Anda di halaman 1dari 155

INSPEKTORAT JENDERAL

KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN


:
:
:
:
:

REVIU PENYERAPAN ANGGARAN

PAGU ANGGARAN/RENCANA PENARIKAN DANA TAHUN 2020


Anggaran Belanja
No. Uraian
Pegawai Barang Modal Jumlah
I Pagu Tahun 2020 198,342,838,000 1,949,079,573,000 65,129,803,000 2,212,552,214,000
II RPD Tahun 2020:
1 Triwulan I 38,572,876,000 85,346,691,000 3,095,198,000 127,014,765,000
2 Triwulan II 52,945,616,000 244,736,088,000 4,976,276,000 302,657,980,000
3 Triwulan III 52,517,613,000 625,105,912,000 19,441,094,000 697,064,619,000
4 Triwulan IV 54,306,733,000 993,890,882,000 37,617,235,000 1,085,814,850,000
Total 198,342,838,000 1,949,079,573,000 65,129,803,000 2,212,552,214,000
III 100.00% 100.00% 100.00% 100.00%
% RPD thd Pagu

REALISASI ANGGARAN TAHUN 2020


Realisasi Belanja
No. Uraian
Pegawai Barang Modal Jumlah
1 Triwulan I 41,729,141,529 109,411,464,635 3,050,447,880 154,191,054,044
2 Triwulan II 47,524,825,139 182,705,262,022 5,032,724,945 235,262,812,106
3 Triwulan III 46,480,064,514 506,475,349,987 12,357,057,519 565,312,472,020
4 Triwulan IV - - - -
Total 135,734,031,182 798,592,076,644 20,440,230,344 954,766,338,170

PERSENTASE REALISASI ANGGARAN TAHUN 2020


Realisasi Belanja
No. Uraian
Pegawai Barang Modal Jumlah
1 Triwulan I 108.18% 128.20% 98.55% 121.40%
2 Triwulan II 89.76% 74.65% 101.13% 77.73%
3 Triwulan III 88.50% 81.02% 63.56% 81.10%
4 Triwulan IV 0.00% 0.00% 0.00% 0.00%
Total 68.43% 40.97% 31.38% 43.15%

Ket: Isian otomatis


INSPEKTORAT JENDERAL
KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN
No. Ker:
Dibuat :
Tanggal:
Direviu :
Tanggal:

RINCIAN STATUS PAKET PBJ


Status Paket
Diumu Tandatangan
mkan Kontrak
Peme
Belu
Nilai Pagu nang
Belum/
No Nama Paket
(Rp) namu m Sudah Ada
Proses ada
n Progres
Lelang
belum Prog Fisik
res
Ttd
Fisik
Kontr
ak
1 2 3 4 5 6 7
I Satker Pusat (tidak ada data TW 3)
1 12,913,020,000

CONSULTING SERVICE FOR THE FOREST PROGRAMME II (REDD+) Ya


BIODIVERSITY CONSERVATION AND INTEGRATED WATERSHED
DEVELOPMENT
Pengadaan WITHIN
akomodasi danTHE INDONESIA-GERMAN
konsumsi REDD+
(fullboard dan halfday PROGRAMME
meeting) rapat
2 koordinasi perencanaan bidang PDASHL tahun 2020 315,000,000 Ya
3 283,600,000
PENGADAAN AKOMODASI DAN KONSUMSI (PAKET MEETING FULLBOARD
DAN FULLDAY) DALAM RANGKA KEGIATAN KONSOLIDASI LAPORAN Ya
KEUANGAN TAHUN 2019 TANGGAL 20 S.D 22 JANUARI 2020
4
Pengadaan konsumsi dan akomodasi paket rapat FB dan FD dalam rangka
Binmbingan Teknis Jabatan Fungsional Lingkup Ditjen PDASHL tangggal 20 s/d Ya
22 Februari 2020 244,375,000
5 1,905,090,000
Penyusunan Detail Engineering Design (DED) Persemaian Modern IKN, Provinsi
Kalimantan Timur yang berlokasi di Mentawir Kabupaten Penajam Paser Utara, Ya
Provinsi Kalimantan Timur
6 Paket pekerjaan pengadaan jasa konsultansi penyusunan Detail Engineering 668,250,000
Ya
Design (DED) Pembangunan Persemaian Modern Mandalika, Provinsi NTB
7 Paket pengadaan Jasa Konsultansi Penyusunan Detail Engineering Design 723,360,000
Ya
Pembangunan Persemaian Modern Likupang, Provinsi Sulawesi Utara
8 Paket pekerjaan pengadaan jasa kosultansi penyusunan Detail Engineering 665,707,000
Ya
Design (DED) pembangunan persemaian modern Toba Provinsi Sumatera Utara
9 Paket pekerjaan pengadaan jasa konsultansi penyusunan Detail Engineering 613,122,000
Ya
Design (DED) pembangunan persemaian modern Labuan Bajo Provinsi NTT

II BPDASHL Krueng Aceh (Data sama dengan TW II/tidak ada


perubahan)
1 Pengadaan Plotter + peralatan kantor 300,000,000 Ya
2 Penanaman P0 Vegetatif 2.000 Ha 14,400,000,000 Ya
3 Pengadaan Bibit Produktif 1,770,000,000 Ya
4 Pembuatan Tanaman/Rehabilitasi Hutan Mangrove 1,190,000,000 Ya
5 Pengawasan dan Penilaian RHL P1 (Mangrove) 5,250,000,000 Ya
6 Pengawasan dan Penilaian RHL P0 1,000,000,000 Ya
7 Pemeliharaan Tanaman RHL Tahun Ke-1 23,000,000,000 Ya
8 Pemeliharaan Tanaman Mangrove Tahun Ke-1 276,750,000 Ya
9 Paket Penanaman Reboisasi Agroforestry Pada KPH Wilayah V Blok BJR-4 430,768,800
Kecamatan Blangjerango dan Kecamatan Terangun Kabupaten Gayo Lues Ya
Seluas 222 Ha
10 Paket Penanaman Reboisasi Agroforestry Pada KPH Wilayah V Blok BJR-5 407,484,000
Kecamatan Blangjerango Kabupaten Gayo Lues Seluas 210 Ha Ya

11 Paket Penanaman Reboisasi Agroforestry Pada KPH Wilayah V Blok BKJ-3 429,088,000
Kecamatan Blangkejeren Kabupaten Gayo Lues Seluas 212 Ha Ya

12 Paket Penanaman Reboisasi Agroforestry Pada KPH Wilayah V Blok DBG-8 398,310,000
Kecamatan Dabun Gelang Kabupaten Gayo Lues Seluas 170 Ha Ya

13 Paket Penanaman Reboisasi Agroforestry Pada KPH Wilayah V Blok DBG-9 456,885,000
Kecamatan Dabun Gelang Kabupaten Gayo Lues Seluas 195 Ha Ya

III BPDASHL Wampu Sei Ular (6 paket Data RHL tidak disajikan)
1 Paket 1: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 366,000,000 Ya
2 Paket 2: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 531,000,000 Ya
3 Paket 3: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 566,000,000 Ya
4 Paket 4: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 303,000,000 Ya
5 Paket 5: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 432,000,000 Ya
6 Paket 6: Pengawasan dan Penilaian Pemeliharaan Tahun I RHL Tahun 2019 selu 594,000,000 Ya
7 RHL Agroforestry pada Blok I Kec. Lau Baleng dan Mardinding Kab. Karo seluas 411,000,000 Ya
8 RHL Agroforestry pada Blok II Kec. Lau Baleng Kab. Karo seluas 245 Ha 407,000,000 Ya
9 RHL Agroforestry pada Blok V Kec. Juhar Kab. Karo seluas 244 Ha 405,000,000 Ya
10 RHL Agroforestry pada Blok VI Kec. Juhar Kab. Karo seluas 268 Ha 438,000,000 Ya
11 RHL Agroforestry pada Blok VIII Kec. Gunung Meriah Kab. Deli Serdang seluas 2 385,000,000 Ya
12 RHL Agroforestry pada Blok IX Kec. Gunung Meriah Kab. Deli Serdang seluas 28 460,000,000 Ya

IV BPDASHL Asahan Barumun (tidak ada data di TW III)


1
PEMBUATAN TANAMAN RHL P-0 KPH WIL. VII GUNUNG TUA 1 DAN 2 7,588,880,750 Ya
SELUAS 400 HA (PAKET 1)
2
PEMBUATAN TANAMAN RHL P-0 KPH WIL. XI PANDAN 1, 2 DAN 3 SELUAS 2,312,574,000 Ya
200 HA (PAKET 2)
3
Ya
PEMBUATAN TANAMAN RHL P-0 SM. BARUMUN SELUAS 100 HA (PAKET 3) 1,977,998,000
4
PEMBUATAN TANAMAN RHL P-0 KPH WIL. X PADANGSIDIMPUAN 1 DAN 2 Ya
SELUAS 200 HA (PAKET 4) 3,955,996,000
5 PEMBUATAN TANAMAN RHL P-0 KPH WIL.VIII KOTANOPAN DAN KPH 4,964,660,250
WIL.IX PANYABUNGAN SELUAS 300 HA (PAKET 5) Ya

6 PEMBUATAN TANAMAN RHL P-0 KPH WIL.XIII DOLOKSANGGUL 1 SELUAS 3,955,996,000


200 HA (PAKET 6) Ya

7 PEMBUATAN TANAMAN RHL P-0 KPH WIL. XIII DOLOKSANGGUL 2 SELUAS 1,977,998,000
100 HA (PAKET 7) Ya

8 PENGAWASAN DAN PENILAIAN PEMELIHARAAN TANAMAN RHL TAHUN I 1,778,249,000


(P1) SELUAS 3.988 HA Ya

9 PENGAWASAN DAN PENILAIAN PEMELIHARAAN TANAMAN RHL TAHUN I 1,750,661,000


(P1) SELUAS 4.012 HA Ya

10 PENGAWASAN DAN PENILAIAN PEMELIHARAAN TANAMAN RHL TAHUN I 2,160,950,000


(P1) SELUAS 5.200 HA Ya

V BPDASHL Agam Kuantan (Data sama dengan TW II/ tidak ada perubahan)
1 Pengadaan bibit tan RHL Nag. Lunang Kab Pessel 304,512,000 Ya
2 Pengawasan dan Penilaian Keg. RHL (P0) Thn 2020 255,860,000 Ya

VI BPDASHL Indragiri Rokan (Belum ada data TW III)


1 Paket I Reboisasi Agroforestry KPHL Pasaman Raya (Penyediaan Bibit P0) Ya
2 Paket II Reboisasi Agroforestry KPHL Sijunjung (Penyediaan Bibit P0) Ya
3 Paket III Reboisasi Intensif Blok I Taman Nasional Tesso Nilo (Penyediaan Bibit P0 Ya
4 Paket IV Reboisasi Intensif Blok II Taman Nasional Tesso Nilo (Penyediaan Bibit P 7,939,150,000 Ya
5 Paket V Reboisasi Intensif Blok III Taman Nasional Tesso Nilo (Penyediaan Bibit P Ya
6 Paket VI Reboisasi Intensif Blok IV Taman Nasional Tesso Nilo (Penyediaan Bibit Ya
7 Paket VII Reboisasi Intensif Blok V Taman Nasional Tesso Nilo (Penyediaan Bibit Ya
8 Pengadaan Bibit Produktif 1,369,000,000 Ya

VII BPDASHL Sei Jang Duriangkang (Data sama dengan TW II/ tidak
ada perubahan)
1 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL Tahun Ke-1 seluas 400
Ya
Ha 200,000,000
2 Pengawasan dan Penilaian Pembuatan Tanaman (P0) RHL Tahun 2020 Seluas
Ya
550 Ha 281,000,000
3 Rehabilitasi Hutan dan Lahan Seluas 450 Ha di Kota Batam Tahun 2020 6,718,115,250 Ya

VIII BPDASHL Batanghari (TW 2 ada 16 Paket)


1 Pembuatan Tanaman RHL Pola Reboisasi Agroforestry Seluas 100 Ha 195,000,000 Ya
2 Paket 1 Pembuatan Tanaman RHL Pola Reboisasi Agroforestry Seluas 505 Ha 943,592,500 Ya
3 Paket 2 Pembuatan Tanaman RHL Pola Reboisasi Agroforestry Seluas 495 Ha 961,661,250 Ya
4 Pengawasan dan Penilaian Penanaman (P0) RHL Seluas 1.000 Ha 195,000,000 Ya
5 Pengawasan dan Penilaian Pemeliharaan I (P1) RHL Seluas 2.000 Ha 927,740,000 Ya
6 Pengawasan dan Penilaian Pemeliharaan I (P1) RHL Seluas 355 Ha 156,420,000 Ya
7 Paket 1 Pemeliharaan I (P1) RHL Seluas 200 Ha 526,200,000 Ya
8 Paket 2 Pemeliharaan I (P1) RHL Seluas 700 Ha 1,648,824,375 Ya
9 Paket 3 Pemeliharaan I (P1) RHL Seluas 100 Ha 257,700,000 Ya
10 Paket 4 Pemeliharaan I (P1) RHL Seluas 300 Ha 615,950,000 Ya
11 Paket 5 Pemeliharaan I (P1) RHL Seluas 420 Ha 838,530,000 Ya
12 Paket 6 Pemeliharaan I (P1) RHL Seluas 106 Ha 226,235,000 Ya
13 Paket 7 Pemeliharaan I (P1) RHL Seluas 174 Ha 390,261,500 Ya

IX BPDASHL Batu Rusa Cerucuk (Data sama dengan TW II/ tidak ada
perubahan)
1 Pengadaan Bibit Produktif Pulau Bangka 266,000,000 Ya
2 Pengadaan Bibit Produktif Pulau Belitung 209,000,000 Ya
3 Pengawasan dan Penilaian RHL Penanaman (P-0) Reboisasi Intensif 296,125,000
dan Mangrove Ya

4 Pengadaan Bibit Produktif Tambahan 950,000,000 Ya

X BPDASHL Musi (Data sama dengan TW II/ tidak ada perubahan)


1 PEMELIHARAAN TANAMAN RHL VEGETATIF DTA WADUK TAHUN 640,500,000
PERTAMA (P1) BLOK XI DESA TANJUNG BULAN ILIR KECAMATAN PULAU
BERINGIN KABUPATEN OKU SELATAN SELUAS 300 HA DI KAWASAN Ya
HUTAN LINDUNG MEKAKAU

2 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,356,633,000


PERTAMA (P1) BLOK I, BLOK II, DESA MUARA PAYANG KECAMATAN
MUARA PAYANAG KABUPATEN LAHAT SELUAS 500 HA DI KAWASAN Ya
HUTAN KONSERVASI HUTAN SUAKA ALAM GUMAY TEBING TINGGI

3 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,950,655,000


PERTAMA (P1) BLOK I, BLOK II, BLOK III, BLOK IV DESA SUMBER JAYA,
KECAMATAN BUAY PEMATANG RIBU RANAU TENGAH KABUPATEN OKU
Ya
SELATAN SELUAS 700 HA DI KAWASAN HUTAN KONSERVASI SUAKA
MARGASATWA GUNUNG RAYA

4 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,779,294,000


PERTAMA (P1) BLOK I, BLOK II, BLOK III DAN BLOK IV DESA MEHANGGIN,
KECAMATAN MUARA DUA KABUPATEN OKU SELATAN SELUAS 850 HA DI Ya
KAWASAN HUTAN LINDUNG MEKAKAU

5 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,289,787,500


PERTAMA (P1) DESA MUARA PAYANG DAN BANDU AGUNG KEC MUARA
PAYANG KABUPATEN LAHAT SELUAS 450 HA DI KAWASAN HUTAN Ya
KONSERVASI SUAKA ALAM GUMAY TEBING TINGGI

6 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 882,400,000


PERTAMA (P1) BLOK IX DAN BLOK X DESA GALANG TINGGI KECAMATAN
PULAU BERINGIN KABUPATEN OKU SELATAN SELUAS 400 HA DI Ya
KAWASAN HUTAN LINDUNG PERADUAN GISTANG
7 PEMELIHARAAN TANAMAN RHL VEGETATIF RAWAN BENCANA TAHUN 2,512,900,000
PERTAMA (P1) BLOK I DESA BUMI KAWA, BLOK I, BLOK II, BLOK III, BLOK IV
DESA SUKARAJA KECAMATAN LENGKITI KABUPATEN OKU SELATAN
Ya
SELUAS 1200 HA DI KAWASAN HUTAN LINDUNG BUKIT NANTI

8 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 3,163,700,000


PERTAMA (P1) BLOK I, BLOK II, BLOK III, BLOK IV, BLOK V, BLOK VI DAN
BLOK VII DESA KARANG ENDAH, KECAMATAN LENGKITI, KABUPATEN OKU
Ya
SELUAS 1.700 HA DI KAWASAN HUTAN LINDUNG BUKIT NANTI

9 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,400,100,000


PERTAMA (P1) BLOK I DESA MANGUNSARI KECAMATAN JARAI DAN BLOK
I DESA MUARA GELUMPAI, BLOK I DESA MUARA JAUH KECAMATAN
Ya
MUARA PAYANG KABUPATEN LAHAT SELUAS 650 HA DI KAWASAN HUTAN
LINDUNG BUKIT DINGIN

10 PEMELIHARAAN TANAMAN RHL VEGETATIF RAWAN BENCANA TAHUN 544,500,000


PERTAMA (P1) BLOK I DESA MUARA EMIL KECAMATAN TANJUNG AGUNG
KABUPATEN MUARA ENIM SELUAS 250 HA DI KAWASAN HUTAN LINDUNG Ya
MUARA EMIL

11 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 989,750,000


PERTAMA (P1) BLOK V DESA TANJUNG BESAR, BLOK VI DESA PERE’AN,
BLOK VII DESA KOTA BARU, BLOK VIII DESA GALANG TINGGI,
KECAMATAN MEKAKAU ILIR KABUPATEN OKU SELATAN SELUAS 750 HA Ya
DI KAWASAN HUTAN LINDUNG MEKAKAU DAN PERADUAN GISTANG

12 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 565,508,600


PERTAMA (P1) DESA SUMBER JAYA KEC BUAY PEMATANG RIBU RANAU
TENGAH KABUPATEN OKU SELATAN SELUAS 200 HA DI HUTAN Ya
KONSERVASI HUTAN SM GUNUNG RAYA

13 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 1,389,727,500


PERTAMA (P1) BLOK I, BLOK II, BLOK III DESA BUNGA TANJUNG
KECAMATAN LENGKITI KABUPATEN OKU SELUAS 675 HA DI KAWASAN Ya
HUTAN LINDUNG BUKIT NANTI

14 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 588,625,000


PERTAMA (P1) BLOK I, BLOK II, BLOK III, DESA MENDINGIN KECAMATAN
ULU OGAN KABUPATEN OKU SELUAS 325 HA DI KAWASAN HUTAN Ya
LINDUNG BUKIT NANTI

15 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PRIORITAS TAHUN 950,761,300


PERTAMA (P1) BLOK I, BLOK II DESA SINGAPURE KECAMATAN KOTA
AGUNG, KABUPATEN LAHAT SELUAS 445 HA DI KAWASAN HUTAN Ya
LINDUNG GUNUNG PATAH

16 PEMELIHARAAN TANAMAN RHL VEGETIF RAWAN BENCANA TAHUN 791,635,000


PERTAMA (P1) BLOK I DESA PANDANARANG ULU DAN BLOK I, BLOK II
DESA TUNGGUL BUTE KECAMATAN KOTA AGUNG KABUPATEN LAHAT
Ya
SELUAS 365 HA DI KAWASAN HUTAN LINDUNG GUNUNG PATAH

17 PEMELIHARAAN TANAMAN RHL TAHUN PERTAMA (P1) VEGETATIF DAS 1,389,152,080


PRIORITAS BLOK I DESA CANDI JAYA KECAMATAN DEMPO TENGAH DAN
RAWAN BENCANA BLOK I, BLOK II KELURAHAN BURUNG DINANG
Ya
KECAMATAN DEMPO UTARA KOTA PAGARALAM SELUAS 640 HA DI
KAWASAN HUTAN LINDUNG MERANG

18 PAKET PENGAWASAN DAN PENILAIAN PEMELIHARAAN P1 RHL 994,400,000


VEGETATIF DI WILAYAH UPTD KPH WILAYAH VII MEKAKAU-SAKA SELUAS Ya
2.300 HA
19 PAKET PENGAWASAN DAN PENILAIAN RHL VEGETATIF DI WILAYAH SM 790,350,000
GUNUNG RAYA DAN HSA GUMAY TEBING TINGGI SELUAS 1.850 HA Ya

20 PENGAWASAN DAN PENILAIAN PEMELLIHARAAN P1 RHL VEGETATIF DI 1,020,580,000


WILAYAH UPTD KPH VIII SEMENDO, WILAYAH UPTD KPH IX SUBAN JERIJI,
UPTD KPH X DEMPO DAN UPTD KPH XI KIKIM PASEMAH SELUAS 2.350 HA Ya

21 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN PEMELIHARAAN P1 RHL 1,608,420,000


VEGETATIF DI WILAYAH UPTD KPH BUKIT NANTI SELUAS 3.900 HA Ya

22 PAKET RHL VEGETATIF PENANAMAN REBOISASI 580,200,000


AGROFORESTRYSELUAS 300 HA PADA BLOK B DESA JOKOH KECAMATAN Ya
DEMPO SELATAN KOTA PAGAR ALAM
23 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 388,320,000
SELUAS 200 HA PADA BLOK B DESA AIR KELINSAR KECAMATAN ULU Ya
MUSI KABUPATEN EMPAT LAWANG
24 PAKET REHABILITASI HUTAN DAN LAHAN VEGETATIF PENANAMAN 414,435,000
REBOISASI AGROFORESTRY SELUAS 210 HA BLOK E DESA BUMIRAWA
KEC LENGKITI KAB OKU DI KPH WILAYAH VI BUKIT NANTI MARTAPURA Ya

25 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 555,750,000


SELUAS 300 HA PADA BLOK C DESA SWARNA DWIPA KEC SEMENDE
DARAT TENGAH KAB MUARA ENIM DI KPH WILAYAH VIII SEMENDO DI HL Ya
GUNUNG PATAH SUMSEL

26 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 703,740,000


SELUAS 370 HA PADA BLOK I DAN BLOK J DESA BUMI KAWA KEC
LENGKITI KAB OKU DI KPH WILAYAH VI BUKIT NANTI MARTAPURA HL Ya
GUNUNG PATAH
27 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 931,992,000
SELUAS 480 HA PADA BLOK G DAN BLOK H DESA BUMI KAWA KEC
LENGKITI KAB OKU DI KPH WILAYAH VI BUKIT NANTI MARTAPURA PROV Ya
SUMSEL

28 PAKET RHL VEGETATIF PENANAMAN REBOISASIAGROFORESTRY 415,380,000


SELUAS 210 HA PADA BLOK C DESA BUMI KAWA KEC LENGKITI KAB OKU Ya
DI KPH WILAYAH VI BUKIT NANTI MARTAPURA DI PROV SUMSEL
29 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 491,150,000
SELUAS 250 HA PADA BLOK F DESA AGUNG LAWANGAN KEC DEMPO
UTARA PAGAR ALAM DI KPH WILAYAH X DEMPO DI KAWASAN HL Ya
GUNUNG PATAH

30 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN TANAMAN RHL 541,750,000


VEGETATIF DI WILAYAH UPTD KPH BUKIT NANTI SELUAS 1.070 HA Ya

31 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN TANAMAN RHL 508,475,000


VEGETATIF DI WILAYAH UPTD KPH LAINNYA SELUAS 1.040 HA Ya

32 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN TANAMAN RHL 501,754,000


VEGETATIF DI UPTD KPH WILAYAH VI BUKIT NANTI MARTAPURA DAN Ya
UPTD KPH WILAYAH VII MEKAKAU SAKA 980 HA
33 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 425,400,000
SELUAS 250 HA PADA BLOK E DESA GEDUNG WANI KEC RUNJUNG
AGUNG KAB OKU SELATAN DI KPH WILAYAH VII MEKAKAU SAKA Ya
PROV.SUMSEL

34 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 463,447,600


SELUAS 250 HA PADA BLOK A DESA KARANG ENDAH KEC LENGKITI KAB
OKU DI KPH WILAYAH VI BUKIT NANTI MARTAPURA DI PROV. SEMSEL Ya

35 PAKET RHL VEGETATIF PENANAMAN REBOISASI AGROFORESTRY 404,569,000


SELUAS 250 HA PADA BLOK D DESA GEDUNG WANI KEC RUNJUNG
AGUNG KAB OKU SELATAN DI KPH WILAYAH VII MEKAKAU SAKA PROV Ya
SUMSEL

36 PENANAMAN DALAM RANGKA REHABILITASI HUTAN MANGROVE BLOK 716,100,000


TANJUNG API-API DESA MUARA SUNGSANG KECAMATAN BANYUASIN II Ya
KABUPATEN BANYUASIN SELUAS 50 HA
37 PEMBUATAN GULLY PLUG (GP) SEBANYAK 53 UNIT DI KOTA PAGAR ALAM 402,050,000
Ya

38 PEMBUATAN GULLY PLUG (GP) SEBANYAK 108 UNIT DI KABUPATEN 874,434,000


MUARA ENIM DAN OKU Ya

XI
BPDASHL Ketahun (Data sama dengan TW II/ tidak ada perubahan)
1 Pemeliharaan RHL Intensif, Blok 1 KPHL Mekakau Saka, 300 Ha (termin I) 343,061,000 Ya
2 Pemeliharaan RHL Intensif, Blok 1 KPHL Mekakau Saka, 300 Ha (termin II) 514,592,000 Ya
3 Pemeliharaan RHL Intensif, Blok 2 KPHL Mekakau Saka, 300 Ha 855,546,000 Ya
4 Pemeliharaan RHL Intensif, Blok 3 KPHL Mekakau Saka, 300 Ha 856,439,000 Ya
5 Pemeliharaan RHL Intensif, Blok 4 KPHL Mekakau Saka, 300 Ha (termin I) 337,256,000 Ya
6 Pemeliharaan RHL Intensif, Blok 4 KPHL Mekakau Saka, 300 Ha (termin II) 505,884,000 Ya
7 Pemeliharaan RHL Intensif, Blok 5 KPHL Mekakau Saka, 300 Ha 859,168,000 Ya
8 Pemeliharaan RHL Intensif, Blok 6 KPHL Mekakau Saka, 300 Ha 842,694,000 Ya
9 Pemeliharaan RHL Intensif, Blok 7 KPHL Mekakau Saka, 300 Ha (termin I) 333,110,000 Ya
10 Pemeliharaan RHL Intensif, Blok 7 KPHL Mekakau Saka, 300 Ha (termin II) 499,665,000 Ya
11 Pemeliharaan RHL Intensif, Blok 8 KPHL Mekakau Saka, 300 Ha 845,318,000 Ya
12 Pemeliharaan RHL Intensif, Blok 9 KPHL Mekakau Saka, 300 Ha 865,988,000 Ya
13 Pemeliharaan RHL Intensif, Blok 10 KPHL Mekakau Saka, 300 Ha 848,177,000 Ya
14 Pemeliharaan RHL Intensif, Blok 11 KPHL Mekakau Saka, 300 Ha 848,263,000 Ya
15 Pemeliharaan RHL Intensif, Blok 12 KPHL Mekakau Saka, 300 Ha 848,263,000 Ya
16 Pemeliharaan RHL Intensif, Blok 13 KPHL Mekakau Saka, 205 Ha 586,600,000 Ya
17 Pemeliharaan RHL Intensif, Blok 14 KPHL Mekakau Saka, 300 Ha (termin I) 346,314,000 Ya
18 Pemeliharaan RHL Intensif, Blok 14 KPHL Mekakau Saka, 300 Ha (termin II) 519,471,000 Ya
19 Pemeliharaan RHL Intensif, Blok 15 KPHL Mekakau Saka, 300 Ha (termin I) 345,930,000 Ya
20 Pemeliharaan RHL Intensif, Blok 15 KPHL Mekakau Saka, 300 Ha (termin II) 518,895,000 Ya
21 Pemeliharaan RHL Intensif, Blok 16 KPHL Mekakau Saka, 300 Ha 848,263,000 Ya
22 Pemeliharaan RHL Intensif, Blok 17 KPHL Mekakau Saka, 300 Ha (termin I) 339,306,000 Ya
23 Pemeliharaan RHL Intensif, Blok 17 KPHL Mekakau Saka, 300 Ha (termin II) 508,958,000 Ya
24 Pemeliharaan RHL Intensif, Blok 18 KPHL Mekakau Saka, 250 Ha (termin I) 283,791,000 Ya
25 Pemeliharaan RHL Intensif, Blok 18 KPHL Mekakau Saka, 250 Ha (termin II) 425,686,000 Ya
26 Pemeliharaan RHL Intensif, Blok 19 KPHL Mekakau Saka, 300 Ha 849,303,000 Ya
27 Pemeliharaan RHL Intensif, Blok 20 KPHL Mekakau Saka, 250 Ha (termin I) 290,927,000 Ya
28 Pemeliharaan RHL Intensif, Blok 20 KPHL Mekakau Saka, 250 Ha (termin II) 436,390,000 Ya
29 Pemeliharaan RHL Intensif, Blok 21 KPHL Mekakau Saka, 295 Ha (termin I) 231,739,000 Ya
30 Pemeliharaan RHL Intensif, Blok 21 KPHL Mekakau Saka, 295 Ha (termin II) 347,609,000 Ya
31 Pemeliharaan RHL Intensif, Blok 22 KPHL Mekakau Saka, 300 Ha 867,316,000 Ya
32 Pemeliharaan RHL Intensif, Blok 23 KPHL Mekakau Saka, 300 Ha 866,278,000 Ya
33 Pemeliharaan RHL Intensif, Blok 24 KPHL Mekakau Saka, 300 Ha 868,609,000 Ya
34 Pemeliharaan RHL Intensif, Blok 25 KPHL Mekakau Saka, 250 Ha 709,476,000 Ya
35 Pemeliharaan RHL Intensif, Blok 26 KPHL Kab. Kaur, 250 Ha (termin I) 284,196,000 Ya
36 Pemeliharaan RHL Intensif, Blok 26 KPHL Kab. Kaur, 250 Ha (termin II) 426,294,000 Ya
37 Pemeliharaan RHL Intensif, Blok 27 KPHL Kab. Kaur, 250 Ha 709,160,000 Ya
38 Pemeliharaan RHL Intensif, Blok 28 KPHL Kab. Kaur, 250 Ha 726,280,000 Ya
39 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL (P1), Paket 1 luas 2.950 Ha 1,325,000,000 Ya
40 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL (P1), Paket 2 luas 2.505 Ha 1,120,000,000 Ya
41 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL (P1), Paket 3 luas 1.795 Ha 806,000,000 Ya
42 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL (P1), Paket 4 luas 750 Ha 336,000,000 Ya
43 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS Rawan/Pasca Bencana di KPHL Wil 289,050,000.00 Ya
44 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS Rawan/Pasca Bencana di KPHL Buk 240,875,000.00 Ya
45 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS Rawan/Pasca Bencana di KPHL Buk 240,875,000.00 Ya
46 Pemeliharaan Tanaman Tahun II (P2) RHL pada KPHL/HL Blok 2, 125 Ha 240,875,000.00 Ya
47 Penanaman RHL Agroforestry, Blok 1 (300 Ha) 797,280,000 Ya
48 Penanaman RHL Agroforestry, Blok 2 (300 Ha) 797,280,000 Ya
49 Penanaman RHL Agroforestry, Blok 3 (250 Ha) 659,725,000 Ya
50 Penanaman RHL Agroforestry, Blok 4 (250 Ha) 661,100,000 Ya
51 Penanaman RHL Agroforestry, Blok 5 (250 Ha) 661,100,000 Ya
52 Penanaman RHL Agroforestry, Blok 6 (250 Ha) 661,000,000 Ya
53 Penanaman RHL Agroforestry, Blok 7 (200 Ha) 530,640,000 Ya
54 Penanaman RHL Agroforestry, Blok 8 (200 Ha) 527,120,000 Ya
55 Pengawasan dan Penilaian Pembuatan Tanaman RHL (P0), Paket luasan 2.000 Ha 490,000,000 Ya
56 Penyusunan Rancangan Kegiatan Penanaman RHL, Pengukuran dan Penataan Batas 824,000,000
Ya

XII BPDASHL Citarum Ciliwung (Data sama dengan TW II/ tidak ada
perubahan)
1 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
1_TNGHS Ya
606,449,250
2 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
2_TNGP Ya
383,693,750
3 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
3_KSDA BGR Ya
650,754,500
4 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
4_KSDA BDG-CMS Ya
525,750,500
5 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
5_KPH BDU-CJR Ya
544,428,500
6 Repeat Order Jasa Konsultansi Pengawasan dan Penilaian RHL P1 Paket
6_KPH BDS Ya
904,508,000
7 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 1 TNGHS 532,842,000 Ya
8 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 2 TNGHS 2,471,878,500 Ya
9 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 3 TNGHS 733,261,000 Ya
10 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 4 TNGGP 264,764,500 Ya
11 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 5 TNGGP 490,785,000 Ya
12 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 6 TNGGP 791,089,500 Ya
13 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 7
BBKSDA Ya
1,066,657,000
14 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 8
BBKSDA Ya
1,760,490,700
15 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 9
BBKSDA Ya
2,191,965,200
16 Addendum Pemeliharaan RHL Tahun Pertama (P1) Tahun 2020 Paket 10
BBKSDA Ya
2,472,742,500
17 Addendum Pemeliharaan RHL Tahun Pertama (P1) Perum Perhutani Tahun
2020 Paket 1 KPH BDS Ya
2,318,091,000
18 Addendum Pemeliharaan RHL Tahun Pertama (P1) Perum Perhutani Tahun
2020 Paket 2 KPH BDS Ya
1,191,346,000
19 Addendum Pemeliharaan RHL Tahun Pertama (P1) Perum Perhutani Tahun
2020 Paket 3 KPH BDS Ya
2,556,890,000
20 Addendum Pemeliharaan RHL Tahun Pertama (P1) Perum Perhutani Tahun
2020 Paket 4 KPH BDU Ya
2,920,419,000
21 Addendum Pemeliharaan RHL Tahun Pertama (P1) Perum Perhutani Tahun
2020 Paket 5 KPH Cianjur Ya
252,006,000
22 Addendum Pemeliharaan RHL Tahun Kedua (P2) Perum Perhutani Tahun 2020
Divreg Jabar Banten Ya
3,294,600,400
23 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 2_BDS 355,728,000 Ya
24 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 3_CJR 351,627,500 Ya
25 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 4_BTN 744,622,000 Ya
26 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 5_SMD 357,527,500 Ya
27 BIBIT PRODUKTIF PAKET 1 1,053,150,000 Ya
28 BIBIT PRODUKTIF PAKET 2 506,900,000 Ya
29 BIBIT PRODUKTIF PAKET 3 425,600,000 Ya
30 BIBIT PRODUKTIF PAKET 4 271,950,000 Ya
31 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun 2020 Paket 1 595,102,000 Ya
32 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun 2020 Paket 2 754,550,000 Ya
33 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun 2020 Paket 3 663,075,000 Ya
34 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun 2020 Paket 4 1,267,200,000 Ya
35 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun 2020 Paket 5 934,672,000 Ya

XIII BPDASHL Cimanuk Citanduy (Data sama dengan TW II / tidak ada


perubahan)
1 Pelaksanaan RHL P-0 Paket 1 KPH Garut 4,332,700,000 Ya
2 Waslai RHL P-0 498,000,000 Ya
3 Waslai RHL P-1 Paket 1 881,658,800 Ya
4 Waslai RHL P-1 Paket 2 853,259,000 Ya
5 Waslai RHL P-1 Paket 3 809,248,000 Ya
6 Waslai RHL P-1 Paket 4 679,695,500 Ya

XIV BPDASHL Serayu Opak Progo


1 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket A 445,000,000.00 Ya
2 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket B 440,000,000.00 Ya
3 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket C 533,950,000.00 Ya
4 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket D 577,775,000.00 Ya
5 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian Penanaman RHL 153,600,000.00
Tahun 2020 di Kawasan Hutan Lindung Perum Perhutani Wilayah Balai
Pengelolaan DAS dan Hutan Lindung Serayu Opak Progo dan Kawasan Hutan Ya
dengan Tujuan Khusus Wanagama

6 Pengadaan Bibit Tanaman dalam rangka Pembuatan Kebun Bibit Desa (KBD) 359,650,000.00
Tahun 2020 Paket A Ya

7 Pengadaan Bibit Tanaman dalam rangka Pembuatan Kebun Bibit Desa (KBD) 504,000,000.00
Tahun 2020 Paket B Ya

8 Pengadaan Bibit Tanaman dalam rangka Pembuatan Kebun Bibit Desa (KBD) 575,600,000.00
Tahun 2020 Paket C Ya
XV BPDASHL Pemali Jratun (Data sama dengan TW II / tidak ada
perubahan)
1 Pengadaan Bibit Produktif Paket A 418,000,000.00 Ya
2 Pengadaan Jasa Konsultasi Pengawasan dan Penilaian Tanaman RHL (P1) Ya
Hutan Lindung seluas 4.500 ha (Paket B) 947,000,000.00
3 Pengadaan Jasa Konsultasi Pengawasan dan Penilaian Tanaman RHL (P1) Ya
KHDTK seluas 500 ha (Paket C) 199,000,000.00
4 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Kebonharjo Seluas 544,8 Ya
Ha (P1) 1,319,519,300.00
5 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pati Seluas 1121,5 Ha (P1) 2,515,126,600 Ya
6 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pekalongan Timur Seluas 2,734,265,500
Ya
1134,2 Ha (P1)
7 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pekalongan Barat Seluas 3,422,592,000
Ya
1371,1 Ha (P1)
8 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Balapulang Seluas 290,2 Ha 621,236,400
Ya
(P1)
9 Pembuatan Tanaman RHL di KPH Kebonharjo seluas 156,6 Ha 213,916,000 Ya
10 Pembuatan Tanaman RHL di KPH Pati seluas 235,7 Ha 353,592,000 Ya
11 Pembuatan Tanaman RHL di KPH Pekalongan Timur seluas 144,3 Ha 224,696,000 Ya
12 Pembuatan Tanaman RHL di KPH Pekalongan Barat seluas 291,5 Ha 403,436,000 Ya
13 Pembuatan Tanaman RHL di KPH Balapulang seluas 171,9 Ha 265,586,000 Ya
14 Pengadaan Bibit Produktif Paket B 1,488,221,000 Ya
15 Pengadaan Bibit Produktif Paket C 658,779,000 Ya
16 Pengadaan Bibit Kebun Desa 704,000,000 Ya

