Anda di halaman 1dari 8

LAPORAN

KERJA PRAKTEK ( KP )
ANALISA LINER TUNGSTEN CARBIDE DAN BAJA XW42
PT KERAMIK DIAMOND INDUSTRIES

oleh :

1. MOCHAMAD GALOH RIVANDI NIM : 141214510


2. MUCHAMMAD IRFAN NIM : 141214536
3. MUHAMMAD AGIL FEBRIANZAH NIM : 141214543

PROGRAM STUDI S1 TEKNIK MESIN


FAKULTAS TEKNIK
UNIVERSITAS MAARIF HASYIMLATIF SIDOARJO
TAHUN AJARAN 2017 2018

i
LEMBAR PENGESAHAN I
LAPORAN KERJA PRAKTEK ( KP )
ANALISA LINER TUNGSTEN CARBIDE DAN BAJA XW42
PT KERAMIK DIAMOND INDUSTRIES

Waktu Pelaksanaan
9 Oktober 2017 s/d 11 November 2017

Disusun oleh :
Mahasiswa Kerja Praktek ( KP )

1. MOCHAMMAD GALUH RIVANDI [141214510]


2. MUCHAMMAD IRFAN [141214536]
3. MUHAMMAD AGIL FEBRIANZAH [141214543]

Mengetahui dan Menyetujui :

Dosen pembimbing Pembimbing di perusahaan

( Donny Perdana, ST., MT. ) ( Novem Agus Maulana, ST.)

Manager Engineering

( Abdul Azis )

ii
LEMBAR PENGESAHAN II
LAPORAN KERJA PRAKTEK ( KP )
ANALISA LINER TUNGSTEN CARBIDE DAN BAJA XW42
PT KERAMIK DIAMOND INDUSTRIES

Waktu Pelaksanaan
9 Oktober 2017 s/d 11 November 2017

Disusun oleh :
Mahasiswa Kerja Praktek ( KP )

1. MOCHAMMAD GALUH RIVANDI [141214510]


2. MUCHAMMAD IRFAN [141214536]
3. MUHAMMAD AGIL FEBRIANZAH [141214543]

Mengetahui dan Menyetujui :

Ketua Program Studi

Teknik Mesin

Ir. H. Eddy Gunawan, MT.

iii
KATA PENGANTAR

Puji syukur penulis panjatkan ke hadirat Allah S.W.T. atas rahmat dan
karunianya, sehingga penulisan Laporan Kerja Praktek (KP) yang berjudul:
Analisa Liner Tungsten Carbide dan Baja XW42 dapat diselesaikan dengan
baik.

Laporan Kerja Praktek (KP) ini disusun untuk memenuhi sebagian


persyaratan untuk mengikuti Skripsi di UMAHA YPM Sepanjang Sidoarjo.

Penulis sadari, bahwa Laporan Kerja Praktek (KP) ini masih jauh dari
sempurna, oleh karena itu berbagai saran dan kritik yang membangun dari semua
pihak, akan diterima sebagai masukkan.

Ucapan terima kasih dan penghargaan yang setinggi-tingginya penulis


sampaikan kepada yang terhormat :

1) Bapak Donny Perdana, ST. MT. Selaku Dosen pembimbing Kerja Praktek
(KP) UMAHA YPM Sepanjang Sidoarjo.
2) Bapak Ir. H. Eddy Gunawan, MT. Selaku Ketua Jurusan Teknik Mesin
Fakultas Teknik, beserta staf.
3) Bapak Novem Agus Maulana, ST. Selaku pembimbing Kerja Praktek (KP)
di PT. KDI.
4) Rekan-rekan Mahasiswa yang telah banyak memberikan masukan untuk
Laporan Kerja Praktek (KP) ini.

Semoga amal kebaikan dari berbagai pihak di atas, mendapat imbalan


yang sepadan dari Allah S.W.T, dan semoga karya tulis ini bermanfaat bagi siapa
saja yang membacanya. Amin.

