1 2 3 4
BIAYA PENERAPAN SMK3L 8,352,500,000 100.00%
Rencana Anggaran
NO URAIAN
Sat Vol Freq
Penyiapan SMK3L
a Penyiapan RK3K terdiri atas: Pembuatan Manual, Prosedur, Set 1 1
Instruksi Kerja, Ijin Kerja
b Pembuatan Kartu Identitas Pekerja (KIP); Lb 400 1
c Pembuatan pengajuan zero accident Ls 1 5
d Pembuatan pengajuan penghargaan HIV AIDS Ls 1 5
e Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Ls 1 1
Kesehatan Kerja (P2K3);
1 f MoU Damkar
g MoU BPBD
h MoU RS Rujukan
i Perijinan pengesahan Instalasi Penangkal Petir ls 1 1
j Perijinan pengesahan Instalasi Listrik ls 1 1
k Resertifikasi instalasi pengangkal petir ls 1 3
l Resertifikasi instalasi listrik ls 1 3
m SIO SILO Unit/Org 50 1
Subtotal
Sosialisasi dan Promosi SMK3L
a Induksi K3 (Safety Induction ); Org 800
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan Org 800
( Tool Box Meeting) ;
c Pelatihan K3 dari external Ls 1 5
d Simulasi K3; Org 800 10
1. Huru hara
2. Pemadam kebakaran
2
Rencana Anggaran
NO URAIAN
Sat Vol Freq
3. Evakuasi Gempa
4. Kecelakaan kerja
2
5. Pencemaran Lingkungan
6. AMDAL
Subtotal
Lain- Lain Terkait Pengendalian Risiko K3L
a Alat Pemadam Api Ringan (APAR) (powder) Bh 20
Alat Pemadam Api Ringan (APAR) (CO2) Bh 10
b Refill APAR Bh 20 4
c Sirine; Bh 2
d Bendera Merah Putih, K3, Perusahaan ; Bh 3 5
e Jalur Evakuasi (Escape Route ); Ls 1
f Lampu Darurat (Emergency Lamp ); Bh 20
g Program Inspeksi Dan Audit Internal; Ls 5 5
h Pelaporan dan Penyelidikan Insiden. Ls 1 5
i Environmental multitest Bh 1 5
8 j Eye Wash Bh 5
k Megaphone (toA) Bh 10
l Alat komunikasi (HT) Bh 20
m CCTV bh 5
n Selimut api (fire blanket) Bh 5
o K3 reward kali 12 5
p Medical Check-Up (MCU) Staff Org 100 5
q Medical Check-Up (MCU) Pekerja Org 400 5
r Gas Detector Bh 1
s Pemeriksaan HIV AIDS Org 75 5
t Safe Manhours Org 75 5
Subtotal
Industrial Hygiene, Kelola dan Pemantauan Lingkungan
a Pemeriksaan kesehatan lingkungan kerja
1. Pemeriksaan kualitas air bersih set 1 5
2. Pemeriksaan kualitas air minum set 1 5
3. Penyehatan udara ruangan set 1 5
5. Pengukuran mikrobiologi bakteri legionella pneumophila set 1 5
6. Pemeriksaan effluent air limbah domestik set 1 5
7. Pengukuran intensitas pencahayaan di ruangan set 1 5
8. Pengkuran intensitas kebisingan set 1 5
9. Pengkuran getaran di ruangan set 1 5
9 10. Pengujian emisi sumber tidak bergerak set 1 5
b Fasilitas penyimpanan limbah padat domestik unit 1
c Fasilitas penyimpanan limbah b3 unit 1
9 Rencana Anggaran
NO URAIAN
Sat Vol Freq
Total
CIAN BIAYA PENERAPAN SMK3L
n Keselamatan Kerja dan Lindung Lingkungan
November 2019
endungan Tiga Dihaji Paket I
Kecamatan Tiga Dihaji, Kabupaten OKU Selatan Propinsi Sumatera Selatan
kerjaan Umum,Direktorat Jendral Sumber Daya Air, Balai Besar Wilayah Sungai Sumatera VIII
7,500,000 7,500,000
5,000 2,000,000
3,000,000 15,000,000
2,000,000 10,000,000
10,000,000 10,000,000
6,000,000
6,000,000
8,000,000 8,000,000
8,000,000 8,000,000
2,000,000 6,000,000
3,500,000 10,500,000
7,000,000 350,000,000
439,000,000
10,000 8,000,000
100,000 80,000,000
10,000,000 50,000,000
10,000 80,000,000
Rencana Anggaran s.d Bulan lalu Bulan in
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
350,000 35,000,000
150,000 6,000,000
1,000,000 5,000,000
300,000 60,000,000
2,000,000 10,000,000
