LAPORAN PRAKTIK KERJA LAPANGAN PROYEK JALAN

TOL CINERE - SERPONG STA 51+186 s/d STA 61+322

Disusun oleh :

Ibnu Rusyid
( NIM : 4115110017 )

Irvandy Yerman
( NIM : 4115110018 )

Pembimbing :

Rosma Indriyani, S.T


PT. Cinere Serpong Jaya

Putera Agung Maha Agung, S.T., M.T., Ph.D


NIP: 19660602 199003 1 002

PROGRAM STUDI

D-IV TEKNIK PERANCANGAN JALAN DAN JEMBATAN

KONSENTRASI JALAN TOL

POLITEKNIK NEGERI JAKARTA

2018
Laporan Praktik Kerja Lapangan

LEMBAR PENGESAHAN

LAPORAN PRAKTIK KERJA LAPANGAN

PROYEK JALAN TOL CINERE – SERPONG


STA 51+186 s/d STA 61+322
Disusun Oleh :
Ibnu Rusyid (4115110017)
Irvandy Yerman (4115110018)

untuk memenuhi mata kuliah praktik kerja lapangan pada semester VII

Disetujui Oleh :

Pembimbing Industri, Pembimbing Akademik,

Rosma Indriyani S.T. Putera Agung Maha Agung,.ST.,MT.,Ph.D


PT. CINERE SERPONG JAYA NIP: 19660602 199003 1 002

Mengetahui,

Ketua Jurusan Teknik Sipil

Agung Budi Broto, S.T., M.T.


NIP: 19630402 198903 1003

Proyek Pembangunan Jalan Tol Cinere – Serpong i


Laporan Praktik Kerja Lapangan

KATA PENGANTAR

Kami ucapkan puji dan panjatkan syukur kepada Allah SWT, karena berkat
dan rahmatNya penulis diberikan kesehatan dan kesempatan selama menjalani
Praktek Kerja Lapangan, dalam menyusun hingga menyelesaikan Laporan Praktek
Kerja Lapangan di Proyek Pembangunan Jalan Tol Cinere - Serpong STA 51+186
– STA 61+322
Dimana penyusunan Laporan Praktik Kerja Lapangan ini dimaksudkan dapat
memenuhi salah satu mata kuliah pada Semester VII di dalam perkuliahan dan
merupakan persyaratan akademis untuk melakukan PraktIk Kerja Lapangan.
Adapun lamanya waktu Praktik Kerja Lapangan yang dilakukan ialah selama 2
(dua) bulan terhitung pada tanggal 16 Juli – 8 September 2018. Dengan adanya
laporan ini, diharapkan mahasiswa memiliki tanggung jawab terhadap apa yang
telah dikerjakan selama Praktik Kerja Lapangan dengan tujuan agar mahasiswa
benar-benar memahami dan memperhatikan pelaksanaan konstruksi bangunan sipil
di lapangan.
Pada kesempatan ini penulis juga menuliskan ucapan terima kasih kepada
semua pihak yang telah membantu selama melaksanakan serta menyelesaikan
Praktik Kerja Lapangan dan penyusunan laporan ini. Antara lain, kepada :

1. Bapak Agung Budi Broto, S.T., M.T. selaku ketua jurusan teknik sipil
Politeknik Negeri Jakarta
2. Bapak Putera Agung Maha Agung S.T.,M,.T.,Ph.D selaku dosen
pembimbing kampus praktik kerja lapangan yang telah memberikan
bimbingan
3. Ibu Rosma Indriyani S.T, selaku dosen pembimbing industri pada Proyek
Pembangunan Jalan Tol Cinere – Serpong STA 51+186 – STA 61+322
4. Bapak Ir. Mhd. Irsan Setiabudi selaku Kepala Proyek yang telah
memberikan kesempatan kepada kami untuk melaksanakan Praktik Kerja

Proyek Pembangunan Jalan Tol Serpong – Cinere ii


Laporan Praktik Kerja Lapangan

Lapangan di Proyek Pembangunan Jalan Tol Cinere – Serpong STA


51+186 – STA 61+322
5. Seluruh karyawan PT. Cinere Serpong Jaya yang bekerja di dalam proyek
6. Seluruh karyawan PT. Waskita Karya (Persero) yang bekerja di dalam
proyek
7. Seluruh karyawan PT. Virama Karya (Persero) yang bekerja di dalam
proyek
8. Orangtua dan keluarga kami yang telah memberika doa dan dukungannya
baik secara moral maupun materil

Akhir kata dengan segala kerendahan hati penulis menyadari bahwa dalam
penyusunan laporan ini masih banyak terdapat kekurangan yang harus diperbaiki.
Untuk itu penulis mengharapkan kritik dan saran yang membangun demi
kesempurnaan laporan ini, penulis juga berharap semoga laporan ini dapat berguna
bagi penulis pada khususnya dan pada pembaca pada umumnya.
Atas perhatian dan kesempatannya, penulis mengucapkan rasa terima kasih.