XVI BPDASHL Brantas Sampean (ada paket di TW2 yang tidak ada di
TW 3)
1 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) Paket Relokasi Banyuwangi 2,083,724,800
Ya
Selatan
2 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Banyuwangi Barat 708,067,200 Ya
3 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Bondowoso 3,000,329,000 Ya
4 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Jember (1) 1,669,429,400 Ya
5 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Jember (2) 2,770,465,200 Ya
6 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Probolinggo 2,062,580,300 Ya
7 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Pasuruan 1,920,507,200 Ya
8 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Malang (1) 1,927,871,900 Ya
9 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Malang (2) 1,439,902,000 Ya
10 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Blitar (1) 2,067,578,100 Ya
11 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Blitar (2) 1,153,134,300 Ya
12 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 (P1) KPH Kediri 1,765,987,300 Ya
13 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian Pemeliharaan Tahun ke-1 (P1) 1,808,499,000
Ya
Tanaman RHL Hutan Lindung BPDASHL Brantas Sampean Tahun 2020 Paket 2
14 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian Pemeliharaan Tahun ke-1 (P1) 1,445,202,000
Ya
Tanaman RHL Hutan Lindung BPDASHL Brantas Sampean Tahun 2020 Paket 3
15 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian Pemeliharaan Tahun ke-1 (P1) 2,416,507,500
Ya
Tanaman RHL Hutan Lindung BPDASHL Brantas Sampean Tahun 2020 Paket 1
16 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH Malang 1,888,396,600 Ya
17 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH Blitar 2,017,732,900 Ya
18 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH Kediri 1,108,879,100 Ya
19 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH Probolinggo 1,706,639,300 Ya
20 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH Bondowoso 1,556,004,600 Ya
21 Pengadaan Bibit Produktif Paket 1 943,782,500 Ya
22 Pengadaan Bibit Produktif Paket 2 876,360,000 Ya
23 Pengadaan Bibit Produktif Paket 3 752,150,000 Ya
24 Pengadaan Bibit Produktif Paket 4 1,193,500,000 Ya
25 Pengadaan Bibit Produktif Ceremony 2,204,134,000 Ya

XVII BPDASHL Solo


1 Pengadaan Bibit Produktif Tahun 2020 Paket I 1,002,700,000.00 Ya
2 Pengadaan Bibit Produktif Tahun 2020 Paket II 813,600,000.00 Ya
3 Pengadaan Bibit Produktif Tahun 2020 Paket III 733,000,000.00 Ya
4 Pengadaan Bibit Produktif Tahun 2020 Paket IV 1,187,550,000.00 Ya
5 Pengadaan Bibit Produktif Tahun 2020 Paket V 709,150,000.00 Ya
6 Jasa Konsultansi Pengawasan dan Penilaian
Kegiatan Pemeliharaan Tahun 1 (P1) RHL Kawasan Hutan Wilayah Ya
BPDASHL Solo Tahun 2019 Paket I. 1,214,745,000.00
7
Jasa Konsultansi Pengawasan dan Penilaian
Kegiatan Pemeliharaan Tahun 1 (P1) RHL Kawasan Hutan Wilayah Ya
BPDASHL Solo Tahun 2019 Paket II 1,545,255,000.00
8
Jasa Konsultansi Pengawasan dan Penilaian
Kegiatan RHL Dalam Kawasan Hutan Wilayah BPDASHL Solo Tahun Ya
2020. 425,000,000.00
9 Pengadaan Pembuatan Tanaman Rehabilitasi Hutan dan Lahan Agroforestry Reboisasi 1,546,500,000.00
Hutan Lindung pada KPH Lawu Ds Seluas 950 Ha Ya

10 Pengadaan Bibit Kegiatan Pembuatan Kebun Bibit Desa (KBD) di Wilayah BPDASHL 615,850,000.00
Solo Tahun 2020 Ya

XVIII BPDASHL Kapuas


1 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Blok I Desa 2,396,906,946.50
Karangan Hora Kecamatan Ella Hilir Kabupaten Melawi Seluas 175 Ha Ya

2 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Desa Parembang 4,591,138,750.00
Nyuruh Kecamatan Ella Hilir Kabupaten Melawi Seluas 225 Ha Ya

3 Penanaman RHLl Kritis Tahun 2020 Secara Vegetatif Desa Pakak 3,081,059,850.00
Kecamatan Kayan Hilir Kabupaten Sintang Seluas 225 Ha di Hutan Ya
Lindung Gunung Bang
4 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Desa Tepang 2,054,124,875.00
Benua Kecamatan Kayan Hulu Kabupaten Sintang Seluas 150 Ha Ya

5 Pengawasan dan Evaluasi Kegiatan Pembuatan Tanaman (P0), di 329,375,000.00


Wilayah Kabupaten Sintang seluas 625 Ha Ya

6 Pengawasan dan Evaluasi Kegiatan Pembuatan Tanaman (P0), di 459,365,500.00


Wilayah Kabupaten Melawi seluas 875 Ha Ya
7 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan di Wilayah 258,300,000
Mempawah, Landak dan Sekadau, seluas 525 Ha Ya

8 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan Wilayah 885,600,000


Kabupaten Sintang Kecamatan Kayan Hilir Seluas 1.000 Ha dan Ya
Kecamatan Kayan Hulu Seluas 800 Ha
9 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan Wilayah KPH 1,131,600,000
Melawi seluas 2.300 Ha Ya

10 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan Wilayah KPH 885,600,000
Sintang Utara Seluas 1.800 Ha Ya

11 Pengawasan dan Penilaian Pemeliharaan Tahun Pertama (P1) Kegiatan 1,230,000,000


RHL Kawasan Hutan Lindung Bukit Alat- Sungai Demu, Serawai Ya
Kabupaten Sintang Seluas 2.500 Ha
12 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan di Wilayah 713,400,000
Kabupaten Kapuas Hulu Seluas 1.450 Ha Ya

13 Pengawasan dan Penilaian Kegiatan RHL Kawasan Hutan Lindung 307,500,000


Gunung Juring Kabupaten Ketapang Seluas 125 Ha dan Taman Ya
Nasional Gunung Palung seluas 500 Ha
14 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Blok II Desa 3,587,101,000
Karangan Hora Kecamatan Ella Hilir Kabupaten Melawi Seluas 175 Ha Ya

15 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Desa Nanga 3,437,420,000
Masau, Kecamatan Kayan Hulu Kabupaten Sintang Seluas 250 Ha Ya

16 Penanaman RHL Kritis Tahun 2020 Secara Vegetatif Desa Kuala Tiga 4,124,734,000
Kecamatan Tempunak Kabupaten Melawi Seluas 300 Ha Ya

17 Pembangunan Rumah Dinas Eselon IV 1,060,000,000 Ya


18 Perbaikan Gudang, Dapur Kantor dan Pintu Masuk Kantor dan Ruang 662,000,000
Kepala Balai Ya

19 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok III Nanga Nyuruh Kec. Ella Hilir Kab. Melawi seluas 150 Ha di Kawasan HL Tanjung Ya
Betung 425,997,000
20
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Mandau Baru Kec. Pinoh Selatan Kab. Melawi seluas 450 Ha di Kawasan HL Ya
Bukit Penintin-Bukit Mancung 1,172,424,000
21 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Lintah Taum Kec. Tanah Pinoh Barat Kab. Melawi seluas 350 Ha di Kawasan HL Ya
Gunung Burung 823,145,950
22
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif Ya
Blok I/II Nanga Nyuruh Kec. Ella Hilir Kab. Melawi seluas 450 Ha di Kawasan HPT 1,314,692,500
23
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Sinar Pekayau Kec. Sepauk Kab. Sintang seluas 350 Ha di Kawasan HL Gunung Ya
Naning/Gunung Burung/Lubuk Lintang 738,273,250
24
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok IV/V Nanga Nyuruh Kec. Ella Hilir Kab. Melawi Seluas 450 Ha di Kawasan HL Ya
Tanjung Betung 1,346,500,000
25
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Mungguk Gelombang Kec. Ketungau Tengah Kab. Sintang seluas 500 Ha di Ya
Kawasan HL Gn. Kehuma 1,289,670,250
26 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Ansiap Kec. Sadaniang Kab. Mempawah seluas 200 ha di Kawasan HL Ya
Penampean 731,918,000
27
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetaif
Blok I Amawang Kec. Sadaniang Kab. Mempawah seluas 125 Ha di Kawasan HL Ya
Selindung 465,121,250
28 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Mensulung Bio Kec. Serawai Kab. Sintang seluas 400 ha di Kawasan HL Bukit 1,457,500,000 Ya
Alat-Sungai Demu
29 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok III Mensulung Bio Kec. Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit 1,094,005,000 Ya
Alat-Sungai Demu
30 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Nanga Kelapan Kec. Ketungau Tengah Kab. Sintang seluas 400 Ha di Kawasan 964,198,400 Ya
HL Gn. Kehuma
31 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Merah Arai Kec. Kayan Hulu Kab. Sintang seluas 300 Ha di Kawasan HL Bukit 1,088,186,000 Ya
Patura-Bukit Alat
32 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok III/IV Langan Baru Kec. Embaloh Hulu Kab. Kapuas Hulu seluas 400 Ha di Kawasan 1,482,448,000 Ya
HL
33 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok III Tahai Permai Kec. Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit 1,095,109,400 Ya
Alat-Sungai Demu
34 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Melingkat Kec. Kayan Hilir Kab. Sintang seluas 350 Ha di Kawasan HL Bukit 1,276,644,600 Ya
Meraung
35 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok II Melingkat Kec. Kayan Hilir Kab. Sintang seluas 350 Ha di Kawasan HL Bukit 1,065,179,500 Ya
Meraung
36 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Pulau Majang Kec. Badau Kab. Kapuas Hulu seluas 200 Ha di Kawasan TNBKDS 729,410,000 Ya

37 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I kepala Gurung Kec. Mentebah Kab. Kapuas Hulu seluas 100 Ha di Kawasan HL 366,454,000 Ya

38 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Gema Kec. Simpang Dua Kab. Ketapang seluas 125 Ha di Kawasan HL Gn. Juring 408,010,625 Ya

39 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I-II Pantok Kec. Nanga Taman Kab. Sekadau seluas 100 Ha di Kawasan HL 261,629,500 Ya
Naning/Gunung Gurung/Lubuk Lintang
40 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Limbur Bernaung Kec. Serawai Kab. Sintang seluas 250 ha di Kawasan HL Bukit 896,115,000 Ya
Alat-Sungai Demu
41
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Nanga Masau Kec. Kayan Hulu Kab. Sintang seluas 200 Ha di Kawasan HL Bukit 721,512,000 Ya
Alat
42
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok II Merah Arai Kec. Kayan Hulu Kab. Sintang seluas 300 Ha di Kawasan HL Bukit 1,095,061,000 Ya
Patura-Bukit Alat
43 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok III/IV Nanga Kelapan Kec. Ketungau Tengah Kab. Sintang seluas 400 Ha di 995,823,400 Ya
Kawasan HL Gn. Kehuma
44
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Entibab Kec. Bunut Hilir Kab. Kapuas Hulu seluas 150 Ha di Kawasan HL Siawan 553,403,960 Ya
Belida
45
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif 554,218,500 Ya
Blok I Lubuk Pengail Kec. Suhaid Kab. Kapuas Hulu seluas 150 Ha di Kawasan TNBKDS
46
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Langan Baru Kec. Embaloh Hulu Kab. Kapuas Hulu seluas 300 Ha di Kawasan Ya
HL 1,091,169,200
47
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Sedahan Jaya Kec. Sukadana Kab. Kayong Utara seluas 250 Ha di Kawasan Ya
TNGP 991,001,000
48
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Nanga Tuan Kec. Bunut Hilir Kab. Kapuas Hulu Seluas 150 Ha di Kawasan HL Ya
Siawan Belida 561,143,110
49
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok II Limbur Bernaung Kec. Serawai Kab. Sintang seluas 250 Ha di Kawasan HL Bukit Ya
Alat-Sungai Demu 898,315,000
50 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I/II Tahai Permai Kec. Serawai Kab. Sintang seluas 400 Ha di Kawasan HL Bukit Ya
Alat-Sungai Demu 1,451,692,000
51
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok IV Mensulung Bio Kec. Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Ya
Alat-Sungai Demu 1,091,255,000
52 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok IV Tahai Permai Kec. Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Ya
Alat-Sungai Demu 1,091,387,000
53
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif
Blok I Kempas Raya Kec. Kayan Hilir Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Ya
Paturan dan Bukit Alat 1,095,501,000
54
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif Ya
Blok I Nanga Bayan Kec. Ketungau Hulu Kab. Sintang seluas 250 ha di Kawasan HLT 923,389,500
55
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis Tahun 2020 secara Vegetatif Ya
Blok II Nanga Bayan Kec. Ketungau Hulu Kab. Sintang seluas 250 ha di Kawasan HLT 935,533,500
56
Pemeliharaan Tanaman Tahun Pertama (P1) RHL kritis Tahun 2019 secara Vegetatif
Dusun Kopiang Desa Mandor Kecamatan Mandor Kabupaten Landak seluas 100 Ha di Ya
Kawasan Hutan dengan Tujuan Khusus UNTAN 235,738,250
57 Pemeliharaan Tanaman RHL DTA Danau Tahun Kedua (P2) seluas 132 Ha di HL Lanjak Ya
Desa Sei Abau, Kec. Batang Lupar , Kab. Kapuas Hulu, Prov. Kalbar 226,408,346

XIX BPDASHL Mahakam Berau (tidak ada data di TW 3)


Paket 1 RHL DTA Danau di DTA Danau Kaskade Mahakam, Desa
1 Enggelam, Kec. Muara Wis, Kab. Kutai Kartanegara, Ruang Lingkup 816,367,750 Ya
Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 2 RHL Rawan Bencana di Hutan Lindung Gunung Hantu III, KPHP
2 Manubar (Blok I dan II) Seluas 350 Hektar, Ruang Lingkup Pekerjaan 1,128,796,875 Ya
Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 3 RHL Rawan Bencana di Hutan Lindung Gunung Hantu III, KPHP
3 Manubar (Blok III) Seluas 299 Hektar, Ruang Lingkup Pekerjaan 960,556,187 Ya
Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 4 RHL Rawan Bencana di Hutan Lindung Gunung Hantu III, KPHP
4 Manubar (Blok IV) Seluas 109 Hektar, Ruang Lingkup Pekerjaan 352,587,750 Ya
Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 5 RHL Rawan Bencana di Hutan Lindung Lembak Sungai
Keraitan, KPHP Bengalon (Blok I dan II) Seluas 350 Hektar, Ruang
5 1,134,567,000 Ya
Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Tahun Pertama (P1) Tahun 2020
Paket 6 RHL Rawan Bencana di Hutan Lindung Lembak Sungai
6 Keraitan, KPHP Bengalon (Blok III dan IV) Seluas 516 Hektar, Ruang 1,666,035,000 Ya
Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 7 RHL Rawan Bencana di Hutan Lindung Lembak Sungai
7 Keraitan, KPHP Bengalon (Blok V dan VI) Seluas 484 Hektar, Ruang 1,573,363,000 Ya
Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 8 RHL Rawan Bencana di Hutan Lindung Lembak Sungai
8 Keraitan, KPHP Bengalon (Blok VII dan VIII) Seluas 546 Hektar, Ruang 1,774,909,500 Ya
Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 9 RHL Rawan Bencana di Hutan Lindung Lembak Sungai
9 Keraitan, KPHP Bengalon (Blok IX dan X) Seluas 420 Hektar, Ruang 1,323,682,500 Ya
Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 10 RHL Rawan Bencana di Hutan Lindung Gunung Hantu III,
10 KPHP Berau Barat (Blok I dan II) Seluas 345 Hektar, Ruang Lingkup 1,099,170,000 Ya
Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 11 RHL DTA Waduk di DTA Waduk Lambakan, KPHP Telake
11 Seluas 100 Hektar, Ruang Lingkup Pekerjaan Pemeliharaan Tahun 322,437,500 Ya
Pertama (P1) Tahun 2020
Paket 12 RHL Mangrove di KPH Delta Mahakam Seluas 50 Hektar,
12 Ruang Lingkup Pekerjaan Pemeliharaan Tahun Pertama (P1) Tahun 180,961,000 Ya
2020
Pekerjaan Rehabilitasi Hutan Pola Intensif pada DAS Rawan
Bencana/Pasca Bencana Tahun 2018 (Blok I 200 Ha) di Batu Putih,
13 231,825,000 Ya
Berau (KPHP Berau Pantai), Ruang Lingkup Pekerjaan Pemeliharaan
Tahun Kedua (P2) Tahun 2020

Pekerjaan Rehabilitasi Hutan Pola Intensif pada DAS Rawan


Bencana/Pasca Bencana Tahun 2018 (Blok II, 200 Ha) di Batu Putih,
14 231,825,000 Ya
Berau (KPHP Berau Pantai), Ruang Lingkup Pekerjaan Pemeliharaan
Tahun Kedua (P2) Tahun 2020
Paket I Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 121
15 643,965,410 Ya
Hektar Tahun 2020
Paket II Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 278
16 1,442,678,380 Ya
Hektar Tahun 2020
Paket III Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 283
17 1,467,379,430 Ya
Hektar Tahun 2020
Paket IV Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 235
18 1,230,249,350 Ya
Hektar Tahun 2020
Paket V Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 293
19 1,516,781,530 Ya
Hektar Tahun 2020
Paket VI Rehabilitasi Hutan dan Lahan pola Agroforestry Seluas 290
20 1,501,960,900 Ya
Hektar Tahun 2020
Paket 1 Pengawasan dan Penilaia Kegiatan RHL Rawan Bencana Di
KPHP Manubar dan KPHP Berau Barat, KPHP Kendilo, Muara Wis dan
21 662,200,000 Ya
Delta Mahakam Selaus 1.434 Hektar, Ruang Lingkup Pekerjaan
Pemeliharaan Tahun Pertama (P1) Tahun 2020
Paket 2 Pengawasan dan Penilaian Kegiatan RHL Rawan Bencana di
22 KPHP Bengalon Seluas 2.316 Hektar, Ruang Lingkup Pekerjaan 923,175,000 Ya
Pemeluharaan Tahun Pertama (P1) Tahun 2020
Jasa Konsultansi Pengawasan dan Penilaian Kegiatan RHL Rawan
23 Bencana di Hutan Lindung Sungai Wain Seluas 1.500 Ha, Ruang 570,240,000 Ya
Lingkup Pekerjaan Penanaman (P0) Tahun 2020
24 Pengadaan Bibit Produktif Tahun 2020 Sebanyak 74.850 Batang 1,299,408,000 Ya

XX BPDASHL Barito (paket di TW2 tidak ada di Tw 3)


1 Pekerjaan Pemeliharaan Tanaman Tahun Kedua P2 Kontrak Tahun 354,870,000
YA
Jamak Rehabilitasi Hutan di UPT KPH Balangan seluas 200 Ha TA 2020
2 Pekerjaan Pemeliharaan Tanaman Tahun Kedua P2 Kontrak Tahun 296,900,000
Jamak Rehabilitasi Hutan di UPT KPHL Gerbang Barito Unit IX Seluas 200 YA
Ha TA 2020
3 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,274,039,000
Rehabilitasi Hutan Paket XIII (Tiga Belas) UPTD. KPH Kayu Tangi Seluas YA
415 Ha
4 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,178,945,000
Rehabilitasi Hutan Paket XIV (Empat Belas) UPTD KPH Tanah Laut YA
Seluas 270 Ha
5 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,645,487,000
Rehabilitasi Hutan Paket XV (Lima Belas) UPTD. KPH Tanah Laut Seluas YA
378 Ha
6 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,304,158,000
Rehabilitasi Hutan Paket XVI (Enam Belas) UPTD. KPH Tanah Laut Seluas YA
301 Ha
7 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,635,359,000
YA
Rehabilitasi Hutan Paket I (Satu) UPTD. KPH Balangan Seluas 644 Ha
8 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,526,574,000
YA
Rehabilitasi Hutan Paket II (Dua) UPTD. KPH Balangan Seluas 606 Ha
9 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,227,197,400
Rehabilitasi Hutan Paket V (Lima) UPTD. KPH Hulu Sungai Selatan Seluas YA
409 Ha
10 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,203,184,000
Rehabilitasi Hutan Paket IV (Empat) UPTD. KPH Hulu Sungai Seluas 423 YA
Ha
11 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,347,525,000
Rehabilitasi Hutan Paket III (Tiga) UPTD. KPH Hulu Sungai Seluas 425 YA
Ha
12 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 2,036,728,000
Rehabilitasi Hutan Paket VI (Enam) UPTD. KPH Hulu Sungai Seluas 719 YA
Ha
13 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,362,029,600
Rehabilitasi Hutan Paket VII (Tujuh) UPTD. KPH Kayu Tangi Seluas 490 YA
Ha
14 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,092,878,000
Rehabilitasi Hutan Paket VIII (Delapan) UPTD. KPH Kayu Tangi Seluas YA
357 Ha
15 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 738,135,000
Rehabilitasi Hutan Paket IX (Sembilan) UPTD. KPH Kayu Tangi Seluas YA
250 Ha
16 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,763,075,000
Rehabilitasi Hutan Paket X (Sepuluh) UPTD. KPH Kayu Tangi Seluas 600 YA
Ha
17 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1) Pekerjaan 1,798,962,000
Rehabilitasi Hutan Paket XII (Dua Belas) UPTD. KPH Kayu Tangi Seluas YA
606 Ha
18 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (Pemeliharaan P.1) 1,376,271,500
Pekerjaan Rehabilitasi Hutan Paket XI (Sebelas) UPTD. KPH Kayu Tangi YA
Seluas 413 Ha
19 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (Pemeliharaan P.1) 2,567,914,000
YA
Pekerjaan Rehabilitasi Hutan Paket XVII (Tujuh Belas) UPTD. KPH Pulau
20 Laut Sebuku seluas 895 Ha 1,393,711,000
Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan Tanaman Tahun Pertama YA
P1 Rehabilitasi Hutan pada UPTD KPH Kayu Tangi Seluas 3.131 Paket III
21 Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan Tanaman Tahun Pertama 974,726,500
YA
P1 Rehabilitasi Hutan pada UPTD KPH Tanah Laut Seluas 2.199 Paket I
22 Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan Tanaman Tahun Pertama 1,461,240,000
P1 Rehabilitasi Hutan pada UPTD KPH Hulu Sungai seluas 2.075 Paket II (adendum YA
nilai kontrak)
23 Pengawasan dan evaluasi pemeliharaan tanaman RHL (P1) pada UPTD. KPH Pulau 786,162,500 YA
Laut Sebuku seluas 895 Ha
24 RHL Vegetatif pada UPTD. KPH Hulu Sungai seluas 601 Ha (Paket I) 1,274,561,550 YA
25 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 614 Ha (Paket II) 1,297,422,000 YA
26 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 476 Ha (Paket III) 1,044,799,000 YA
27 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 469 Ha (Paket IV) [Ten 990,805,000 YA
28 RHL Vegetatif pada UPTD. KPH Pulau Laut Sebuku seluas 340 Ha (Paket V 1,028,476,000 YA
29 Pengawasan dan Penilaian Penanaman Tahun Berjalan (P0) RHL 757,330,000
YA
Vegetatif UPTD. KPH Kayu Tangi Seluas 1.559 Ha [Paket I ]
30 Pengawasan dan Penilaian Penanaman Tahun Berjalan (P0) RHL 457,000,000
Vegetatif UPTD. KPH Hulu Sungai dan Pulau Laut Sebuku Seluas 941 Ha YA
[Paket II ]
31 Pengadaan Bibit sebanyak 46.000 batang dalam rangka penghijauan 920,000,000
YA
lingkungan

XXI BPDASHL Kahayan


1 Penanaman Rehabilitasi Hutan dan Lahan Seluas 220 hektar Di 1,452,880,500
kawasan KPHL Kapuas Kahayan Desa Tumbang MangkutubTahun Ya
2020-2022
2 Penanaman Rehabilitasi Hutan dan Lahan Seluas 200 hektar Di 2,007,326,000
kawasan KPHP Kahayan Hilir Desa Garung Tahun 2020-2022 Ya

3 Penanaman Rehabilitasi Hutan dan Lahan Seluas 150 hektar Di 1,943,320,000


kawasan Taman Nasional Sebangau Desa Paduran Sebangau Tahun Ya
2020-2022
4 Penanaman Rehabilitasi Hutan Seluas 50 Hektar di KHDTK Kebun Raya 1,424,337,000
Sampit Tahun 2020 - 2022 Ya

5 Penanaman Rehabilitasi Hutan dan Lahan Seluas 150 hektar Di 539,819,000


kawasan Balai KSDA Kalimantan Tengah Desa Petuk Liti Tahun 2020 - Ya
2022 
6 Penanaman Rehabilitasi Hutan dan Lahan Seluas 150 Hektar di Areal 1,452,880,500
Balai Taman Nasional Tanjung Puting di Desa Teluk Pulai Tahun 2020 – Ya
2022
7 Penanaman Rehabilitasi Hutan dan Lahan Seluas 80 hektar Di kawasan 1,422,752,400
KPHP Kahayan Tengah Desa Bukit Rawi Tahun 2020-2022 Ya

8 Pengawasan dan Penilaian Kegiatan RHL Tahun 2020 Seluas 1.000 Ha  525,000,000 Ya

XXII BPDASHL Unda Anyar


1 Pengadaan jasa konsultasn perencanaan gedung Pengadaan 141,051,000
(pembuiatan tanaman RHL) Ya

2 Paket 1 (KPH Bali Utara/Kab. Buleleng / Kec. Seririt/ RPH Seririt / Ds. 763,520,000
Ya
Pangkungparuk /Dsn Yeh Selem/ Mdk Lima - Mdk Asem, 100 Ha)
3 Paket 2 (KPH Bali Timur/ Kab. Bangli / Kec. Kintamani / RPH Penelokan/ 1,199,630,000
Desa Songan B / Dsn. Bukitsari/ Mdk Bukit Sari-Mdk Tung-Tung, 100 Ya
Ha)
4 Paket 3 (KPH Bali Timur/ Kab. Karangasem / Kec. Abang / RPH Abang / 1,027,190,000
Ya
Desa Datah / Dsn Kedampal / Mdk Kedampal, 100 Ha)
5 Paket 4 (KPH Bali Timur/ Kab. Karangasem / Kec. Kubu / RPH Kubu / 770,740,000
Ya
Desa Ban / Dsn Jatituhu / Mdk. Penguleman, 100 Ha
6 Paket 5 (KPH Bali Timur/ Kab. Karangasem / Kec. Rendang / RPH 783,455,000
Rendang / Desa Pempatan / Dsn Puragae / Mdk. Asah, 100 Ha Ya

7 Paket 6 (KPH Bali Timur/ Kab. Bangli / Kec. Kintamani / RPH Kintamani 1,922,890,000
Timur
a. Ds. Pinggan / Pinggan / Mdk . Selumin, 100 Ha Ya
b. Ds. Subaya / Subaya/ Mdk. Subaya, 150 Ha

8 Pengadaan jasa konsultas Wasnil RHL 384,562,200 Ya


9 Pengadaan bibit produktif tahap 1 541,500,000 Ya
10 Pengadaan bibit produktif tahap 2 Paket 1 400,000,000 Ya
11 Pengadaan bibit produktif tahap 2 Paket 2 400,000,000 Ya

XXIII BPDASHL Dodokan Moyosari


1 Pembuatan tanaman RHL intensif wilayah TN Tambora seluas 407 Ha 1,405,272,000
YA
(Paket III)
2 Pembuatan tanaman RHL Agroforestry wilayah BKPH Tambora seluas 200,920,170
YA
102 Ha (Paket VII)
3 Pembuatan tanaman RHL intensif wilayah BKPH Maria Donggomassa 1,052,391,450
YA
seluas 300 Ha (Paket I)
4 Pembuatan tanaman RHL Agroforestry wilayah BKPH Tambora seluas 985,898,100
YA
411 Ha (Paket VIII)
5 Pembuatan tanaman RHL Intensif wilayah Taman Nasional Tambora 1,083,068,250
YA
seluas 293 Ha (Paket IV)
6 Pembuatan tanaman RHL Agroforestry wilayah BKPH Ampang Riwo 905,550,800
YA
Soromandi seluas 398 Ha (Paket V)
7 Pembuatan tanaman RHL Agroforestry wilayah BKPH Ampang Riwo 792,214,500
YA
Soromandi seluas 351 Ha (Paket VI)
8 Pembuatan tanaman RHL Intensif wilayah BKPH Ampang Riwo 745,448,000
YA
Soromandi seluas 200 Ha (Paket II)
9 Pembuatan tanaman RHL Agroforestry wilayah BKPH Rinjani Barat 1,361,888,000
YA
Pelangan Tastura seluas 608 Ha
10 Pengawasan dan penilaian pekerjaan pemeliharaan pembuatan tanaman 498,672,500
RHL tahun I (P-1) di Wilayah BKPH Ampang Riwo seluas 949 ha (paket YA
IV)
11 284,667,500
Pengawasan dan penilaian pekerjaan pemeliharaan pembuatan tanaman YA
RHL tahun I (P-1) di wilayah BKPH Tambora seluas 543 ha (paket III)
12 Pengawasan dan penilaian pekerjaan pemeliharaan pembuatan tanaman 525,097,500
RHL (P-1) di Wilayah Balai TN Tambora dan BKPH Maria Donggomassa YA
seluas 1000 ha (paket II)
13 Pengawasan dan penilaian pekerjaan pemeliharaan pembuatan tanaman 318,582,000
RHL tahun I (P-1) di wiayah BKPH Pelangan Tastura seluas 608 Ha YA
(Paket I)
14 Pembuatan tanaman RHL Agroforestry wilayah BKPH Pelangan Tastura 288,090,000
YA
seluas 180 ha (paket II)
15 Pembuatan tanaman RHL Agroforestry wilayah BKPH Ampang Plampang 264,000,000
YA
seluas 200 ha (paket VI)
16 Pembuatan tanaman RHL Agroforestry wilayah BKPH Maria Donggomasa 293,210,500
YA
seluas 178 ha (paket IX)
17 Pembuatan tanaman RHL Agroforestry wilayah BKPH Ampang Riwo 601,717,875
YA
seluas 447 ha (paket VIII)
18 Pembangunan Persemaian Permanen Modern Tahap 1 4,529,047,000 YA
19 Paket Pengawasan Pembangunan Persemaian Modern Tahap 1 280,953,000 YA

XXIV BPDASHL Benain Noelmina


1 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 2,156,520,775
Hutan Produksi Seluas 150 Ha di Desa Loli Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 1 (Lokasi Desa Loli Kecamatan Polen
Kabupaten Timor Tengah Selatan)
2 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 2,156,530,000
Hutan Produksi Seluas 150 Ha di Desa Konbaki Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 2 (Lokasi Desa Konbaki Kecamatan
Polen Kabupaten Timor Tengah Selatan)
3 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,470,855,000
Hutan Lindung Seluas 50 Ha di Desa Lelobatan Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 3 (Lokasi Desa Lelobatan Kecamatan
Mollo Utara Kabupaten Timor Tengah Selatan)
4 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 737,000,000
Hutan Lindung Seluas 100 Ha di Desa Bikekneno Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak
(Tahun 2020 – 2022) Paket 4 (Lokasi Desa Bikekneno Kecamatan Ya
Mollo Selatan Kabupaten Timor Tengah Selatan)

5 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,441,000,000
Hutan Lindung Seluas 100 Ha di Desa Golo Lijun Pada UPT KPH Wilayah
Kabupaten Manggarai Timur Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 5 (Lokasi Desa Golo Lijun Kecamatan
Elar Kabupaten Manggarai Timur)
6 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,469,000,000
Hutan Lindung Seluas 100 Ha di Desa Dirun Pada UPT KPH Wilayah
Kabupaten Belu Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – Ya
2022) Paket 25 (Lokasi Desa Dirun Kecamatan Lamaknen
Kabupaten Belu)
7 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,497,000,000
Hutan Lindung Seluas 100 Ha di Desa Fatuketi Pada UPT KPH Wilayah
Kabupaten Belu Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – Ya
2022) Paket 26 (Lokasi Desa Fatuketi Kecamatan Kakukluk Mesak
Kabupaten Belu)
8 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,501,000,000
Hutan Lindung Seluas 100 Ha di Desa Tamma Pada UPT KPH Wilayah
Kabupaten Sumba Timur Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 15 (Desa Tamma Kecamatan Pahunga Lodu
Kabupaten Sumba Timur)
9 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 758,000,000
Hutan Lindung Seluas 50 Ha di Desa Persiapan Laimandar Pada UPT KPH
Wilayah Kabupaten Sumba Timur Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 16 (Desa Persiapan Laimandar
Kecamatan Umalulu Kabupaten Sumba Timur)
10 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 2,201,000,000
Hutan Lindung Seluas 150 Ha di Desa Susu Wendewa Pada UPT KPH
Wilayah Kabupaten Sumba Tengah Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 18 (Desa Susu Wendewa Kecamatan
Mamboro Kabupaten Sumba Tengah)
11 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,485,000,000
Hutan Produksi Seluas 100 Ha di Desa Loko Ry Pada UPT KPH Wilayah
Kabupaten Sumba Barat Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 19 (Desa Loko Ry Kecamatan Tana Righu
Kabupaten Sumba Barat)
12 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,441,000,000
Hutan Lindung Seluas 100 Ha di Desa Wanokasa Pada UPT KPH Wilayah
Kabupaten Sumba Barat Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 20 (Desa Wanokasa Kecamatan Tana Righu
Kabupaten Sumba Barat)
13 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,426,000,000
Hutan Lindung Seluas 100 Ha di Desa Reda Pada Pada UPT KPH Wilayah
Kabupaten Sumba Barat Daya Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 21 (Desa Reda Pada Kecamatan
Wewewa Barat Kabupaten Sumba Barat Daya)
14 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,426,000,000
Hutan Produksi Seluas 100 Ha di Desa Wae Makaha Pada UPT KPH
Wilayah Kabupaten Sumba Barat Daya Dengan Skema Kontrak Tahun Ya
Jamak (Tahun 2020 – 2022) Paket 22 (Desa Wae Makaha
Kecamatan Kodi Belagar Kabupaten Sumba Barat Daya)
15 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,500,000,000
Hutan Lindung Seluas 100 Ha di Desa Oemolo Pada UPT KPH Wilayah
Kabupaten Kupang Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – Ya
2022) Paket 23 (Desa Oemolo Kecamatan Amabi Oefeto Timur
Kabupaten Kupang)
16 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 2,211,000,000
Hutan Lindung Seluas 150 Ha di Desa Bondo Sula Pada UPT KPH Wilayah
Kabupaten Sumba Tengah Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 28 (Desa Bondosula Kecamatan Mamboro
Kabupaten Sumba Tengah)
17 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,479,000,000
Hutan Lindung Seluas 100 Ha di Desa Bondo Sula Pada UPT KPH Wilayah
Kabupaten Sumba Tengah Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 29 (Desa Bondosula Kecamatan Mamboro
Kabupaten Sumba Tengah)
18 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,441,000,000
Hutan Lindung Seluas 100 Ha di Desa Merdeka Pada UPT KPH Wilayah
Kabupaten Lembata Dengan Skema Kontrak Tahun Jamak (Tahun 2020 Ya
– 2022) Paket 12 Lokasi Kegiatan Desa Merdeka kec. Lebatukan Kab.
Lembata  
19 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 733,000,000
Hutan Lindung Seluas 50 Ha di Kelurahan Lewoleba Timur Pada UPT KPH
Wilayah Kabupaten Lembata Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2022) Paket 14. Lokasi Kegiatan Kelurahan lewoleba
Timur Kec. Nubatukan Kab. Lembata 
20 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,496,000,000
Hutan Lindung Seluas 50 Ha di Desa Saindule dan kawasan hutan
produksi seluas 50 Ha di desa Suebela Pada UPT KPH Wilayah Ya
Kabupaten Rote Ndao Dengan Skema Kontrak Tahun Jamak (Tahun
2020 – 2022) Paket 30 
21 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,494,000,000
Hutan Lindung Seluas 100 Ha di Desa Sedeoen dan desa Oenitas Pada
UPT KPH Wilayah Kabupaten Rote Ndao Dengan Skema Kontrak Tahun Ya
Jamak (Tahun 2020 – 2022) Paket 31 
22 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 2,250,000,000
Hutan Lindung Seluas 50 Ha di Desa Faifua dan kawasan hutan produksi
seluas 100 Ha desa Fatelilo dan Oematamboli Pada UPT KPH Wilayah Ya
Kabupaten Rote Ndao Dengan Skema Kontrak Tahun Jamak (Tahun
2020 – 2022) Paket 32 
23 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam Kawasan 1,441,000,000
Hutan Lindung Seluas 100 Ha di Desa Kolana Selatan Pada UPT KPH
Wilayah Kabupaten Alor Dengan Skema Kontrak Tahun Jamak (Tahun Ya
2020 – 2022) Paket 10. Lokasi Kegiatan Desa Kolana Selatan Kec. Alor
Timur Kab. Alor  
24 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan Lindung 1,356,000,000
Seluas 100 Ha di Desa Maritaing Pada UPT KPH Wilayah Kabupaten Alor
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 11. Ya
Lokasi Kegiatan Desa Maritaing Kec. Alor Timur Kab. Alor 
25 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan Produksi 1,789,055,675
Terbatas Seluas 150 Ha Di Desa Binaus Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2023) Paket 1 
26 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan Produksi 1,363,234,950
Terbatas Seluas 115 Ha di Desa Noinbila Pada UPT KPH Wilayah
Kabupaten Timor Tengah Selatan Dengan Skema Kontrak Tahun Jamak Ya
(Tahun 2020 – 2023) Paket 2
27 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan Lindung 1,807,618,175
Seluas 150 Ha di Desa Oeuban Pada UPT KPH Wilayah Kabupaten Timor
Tengah Selatan Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – Ya
2023) Paket 3
28 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan Lindung 566,707,900
Seluas 50 Ha di Kelurahan Wangkung Pada UPT KPH Wilayah Kabupaten
Manggarai Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Ya
Paket 4
29 Penanaman Reboisasi Agroforestry dalam kawasan Hutan Lindung seluas
100 Ha Di Desa Napugera Pada UPT KPH Wilayah Kabupaten Sikka
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Paket 5 Ya