15,000 6,000,000
340,000,000
450,000 2,700,000
2,500,000 5,000,000
1,000,000 60,000,000
3,500,000 3,500,000
71,200,000
150,000 112,500,000
100,000 200,000,000
55,000 55,000,000
200,000 4,000,000
50,000 15,000,000
150,000 7,500,000
50,000 75,000,000
50,000 100,000,000
350,000 262,500,000
200,000 400,000,000
250,000 2,500,000
200,000 200,000,000
50,000 100,000,000
300,000 1,500,000
150,000 300,000,000
800,000 80,000,000
30,000 6,000,000
Rencana Anggaran s.d Bulan lalu Bulan in
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
100,000 200,000,000
500,000 450,000,000
7,500,000 15,000,000
2,586,500,000
20,000,000 -
7,500,000 -
6,000,000 900,000,000
5,000,000 250,000,000
4,500,000 225,000,000
5,000,000 250,000,000
3,000,000 300,000,000
1,925,000,000
25,000,000 50,000,000
10,000,000 10,000,000
4,500,000 18,000,000
2,500,000 2,500,000
600,000 600,000
2,000,000 2,000,000
750,000 4,500,000
3,000,000 3,000,000
400,000,000 400,000,000
50,000,000 50,000,000
200,000,000 200,000,000
34,000,000 136,000,000
876,600,000
250,000 20,000,000
250,000 20,000,000
250,000 20,000,000
200,000 4,000,000
250,000 10,000,000
250,000 5,000,000
150,000 9,000,000
100,000 20,000,000
100,000 1,200,000
100,000 4,000,000
Rencana Anggaran s.d Bulan lalu Bulan in
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
113,200,000
1,000,000 20,000,000
1,000,000 10,000,000
1,000,000 80,000,000
1,000,000 2,000,000
150,000 2,250,000
1,000,000 1,000,000
75,000 1,500,000
5,000,000 125,000,000
50,000,000 250,000,000
10,000,000 50,000,000
4,500,000 22,500,000
1,000,000 10,000,000
1,500,000 30,000,000
3,000,000 15,000,000
250,000 1,250,000
500,000 30,000,000
600,000 300,000,000
250,000 500,000,000
9,000,000 9,000,000
### 75,000,000
### 75,000,000
1,609,500,000
2,000,000 10,000,000
2,000,000 10,000,000
3,000,000 15,000,000
3,000,000 15,000,000
3,000,000 15,000,000
2,000,000 10,000,000
2,000,000 10,000,000
2,000,000 10,000,000
2,000,000 10,000,000
10,000,000
20,000,000
Rencana Anggaran s.d Bulan lalu Bulan in
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
150,000 7,500,000
1,000,000 10,000,000
1,000,000 5,000,000
500,000 30,000,000
5,000,000 50,000,000
10,000,000 50,000,000
10,000,000 50,000,000
337,500,000
100,000 25,000,000
2,000,000 4,000,000
5,000 25,000,000
54,000,000
8,352,500,000 -
Bulan ini s.d Bulan ini Sisa Anggar
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
-
Bulan ini s.d Bulan ini Sisa Anggar
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
Bulan ini s.d Bulan ini Sisa Anggar
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
Bulan ini s.d Bulan ini Sisa Anggar
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
Bulan ini s.d Bulan ini Sisa Anggar
Harga Satuan Jumlah Vol Harga Satuan Jumlah Vol
- -
Sisa Anggaran
Keterangan
Harga Satuan Jumlah
Sisa Anggaran
Keterangan
Harga Satuan Jumlah
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Consumable
Tanpa penggantian kerusakan dan
kehilangan
Tanpa penggantian kerusakan dan
kehilangan
Menyesuaikan lokasi
Consumable
Sisa Anggaran
Keterangan
Harga Satuan Jumlah
Second
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sesuai kebutuhan
Sisa Anggaran
Keterangan
Harga Satuan Jumlah
1 tahun sekali
1 tahun sekali
satu tahun 2x
Mengetahui,
LANJAR SAMADI, ST
Kepala Proyek