Depok, 6 September 2018

Penulis

Proyek Pembangunan Jalan Tol Serpong – Cinere iii


Laporan Praktik Kerja Lapangan

DAFTAR ISI

Lembar Pengesahan............................................................................................ i
Kata Pengantar ................................................................................................... ii
Daftar Isi .............................................................................................................. iv
Daftar Tabel ........................................................................................................ vi
Daftar Gambar .................................................................................................... vi

BAB I PENDAHULUAN .................................................................................... 1


1.1 Latar Belakang Proyek .................................................................................... 1
1.1.1 Proyek yang Diamati ............................................................................ 1
1.1.2 Lokasi Proyek ....................................................................................... 2
1.2 Tujuan Praktik Kerja Lapangan ...................................................................... 3
1.2.1 Tujuan Umum ........................................................................................ 3
1.2.2 Tujuan Khusus ....................................................................................... 3
1.3 Manfaat Kerja Praktek Lapangan ................................................................... 4
1.3.1 Bagi Mahasiswa ..................................................................................... 4
1.3.2 Bagi Lembaga Perguruan Tinggi ........................................................... 4
1.3.3 Bagi Instansi Tempat PKL ..................................................................... 4
1.4 Metode Pengumpulan Data ............................................................................. 4
1.5 Sistematika Penulisan ..................................................................................... 5

BAB II PENGENALAN PERUSAHAAN ........................................................ 6


2.1 PT. Cinere Serpong Jaya ................................................................................ 6
2.2 Informasi Pemegang Saham........................................................................... 9
2.2.1 PT. Jasa Marga (Persero) Tbk ................................................................ 9
2.2.2 PT. Waskita Toll Road ........................................................................... 10
2.2.3 PT. Jakarta Properti ................................................................................ 10
2.2.4 PT. Waskita Karya (Persero) Tbk .......................................................... 10
2.3 PT. Waskita Karya (Persero) Tbk .................................................................. 12

Proyek Pembangunan Jalan Tol Serpong – Cinere iv


Laporan Praktik Kerja Lapangan

2.3.1 Visi ......................................................................................................... 12


2.3.2 Misi ........................................................................................................ 12
2.3.3 Sejarah Perusahaan ................................................................................ 12
2.3.4 Struktur Organisasi ................................................................................ 15
2.4 PT. Virama Karya ......................................................................................... 16
2.4.1 Visi ........................................................................................................ 16
2.4.2 Misi ....................................................................................................... 16
2.4.3 Sejarah Perusahaan ............................................................................... 16
2.4.4 Struktur Organisasi ............................................................................... 18

BAB III PENGENALAN PROYEK.................................................................. 19


2.1 Gambaran Umum Proyek .............................................................................. 19
3.1.1 Informasi Proyek ................................................................................... 19
3.1.2 Kontraksi ............................................................................................... 20
3.1.3 Data Teknis Jalan Tol ........................................................................... 20
3.1.4 Material Umum ..................................................................................... 21
3.1.5 Alat Yang Digunakan ........................................................................... 21
3.1.6 Status Pembebasan Lahan ..................................................................... 22
2.2 Progres Konstruksi ......................................................................................... 28

BAB IV KEGIATAN YANG DIAMATI .......................................................... 32


4.1 Pekerjaan yang Diamati ................................................................................. 32
4.1.1 Pekerjaan Jembatan Padjajaran ............................................................. 34
4.1.1.1 Pekerjaan Erection PCU girder................................................... 34
4.1.1.2 Pekerjaan Pemancangan Spun Pile ............................................. 38
4.1.2 Pekerjaan DeckSlab Jembatan Nusa Indah .......................................... 43
4.1.3 Pekerjaan Lean Concrete ...................................................................... 48
4.2 Tugas Selama Praktik .................................................................................... 51
4.2.1 Menghitung Volume Pekerjaan ............................................................ 51
4.2.2 Mengoreksi Shop Drawing RCP .......................................................... 52
4.3 Studi Kasus ................................................................................................... 52

