TC-2019
Tujuan Pembelajaran
TC-2019 2
Tujuan Preload
TC-2019
Komponen final drive 785-7
4
1. Sun gear
2. Planetary gear
3 3. Planetary shaft
4. Ring gear
2
5. Iner hub
1 6. Wheel hub
7. Drive shaft
8. Retainer
9. Bolt
10. Shaft wheel hub
9
8
10
7 6 5
TC-2019 4
Proses
Assembly
Final drive
group
TC-2019
Assembling proses
3
1 2
4 5 6
5
5
TC-2019 6
Assembling proses
7 8
TC-2019 7
Proses preload
tapered roller
bearing
TC-2019
Preload
a
TC-2019
Preload
Ketebalan shim
1. Ukur jarak kedadalaman Dt, dari ujung 1. 1.0 mm
2. 0.3 mm
spacer (5) ke ujung poros (14) 3. 0. 2 mm
2. Lepas 4 baut mounting dan retainer 4. 0.05 mm
TC-2019
Preload
TC-2019
TC-2019 12