Surabaya, 17 November 2017

Penulis

iv
DAFTAR ISI

HALAMAN JUDUL ............................................................................................ i


LEMBAR PENGESAHAN I ................................................................................ ii
LEMBAR PENGESAHAN II ............................................................................... iii
KATA PENGANTAR .......................................................................................... iv
DAFTAR ISI ........................................................................................................ v
DAFTAR GAMBAR ........................................................................................... vi
DAFTAR TABEL ............................................................................................... vii
BAB I PENDAHULUAN
I . 1 Latar belakang ................................................................................... 2
I . 2 Ruang Lingkup Kerja Praktek ........................................................... 2
I . 3 Tujuan dan Manfaat Kerja Praktek .................................................... 3
I . 3 . 1 Tujuan Kerja Praktek .................................................................... 4
I . 3 . 2 Manfaat Dalam yang diharapkan dalam kegiatan ini .................... 4
BAB II GAMBARAN UMUM PERUSAHAAN
II . 1 Sejarah dan Kegiatan operasional Perusahaan ................................ 8
II . 2 Struktur Organisasi dan Deskripsi Tugas ........................................ 15
BAB III METODOLOGI
III . 1 Diagram Alur Proses Pengerjaan ( flow chart ) ............................. 16
III . 2 Bahan dan Alat .............................................................................. 17
III . 2 . 1 Bahan ........................................................................................ 17
III . 2 . 2 Alat ........................................................................................... 17
III . 3 Tempat Kerja Praktek .................................................................... 17
III . 3 Tempat pelaksanaan ....................................................................... 17
III . 3 . 2 Lama / Waktu Pelaksanaan ....................................................... 17
III . 3 . 3 Jadwal Kegiatan ........................................................................ 18
III . 3 . 4 Akomodasi dan Perlengkapan .................................................. 19
BAB IV HASIL DAN PEMBAHASAN
Proses produksi ........................................................................................ 21
IV . 1 Sifat Mekanik Bahan ..................................................................... 24
IV . 1 . 1 Analisa data .............................................................................. 26
IV . 1 . 2 Pembahasan .............................................................................. 28

v
IV . 2 Umur pakai .................................................................................... 29
IV . 2 . 1 Analisa data .................................................................. 32
IV . 2 . 2 Pembahasan .................................................................. 35
IV . 3 Perlakuan dalam proses instalasi ................................................... 36
IV . 3 . 1 Analisa data .................................................................. 37
IV . 3 . 2 Pembahasan .................................................................. 41
BAB V PENUTUP
V . 1 Kesimpulan...................................................................................... 42
V . 2 Saran ............................................................................................... 43
DAFTAR PUSTAKA

v
DAFTAR GAMBAR

Gambar 2.1 P.T. Keramik Diamond Industries ................................................... 5


Gambar 2.2 Proses pembuatan keramik masing-masing plant ............................ 7
Gambar 3.1 Diagram alir ..................................................................................... 16
Gambar 4.1 Hasil produksi tools Tungsten Carbide ........................................... 20
Gambar 4.2 Hasil produksi tools Baja XW42 ..................................................... 21
Gambar 4.3 Perbandingan kurva SS uji tarik 3 jenis baja ................................... 22
Gambar 4.4 Tools (liner) Baja XW42 ................................................................. 24
Gambar 4.5 Heat treatment certificate Baja XW42 ............................................ 25
Gambar 4.6 Tools (liner) Tungsten Carbide ....................................................... 26
Gambar 4.9 Mesin press no 6 PH 1000 PT. KDI ................................................ 29
Gambar 4.10 Mesin press no 5 PH 1000 PT. KDI .............................................. 30
Gambar 4.11 Proses produksi keramik ................................................................ 30
Gambar 4.12 Control panel mesin press no 6 PT. KDI ....................................... 31
Gambar 4.16 Frame 25cmx25cm tools tungsten Carbide ................................... 36
Gambar 4.17 Frame 25cmx25cm tools Baja XW42 ............................................ 37
Gambar 4.19 Liner panjang Tungsten Carbide .................................................... 39
Gambar 4.20 Liner penekan Tungsten Carbide ................................................... 39
Gambar 4.21 Proses pengukuran cavitiy .............................................................. 39
Gambar 4.22 Liner panjang Baja XW42 .............................................................. 41
Gambar 4.23 Liner penekan Baja XW42 ............................................................. 41

vi
DAFTAR TABEL

Tabel 4.7 Kekerasan bahan .................................................................................. 26


Tabel 4.8 Konversi satuan kekerasan HRA to HRC ........................................... 27
Tabel 4.13 Daftar ganti/balik frame press no 6 PT. KDI .................................... 31
Tabel 4.14 Daftar ganti/balik frame press no 5 PT. KDI .................................... 32
Tabel 4.15 Komparasi Tungsten Carbide vs Baja XW42 ................................... 35
Tabel 4.18 Ukuran cavity frame .......................................................................... 37

vii

Anda mungkin juga menyukai