1,133,035,750
30 Penanaman Reboisasi Agroforestry dalam kawasan Hutan Lindung seluas
100 Ha Di Desa Bu Watuweti Pada UPT KPH Wilayah Kabupaten Sikka
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Paket 6 Ya

1,133,035,750
31 Penanaman Reboisasi Agroforestry dalam kawasan Hutan Lindung seluas
100 Ha Di Desa Bu Utara Pada UPT KPH Wilayah Kabupaten Sikka
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Paket 7 Ya

1,133,035,750
32 Penanaman Reboisasi Agroforestry dalam kawasan Hutan Lindung seluas 1,132,661,750
100 Ha Di Desa Reda Pada Pada UPT KPH Wilayah Kabupaten Sumba
Barat Daya Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Ya
Paket 8
33 Penanaman Reboisasi Intensif (625 Batang Per Ha) dalam kawasan 1,553,799,500
Hutan Lindung seluas 100 Ha Di Desa Kangeli Pada Balai Taman
Nasional Manupeu Tanah Daru Laiwangi Wanggameti Dengan Skema Ya
Kontrak Tahun Jamak (Tahun 2020 – 2023) Paket 9
34 Penanaman Reboisasi Agroforestry dalam kawasan Hutan Lindung seluas 1,235,026,650
100 Ha Di Desa Nanaet Pada UPT KPH Wilayah Kabupaten Belu Dengan Ya
Skema Kontrak Tahun Jamak (Tahun 2020 – 2023) Paket 10
35 Pembuatan Tanaman Rehabilitasi Hutan Mangrove Seluas 50 Ha Di Desa 984,450,500
Kuli, Oetefu, dan Serubeba Pada UPT KPH Wilayah Kabupaten Rote Ndao Ya
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 - 2022)
36 PENGAWASAN PEMBANGUNAN PERSEMAIAN MODERN LABUAN BAJO 245,000,000
Ya
TAHAP I PROVINSI NUSA TENGGARA TIMUR TAHUN ANGGARAN 2020
37 PEMBANGUNAN PERSEMAIAN MODERN LABUAN BAJO TAHAP I 4,400,000,000
Ya
PROVINSI NUSA TENGGARA TIMUR TAHUN ANGGARAN 2020

XXV BPDASHL Jeneberang Saddang (tidak ada data TW 3)


1 Paket I. Pengawasan dan Penilaian Pemeliharaan Th. I (P1) Tanaman 1,236,939,000 Ya
RHL DAS Rawan Bencana Kabupaten. Bone seluas 4.270 Ha
2 Paket II Pengawasan dan Penilaian Pemeliharaan Th. I (P1) Tanaman 1,016,526,500 Ya
RHL DTA Waduk, DAS Prioritas dan DAS Rawan Bencana Kab. Gowa,
Jeneponto, Takalar, Maros, Barru, dan Selayar Seluas 3.450 Ha

3 Paket III. Pengawasan dan Penilaian Pemeliharaan Th. I (P1) Tanaman 1,243,077,000 Ya
RHL DAS Prioritas Kabupaten Tana Toraja Seluas 4.125 Ha
4 Paket IV. Pengawasan dan Penilaian Pemeliharaan Th. I (P1) Tanaman 912,917,500 Ya
RHL DTA Danau, DAS Prioritas, DAS Rawan Bencana Kab. Soppeng,
Enrekang, Toraja Utara, Palopo, Luwu Timur, dan Luwu Utara seluas
3.105 Ha

5 Paket V. Pengawasan dan Penilaian Pemeliharaan Th. I (P1) Tanaman 1,383,833,000 Ya


RHL DAS Priritas, DTA Danau Kab. Pinrang dan Sidrap Seluas 4.650
Ha
6 Paket 21. Pembuatan Tanaman RHL DAS Prioritas Blok Sima I, Sima II, 1,336,500,000 Ya
Sima III Kabupaten Tana Toraja Seluas 900 Ha (Lanjutan)
7 Paket 24. Pembuatan Tanaman RHL DAS Prioritas Blok Salu Rea 533,610,000 Ya
I/Lembang Barupu Selatan, Salu Rea II/ Lembang Barupu Selatan, Salu
Salu/ Lembang Barupu Selatan, Talende/ Lembang Barupu Selatan
Kabupaten Toraja Utara Seluas 770 Ha (Lanjutan)

8 Paket 1. Pemeliharaan Th I (P1) RHL DAS Rawan Bencana Blok 1,093,730,000 Ya


Bontojai, Lamoncong, Mattirowalie, Patukku Kabupaten Bone Seluas
775 Ha
9 Paket 2. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 2,777,346,000 Ya
Blok Masserengpulu, Mattirobulu, Barakkae I, Barakkae II Kabupaten
Bone seluas 845 Ha
10 Paket 3. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 1,408,323,500 Ya
Blok Baringeng, Tompobulu, Ponre-Ponre Kabupaten Bone Seluas 500
Ha
11 Paket 4. Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok Batu 1,292,290,000 Ya
Putih, Gaya Baru, Sadar, Tapong Kabupaten Bone Seluas 700 Ha
12 Paket 5. Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok 2,044,735,000 Ya
Pallawa I, Pallawa II, Pallawa III Kabupaten Bone seluas 700 Ha
13 Paket 6. Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok 1,255,155,000 Ya
Tondong Kabupaten Bone Seluas 300 Ha
14 Paket 7. Pemeliharaan Th. I Tanaman RHL Daerah Tangkapan Air 812,143,750 Ya
(DTA) Waduk Blok Berutallasa, Baturappe, Laliwa, Kabupaten Gowa
Seluas 250 Ha
15 Paket 8. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 2,084,152,125 Ya
Bissoloro, Rannaloe, Manimbahoi, Buakkang Kabupaten Gowa seluas
650 Ha
16 Paket 9. Pemeliharaan Th. I (P1) Tanaman RHL Daerah Tangkapan Air 292,930,000 Ya
(DTA) Waduk Blok Cikoro Kabupaten Gowa Seluas 100 Ha
17 Paket 10. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 3,188,889,000 Ya
Basseang I, Basseang II, Basseang III Kabupaten Pinrang Seluas 900
Ha
18 Paket 11. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 1,075,248,000 Ya
Basseang IV Kabupaten Pinrang seluas 300 Ha
19 Paket 12. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 3,212,946,000 Ya
Lembang Mesakada I, Lembang Mesakada II, Lembang Mesakada III
Kabupaten Pinrang seluas 900 Ha
20 Paket 13. Pemeliharaan Th. I (P1) RHL DAS Prioritas Blok Lembang 2,855,952,000 Ya
Mesakada IV, Lembang Mesakada V, Lembang Mesakada VI Kabupaten
Pinrang seluas 800 Ha
21 Paket 14. Pemeliharaan Th. I (P1) RHL DAS Prioritas Blok Suppirang I, 3,258,003,155 Ya
Suppirang II, Suppirang III, Suppirang IV Kabupaten Pinrang seluas 900
Ha
22 Paket 15. Pemeliharaan Th. I (P1) Tanaman RHL Daerah Tangkapan Air 1,997,105,000 Ya
(DTA) Danau Blok Kundala/ Teppo, Jennae/ Teppo Kabupaten Sidrap
seluas 550 Ha
23 Paket 16. Pemeliharaan Th. I (P1) Tanaman RHL Daerah Tangkapan Air 1,094,957,500 Ya
(DTA) Danau Blok Buae I, Buae II Kabupaten Sidrap Seluas 300 Ha
24 Paket 17. Pemeliharaan Th. I (P1) RHL DAS Prioritas Blok Butang, 1,476,666,950 Ya
Kondodewata Kabupaten Tana Toraja Seluas 550 Ha
25 Paket 18. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 3,156,340,000 Ya
Sangpeparkan I, Sangpeparkan II, Sangpeparkan III, Tanete Kabupaten
Tana Toraja seluas 900 Ha
26 Paket 19. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 1,771,220,000 Ya
Makkodo I, Makkodo II Kabupaten Tana Toraja Seluas 500 Ha
27 Paket 20. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 1,707,921,600 Ya
Pongbembe, Sambuang Kabupaten Tana Toraja Seluas 475 Ha
28 Paket 21. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 3,266,010,000 Ya
Sima I, Sima II, Sima III Kabupaten Tana Toraja Seluas 900 Ha
29 Paket 22. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 2,836,108,000 Ya
Sima IV, Sima V, Leppan Kabupaten Tana Toraja Seluas 800 Ha
30 Paket 23. Pemeliharaan Th. I (P1) Tanaman RHL Daerah Tangapan Air 1,510,080,000 Ya
(DTA) Danau Pesse I, Pesse II, Pesse III, Pesse IV Kabupaten Soppeng
seluas 800 Ha
31 Paket 24. Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok 1,734,294,100 Ya
Salu Rea I/Lembang Barupu Selatan, Salu Rea II/ Lembang Barupu
Selatan, Salu Salu/ Lembang Barupu Selatan, Talende/ Lembang
Barupu Selatan Kabupaten Toraja Utara Seluas 770 Ha

32 Paket 25. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 223,740,000 Ya
Blok Battang Barat, Latuppa Kota Palopo seluas 100 Ha
33 Paket 26 Pemeliharaan Th. I (P1) RHL DAS Prioritas Blok Tanete, 3,177,680,000 Ya
Sawito, Lembang Rossoan I Kabupaten Enrekang Seluas 1.000 Ha
34 Paket 27 Pemeliharaan Th. I. (P1) Tanaman RHL DAS Rawan Bencana 1,640,529,000 Ya
Blok Mattiro Deceng/Pujananting, Landange/Pujananting, Bonto Payung
I/ Pujananting, Bonto Payung II/ Pujananting Kabupaten Barru Seluas
600 Ha

35 Paket 28. Pemeliharaan Th. I (P1) Tanaman RHL Kawasan Konservasi 282,535,000 Ya
Blok Pappaluang Kabupaten Jeneponto seluas 125 Ha
36 Paket 30. Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok Bolli, 303,703,125 Ya
Patimpa Kabupaten Bone Seluas 100 Ha
37 349,305,000 Ya
Paket 31. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana
Blok Kota Intang/ Lembang Baji, Binanga/ Bakka/ Bontosaile Kabupaten
Selayar Seluas 150 Ha
38 Paket 32 Pemeliharaan Th. I (P1) Tanaman RHL Daerah Tangkapan Air 323,950,000 Ya
(DTA) Danau Blok Matano Kabupaten Luwu Timur seluas 100 Ha
39 Paket 33 Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 617,677,000 Ya
Blok Bonto Manurung, Laiya Kabupaten Maros Seluas 400 Ha Ha
40 Paket 34 Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok 284,006,250 Ya
Pationgi Kabupaten Bone seluas 150 Ha
41 Paket 35 Pemeliharaan Th. I (P1) RHL DAS Rawan Bencana Blok 702,515,000 Ya
Walimpong Kabupaten Bone Seluas 200 Ha
42 Paket 36. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 368,500,000 Ya
Blok Nepo Kabupaten Barru seluas 200 Ha
43 Paket 37 Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 376,717,000 Ya
Blok Tangngasoe/ Jangang-Jangang Kabupaten Barru seluas 150 Ha
44 Paket 38. Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana 572,665,500 Ya
Blok Lempang/ Gattareng Kab. Barru seluas 250 Ha
45 498,150,000 Ya
Pekerjaan Pemeliharaan Th.I (P1) Tanaman RHL DAS Prioritas Blok
Parigi/ Desa Parigi Kecamatan Tinggi Moncong Kabupaten Gowa Seluas
150 Ha
46 242,780,000 Ya
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana
Blok Wanuawaru/ Desa Wanuawaru Kecamatan Mallawa Kabupaten
Maros Seluas 100 Ha
47 252,990,000 Ya
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana
Blok Kanandede II/ Desa Kanandede Kecamatan Rongkong Kabupaten
Luwu Utara Seluas 100 Ha
48 249,083,200 Ya
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS Prioritas Blok
Pao/ Desa Pao Kecamatan Tombolopao Kabupaten Gowa Seluas 75 Ha
49 486,000,000 Ya
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS Rawan Bencana
Blok Beroanging/ Desa Beroanging Kecamatan Bangkala Barat
Kabupaten Jeneponto Seluas 200 Ha
50 1,475,000,000 Ya
Paket 1. Pengadaan Bibit Produktif wilayah layanan Kab/kota Palopo,
Bone, Soppeng, Wajo, Sidrap, Luwu, Luwu Timur, Luwu Utara,, Tana
Toraja, Toraja Utara, Enrekang, Makasa Timur, Mamasa Tengah dan
Pinrang sebanyak 105.500 batang Kontrak
51 1,449,500,000 Ya
Paket 2. Pengadaan Bibit Produktif wilayah layanan Kab/kota Makassar,
Gowa, Takalar, Jeneponto, Bantaeng, Bulukumba, Sinjai, Selayar,
Maros, Pangkep dan Barru sebanyak 105.500 batang Kontrak
52 Paket 1. Penanaman RHL DAS Prioritas Blok Padang Pabbo I Kabupaten 239,184,000 Ya
53 Paket 2. Penanaman RHL DAS Prioritas Blok HKM Padang Pabbo Kabupa 159,456,000 Ya
54 Paket 3. Penanaman RHL DAS Prioritas Blok Padang Pabbo II Kabupaten 239,184,000 Ya
55 Paket 4. Penanaman RHL DAS Prioritas Blok Takapala Kabupaten Barru 554,400,000 Ya
56 Paket 5. Penanaman RHL DAS Prioritas Blok Batu Collong II Kabupaten 203,280,000 Ya
57 Paket 6. Penanaman RHL DAS Prioritas Blok BOMPO I Kabupaten Bone 376,640,000 Ya
58 Paket 7. Penanaman RHL DAS Prioritas Blok Timpa I Kabupaten Bone Se 235,400,000 Ya
59 Paket 8. Penanaman RHL DAS Prioritas Blok Kampung Beru I Kabupaten 376,640,000 Ya
60 Paket 9. Penanaman RHL DAS Prioritas Blok Kampung Beru II Kabupate 376,640,000 Ya
61 Paket 10. Penanaman RHL DAS Prioritas Blok Kampung Beru III Kabupat 94,160,000 Ya
62 Paket 11. Penanaman RHL DAS Prioritas Blok Talimbangan Kabupaten E 323,400,000 Ya
63 Paket 12. Penanaman RHL DAS Prioritas Blok Cemba Kabupaten Enreka 279,840,000 Ya
64 Paket 13. Penanaman RHL DAS Prioritas Blok Deakaju Kabupaten Enrek 184,800,000 Ya
65 Paket 14. Penanaman RHL DAS Prioritas Blok Malenteng Kabupaten Gow 152,275,200 Ya
66 Paket 15. Penanaman RHL DAS Prioritas HKm Rimba Lestari Kabupaten 234,520,000 Ya
67 Paket 16. Penanaman RHL DAS Prioritas Blok Ta'binjai Kabuapten Gowa 271,920,000 Ya
68 Paket 17. Penanaman RHL DAS Prioritas Blok Rappoala Kabupaten Gow 427,820,800 Ya

XXVI BPDASHL Bone Bolango


1 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 321,255,000
Gorontalo I Seluas 1.110 Ha (Repeat Order) Ya

2 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 403,639,500


Gorontalo II Seluas 1.400 Ha (Repeat Order) Ya

3 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 368,857,500


Gorontalo III Seluas 1.310 Ha (Repeat Order) Ya

4 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 421,000,000


Gorontalo IV Seluas 1.450 Ha (Repeat Order) Ya

5 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 300,850,000


Boalemo I Seluas 1.065 Ha (Repeat Order) Ya

6 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 370,122,500


Boalemo II Seluas 1.305 Ha (Repeat Order) Ya

7 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 407,000,000


Bone Bolango Seluas 1.415 Ha (Repeat Order) Ya

8 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 344,025,000


Gorontalo Utara Seluas 1.200 Ha (Repeat Order) Ya

9 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 300,000,000


Pohuwato Seluas 1.060 Ha (Repeat Order) Ya

10 Pengawasan dan Evaluasi Kegiatan Tanaman RHL P1 di Kabupaten 282,480,000


Gorontalo Barat Seluas 985 Ha (Repeat Order) Ya

11 Paket 1 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 978,660,000


Totopo Kec. Bilato Kab. Gorontalo, UPTD KPH Wil. VI Gorontalo seluas Ya
90 Ha.
12 Paket 2 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,869,750,000
Pelehu Kec. Bilato Kab. Gorontalo, UPTD KPH Wil. VI Gorontalo seluas Ya
150 Ha.
13 Paket 3 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,688,680,000
Taulaa Kec. Bilato Kab. Gorontalo, UPTD KPH Wil. VI Gorontalo seluas Ya
140 Ha.
14 Paket 4 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,266,510,000
Mebongo Kec. Sumalata Kab. Gorontalo Utara, UPTD KPH Wil. IV Ya
Gorontalo Utara seluas 105 Ha.
15 Paket 5 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,387,130,000
Mebongo Kec. Sumalata Kab. Gorontalo Utara, UPTD KPH Wil. IV Ya
Gorontalo Utara seluas 115 Ha.
16 Paket 6 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,929,920,000
Puncak Mandiri Kec. Sumalata Kab. Gorontalo Utara, UPTD KPH Wil. IV Ya
Gorontalo Utara seluas 160 Ha.
17 Paket 7 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,387,130,000
Kasia Kec. Sumalata Kab. Gorontalo Utara, UPTD KPH Wil. IV Ya
Gorontalo Utara seluas 115 Ha.
18 Paket 8 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 978,660,000
Bondawuna Kec. Suwawa Selatan Kab. Bone Bolango, UPTD KPH Wil. Ya
VII Bone Bolango seluas 90 Ha.
19 Paket 9 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,447,440,000
Tulabolo Barat Kec. Suwawa Timur Kab. Bone Bolango, UPTD KPH Wil. Ya
VII Bone Bolango seluas 120 Ha.
20 Paket 10 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,387,130,000
Tulabolo Barat Kec. Suwawa Timur Kab. Bone Bolango, UPTD KPH Wil. Ya
VII Bone Bolango seluas 115 Ha.
21 Paket 11 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,507,750,000
Ayuhulalo Kec. Tilamuta Kab. Boalemo, UPTD KPH Wil. V Boalemo Ya
seluas 125 Ha.
22 Paket 12 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,206,200,000
Pangi Kec. Dulupi Kab. Boalemo, UPTD KPH Wil. V Boalemo seluas 100 Ya
Ha.
23 Paket 13 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 2,171,160,000
Tangga Barito Kec. Dulupi Kab. Boalemo, UPTD KPH Wil. V Boalemo Ya
seluas 180 Ha.
24 Paket 14 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,387,130,000
Balayo Kec. Patilanggio Kab. Pohuwato, UPTD KPH Wil. III Pohuwato Ya
seluas 115 Ha.
25 Paket 15 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 978,660,000
Londoun / Kelapa Lima Kec. Popayato Timur Kab. Pohuwato, UPTD Ya
KPH Wil. I/II Gorontalo Barat seluas 90 Ha.
26 Paket 16 Kegiatan Penanaman RHL Agroforestry Tahun 2020 di Desa 1,206,200,000
Tuweya Kec. Wonggarasi Kab. Pohuwato, UPTD KPH Wil. I/II Gorontalo Ya
Barat seluas 100 Ha.
27 Pengadaan Bibit Produktif 2,135,900,000 Ya

XXVII BPDASHL Lariang Mamasa (tidak ada data di TW 3)


1
PENGAWASAN DAN PENILAIAN PEKERJAAN PEMELIHARAAN
TANAMAN REBOISASI POLA INTENSIF (P-1) PADA KEGIATAN
REHABILITASI HUTAN DAN LAHAN TAHUN 2020 SELUAS 2000 779,570,000 Ya
HEKTAR DI KPH BONEHAU KALUMPANG, KPH MAMASA BARAT,
KPH MAPILLI, KPH MALUNDA, DAN KPH KARAMA (Lelang)
2 Perencanaan Renovasi Bangunan Gedung Kantor BPDASHL Lariang 545,200,000 Ya
Mamasa (lelang)

XXVIII BPDASHL Palu Poso


1 Pekerjaan Pembuatan Tanaman RHL DAS Rawan/Pasca Bencana
dalam rangka Pemeliharaan Tahun II KPH Dampelas Tinombo Seluas 328,020,000 Ya
200 Ha
2 Pekerjaan Pembuatan Tanaman RHL DAS Rawan/Pasca Bencana
dalam rangka Pemeliharaan Tanaman Tahun II KPH Banawa Lalundu 328,020,000 Ya
Seluas 200 Ha
3 Pekerjaan Pembuatan Tanaman RHL secara Vegetatif KPH Sivia Patuju
Seluas 200 Ha di Desa Malino Jaya Kecamatan Soyo Jaya Kabupaten 851,950,000 Ya
Morowali Utara Provinsi Sulawesi Tengah
4 Pengawasan dan Penilaian Kegiatan Pemeliharaan Tahun I RHL Secara
Vegetatif, Pemeliharaan Tahun II RHL Rawan/Pasca Bencana Pada Ya
BPDASHL Palu Poso di Provinsi Sulawesi Tengah 446,875,000
5 Pembuatan Tanaman RHL DAS Pola Agroforestry KPH Dampelas
Tinombo Seluas 300 Ha Di Desa Ogoalas Kecamatan Tinombo Kabupaten Ya
Parigi Moutong Propinsi Sulawesi tengah 548,220,000
6 Pengadaan Pupuk Kegiatan Pembuatan Tanaman RHL FP III di Desa
Ya
Bangga dan Baluase Kec. Dolo Selatan Kab. Sigi Tahun 2020 397,000,000
7 Pengadaan Pupuk Kegiatan Pemeliharaan Tahun I RHL FP III di Desa
Ya
Bulubete Kec. Dolo Selatan Kab. Sigi 304,128,000
8 Pengadaan Bibit Kegiatan Pembuatan Tanaman RHL FP III di Desa
Ya
Bangga Kec. Dolo Selatan Kab. Sigi Tahun 2020 1,044,990,000
9 Pengadaan Bibit Kegiatan Pembuatan Tanaman RHL FP III di desa
Ya
Alitupu Kec. Lore Utara Kab. Poso Tahun 2020 349,490,000
10 Pengadaan Bibit Kegiatan Pembuatan Tanaman RHL FP III di desa
Ya
Baluase Kec. Dolo Selatan Kab. Sigi Tahun 2020 789,350,000
11 Pembuatan Tanaman RHL Pasca/Rawan Bencana Pola Agroforestry KPH
Kulawi Seluas 300 Ha di desa Wisolo Kecamatan Dolo Selatan Kabupaten Ya
Sigi Propinsi Sulawesi Tengah 548,220,000

XXIX BPDASHL Sampara


1 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH
Mekongga Utara Ya
1,080,427,000.00
2 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH
Ueesi Ya
1,574,426,000.00
3 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH 1,781,013,000
Lasalimu Ya

4 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Gantara 2,317,457,000 Ya
5 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Laiwoi Barat 1 3,408,571,200
Ya

6 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Laiwoi Barat 2 3,758,737,000
Ya

7 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Pulau Muna 5,747,753,000
Ya

8 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Wawonii 3,805,190,600 Ya
9 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Lakompa 5,632,441,600 Ya
10 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif KPH Katondoki 3,195,331,800 Ya
11 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH 3,216,907,000
Patampanua Utara Ya

12 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH 5,802,119,000
Patampanua Selatan Ya

13 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH 3,345,571,000
Laiwoi Ya

14 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif Paket KPH 5,538,363,900
Wakatobi Ya

15 Pengawasan dan Penilaian RHL Paket 2 KPH Lakompa Lasalimu 101,915,000 Ya


16 Pengawasan dan Penilaian RHL Paket 3 KPH Muna, Katondoki, Gantara 161,480,000
Ya

17 Pengawasan dan Penilaian RHL Paket 4 KPH Patampanua Selatan, 149,160,000


Patampanua Utara, Mekongga Utara Ya

18 Pengawasan dan Penilaian RHL Paket 6 KPH Laiwoi Barat 127,050,000 Ya


19 Pengawasan dan Penilaian Kegiatan Pemeliharaan 196,460,000
Tahun II (P2) Penanaman RHL secara Vegetatif Tahun 2018 seluas
300 Ha dan Pekerjaan Rehabilitasi Hutan Mangrove seluas 475 Ha Ya

20 Penanaman Rehabilitasi Hutan Mangrove Tahun 2020 809,500,000 Ya


XXX BPDASHL Waehapu Batu Merah

XXXI BPDASHL Ake Malamo


1 482,493,000
PEKERJAAN PEMELIHARAAN TAHUN KEDUA REBOISASI INTENSIF
PULAU MARE KPHL TERNATE TIDORE DENGAN SKEMA TAHUN YA
JAMAK TAHUN 2018-2020
2 1,000,908,302
PEMELIHARAAN TAHUN PERTAMA PEKERJAAN REBOISASI HUTAN
LINDUNG DI KPHL KABUPATEN HALMAHERA BARAT SELUAS 300 YA
HEKTAR
3 PEMELIHARAAN TAHUN PERTAMA KEGIATAN REBOISASI HUTAN 657,382,000
YA
LINDUNG DI KPHL PULAU MOROTAI SELUAS 200 HEKTAR
4 1,744,400,000
PENANAMAN RHL POLA AGROFORESTRY DI HUTAN LINDUNG
KPHL HALMAHERA TENGAH BLOK PULAU YOI SELUAS 700 YA
HEKTAR
5 2,547,600,000
PENANAMAN REHABILITASI HUTAN DAN LAHAN DI KPHL
HALMAHERA UTARA BLOK PULAU DAGASULI SELUAS 300 HA YA
(2020-2022)
6 PENANAMAN REHABILITASI HUTAN DAN LAHAN DI KPHL PULAU 2,123,000,000
YA
MOROTAI BLOK SOPI MAJIKO SELUAS 250 HA (2020-2022)
7 PENYEDIAAN BIBIT TANAMAN PRODUKTIF TAHUN 2020 475,200,000 YA
8 PENGAWASAN DAN PENILAIAN PEMELIHARAAN TAHUN KEDUA 143,250,000
YA
(P2) RHL TAHUN 2020 SELUAS 265 HA
9 PENGAWASAN DAN PENILAIAN PEMELIHARAAN TAHUN PERTAMA 270,250,000
YA
(P1) RHL TAHUN 2020 SELUAS 500 HA
10 Rehabilitasi Hutan Mangrove di KPH Halmahera Selatan Blok Belang- 614,900,000
YA
Belang seluas 25 Hektar
11 Jasa Konsultansi Pekerjaan Pengawasan dan Penilaian Pembuatan 305,525,000
YA
Rehabilitasi Hutan dan Lahan (P0) Pola Agroforestry seluas 550 Ha 

XXXII BPDASHL Remu Ransiki

XXXIII BPDASHL Memberamo


1 Pemeliharaan Tahun Pertama (P1) Kabupaten Pegunungan Bintang YA
Seluas 300 Ha 1,130,400,000
2 Pemeliharaan Tahun Pertama (P1) Kabupaten Lanny Jaya Seluas 300 YA
Ha 1,130,400,000
3 Pemeliharaan Tahun Pertama (P1) Kabupaten Nabire Seluas 100 Ha 381,200,000 YA
4 Pemeliharaan Tahun Pertama (P1) Kabupaten Jayawijaya Seluas 75 Ha
YA
302,400,000
5 Pemeliharaan Tahun Pertama (P1) Kabupaten Jayapura Seluas 150 Ha
YA
433,200,000
6 Pengawasan dan Penilaian Tanaman RHL Cyclops (1.500 Ha) 650,000,000 YA
7 Pengawasan dan penilaian tanaman RHL P1 700,000,000 YA
8 Pengawasan dan Penilaian Tanaman RHL P2 350,000,000 YA
9 P0 Mangrove di Kabupaten Merauke seluas 25 Ha 431,325,000 YA
10 Produksi Bibit Produktif (Kabupaten Nabire) 650,000,000 YA
11 Produksi Bibit Produktif (Kabupaten Jayapura) 500,000,000 YA
12 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020 Paket I Moi,
Reboisasi Insentif Pola Khusus Cagar Alam Pegunungan Cycloop.
Resort Moi, Blok I Moi dan Blok II Moi, Kampung/Kelurahan Sabron dan
3,570,180,625 YA
Doyobaru, Distrik Sentani Barat, Waibu, Kabupaten Jayapura, Papua
(283 ha)

13 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020


Penanaman P0 Vegetatif Cyclop Paket II Sentani I, Reboisasi Insentif
Pola Khusus Cagar Alam Pegunungan Cycloop. Resort Sentani, Blok I
5,778,806,000 YA
Sentani dan Blok II Sentani, Kampung/Kelurahan Sereh, Distrik Sentani,
Kabupaten Jayapura, Papua (330 ha)

14 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020


Penanaman P0 Vegetatif Cyclop Paket III Sentani II, Reboisasi Insentif
Pola Khusus Cagar Alam Pegunungan Cycloop. Resort Sentani, Blok III
4,682,172,000 YA
Sentani, Kampung/Kelurahan Kampung Harapan, Distrik Sentani Timur,
Kabupaten Jayapura, Papua (212 ha)

15 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020


Penanaman P0 Vegetatif Cyclop Paket IV Sentani III, Reboisasi Insentif
Pola Khusus Cagar Alam Pegunungan Cycloop. Resort Sentani, Blok IV
Sentani, Kampung/Kelurahan Kampung Harapan dan Waena, Distrik 5,665,709,500 YA
Sentani Timur dan Waena, Kabupaten Jayapura dan Kota Jayapura,
Papua (266 ha)

16 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020


Penanaman P0 Vegetatif Cyclop Paket V Port Numbay 1, Reboisasi
Insentif Pola Khusus Cagar Alam Pegunungan Cycloop. Resort Port
Numbay, Blok I Port Numbay, Kampung/Kelurahan Waena dan Ardipura, 5,015,257,500 YA
Distrik Heram dan Jayapura Utara, Kota Jayapura, Papua (303 ha)

17 Penyediaan Kompos Blok dan Penanaman (P0) Tahun 2020


Penanaman P0 Vegetatif Cyclop Paket VI Port Numbay II, Reboisasi
Insentif Pola Khusus Cagar Alam Pegunungan Cycloop. Resort Port
Numbay, Blok II Port Numbay, Kampung/Kelurahan Gurabesi, 1,960,101,000 YA
Bayangkara dan Angkasapura, Distrik Jayapura Utara, Kota Jayapura,
Papua (106 ha)

XXXIV BPDASHL Tondano


1 Pembuatan tanaman RHL secara vegetatif Kabupaten Bolaang Mongondow Ya
Utara 637,824,000
2 Pembuatan Tanaman RHL Secara Vegetatif di Kabupaten Minahasa Tenggara 272,393,000 Ya
3 Pembuatan tanaman RHL secara vegetatif di Kabupaten Kepulauan Talaud. 313,412,000 Ya
4 Pengawas dan penilaian pemeliharaan Tahun pertama (P1) RHL seluas 400 ha. 174,047,500 Ya
5 Pembuatan tanaman RHL pada DAS Rawan / pasca bencana di Kabupaten Ya
Bolaang Mongondow Utara 425,700,000
6 Pekerjaan pengadaan bibit produktif wilayah daratan Propinsi Sulawesi Utara 405,562,500 Ya
7 Pekerjaan pengadaan bibit produktif wilayah kepulauan Propinsi Sulawesi Utara 414,962,500 Ya

XXXV BPDASHL Way Seputih Sekampung


1 1,634,322,800 Ya
Paket 1 Pengawasan dan Penilaian Pelaksanaan Kegiatan
Pemeliharaan Tanaman RHL Vegetatif Tahun I (P1) di KPHL Kotaagung
Utara dan KPHL Liwa seluas 3.597 Ha
2 Paket 2 Pengawasan dan Penilaian Pelaksanaan Kegiatan 1,596,563,100 Ya
Pemeliharaan Tanaman RHL Vegetatif Tahun I (P1) di KPHL Batu Tegi
seluas 3.460 Ha
3 Paket 3 Pengawasan dan Penilaian Pelaksanaan Kegiatan 1,596,563,100 Ya
Pemeliharaan Tanaman RHL Vegetatif Tahun I (P1) di KPHL Pesawaran
seluas 3.419 Ha
4 Paket 4 Pengawasan dan Penilaian Pelaksanaan Kegiatan 1,682,978,000 Ya
Pemeliharaan Tanaman RHL Vegetatif Tahun I (P1) di KPHL Pematang
Neba seluas 3.693 Ha
5 Paket I Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 2,025,475,683
Blok III, IV, V Maja seluas 919 Ha (P1) 2020 Ya

6 Paket II Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 480,691,907


Blok VI Bayas Jaya seluas 219 Ha (P1) 2020 Ya

7 Paket III Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 376,280,716
Blok VII Bayas Jaya seluas 183 Ha (P1) 2020 Ya

8 Paket IV Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 380,982,972


Blok VIII Harapan Jaya seluas 184 Ha (P1) 2020 Ya

9 Paket V Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 466,710,965


Blok IX Babakan Loa seluas 214 Ha (P1) 2020 Ya

10 Paket VI Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 522,190,680


Blok XI Babakan Loa seluas 240 Ha (P1) 2020 Ya

11 Paket VII Pembuatan Tanaman RHL Secara Vegetatif di KPH 349,968,729


Pesawaran Blok XII Bangun Rejo Seluas 168 Ha (P1) 2020 Ya

12 Paket VIII Pembuatan Tanaman RHL Secara Vegetatif di KPH 476,635,984


Pesawaran Blok XIII Bangun Rejo seluas 216 Ha (P1) 2020 Ya

13 Paket IX Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 382,210,290


Blok XIV Bangun Rejo seluas 186 Ha (P1) 2020 Ya

14 Paket X Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 478,385,967


Blok XV Suka Maju seluas 219 Ha (P1) 2020 Ya

15 Paket XI Pembuatan Tanaman RHL Secara Vegetatif di KPH Pesawaran 453,789,754


Blok XVI Suka Maju seluas 204 Ha (P1) 2020 Ya

16 Paket XII Pembuatan Tanaman RHL Secara Vegetatif di KPH 456,649,303


Pesawaran Blok XVII Suka Maju seluas 207 Ha (P1) 2020 Ya

17 Paket 13 Pembuatan Tanaman RHL Secara Vegetatif di KPH XI 560,779,120


Pesawaran Blok X seluas 260 Ha (P1) 2020 Ya
18 Pembuatan Tanaman RHL Secara Vegetatif di KPH Kotaagung Utara 2,025,148,609
Blok III, IV, V Gunung Doh seluas 901 Ha (P1) Ya

19 Pembuatan Tanaman RHL Secara Vegetatif di KPH Kotaagung Utara 1,335,378,748


Blok VII dan Blok VIII Gunung Doh seluas 600 Ha (P1) Ya

20 Pembuatan Tanaman RHL Secara Vegetatif di KPH Kotaagung Utara 1,340,614,880


Blok IX dan Blok X Gunung Doh seluas 600 Ha (P1) Ya

21 Paket 4 Pembuatan Tanaman RHL Secara Vegetatif di KPH IX 672,324,640


Kotaagung Utara Blok VI seluas 300 Ha (P1) Ya

22 Paket I Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 1,969,637,098


Neba Blok II, III, IV Antar Brak seluas 893 Ha (P1) 2020 Ya

23 Paket II Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 1,746,565,040 Ya


Neba Blok V, VI, VII Rantau Tijang seluas 800 Ha (P1) 2020
24 Paket III Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 527,606,637
Neba Blok VIII Putih Doh seluas 243 Ha (P1) 2020 Ya

25 Paket IV Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 515,036,236


Neba Blok IX Putih Doh Seluas 235 Ha (P1) 2020 Ya

26 Paket V Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 483,933,833


Neba Blok X Putih Doh seluas 225 Ha (P1) 2020 Ya

27 Paket VI Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 481,776,272


Neba Blok XI Putih Doh seluas 217 Ha (P1) 2020 Ya

28 Paket VII Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 438,908,800
Neba Blok XII Putih Doh seluas 200 Ha (P1) 2020 Ya

29 Paket VIII Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 484,060,100
Neba Blok XIII Putih Doh seluas 227 Ha (P1) 2020 Ya

30 Paket IX Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 475,877,996


Neba Blok XIV Putih Doh seluas 221 Ha (P1) 2020 Ya

31 Paket X Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 471,286,464


Neba Blok XV Pampangan seluas 219 Ha (P1) 2020 Ya

32 Paket XI Pembuatan Tanaman RHL Secara Vegetatif di KPH Pematang 462,692,314


Neba Blok XVI Pampangan seluas 213 Ha (P1) 2020 Ya

33 Paket I Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu tegi 505,795,103
Blok 1 Sinar Galih seluas 240 Ha (P1) 2020 Ya

34 Paket II Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu 662,663,696
tegi Blok 2 Sinar Galih seluas 305 Ha (P1) 2020 Ya

35 Paket III Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu 450,541,942
Tegi Blok 4 Sinar Galih seluas 205 Ha (P1) 2020 Ya

36 Paket IV Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu 1,250,808,785
Tegi Blok 6 dan Blok 7 Penantian seluas 580 Ha (P1) 2020 Ya

37 Paket V Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu 490,665,380
Tegi Blok 8 Sinar Galih seluas 230 Ha (P1) 2020 Ya

38 Paket VI Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 363,879,333
Blok X Penantian seluas 180 Ha (P1) 2020 Ya
39 Paket VII Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 442,113,936
Blok XI Penantian seluas 200 Ha (P1) 2020 Ya

40 Paket VIII Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 462,334,769
Ya
Blok XII Penantian seluas 210 Ha (P1) 2020
41 Paket IX Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 517,705,855
Blok XIII Penantian seluas 245 Ha (P1) 2020 Ya
42 Paket X Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 390,505,852
Blok XIV Datar Lebuay seluas 195 Ha (P1) 2020 Ya

43 Paket XI Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 375,856,215
Blok XV Sidomulyo seluas 186 Ha (P1) 2020 Ya

44 Paket XII Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 390,065,743
Blok XVI Sidomulyo seluas 192 Ha (P1) 2020 Ya

45 Paket XIII Pembuatan Tanaman RHL Secara Vegetatif di KPH Batu Tegi 461,001,635
Blok XVII Sidomulyo seluas 217 Ha (P1) 2020 Ya
46 Paket XIV Pembuatan Tanaman RHL Secara Vegetatif di KPH Liwa Blok 1,936,568,035
II, III, IV Sidodadi seluas 887 Ha (P1) 2020 Ya

47 Paket 15 Pembuatan Tanaman RHL Secara Vegetatif di KPH VIII Batu 621,337,226
Tegi Blok IX seluas 275 Ha (P1) 2020 Ya

48 Paket 16 Pembuatan Tanaman RHL Secara Vegetatif di KPH II Liwa 686,350,040


Blok V seluas 309 Ha (P1) 2020 Ya

49 Tender Pengadaan Bibit Produktif untuk KPH 540,000,000 Ya

XXXVI BPTH Wilayah I


Tidak ada Lelang di Triwulan ke-3

XXXVII BPTH Wilayah II


Tidak ada Lelang di Triwulan ke-3
Total 783,414,015,312
REKAPITULASI STATUS PBJ
Status Jumlah Nilai Pagu
1 Belum/masih proses lelang 92 104,017,125,050.00
2 Belum Ttd kontrak 16 56,977,555,100.00
3 TTD-Belum ada Progres Fisik 39 34,877,009,900.00
4 TTD-Sudah ada Progres Fisik 520 587,542,325,261.70
Total 667 783,414,015,311.70 61.00

Ket: Isian otomatis

559
Cara Pengisian:

1 Isi nama paket pada kolom (2)


2 Isi nilai pagu paket pada kolom (3)
3 Isi "YA" pada kolom (4) atau (5) atau (6) atau (7)

575

13

12
10

13

4
38
56

35

8
16

25

10
57
24
31

11

19
37

belum ada nilai pagu, yang ditulis merupakan nilai kontrak

rincian berbeda dengan progress fisik


68
27

11

20
11

prosentase progress fisik belum ditulis

17

7
49

667
INSPEKTORAT JENDERAL
KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN

No. Kontrak
Uraian Paket Pekerjaan Nilai Kontrak
Nomor Tanggal
(Rp)
I Satker Pusat
1 CONSULTING SERVICE FOR THE FOREST SPK.25/KTA-3/2015 '01-JAN-20 12,913,020,000
PROGRAMME II (REDD+) BIODIVERSITY
CONSERVATION AND INTEGRATED WATERSHED
DEVELOPMENT WITHIN THE INDONESIA-GERMAN
REDD+ PROGRAMME

2 Pengadaan akomodasi dan konsumsi (fullboard dan SPK. 12/PE-2/2020 13-JAN-20 315,000,000
halfday meeting) rapat koordinasi perencanaan bidang
PDASHL tahun 2020
3 PENGADAAN AKOMODASI DAN KONSUMSI (PAKET SPK.5/SET/PPK/KU/1/2020 20-JAN-20 283,600,000
MEETING FULLBOARD DAN FULLDAY) DALAM
RANGKA KEGIATAN KONSOLIDASI LAPORAN
KEUANGAN TAHUN 2019 TANGGAL 20 S.D 22
JANUARI 2020

4 Pengadaan konsumsi dan akomodasi paket rapat FB SPK. 07/KOTL-2/2/2020 20-FEB-20 244,375,000
dan FD dalam rangka Binmbingan Teknis Jabatan
Fungsional Lingkup Ditjen PDASHL tangggal 20 s/d 22
Februari 2020

5 Penyusunan Detail Engineering Design (DED) 25/PTH/SPK/P2TH-1/3/2020 '06-MAR-20 1,905,090,000


Persemaian Modern IKN, Provinsi Kalimantan Timur
yang berlokasi di Mentawir Kabupaten Penajam Paser
Utara, Provinsi Kalimantan Timur

6 Paket pekerjaan pengadaan jasa konsultansi 39/PTH/SPK/P2TH-1/3/2020 23-MAR-20 668,250,000


penyusunan Detail Engineering Design (DED)
Pembangunan Persemaian Modern Mandalika, Provinsi
NTB

7 Paket pengadaan Jasa Konsultansi Penyusunan Detail 37/PTH/SPK/P2TH-1/3/2020 23-MAR-20 723,360,000


Engineering Design Pembangunan Persemaian Modern
Likupang, Provinsi Sulawesi Utara
8 Paket pekerjaan pengadaan jasa kosultansi penyusunan 41/PTH/SPK/P2TH-1/3/2020 23-MAR-20 665,707,000
Detail Engineering Design (DED) pembangunan
persemaian modern Toba Provinsi Sumatera Utara
9 Paket pekerjaan pengadaan jasa konsultansi 35/PTH/SPK/P2TH-1/3/2020 23-MAR-20 613,122,000
penyusunan Detail Engineering Design (DED)
pembangunan persemaian modern Labuan Bajo Provinsi
NTT

II BPDASHL Krueng Aceh (Data sama dengan


TW II/tidak ada perubahan)
1 Pengadaan Plotter + peralatan kantor PK.03/PPK/BPDASHL.KA- 20-04-2020 298,650,100
1/4/2020
2 Pengawasan dan Penilaian RHL P1 (Mangrove) 11-06-2020 4,568,204,300
SPK.125/BPDASHL.KA-
4/2020,
SPk.126/BPDASHl>KA-
4/2020,
SPK.127/BPDASHL.KA-
4/2020
3 Pemeliharaan Tanaman Mangrove Tahun Ke-1 ADD.SPk.103/BPDASHL.kA-4/ 16-03-2020 247,665,000

III BPDASHL Wampu Sei Ular


1 Paket 1: Pengawasan dan Penilaian Pemeliharaan PK. 66/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 850 Ha 4/4/2020 20 April 2020 366,000,000
2 Paket 2: Pengawasan dan Penilaian Pemeliharaan PK. 68/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 1.500 Ha 4/4/2020 20 April 2020 531,000,000
3 Paket 3: Pengawasan dan Penilaian Pemeliharaan PK. 70/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 1.674 Ha 4/4/2020 20 April 2020 566,000,000
4 Paket 4: Pengawasan dan Penilaian Pemeliharaan PK. 125/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 675 Ha 4/6/2020 10 Juni 2020 303,000,000
5 Paket 5: Pengawasan dan Penilaian Pemeliharaan PK. 126/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 1.200 Ha 4/6/2020 10 Juni 2020 432,000,000
6 Paket 6: Pengawasan dan Penilaian Pemeliharaan PK. 72/BPDASHL.WU-
Tahun I RHL Tahun 2019 seluas 1.800 Ha 4/4/2020 20 April 2020 594,000,000

IV BPDASHL Asahan Barumun


1 PENGAWASAN DAN PENILAIAN PEMELIHARAAN SPK. 59/BPDASHL.AB-4/2020 08 Mei 2020 1,976,810,000
TANAMAN RHL TAHUN I (P1) SELUAS 3.988 HA
2 PENGAWASAN DAN PENILAIAN PEMELIHARAAN SPK. 60/BPDASHL.AB-4/2020 08 Mei 2020 1,601,611,000
TANAMAN RHL TAHUN I (P1) SELUAS 4.012 HA
3 PENGAWASAN DAN PENILAIAN PEMELIHARAAN SPK. 61/BPDASHL.AB-4/2020 08 Mei 2020 1,625,899,000
TANAMAN RHL TAHUN I (P1) SELUAS 5.200 HA

V BPDASHL Agam Kuantan


1 Pengadaan bibit tan RHL Nag. Lunang Kab Pessel SPK.96/BPDASHL.AK/RHL/DAS.2/4/2020 4/2/2020 304,512,000
2 Pengawasan dan Penilaian Keg. RHL (P0) Thn 2020SPK.112/BPDASHL.AK/EVA/DAS.2/2020 6/12/2020 255,860,000

VI BPDASHL Indragiri Rokan (Belum ada data TW III)

VII BPDASHL Sei Jang Duriangkang


1 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL PKS.295/BPDASHL.SJD/ 5 Mei 2020 192,070,000
Tahun Ke-1 seluas 400 Ha EV/DAS.1/5/2020
2 Pengawasan dan Penilaian Pembuatan Tanaman (P0) PKS.119/BPDASHL.SJD/ 16 Maret 2020 281,000,000
RHL Tahun 2020 Seluas 550 Ha EV/DAS.1/3/2020
3 Rehabilitasi Hutan dan Lahan Seluas 450 Ha di Kota PKS.290/BPDASHL.SJD/
Batam Tahun 2020 05 Mei 2020 6,718,115,250
RHL/DAS.1/5/2020

VIII BPDASHL Batanghari


1 Paket 1 Pembuatan Tanaman RHL Pola Reboisasi PKS. 789/BPDASHL.BH/
Agroforestry Seluas 505 Ha RHL/07/2020 7 Juli 2020 943,592,500

2 Paket 2 Pembuatan Tanaman RHL Pola Reboisasi PKS. 791/BPDASHL.BH/


Agroforestry Seluas 495 Ha RHL/07/2020 7 Juli 2020 961,661,250
3 Pengawasan dan Penilaian Penanaman (P0) RHL PKS. 1092/BPDASHL.BH/
Seluas 1.000 Ha EV/08/2020 03 Agustus 2020 195,000,000

4 Pengawasan dan Penilaian Pemeliharaan I (P1) RHL PKS. 435/BPDASHL/


Seluas 2.000 Ha EV/03/2020 18 Maret 2020 927,740,000

5 Pengawasan dan Penilaian Pemeliharaan I (P1) RHL PKS. 705/BPDASHL.BH/


Seluas 355 Ha EV/06/2020 15 Juni 2020 155,705,000

6 Paket 1 Pemeliharaan I (P1) RHL Seluas 200 Ha PKS. 82/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 526,200,000

7 Paket 2 Pemeliharaan I (P1) RHL Seluas 700 Ha PKS. 83/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 1,648,824,375

8 Paket 3 Pemeliharaan I (P1) RHL Seluas 100 Ha PKS. 84/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 257,700,000

9 Paket 4 Pemeliharaan I (P1) RHL Seluas 300 Ha PKS. 85/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 615,950,000

10 Paket 5 Pemeliharaan I (P1) RHL Seluas 420 Ha PKS. 86/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 838,530,000

11 Paket 6 Pemeliharaan I (P1) RHL Seluas 106 Ha PKS. 87/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 226,235,000

12 Paket 7 Pemeliharaan I (P1) RHL Seluas 174 Ha PKS. 88/BPDASHL.BH/


RHL/1/2020 23 Januari 2020 390,261,500

IX BPDASHL Batu Rusa Cerucuk


2 Pengadaan Bibit Produktif Pulau Bangka PKS.134/BPDASHL.BRC/EV/KU
8 Mei 2020 264,850,000
3 Pengadaan Bibit Produktif Pulau Belitung PKS.135/BPDASHL.BRC/EV/KU
8 Mei 2020 208,600,000
4 Pengawasan dan Penilaian RHL Penanaman (P-0) PKS.144/BPDASHL.BRC/EV/KU
18 Mei 2020 295,625,000
Reboisasi Intensif dan Mangrove
5 Pengadaan Bibit Produktif Tambahan PKS.162//BPDASHL.BRC/EV/
KUM.3/7/2020 2 Juli 2020 948,750,000

X BPDASHL Musi
1 PEMELIHARAAN TANAMAN RHL VEGETATIF DTA PKS.07/BPDASHL.M/RHL/01/ 13 JANUARI 2020 640,500,000
WADUK TAHUN PERTAMA (P1) BLOK XI DESA 2020
TANJUNG BULAN ILIR KECAMATAN PULAU
BERINGIN KABUPATEN OKU SELATAN SELUAS 300
HA DI KAWASAN HUTAN LINDUNG MEKAKAU

2 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.09/BPDASHL.M/RHL/01/ 13 JANUARI 2020 1,356,633,000


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 2020
DESA MUARA PAYANG KECAMATAN MUARA
PAYANAG KABUPATEN LAHAT SELUAS 500 HA DI
KAWASAN HUTAN KONSERVASI HUTAN SUAKA
ALAM GUMAY TEBING TINGGI

3 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.08/BPDASHL.M/RHL/01/ 13 JANUARI 2020 1,950,655,000


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 2020
BLOK III, BLOK IV DESA SUMBER JAYA, KECAMATAN
BUAY PEMATANG RIBU RANAU TENGAH
KABUPATEN OKU SELATAN SELUAS 700 HA DI
KAWASAN HUTAN KONSERVASI SUAKA
MARGASATWA GUNUNG RAYA
4 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.04/BPDASHL.M/RHL/01/ 13 JANUARI 2020 1,779,294,000
PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 2020
BLOK III DAN BLOK IV DESA MEHANGGIN,
KECAMATAN MUARA DUA KABUPATEN OKU
SELATAN SELUAS 850 HA DI KAWASAN HUTAN
LINDUNG MEKAKAU

5 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.10/BPDASHL.M/RHL/01/ 13 JANUARI 2020 1,289,787,500


PRIORITAS TAHUN PERTAMA (P1) DESA MUARA 2020
PAYANG DAN BANDU AGUNG KEC MUARA PAYANG
KABUPATEN LAHAT SELUAS 450 HA DI KAWASAN
HUTAN KONSERVASI SUAKA ALAM GUMAY TEBING
TINGGI

6 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.06/BPDASHL.M/RHL/01/ 13 JANUARI 2020 882,400,000


PRIORITAS TAHUN PERTAMA (P1) BLOK IX DAN 2020
BLOK X DESA GALANG TINGGI KECAMATAN PULAU
BERINGIN KABUPATEN OKU SELATAN SELUAS 400
HA DI KAWASAN HUTAN LINDUNG PERADUAN
GISTANG

7 PEMELIHARAAN TANAMAN RHL VEGETATIF RAWAN PKS.03/BPDASHL.M/RHL/01/ 13 JANUARI 2020 2,512,900,000


BENCANA TAHUN PERTAMA (P1) BLOK I DESA BUMI 2020
KAWA, BLOK I, BLOK II, BLOK III, BLOK IV DESA
SUKARAJA KECAMATAN LENGKITI KABUPATEN
OKU SELATAN SELUAS 1200 HA DI KAWASAN
HUTAN LINDUNG BUKIT NANTI

8 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.02/BPDASHL.M/RHL/01/ 13 JANUARI 2020 3,163,700,000


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 2020
BLOK III, BLOK IV, BLOK V, BLOK VI DAN BLOK VII
DESA KARANG ENDAH, KECAMATAN LENGKITI,
KABUPATEN OKU SELUAS 1.700 HA DI KAWASAN
HUTAN LINDUNG BUKIT NANTI

9 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.01/BPDASHL.M/RHL/01/ 13 JANUARI 2020 1,400,100,000


PRIORITAS TAHUN PERTAMA (P1) BLOK I DESA 2020
MANGUNSARI KECAMATAN JARAI DAN BLOK I
DESA MUARA GELUMPAI, BLOK I DESA MUARA
JAUH KECAMATAN MUARA PAYANG KABUPATEN
LAHAT SELUAS 650 HA DI KAWASAN HUTAN
LINDUNG BUKIT DINGIN

10 PEMELIHARAAN TANAMAN RHL VEGETATIF RAWAN PKS.15/BPDASHL.M/RHL/01/ 15 JANUARI 2020 544,500,000


BENCANA TAHUN PERTAMA (P1) BLOK I DESA 2020
MUARA EMIL KECAMATAN TANJUNG AGUNG
KABUPATEN MUARA ENIM SELUAS 250 HA DI
KAWASAN HUTAN LINDUNG MUARA EMIL
11 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.05/BPDASHL.M/RHL/01/ 13 JANUARI 2020 989,750,000
PRIORITAS TAHUN PERTAMA (P1) BLOK V DESA 2020
TANJUNG BESAR, BLOK VI DESA PERE’AN, BLOK VII
DESA KOTA BARU, BLOK VIII DESA GALANG TINGGI,
KECAMATAN MEKAKAU ILIR KABUPATEN OKU
SELATAN SELUAS 750 HA DI KAWASAN HUTAN
LINDUNG MEKAKAU DAN PERADUAN GISTANG

12 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.11/BPDSHL.M/RHL/01/2 13 JANUARI 2020 565,508,600


PRIORITAS TAHUN PERTAMA (P1) DESA SUMBER 020
JAYA KEC BUAY PEMATANG RIBU RANAU TENGAH
KABUPATEN OKU SELATAN SELUAS 200 HA DI
HUTAN KONSERVASI HUTAN SM GUNUNG RAYA

13 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.12/BPDASHL.M/TU/01/2 15 JANUARI 2020 1,389,727,500


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 020
BLOK III DESA BUNGA TANJUNG KECAMATAN
LENGKITI KABUPATEN OKU SELUAS 675 HA DI
KAWASAN HUTAN LINDUNG BUKIT NANTI

14 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.13/BPDASHL.M/TU/01/2 15 JANUARI 2020 588,625,000


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II, 020
BLOK III, DESA MENDINGIN KECAMATAN ULU OGAN
KABUPATEN OKU SELUAS 325 HA DI KAWASAN
HUTAN LINDUNG BUKIT NANTI

15 PEMELIHARAAN TANAMAN RHL VEGETATIF DAS PKS.17/BPDASHL.M/TU/01/2 15 JANUARI 2020 950,761,300


PRIORITAS TAHUN PERTAMA (P1) BLOK I, BLOK II 020
DESA SINGAPURE KECAMATAN KOTA AGUNG,
KABUPATEN LAHAT SELUAS 445 HA DI KAWASAN
HUTAN LINDUNG GUNUNG PATAH

16 PEMELIHARAAN TANAMAN RHL VEGETIF RAWAN PKS.16/BPDASHL.M/TU/01/2 15 JANUARI 2020 791,635,000


BENCANA TAHUN PERTAMA (P1) BLOK I DESA 020
PANDANARANG ULU DAN BLOK I, BLOK II DESA
TUNGGUL BUTE KECAMATAN KOTA AGUNG
KABUPATEN LAHAT SELUAS 365 HA DI KAWASAN
HUTAN LINDUNG GUNUNG PATAH

17 PEMELIHARAAN TANAMAN RHL TAHUN PERTAMA PKS.14/BPDASHL.M/TU/01/2 15 JANUARI 2020 1,389,152,080


(P1) VEGETATIF DAS PRIORITAS BLOK I DESA 020
CANDI JAYA KECAMATAN DEMPO TENGAH DAN
RAWAN BENCANA BLOK I, BLOK II KELURAHAN
BURUNG DINANG KECAMATAN DEMPO UTARA
KOTA PAGARALAM SELUAS 640 HA DI KAWASAN
HUTAN LINDUNG MERANG

18 PAKET PENGAWASAN DAN PENILAIAN PKS.22/BPDASHL.M/EV/1/20 1 FEBRUARI 2020 994,400,000


PEMELIHARAAN P1 RHL VEGETATIF DI WILAYAH 20
UPTD KPH WILAYAH VII MEKAKAU-SAKA SELUAS
2.300 HA

19 PAKET PENGAWASAN DAN PENILAIAN RHL PKS.21/BPDASHL.M/EV/1/20 1 FEBRUARI 2020 790,350,000


VEGETATIF DI WILAYAH SM GUNUNG RAYA DAN 20
HSA GUMAY TEBING TINGGI SELUAS 1.850 HA
20 PENGAWASAN DAN PENILAIAN PEMELLIHARAAN P1 PKS.23/BPDASHL.M/EV/1/20 31 JANUARI 2020 1,020,580,000
RHL VEGETATIF DI WILAYAH UPTD KPH VIII 20
SEMENDO, WILAYAH UPTD KPH IX SUBAN JERIJI,
UPTD KPH X DEMPO DAN UPTD KPH XI KIKIM
PASEMAH SELUAS 2.350 HA

21 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN PKS.20/BPDASHL.M/EV/1/20 31 JANUARI 2020 1,608,420,000


PEMELIHARAAN P1 RHL VEGETATIF DI WILAYAH 20
UPTD KPH BUKIT NANTI SELUAS 3.900 HA

22 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.55/BPDASHL.M/RHL/DA 3 MARET 2020 580,200,000


AGROFORESTRYSELUAS 300 HA PADA BLOK B S.1/03/2020
DESA JOKOH KECAMATAN DEMPO SELATAN KOTA
PAGAR ALAM

23 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.57/BPDASHL.M/RHL/DA 3 MARET 2020 388,320,000


AGROFORESTRY SELUAS 200 HA PADA BLOK B S.1/03/2020
DESA AIR KELINSAR KECAMATAN ULU MUSI
KABUPATEN EMPAT LAWANG

24 PAKET REHABILITASI HUTAN DAN LAHAN PKS.53/BPDASHL.M/RHL/DA 3 MARET 2020 414,435,000


VEGETATIF PENANAMAN REBOISASI S.1/03/2020
AGROFORESTRY SELUAS 210 HA BLOK E DESA
BUMIRAWA KEC LENGKITI KAB OKU DI KPH
WILAYAH VI BUKIT NANTI MARTAPURA

25 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.54/BPDASHL.M/RHL/DA 3 MARET 2020 555,750,000


AGROFORESTRY SELUAS 300 HA PADA BLOK C S.1/03/2020
DESA SWARNA DWIPA KEC SEMENDE DARAT
TENGAH KAB MUARA ENIM DI KPH WILAYAH VIII
SEMENDO DI HL GUNUNG PATAH SUMSEL

26 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.59/BPDASHL.M/RHL/DA 10 MARET 2020 703,740,000


AGROFORESTRY SELUAS 370 HA PADA BLOK I DAN S.1/03/2020
BLOK J DESA BUMI KAWA KEC LENGKITI KAB OKU
DI KPH WILAYAH VI BUKIT NANTI MARTAPURA HL
GUNUNG PATAH

27 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.61/BPDASHL,M/RHL/DA 12 MARET 2020 931,992,000


AGROFORESTRY SELUAS 480 HA PADA BLOK G S.1/03/2020
DAN BLOK H DESA BUMI KAWA KEC LENGKITI KAB
OKU DI KPH WILAYAH VI BUKIT NANTI MARTAPURA
PROV SUMSEL

28 PAKET RHL VEGETATIF PENANAMAN PKS.62/BPDASHL.M/RHL/DA 12 MARET 2020 415,380,000


REBOISASIAGROFORESTRY SELUAS 210 HA PADA S.1/03/2020
BLOK C DESA BUMI KAWA KEC LENGKITI KAB OKU
DI KPH WILAYAH VI BUKIT NANTI MARTAPURA DI
PROV SUMSEL

29 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.63/BPDASHL.M/RHL/DA 12 MARET 2020 491,150,000


AGROFORESTRY SELUAS 250 HA PADA BLOK F S.1/03/2020
DESA AGUNG LAWANGAN KEC DEMPO UTARA
PAGAR ALAM DI KPH WILAYAH X DEMPO DI
KAWASAN HL GUNUNG PATAH
30 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN PKS.67/BPDASHL.M/EV/4/20 3 APRIL 2020 541,750,000
TANAMAN RHL VEGETATIF DI WILAYAH UPTD KPH 20
BUKIT NANTI SELUAS 1.070 HA

31 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN PKS.69/BPDASHL.M/EV/4/20 3 APRIL 2020 508,475,000


TANAMAN RHL VEGETATIF DI WILAYAH UPTD KPH 20
LAINNYA SELUAS 1.040 HA
32 PAKET PENGAWASAN DAN PENILAIAN KEGIATAN PKS.68/BPDASHL.M/EV/4/20 3 APRIL 2020 501,754,000
TANAMAN RHL VEGETATIF DI UPTD KPH WILAYAH 20
VI BUKIT NANTI MARTAPURA DAN UPTD KPH
WILAYAH VII MEKAKAU SAKA 980 HA

33 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.64/BPDASHL.M/RHL/DA 1 APRIL 2020 425,400,000


AGROFORESTRY SELUAS 250 HA PADA BLOK E S.1/04/2020
DESA GEDUNG WANI KEC RUNJUNG AGUNG KAB
OKU SELATAN DI KPH WILAYAH VII MEKAKAU SAKA
PROV.SUMSEL

34 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.65/BPDASHL.M/RHL/DA 2 APRIL 2020 463,447,600


AGROFORESTRY SELUAS 250 HA PADA BLOK A S.1/04/2020
DESA KARANG ENDAH KEC LENGKITI KAB OKU DI
KPH WILAYAH VI BUKIT NANTI MARTAPURA DI
PROV. SEMSEL

35 PAKET RHL VEGETATIF PENANAMAN REBOISASI PKS.66/BPDASHL.M/RHL/DA 2 APRIL 2020 404,569,000


AGROFORESTRY SELUAS 250 HA PADA BLOK D S.1/04/2020
DESA GEDUNG WANI KEC RUNJUNG AGUNG KAB
OKU SELATAN DI KPH WILAYAH VII MEKAKAU SAKA
PROV SUMSEL

36 PENANAMAN DALAM RANGKA REHABILITASI HUTAN PKS.124/BPDASHL.M/PROG/ 1 JULI 2020 716,100,000


MANGROVE BLOK TANJUNG API-API DESA MUARA DAS.1/7/2020
SUNGSANG KECAMATAN BANYUASIN II
KABUPATEN BANYUASIN SELUAS 50 HA

37 PEMBUATAN GULLY PLUG (GP) SEBANYAK 53 UNIT PKS.126/BPDASHL.M/TU/DA 20 JULI 2020 402,050,000
DI KOTA PAGAR ALAM S.1/7/2020
38 PEMBUATAN GULLY PLUG (GP) SEBANYAK 108 PKS.127/BPDASHL.M/TU/DA 20 JULI 2020 874,434,000
UNIT DI KABUPATEN MUARA ENIM DAN OKU S.1/7/2020

XI BPDASHL Ketahun
1 Pemeliharaan RHL Intensif, Blok 1 KPHL Mekakau Saka, 163 7/3/2019
300 Ha (termin I) 343,061,000
2 Pemeliharaan RHL Intensif, Blok 1 KPHL Mekakau Saka, 163 7/3/2019
300 Ha (termin II) 514,592,000
3 Pemeliharaan RHL Intensif, Blok 2 KPHL Mekakau Saka, 164 7/3/2019 855,545,504
300 Ha
4 Pemeliharaan RHL Intensif, Blok 3 KPHL Mekakau Saka, 165 8/2/2019 856,438,550
300 Ha
5 Pemeliharaan RHL Intensif, Blok 4 KPHL Mekakau Saka, 166 7/5/2019
300 Ha (termin I) 337,256,000
6 Pemeliharaan RHL Intensif, Blok 4 KPHL Mekakau Saka, 166 7/5/2019
300 Ha (termin II) 505,884,000
7 Pemeliharaan RHL Intensif, Blok 5 KPHL Mekakau Saka, 167 7/5/2019 859,167,552
300 Ha
8 Pemeliharaan RHL Intensif, Blok 6 KPHL Mekakau Saka, 168 7/5/2019 842,693,379
300 Ha
9 Pemeliharaan RHL Intensif, Blok 7 KPHL Mekakau Saka, 169 7/3/2019
300 Ha (termin I) 333,110,000
10 Pemeliharaan RHL Intensif, Blok 7 KPHL Mekakau Saka, 169 7/3/2019
300 Ha (termin II) 499,665,000
11 Pemeliharaan RHL Intensif, Blok 8 KPHL Mekakau Saka, 170 7/3/2019 845,317,550
300 Ha
12 Pemeliharaan RHL Intensif, Blok 9 KPHL Mekakau Saka, 186 7/15/2019 865,987,804
300 Ha
13 Pemeliharaan RHL Intensif, Blok 10 KPHL Mekakau 236 8/16/2019 848,176,175
Saka, 300 Ha
14 Pemeliharaan RHL Intensif, Blok 11 KPHL Mekakau 171 7/1/2019 848,262,800
Saka, 300 Ha
15 Pemeliharaan RHL Intensif, Blok 12 KPHL Mekakau 172 7/1/2019 848,262,800
Saka, 300 Ha
16 Pemeliharaan RHL Intensif, Blok 13 KPHL Mekakau 173 7/1/2019 586,599,255
Saka, 205 Ha
17 Pemeliharaan RHL Intensif, Blok 14 KPHL Mekakau 156 7/1/2019
Saka, 300 Ha (termin I) 346,314,000
18 Pemeliharaan RHL Intensif, Blok 14 KPHL Mekakau 156 7/1/2019
Saka, 300 Ha (termin II) 519,471,000
19 Pemeliharaan RHL Intensif, Blok 15 KPHL Mekakau 157 7/1/2019
Saka, 300 Ha (termin I) 345,930,000
20 Pemeliharaan RHL Intensif, Blok 15 KPHL Mekakau 157 7/1/2019
Saka, 300 Ha (termin II) 518,895,000
21 Pemeliharaan RHL Intensif, Blok 16 KPHL Mekakau 174 7/1/2019 848,262,800
Saka, 300 Ha
22 Pemeliharaan RHL Intensif, Blok 17 KPHL Mekakau 175 7/1/2019
Saka, 300 Ha (termin I) 339,306,000
23 Pemeliharaan RHL Intensif, Blok 17 KPHL Mekakau 175 7/1/2019
Saka, 300 Ha (termin II) 508,958,000
24 Pemeliharaan RHL Intensif, Blok 18 KPHL Mekakau 212 8/2/2019
Saka, 250 Ha (termin I) 283,791,000
25 Pemeliharaan RHL Intensif, Blok 18 KPHL Mekakau 212 8/2/2019
Saka, 250 Ha (termin II) 425,686,000
26 Pemeliharaan RHL Intensif, Blok 19 KPHL Mekakau 158 7/1/2019 849,302,300
Saka, 300 Ha
27 Pemeliharaan RHL Intensif, Blok 20 KPHL Mekakau 159 7/1/2019
Saka, 250 Ha (termin I) 290,927,000
28 Pemeliharaan RHL Intensif, Blok 20 KPHL Mekakau 159 7/1/2019
Saka, 250 Ha (termin II) 436,390,000
29 Pemeliharaan RHL Intensif, Blok 21 KPHL Mekakau 214 8/2/2019
Saka, 295 Ha (termin I) 231,739,000
30 Pemeliharaan RHL Intensif, Blok 21 KPHL Mekakau 214 8/2/2019
Saka, 295 Ha (termin II) 347,609,000
31 Pemeliharaan RHL Intensif, Blok 22 KPHL Mekakau 160 7/1/2019 867,315,504
Saka, 300 Ha
32 Pemeliharaan RHL Intensif, Blok 23 KPHL Mekakau 161 7/1/2019 866,277,535
Saka, 300 Ha
33 Pemeliharaan RHL Intensif, Blok 24 KPHL Mekakau 162 7/1/2019 868,608,202
Saka, 300 Ha
34 Pemeliharaan RHL Intensif, Blok 25 KPHL Mekakau 213 8/2/2019 709,475,250
Saka, 250 Ha
35 Pemeliharaan RHL Intensif, Blok 26 KPHL Kab. Kaur, 151 6/28/2019
250 Ha (termin I) 284,196,000
36 Pemeliharaan RHL Intensif, Blok 26 KPHL Kab. Kaur, 151 6/28/2019
250 Ha (termin II) 426,294,000
37 Pemeliharaan RHL Intensif, Blok 27 KPHL Kab. Kaur, 122 5/23/2019 709,159,000
250 Ha
38 Pemeliharaan RHL Intensif, Blok 28 KPHL Kab. Kaur, 123 5/23/2019 726,277,750
250 Ha
39 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL 138 3/13/2020 1,324,400,000
(P1), Paket 1 luas 2.950 Ha
40 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL 139 3/13/2020 1,119,800,000
(P1), Paket 2 luas 2.505 Ha
41 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL 140 3/13/2020 805,420,000
(P1), Paket 3 luas 1.795 Ha
42 Pengawasan dan Penilaian Pemeliharaan Tanaman RHL 141 3/13/2020 335,819,000
(P1), Paket 4 luas 750 Ha
43 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS 91 2/10/2020 193,048,790
Rawan/Pasca Bencana di KPHL Wilayah V Blok 1, 150
Ha
44 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS 89 2/10/2020 163,900,000
Rawan/Pasca Bencana di KPHL Bukit Daun Blok 1, 125
Ha
45 Pemeliharaan Tanaman Tahun II (P2) RHL pada DAS 92 2/10/2020 161,425,000
Rawan/Pasca Bencana di KPHL Bukit Daun Blok 2, 125
Ha
46 Pemeliharaan Tanaman Tahun II (P2) RHL pada 168 3/10/2020 132,110,000
KPHL/HL Blok 2, 125 Ha

XII BPDASHL Citarum Ciliwung


1 Repeat Order Jasa Konsultansi Pengawasan dan SPK.283/BPDASHL.CTW/EV/DA
28-APR-20 606,449,250
Penilaian RHL P1 Paket 1_TNGHS
2 Repeat Order Jasa Konsultansi Pengawasan dan SPK.284/BPDASHL.CTW/EV/DA
28-APR-20 383,693,750
Penilaian RHL P1 Paket 2_TNGP
3 Repeat Order Jasa Konsultansi Pengawasan dan SPK.285/BPDASHL.CTW/EV/DA
28-APR-20 650,754,500
Penilaian RHL P1 Paket 3_KSDA BGR
4 Repeat Order Jasa Konsultansi Pengawasan dan SPK.286/BPDASHL.CTW/EV/DA
28-APR-20 525,750,500
Penilaian RHL P1 Paket 4_KSDA BDG-CMS
5 Repeat Order Jasa Konsultansi Pengawasan dan SPK.287/BPDASHL.CTW/EV/DA
28-APR-20 544,428,500
Penilaian RHL P1 Paket 5_KPH BDU-CJR
6 Repeat Order Jasa Konsultansi Pengawasan dan SPK.288/BPDASHL.CTW/EV/DA
28-APR-20 904,508,000
Penilaian RHL P1 Paket 6_KPH BDS
7 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 302/BPDASHL.CTW/Prog29-APR-20 532,842,000
Tahun 2020 Paket 1 TNGHS
8 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 303/BPDASHL.CTW/Prog29-APR-20 2,471,878,500
Tahun 2020 Paket 2 TNGHS
9 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 304/BPDASHL.CTW/Prog29-APR-20 733,261,000
Tahun 2020 Paket 3 TNGHS
10 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 305/BPDASHL.CTW/Prog29-APR-20 264,764,500
Tahun 2020 Paket 4 TNGGP
11 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 306/BPDASHL.CTW/Prog29-APR-20 490,785,000
Tahun 2020 Paket 5 TNGGP
12 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD. 307/BPDASHL.CTW/Prog29-APR-20 791,089,500
Tahun 2020 Paket 6 TNGGP
13 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD.290/BPDASHL.CTW/EV/DA
28-APR-20 1,066,657,000
Tahun 2020 Paket 7 BBKSDA
14 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD.291/BPDASHL.CTW/EV/DA
28-APR-20 1,760,490,700
Tahun 2020 Paket 8 BBKSDA
15 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD.292/BPDASHL.CTW/EV/DA
28-APR-20 2,191,965,200
Tahun 2020 Paket 9 BBKSDA
16 Addendum Pemeliharaan RHL Tahun Pertama (P1) ADD.293/BPDASHL.CTW/EV/DA
28-APR-20 2,472,742,500
Tahun 2020 Paket 10 BBKSDA
17 Addendum Pemeliharaan RHL Tahun Pertama (P1) 227/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 2,318,091,000
Perum Perhutani Tahun 2020 Paket 1 KPH BDS
18 Addendum Pemeliharaan RHL Tahun Pertama (P1) 224/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 1,191,346,000
Perum Perhutani Tahun 2020 Paket 2 KPH BDS
19 Addendum Pemeliharaan RHL Tahun Pertama (P1) 225/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 2,556,890,000
Perum Perhutani Tahun 2020 Paket 3 KPH BDS
20 Addendum Pemeliharaan RHL Tahun Pertama (P1) 226/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 2,920,419,000
Perum Perhutani Tahun 2020 Paket 4 KPH BDU
21 Addendum Pemeliharaan RHL Tahun Pertama (P1) 228/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 252,006,000
Perum Perhutani Tahun 2020 Paket 5 KPH Cianjur
22 Addendum Pemeliharaan RHL Tahun Kedua (P2) Perum 229/BPDASHL-CTW/RHL/DAS.1
26-MAR-20 3,294,600,400
Perhutani Tahun 2020 Divreg Jabar Banten
23 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 2_BDS SPK. 740/BPDASHL-CTW/RHL/30-JUL-20
355,728,000
24 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 3_CJR SPK. 742/BPDASHL-CTW/RHL/30-JUL-20
351,627,500
25 RHL PERUM PERHUTANI P0 Tahun 2020 Paket 4_BTN SPK. 743/BPDASHL-CTW/RHL/30-JUL-20
744,622,000
26 RHL PERUM PERHUTANI P0 Tahun 2020 Paket SPK. 739/BPDASHL-CTW/RHL/30-JUL-20
5_SMD 357,527,500
27 BIBIT PRODUKTIF PAKET 1 SPK.1180/BPDASHL.CTW/Prog11-SEP-20 1,053,150,000
28 BIBIT PRODUKTIF PAKET 2 SPK.1181/BPDASHL.CTW/Prog11-SEP-20 506,900,000
29 BIBIT PRODUKTIF PAKET 3 SPK.1182/BPDASHL.CTW/Prog11-SEP-20 425,600,000
30 BIBIT PRODUKTIF PAKET 4 SPK.1183/BPDASHL.CTW/Prog11-SEP-20 271,950,000
31 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun SPK.1282/BPDASHL.CTW/PRO8-OKT-20 595,102,000
2020 Paket 1
32 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun SPK.1283/BPDASHL.CTW/PRO
8-OKT-20 754,550,000
2020 Paket 2
33 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun SPK.1284/BPDASHL.CTW/PRO
8-OKT-20 663,075,000
2020 Paket 3
34 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun SPK.1285/BPDASHL.CTW/PRO
8-OKT-20 1,267,200,000
2020 Paket 4
35 RHL Pasca Bencana di Kawasan TNGHS P0 Tahun SPK.1286/BPDASHL.CTW/PRO
8-OKT-20 934,672,000
2020 Paket 5

XIII BPDASHL Cimanuk Citanduy


1 Waslai RHL P-1 Paket 1 SPK.880/BPDASHL.CKY-4/3/2 3/4/2020 881,658,800
2 Waslai RHL P-1 Paket 2 SPK.881/BPDASHL.CKY-4/3/2 3/4/2020 853,259,000
3 Waslai RHL P-1 Paket 3 SPK.882/BPDASHL.CKY-4/3/2 3/4/2020 809,248,000
4 Waslai RHL P-1 Paket 4 SPK.883/BPDASHL.CKY-4/3/2 3/4/2020 679,695,500

XIV BPDASHL Serayu Opak Progo


1 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket A SPK.154/BPDASHL.SOP/Progra 06-04-2020 441,900,000
2 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket B SPK.155/BPDASHL.SOP/Progra 06-04-2020 439,200,000
3 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket C SPK.156/BPDASHL.SOP/Progra 06-04-2020 530,240,000
4 Pengadaan Bibit Tanaman Produktif Tahun 2020 Paket D SPK.157/BPDASHL.SOP/Progra 06-04-2020 575,250,000
5 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian
Penanaman RHL Tahun 2020 di Kawasan Hutan
Lindung Perum Perhutani Wilayah Balai Pengelolaan
SPK.298/BPDASHL.SOP/EV/DA 09-07-2020 152,130,000
DAS dan Hutan Lindung Serayu Opak Progo dan
Kawasan Hutan dengan Tujuan Khusus Wanagama

6 Pengadaan Bibit Tanaman dalam rangka Pembuatan


Kebun Bibit Desa (KBD) Tahun 2020 Paket A SPK.788/BPDASHL.SOP/RHL/D 23-09-2020 358,980,000

7 Pengadaan Bibit Tanaman dalam rangka Pembuatan


Kebun Bibit Desa (KBD) Tahun 2020 Paket B SPK.789/BPDASHL.SOP/RHL/D 23-09-2020 502,430,000

8 Pengadaan Bibit Tanaman dalam rangka Pembuatan


Kebun Bibit Desa (KBD) Tahun 2020 Paket C SPK.790/BPDASHL.SOP/RHL/D 23-09-2020 573,850,000

XV BPDASHL Pemali Jratun


1 Pengadaan Bibit Produktif Paket A 10 Maret 2020 417,400,000
SPK.
45/BPDASHL.PJ/PROG/DAS.
2/3/2020
2 Pengadaan Jasa Konsultasi Pengawasan dan Penilaian 13 April 2020 941,501,000
Tanaman RHL (P1) Hutan Lindung seluas 4.500 ha SPK. 154
(Paket B) /BPDASHL.PJ/EVL/DAS.2/4/2
020
3 Pengadaan Jasa Konsultasi Pengawasan dan Penilaian 13 April 2020 195,827,500
Tanaman RHL (P1) KHDTK seluas 500 ha (Paket C) SPK. 155
/BPDASHL.PJ/EVL/DAS.2/4/2
020
4 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Kebon 7 Februari 2020
SPK.11
/BPDASHL.PJ/PROG/Keu.1/0
2/2020 1,319,519,300.00
5 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pati S 7 Februari 2020 2,515,126,600
SPK.
8/BPDASHL.PJ/EVDAS/Keu.1
/02/2020
6 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pekal 7 Februari 2020 2,734,265,500
SPK. 9
/BPDASHL.PJ/RHL/Keu.1/02/
2020
7 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Pekalo 7 Februari 2020 3,422,592,000
SPK. 10
/BPDASHL.PJ/RHL/Keu.1/02/
2020
8 Pemeliharaan Tanaman RHL Hutan Lindung di KPH Balapu 7 Februari 2020 621,236,400
SPK.
7/BPDASHL.PJ/EVDAS/Keu.1
/02/2020
9 Pembuatan Tanaman RHL di KPH Kebonharjo seluas 156
SPK.239 17 Juli 2020 213,915,600
/BPDASHL.PJ/EV/DAS.2/
07/2020
10 Pembuatan Tanaman RHL di KPH Pati seluas 235,7 Ha 17 Juli 2020 351,702,000
SPK.237
/BPDASHL.PJ/EV/DAS.2/
07/2020
11 Pembuatan Tanaman RHL di KPH Pekalongan Timur seluSPK.235/BPDASHL.PJ/R 17 Juli 2020 224,695,500
HL/DAS.2/07/2020
12 Pembuatan Tanaman RHL di KPH Pekalongan Barat seluSPK.236/BPDASHL.PJ/R 17 Juli 2020 403,436,000
HL/DAS.2/07/2020
13 Pembuatan Tanaman RHL di KPH Balapulang seluas 171 17 Juli 2020 265,585,500
SPK.238
/BPDASHL.PJ/EV/DAS.2/
07/2020
14 Pengadaan Bibit Produktif Paket B 19 Agustus 2020 751,092,500
SPK.264
/BPDASHL.PJ/PRG/DAS.
2/8/2020
15 Pengadaan Bibit Produktif Paket C
SPK.265 19 Agustus 2020 1,374,267,500
/BPDASHL.PJ/PRG/DAS.
2/8/2020
16 Pengadaan Bibit Kebun Desa 19 Agustus 2020 691,100,000
SPK. 266
/BPDASHL.PJ/EV/DAS.2/
8/2020

XVI BPDASHL Brantas Sampean


1 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 490/BPDASHL.BS-3/6/2020 8 Juni 2020 2,083,724,800
(P1) Paket Relokasi Banyuwangi Selatan
2 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 491/BPDASHL.BS-3/6/2020 8 Juni 2020 708,067,200
(P1) KPH Banyuwangi Barat
3 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 493/BPDASHL.BS-3/6/2020 8 Juni 2020 3,000,329,000
(P1) KPH Bondowoso
4 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 494/BPDASHL.BS-3/6/2020 8 Juni 2020 1,669,429,400
(P1) KPH Jember (1)
5 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 495/BPDASHL.BS-3/6/2020 8 Juni 2020 2,770,465,200
(P1) KPH Jember (2)
6 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 496/BPDASHL.BS-3/6/2020 8 Juni 2020 2,062,580,300
(P1) KPH Probolinggo
7 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 497/BPDASHL.BS-3/6/2020 8 Juni 2020 1,920,507,200
(P1) KPH Pasuruan
8 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 498/BPDASHL.BS-3/6/2020 8 Juni 2020 1,927,871,900
(P1) KPH Malang (1)
9 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 499/BPDASHL.BS-3/6/2020 8 Juni 2020 1,439,902,000
(P1) KPH Malang (2)
10 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 500/BPDASHL.BS-3/6/2020 8 Juni 2020 2,067,578,100
(P1) KPH Blitar (1)
11 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 501/BPDASHL.BS-3/6/2020 8 Juni 2020 1,153,134,300
(P1) KPH Blitar (2)
12 Pemeliharaan Tanaman RHL Hutan Lindung Tahun Ke-1 S. 502/BPDASHL.BS-3/6/2020 8 Juni 2020 1,765,987,300
(P1) KPH Kediri
13 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian S. 393/BPDAS.BS-4/4/2020 08 April 2020 1,808,499,000
Pemeliharaan Tahun ke-1 (P1) Tanaman RHL Hutan
Lindung BPDASHL Brantas Sampean Tahun 2020 Paket
2

14 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian S. 394/BPDAS.BS-4/4/2020 08 April 2020 1,445,202,000
Pemeliharaan Tahun ke-1 (P1) Tanaman RHL Hutan
Lindung BPDASHL Brantas Sampean Tahun 2020 Paket
3

15 Pengadaan Jasa Konsultansi Pengawasan dan Penilaian S. 379/BPDAS.BS-4/4/2020 06 April 2020 2,416,507,500
Pemeliharaan Tahun ke-1 (P1) Tanaman RHL Hutan
Lindung BPDASHL Brantas Sampean Tahun 2020 Paket
1

16 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH 05 Agustus 2020 1,888,396,600
Malang S. 750/BPDASHL.BS.2/8/2020
17 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH 05 Agustus 2020 2,017,732,900
Blitar S. 751/BPDASHL.BS.2/8/2020
18 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH 05 Agustus 2020 1,108,879,100
Kediri S. 752/BPDASHL.BS.2/8/2020
19 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH 05 Agustus 2020 1,706,639,300
Probolinggo S. 754/BPDASHL.BS.2/8/2020
20 Pembuatan RHL Hutan Lindung Tahun 2020 di KPH 05 Agustus 2020 1,556,004,600
Bondowoso S. 755/BPDASHL.BS.2/8/2020
21 Pengadaan Bibit Produktif Paket 1 S. 793/BPDASHL.BS- 14 Agustus 2020 943,782,500
2/8/2020

22 Pengadaan Bibit Produktif Paket 2 S. 794/BPDASHL.BS- 14 Agustus 2020 876,360,000


2/8/2020

23 Pengadaan Bibit Produktif Paket 3 S. 795/BPDASHL.BS- 14 Agustus 2020 752,150,000


2/8/2020

24 Pengadaan Bibit Produktif Paket 4 S. 796/BPDASHL.BS- 14 Agustus 2020 1,193,500,000


2/8/2020

XVII BPDASHL Solo


1 Pengadaan Bibit Produktif Tahun 2020 Paket I SPK.95/BPDASHL.Slo/EVL 6 Maret 2020 995,250,000
/DAS.1/3/2020
2 Pengadaan Bibit Produktif Tahun 2020 Paket II SPK.96/BPDASHL.Slo/EVL 6 Maret 2020 810,000,000
/DAS.1/3/2020
3 Pengadaan Bibit Produktif Tahun 2020 Paket III SPK.97/BPDASHL.Slo/EVL 6 Maret 2020 717,850,000
/DAS.1/3/2020
4 Pengadaan Bibit Produktif Tahun 2020 Paket IV SPK.98/BPDASHL.Slo/EVL 6 Maret 2020 1,166,175,000
/DAS.1/3/2020
5 Pengadaan Bibit Produktif Tahun 2020 Paket V SPK.99/BPDASHL.Slo/EVL 6 Maret 2020 703,010,000
/DAS.1/3/2020
6 Jasa Konsultansi Pengawasan dan Penilaian SPK.195/BPDASHL.Slo/EV 8 April 2020 1,154,487,180
Kegiatan Pemeliharaan Tahun 1 (P1) RHL L/DAS.1/4/2020
Kawasan Hutan Wilayah BPDASHL Solo Tahun
2019 Paket I.

7 Jasa Konsultansi Pengawasan dan Penilaian SPK.196/BPDASHL.Slo/EV 8 April 2020 1,448,527,960


Kegiatan Pemeliharaan Tahun 1 (P1) RHL L/DAS.1/4/2020
Kawasan Hutan Wilayah BPDASHL Solo Tahun
2019 Paket II

8 Jasa Konsultansi Pengawasan dan Penilaian SPK.259/BPDASHL.Slo/EV 19 Mei 2020 164,945,000


Kegiatan RHL Dalam Kawasan Hutan Wilayah L/DAS.1/5/2020
BPDASHL Solo Tahun 2020.
9 Pengadaan Pembuatan Tanaman Rehabilitasi Hutan dan SPK.396/BPDASHL.Slo/RHL/DAS.1/7/2020 27 Juli 2020 1,544,627,900
Lahan Agroforestry Reboisasi Hutan Lindung pada KPH Lawu
Ds Seluas 950 Ha
10 Pengadaan Bibit Kegiatan Pembuatan Kebun Bibit Desa SPK.399/BPDASHL.Slo/RHL/DAS.1/7/2020 27 Juli 2020 72,100,000
(KBD) di Wilayah BPDASHL Solo Tahun 2020

XVIII BPDASHL Kapuas


1 Penanaman RHL Kritis Tahun 2020 Secara
Vegetatif Blok I Desa Karangan Hora Kecamatan PKS.88/BPDASHL.Kp-3/7/2020 6 Juli 2020 1,418,775,500
Ella Hilir Kabupaten Melawi Seluas 175 Ha
2 Penanaman RHL Kritis Tahun 2020 Secara 1,424,218,000
Vegetatif Desa Parembang Nyuruh Kecamatan PKS.87/BPDASHL.Kp-3/7/2020 6 Juli 2020
Ella Hilir Kabupaten Melawi Seluas 225 Ha
3 Penanaman RHLl Kritis Tahun 2020 Secara 1,172,084,840
Vegetatif Desa Pakak Kecamatan Kayan Hilir
Kabupaten Sintang Seluas 225 Ha di Hutan PKS.89/BPDASHL.Kp-3/7/2020 6 Juli 2020
Lindung Gunung Bang

4 Penanaman RHL Kritis Tahun 2020 Secara 1,744,809,700


Vegetatif Desa Tepang Benua Kecamatan Kayan PKS.86/BPDASHL.Kp-3/7/2020 6 Juli 2020
Hulu Kabupaten Sintang Seluas 150 Ha
5 Pengawasan dan Evaluasi Kegiatan Pembuatan 304,700,000
Tanaman (P0), di Wilayah Kabupaten Sintang PKS.8/ BPDASHL.Kp-3/3/2020 23 April 2020
seluas 625 Ha
6 Pengawasan dan Evaluasi Kegiatan Pembuatan 425,260,000
Tanaman (P0), di Wilayah Kabupaten Melawi PKS.51/ BPDASHL.Kp-4/4/2020 23 April 2020
seluas 875 Ha
7 Pengawasan dan Penilaian Kegiatan RHL 208,274,000
Kawasan Hutan di Wilayah Mempawah, Landak PKS.57/ BPDASHL.Kp-4/5/2020 15 Mei 2020
dan Sekadau, seluas 525 Ha
8 Pengawasan dan Penilaian Kegiatan RHL 808,830,000
Kawasan Hutan Wilayah Kabupaten Sintang
Kecamatan Kayan Hilir Seluas 1.000 Ha dan PKS.61/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Kecamatan Kayan Hulu Seluas 800 Ha

9 Pengawasan dan Penilaian Kegiatan RHL 912,796,500


Kawasan Hutan Wilayah KPH Melawi seluas 2.300 PKS.59/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Ha
10 Pengawasan dan Penilaian Kegiatan RHL 822,580,000
Kawasan Hutan Wilayah KPH Sintang Utara PKS.60/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Seluas 1.800 Ha
11 Pengawasan dan Penilaian Pemeliharaan Tahun 984,665,000
Pertama (P1) Kegiatan RHL Kawasan Hutan
Lindung Bukit Alat- Sungai Demu, Serawai PKS.62/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Kabupaten Sintang Seluas 2.500 Ha

12 Pengawasan dan Penilaian Kegiatan RHL 629,817,650


Kawasan Hutan di Wilayah Kabupaten Kapuas PKS.59/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Hulu Seluas 1.450 Ha
13 Pengawasan dan Penilaian Kegiatan RHL 248,083,000
Kawasan Hutan Lindung Gunung Juring
Kabupaten Ketapang Seluas 125 Ha dan Taman PKS.63/ BPDASHL.Kp-4/5/2020 15 Mei 2020
Nasional Gunung Palung seluas 500 Ha

14 Penanaman RHL Kritis Tahun 2020 Secara 1,222,118,700


Vegetatif Blok II Desa Karangan Hora Kecamatan
Ella Hilir Kabupaten Melawi Seluas 175 Ha 04-Sep-20

PKS.156/BPDASHL.Kp-3/9/2020
15 Penanaman RHL Kritis Tahun 2020 Secara 1,897,580,850
Vegetatif Desa Nanga Masau, Kecamatan Kayan 05-Sep-20
Hulu Kabupaten Sintang Seluas 250 Ha
PKS.154/BPDASHL.Kp-3/9/2020
16 Penanaman RHL Kritis Tahun 2020 Secara 2,261,544,450
Vegetatif Desa Kuala Tiga Kecamatan Tempunak 06-Sep-20
Kabupaten Melawi Seluas 300 Ha
PKS.155/BPDASHL.Kp-3/9/2022
17 Pembangunan Rumah Dinas Eselon IV PKS.97/BPDASHL.Kp- 423,957,000
1/7/2020 27 Juli 2020

18 Perbaikan Gudang, Dapur Kantor dan Pintu Masuk PKS. 111/BPDASHL.Kp- 352,461,000
Kantor dan Ruang Kepala Balai 05 Agustus 2020
1/8/2020
19
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok III Nanga Nyuruh Kec. Ella 22-MAR-19
Hilir Kab. Melawi seluas 150 Ha di Kawasan HL Tanjung
Betung PKS.22/BPDASHL.Kp-3/03/2019 425,997,000
20
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Mandau Baru Kec. 22-MAR-19
Pinoh Selatan Kab. Melawi seluas 450 Ha di Kawasan HL
Bukit Penintin-Bukit Mancung PKS.26/BPDASHL.Kp-3/03/2019 1,172,424,000
21
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Lintah Taum Kec. Tanah 22-MAR-19
Pinoh Barat Kab. Melawi seluas 350 Ha di Kawasan HL
Gunung Burung PKS.23/BPDASHL.Kp-3/03/2019 823,145,950
22
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis 22-MAR-19
Tahun 2020 secara Vegetatif Blok I/II Nanga Nyuruh Kec. Ella
Hilir Kab. Melawi seluas 450 Ha di Kawasan HPT PKS.21/BPDASHL.Kp-3/03/2019 1,314,692,500
23
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Sinar Pekayau Kec. 22-MAR-19
Sepauk Kab. Sintang seluas 350 Ha di Kawasan HL Gunung
Naning/Gunung Burung/Lubuk Lintang PKS.25/BPDASHL.Kp-3/03/2019 738,273,250
24
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok IV/V Nanga Nyuruh Kec. 22-MAR-19
Ella Hilir Kab. Melawi Seluas 450 Ha di Kawasan HL Tanjung
Betung PKS.24/BPDASHL.Kp-3/03/2019 1,346,500,000
25
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Mungguk Gelombang 26-MAR-19
Kec. Ketungau Tengah Kab. Sintang seluas 500 Ha di
Kawasan HL Gn. Kehuma PKS.40/BPDASHL.Kp-3/3/2019 1,289,670,250
26
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis 26-MAR-19
Tahun 2020 secara Vegetatif Blok I Ansiap Kec. Sadaniang
Kab. Mempawah seluas 200 ha di Kawasan HL Penampean PKS.28/BPDASHL.Kp-2/3/2019 731,918,000
27
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis 26-MAR-19
Tahun 2020 secara Vegetaif Blok I Amawang Kec. Sadaniang
Kab. Mempawah seluas 125 Ha di Kawasan HL Selindung PKS.27/BPDASHL.Kp-2/3/2019 465,121,250
28 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Mensulung Bio Kec. PKS.46/BPDASHL.Kp-
Serawai Kab. Sintang seluas 400 ha di Kawasan HL Bukit 26-MAR-19 1,457,500,000
3/3/2019
Alat-Sungai Demu
29 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok III Mensulung Bio Kec. PKS.47/BPDASHL.Kp-
Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit 26-MAR-19 1,094,005,000
3/3/2019
Alat-Sungai Demu
30 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Nanga Kelapan Kec. PKS.38/BPDASHL.Kp-
Ketungau Tengah Kab. Sintang seluas 400 Ha di Kawasan HL 26-MAR-19 964,198,400
3/3/2019
Gn. Kehuma
31 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Merah Arai Kec. Kayan PKS.49/BPDASHL.Kp-
Hulu Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Patura- 26-MAR-19 1,088,186,000
3/3/2019
Bukit Alat
32 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok III/IV Langan Baru Kec. PKS.37/BPDASHL.Kp-
Embaloh Hulu Kab. Kapuas Hulu seluas 400 Ha di Kawasan 26-MAR-19 1,482,448,000
3/3/2019
HL
33 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok III Tahai Permai Kec.
Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit PKS.53/BPDASHL.Kp-3/3/2019 26-MAR-19 1,095,109,400
Alat-Sungai Demu
34 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Melingkat Kec. Kayan Hilir
Kab. Sintang seluas 350 Ha di Kawasan HL Bukit Meraung PKS.43/BPDASHL.Kp-3/3/2019 26-MAR-19 1,276,644,600

35 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis


Tahun 2020 secara Vegetatif Blok II Melingkat Kec. Kayan
Hilir Kab. Sintang seluas 350 Ha di Kawasan HL Bukit PKS.44/BPDASHL.Kp-3/3/2019 26-MAR-19 1,065,179,500
Meraung
36 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Pulau Majang Kec. Badau
Kab. Kapuas Hulu seluas 200 Ha di Kawasan TNBKDS PKS.56/BPDASHL.Kp-3/3/2019 26-MAR-19 729,410,000

37 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis


Tahun 2020 secara Vegetatif Blok I kepala Gurung Kec.
Mentebah Kab. Kapuas Hulu seluas 100 Ha di Kawasan HL PKS.33/BPDASHL.Kp-3/3/2019 26-MAR-19 366,454,000

38 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis


Tahun 2020 secara Vegetatif Blok I Gema Kec. Simpang Dua
Kab. Ketapang seluas 125 Ha di Kawasan HL Gn. Juring PKS.32/BPDASHL.Kp-3/3/2019 26-MAR-19 408,010,625

39 Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis


Tahun 2020 secara Vegetatif Blok I-II Pantok Kec. Nanga
Taman Kab. Sekadau seluas 100 Ha di Kawasan HL PKS.29/BPDASHL.Kp-2/03/2019 26-MAR-19 261,629,500
Naning/Gunung Gurung/Lubuk Lintang
40
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Limbur Bernaung Kec. PKS.30/BPDASHL.Kp-2/03/2019 26-MAR-19 896,115,000
Serawai Kab. Sintang seluas 250 ha di Kawasan HL Bukit
Alat-Sungai Demu
41
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis PKS.51/BPDASHL.Kp-3/3/2019 26-MAR-19 721,512,000
Tahun 2020 secara Vegetatif Blok I Nanga Masau Kec. Kayan
Hulu Kab. Sintang seluas 200 Ha di Kawasan HL Bukit Alat
42
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok II Merah Arai Kec. Kayan PKS.50/BPDASHL.Kp-3/03/2019 26-MAR-19 1,095,061,000
Hulu Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Patura-
Bukit Alat
43
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok III/IV Nanga Kelapan Kec. PKS.39/BPDASHL.Kp-3/3/2019 26-MAR-19 995,823,400
Ketungau Tengah Kab. Sintang seluas 400 Ha di Kawasan HL
Gn. Kehuma
44
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Entibab Kec. Bunut Hilir PKS.34/BPDASHL.Kp-3/3/2019 26-MAR-19 553,403,960
Kab. Kapuas Hulu seluas 150 Ha di Kawasan HL Siawan
Belida
45
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Lubuk Pengail Kec. 26-MAR-19 554,218,500
Suhaid Kab. Kapuas Hulu seluas 150 Ha di Kawasan
TNBKDS PKS.57/BPDASHL.Kp-3/3/2019
46
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Langan Baru Kec. 26-MAR-19
Embaloh Hulu Kab. Kapuas Hulu seluas 300 Ha di Kawasan
HL PKS.36/BPDASHL.Kp-3/3/2019 1,091,169,200
47
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Sedahan Jaya Kec.
Sukadana Kab. Kayong Utara seluas 250 Ha di Kawasan
TNGP PKS.55/BPDASHL.Kp-3/3/2019 26-MAR-19 991,001,000
48
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Nanga Tuan Kec. Bunut 26-MAR-19
Hilir Kab. Kapuas Hulu Seluas 150 Ha di Kawasan HL Siawan
Belida PKS.35/BPDASHL.Kp-3/3/2019 561,143,110
49
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok II Limbur Bernaung Kec. 26-MAR-19
Serawai Kab. Sintang seluas 250 Ha di Kawasan HL Bukit
Alat-Sungai Demu PKS.31/BPDASHL.Kp-2/03/2019 898,315,000
50
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I/II Tahai Permai Kec. 26-MAR-19
Serawai Kab. Sintang seluas 400 Ha di Kawasan HL Bukit
Alat-Sungai Demu PKS.52/BPDASHL.Kp-3/3/2019 1,451,692,000
51
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok IV Mensulung Bio Kec. 26-MAR-19
Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit
Alat-Sungai Demu PKS.48/BPDASHL.Kp-3/3/2019 1,091,255,000
52
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok IV Tahai Permai Kec. 26-MAR-19
Serawai Kab. Sintang seluas 300 Ha di Kawasan HL Bukit
Alat-Sungai Demu PKS.54/BPDASHL.Kp-3/3/2019 1,091,387,000
53
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis
Tahun 2020 secara Vegetatif Blok I Kempas Raya Kec. Kayan 26-MAR-19
Hilir Kab. Sintang seluas 300 Ha di Kawasan HL Bukit Paturan
dan Bukit Alat PKS.45/BPDASHL.Kp-3/3/2019 1,095,501,000
54
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis 26-MAR-19
Tahun 2020 secara Vegetatif Blok I Nanga Bayan Kec.
Ketungau Hulu Kab. Sintang seluas 250 ha di Kawasan HLT PKS.41/BPDASHL.Kp-3/3/2019 923,389,500
55
Pemeliharaan Tanaman Tahun Pertama (P1) RHL Kritis 26-MAR-19
Tahun 2020 secara Vegetatif Blok II Nanga Bayan Kec.
Ketungau Hulu Kab. Sintang seluas 250 ha di Kawasan HLT PKS.42/BPDASHL.Kp-3/3/2019 935,533,500
56

Pemeliharaan Tanaman Tahun Pertama (P1) RHL kritis Tahun


2019 secara Vegetatif Dusun Kopiang Desa Mandor 9-Sep-19
Kecamatan Mandor Kabupaten Landak seluas 100 Ha di
Kawasan Hutan dengan Tujuan Khusus UNTAN PKS.199/BPDASHL.Kp-3/9/2019 235,738,250
57
Pemeliharaan Tanaman RHL DTA Danau Tahun Kedua (P2)
seluas 132 Ha di HL Lanjak Desa Sei Abau, Kec. Batang 24-SEP-18
Lupar , Kab. Kapuas Hulu, Prov. Kalbar PKS.63/BPDASHL.Kp-3/9/2018 226,408,346

XIX BPDASHL Mahakam Berau (tidak ada data di


TW 3)

Paket 1 RHL DTA Danau di DTA Danau Kaskade


SP. 11/Add/PPK-
Mahakam, Desa Enggelam, Kec. Muara Wis, Kab.
1 PBJ/BPDASHL.MB- 09 Maret 2020 816,367,750
Kutai Kartanegara, Ruang Lingkup Pekerjaan
03/3/2020
Pemeliharaan Tahun Pertama (P1) Tahun 2020

Paket 2 RHL Rawan Bencana di Hutan Lindung


SP. 12/Add/PPK-
Gunung Hantu III, KPHP Manubar (Blok I dan II)
2 PBJ/BPDASHL.MB- 09 Maret 2020 1,128,796,875
Seluas 350 Hektar, Ruang Lingkup Pekerjaan
03/3/2020
Pemeliharaan Tahun Pertama (P1) Tahun 2020

Paket 3 RHL Rawan Bencana di Hutan Lindung


SP. 13/Add/PPK-
Gunung Hantu III, KPHP Manubar (Blok III) Seluas
3 PBJ/BPDASHL.MB- 09 Maret 2020 960,556,187
299 Hektar, Ruang Lingkup Pekerjaan
03/3/2020
Pemeliharaan Tahun Pertama (P1) Tahun 2020

Paket 4 RHL Rawan Bencana di Hutan Lindung


SP. 14/Add/PPK-
Gunung Hantu III, KPHP Manubar (Blok IV) Seluas
4 PBJ/BPDASHL.MB- 09 Maret 2020 352,587,750
109 Hektar, Ruang Lingkup Pekerjaan
03/3/2020
Pemeliharaan Tahun Pertama (P1) Tahun 2020

Paket 5 RHL Rawan Bencana di Hutan Lindung


Lembak Sungai Keraitan, KPHP Bengalon (Blok I SP. 15/Add/PPK-
5 dan II) Seluas 350 Hektar, Ruang Lingkup PBJ/BPDASHL.MB- 09 Maret 2020 1,134,567,000
Pekerjaan Pemeliharaan Tahun Pertama (P1) 03/3/2020
Tahun 2020 Tahun Pertama (P1) Tahun 2020

Paket 6 RHL Rawan Bencana di Hutan Lindung


Lembak Sungai Keraitan, KPHP Bengalon (Blok III SP. 16/Add/PPK-
6 dan IV) Seluas 516 Hektar, Ruang Lingkup PBJ/BPDASHL.MB- 09 Maret 2020 1,666,035,000
Pekerjaan Pemeliharaan Tahun Pertama (P1) 03/3/2020
Tahun 2020

Paket 7 RHL Rawan Bencana di Hutan Lindung


Lembak Sungai Keraitan, KPHP Bengalon (Blok V SP. 17/Add/PPK-
7 dan VI) Seluas 484 Hektar, Ruang Lingkup PBJ/BPDASHL.MB- 09 Maret 2020 1,573,363,000
Pekerjaan Pemeliharaan Tahun Pertama (P1) 03/3/2020
Tahun 2020

Paket 8 RHL Rawan Bencana di Hutan Lindung


Lembak Sungai Keraitan, KPHP Bengalon (Blok SP. 18/Add/PPK-
8 VII dan VIII) Seluas 546 Hektar, Ruang Lingkup PBJ/BPDASHL.MB- 09 Maret 2020 1,774,909,500
Pekerjaan Pemeliharaan Tahun Pertama (P1) 03/3/2020
Tahun 2020
Paket 9 RHL Rawan Bencana di Hutan Lindung
Lembak Sungai Keraitan, KPHP Bengalon (Blok IX SP. 19/Add/PPK-
9 dan X) Seluas 420 Hektar, Ruang Lingkup PBJ/BPDASHL.MB- 09 Maret 2020 1,323,682,500
Pekerjaan Pemeliharaan Tahun Pertama (P1) 03/3/2020
Tahun 2020

Paket 10 RHL Rawan Bencana di Hutan Lindung


SP. 20/Add/PPK-
Gunung Hantu III, KPHP Berau Barat (Blok I dan
10 PBJ/BPDASHL.MB- 09 Maret 2020 1,099,170,000
II) Seluas 345 Hektar, Ruang Lingkup Pekerjaan
03/3/2020
Pemeliharaan Tahun Pertama (P1) Tahun 2020

Paket 11 RHL DTA Waduk di DTA Waduk


SP. 21/Add/PPK-
Lambakan, KPHP Telake Seluas 100 Hektar,
11 PBJ/BPDASHL.MB- 09 Maret 2020 322,437,500
Ruang Lingkup Pekerjaan Pemeliharaan Tahun
03/3/2020
Pertama (P1) Tahun 2020
Paket 12 RHL Mangrove di KPH Delta Mahakam SP. 81/Add/PPK-
12 Seluas 50 Hektar, Ruang Lingkup Pekerjaan PBJ/BPDASHL.MB- 13 Mei 2020 180,961,000
Pemeliharaan Tahun Pertama (P1) Tahun 2020 03/3/2020

Pekerjaan Rehabilitasi Hutan Pola Intensif pada


DAS Rawan Bencana/Pasca Bencana Tahun 2018 SP. 51/Add/PPK-
13 (Blok I 200 Ha) di Batu Putih, Berau (KPHP Berau PBJ/BPDASHL.MB- 30 Maret 2020 231,825,000
Pantai), Ruang Lingkup Pekerjaan Pemeliharaan 03/03/2020
Tahun Kedua (P2) Tahun 2020

Pekerjaan Rehabilitasi Hutan Pola Intensif pada


DAS Rawan Bencana/Pasca Bencana Tahun 2018 SP. 52/Add/PPK-
14 (Blok II, 200 Ha) di Batu Putih, Berau (KPHP Berau PBJ/BPDASHL.MB- 30 Maret 2020 231,825,000
Pantai), Ruang Lingkup Pekerjaan Pemeliharaan 03/03/2020
Tahun Kedua (P2) Tahun 2020

Paket 1 Pengawasan dan Penilaia Kegiatan RHL


Rawan Bencana Di KPHP Manubar dan KPHP
SP. 59/PPK-
Berau Barat, KPHP Kendilo, Muara Wis dan Delta
15 PBJ/BPDASHL.MB- 06 April 2020 662,200,000
Mahakam Selaus 1.434 Hektar, Ruang Lingkup
04/4/2020
Pekerjaan Pemeliharaan Tahun Pertama (P1)
Tahun 2020

Paket 2 Pengawasan dan Penilaian Kegiatan RHL


SP. 59/PPK-
Rawan Bencana di KPHP Bengalon Seluas 2.316
16 PBJ/BPDASHL.MB- 06 April 2020 923,175,000
Hektar, Ruang Lingkup Pekerjaan Pemeluharaan
04/4/2020
Tahun Pertama (P1) Tahun 2020
SP. 68/PPK-
Pengadaan Bibit Produktif Tahun 2020 Sebanyak
17 PBJ/BPDASHL.MB- 23 April 2020 1,299,408,000
74.850 Batang
04/4/2020

XX BPDASHL Barito
1 Pekerjaan Pemeliharaan Tanaman Tahun Kedua P2 Kontrak
Tahun Jamak Rehabilitasi Hutan di UPT KPH Balangan seluas SPK.408/BPDASHL.Brt-
14-FEB-20 354,870,000
200 Ha TA 2020 2/ADD-II/2/2020

2 Pekerjaan Pemeliharaan Tanaman Tahun Kedua P2 Kontrak


Tahun Jamak Rehabilitasi Hutan di UPT KPHL Gerbang Barito SPK.407/BPDASHL.Brt-
14-FEB-20 296,900,000
Unit IX Seluas 200 Ha TA 2020 2/ADD-II/2/2020

3 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket XIII (Tiga Belas) UPTD. PKS.44/BPDASHL.Brt-
02-MAR-20 1,274,039,000
KPH Kayu Tangi Seluas 415 Ha 1/ADD-IV/3/2020

4 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket XIV (Empat Belas) UPTD PKS.45/BPDASHL.Brt-
02-MAR-20 1,178,945,000
KPH Tanah Laut Seluas 270 Ha 1/ADD-IV/3/2020

5 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket XV (Lima Belas) UPTD. PKS.46/BPDASHL.Brt-
02-MAR-20 1,645,487,000
KPH Tanah Laut Seluas 378 Ha 1/ADD-IV/3/2020
6 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)
Pekerjaan Rehabilitasi Hutan Paket XVI (Enam Belas) UPTD. PKS.47/BPDASHL.Brt-
02-MAR-20 1,304,158,000
KPH Tanah Laut Seluas 301 Ha 1/ADD-IV/3/2020

7 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket I (Satu) UPTD. KPH PKS.32/BPDASHL.Brt-
02-MAR-20 1,635,359,000
Balangan Seluas 644 Ha 1/ADD-V/3/2020

8 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket II (Dua) UPTD. KPH PKS.33/BPDASHL.Brt-
02-MAR-20 1,526,574,000
Balangan Seluas 606 Ha 1/ADD-V/3/2020

9 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket V (Lima) UPTD. KPH Hulu PKS.36/BPDASHL.Brt-
02-MAR-20 1,227,197,400
Sungai Selatan Seluas 409 Ha 1/ADD-IV/3/2020

10 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket IV (Empat) UPTD. KPH PKS.35/BPDASHL.Brt-
02-MAR-20 1,203,184,000
Hulu Sungai Seluas 423 Ha 1/ADD-IV/3/2020

11 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket III (Tiga) UPTD. KPH Hulu PKS.34/BPDASHL.Brt-
02-MAR-20 1,347,525,000
Sungai Seluas 425 Ha 1/ADD-III/3/2020

12 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket VI (Enam) UPTD. KPH PKS.37/BPDASHL.Brt-
02-MAR-20 2,036,728,000
Hulu Sungai Seluas 719 Ha 1/ADD-V/3/2020

13 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket VII (Tujuh) UPTD. KPH PKS.38/BPDASHL.Brt-
02-MAR-20 1,362,029,600
Kayu Tangi Seluas 490 Ha 1/ADD-IV/3/2020

14 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket VIII (Delapan) UPTD. KPH PKS.39/BPDASHL.Brt-
02-MAR-20 1,092,878,000
Kayu Tangi Seluas 357 Ha 1/ADD-IV/3/2020

15 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket IX (Sembilan) UPTD. KPH PKS.40/BPDASHL.Brt-
02-MAR-20 738,135,000
Kayu Tangi Seluas 250 Ha 1/ADD-IV/3/2020

16 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket X (Sepuluh) UPTD. KPH PKS.41/BPDASHL.Brt-
02-MAR-20 1,763,075,000
Kayu Tangi Seluas 600 Ha 1/ADD-IV/3/2020

17 Pekerjaan Pemeliharaan Tanaman Tahun Pertama (P1)


Pekerjaan Rehabilitasi Hutan Paket XII (Dua Belas) UPTD. PKS.43/BPDASHL.Brt-
02-MAR-20 1,798,962,000
KPH Kayu Tangi Seluas 606 Ha 1/ADD-IV/3/2020

18 Pekerjaan Pemeliharaan Tanaman Tahun Pertama


(Pemeliharaan P.1) Pekerjaan Rehabilitasi Hutan Paket XI PKS.42/BPDASHL.Brt-
02-MAR-20 1,376,271,500
(Sebelas) UPTD. KPH Kayu Tangi Seluas 413 Ha 1/ADD-IV/3/2020

19 Pekerjaan Pemeliharaan Tanaman Tahun Pertama


(Pemeliharaan P.1) Pekerjaan Rehabilitasi Hutan Paket XVII PKS.5/BPDASHL.BRT/EV/KUM.
(Tujuh Belas) UPTD. KPH Pulau Laut Sebuku seluas 895 Ha 04 Agustus 2020 1,935,542,500
3/8/2020
(Putus Kontrak/Tender Ulang)

20 Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan 1,393,711,000


Tanaman Tahun Pertama P1 Rehabilitasi Hutan pada UPTD S.158/BPDASHL.BRT/EV/KUM
KPH Kayu Tangi Seluas 3.131 Paket III .3/3/2020 23-MAR-20

21 Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan 974,726,500


Tanaman Tahun Pertama P1 Rehabilitasi Hutan pada UPTD S.156/BPDASHL.BRT/EV/K 23-MAR-20
KPH Tanah Laut Seluas 2.199 Paket I UM.3/3/2020

22 Pekerjaan Pengawasan dan Penilaian Kegiatan Pemeliharaan 1,461,240,000


Tanaman Tahun Pertama P1 Rehabilitasi Hutan pada UPTD S.157/BPDASHL.BRT/EV/K
KPH Hulu Sungai seluas 2.075 Paket II (adendum nilai 23-MAR-20
UM.3/3/2020
kontrak)

23 Pengawasan dan evaluasi pemeliharaan tanaman RHL (P1) PKS.18/BPDASHL.BRT/EV/DAS.


pada UPTD. KPH Pulau Laut Sebuku seluas 895 Ha 01 September 2020 267,811,500
0/9/2020
24 RHL Vegetatif pada UPTD. KPH Hulu Sungai seluas 601 Ha PKS.12/BPDASHL.BRT/RHL/KU
(Paket I) 7 Agustus 2020 1,105,091,500
M.3/8/2020
25 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 614 Ha PKS.13/BPDASHL.BRT/RHL/KU
(Paket II) 7 Agustus 2020 1,250,797,400
M.3/8/2020
26 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 476 Ha PKS.14/BPDASHL.BRT/RHL/KU
(Paket III) 10 Agustus 2020 1,044,477,000
M.3/8/2020
27 RHL Vegetatif pada UPTD. KPH Kayu Tangi seluas 469 Ha PKS.17/BPDASHL.BRT/RHL/KU
(Paket IV) [Tender Ulang] 26 Agustus 2020 814,910,000
M.3/8/2020
28 RHL Vegetatif pada UPTD. KPH Pulau Laut Sebuku seluas PKS.15/BPDASHL.BRT/RHL/KU
340 Ha (Paket V) 10 Agustus 2020 1,020,000,000
M.3/8/2020
29 Pengawasan dan Penilaian Penanaman Tahun Berjalan (P0)
RHL Vegetatif UPTD. KPH Kayu Tangi Seluas 1.559 Ha PKS.10/BPDASHL.BRT/RHL/KU
5 Agustus 2020 250,815,000
[Paket I ] M.3/8/2020

30 Pengawasan dan Penilaian Penanaman Tahun Berjalan (P0)


RHL Vegetatif UPTD. KPH Hulu Sungai dan Pulau Laut PKS.11/BPDASHL.BRT/RHL/KU
5 Agustus 2020 150,277,000
Sebuku Seluas 941 Ha [Paket II ] M.3/8/2020

31 Pengadaan Bibit sebanyak 46.000 batang dalam rangka


penghijauan lingkungan PKS.19/BPDASHL.BRT/EV/KUM 15 September 2020 919,700,000
.3/9/2020

XXI BPDASHL Kahayan


1 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.31/BPDAS.KH- 24/4/2020 1,452,880,500
220 hektar Di kawasan KPHL Kapuas Kahayan 2/4/2020
Desa Tumbang MangkutubTahun 2020-2022
2 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.32/BPDAS.KH- 24/4/2020 2,007,326,000
200 hektar Di kawasan KPHP Kahayan Hilir Desa 2/4/2020
Garung Tahun 2020-2022
3 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.33/BPDAS.KH- 24/4/2020 1,943,320,000
150 hektar Di kawasan Taman Nasional Sebangau 2/4/2020
Desa Paduran Sebangau Tahun 2020-2022

4 Penanaman Rehabilitasi Hutan Seluas 50 Hektar di PKS.34/BPDAS.KH- 24/4/2020 1,424,337,000


KHDTK Kebun Raya Sampit Tahun 2020 - 2022 2/4/2020

5 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.35/BPDAS.KH- 24/4/2020 539,819,000


150 hektar Di kawasan Balai KSDA Kalimantan 2/4/2020
Tengah Desa Petuk Liti Tahun 2020 - 2022 
6 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.36/BPDAS.KH- 24/4/2020 1,452,880,500
150 Hektar di Areal Balai Taman Nasional Tanjung 2/4/2020
Puting di Desa Teluk Pulai Tahun 2020 – 2022

7 Penanaman Rehabilitasi Hutan dan Lahan Seluas PKS.37/BPDAS.KH- 24/4/2020 1,422,752,400


80 hektar Di kawasan KPHP Kahayan Tengah 2/4/2020
Desa Bukit Rawi Tahun 2020-2022
8 Pengawasan dan Penilaian Kegiatan RHL Tahun 2020
PKS.44/BPDASHL.KH-
Seluas 1.000 Ha  2/6/2020 491,311,000
EV/DAS.1/6/2020

XXII BPDASHL Unda Anyar


1 Pengadaan jasa konsultasn perencanaan gedung PKS.1/BPDASHL.UA/TU/K 2 Januari 2020
Pengadaan (pembuiatan tanaman RHL) AP.1/I/2020 88,324,000
2 31 Januari 2020 713,193,690
Paket 1 (KPH Bali Utara/Kab. Buleleng / Kec.
PKS.33/BPDASHL.UA/RH
Seririt/ RPH Seririt / Ds. Pangkungparuk /Dsn Yeh
L/ KAP.1/I/2020
Selem/ Mdk Lima - Mdk Asem, 100 Ha)
3 Paket 2 (KPH Bali Timur/ Kab. Bangli / Kec. 31 Januari 2020 1,101,347,500
Kintamani / RPH Penelokan/ Desa Songan B / PKS.37/BPDASHL.UA/RH
Dsn. Bukitsari/ Mdk Bukit Sari-Mdk Tung-Tung, L/ KAP.1/I/2020
100 Ha)

4 31 Januari 2020 934,586,180


Paket 3 (KPH Bali Timur/ Kab. Karangasem / Kec.
PKS.39/BPDASHL.UA/RH
Abang / RPH Abang / Desa Datah / Dsn Kedampal
L/ KAP.1/I/2020
/ Mdk Kedampal, 100 Ha)
5 31 Januari 2020 716,954,700
Paket 4 (KPH Bali Timur/ Kab. Karangasem / Kec.
PKS.41/BPDASHL.UA/RH
Kubu / RPH Kubu / Desa Ban / Dsn Jatituhu / Mdk.
L/ KAP.1/I/2020
Penguleman, 100 Ha
6 Paket 5 (KPH Bali Timur/ Kab. Karangasem / Kec. 31 Januari 2020 730,918,210
Rendang / RPH Rendang / Desa Pempatan / Dsn PKS.35/BPDASHL.UA/RH
Puragae / Mdk. Asah, 100 Ha L/ KAP.1/I/2020
7 Paket 6 (KPH Bali Timur/ Kab. Bangli / Kec. 31 Januari 2020 1,755,728,700
Kintamani / RPH Kintamani Timur PKS.43/BPDASHL.UA/RH
a. Ds. Pinggan / Pinggan / Mdk . Selumin, L/ KAP.1/I/2020
100 Ha
b. Ds. Subaya / Subaya/ Mdk. Subaya, 150
Ha

8 Pengadaan jasa konsultas Wasnil RHL 17 Februari 2020 293,062,000


PKS.52/BPDASHL.UA/RH
L/KAP.1/2/2020
9 Pengadaan bibit produktif tahap 1 PKS.83/BPDASHL.UA/RH 27 Maret 2020 534,143,750
L/KEU.1/3/2020
10 Pengadaan bibit produktif tahap 2 Paket 1 18 Agustus 2020 390,673,500
PKS.164/BPDASHL.UA/R
HL/KEU.1/8/2020
11 Pengadaan bibit produktif tahap 2 Paket 2 PKS.165/BPDASHL.UA/R 18 Agustus 2020 390,851,125
HL/KEU.1/8/2020

XXIII BPDASHL Dodokan Moyosari


1 Pembuatan tanaman RHL intensif wilayah TN Tambora seluas PKS.82/BPDASHL.DMY/RHL
407 Ha (Paket III) 24-APR-19 1,405,272,000
/4/2019
2 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.84/BPDASHL.DMY/RHL
Tambora seluas 102 Ha (Paket VII) 24-MAY-19 200,920,170
/5/2019
3 Pembuatan tanaman RHL intensif wilayah BKPH Maria PKS.85/BPDASHL.DMY/Pro
Donggomassa seluas 300 Ha (Paket I) 27-MAY-19 1,052,391,450
g/5/2019
4 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.162/BPDASHL.DMY/RH
Tambora seluas 411 Ha (Paket VIII) '09-AUG-19 985,898,100
L/8/2019
5 Pembuatan tanaman RHL Intensif wilayah Taman Nasional PKS.160/BPDASHL.DMY/RH
Tambora seluas 293 Ha (Paket IV) '09-AUG-19 1,083,068,250
L/8/2019
6 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.161/BPDASHL.DMY/RH
Ampang Riwo Soromandi seluas 398 Ha (Paket V) '09-AUG-19 905,550,800
L/8/2019
7 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.163/BPDASHL.DMY/RH
Ampang Riwo Soromandi seluas 351 Ha (Paket VI) 13-AUG-19 792,214,500
L/8/2019
8 Pembuatan tanaman RHL Intensif wilayah BKPH Ampang PKS.159/BPDASHL.DMY/RH
Riwo Soromandi seluas 200 Ha (Paket II) '09-AUG-19 745,448,000
L/8/2019
9 Pembuatan tanaman RHL Agroforestry wilayah BKPH Rinjani PKS.168/BPDASHL.DMY/PR
Barat Pelangan Tastura seluas 608 Ha 26-AUG-19 1,361,888,000
OG/8/2019
10 Pengawasan dan penilaian pekerjaan pemeliharaan
pembuatan tanaman RHL tahun I (P-1) di Wilayah BKPH PKS.8/BPDASHL.DMY/Ev/3/
18-MAR-20 498,672,500
Ampang Riwo seluas 949 ha (paket IV) 2020

11 Pengawasan dan penilaian pekerjaan pemeliharaan


pembuatan tanaman RHL tahun I (P-1) di wilayah BKPH PKS.7/BPDASHL.DMY/Ev/3/
18-MAR-20 284,667,500
Tambora seluas 543 ha (paket III) 2020
12 Pengawasan dan penilaian pekerjaan pemeliharaan
pembuatan tanaman RHL (P-1) di Wilayah Balai TN Tambora PKS.6/BPDASHL.DMY/Ev/3/
dan BKPH Maria Donggomassa seluas 1000 ha (paket II) 18-MAR-20 525,097,500
2020

13 Pengawasan dan penilaian pekerjaan pemeliharaan


pembuatan tanaman RHL tahun I (P-1) di wiayah BKPH PKS.5/BPDASHL.DMY/Ev/3/
18-MAR-20 318,582,000
Pelangan Tastura seluas 608 Ha (Paket I) 2020

14 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.174/BPDASHL.DMY/RH


Pelangan Tastura seluas 180 ha (paket II) 24-AUG-20 288,090,000
L/8/2020
15 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.190/BPDASHL.DMY/RH
Ampang Plampang seluas 200 ha (paket VI) 27-AUG-20 264,000,000
L/8/2020
16 Pembuatan tanaman RHL Agroforestry wilayah BKPH Maria PKS.195/BPDASHL.DMY/RH
Donggomasa seluas 178 ha (paket IX) 31-AUG-20 293,210,500
L/8/2020
17 Pembuatan tanaman RHL Agroforestry wilayah BKPH PKS.206/BPDASHL.DMY/RH
Ampang Riwo seluas 447 ha (paket VIII) '03-SEP-20 601,717,875
L/9/2020

XXIV BPDASHL Benain Noelmina


1 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.303/BPDASHL.BN- 7 April 2020 1,217,044,500
Kawasan Hutan Produksi Seluas 150 Ha di Desa Loli Pada 1/4/2020
UPT KPH Wilayah Kabupaten Timor Tengah Selatan Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 1
(Lokasi Desa Loli Kecamatan Polen Kabupaten Timor Tengah
Selatan)

2 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.197/BPDASHL.BN- 11 Maret 2020 1,168,175,000
Kawasan Hutan Produksi Seluas 150 Ha di Desa Konbaki 1/3/2020
Pada UPT KPH Wilayah Kabupaten Timor Tengah Selatan
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 2 (Lokasi Desa Konbaki Kecamatan Polen Kabupaten
Timor Tengah Selatan)

3 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK. 257/BPDASHL.BN- 23 Maret 2020 836,183,800
Kawasan Hutan Lindung Seluas 50 Ha di Desa Lelobatan 1/3/2020
Pada UPT KPH Wilayah Kabupaten Timor Tengah Selatan
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 3 (Lokasi Desa Lelobatan Kecamatan Mollo Utara
Kabupaten Timor Tengah Selatan)

4 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK. 258/BPDASHL.BN- 23 Maret 2020 416,499,000
Kawasan Hutan Lindung Seluas 100 Ha di Desa Bikekneno 1/3/2020
Pada UPT KPH Wilayah Kabupaten Timor Tengah Selatan
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 4 (Lokasi Desa Bikekneno Kecamatan Mollo Selatan
Kabupaten Timor Tengah Selatan)

5 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.260 /BPDASHL.BN- 23 Maret 2020 816,170,750
Kawasan Hutan Lindung Seluas 100 Ha di Desa Golo Lijun 1/3/2020
Pada UPT KPH Wilayah Kabupaten Manggarai Timur Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 5
(Lokasi Desa Golo Lijun Kecamatan Elar Kabupaten
Manggarai Timur)

6 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.321 /BPDASHL.BN- 14 April 2020 846,326,600
Kawasan Hutan Lindung Seluas 100 Ha di Desa Dirun Pada 4/4/2020
UPT KPH Wilayah Kabupaten Belu Dengan Skema Kontrak
Tahun Jamak (Tahun 2020 – 2022) Paket 25 (Lokasi Desa
Dirun Kecamatan Lamaknen Kabupaten Belu)
7 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.340 /BPDASHL.BN- 21 April 2020 856,148,500
Kawasan Hutan Lindung Seluas 100 Ha di Desa Fatuketi 4/4/2020
Pada UPT KPH Wilayah Kabupaten Belu Dengan Skema
Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 26 (Lokasi
Desa Fatuketi Kecamatan Kakukluk Mesak Kabupaten Belu)

8 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.251/BPDASHL.BN- 23 Maret 2020 797,364,750
Kawasan Hutan Lindung Seluas 100 Ha di Desa Tamma Pada 3/3/2020
UPT KPH Wilayah Kabupaten Sumba Timur Dengan Skema
Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 15 (Desa
Tamma Kecamatan Pahunga Lodu Kabupaten Sumba Timur)

9 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.252/BPDASHL.BN- 23 Maret 2020 410,935,875
Kawasan Hutan Lindung Seluas 50 Ha di Desa Persiapan 3/3/2020
Laimandar Pada UPT KPH Wilayah Kabupaten Sumba Timur
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 16 (Desa Persiapan Laimandar Kecamatan Umalulu
Kabupaten Sumba Timur)

10 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.201/BPDASHL.BN- 12 Maret 2020 1,185,155,800
Kawasan Hutan Lindung Seluas 150 Ha di Desa Susu 3/3/2020
Wendewa Pada UPT KPH Wilayah Kabupaten Sumba Tengah
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 18 (Desa Susu Wendewa Kecamatan Mamboro
Kabupaten Sumba Tengah)

11 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.253/BPDASHL.BN- 23 Maret 2020 799,203,600
Kawasan Hutan Produksi Seluas 100 Ha di Desa Loko Ry 3/3/2020
Pada UPT KPH Wilayah Kabupaten Sumba Barat Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 19
(Desa Loko Ry Kecamatan Tana Righu Kabupaten Sumba
Barat)

12 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.254/BPDASHL.BN- 23 Maret 2020 790,172,650
Kawasan Hutan Lindung Seluas 100 Ha di Desa Wanokasa 3/3/2020
Pada UPT KPH Wilayah Kabupaten Sumba Barat Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 20
(Desa Wanokasa Kecamatan Tana Righu Kabupaten Sumba
Barat)

13 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.255/BPDASHL.BN- 23 Maret 2020 804,587,500
Kawasan Hutan Lindung Seluas 100 Ha di Desa Reda Pada 3/3/2020
Pada UPT KPH Wilayah Kabupaten Sumba Barat Daya
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 21 (Desa Reda Pada Kecamatan Wewewa Barat
Kabupaten Sumba Barat Daya)

14 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.256/BPDASHL.BN- 23 Maret 2020 780,670,500
Kawasan Hutan Produksi Seluas 100 Ha di Desa Wae 3/3/2020
Makaha Pada UPT KPH Wilayah Kabupaten Sumba Barat
Daya Dengan Skema Kontrak Tahun Jamak (Tahun 2020 –
2022) Paket 22 (Desa Wae Makaha Kecamatan Kodi Belagar
Kabupaten Sumba Barat Daya)

15 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.202/BPDASHL.BN- 12 Maret 2020 839,087,250
Kawasan Hutan Lindung Seluas 100 Ha di Desa Oemolo Pada 3/3/2020
UPT KPH Wilayah Kabupaten Kupang Dengan Skema
Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 23 (Desa
Oemolo Kecamatan Amabi Oefeto Timur Kabupaten Kupang)
16 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.203/BPDASHL.BN- 12 Maret 2020 1,251,057,550
Kawasan Hutan Lindung Seluas 150 Ha di Desa Bondo Sula 3/3/2020
Pada UPT KPH Wilayah Kabupaten Sumba Tengah Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 28
(Desa Bondosula Kecamatan Mamboro Kabupaten Sumba
Tengah)

17 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.204/BPDASHL.BN- 12 Maret 2020 770,702,500
Kawasan Hutan Lindung Seluas 100 Ha di Desa Bondo Sula 3/3/2020
Pada UPT KPH Wilayah Kabupaten Sumba Tengah Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket
29 (Desa Bondosula Kecamatan Mamboro Kabupaten Sumba
Tengah)

18 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.194/BPDASHL.BN- 10 Maret 2020 740,432,000
Kawasan Hutan Lindung Seluas 100 Ha di Desa Merdeka 2/3/2020
Pada UPT KPH Wilayah Kabupaten Lembata Dengan Skema
Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 12 Lokasi
Kegiatan Desa Merdeka kec. Lebatukan Kab. Lembata  

19 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam PKS.193/BPDASHL.BN- 10 Maret 2020 413,418,500
Kawasan Hutan Lindung Seluas 50 Ha di Kelurahan Lewoleba 2/3/2020
Timur Pada UPT KPH Wilayah Kabupaten Lembata Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 14.
Lokasi Kegiatan Kelurahan lewoleba Timur Kec. Nubatukan
Kab. Lembata 

20 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.231/BPDASHL.BN- 18 Maret 2020 839,465,100
Kawasan Hutan Lindung Seluas 50 Ha di Desa Saindule dan 2/3/2020
kawasan hutan produksi seluas 50 Ha di desa Suebela Pada
UPT KPH Wilayah Kabupaten Rote Ndao Dengan Skema
Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 30 

21 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.232/BPDASHL.BN- 18 Maret 2020 842,063,000
Kawasan Hutan Lindung Seluas 100 Ha di Desa Sedeoen dan 2/3/2020
desa Oenitas Pada UPT KPH Wilayah Kabupaten Rote Ndao
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 31 

22 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.233/BPDASHL.BN- 18 Maret 2020 1,254,605,100
Kawasan Hutan Lindung Seluas 50 Ha di Desa Faifua dan 2/3/2020
kawasan hutan produksi seluas 100 Ha desa Fatelilo dan
Oematamboli Pada UPT KPH Wilayah Kabupaten Rote Ndao
Dengan Skema Kontrak Tahun Jamak (Tahun 2020 – 2022)
Paket 32 

23 Penanaman Reboisasi Intensif (625 Batang Per Ha) Dalam SPK.259/BPDASHL.BN- 23 Maret 2020 813,782,000
Kawasan Hutan Lindung Seluas 100 Ha di Desa Kolana 2/3/2020
Selatan Pada UPT KPH Wilayah Kabupaten Alor Dengan
Skema Kontrak Tahun Jamak (Tahun 2020 – 2022) Paket 10.
Lokasi Kegiatan Desa Kolana Selatan Kec. Alor Timur Kab.
Alor  

24 Penanaman Reboisasi Agroforestry Dalam Kawasan Hutan SPK.272/BPDASHL.BN- 23 Maret 2020 627,760,500
Lindung Seluas 100 Ha di Desa Maritaing Pada UPT KPH 2/3/2020
Wilayah Kabupaten Alor Dengan Skema Kontrak Tahun
Jamak (Tahun 2020 – 2022) Paket 11. Lokasi Kegiatan Desa
Maritaing Kec. Alor Timur Kab. Alor 
XXV BPDASHL Jeneberang Saddang (tidak ada data
di TW 3)
1 Paket I. Pengawasan dan Penilaian Pemeliharaan PKS.235/BPDASHLJS/EV/ 5/27/2020 1,236,939,000
Th. I (P1) Tanaman RHL DAS Rawan Bencana KUM.3/5/2020
Kabupaten. Bone seluas 4.270 Ha
2 Paket II Pengawasan dan Penilaian Pemeliharaan PKS.236/BPDASHLJS/EV/ 5/27/2020 1,016,526,500
Th. I (P1) Tanaman RHL DTA Waduk, DAS KUM.3/5/2020
Prioritas dan DAS Rawan Bencana Kab. Gowa,
Jeneponto, Takalar, Maros, Barru, dan Selayar
Seluas 3.450 Ha

3 Paket III. Pengawasan dan Penilaian PKS.227/BPDASHLJS/EV/ 5/15/2020 1,243,077,000


Pemeliharaan Th. I (P1) Tanaman RHL DAS KUM.3/5/2020
Prioritas Kabupaten Tana Toraja Seluas 4.125 Ha
4 Paket IV. Pengawasan dan Penilaian PKS.239/BPDASHLJS/EV/ 5/27/2020 912,917,500
Pemeliharaan Th. I (P1) Tanaman RHL DTA KUM.3/5/2020
Danau, DAS Prioritas, DAS Rawan Bencana Kab.
Soppeng, Enrekang, Toraja Utara, Palopo, Luwu
Timur, dan Luwu Utara seluas 3.105 Ha

5 Paket V. Pengawasan dan Penilaian Pemeliharaan PKS.228/BPDASHLJS/EV/ 5/15/2020 1,383,833,000


Th. I (P1) Tanaman RHL DAS Priritas, DTA Danau KUM.3/5/2020
Kab. Pinrang dan Sidrap Seluas 4.650 Ha

6 Paket 21. Pembuatan Tanaman RHL DAS Prioritas PKS.13/BPDASHLJS/RHL/ 6/1/2020 1,336,500,000
Blok Sima I, Sima II, Sima III Kabupaten Tana KUM.3/1/2020
Toraja Seluas 900 Ha (Lanjutan)
7 Paket 24. Pembuatan Tanaman RHL DAS Prioritas PKS.24/BPDASHLJS/RHL/ 6/1/2020 533,610,000
Blok Salu Rea I/Lembang Barupu Selatan, Salu KUM.3/1/2020
Rea II/ Lembang Barupu Selatan, Salu Salu/
Lembang Barupu Selatan, Talende/ Lembang
Barupu Selatan Kabupaten Toraja Utara Seluas
770 Ha (Lanjutan)

8 Paket 1. Pemeliharaan Th I (P1) RHL DAS Rawan PKS.65/BPDASHLJS/RHL/ 28/01/20 1,093,730,000


Bencana Blok Bontojai, Lamoncong, Mattirowalie, KUM.3/1/2020
Patukku Kabupaten Bone Seluas 775 Ha

9 Paket 2. Pemeliharaan Th. I (P1) Tanaman RHL PKS.66/BPDASHLJS/RHL/ 28/01/20 2,777,346,000


DAS Rawan Bencana Blok Masserengpulu, KUM.3/1/2020
Mattirobulu, Barakkae I, Barakkae II Kabupaten
Bone seluas 845 Ha

10 Paket 3. Pemeliharaan Th. I (P1) Tanaman RHL PKS.67/BPDASHLJS/RHL/ 28/01/20 1,408,323,500


DAS Rawan Bencana Blok Baringeng, Tompobulu, KUM.3/ 1/2020
Ponre-Ponre Kabupaten Bone Seluas 500 Ha

11 Paket 4. Pemeliharaan Th. I (P1) RHL DAS Rawan PKS.68/BPDASHLJS/RHL/ 28/01/20 1,292,290,000
Bencana Blok Batu Putih, Gaya Baru, Sadar, KUM.3/1/2020
Tapong Kabupaten Bone Seluas 700 Ha
12 Paket 5. Pemeliharaan Th. I (P1) RHL DAS Rawan PKS.69/BPDASHLJS/RHL/ 28/01/20 2,044,735,000
Bencana Blok Pallawa I, Pallawa II, Pallawa III KUM.3/1/2020
Kabupaten Bone seluas 700 Ha
13 Paket 6. Pemeliharaan Th. I (P1) RHL DAS Rawan 28/01/20 1,255,155,000
Bencana Blok Tondong Kabupaten Bone Seluas PKS.70/BPDASHLJS/RHL/
300 Ha KUM.3/1/2020
14 Paket 7. Pemeliharaan Th. I Tanaman RHL PKS.85/BPDASHLJS/EVD 28/01/20 812,143,750
Daerah Tangkapan Air (DTA) Waduk Blok AS/KUM.3/1/2020
Berutallasa, Baturappe, Laliwa, Kabupaten Gowa
Seluas 250 Ha
15 Paket 8. Pemeliharaan Th. I (P1) Tanaman RHL PKS.86/BPDASHLJS/EVD 28/01/20 2,084,152,125
DAS Prioritas Blok Bissoloro, Rannaloe, AS/ KUM.3/1/2020
Manimbahoi, Buakkang Kabupaten Gowa seluas
650 Ha

16 Paket 9. Pemeliharaan Th. I (P1) Tanaman RHL PKS.87/BPDASHLJS/EVD 28/01/20 292,930,000


Daerah Tangkapan Air (DTA) Waduk Blok Cikoro AS/KUM.3/1 /2020
Kabupaten Gowa Seluas 100 Ha
17 Paket 10. Pemeliharaan Th. I (P1) Tanaman RHL PKS.88/BPDASHLJS/EVD 28/01/20 3,188,889,000
DAS Prioritas Blok Basseang I, Basseang II, AS/KUM.3/1/2020
Basseang III Kabupaten Pinrang Seluas 900 Ha
18 Paket 11. Pemeliharaan Th. I (P1) Tanaman RHL 28/01/20 1,075,248,000
DAS Prioritas Blok Basseang IV Kabupaten PKS.89/BPDASHLJS/EVD
Pinrang seluas 300 Ha AS/KUM.3/1/2020
19 Paket 12. Pemeliharaan Th. I (P1) Tanaman RHL PKS.71/BPDASHLJS/RHL/ 28/01/20 3,212,946,000
DAS Prioritas Blok Lembang Mesakada I, KUM.3/1/2020
Lembang Mesakada II, Lembang Mesakada III
Kabupaten Pinrang seluas 900 Ha

20 Paket 13. Pemeliharaan Th. I (P1) RHL DAS PKS.72/BPDASHLJS/RHL/ 28/01/20 2,855,952,000
Prioritas Blok Lembang Mesakada IV, Lembang KUM.3/1/2020
Mesakada V, Lembang Mesakada VI Kabupaten
Pinrang seluas 800 Ha

21 Paket 14. Pemeliharaan Th. I (P1) RHL DAS PKS.73/BPDASHLJS/RHL/ 28/01/20 3,258,003,155
Prioritas Blok Suppirang I, Suppirang II, Suppirang KUM.3/ 1/2020
III, Suppirang IV Kabupaten Pinrang seluas 900 Ha

22 Paket 15. Pemeliharaan Th. I (P1) Tanaman RHL PKS.63/BPDASHLJS/PRO 28/01/20 1,997,105,000
Daerah Tangkapan Air (DTA) Danau Blok Kundala/ GDAS/KEU.1.1/1/2020
Teppo, Jennae/ Teppo Kabupaten Sidrap seluas
550 Ha

23 Paket 16. Pemeliharaan Th. I (P1) Tanaman RHL PKS.64/BPDASHLJS/PRO 28/01/20 1,094,957,500
Daerah Tangkapan Air (DTA) Danau Blok Buae I, GDAS/KUM.1.1/1/2020
Buae II Kabupaten Sidrap Seluas 300 Ha
24 Paket 17. Pemeliharaan Th. I (P1) RHL DAS PKS.74/BPDASHLJS/RHL/ 28/01/20 1,476,666,950
Prioritas Blok Butang, Kondodewata Kabupaten KUM.3/1/2020
Tana Toraja Seluas 550 Ha
25 Paket 18. Pemeliharaan Th. I (P1) Tanaman RHL PKS.75/BPDASHLJS/RHL/ 28/01/20 3,156,340,000
DAS Prioritas Blok Sangpeparkan I, Sangpeparkan KUM.3/1/2020
II, Sangpeparkan III, Tanete Kabupaten Tana
Toraja seluas 900 Ha

26 Paket 19. Pemeliharaan Th. I (P1) Tanaman RHL PKS.90/BPDASHLJS/EVD 28/01/20 1,771,220,000
DAS Prioritas Blok Makkodo I, Makkodo II AS/KUM.3/1/2020
Kabupaten Tana Toraja Seluas 500 Ha
27 Paket 20. Pemeliharaan Th. I (P1) Tanaman RHL PKS.91/BPDASHLJS/EVD 28/01/20 1,707,921,600
DAS Prioritas Blok Pongbembe, Sambuang AS/KUM.3/1/2020
Kabupaten Tana Toraja Seluas 475 Ha
28 Paket 21. Pemeliharaan Th. I (P1) Tanaman RHL PKS.109/BPDASHLJS/RH 19/02/20 3,266,010,000
DAS Prioritas Blok Sima I, Sima II, Sima III L/KUM.3/1/2020,
Kabupaten Tana Toraja Seluas 900 Ha
29 Paket 22. Pemeliharaan Th. I (P1) Tanaman RHL PKS.76/BPDASHLJS/RHL/ 28/01/20 2,836,108,000
DAS Prioritas Blok Sima IV, Sima V, Leppan KUM.3/1/2020
Kabupaten Tana Toraja Seluas 800 Ha
30 Paket 23. Pemeliharaan Th. I (P1) Tanaman RHL PKS.58/BPDASHLJS/PRO 28/01/20 1,510,080,000
Daerah Tangapan Air (DTA) Danau Pesse I, Pesse GDAS/ KEU.3/1/2020
II, Pesse III, Pesse IV Kabupaten Soppeng seluas
800 Ha
31 Paket 24. Pemeliharaan Th. I (P1) Tanaman RHL PKS.92/BPDASHLJS/EVD 28/01/20 1,734,294,100
DAS Prioritas Blok Salu Rea I/Lembang Barupu AS/KUM.3/1/2020
Selatan, Salu Rea II/ Lembang Barupu Selatan,
Salu Salu/ Lembang Barupu Selatan, Talende/
Lembang Barupu Selatan Kabupaten Toraja Utara
Seluas 770 Ha

32 Paket 25. Pemeliharaan Th. I (P1) Tanaman RHL PKS.93/BPDASHLJS/EVD 28/01/20 223,740,000
DAS Rawan Bencana Blok Battang Barat, Latuppa AS/KUM.3/1/2020
Kota Palopo seluas 100 Ha
33 Paket 26 Pemeliharaan Th. I (P1) RHL DAS PKS.77/BPDASHLJS/RHL/ 28/01/20 3,177,680,000
Prioritas Blok Tanete, Sawito, Lembang Rossoan I KUM.3/1/2020
Kabupaten Enrekang Seluas 1.000 Ha
34 Paket 27 Pemeliharaan Th. I. (P1) Tanaman RHL PKS.59/BPDASHLJS/ 28/01/20 1,640,529,000
DAS Rawan Bencana Blok Mattiro PROGDAS/KEU.1.1/1/202
Deceng/Pujananting, Landange/Pujananting, Bonto 0
Payung I/ Pujananting, Bonto Payung II/
Pujananting Kabupaten Barru Seluas 600 Ha

35 Paket 28. Pemeliharaan Th. I (P1) Tanaman RHL PKS.94/BPDASHLJS/EVD 28/01/20 282,535,000
Kawasan Konservasi Blok Pappaluang Kabupaten AS/KUM.3/1/2020
Jeneponto seluas 125 Ha
36 Paket 30. Pemeliharaan Th. I (P1) RHL DAS PKS.78/BPDASHLJS/RHL/ 28/01/20 303,703,125
Rawan Bencana Blok Bolli, Patimpa Kabupaten KUM.3/1/2020
Bone Seluas 100 Ha
37 PKS.96/BPDASHLJS/EVD 28/01/20 349,305,000
Paket 31. Pemeliharaan Th. I (P1) Tanaman RHL AS/KUM.3/1/2020
DAS Rawan Bencana Blok Kota Intang/ Lembang
Baji, Binanga/ Bakka/ Bontosaile Kabupaten
Selayar Seluas 150 Ha
38 PKS.97/BPDASHLJS/EVD 28/01/20 323,950,000
Paket 32 Pemeliharaan Th. I (P1) Tanaman RHL
AS/KUM.3/1/2020
Daerah Tangkapan Air (DTA) Danau Blok Matano
Kabupaten Luwu Timur seluas 100 Ha
39 PKS.98/BPDASHLJS/EVD 28/01/20 617,677,000
Paket 33 Pemeliharaan Th. I (P1) Tanaman RHL
AS/KUM.3/1/2020
DAS Rawan Bencana Blok Bonto Manurung, Laiya
Kabupaten Maros Seluas 400 Ha Ha
40 PKS.79/BPDASHLJS/RHL/ 28/01/20 284,006,250
Paket 34 Pemeliharaan Th. I (P1) RHL DAS
KUM.3/1/2020
Rawan Bencana Blok Pationgi Kabupaten Bone
seluas 150 Ha
41 PKS.80/BPDASHLJS/RHL/ 28/01/20 702,515,000
Paket 35 Pemeliharaan Th. I (P1) RHL DAS
KUM.3/1/2020
Rawan Bencana Blok Walimpong Kabupaten Bone
Seluas 200 Ha
42 28/01/20 368,500,000
Paket 36. Pemeliharaan Th. I (P1) Tanaman RHL
PKS.60/BPDASHLJS/PRO
DAS Rawan Bencana Blok Nepo Kabupaten Barru
GDAS/ KEU.1.1/1 2020
seluas 200 Ha
43 PKS.61/BPDASHLJS/PRO 28/01/20 376,717,000
GDAS/KEU.1.1/1/2020
Paket 37 Pemeliharaan Th. I (P1) Tanaman RHL
DAS Rawan Bencana Blok Tangngasoe/ Jangang-
Jangang Kabupaten Barru seluas 150 Ha
44 PKS.62/BPDASHLJS/PRO 28/01/20 572,665,500
Paket 38. Pemeliharaan Th. I (P1) Tanaman RHL
GDAS/KEU.1.1/1/2020
DAS Rawan Bencana Blok Lempang/ Gattareng
Kab. Barru seluas 250 Ha
45 PKS.99/BPDASHLJS/EVD 28/01/20 498,150,000
Pekerjaan Pemeliharaan Th.I (P1) Tanaman RHL
AS/KUM.3/1/2020
DAS Prioritas Blok Parigi/ Desa Parigi Kecamatan
Tinggi Moncong Kabupaten Gowa Seluas 150 Ha
46 PKS.102/BPDASHLJS/EV 28/01/20 242,780,000
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS/KUM.3/1/2020
DAS Rawan Bencana Blok Wanuawaru/ Desa
Wanuawaru Kecamatan Mallawa Kabupaten
Maros Seluas 100 Ha
47 PKS.103/BPDASHLJS/EV 28/01/20 252,990,000
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS/KUM.3/1/2020
DAS Rawan Bencana Blok Kanandede II/ Desa
Kanandede Kecamatan Rongkong Kabupaten
Luwu Utara Seluas 100 Ha
48 PKS.100/BPDASHLJS/EV 28/01/20 249,083,200
DAS/KUM.3/1/2020
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL
DAS Prioritas Blok Pao/ Desa Pao Kecamatan
Tombolopao Kabupaten Gowa Seluas 75 Ha
49 PKS.101/BPDASHLJS/EV 28/01/20 486,000,000
Pekerjaan Pemeliharaan Th. I (P1) Tanaman RHL DAS/KUM.3/1/ 202
DAS Rawan Bencana Blok Beroanging/ Desa
Beroanging Kecamatan Bangkala Barat Kabupaten
Jeneponto Seluas 200 Ha
50 PKS.459/BPDASHLJS/EV 15/05/20 1,475,000,000
Paket 1. Pengadaan Bibit Produktif wilayah DAS/KUM.1.1/5/2020
layanan Kab/kota Palopo, Bone, Soppeng, Wajo,
Sidrap, Luwu, Luwu Timur, Luwu Utara,, Tana
Toraja, Toraja Utara, Enrekang, Makasa Timur,
Mamasa Tengah dan Pinrang sebanyak 105.500
batang Kontrak
51 PKS.459/BPDASHLJS/EV 15/05/20 1,449,500,000
Paket 2. Pengadaan Bibit Produktif wilayah DAS/KUM.1.1/5/2020
layanan Kab/kota Makassar, Gowa, Takalar,
Jeneponto, Bantaeng, Bulukumba, Sinjai, Selayar,
Maros, Pangkep dan Barru sebanyak 105.500
batang Kontrak

XXVI BPDASHL Bone Bolango


1 Pengawasan dan Evaluasi Kegiatan Tanaman SP.681/BPDASHL.BB/TU/ 27 April 2020 321,255,000
RHL P1 di Kabupaten Gorontalo I Seluas 1.110 04/2020
Ha (Repeat Order)
2 Pengawasan dan Evaluasi Kegiatan Tanaman SP.679/BPDASHL.BB/TU/ 27 April 2020 403,639,500
RHL P1 di Kabupaten Gorontalo II Seluas 1.400 04/2020
Ha (Repeat Order)
3 Pengawasan dan Evaluasi Kegiatan Tanaman SP.678/BPDASHL.BB/TU/ 27 April 2020 368,857,500
RHL P1 di Kabupaten Gorontalo III Seluas 1.310 04/2020
Ha (Repeat Order)
4 Pengawasan dan Evaluasi Kegiatan Tanaman SP.675/BPDASHL.BB/TU/ 27 April 2020 421,000,000
RHL P1 di Kabupaten Gorontalo IV Seluas 1.450 04/2020
Ha (Repeat Order)
5 Pengawasan dan Evaluasi Kegiatan Tanaman SP.674/BPDASHL.BB/TU/ 27 April 2020 300,850,000
RHL P1 di Kabupaten Boalemo I Seluas 1.065 Ha 04/2020
(Repeat Order)
6 Pengawasan dan Evaluasi Kegiatan Tanaman SP.680/BPDASHL.BB/TU/ 27 April 2020 370,122,500
RHL P1 di Kabupaten Boalemo II Seluas 1.305 Ha 04/2020
(Repeat Order)
7 Pengawasan dan Evaluasi Kegiatan Tanaman SP.676/BPDASHL.BB/TU/ 27 April 2020 407,000,000
RHL P1 di Kabupaten Bone Bolango Seluas 1.415 04/2020
Ha (Repeat Order)
8 Pengawasan dan Evaluasi Kegiatan Tanaman SP.677/BPDASHL.BB/TU/ 27 April 2020 344,025,000
RHL P1 di Kabupaten Gorontalo Utara Seluas 04/2020
1.200 Ha (Repeat Order)
9 Pengawasan dan Evaluasi Kegiatan Tanaman SP.673/BPDASHL.BB/TU/ 27 April 2020 300,000,000
RHL P1 di Kabupaten Pohuwato Seluas 1.060 Ha 04/2020
(Repeat Order)
10 Pengawasan dan Evaluasi Kegiatan Tanaman SP.681/BPDASHL.BB/TU/ 27 April 2020 282,480,000
RHL P1 di Kabupaten Gorontalo Barat Seluas 985 04/2020
Ha (Repeat Order)
XXVII BPDASHL Lariang Mamasa (tidak ada data di
TW 3)
SPK.051/BPDASHL.LM/EV 3/16/2020 772,805,000
PENGAWASAN DAN PENILAIAN PEKERJAAN L/03/2020
PEMELIHARAAN TANAMAN REBOISASI POLA
INTENSIF (P-1) PADA KEGIATAN REHABILITASI
1 HUTAN DAN LAHAN TAHUN 2020 SELUAS 2000
HEKTAR DI KPH BONEHAU KALUMPANG, KPH
MAMASA BARAT, KPH MAPILLI, KPH MALUNDA,
DAN KPH KARAMA (Lelang)

Perencanaan Renovasi Bangunan Gedung Kantor 052/BPDASHL.LM/TU/3/20


2 3/16/2020 533,429,600
BPDASHL Lariang Mamasa (lelang) 20

XXVIII BPDASHL Palu Poso


1 Pekerjaan Pembuatan Tanaman RHL DAS
Rawan/Pasca Bencana dalam rangka SPK.53/BPDASHL.PP-
25-SEP-18 328,020,000
Pemeliharaan Tahun II KPH Dampelas Tinombo 3/9/2018
Seluas 200 Ha
2 Pekerjaan Pembuatan Tanaman RHL DAS
Rawan/Pasca Bencana dalam rangka SPK.57/BPDASHL.PP-
28-SEP-18 328,020,000
Pemeliharaan Tanaman Tahun II KPH Banawa 3/9/2018
Lalundu Seluas 200 Ha
3 Pekerjaan Pembuatan Tanaman RHL secara
Vegetatif KPH Sivia Patuju Seluas 200 Ha di Desa SPK.33/BPDAS.PP-
12-JUN-19 851,950,000
Malino Jaya Kecamatan Soyo Jaya Kabupaten 3/6/2019
Morowali Utara Provinsi Sulawesi Tengah
4 Pengawasan dan Penilaian Kegiatan Pemeliharaan
Tahun I RHL Secara Vegetatif, Pemeliharaan Tahun
II RHL Rawan/Pasca Bencana Pada BPDASHL Palu
Poso di Provinsi Sulawesi Tengah
SPK.24/BPDASHL.PP/RHL/DA
17-JUL-20 446,875,000
5 Pembuatan Tanaman RHL DAS Pola Agroforestry
KPH Dampelas Tinombo Seluas 300 Ha Di Desa
Ogoalas Kecamatan Tinombo Kabupaten Parigi
Moutong Propinsi Sulawesi tengah SPK.27/BPDASHL.PP/RHL/DA
28-AUG-20 548,220,000
6 Pengadaan Pupuk Kegiatan Pembuatan Tanaman
RHL FP III di Desa Bangga dan Baluase Kec. Dolo
Selatan Kab. Sigi Tahun 2020 SPK.47/BPDASHL.PP/RHL/KE16-SEP-20 397,000,000
7 Pengadaan Pupuk Kegiatan Pemeliharaan Tahun I
RHL FP III di Desa Bulubete Kec. Dolo Selatan Kab.
Sigi SPK.48/BPDASHL.PP/RHL/KE16-SEP-20 304,128,000
8 Pengadaan Bibit Kegiatan Pembuatan Tanaman
RHL FP III di Desa Bangga Kec. Dolo Selatan Kab.
Sigi Tahun 2020 SPK.35/BPDASHL.PP/RHL/KE14-SEP-20 1,044,990,000
9 Pengadaan Bibit Kegiatan Pembuatan Tanaman
RHL FP III di desa Alitupu Kec. Lore Utara Kab.
Poso Tahun 2020 SPK.33/BPDASHL.PP/RHL/KE14-SEP-20 349,490,000
10 Pengadaan Bibit Kegiatan Pembuatan Tanaman
RHL FP III di desa Baluase Kec. Dolo Selatan Kab.
Sigi Tahun 2020 SPK.34/BPDASHL.PP/RHL/KE14-SEP-20 789,350,000
11 Pembuatan Tanaman RHL Pasca/Rawan Bencana
Pola Agroforestry KPH Kulawi Seluas 300 Ha di
desa Wisolo Kecamatan Dolo Selatan Kabupaten
Sigi Propinsi Sulawesi Tengah SPK.45/BPDASHL.PP/RHL/DA16-SEP-20 548,220,000

XXIX BPDASHL Sampara


1 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif SPK.44/BPDASHL.SPR-3/02/01-JAN-20 838,414,000
Paket KPH Mekongga Utara
2 Pekerjaan Rehabilitasi Hutan dan Lahan secara Vegetatif SPK.45/BPDASHL.SPR-3/02/01-JAN-20 1,161,795,000
Paket KPH Ueesi
3 Pekerjaan Rehabilitasi Hutan dan Lahan Secara vegetatif SPK.46/BPDASHL.SPR-3/02/01-JAN-20 1,298,210,000
Paket KPH Lasalimu
4 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif SPK.47/BPDASHL.SPR-3/02/01-JAN-20 1,668,172,000
Paket KPH Gantara
5 Pekerjaan Rehabiitasi Hutan dan Lahan Secara vegetatif SPK.48/BPDASHL.SPR-3/02/01-JAN-20 3,623,622,200
Paket KPH Laiwoi Barat 1
6 Pekerjaan Rehabilitasi Hutan dan Lahan Secara vegetatif SPK.49/BPDASHL.SPR-3/02/01-JAN-20 4,193,750,000
Paket KPH LAIWOI Barat 2
7 Pekerjaan Rehabiitasi Hutan dan Lahan Secara Vegetatif SPK.50/BPDASHL.SPR-3/02/01-JAN-20 5,022,883,000
Paket KPH Pulau Muna
8 Pekerjaan Rehabilitasi Hutan dan Lahan secara Vegetatif SPK.51/BPDASHL.SPR-3/02.01-JAN-20 2,666,329,000
Paket KPH Wawonii
9 Pekerjaan Rehabiitasi Hutan dan Lahan secara vegetatif SPK.52/BPDASHL.SPR-3/02/01-JAN-20 4,541,086,000
Paket KPH Lakompa
10 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif SPK.53/BPDASHL.SPR-3/02/01-JAN-20 2,595,760,200
Paket KPH Katondoki
11 Pekerjaan Rehabiitasi Hutan dan Lahan Secara Vegetatif SPK.109/BPDASHL.SPR-3/3/01-JAN-20 2,694,243,000
Paket PATAMPANUA UTARA
12 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif SPK.110/BPDASHL.SPR-3/3/01-JAN-20 4,213,128,000
Paket Patampanua Selatan
13 Pekerjaan Rehabilitasi Hutan dan Lahan secara Vegetatif SPK.111/BPDASHL.SPR-3/3/01-JAN-20 3,372,178,000
Paket LAIWOI
14 Pekerjaan Rehabilitasi Hutan dan Lahan Secara Vegetatif SPK.112/BPDASHL.SPR-3/3/01-JAN-20 4,362,275,000
Paket WAKATOBI
15 Pengawasan dan Penilaian RHL Paket 2 KPH
Lakompa Lasalimu
16 Pengawasan dan Penilaian RHL Paket 3 KPH
Muna, Katondoki, Gantara
17 Pengawasan dan Penilaian RHL Paket 4 KPH
Patampanua Selatan, Patampanua Utara, Mekongga
Utara
18 Pengawasan dan Penilaian RHL Paket 6 KPH
Laiwoi Barat
19 SPK.169/BPDASHL.SPR-3/6/29 JUNI-2020 136,372,500
Pengawasan dan Penilaian Kegiatan Pemeliharaan
Tahun II (P2) Penanaman RHL secara Vegetatif Tahun 2018
seluas
300 Ha dan Pekerjaan Rehabilitasi Hutan Mangrove seluas
475 Ha

20 Penanaman Rehabilitasi Hutan Mangrove Tahun 2020 SPK.260/BPDASHL.SPR-3/9/17 SEPT-2020 2,694,243,000

XXX BPDASHL Waehapu Batu Merah

XXXI BPDASHL Ake Malamo


1 PEKERJAAN PEMELIHARAAN TAHUN KEDUA PKS.22/BPDASHL.AM- 20 Agustus 2018 482,493,000
REBOISASI INTENSIF PULAU MARE KPHL 4/8/2018
TERNATE TIDORE DENGAN SKEMA TAHUN PEKERJAAN REBOISASI
JAMAK TAHUN 2018-2020 INTENSIF PULAU MARE
KPHL TERNATE TIDORE
DENGAN SKEMA TAHUN
JAMAK TAHUN 2018-2020

2 PEMELIHARAAN TAHUN PERTAMA PKS.02/BPDASHL.AM- 21 Maret 2019 1,000,908,302


PEKERJAAN REBOISASI HUTAN LINDUNG DI 4/3/2019
KPHL KABUPATEN HALMAHERA BARAT
SELUAS 300 HEKTAR

3 PEMELIHARAAN TAHUN PERTAMA KEGIATAN PKS.40/BPDASHL.AM- 01 Juli 2019 657,382,000


REBOISASI HUTAN LINDUNG DI KPHL PULAU 4/7/2019
MOROTAI SELUAS 200 HEKTAR
4 PENANAMAN RHL POLA AGROFORESTRY DI PK.17/BPDASHL.AM/RHL/ '01-JAN-20 1,641,255,000
HUTAN LINDUNG KPHL HALMAHERA TENGAH KUM.3/5/2020
BLOK PULAU YOI SELUAS 700 HEKTAR

5 PENANAMAN REHABILITASI HUTAN DAN PK.02/BPDASHL.AM- 23 Maret 2020 1,708,260,000


LAHAN DI KPHL HALMAHERA UTARA BLOK 4/3/2020
PULAU DAGASULI SELUAS 300 HA (2020-2022)

6 PENANAMAN REHABILITASI HUTAN DAN PK.01/BPDASHL.AM- 23 Maret 2020 1,418,856,000


LAHAN DI KPHL PULAU MOROTAI BLOK SOPI 4/3/2020
MAJIKO SELUAS 250 HA (2020-2022)
7 PENYEDIAAN BIBIT TANAMAN PRODUKTIF PK.04/BPDASHL.AM/RHL/ 21-APR-20 475,200,000
TAHUN 2020 KUM.3/4/2020
8 PENGAWASAN DAN PENILAIAN PKS.19/BPDASHL.AM/EV/ 17-JUN-20 128,970,000
PEMELIHARAAN TAHUN KEDUA (P2) RHL KUM.3/6/2020
TAHUN 2020 SELUAS 265 HA
9 PENGAWASAN DAN PENILAIAN PKS.18/BPDASHL.AM/EV/ 17-JUN-20 250,000,000
PEMELIHARAAN TAHUN PERTAMA (P1) RHL KUM.3/6/2020
TAHUN 2020 SELUAS 500 HA
10

Rehabilitasi Hutan Mangrove di KPH Halmahera PK.22/BPDASHL.AM/RHL/K


Selatan Blok Belang-Belang seluas 25 Hektar UM.3/7/2020 22-Jul-20 439,915,000
11
Jasa Konsultansi Pekerjaan Pengawasan dan
Penilaian Pembuatan Rehabilitasi Hutan dan Lahan PKS.33/BPDASHL.AM/EV/K
(P0) Pola Agroforestry seluas 550 Ha  UM.3/8/2020 6-Aug-20 261,717,000

XXXII BPDASHL Remu Ransiki

XXXIII BPDASHL Memberamo


1 Pemeliharaan Tahun Pertama (P1) Kabupaten PKS.34/BPDASHL.Mbr/RH 21 Februari 2020
Pegunungan Bintang Seluas 300 Ha L/02/2021 1,130,400,000
2 Pemeliharaan Tahun Pertama (P1) Kabupaten PKS.35/BPDASHL.Mbr/RH 21 Februari 2020
Lanny Jaya Seluas 300 Ha L/02/2022 1,130,400,000
3 Pemeliharaan Tahun Pertama (P1) Kabupaten PKS.36/BPDASHL.Mbr/RH 21 Februari 2020
Nabire Seluas 100 Ha L/02/2023 381,200,000
4 Pemeliharaan Tahun Pertama (P1) Kabupaten PKS.37/BPDASHL.Mbr/RH 21 Februari 2020
Jayawijaya Seluas 75 Ha L/02/2024 302,400,000
5 Pemeliharaan Tahun Pertama (P1) Kabupaten PKS.39/BPDASHL.Mbr/RH 21 Februari 2020
Jayapura Seluas 150 Ha L/02/2026 433,200,000
6 Penyediaan Kompos Blok dan Penanaman (P0)
Tahun 2020 Paket I Moi, Reboisasi Insentif Pola
Khusus Cagar Alam Pegunungan Cycloop. Resort
Moi, Blok I Moi dan Blok II Moi, SPK.58/BPDASHL.Mbr/PR
Kampung/Kelurahan Sabron dan Doyobaru, Distrik 13 Maret 2020 3,570,180,625
OG/03/2020
Sentani Barat, Waibu, Kabupaten Jayapura, Papua
(283 ha)

7 Penyediaan Kompos Blok dan Penanaman (P0)


Tahun 2020 Penanaman P0 Vegetatif Cyclop
Paket II Sentani I, Reboisasi Insentif Pola Khusus
Cagar Alam Pegunungan Cycloop. Resort Sentani, SPK.59/BPDASHL.Mbr/PR
Blok I Sentani dan Blok II Sentani, 13 Maret 2020 5,778,806,000
OG/03/2020
Kampung/Kelurahan Sereh, Distrik Sentani,
Kabupaten Jayapura, Papua (330 ha)

8 Penyediaan Kompos Blok dan Penanaman (P0)


Tahun 2020 Penanaman P0 Vegetatif Cyclop
Paket III Sentani II, Reboisasi Insentif Pola Khusus
Cagar Alam Pegunungan Cycloop. Resort Sentani,
Blok III Sentani, Kampung/Kelurahan Kampung SPK.60/BPDASHL.Mbr/PR
13 Maret 2020 4,682,172,000
Harapan, Distrik Sentani Timur, Kabupaten OG/03/2020
Jayapura, Papua (212 ha)

9 Penyediaan Kompos Blok dan Penanaman (P0)


Tahun 2020 Penanaman P0 Vegetatif Cyclop
Paket IV Sentani III, Reboisasi Insentif Pola
Khusus Cagar Alam Pegunungan Cycloop. Resort
Sentani, Blok IV Sentani, Kampung/Kelurahan SPK.61/BPDASHL.Mbr/PR
Kampung Harapan dan Waena, Distrik Sentani 13 Maret 2020 5,665,709,500
OG/03/2020
Timur dan Waena, Kabupaten Jayapura dan Kota
Jayapura, Papua (266 ha)

10 Penyediaan Kompos Blok dan Penanaman (P0)


Tahun 2020 Penanaman P0 Vegetatif Cyclop
Paket V Port Numbay 1, Reboisasi Insentif Pola
Khusus Cagar Alam Pegunungan Cycloop. Resort
Port Numbay, Blok I Port Numbay, SPK.62/BPDASHL.Mbr/PR
13 Maret 2020 5,015,257,500
Kampung/Kelurahan Waena dan Ardipura, Distrik OG/03/2020
Heram dan Jayapura Utara, Kota Jayapura, Papua
(303 ha)

11 Penyediaan Kompos Blok dan Penanaman (P0)


Tahun 2020 Penanaman P0 Vegetatif Cyclop
Paket VI Port Numbay II, Reboisasi Insentif Pola
Khusus Cagar Alam Pegunungan Cycloop. Resort
Port Numbay, Blok II Port Numbay, SPK.63/BPDASHL.Mbr/PR
13 Maret 2020 1,960,101,000
Kampung/Kelurahan Gurabesi, Bayangkara dan OG/03/2020
Angkasapura, Distrik Jayapura Utara, Kota
Jayapura, Papua (106 ha)

XXXIV BPDASHL Tondano


1 Pembuatan tanaman RHL secara vegetatif Kabupaten PKS.121/BPDASHL.Tdo-
Bolaang Mongondow Utara 2/2020 15-JUN-20 637,824,000
2 Pembuatan Tanaman RHL Secara Vegetatif di PKS.120/BPDASHL.Tdo-
Kabupaten Minahasa Tenggara 2/2020 15-JUN-20 272,393,000
3 Pembuatan tanaman RHL secara vegetatif di Kabupaten PKS.122/BPDASHL.Tdo-
Kepulauan Talaud. 2/2020 15-JUN-20 313,412,000
4 Pengawas dan penilaian pemeliharaan Tahun pertama PKS.126/BPDASHL.Tdo-
(P1) RHL seluas 400 ha. 2/2020 15-JUN-20 174,047,500
5 Pembuatan tanaman RHL pada DAS Rawan / pasca PKS.123/BPDASHL.Tdo-
bencana di Kabupaten Bolaang Mongondow Utara 2/2020 15-JUN-20 425,700,000
6 Pekerjaan pengadaan bibit produktif wilayah daratan PKS.10/BPDASHL.TDO/EV/K
Propinsi Sulawesi Utara AP.!/7/2020 21-JUL-20 405,562,500
7 Pekerjaan pengadaan bibit produktif wilayah kepulauan PKS.11/BPDASHL.TDO/EV/K
Propinsi Sulawesi Utara AP.1/7/2020 21-JUL-20 414,962,500

XXXV BPDASHL Way Seputih Sekampung


1 SP.81/BPDASHL.WSS/EVALUA 3/2/2020 1,628,638,000
Paket 1 Pengawasan dan Penilaian Pelaksanaan SI/PBJ/3/2020
Kegiatan Pemeliharaan Tanaman RHL Vegetatif
Tahun I (P1) di KPHL Kotaagung Utara dan KPHL
Liwa seluas 3.597 Ha
2 Paket 2 Pengawasan dan Penilaian Pelaksanaan SP.84/BPDASHL.WSS/EVALUA 3/2/2020 1,595,200,046
Kegiatan Pemeliharaan Tanaman RHL Vegetatif SI/PBJ/3/2020
Tahun I (P1) di KPHL Batu Tegi seluas 3.460 Ha
3 Paket 3 Pengawasan dan Penilaian Pelaksanaan SP.87/BPDASHL.WSS/EVALUA 3/2/2020 1,594,153,000
Kegiatan Pemeliharaan Tanaman RHL Vegetatif SI/PBJ/3/2020
Tahun I (P1) di KPHL Pesawaran seluas 3.419 Ha

4 Paket 4 Pengawasan dan Penilaian Pelaksanaan SP.90/BPDASHL.WSS/EVALUA 3/2/2020 1,678,600,000


Kegiatan Pemeliharaan Tanaman RHL Vegetatif SI/PBJ/3/2020
Tahun I (P1) di KPHL Pematang Neba seluas
3.693 Ha

5 Paket I Pembuatan Tanaman RHL Secara 061/BPDASHL.WSS/PROGRAM/ 2/10/2020 2,025,475,683


Vegetatif di KPH Pesawaran Blok III, IV, V Maja PBJ/2/2020
seluas 919 Ha (P1) 2020
6 Paket II Pembuatan Tanaman RHL Secara 062/BPDASHL.WSS/PROGRAM/ 2/10/2020 480,691,907
Vegetatif di KPH Pesawaran Blok VI Bayas Jaya PBJ/2/2020
seluas 219 Ha (P1) 2020
7 Paket III Pembuatan Tanaman RHL Secara 063/BPDASHL.WSS/PROGRAM/ 2/10/2020 376,280,716
Vegetatif di KPH Pesawaran Blok VII Bayas Jaya PBJ/2/2020
seluas 183 Ha (P1) 2020
8 Paket IV Pembuatan Tanaman RHL Secara 064/BPDASHL.WSS/PROGRAM/ 2/10/2020 380,982,972
Vegetatif di KPH Pesawaran Blok VIII Harapan PBJ/2/2020
Jaya seluas 184 Ha (P1) 2020
9 Paket V Pembuatan Tanaman RHL Secara 065/BPDASHL.WSS/PROGRAM/ 2/10/2020 466,710,965
Vegetatif di KPH Pesawaran Blok IX Babakan Loa PBJ/2/2020
seluas 214 Ha (P1) 2020
10 Paket VI Pembuatan Tanaman RHL Secara 066/BPDASHL.WSS/PROGRAM/ 2/10/2020 522,190,680
Vegetatif di KPH Pesawaran Blok XI Babakan Loa PBJ/2/2020
seluas 240 Ha (P1) 2020
11 Paket VII Pembuatan Tanaman RHL Secara 067/BPDASHL.WSS/PROGRAM/ 2/10/2020 349,968,729
Vegetatif di KPH Pesawaran Blok XII Bangun Rejo PBJ/2/2020
Seluas 168 Ha (P1) 2020
12 Paket VIII Pembuatan Tanaman RHL Secara 068/BPDASHL.WSS/PROGRAM/ 2/10/2020 476,635,984
Vegetatif di KPH Pesawaran Blok XIII Bangun Rejo PBJ/2/2020
seluas 216 Ha (P1) 2020
13 Paket IX Pembuatan Tanaman RHL Secara 069/BPDASHL.WSS/PROGRAM/ 2/10/2020 382,210,290
Vegetatif di KPH Pesawaran Blok XIV Bangun Rejo PBJ/2/2020
seluas 186 Ha (P1) 2020
14 Paket X Pembuatan Tanaman RHL Secara 070/BPDASHL.WSS/PROGRAM/ 2/10/2020 478,385,967
Vegetatif di KPH Pesawaran Blok XV Suka Maju PBJ/2/2020
seluas 219 Ha (P1) 2020
15 Paket XI Pembuatan Tanaman RHL Secara 071/BPDASHL.WSS/PROGRAM/ 2/10/2020 453,789,754
Vegetatif di KPH Pesawaran Blok XVI Suka Maju PBJ/2/2020
seluas 204 Ha (P1) 2020
16 Paket XII Pembuatan Tanaman RHL Secara 072/BPDASHL.WSS/PROGRAM/ 2/10/2020 456,649,303
Vegetatif di KPH Pesawaran Blok XVII Suka Maju PBJ/2/2020
seluas 207 Ha (P1) 2020
17 Paket 13 Pembuatan Tanaman RHL Secara 073/BPDASHL.WSS/PROGRAM/ 2/10/2020 560,779,120
Vegetatif di KPH XI Pesawaran Blok X seluas 260 PBJ/2/2020
Ha (P1) 2020
18 Pembuatan Tanaman RHL Secara Vegetatif di SP.034/BPDASHL.WSS/TU/PBJ/ 27-01-2020 2,025,148,609
KPH Kotaagung Utara Blok III, IV, V Gunung Doh 1/2020
seluas 901 Ha (P1)
19 Pembuatan Tanaman RHL Secara Vegetatif di SP.035/BPDASHL.WSS/TU/PBJ/ 27-01-2020 1,335,378,748
KPH Kotaagung Utara Blok VII dan Blok VIII 1/2020
Gunung Doh seluas 600 Ha (P1)
20 Pembuatan Tanaman RHL Secara Vegetatif di SP.036/BPDASHL.WSS/TU/PBJ/ 27-01-2020 1,340,614,880
KPH Kotaagung Utara Blok IX dan Blok X Gunung 1/2020
Doh seluas 600 Ha (P1)
21 Paket 4 Pembuatan Tanaman RHL Secara SP.037/BPDASHL.WSS/TU/PBJ/ 27-01-2020 672,324,640
Vegetatif di KPH IX Kotaagung Utara Blok VI 1/2020
seluas 300 Ha (P1)
22 Paket I Pembuatan Tanaman RHL Secara 050/BPDASHL.WSS/EVALUASI/PB 10-02-2020 1,969,637,098
Vegetatif di KPH Pematang Neba Blok II, III, IV
Antar Brak seluas 893 Ha (P1) 2020
23 Paket II Pembuatan Tanaman RHL Secara 051/BPDASHL.WSS/EVALUASI/PB 10-02-2020 1,746,565,040
Vegetatif di KPH Pematang Neba Blok V, VI, VII
Rantau Tijang seluas 800 Ha (P1) 2020
24 Paket III Pembuatan Tanaman RHL Secara 052/BPDASHL.WSS/EVALUASI/PB 10-02-2020 527,606,637
Vegetatif di KPH Pematang Neba Blok VIII Putih
Doh seluas 243 Ha (P1) 2020
25 Paket IV Pembuatan Tanaman RHL Secara 053/BPDASHL.WSS/EVALUASI/PB 10-02-2020 515,036,236
Vegetatif di KPH Pematang Neba Blok IX Putih
Doh Seluas 235 Ha (P1) 2020
26 Paket V Pembuatan Tanaman RHL Secara 054/BPDASHL.WSS/EVALUASI/PB 10-02-2020 483,933,833
Vegetatif di KPH Pematang Neba Blok X Putih Doh
seluas 225 Ha (P1) 2020
27 Paket VI Pembuatan Tanaman RHL Secara 055/BPDASHL.WSS/EVALUASI/PB 10-02-2020 481,776,271
Vegetatif di KPH Pematang Neba Blok XI Putih
Doh seluas 217 Ha (P1) 2020
28 Paket VII Pembuatan Tanaman RHL Secara 056/BPDASHL.WSS/EVALUASI/PB 10-02-2020 438,908,800
Vegetatif di KPH Pematang Neba Blok XII Putih
Doh seluas 200 Ha (P1) 2020
29 Paket VIII Pembuatan Tanaman RHL Secara 057/BPDASHL.WSS/EVALUASI/PB 10-02-2020 484,060,099
Vegetatif di KPH Pematang Neba Blok XIII Putih
Doh seluas 227 Ha (P1) 2020
30 Paket IX Pembuatan Tanaman RHL Secara 058/BPDASHL.WSS/EVALUASI/PB 10-02-2020 475,877,996
Vegetatif di KPH Pematang Neba Blok XIV Putih
Doh seluas 221 Ha (P1) 2020
31 Paket X Pembuatan Tanaman RHL Secara 059/BPDASHL.WSS/EVALUASI/PB 10-02-2020 471,286,464
Vegetatif di KPH Pematang Neba Blok XV
Pampangan seluas 219 Ha (P1) 2020
32 Paket XI Pembuatan Tanaman RHL Secara 060/BPDASHL.WSS/EVALUASI/PB 10-02-2020 462,692,313
Vegetatif di KPH Pematang Neba Blok XVI
Pampangan seluas 213 Ha (P1) 2020
33 Paket I Pembuatan Tanaman RHL Secara 138/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 505,795,103
Vegetatif di KPH VIII Batu tegi Blok 1 Sinar Galih
seluas 240 Ha (P1) 2020
34 Paket II Pembuatan Tanaman RHL Secara 139/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 662,663,696
Vegetatif di KPH VIII Batu tegi Blok 2 Sinar Galih
seluas 305 Ha (P1) 2020
35 Paket III Pembuatan Tanaman RHL Secara 140/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 450,541,942
Vegetatif di KPH VIII Batu Tegi Blok 4 Sinar Galih
seluas 205 Ha (P1) 2020
36 Paket IV Pembuatan Tanaman RHL Secara 141/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 1,250,808,785
Vegetatif di KPH VIII Batu Tegi Blok 6 dan Blok 7
Penantian seluas 580 Ha (P1) 2020
37 Paket V Pembuatan Tanaman RHL Secara 142/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 490,665,380
Vegetatif di KPH VIII Batu Tegi Blok 8 Sinar Galih
seluas 230 Ha (P1) 2020
38 Paket VI Pembuatan Tanaman RHL Secara 143/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 363,879,333
Vegetatif di KPH Batu Tegi Blok X Penantian
seluas 180 Ha (P1) 2020
39 Paket VII Pembuatan Tanaman RHL Secara 144/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 442,113,936
Vegetatif di KPH Batu Tegi Blok XI Penantian
seluas 200 Ha (P1) 2020
40 145/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 462,334,769
Paket VIII Pembuatan Tanaman RHL Secara
Vegetatif di KPH Batu Tegi Blok XII Penantian
seluas 210 Ha (P1) 2020
41 Paket IX Pembuatan Tanaman RHL Secara 146/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 517,705,855
Vegetatif di KPH Batu Tegi Blok XIII Penantian
seluas 245 Ha (P1) 2020
42 Paket X Pembuatan Tanaman RHL Secara 147/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 390,505,852
Vegetatif di KPH Batu Tegi Blok XIV Datar Lebuay
seluas 195 Ha (P1) 2020
43 Paket XI Pembuatan Tanaman RHL Secara 148/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 375,856,215
Vegetatif di KPH Batu Tegi Blok XV Sidomulyo
seluas 186 Ha (P1) 2020
44 Paket XII Pembuatan Tanaman RHL Secara 149/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 390,065,743
Vegetatif di KPH Batu Tegi Blok XVI Sidomulyo
seluas 192 Ha (P1) 2020
45 Paket XIII Pembuatan Tanaman RHL Secara 150/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 461,001,635
Vegetatif di KPH Batu Tegi Blok XVII Sidomulyo
seluas 217 Ha (P1) 2020
46 Paket XIV Pembuatan Tanaman RHL Secara 7 Februari 2020 581,984,066
Vegetatif di KPH Liwa Blok II, III, IV Sidodadi 170/BPDASHL.WSS/RHL/PBJ/2/
seluas 887 Ha (P1) 2020 2020
47 Paket 15 Pembuatan Tanaman RHL Secara 144/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 1,936,568,035
Vegetatif di KPH VIII Batu Tegi Blok IX seluas 275
Ha (P1) 2020
48 Paket 16 Pembuatan Tanaman RHL Secara 146/BPDASHL.WSS/RHL/PBJ/2/2 7 Februari 2020 686,350,040
Vegetatif di KPH II Liwa Blok V seluas 309 Ha (P1)
2020

XXXVI BPTH Wilayah I


Tidak ada Lelang di Triwulan ke-3

XXXVII BPTH Wilayah II


Tidak ada Lelang di Triwulan ke-3
577,664,036,309

Ket: Isian otomatis


KERTAS KERJA KEMAJUAN FISIK PEKERJAAN
Fisik Kemajuan Fisik Pekerjaan
Pekerja
0% 1-25% 26-50% 51-75%
an
(%) Paket Rp Paket Rp Paket Rp Paket

0 1 12,913,020,000 - - - - -

0 1 315,000,000 - - - - -

0 1 283,600,000 - - - - -

0 1 244,375,000 - - - - -

25 - - 1 1,905,090,000 - - -

0 1 668,250,000 - - - - -

0 1 723,360,000 - - - - -

0 1 665,707,000 - - - - -

20 - - 1 613,122,000 - - -
100 - - - - - - -

3.96 - - 1 4,568,204,300 - - -

50 - - - - 1 247,665,000 -

- - - - - - 1
62.50
- - - - - - 1
62.50
- - - - - - 1
62.50
- - - - 1 303,000,000 -
50.00
- - - - 1 432,000,000 -
50.00
- - - - - - 1
62.50

20.00 - - 1 1,976,810,000 - - -

20.00 - - 1 1,601,611,000 - - -

20.00 - - 1 1,625,899,000 - - -

100 - - - - - - -
20 - - 1 255,860,000 - - -

30 - - - - 1 192,070,000 -

30 - - - - 1 281,000,000 -

88.12 - - - - - - -

- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - - - 1
75
- - - - 1 390,261,500 -
50

100 - - - - - - -
100 - - - - - - -
62.5 - - - - - - 1

100 - - - - - - -

59.52 - - - - - - 1

60.69 - - - - - - 1

60.37 - - - - - - 1
31.28 - - - - 1 1,779,294,000 -

33.4 - - - - 1 1,289,787,500 -

59.32 - - - - - - 1

60.71 - - - - - - 1

32.7 - - - - 1 3,163,700,000 -

0 1 1,400,100,000 - - - - -

0 1 544,500,000 - - - - -
34.99 - - - - 1 989,750,000 -

62.39 - - - - - - 1

61.09 - - - - - - 1

62 - - - - - - 1

31.44 - - - - 1 950,761,300 -

31.08 - - - - 1 791,635,000 -

60.48 - - - - - - 1

30.84 - - - - 1 994,400,000 -

31.06 - - - - 1 790,350,000 -
30.98 - - - - 1 1,020,580,000 -

31 - - - - 1 1,608,420,000 -

100 - - - - - - -

100 - - - - - - -

0 1 414,435,000 - - - - -

0 1 555,750,000 - - - - -

0 1 703,740,000 - - - - -

0 1 931,992,000 - - - - -

0 1 415,380,000 - - - - -

0 1 491,150,000 - - - - -
0 1 541,750,000 - - - - -

0 1 508,475,000 - - - - -

0 1 501,754,000 - - - - -

0 1 425,400,000 - - - - -

0 1 463,447,600 - - - - -

100 - - - - - - -

30 - - - - 1 716,100,000 -

100 - - - - - - -

100 - - - - - - -

65 - - - - - - 1

0 1 514,592,000 - - - - -

65 - - - - - - 1

50 - - - - 1 856,438,550 -

50 - - - - 1 337,256,000 -

0 1 505,884,000 - - - - -
50 - - - - 1 859,167,552 -

50 - - - - 1 842,693,379 -

65 - - - - - - 1

0 1 499,665,000 - - - - -

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

0 1 519,471,000 - - - - -

65 - - - - - - 1

0 1 518,895,000 - - - - -

65 - - - - - - 1

65 - - - - - - 1

0 1 508,958,000 - - - - -

65 - - - - - - 1

0 1 425,686,000 - - - - -

65 - - - - - - 1

65 - - - - - - 1

0 1 436,390,000 - - - - -

50 - - - - 1 231,739,000 -

0 1 347,609,000 - - - - -
65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

0 1 426,294,000 - - - - -

65 - - - - - - 1

65 - - - - - - 1

48.98 - - - - 1 1,324,400,000 -

48.98 - - - - 1 1,119,800,000 -

48.98 - - - - 1 805,420,000 -

48.98 - - - - 1 335,819,000 -

50 - - - - 1 193,048,790 -

50 - - - - 1 163,900,000 -

50 - - - - 1 161,425,000 -

50 - - - - 1 132,110,000 -

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1
70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

70 - - - - - - 1

50 - - - - 1 355,728,000 -

50 - - - - 1 351,627,500 -

50 - - - - 1 744,622,000 -

50 - - - - 1 357,527,500 -

100 - - - - - - -
100 - - - - - - -
100 - - - - - - -
100 - - - - - - -
0 1 595,102,000 - - - - -

0 1 754,550,000 - - - - -
0 1 663,075,000 - - - - -

0 1 1,267,200,000 - - - - -

0 1 934,672,000 - - - - -

0 1 881,658,800 - - - - -
0 1 853,259,000 - - - - -
0 1 809,248,000 - - - - -
0 1 679,695,500 - - - - -

100 - - - - - - -
100 - - - - - - -
100 - - - - - - -
100 - - - - - - -
- - - - - - -

90

- - - - - - -
100
- - - - - - -
100
- - - - - - -
100

100 - - - - - - -

40 - - - - 1 941,501,000 -

40 - - - - 1 195,827,500 -

45 - - - - 1 1,319,519,300 -

41.9 - - - - 1 2,515,126,600 -

44.8 - - - - 1 2,734,265,500 -
44.8 - - - - 1 3,422,592,000 -

43.8 - - - - 1 621,236,400 -

78 - - - - - - -

85 - - - - - - -

78 - - - - - - -

86 - - - - - - -

83 - - - - - - -

100 - - - - - - -

100 - - - - - - -

100 - - - - - - -

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1
65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

65 - - - - - - 1

30 - - - - 1 1,808,499,000 -

30 - - - - 1 1,445,202,000 -

30 - - - - 1 2,416,507,500 -

60 - - - - - - 1

60 - - - - - - 1

60 - - - - - - 1

60 - - - - - - 1

60 - - - - - - 1

100 - - - - - - -

100 - - - - - - -

100 - - - - - - -

100 - - - - - - -

100 - - - - - - -
100 - - - - - - -

100 - - - - - - -

100 - - - - - - -

100 - - - - - - -

40 - - - - 1 1,154,487,180 -

40 - - - - 1 1,448,527,960 -

0 1 164,945,000 - - - - -

80.65 - - - - - - -

100 - - - - - - -

- - - - 1 1,418,775,500 -
40

- - - - 1 1,424,218,000 -
40

- - - - 1 1,172,084,840 -

40

- - - - 1 1,744,809,700 -
40

- - - - 1 304,700,000 -
40

- - - - 1 425,260,000 -
40

- - - - 1 208,274,000 -
40

- - - - 1 808,830,000 -

40

- - - - 1 912,796,500 -
40
- - - - 1 822,580,000 -
40

- - - - 1 984,665,000 -

40

- - - - 1 629,817,650 -
40

- - - - 1 248,083,000 -

40

1 1,222,118,700 - - - - -

1 1,897,580,850 - - - - -
0

- - 1 2,261,544,450 - - -
20

- - - - - - -
79

- - - - - - 1
65

- - - - 1 425,997,000 -

40
- - - - 1 1,172,424,000 -

40
- - - - 1 823,145,950 -

40
- - - - 1 1,314,692,500 -

40
- - - - 1 738,273,250 -

40
- - - - 1 1,346,500,000 -

40
- - - - 1 1,289,670,250 -

40
- - - - 1 731,918,000 -

40
- - - - 1 465,121,250 -

40
- - - - 1 1,457,500,000 -

40
- - - - 1 1,094,005,000 -

40
- - - - 1 964,198,400 -

40
- - - - 1 1,088,186,000 -

40
- - - - 1 1,482,448,000 -

40
- - - - 1 1,095,109,400 -

40
- - - - 1 1,276,644,600 -

40
- - - - 1 1,065,179,500 -

40
- - - - 1 729,410,000 -

40
- - - - 1 366,454,000 -

40
- - - - 1 408,010,625 -

40
- - - - 1 261,629,500 -

40
- - - - 1 896,115,000 -

40
- - - - 1 721,512,000 -

40
- - - - 1 1,095,061,000 -

40
- - - - 1 995,823,400 -

40
- - - - 1 553,403,960 -

40
- - - - 1 554,218,500 -

40
- - - - 1 1,091,169,200 -

40
- - - - 1 991,001,000 -

40
- - - - 1 561,143,110 -

40
- - - - 1 898,315,000 -

40
- - - - 1 1,451,692,000 -

40
- - - - 1 1,091,255,000 -

40
- - - - 1 1,091,387,000 -

40
- - - - 1 1,095,501,000 -

40
- - - - 1 923,389,500 -

40
- - - - 1 935,533,500 -

40
- - - - 1 235,738,250 -

40
- - - - 1 226,408,346 -

40

- - - - 1 816,367,750 -

46.17

- - - - 1 1,128,796,875 -

39.415

- - - - 1 960,556,187 -

31.51

- - - - 1 352,587,750 -

45.6

- - - - 1 1,134,567,000 -

35.645

- - - - 1 1,666,035,000 -

35.53

- - - - 1 1,573,363,000 -

34.42

- - - - 1 1,774,909,500 -

34.42
- - - - 1 1,323,682,500 -

34.8

- - - - - - 1

63.48

- - - - 1 322,437,500 -

44.57

- - - - 1 180,961,000 -
31.71

- - - - - - 1

63

- - - - - - 1

68

- - - - 1 662,200,000 -

48

- - - - 1 923,175,000 -

48

- - - - - - -
96

- - - - - - 1
60

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80
- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - - - -
80