Proyek Pembangunan Jalan Tol Serpong – Cinere v


Laporan Praktik Kerja Lapangan

4.3.1 Permasalahan ..................................................................................... 53


4.3.2 Alternatif Solusi Pekerjaan Konstruksi Area Situ Kedaung .............. 54
4.3.3 Perbandingan Keandalan Alternatif Solusi Area Situ Kedaung ........ 55
4.3.4 Matriks Alternatif Solusi Pekerjaan Konstruksi Area Situ Kedaung . 55

BAB V PENUTUP............................................................................................... 56
5.1 Kesimpulan .................................................................................................... 56
3.2 Saran .............................................................................................................. 56

LAMPIRAN ......................................................................................................... 58

DAFTAR TABEL

Tabel 2.1 Pemegang Saham PT. Cinere Serpong Jaya ........................................ 7


Tabel 3.1 Tabel Status Pembebasan Lahan .......................................................... 22
Tabel 3.2 Data Struktur ........................................................................................ 24
Tabel 3.3 Jadwal Proyek ...................................................................................... 27
Tabel 4.1 Tabel Rekapitulasi Perhitungan Volume.............................................. 52
Tabel 4.2 Perbandingan Keandalan Alternatif Solusi .......................................... 55
Tabel 4.3 Matriks Alternatif Solusi ..................................................................... 55

DAFTAR GAMBAR

Gambar 1.1 Lokasi Proyek .................................................................................. 2


Gambar 1.2 Lokasi Proyek Jalan Tol Cinere – Serpong ..................................... 2
Gambar 2.1 Bagan Koordinasi ............................................................................ 7
Gambar 2.2 Struktur Organisasi PT. Cinere Serpong Jaya ................................. 8
Gambar 2.3 Struktur Organisai PT. Waskita Karya ............................................ 15
Gambar 2.4 Struktur Organisai PT. Virama Karya ............................................. 18
Gambar 3.1 Tipikal Pasangan Melintang ............................................................ 23

Proyek Pembangunan Jalan Tol Serpong – Cinere vi


Laporan Praktik Kerja Lapangan

Gambar 3.2 Progress Konstruksi ......................................................................... 28


Gambar 3.3 Serpong Junction ............................................................................. 29
Gambar 3.4 Retaining Wall Jombang ................................................................. 29
Gambar 3.5 Jembatan Situ Pamulang.................................................................. 30
Gambar 3.6 Underpass Nusa Indah .................................................................... 30
Gambar 3.7 IC Pamulang .................................................................................... 31
Gambar 3.8 Retaining Wall ................................................................................. 31
Gambar 4.1 Pekerjaan yang diamati .................................................................... 33
Gambar 4.2 Design Jembatan Padjajran .............................................................. 34
Gambar 4.3 Detail Rencana PC-U Girder .......................................................... 34
Gambar 4.4 Pekerjaan Erection Girder ............................................................... 35
Gambar 4.5 Pengangkutan Girder dengan Boogie .............................................. 37
Gambar 4.6 Peletakan Girder dengan Crawler Crane ........................................ 37
Gambar 4.7 Peletakan Girder di atas Bearing Pad ............................................. 38
Gambar 4.8 Plan Main Road Sta. 56+900 – 57+500........................................... 39
Gambar 4.9 Pengangkatan Tiang Pancang .......................................................... 40
Gambar 4.10 Pemancangan Pada Titik ............................................................... 41
Gambar 4.11 Pengelasan Sambungan Tiang ....................................................... 42
Gambar 4.12 Design Jembatan Nusa Indah ........................................................ 43
Gambar 4.13 Plan Main Road Sta. 51+850 – 52+5250....................................... 44
Gambar 4.14 Tulangan pada Deck Slab .............................................................. 45
Gambar 4.15 Pengisian celah bondek ................................................................. 45
Gambar 4.16 Pemindahan beton dari TM ke Concrete Pump ............................. 46
Gambar 4.17 Proses Pengecoran ......................................................................... 47
Gambar 4.18 Proses perataan dengan jidar ......................................................... 47
Gambar 4.19 Proses Curing ................................................................................ 48
Gambar 4.20 Proses pengalasan dengan plastik .................................................. 50
Gambar 4.21 Proses pengecoran LC ................................................................... 50
Gambar 4.22 Proses perataan LC ........................................................................ 51
Gambar 4.23 Plan Main Road Sta. 56+750 – 57+450......................................... 53

Proyek Pembangunan Jalan Tol Serpong – Cinere vii


Laporan Praktik Kerja Lapangan

Gambar 4.24 Long Section Sta. 56+900 – 57+115 ............................................. 53

Proyek Pembangunan Jalan Tol Serpong – Cinere viii