Webinar Sipilpedia - Tipikal Perbaikan Tanah PDF
Webinar Sipilpedia - Tipikal Perbaikan Tanah PDF
Aksan Kawanda
An Ordinary Geotechnical Engineer
Bio Skills
Soil Mechanics
Lahir : Makasar, 13 Agustus 1979
Pendidikan : Doktor Geoteknik, Univ. Katolik Parahyangan Foundation
Magister Geoteknik, Univ. Katolik Parahyangan
Sarjana Teknik Sipil, Universitas Trisakti Slope Stability
1
14/08/2020
Pemadatan tanah
menggunakan giant tamper
(2011)
• Soft clay area : east of Sumatera, north of Java, South of Kalimantan, south of Papua
PVD with vacuum / soil preloading.
• Loose sand area : north and south of Sumatera, most of Sulawesi, NTT, NTB, Maluku
Dynamic compaction, vibroflotation.
• High working load area Deep cement mixing, Stone Column.
2
14/08/2020
• Soft clay area : east of Sumatera, north of Java, most of Kalimantan, south of Papua
PVD with vacuum / soil preloading.
• Loose sand area : north and south of Sumatera, most of Sulawesi, NTT, NTB, Maluku
Dynamic compaction, vibroflotation.
• High working load area Deep cement mixing, Stone Column.
3
14/08/2020
3. Rancang dan implementasikan perbaikan yang sesuai untuk mengatasi kekurangan/kelemahan yang ada.
• Waktu
• Area dan kedalaman tanah yang akan diperbaiki
• Ketersediaan material
• Peralatan dan keahlian yang dimiliki
• Lingkungan
• Pengalaman dan kebiasaan lokal
• Kemungkinan pelaksanaan konstruksi
• Biaya
Lateral Deformation
Sliding due to lateral capacity failure at bridge abutment. The original soil is soft clay
without soil improvement to increase the lateral capacity and increase sliding resistant.
Case : South Sumatera
4
14/08/2020
Sliding
Sliding due to high backfill on untreated
soft soil.
Case : South Sumatera
Improved area
No improvement
Improved area
No improvement
5
14/08/2020
Settlement
Large Post
Negative skin friction pile failure cause by consolidation settlement process after
all construction on pile is finish.
6
14/08/2020
7
14/08/2020
8
14/08/2020
9
14/08/2020
Settlement
10
14/08/2020
11
14/08/2020
Grouting
GROUTING
DCM
Tipikal dari TEKNIK
CFG
Pendahuluan Chemical Mechanical Drainage
Grouting
Techniques
DCM
Range of Grouting
CFG
12
Range of Grouting
Techniques Range of Grouting Techniques
(Jet Grouting) (Compaction Grouting)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Drainage
13
14/08/2020
14/08/2020
Grouting
Techniques
(Jet Grouting)
DCM
Range of Grouting
Monitoring
CFG
Tekanan, volume dan lokasi diamati real-time
(meningkatkan efisiensi dan kualitas) untuk
review. Pengamatan campuran grouting juga
dilakukan periodik terhadap viskositas (Marsh
Funnel Test), berat jenis (Baroid Mud Balance),
kohesi dan parameter lainnya (API, 1990)
14
14/08/2020
Grouting
DCM Equipment
DCM
CFG
1- host ; 2 - rack ; 3- mortar mixing machine ; 4- hopper ; 5- mortar pump ; 6- storage tank ;7- cooling water
pump ; 8- rail ; 9- guide tube ; 10- cable ; 11- lose slurry pipe ; 12- pipes
Grouting
DCM
CFG
15
14/08/2020
Grouting
DCM
CFG
Positioning Equipment Positioning Auger Tools Soil Mixing Drawing While Continue Complete Result
Mixing
The columns installed by the dry method are typically circular and about 0.6–1.0 m in diameter, while the
columns installed by the wet method can be of different shape and up to about 2.5m in equivalent diameter.