- - - - 1 1,935,542,500 -

50

- - - - - - -

80

- - - - - - 1
70

- - - - - - 1

70

- - - - 1 267,811,500 -
50
- - - - 1 1,105,091,500 -
40

- - - - 1 1,250,797,400 -
40

- - - - 1 1,044,477,000 -
40

- - - - 1 814,910,000 -
40

- - - - 1 1,020,000,000 -
40

- - - - 1 250,815,000 -
40

- - - - 1 150,277,000 -
40

- - - - - - -
90

80
- - - - - - -

80
- - - - - - -

60

- - - - - - 1

80
- - - - - - -

80
- - - - - - -

60

- - - - - - 1

80
- - - - - - -

50
- - - - 1 491,311,000 -

100
- - - - - - -

75
- - - - - - 1
75

- - - - - - 1

75
- - - - - - 1

75
- - - - - - 1

75
- - - - - - 1

75

- - - - - - 1

45
- - - - 1 293,062,000 -

100
- - - - - - -

100
- - - - - - -

100
- - - - - - -

- - 1 1,405,272,000 - - -
20

- - 1 200,920,170 - - -
20

1 1,052,391,450 - - - - -
0

- - 1 985,898,100 - - -
20

- - 1 1,083,068,250 - - -
20

- - 1 905,550,800 - - -
20

- - 1 792,214,500 - - -
20

- - 1 745,448,000 - - -
20

- - - - 1 1,361,888,000 -
30

- - - - 1 498,672,500 -
50

- - - - 1 284,667,500 -
50
- - - - 1 525,097,500 -

50

- - - - 1 318,582,000 -
50

- - - - 1 288,090,000 -
31

- - - - 1 264,000,000 -
39

- - - - 1 293,210,500 -
30

1 601,717,875 - - - - -
0

64.03 - - - - - - 1

60.14 - - - - - - 1

85.88 - - - - - - -

85.73 - - - - - - -

75.14 - - - - - - -

77.2 - - - - - - -
76.69 - - - - - - -

76.00 - - - - - - -

77.00 - - - - - - -

76.71 - - - - - - -

77.77 - - - - - - -

83.9 - - - - - - -

75.8 - - - - - - -

76.12 - - - - - - -

80.01 - - - - - - -
61.53 - - - - - - 1

76.12 - - - - - - -

54.5 - - - - - - 1

76 - - - - - - -

77 - - - - - - -

77 - - - - - - -

77 - - - - - - -

60.55 - - - - - - 1

60.74 - - - - - - 1
20 - - 1 1,236,939,000 - - -

20 - - 1 1,016,526,500 - - -

20 - - 1 1,243,077,000 - - -

20 - - 1 912,917,500 - - -

20 - - 1 1,383,833,000 - - -

100 - - - - - - -

100 - - - - - - -

40 - - - - 1 1,093,730,000 -

40 - - - - 1 2,777,346,000 -

40 - - - - 1 1,408,323,500 -

40 - - - - 1 1,292,290,000 -

40 - - - - 1 2,044,735,000 -

40 - - - - 1 1,255,155,000 -

40 - - - - 1 812,143,750 -
40 - - - - 1 2,084,152,125 -

40 - - - - 1 292,930,000 -

40 - - - - 1 3,188,889,000 -

40 - - - - 1 1,075,248,000 -

40 - - - - 1 3,212,946,000 -

40 - - - - 1 2,855,952,000 -

40 - - - - 1 3,258,003,155 -

40 - - - - 1 1,997,105,000 -

40 - - - - 1 1,094,957,500 -

40 - - - - 1 1,476,666,950 -

40 - - - - 1 3,156,340,000 -

40 - - - - 1 1,771,220,000 -

40 - - - - 1 1,707,921,600 -

40 - - - - 1 3,266,010,000 -

40 - - - - 1 2,836,108,000 -

40 - - - - 1 1,510,080,000 -
40 - - - - 1 1,734,294,100 -

40 - - - - 1 223,740,000 -

40 - - - - 1 3,177,680,000 -

40 - - - - 1 1,640,529,000 -

40 - - - - 1 282,535,000 -

40 - - - - 1 303,703,125 -

40 - - - - 1 349,305,000 -

40 - - - - 1 323,950,000 -

40 - - - - 1 617,677,000 -

40 - - - - 1 284,006,250 -

40 - - - - 1 702,515,000 -

40 - - - - 1 368,500,000 -

40 - - - - 1 376,717,000 -

40 - - - - 1 572,665,500 -

40 - - - - 1 498,150,000 -

40 - - - - 1 242,780,000 -
40 - - - - 1 252,990,000 -

40 - - - - 1 249,083,200 -

40 - - - - 1 486,000,000 -

80 - - - - - - -

80 - - - - - - -

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66

- - - - - - 1
66
20

- - 1 772,805,000 - - -

100
- - - - - - -

- -

80 - - - - -

- -

80 - - - - -

- -

80 - - - - -

- - - - - - -

80

- - - - - - -

85

- - - - - - -
90

- - - - - - -
90

- - - - - - -
90

- - - - - - -
90

- - - - - - -
90

- - - - - - -

80
80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

90 - - - - - - -

90 - - - - - - -

90 - - - - - - -

90 - - - - - - -

0 1 - - -

0 1 - - -

0 1 - - -

0 1 - - -

50 - - - - 1 136,372,500 -

15 - - 1 2,694,243,000 - - -
80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

80 - - - - - - -

100 - - - - - - -

80 - - - - - - -

80 - - - - - - -

- - - - - - 1
75

- - - - 1 261,717,000 -
50

0
1 1,130,400,000 - - - - -

0
1 1,130,400,000 - - - - -

0
1 381,200,000 - - - - -

0
1 302,400,000 - - - - -

0
1 433,200,000 - - - - -
0

1 3,570,180,625 - - - - -

1 5,778,806,000 - - - - -

1 4,682,172,000 - - - - -

1 5,665,709,500 - - - - -

1 5,015,257,500 - - - - -

1 1,960,101,000 - - - - -

1 637,824,000 - - - - -
0
- - 1 272,393,000 - - -
15
- - 1 313,412,000 - - -
15
- - - - 1 174,047,500 -
40
1 425,700,000 - - - - -
0
- - - - - - -
100
- - - - - - -
100

69.69 - - - - - - 1

74.98 - - - - - - 1

68.90 - - - - - - 1

69.78 - - - - - - 1

59.66 - - - - - - 1

60.88 - - - - - - 1

59.95 - - - - - - 1

59.91 - - - - - - 1

60.82 - - - - - - 1

60.62 - - - - - - 1

60.08 - - - - - - 1

60.68 - - - - - - 1

59.98 - - - - - - 1

60.70 - - - - - - 1
60.97 - - - - - - 1

60.89 - - - - - - 1

60.59 - - - - - - 1

69.69 - - - - - - 1

74.98 - - - - - - 1

68.90 - - - - - - 1

69.78 - - - - - - 1

60.07 - - - - - - 1

59.21 - - - - - - 1

60.02 - - - - - - 1

60.23 - - - - - - 1

59.16 - - - - - - 1

60.20 - - - - - - 1

59.20 - - - - - - 1

59.43 - - - - - - 1

59.26 - - - - - - 1

59.17 - - - - - - 1

59.09 - - - - - - 1
72.59 - - - - - - 1

72.17 - - - - - - 1

72.49 - - - - - - 1

72.49 - - - - - - 1

72.22 - - - - - - 1

73.55 - - - - - - 1

72.13 - - - - - - 1

72.18 - - - - - - 1

72.52 - - - - - - 1

73.37 - - - - - - 1

73.73 - - - - - - 1

73.63 - - - - - - 1

73.55 - - - - - - 1

74.19 - - - - - - 1

71.53 - - - - - - 1

71.96 - - - - - - 1

- - - - - -
- - - - - -
61 71,905,194,400 24 30,772,658,570 175 175,252,018,409 167
No. Kertas Kerja :
Dibuat Oleh :
Tanggal :
Direviu Oleh :
Tanggal :

Pekerjaan
51-75% 76-99% 100%
Rp Paket Rp Paket Rp

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - 1 298,650,100

- - - - -

- - - - -

366,000,000 - - - -

531,000,000 - - - -

566,000,000 - - - -

- - - - -

- - - - -

594,000,000 - - - -

- - - - -

- - - - -

- - - - -

- - - 1 304,512,000
- - - - -

- - - - -

- - - - -

- 1 6,718,115,250 - -

943,592,500 - - - -

961,661,250 - - - -
195,000,000 - - - -

927,740,000 - - - -

155,705,000 - - - -

526,200,000 - - - -

1,648,824,375 - - - -

257,700,000 - - - -

615,950,000 - - - -

838,530,000 - - - -

226,235,000 - - - -

- - - - -

- - - 1 264,850,000
- - - 1 208,600,000
295,625,000 - - - -

- - - 1 948,750,000

640,500,000 - - - -

1,356,633,000 - - - -

1,950,655,000 - - - -
- - - - -

- - - - -

882,400,000 - - - -

2,512,900,000 - - - -

- - - - -

- - - - -

- - - - -
- - - - -

565,508,600 - - - -

1,389,727,500 - - - -

588,625,000 - - - -

- - - - -

- - - - -

1,389,152,080 - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - 1 580,200,000

- - - 1 388,320,000

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - 1 404,569,000

- - - - -

- - - 1 402,050,000

- - - 1 874,434,000

343,061,000 - - - -

- - - - -

855,545,504 - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

333,110,000 - - - -

- - - - -

845,317,550 - - - -

865,987,804 - - - -

848,176,175 - - - -

848,262,800 - - - -

848,262,800 - - - -

586,599,255 - - - -

346,314,000 - - - -

- - - - -

345,930,000 - - - -

- - - - -

848,262,800 - - - -

339,306,000 - - - -

- - - - -

283,791,000 - - - -

- - - - -

849,302,300 - - - -

290,927,000 - - - -

- - - - -

- - - - -

- - - - -
867,315,504 - - - -

866,277,535 - - - -

868,608,202 - - - -

709,475,250 - - - -

284,196,000 - - - -

- - - - -

709,159,000 - - - -

726,277,750 - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

606,449,250 - - - -

383,693,750 - - - -

650,754,500 - - - -

525,750,500 - - - -

544,428,500 - - - -

904,508,000 - - - -
532,842,000 - - - -

2,471,878,500 - - - -

733,261,000 - - - -

264,764,500 - - - -

490,785,000 - - - -

791,089,500 - - - -

1,066,657,000 - - - -

1,760,490,700 - - - -

2,191,965,200 - - - -

2,472,742,500 - - - -

2,318,091,000 - - - -

1,191,346,000 - - - -

2,556,890,000 - - - -

2,920,419,000 - - - -

252,006,000 - - - -

3,294,600,400 - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - 1 1,053,150,000
- - - 1 506,900,000
- - - 1 425,600,000
- - - 1 271,950,000
- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - 1 441,900,000
- - - 1 439,200,000
- - - 1 530,240,000
- - - 1 575,250,000
- 1 152,130,000 - -

- - - 1 358,980,000

- - - 1 502,430,000

- - - 1 573,850,000

- - - 1 417,400,000

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- 1 213,915,600 - -

- 1 351,702,000 - -

- 1 224,695,500 - -

- 1 403,436,000 - -

- 1 265,585,500 - -

- - - 1 751,092,500

- - - 1 1,374,267,500

- - - 1 691,100,000

2,083,724,800 - - - -

708,067,200 - - - -

3,000,329,000 - - - -

1,669,429,400 - - - -

2,770,465,200 - - - -

2,062,580,300 - - - -

1,920,507,200 - - - -

1,927,871,900 - - - -
1,439,902,000 - - - -

2,067,578,100 - - - -

1,153,134,300 - - - -

1,765,987,300 - - - -

- - - - -

- - - - -

- - - - -

1,888,396,600 - - - -

2,017,732,900 - - - -

1,108,879,100 - - - -

1,706,639,300 - - - -

1,556,004,600 - - - -

- - - 1 943,782,500

- - - 1 876,360,000

- - - 1 752,150,000

- - - 1 1,193,500,000

- - - 1 995,250,000
- - - 1 810,000,000

- - - 1 717,850,000

- - - 1 1,166,175,000

- - - 1 703,010,000

- - - - -

- - - - -

- - - - -

- 1 1,544,627,900 - -

- - - 1 72,100,000

- - - - -

Nomor SPKS dan nilai kontrak berubah di banding lapora


- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- 1 423,957,000 - -

352,461,000 - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

1,099,170,000 - - - -

- - - - -

- - - - -

231,825,000 - - - -

231,825,000 - - - -

- - - - -

- - - - -

- 1 1,299,408,000 - -

354,870,000 - - - -

- 1 296,900,000 - -

- 1 1,274,039,000 - -

- 1 1,178,945,000 - -

- 1 1,645,487,000 - -
- 1 1,304,158,000 - -

- 1 1,635,359,000 - -

- 1 1,526,574,000 - -

- 1 1,227,197,400 - -

- 1 1,203,184,000 - -

- 1 1,347,525,000 - -

- 1 2,036,728,000 - -

- 1 1,362,029,600 - -

- 1 1,092,878,000 - -

- 1 738,135,000 - -

- 1 1,763,075,000 - -

- 1 1,798,962,000 - -

- 1 1,376,271,500 - -

- - - - -

- 1 1,393,711,000 - -

974,726,500 - - - -

1,461,240,000 - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- 1 919,700,000 - -

- 1 1,452,880,500 - -

- 1 2,007,326,000 - -

1,943,320,000 - - - -

- 1 1,424,337,000 - -

- 1 539,819,000 - -

1,452,880,500 - - - -

- 1 1,422,752,400 - -

- - - - -

- - - 1 88,324,000

713,193,690 - - - -
1,101,347,500 - - - -

934,586,180 - - - -

716,954,700 - - - -

730,918,210 - - - -

1,755,728,700 - - - -

- - - - -

- - - 1 534,143,750

- - - 1 390,673,500

- - - 1 390,851,125

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

1,217,044,500 - - - -

1,168,175,000 - - - -

- 1 836,183,800 - -

- 1 416,499,000 - -

- 1 816,170,750 - -

- 1 846,326,600 - -
- 1 856,148,500 - -

- 1 797,364,750 - -

- 1 410,935,875 - -

- 1 1,185,155,800 - -

- 1 799,203,600 - -

- 1 790,172,650 - -

- 1 804,587,500 - -

- 1 780,670,500 - -

- 1 839,087,250 - -
1,251,057,550 - - - -

- 1 770,702,500 - -

740,432,000 - - - -

- 1 413,418,500 - -

- 1 839,465,100 - -

- 1 842,063,000 - -

- 1 1,254,605,100 - -

813,782,000 - - - -

627,760,500 - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - 1 1,336,500,000

- - - 1 533,610,000

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- 1 1,475,000,000 - -

- 1 1,449,500,000 - -

321,255,000 - - - -

403,639,500 - - - -

368,857,500 - - - -

421,000,000 - - - -

300,850,000 - - - -

370,122,500 - - - -

407,000,000 - - - -

344,025,000 - - - -

300,000,000 - - - -

282,480,000 - - - -
- - - - -

- - - 1 533,429,600

- 1 328,020,000 - -

- 1 328,020,000 - -

- 1 851,950,000 - -

- 1 446,875,000 - -

- 1 548,220,000 - -

- 1 397,000,000 - -

- 1 304,128,000 - -

- 1 1,044,990,000 - -

- 1 349,490,000 - -

- 1 789,350,000 - -

- 1 548,220,000 - -
- 1 838,414,000 - -

- 1 1,161,795,000 - -

- 1 1,298,210,000 - -

- 1 1,668,172,000 - -

- 1 3,623,622,200 - -

- 1 4,193,750,000 - -

- 1 5,022,883,000 - -

- 1 2,666,329,000 - -

- 1 4,541,086,000 - -

- 1 2,595,760,200 - -

- 1 2,694,243,000 - -

- 1 4,213,128,000 - -

- 1 3,372,178,000 - -

- 1 4,362,275,000 - -

- -

- -

- -

- -

- - - - -

- - - - -
- 1 482,493,000 - -

- 1 1,000,908,302 - -

- 1 657,382,000 - -

- 1 1,641,255,000 - -

- 1 1,708,260,000 - -

- 1 1,418,856,000 - -

- - - 1 475,200,000

- 1 128,970,000 - -

- 1 250,000,000 - -

439,915,000 - - - -

- - - - -

- - - - -
tidak ada progress fisik

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- - - 1 405,562,500

- - - 1 414,962,500

1,628,638,000 - - - -

1,595,200,046 - - - -

1,594,153,000 - - - -

1,678,600,000 - - - -

2,025,475,683 - - - -

480,691,907 - - - -

376,280,716 - - - -

380,982,972 - - - -

466,710,965 - - - -

522,190,680 - - - -

349,968,729 - - - -

476,635,984 - - - -

382,210,290 - - - -

478,385,967 - - - -
453,789,754 - - - -

456,649,303 - - - -

560,779,120 - - - -

2,025,148,609 - - - -

1,335,378,748 - - - -

1,340,614,880 - - - -

672,324,640 - - - -

1,969,637,098 - - - -

1,746,565,040 - - - -

527,606,637 - - - -

515,036,236 - - - -

483,933,833 - - - -

481,776,271 - - - -

438,908,800 - - - -

484,060,099 - - - -

475,877,996 - - - -

471,286,464 - - - -

462,692,313 - - - -
505,795,103 - - - -

662,663,696 - - - -

450,541,942 - - - -

1,250,808,785 - - - -

490,665,380 - - - -

363,879,333 - - - -

442,113,936 - - - -

462,334,769 - - - -

517,705,855 - - - -

390,505,852 - - - -

375,856,215 - - - -

390,065,743 - - - -

461,001,635 - - - -

581,984,066 - - - -

1,936,568,035 - - - -

686,350,040 - - - -

- - - - -
- - - - -
156,547,445,728 87 116,265,039,627 45 26,921,679,575 559
Nomor SPKS dan nilai kontrak berubah di banding laporan pada TW 2
INSPEKTORAT JENDERAL
KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN
No. Kertas Kerja :
Dibuat Oleh :
Tanggal :
Direviu Oleh :
Tanggal :

POSISI PBJ
Posisi PBJ PER TW III/2020
No URAIAN
Jlh. Paket Nilai (Rp)
1 Target PBJ Tahun 2020 667 783,414,015,312
2 Belum/masih proses Lelang 92 104,017,125,050
3 Sudah Lelang 575 679,396,890,262
Jlh. sama
4 Sudah Ditetapkan Pemenang 575 634,641,591,409
a. Belum ttd kontrak 16 56,977,555,100
b. Sudah ttd kontrak, dengan progres: 559 577,664,036,309
1) 0% 61 71,905,194,400
2) 1-25% 24 30,772,658,570
3) 26-50% 175 175,252,018,409
4) 51-75% 167 156,547,445,728
5) 76-99% 87 116,265,039,627
6) 100% 45 26,921,679,575

Ket: Isian otomatis


Triwulan II Triwulan III Triwulan IV
Paket Nilai (Rp) Paket Nilai (Rp) Paket
100 750 100 750 100
- Nilai
- Pagu/Anggaran
- - -

Selisih antara pagu dan nilai penetapan


pemenang (yang akan dikontrakkan dan
kontrak); efisiensi kontrak
Nilai yang akan
dikontrakkan

Nilai kontrak

498
INSPEKTORAT JENDERAL
KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN
No. Kertas Kerja :
Dibuat Oleh :
Tanggal :
Direviu Oleh :
Tanggal :

REVIU PBJ MELALUI PELELANGAN

TRIWULAN I TA 2020 S.D. TRIWULAN II TA 2020 S.D. TRIWULAN III TA 2020 S.D. TRIWULAN IV TA 2020
No URAIAN
Jlh. Paket Rp Jlh. Paket Rp Jlh. Paket Rp Jlh. Paket Rp
A TARGET PADA RUP
1 Kontrak Ditandatangani 362 317,559,261,796 414 329,634,598,411 646 600,425,061,037 - -
2 Penyelesaian Pekerjaan (100%) 105 80,540,058,177 125 103,573,673,830 197 135,741,123,712 - -
B REALISASI PBJ
1 Kontrak Ditandatangani 295 163,313,398,198 359 239,095,675,190 559 577,664,036,309 - -
2 Penyelesaian Pekerjaan (100%) 64 29,513,039,127 60 17,373,408,560 45 26,921,679,575 - -
C PERSENTASE REALISASI PBJ
1 Kontrak Ditandatangani 81.49% 51.43% 86.71% 72.53% 86.53% 96.21% #DIV/0! #DIV/0!
2 Penyelesaian Pekerjaan (100%) 60.95% 36.64% 48.00% 16.77% 22.84% 19.83% #DIV/0! #DIV/0!

Isian otomatis
INSPEKTORAT JENDERAL
KEMENTERIAN LINGKUNGAN HIDUP DAN KEHUTANAN
No. Kertas Kerja :
Dibuat Oleh :
Tanggal :
Direviu Oleh :
Tanggal :

REVIU PBJ MELALUI PELELANGAN

S.D. TRIWULAN III TA 2020 S.D. TRIWULAN IV TA 2020


No URAIAN
Jlh. Paket Rp Jlh. Paket Rp
A TARGET PADA RUP
1 Kontrak Ditandatangani 646 600,425,061,037 - -
Kantor Pusat PDASHL 9 18,331,524,000
BPDASHL Krueng Aceh 3 5,114,519,400
BPDASHL Wampu Sei Ular 6 2,792,000,000
BPDASHL Asahan Barumun 8 22,581,345,000
BPDASHL Indragiri Rokan
BPDASHL Baturusa Cerucuk 4 1,717,825,000
BPDASHL Agam Kuantan 6 1,191,892,000
BPDASHL Batanghari 1 156,420,000
BPDASHL Ketahun 65 33,498,348,213
BPDASHL Sei Jang Duriangkang 3 7,199,115,250
BPDASHL Musi 38 35,918,325,580
BPDASHL Way Seputih Sekampung 48 37,307,031,164
BPDASHL Citarum Ciliwung 31 33,179,303,800
BPDASHL Cimanuk Citanduy 11 7,972,036,000
BPDASHL Serayu Opak Progo 8 3,589,575,000
BPDASHL Pemali Jratun 17 16,582,136,000
BPDASHL Brantas Sampean 36 44,853,459,800
BPDASHL Unda Anyar 11 7,649,783,355
BPDASHL Dodokan Moyosari 48 5,720,459,125
BPDASHL Benain Noelmina 37 15,324,371,725
BPDASHL Kapuas 57 52,267,740,181
BPDASHL Mahakam Berau 17 15,681,867,062
BPDASHL Barito 31 35,751,416,900
BPDASHL Kahayan 15 1,285,000,000
BPDASHL Jeneberang Saddang 51 68,742,975,755
BPDASHL Bone Bolango 17 21,799,450,000
BPDASHL Lariang Mamasa 2 1,306,234,600
BPDASHL Tondano 7 2,643,901,500
BPDASHL Palu Poso 5 6,779,912,000
BPDASHL Sampara 20 45,082,460,900
BPDASHL Waehapu Batu Merah - -
BPDASHL Ake Malamo 12 8,487,955,102
BPDASHL Remu Ransiki
BPDASHL Memberamo 11 30,049,826,625
BPDASHL Solo 11 9,866,850,000
BPTH Wilayah I
BPTH Wilayah II
2 Penyelesaian Pekerjaan (100%) 197 135,741,123,712 - -
Kantor Pusat PDASHL
BPDASHL Krueng Aceh 11 30,049,826,625
BPDASHL Wampu Sei Ular
BPDASHL Asahan Barumun
BPDASHL Indragiri Rokan
BPDASHL Baturusa Cerucuk 4 1,721,125,000
BPDASHL Agam Kuantan 5 936,032,000
BPDASHL Batanghari - -
BPDASHL Ketahun 3 124,223,000
BPDASHL Sei Jang Duriangkang 3 7,199,115,250
BPDASHL Musi
BPDASHL Way Seputih Sekampung - -
BPDASHL Citarum Ciliwung 4 2,257,600,000
BPDASHL Cimanuk Citanduy 3 2,839,000,000
BPDASHL Serayu Opak Progo 7 3,435,975,000
BPDASHL Pemali Jratun 4 3,233,860,000
BPDASHL Brantas Sampean 36 44,853,459,800
BPDASHL Unda Anyar 4 1,403,992,375
BPDASHL Dodokan Moyosari 29 3,669,765,500
BPDASHL Benain Noelmina 29 3,669,765,500
BPDASHL Kapuas
BPDASHL Mahakam Berau
BPDASHL Barito 11 703,601,960
BPDASHL Kahayan 15 1,285,000,000
BPDASHL Jeneberang Saddang 2 1,870,110,000
BPDASHL Bone Bolango - -
BPDASHL Lariang Mamasa 1 533,429,600
BPDASHL Tondano 2 820,525,000
BPDASHL Palu Poso 5 6,779,912,000
BPDASHL Sampara
BPDASHL Waehapu Batu Merah
BPDASHL Ake Malamo 12 8,487,955,102
BPDASHL Remu Ransiki
BPDASHL Memberamo
BPDASHL Solo 7 9,866,850,000
BPTH Wilayah I
BPTH Wilayah II
B REALISASI PBJ
1 Kontrak Ditandatangani 559 577,664,036,309 - -
Kantor Pusat PDASHL 9 18,331,524,000
BPDASHL Krueng Aceh 3 5,114,519,400
BPDASHL Wampu Sei Ular 6 2,792,000,000
BPDASHL Asahan Barumun 3 5,204,320,000
BPDASHL Indragiri Rokan - -
BPDASHL Baturusa Cerucuk 4 1,717,825,000
BPDASHL Agam Kuantan 2 560,372,000
BPDASHL Batanghari 12 7,687,399,625
BPDASHL Ketahun 46 26,776,126,500
BPDASHL Sei Jang Duriangkang 3 7,191,185,250
BPDASHL Musi 38 35,918,325,580
BPDASHL Way Seputih Sekampung 48 37,307,031,164
BPDASHL Citarum Ciliwung 35 37,207,116,800
BPDASHL Cimanuk Citanduy 4 3,223,861,300
BPDASHL Serayu Opak Progo 8 3,573,980,000
BPDASHL Pemali Jratun 16 16,443,262,900
BPDASHL Brantas Sampean 24 40,283,230,200
BPDASHL Unda Anyar 11 7,649,783,355
BPDASHL Dodokan Moyosari 17 11,606,689,145
BPDASHL Benain Noelmina 24 20,117,012,325
BPDASHL Kapuas 57 52,267,740,181
BPDASHL Mahakam Berau 17 15,681,867,062
BPDASHL Barito 31 35,751,416,900
BPDASHL Kahayan 8 10,734,626,400
BPDASHL Jeneberang Saddang 51 68,742,975,755
BPDASHL Bone Bolango 10 3,519,229,500
BPDASHL Lariang Mamasa 2 1,306,234,600
BPDASHL Tondano 7 2,643,901,500
BPDASHL Palu Poso 11 5,936,263,000
BPDASHL Sampara 20 45,082,460,900
BPDASHL Waehapu Batu Merah - -
BPDASHL Ake Malamo 11 8,464,956,302
BPDASHL Remu Ransiki -
BPDASHL Memberamo 11 30,049,826,625
BPDASHL Solo 10 8,776,973,040
BPTH Wilayah I -
BPTH Wilayah II -
2 Penyelesaian Pekerjaan (100%) 45 26,921,679,575 - -
Kantor Pusat PDASHL - -
BPDASHL Krueng Aceh 1 298,650,100
BPDASHL Wampu Sei Ular - -
BPDASHL Asahan Barumun - -
BPDASHL Indragiri Rokan - -
BPDASHL Baturusa Cerucuk 3 1,422,200,000
BPDASHL Agam Kuantan 1 304,512,000
BPDASHL Batanghari - -
BPDASHL Ketahun - -
BPDASHL Sei Jang Duriangkang - -
BPDASHL Musi 5 2,649,573,000
BPDASHL Way Seputih Sekampung - -
BPDASHL Citarum Ciliwung 4 2,257,600,000
BPDASHL Cimanuk Citanduy - -
BPDASHL Serayu Opak Progo 7 3,421,850,000
BPDASHL Pemali Jratun 4 3,233,860,000
BPDASHL Brantas Sampean 4 3,765,792,500
BPDASHL Unda Anyar 4 1,403,992,375
BPDASHL Dodokan Moyosari - -
BPDASHL Benain Noelmina - -
BPDASHL Kapuas - -
BPDASHL Mahakam Berau - -
BPDASHL Barito - -
BPDASHL Kahayan - -
BPDASHL Jeneberang Saddang 2 1,870,110,000
BPDASHL Bone Bolango - -
BPDASHL Lariang Mamasa 1 533,429,600
BPDASHL Tondano 2 820,525,000
BPDASHL Palu Poso - -
BPDASHL Sampara - -
BPDASHL Waehapu Batu Merah - -
BPDASHL Ake Malamo 1 475,200,000
BPDASHL Remu Ransiki - -
BPDASHL Memberamo - -
BPDASHL Solo 6 4,464,385,000
BPTH Wilayah I - -
BPTH Wilayah II - -
C PERSENTASE REALISASI PBJ
1 Kontrak Ditandatangani 86.53% 96.21% #DIV/0! #DIV/0!
2 Penyelesaian Pekerjaan (100%) 22.84% 19.83% #DIV/0! #DIV/0!

Isian otomatis
REVIU KUALITAS BELANJA

No Variabel Indikator Ket. Isian Isian APIP Skor Max Skor


1
Realisasi Belanja Barang Otomatis 40.97% 10 4.10

Alokasi dan
realisasi
Realisasi Belanja Modal Otomatis 31.38% 10 3.14

Realisasi Total Belanja Otomatis 43.15% 5 2.16


2 Realisasi ttd kontrak PBJ Otomatis 86.53% 8 6.92
Ketepatan Waktu
Realisasi Penyelesaian Pekerjaan PBJ Otomatis 22.84% 17 3.88

3 Informasi keuangan melalui website Ya/Tidak Ya 2 2.00

Melaksanaan e-procurement Ya/Tidak Ya 2 2.00

Sistem pemantauan anggaran Tidak/Berkala/Realtime Realtime 7 7.00


Transparansi dan
Akuntabilitas

Sistem pemantauan kinerja Tidak/Berkala/Realtime Berkala 7 3.50

Sistem pemantauan PBJ Tidak/Berkala/Realtime Berkala 7 3.50

Menggunaan standar biaya Ya/Tidak Ya 3 3.00

Efisiensi dan
efektivitas
Reviu Efisiensi Anggaran Ya/Tidak Ya 5 5.00

Jumlah rata-rata revisi anggaran/satker Angka 3.59 7 0.00


Persentase realisasi kegiatan/output Angka 119% 10 10.00
Total 100 56.20

Kertas Kerja Dukungan


No Variabel Indikator Uraian Isian
1 Efisiensi dan Jumlah rata-rata revisi anggaran/satker Jumlah satker
efektivitas jumlah total pergeseran anggaran
Rata-rata
Persentase realisasi kegiatan/output Realisasi Anggaran sd TW III
Realisasi PBJ sd TW III
Persentase

Keterangan Isian otomatis

Pengisian RCA
No Variabel Skor Variabel Wajib Isi RCA
1 Alokasi dan realisasi 9.39 YA
2 Ketepatan Waktu 10.81 YA
3 Transparansi dan Akuntabilitas 18.00 TIDAK
4 Efisiensi dan efektivitas 18.00 TIDAK
Total 56.20 YA
REVIU KUALITAS BELANJA

Keterangan
Realiasasi belanja barang TW III sebesar 40,97% (tidak mencapai target 100%), hal ini
disebabkan oleh dampak pandemi Covid-19, pengadaan RHL masih proses lelang,
pembayaran kepada penyedia barang/jasa dilakukan per termin
Realisasi belanja modal (BM) TW III sebesar 31,38% (tidak mencapai target 100%), hal ini
disebabkan adanya kegiatan yang dilakukan efisiensi anggaran yaitu dalam rangka efisiensi
anggaran sehingga BM dilaksanakan untuk tahun anggaran berikutnya.

Realisasi ttd kontrak PBJ TW III sebesar 86,69% (tidak mencapai target 100%)

Realisasi penyelesaian pekerjaan TW III sebesar 22,84% (tidak mencapai target 100%),

Informasi keuangan belum diupload di website


Ya, melalui aplikasi SPSE, informasi yang disajikan berupa jenis dan harga barang yang akan
diadakan, nama penyedia, dan informasi lainnya terkait penyedia

Sistem pemantauan anggaran dilakukan melalui aplikasi OM-SPAN (realtime) dan SMART
(berkala), data yang dihasilkan berupa capaian anggaran dan realisasi belanja per hari

Sistem pemantauan kinerja dilakukan melalui aplikasi SMART (Kemenkeu sd output) dan E-
Monev BAPPENAS sampai komponen (per bulan diisi oleh satker report per triwulan). Data
yang dihasilkan monev capaian kinerja, pagu anggaran, realisasi penyerapan anggaran, dan
realisasi volume keluaran (output)
Sistem pemantauan PBJ dilakukan oleh masing-masing satker, tidak ada pemantauan dari
E1nya (Ditjen PDASHL), masing2 satker SIRUP nya cuman 1 saja.
PMK Nomor 78/PMK.02/2019 tentang SBM TA 2020, Persekjen KLHK Nomor
P.5/SETJEN/ROKEU/KEU.1/8/2019 tentang Pedoman SBK TA 2020 Lingkup KLHK, dan SE
Ditjen PDASHL Nomor Se.7/PDASHL/SET/REM.0/10/2019 tentang HSPK Bidang PDASHL
Tahun 2020
Sudah melakukan reviu efisiensi anggaran terhadap seluruh kegiatan. Hasilnya digunakan
untuk refocussing kegiatan dan realokasi anggaran dalam rangka percepatan penanganan
COVID-19.
0.25162162

CUKUP

Isian
37
133
3.59
81
96
118.63%
SKORING REVIU KUALITAS BELANJA

No Variabel Indikator Ket. Isian Isian APIP


1 Alokasi dan Realisasi Belanja Barang Otomatis (Realisasi/RPD) x 10
realisasi Realisasi Belanja Modal Otomatis (Realisasi/RPD) x 10
Realisasi Total Belanja Otomatis (Realisasi/RPD) x 5
2 Ketepatan Waktu Realisasi ttd kontrak Otomatis (Realisasi/RUP) x 8
Realisasi Penyelesaian
Pekerjaan Otomatis (Realisasi/RUP) x 17
3 Transparansi dan Informasi keuangan melalui Ya
Ya/Tidak
Akuntabilitas website Tidak
Ya
Melaksanakan e-procurement Ya/Tidak
Tidak
realtime
Sistem pemantauan anggaran Tidak/Berkala/
berkala
oleh APIP Realtime
Tidak
realtime
Sistem pemantauan PBJ oleh Tidak/Berkala/
APIP Realtime berkala
Tidak
realtime
Sistem pemantauan kinerja oleh Tidak/Berkala/
APIP Realtime berkala
Tidak
4 Efisiensi dan Ya
Menggunakan standar biaya Ya/Tidak
efektivitas Tidak
Ya
Reviu Efisiensi Anggaran Ya/Tidak
Tidak
0<=x<=1
Jumlah rata-rata revisi
Angka 1<x<2
anggaran /satker
x>=2
Persentase realisasi Angka Persentase (Rasio keg;output/Rasio keu) x 10
kegiatan/output
Skor
10
10
5
8

17
2
0
2
0
7
3.5
0
7
3.5
0
7
3.5
0
3
0
5
0
7
3.5
0
10
Jumlah Pergeseran Jumlah Pergeseran
No Satker
Anggaran (/TW 1) Anggaran (/TW 3)
1 Kantor Pusat PDASHL 4
2 BPDASHL Krueng Aceh 4
3 BPDASHL Wampu Sei Ular 2
4 BPDASHL Asahan Barumun 5
5 BPDASHL Indragiri Rokan 2
6 BPDASHL Baturusa Cerucuk 4
7 BPDASHL Agam Kuantan 2
8 BPDASHL Batanghari 1 4
9 BPDASHL Ketahun 3
10 BPDASHL Sei Jang Duriangkang 1 3
11 BPDASHL Musi 7
12 BPDASHL Way Seputih Sekampung 3
13 BPDASHL Citarum Ciliwung 2
14 BPDASHL Cimanuk Citanduy 3
15 BPDASHL Serayu Opak Progo 4
16 BPDASHL Pemali Jratun 4
17 BPDASHL Brantas Sampean 2
18 BPDASHL Unda Anyar 6
19 BPDASHL Dodokan Moyosari 1 5
20 BPDASHL Benain Noelmina 3
21 BPDASHL Kapuas 1 7
22 BPDASHL Mahakam Berau 3
23 BPDASHL Barito 2
24 BPDASHL Kahayan 3
25 BPDASHL Jeberang Saddang 4
26 BPDASHL Bone Bolango 2
27 BPDASHL Lariang Mamasa 3
28 BPDASHL Tondano 4
29 BPDASHL Palu Poso 3
30 BPDASHL Sampara 3
31 BPDASHL Waehapu Batu Merah 4
32 BPDASHL Ake Malamo 4
33 BPDASHL Remu Ransiki 4
34 BPDASHL Memberamo 2
35 BPDASHL Solo 6
36 BPTH Wilayah I 4
37 BPTH Wilayah II 3
4 133