PENAMBANGAN DI PT
G U N U N G M A S J A YA
I N DA H , D E S A
RENGASJAJAR , KEC
C I G U D E G , K A B U PA T E N
BOGOR

Hasyifa Amalia Hendarmin (11170980000001)


Hana Tyas Ratnanggana (11170980000024)
Salman Muify Dhiyauddin (11170980000033)
TUJUAN MELAKUKAN PENELITIAN

1.Produktivitas alat bor, muat & angkut


2.Volume hasil blasting dan powder factor
3.Match Factor
4.Volume ritasi per shift

© 2018 Slidefabric.com All rights reserved. P A G E 2


Lokasi dan Luas IUP PT Gunung Mas
Jaya Indah
KOORDINAT
106o 33’15.80” - 106o33’36.82” dan 6o27’11.70” - 6o27’36.54”
LUAS WILAYAH IUP
25 Ha

Batas Wilayah PT Gunung Mas Jaya Indah


Utara : Berbatasan dengan Desa Gorowong
Barat : Berbatasan dengan Desa Bangunjaya
Timur : Berbatasan dengan Desa Batu Jajar
Selatan : Berbatasan dengan Desa Cintamanik

© 2018 Slidefabric.com All rights reserved. P A G E 3


STRUKTUR ORGANISASI PT GUNUNG MAS JAYA INDAH

© 2018 Slidefabric.com All rights reserved. P A G E 4


DRILLING
&
BLASTING

© 2018 Slidefabric.com All rights reserved. P A G E 5


Diagram Alir Drill & Blast

© 2018 Slidefabric.com All rights reserved. P A G E 6


Drilling
HCR Junjin JD-800

CRD Wolf

© 2018 Slidefabric.com All rights reserved. P A G E 7


Drill HCR & CRD
Laju Penetrasi Pengeboran (m/min)
0.727 m/min
LPP = Kedalaman Rata2/Cycle Time Rata2

Kemampuan Pengeboran (lubang/hari)


15.86 lubang/hari
KP = waktu efektif pengeboran/cycle time

Volume Setara
8.58 m3/m
VS = B x S x (H - J) / H

Produktivitas Alat Bor


1.98 lubang/jam
PB = EK x 60 / Cycle Time

Cycle time
  detik menit waktu efektif Efektivitas Kerja
(menit)
Rata-Rata (HCR & CRD) 0:08:50 530 8.8 140.15 29%

© 2018 Slidefabric.com All rights reserved. P A G E 8


Blasting

Detonator Listrik

© 2018 Slidefabric.com All rights reserved. P A G E 9


Geometri Peledakan Gudang Handak
& Bahan Peledak

Keterangan :
B : Burden I : Kedalaman Lubang
S : Spasi PC : Powder Coloumn
H : Ketinggian Lereng J : Sub Drilling
T : Steaming α : Kemiringan Lubang

© 2018 Slidefabric.com All rights reserved. P A G E 1 0


Pola Peledakan
Pola V Cut Pola Row by Row

© 2018 Slidefabric.com All rights reserved. P A G E 1 1


Rekap Drill & Blast
Rekapitulasi Drill and Blast PT GMJI
Jumlah Jumlah Volume Volume Volume Volume ANFO ANFO Dynamit Dynamit Detonator Detonator
No Kedalaman Burden Space
Lubang Lubang/hari (BCM) (BCM) (LCM) (LCM) (Kg) (Kg) (kg) (kg) (pcs) (pcs)
Jumlah 361 115.68 54 54 21248.64 25498.368 4550 146 361
10 Hari
Rata- 20 36 6 3 3 1180 2125 1417 2550 268 455 9 15 21 36
Rata

