Rp 94.544.701.354 Rp 39.147.200.000
Total Rp 852.800.000 0 Rp - Rp - Total Rp 40.000.000.000
5 Rp 94.544.701.354 0 Rp - Rp - 0 Rp - Rp - Rp - Rp 94.544.701.354 Rp -
CASE TABLET
Pembelian Bahan Baku ke PT. Ekacarama Periode 1:
Penjualan Produk ke Vendor (PT. Bilamana) Periode 1: