1. BAB I UMUM
2. BAB II INFORMASI KEGIATAN
3. BAB III SASARAN MUTU
4. BAB IV PERSYARATAN TEKNIS DAN ADMINISTRASI
5. BAB V STRUKTUR ORGANISASI
6. BAB VI TUGAS, TANGGUNG JAWAB & WEWENANG
7. BAB VII BAGAN ALIR PELAKSANAAN PEKERJAAN
8. BAB VIII JADWAL PELAKSANAAN PEKERJAAN
9. BAB IX JADWAL PERALATAN DAN JADWAL PENGGUNANNYA
10. BAB X JADWAL MATERIAL DAN PENGGUNANNYA
11. BAB XI JADWAL PERSONIL
12. BAB XII JADWAL ARUS KAS
13. BAB XIII RENCANA & METODA VERIVIKASI,
VALIDASI, MONITORING EVALUASI, INSPEKSI & PENGUJIAN & KRITERIA
PENERIMAAN
14. BAB XIV DAFTAR KRITERIA PENERIMAAN
15. BAB XV DAFTAR INDUK DOKUMEN
16. BAB XVI DAFTAR INDUK REKAMAN
17. BAB XVII PENUTUP
BAB I UMUM
DATA KONTRAK
1. NOMOR KONTRAK : KU.03.01/Ao.6.10/Ao.5.3/08/V/2019
2. TANGGAL KONTRAK : 28 MEI 2019
3. SISTEM KONTRAK : HARGA SATUAN
4. NOMOR SPMK : KU.03.01/Ao.6.1/Ao.5.3/spmk/08/V/2019
5. TANGGAL SPMK : 28 MEI 2019
LINGKUP KEGIATAN
1. PERSIAPAN LAPANGAN
2. REVIEW DESIGN
3. PENGAWASAN PENGUKURAN
4. PENGAWASAN PELAKSANAAN
5. PELAPORAN PELAKSANAAN KONSTRUKSI
PERSIAPAN LAPANGAN
Persiapan pelaksanaan pekerjaan konstruksi meliputi antara lain
penyelesaian perizinan, koordinasi penyiapan lahan / lokasi pekerjaan,
sosialisasi, dan lain-lain.
REVIEW DESIGN
1. Meneliti dan memberi masukan tentang kesesuaian desain dengan
keadaan lapangan kepada pemilik pekejaan.
2. Membantu menyiapkan data pendukung (data ukur, data tanah, dan
lain-lain) yang dalam rangka review design sesuai kebutuhan
lapangan.
3. Menyiapkan konsep review / penyesuaian desain sesuai dengan
kebutuhan / kondisi lapangan atas perintah Pejabat Pembuat
Komitmen (PPK).
PENGAWASAN PENGUKURAN
NO KEGIATAN KETERANGAN
1 Mengecek alat ukur yang telah dikalibrasi sebelum digunakan Tasking
Melaksanakan survei lapangan dalam rangka perhitungan Mutual
2 Chek (pengukuran, perhitungan volume beserta backup-nya, Tasking
penyiapan berita acara) bersama Penyedia Jasa Konstruksi
Memeriksa data elevasi/koordinat pada patok-patok pembantu
3 Tasking
(Tasking).
Memeriksa penerapan seluruh elevasi dan dimensi bangunan dari
4 gambar pelaksanaan (construction drawing / shop drawing) ke Tasking
situasi sesungguhnya di lapangan (kondisi alami)
Mengecek tingkat ketepatan bidang bekisting sebelum pengecoran
5 Tasking
konstruksi beton
Memeriksa buku ukur dan kelengkapan dokumentasi pengukuran
6 Tasking
yang dibuat oleh Penyedia Jasa Konstruksi/Pemborongan
7 Menyiapkan laporan selama kegiatan pengukuran Tasking
PENGAWASAN PELAKSANAAN
NO KEGIATAN KETERANGAN
Mengendalikan pelaksanaan pekerjaan agar pekerjaan dapat
diselesaikan sesuai dengan waktu yang direncanakan, spesifikasi
1 Assist
teknik dan desain sebagaimana ditentukan dalam dokumen kontrak
pekerjaan konstruksi
2 Menyusun Standar Operasi Prosedur (SOP) pelaksanaan konstruksi Assist
Memeriksa / mengesahkan Shop Drawing / Construction Drawing
3 yang dibuat oleh Penyedia Jasa Konstruksi / Pemborongan, untuk Tasking
kemudian diajukan kepada Direksi Teknis Pekerjaan
Memeriksa / mengkoreksi metode dan jadwal pelaksanaan yang
4 Assist
dibuat Penyedia Jasa Konstruksi/Pemborongan
Memeriksa dan mengesahkan laporan harian, laporan mingguan dan
5 laporan bulanan yang dibuat oleh Penyedia Jasa Konstruksi / Tasking
Pemborongan
Memberi masukan lisan/tertulis secara pro aktif, akurat dan tepat,
6 kepada direksi atau Pemilik Pekerjaan, dalam ranglca memperoleh Assist
efektifitas dan efisiensi pelaksanaan pekerjaan
Mengevaluasi program harian, mingguan Penyedian Jasa Konstruksi
7 / Pemborongan serta memberikan izin lingkup pekerjaan perminggu Assist
sesuai jadwal pelaksanaan
Memberikan izin pengecoran beton secara tertulis setelah terlebih
8 dahulu melakukan pemeriksaan begisting, material (semen, pasir, Assist
krikil, besi tulangan, air), peralatan dan tenaga kerja.
Melaksanakan dan menerapkan tata cara, prosedur, mekanisme
9 pelaksanaan yang tercantum dalam Rencana Mutu Kontrak (RMK) Assist
dan hasilnya dilaporkan kepada direksi pekerjaan.
krikil, besi tulangan, air), peralatan dan tenaga kerja.
Melaksanakan dan menerapkan tata cara, prosedur, mekanisme
9 pelaksanaan yang tercantum dalam Rencana Mutu Kontrak (RMK) Assist
PENGAWASAN
dan hasilnyaPELAKSANAAN
dilaporkan kepada direksi pekerjaan.
Membantu Pemilik Pekerjaan melakukan inspeksi kepada pabrik
10 Assist
pemasok, bahan, perakit dan lain-lainnya jika dibutuhkan
Menyiapkan rekomendasi untuk perintah dan konsep perubahan
kontrak/Addendum terkait dengan adanya Change Order / Variation
11 Order, bilamana diperlukan untuk menjamin penyelesaian pekerjaan Assist
yang secara teknis dapat dipertanggung jawabkan dan sesuai
dengan anggaran yang tersedia
Melakukan monitoring dan pengecekan secara terus – menerus
sehubungan dengan pengendalian mutu dan volume pekerjaan serta
12 Assist
menandatangani laporen bulanan, apabila pelaksanaan pekerjaan
telah memenuhi ketentuan dan persyaratan yang telah ditentukan
Melaporkan secara tertulis kepada Pemilik Pekerjaan apabila terjadi
adanya penyimpangan – penyimpangan dari ketentuan dan
13 Assist
persyaratan teknis, dengan tembusan kepada Penyedia Jasa
Konstruksi / Pemborongan
Konsultan pengawas melaporkan kepada Pemilik Pekerjaan masalah
yang berkaitan dengan pelaksanaan pekerjaan termasuk
keterlambatan pencapain target fisik, serta mengusulkan upaya
14 Assist
penanggulangan dan tindak turun tangan yang diperlukan, dan
membantu Pemilik Pekerjaan menyiapkan konsep teguran terhadap