Grouting
DCM
CFG
Project Reference :
Sarulla Geothermal Power Plant
North Sumatera
16
14/08/2020
Grouting
Site Plan
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Grouting
Soil Stratigraphy
DCM
CFG
17
14/08/2020
Foundation System
Grouting
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Cement Mixing Test
Grouting
DCM
CFG
18
14/08/2020
Grouting
Site Activity
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Grouting
DCM
DCM Post-test
CFG
19
14/08/2020
CFG Pile
Grouting
Cement-Flyash-Gravel(CFG)
DCM
CFG
Cement-Flyash-Gravel(CFG) pile was developed based on stone column.
When the stone column is applied in soft soil condition, stone column is not reliable due to the confine resistance
is relatively low. Cement and Flyash is mixed with gravel to work as binder therefore CFG column is a rigid
column. Due the CFG column is rigid column, this method could be applied in most of soil conditions.
CFG Pile
Grouting
Perkenalan Metode CFG
CFG Advantages
• Could applied in most soil, such as peat soil, soft clay, fat clay,
sandy soil, complicated layered soil or hard soil conditions.
• This CFG pile construction is quite fast and in some cases will
be more cost saving compare to other piles.
CFG
20
14/08/2020
Grouting
Inclusions
DCM
CFG Pile as Rigid
CFG
Pendahuluan Chemical Mechanical Drainage
Tipikal Alat
CFG Vibrating Machine
Grouting
DCM
CFG
21
14/08/2020
Grouting
CFG PILE Project Reference
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Grouting
DCM
CFG
22
14/08/2020
Grouting
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Construct the CFG pile cap
Grouting
DCM
CFG
23
14/08/2020
Grouting
DCM
CFG
Pendahuluan Chemical Mechanical Drainage
Static Load Test on CFG Pile
Grouting
DCM
CFG
24
14/08/2020
Vibro Flotation
Pressing a cylindrical vibrator inside with an eccentric iron into soil, meanwhile jetting
pressure water into soil, and force the saturated sand liquefied under the vibration
strength and rearrange sand become more dense.
• Natural deposits and or reclaimed sands can be compacted to a depth of up to 70 m.
• The intensity of compaction can be varied to meet bearing capacity criteria.
• Other improvement effects such as reduction of settlements are achieved.
• The risk of liquefaction in an earthquake prone area is also drastically reduced.
25
14/08/2020
Loose
Press to
Location design
level
Loose Flotation
Press to Vibrate
Location design 20–30
level seconds
26
14/08/2020
Loose Flotation
27
14/08/2020
The sand will be more dense with increase of vibration force and amplitude.
Based on the experiment on site, the optimal vibration retaining time will be 20–60
seconds.
Factor to Influence The
Clay content
It is difficult to get a good effect if the clay content is beyond 20%.
Water content
For dry sand or saturated sand, vibroflotation can get a good effect, if the water
content is between the two situation above, the effect is not good.
Project Reference :
Pantai Maju – PIK
28
14/08/2020
29
14/08/2020
30
14/08/2020
Vibro Replacement is a
combination of vibroflotation
with a gravel backfill resulting
in stone columns; not only
increases the amount of
densification, but provides a
degree of reinforcement and
a potentially effective means
of drainage
31
14/08/2020
The graph shows the settlement reduction with different percentages of soil
being replaced by stone columns (after Priebes, 1993)
Drainage.
The columns accelerate drainage (consolidation) of
the cohesive soil, i.e. the columns work as vertical
drains and thereby accelerate reduction of harmful
excess pore pressures
After slope stabilisation with stone columns: F = 1.60
32
14/08/2020
Settlement
Mass Mass Water
Mass flow
Impermeable soil layer Impermeable soil layer
33
14/08/2020
34
14/08/2020
35
14/08/2020
36
14/08/2020
1. Put machine at position 3. Filling the stone follows the 4. Pull up the tube while vibrate.
2. Push the tube to the design depth designed volume Every 1.5 m lifting pull down the
tube by 0.8 m and keep vibrate for
certain duration
5. Doing step 4 until reach the top.
37
14/08/2020
38
14/08/2020
Project Reference :
Pantai Maju – PIK; NYIA – Yogyakarta; Dubai
39
14/08/2020
40
14/08/2020
41
14/08/2020
STATIC / DYNAMIC ROLLERS RAPID IMPULSE DEEP DYNAMIC DEEP VIBRO COMPACTION
COMPACTION COMPACTION
0.2 m 0.4
0.5 m 1.0 m
m
6m
Depth effect: 10 m
normal range
possible 7.5 - 9.0 m 15 m
range
14 m 25
m
42
14/08/2020
Mencapai:
Pemadatan standar 20% organic content
dengan stone column maks. 5m tanah gambut
43
14/08/2020
Preloading + PVD
PRELOADING PRINCIPLE
Preloading + PVD
Vertical Drain PRINCIPLE
Clay Low Permeability Consolidation settlement of soft clays takes a long time to complete.