Powder Factor
0.221 Kg/m3
PF = Berat Bahan Peledak/volume blasting

© 2018 Slidefabric.com All rights reserved. P A G E 1 2


PEMINDAHAN
TANAH
MEKANIS

© 2018 Slidefabric.com All rights reserved. P A G E 1 3


Diagram Alir Loading Hauling

© 2018 Slidefabric.com All rights reserved. P A G E 1 4


Loading
Kobelko SK-330

Sumitomo SH-210

Hitachi 330

© 2018 Slidefabric.com All rights reserved. P A G E 1 5


Produktivitas

Keterangan :
Kb = Kapasitas Bucket
SF = Swell Factor
FF = Fill Factor
Eff = Efisiensi Kerja
CT = Cycle Time

Factor
Produktivitas Alat
Muat (Pm)
Kapasitas Swell Factor Fill Factor Efisiensi Kerja Cycle (LCM/jam/alat)
Bucket (Kb) (SF) (FF) (EK) Time (CT)
Rata-Rata 2.22 0.63 0.94 53% 13.1 316.2

© 2018 Slidefabric.com All rights reserved. P A G E 1 6


Hauling

Hino FM-260 Ti

Hino FM-260 JD

© 2018 Slidefabric.com All rights reserved. P A G E 1 7


Produktivitas

Faktor
Produktivitas
Kapasitas Cycle Time Kapasitas baku jumlah Effektifitas Alat
FF SF
bak DT (Cam) Armada (Cta) bucket ( C ) keruk (n) Kerja (EK) (LCM/jam/alat)
Rata-Rata 15.29 734.20 2.22 7.35 0.94 0.63 62% 45.10

© 2018 Slidefabric.com All rights reserved. P A G E 1 8


Match Factor
Jumlah alat angkut 6
Cycle time exca 13
Jumlah alat muat 1
Cycle time DT 734
Jumlah bucket 7

MF 0.79

© 2018 Slidefabric.com All rights reserved. P A G E 1 9


REKAP DATA BLASTING DAN PRODUKSI
Stock Volume Volume Ritasi
Tanggal Jumlah Rit Volume/Rit Volume Ritasi
Inventory Blasting Perusahaan
01 June 2021 1073 3001.5 91 15.57 1417 2145
02 June 2021 2658 3402 134 15.57 2086 2704
03 June 2021 3974 2772 112 15.57 1744 2090
04 June 2021 5002 0 86 15.57 1339 1872
05 June 2021 3663 2583 112 15.57 1744 1268
06 June 2021 4503 1358 121 15.57 1884 2106
07 June 2021 3977 1674 85 15.57 1323 2123
08 June 2021 4328 1163.34 70 15.57 1090 1690
09 June 2021 4402 1666.35 97 15.57 1510 1820
10 June 2021 4558 918 93 15.57 1448 1740
11 June 2021 4028 1512 81 15.57 1261 1820
12 June 2021 4279 1000.8 109 15.57 1697 1453
Rata-Rata 1545 1903
Tingkat Akurasi 81%

© 2018 Slidefabric.com All rights reserved. P A G E 2 0


KESIMPULAN
1. Produktivitas alat bor 1.98 lubang/jam
2. Produktivitas alat muat 316.2 LCM/Jam/alat
3. Produktivitas alat angkut 45.10 LCM/Jam/alat
4. Volume hasil blasting selama 10 hari 25498.368 LCM
5. Powder factor 0.221 kg/m3
6. Match factor 0.79, MF<1 berarti alat angkut bekerja penuh dan alat
muat ada waktu tunggu
7. Volume ritasi per shift 1545 m3

© 2018 Slidefabric.com All rights reserved. P A G E 2 1


SARAN UNTUK PERUSAHAAN

1. Karena Efektivitas Kerja dibawah 70% maka disarankan


perusahaan melakukan peremajaan unit
2. Menambah pengawas untuk kelancaran kegiatan
penambangan

© 2018 Slidefabric.com All rights reserved. P A G E 2 2


T H A N K S F O R YO U R
ATTENTON

© 2018 Slidefabric.com All rights reserved. P A G E 2 3