To shorten the consolidation time vertical drains are installed reduces the length of the drainage
path accelerates the consolidation process allows the clay to gain rapid strength increase.
44
14/08/2020
Preloading + PVD
SOIL PRELOADING PRINCIPLE
Preloading + PVD
SOIL PRELOADING PRINCIPLE
45
14/08/2020
Preloading + PVD
Vertical Drain Type
Corrugated core has a better drainage capacity under large lateral pressure.
Fishbone core has a better drainage capacity under bending or folding condition.
Preloading + PVD
VERTICAL DRAIN INSTALLATION
The square pattern is more convenient to lay out and to control in the field. However, a
triangular pattern is usually preferred since it provides a more uniform consolidation
between drains than the square pattern (Holtz et al., 1991).
46
14/08/2020
Preloading + PVD
VERTICAL DRAIN INSTALLATION
Preloading + PVD
VERTICAL DRAIN INSTALLATION
47
14/08/2020
Preloading + PVD
INSTALLATION
Preloading + PVD
VERTICAL DRAIN DISCHARGE CAPACITY ISSUE
The purpose of using prefabricated vertical drains (PVD) is to release the excess pore water
pressure in soil and or to discharge water.
Once the water has entered the drain, it is still possible for the flow in the drain itself to be
reduced for a number of reasons (Bergado et al., 1996):
• By increasing lateral pressure, the filter passes into the core and subsequently decreases the
discharge capacity due to a reduction of the cross-sectional area available for flow (1).
Vacuum Preloading + PVD
• During consolidation, the ground will be subjected to large settlement. Thus, the drains tend to
settle together with the ground which will result in bending of folding of the drain (2).
• In the initial filtering process of flow from the soil through the drain filter, the displaced water
will contain a small portion of fine particles. These may be deposited with the core channels
and may lead to clogging of the drain (3)
• The discharge capacity may be reduced due to aging in the soil after installation, possibly due
to biological and chemical activities.
• The measured discharge capacity varies with different hydraulic gradients and is smaller when
a higher hydraulic gradient is used. This might be due to the loss of flow energy as a result of
turbulent flow at a high hydraulic gradient.
48
14/08/2020
Preloading + PVD
VERTICAL DRAIN DISCHARGE CAPACITY ISSUE
1. reduction of
discharge area
3. Clogging
Preloading + PVD
SOIL PRELOADING – THINGS TO BE CONCERN
1. Critical initial backfill height. The original soft soil a low shear strength. Due to this
condition the 1st backfill, typically as working platform, cannot be too high. Slope
stability calculation should perform to estimate the critical initial backfill height for
working platform.
Vacuum Preloading + PVD
49
14/08/2020
Preloading + PVD
SOIL PRELOADING – THINGS TO BE CONCERN
2. Staging construction. When backfilling, excess pore pressure increase and lead to
lower stability safety factor. The dissipation process (and the consolidation settlement)
will takes some time. After excess pore water dissipate, the soil strength will increase
and the next stage of backfill can proceed. monitor use piezometer.
3. PVD pull out or broken due to lateral spreading. monitor use inclinometer.
Preloading + PVD
50
14/08/2020
Preloading + PVD
OBSTACLE OF SOIL PRELOAD SYSTEM
• The soft soil is too weak and even a low soil embankment can
cause a stability problem
Preloading + PVD
Vacuum + PVD - Characteristics:
SITE CHARACTERISTICS :
• Know-how and skilled technicians required
• Difficult and care-needing technique
• Large site, important turn-over and duration exceeding 12 to 24 months
51
14/08/2020
Preloading + PVD
VACUUM PRELOADING APPLICATION
Settlement Large, both total and differential settlement, foundation, slab and road may crack
Piling work Large negative friction, reduced pile effective bearing capacity, resulting cost increase etc.
Preloading + PVD
SOIL PRELOADING PRINCIPLE
Soil
preload
52
14/08/2020
Preloading + PVD
VACUUM PRELOADING PRINCIPLE
Vacuum
Preloading + PVD
VACUUM PRELOADING PRINCIPLE
Vacuum
53
14/08/2020
Preloading + PVD
VACUUM + SOIL PRELOADING
Sealing Layer
(Geomembrane)
Atmospheric Atmospheric
Pressure Negative Pressure Pressure
(1Atm) (Min. 80kPa) (1Atm)
Preloading + PVD
VACUUM PRELOAD Monitoring Equipment
SAND BLANKET
- 80kPa
Inclinometer
SOFT SOIL
WATER
54
14/08/2020
Preloading + PVD
VACUUM + SOIL PRELOADING
Sealing Layer
(Geomembrane)
Atmospheric Atmospheric
Pressure Negative Pressure Pressure
(1Atm) (Min. 80kPa) (1Atm)
If 80 kPa from vacuum load is not enough, additional load could be applied
during improvement such as soil load.
Preloading + PVD
VACUUM PRELOADING PRINCIPLE
55
14/08/2020
Preloading + PVD
VACUUM PRELOADING PRINCIPLE
Preloading + PVD
Comparison: Soil Preloading and Vacuum Preloading
Pavement
SandBlanket
Sand Blanket Berm
Berm Berm
Berm
Vacuum Preloading + PVD
Vertical
Vertical Vertical
Vertical
Drain
Drain Drain
Drain
Soft
SoftClay
Clay Soft
SoftClay
Clay
56
14/08/2020
Preloading + PVD
VACUUM PRELOADING
CONSTRUCTION METHOD
Preloading + PVD
Panjang : 21,93 km
Kecepatan Rencana : 100 km/jam
57
14/08/2020
Preloading + PVD
Depth
BH-01 BH-02 BH-03 BH-04 BH-05 BH-06 BH-07 BH-08 BH-09 BH-10 BH-11 BH-12 BH-13 BH-14
ORIGINAL SOIL CONDITION
(m)
STA 1+000 1+850 3+650 5+900 7+125 8+050 9+625 12+000 14+100 16+100 17+650 19+000 20+050 21+400
1.5 0 0 0 0 0 0 2 4 0 19 1 5 0 18
3.0 0 1 0 2 0 0 0 8 0 13 0 7 2 16
4.5 1 1 2 2 0 1 0 9 2 16 0 8 6 16
(Toll road references)
6.0 3 1 0 5 1 5 0 12 2 18 0 7 13 13
7.5 0 1 2 9 1 5 6 9 3 20 4 8 19 14
9.0 0 2 4 17 5 5 6 7 10 17 3 6 31 18
10.5 1 3 7 13 5 2 8 1 7 19 2 11 36 15
12.0 2 4 9 4 7 3 0 1 8 53 2 14 40 18
Preloading + PVD
ORIGINAL SOIL CONDITION
(Toll road references)
58
14/08/2020
Preloading + PVD
ORIGINAL SOIL CONDITION
Preloading + PVD
ORIGINAL SOIL CONDITION
59
1. Typical initial site condition 1. Typical initial site condition
(toll road references) (toll road references)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Vacuum Preloading + PVD Preloading + PVD Vacuum Preloading + PVD Preloading + PVD
60
14/08/2020
14/08/2020
Preloading + PVD
1. Typical initial site condition
(toll road references)
Preloading + PVD
2. Site preparation
(toll road references)
61
14/08/2020
Preloading + PVD
Stripping work
Geotextile spreading
2. Site preparation
Access road
Preloading + PVD
2. Site preparation
(toll road references)
62
14/08/2020
Typically working platform use all sand or soil with top 0.5 m sand as drainage layer
(sand permeability > 5 x 10-3 cm/sec).
Under certain condition, sand is really difficult to get or very expensive. Here soil can
use as platform with modification on horizontal drainage system.
Cannot use organic soil, expansive soil or other problematic soil type.
Preloading + PVD
3. Construct working platform
(toll road references)
63
14/08/2020
Preloading + PVD
4. Install PVD on sand platform
(toll road references)
Preloading + PVD
5. Install PHD on sand platform
(toll road references)
64
14/08/2020
Preloading + PVD
5. Install PHD on sand platform
(toll road references)
Preloading + PVD
6. Geotextile installation (1st layer)
(toll road references)
Aware of connection
between geotextile
65
14/08/2020
Preloading + PVD
7. Geomembrane installation
(toll road references)
Preloading + PVD
7. Geomembrane installation
(toll road references)
66
14/08/2020
67
Preloading + PVD Vacuum Preloading + PVD
Preloading + PVD Vacuum Preloading + PVD Preloading + PVD Vacuum Preloading + PVD
Drainage
Drainage
Mechanical
Mechanical
Chemical
Chemical
Pendahuluan
Pendahuluan
(toll road references) (toll road references)
7. Geomembrane installation 7. Geomembrane installation
14/08/2020
Preloading + PVD
8. Geomembrane lock at perimeter
(toll road references)
Preloading + PVD
8. Geomembrane lock at perimeter
(toll road references)
68
14/08/2020
Preloading + PVD
8. Geomembrane lock at perimeter
(toll road references)
Preloading + PVD
8. Geomembrane lock at perimeter
(toll road references)
Aware of non-uniform
mixture or gap between
slurry pile. Permeability < 1 x 10-5 cm/sec
69
9. Install instrumentation 8. Geomembrane lock at perimeter
(toll road references) (toll road references)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Drainage
70
14/08/2020
14/08/2020
Preloading + PVD
9. Install instrumentation
(toll road references)
extensometer Vacuum
Inclinometer Vacuum Gauge
degree
Preloading + PVD
9. Install instrumentation
(toll road references)
71
9. Install instrumentation 9. Install instrumentation
(toll road references) (toll road references)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Drainage
Vacuum Preloading + PVD Preloading + PVD Vacuum Preloading + PVD Preloading + PVD
72
14/08/2020
10. Install and start vacuum process 10. Install and start vacuum process
(toll road references) (toll road references)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Drainage
Vacuum Preloading + PVD Preloading + PVD Vacuum Preloading + PVD Preloading + PVD
73
14/08/2020
10. Install and start vacuum process
11. Backfill during vacuum process (toll road references)
Pendahuluan
Pendahuluan
Chemical
Chemical
Mechanical
Mechanical
Drainage
Drainage
Vacuum Preloading + PVD Preloading + PVD Vacuum Preloading + PVD Preloading + PVD
74
14/08/2020
14/08/2020
Preloading + PVD
11. Backfill during vacuum process
Preloading + PVD
11. Backfill during vacuum process
75
14/08/2020
Preloading + PVD
11. Backfill during vacuum process
Preloading + PVD
11. Backfill during vacuum process
76
14/08/2020
Preloading + PVD
Before and After Vacuum Preloading
(Power Plant references)
Preloading + PVD
Before and After Vacuum Preloading
(Sinarmas Pulp and Paper Factory, South Sumatera)
Before Vacuum
Preloading
Vacuum Preloading + PVD
77
14/08/2020
Preloading + PVD
Before and After Vacuum Preloading
(Industrial Estate references)
Preloading + PVD
Toll road monitoring
-200 0
-400 -10
(references only)
-600 -20
-800 -30
No.1
-1000 -40
Vacuum Preloading + PVD
No.2
-1200 -50
No.3
-1400 -60
-2000 -90
78
14/08/2020
Preloading + PVD
Toll road monitoring
(references only)
Preloading + PVD
Toll road monitoring
(references only)
79
14/08/2020
Preloading + PVD
Preloading + PVD
Degree of Consolidation
(references only)
Preloading + PVD
Degree of Consolidation
(references only)
80
14/08/2020
Penutup
(6) Faktor yang Mempengaruhi Pemilihan Metode Perbaikan
Lingkungan Ekonomi
Penggunaan material & dampak
Biaya.
pekerjaan terhadap lingkungan.
Aksan KAWANDA