Penyedia JasaKonstruksi / Pemborongan
Membantu Pemilik Pekerjaan mengawasi uji laboratorium dalam
15 Assist
rangka pengendalian mutu konstruksi
Menginventarisasi, merencanakan kebutuhan penyelidikan dan
16 Assist
pengujian lapangan maupun laboratorium
17 Melaporkan dan mencatat pemakaian bahan yang diperlukan, jumlah Assist
PELAPORAN PELAKSANAAN KONSTRUKSI
TENAGA PENDUKUNG
KOORDINATOR PENGAWAS LAPANGAN
PENGAWAS LAPANGAN PEMBORAN
PENGAWAS LAPANGAN JARINGAN
PENGAWAS LAPANGAN GENSET/POMPA
SURVEYOR
TENAGA ADIMISTRASI
TENAGA OPERATOR KOMPUTER
OFFICE BOY
BAB V STRUKTUR ORGANISASI
Pengawas Lapangan
ISMAIL YUSUF, SE
Team Leader
Ir. Sutrisno, MT
KOORDINATOR PENGAWAS
Ichwandi, Amd
PERSIAPAN
A.SPD.1 Ya Ya Ya
A.SPD.2 A.SPD.3
Gambar 7.1
PEKERJAAN AWAL
A
A
PELAKSANAAN PEKERJAAN
E.SP.2
C.SP.1 C.SP.2 D.SP.1
E.SPD.2
C.SPD.1 Ya C.SPD.2 Ya D.SPD.1 Ya
Tidak Tidak
C C
Ya Ya E.SPD.2
C.SPD.3 D.SPD.2
HASIL PEKERJAAN
BUKU
DITERIMA
LAPORAN
BULANAN
D2.SP1
D.SP.3 E.SPD.3
PENYUSUNAN &
DISKUSI LAP. KHUSUS
Tidak
C
D.SPD.3 Ya E.SPD.3
BUKU LAPORAN
KHUSUS
B
B
C.SP.4 D.SP.4
Tidak Tidak
C C
C.SPD.4 Ya D.SPD.4 Ya
PROGRESS BUKU
PEKERJAAN LAPORAN
PENGUKURAN
D.SP.5
DRAFT LAPORAN
C.SP.5 C.SP.6
AKHIR
PEMERIKSAAN
PERHITUNGAN
C1.SP1 AS BUILT DRAWING
MC.100
C1.SP2 E.SP.4
DISKUSI LAPORAN
AKHIR
Tidak Tidak
C C
Tidak
C.SPD.5 Ya C.SPD.6 Ya
C
PROGRES AS BUILT DRAWING
PEKERJAAN DISETUJUI D.SPD.5 Ya
100%
BUKU LAPORAN
AKHIR DISETUJUI
C.SP.7
PERSIAPAN
C1.SP2 PHO
Tidak
C
C.SPD.7 Ya
BERITA ACARA
PHO
SELESAI
BAB VIII JADWAL PELAKSANAAN PEKERJAAN
BULAN
BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII
NO URAIAN KEGIATAN Bobot MEI - JUNI JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKT OKTOBER - NOVEMBER NOVEMBER - DESEMBER KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
28 - 2 3-9 10 - 16 17 - 23 24 - 30 1-7 8 - 14 15 - 21 22 - 28 29 - 4 5 - 11 12 - 18 19 - 25 26 - 1 2-8 9 - 15 16 - 22 23 - 29 30 - 6 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 11 - 17 18 - 24 25 - 1 2-8 9 - 15 16 - 23
A PERSIAPAN
1,52% 0,92% 0,14% 0,27% 0,20%
1 Mobilisasi Demobilisasi Personil dan Peralatan -
0,00% 100%
0,92% 0,92%
2 Penyusunan Rencana kerja (RMK) -
0,00%
3,77% 0,14% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22% 1,88%
3 Pengumpulan Data Administrasi & teknik -
0,00%
0,00% 90%
B PEKERJAAN AWAL 0,00%
1,75% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22%
1 Pengawasan setting out -
0,00%
1,75% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22%
2 Pemeriksaan material bangunan -
0,00%
10,15% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22% 1,88% 1,71% 1,30% 1,29% 1,50% 0,72% 80%
3 Review Desain (Bila Diperlukan) -
0,00%
0,00%
c PELAKSANAAN PENGAWASAN 0,00%
1,75% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22%
1 Perhitungan MC.0 -
0,00%
1,88% 0,14% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22% 70%
2 Pemeriksaan gambar kerja & metode pelaksanaan -
0,00%
Pengawasan Pekerjaan (Kualitas, Kuantitas, Waktu, Pengukuran, 26,37% 0,92% 0,14% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22% 1,88% 1,71% 1,30% 1,29% 1,50% 0,72% 1,08% 0,74% 0,58% 2,93% 1,64% 1,11% 1,10% 1,56% 0,92% 0,75% 0,74% 1,01% 0,55% 0,27% 0,20%
3 -
Pemboran, JIAT, Pemasangan Jenset dan Pompa) 0,00%
25,31% 0,18% 0,15% 0,14% 0,57% 0,27% 0,22% 0,22% 1,88% 1,71% 1,30% 1,29% 1,50% 0,72% 1,08% 0,74% 0,58% 2,93% 1,64% 1,11% 1,10% 1,56% 0,92% 0,75% 0,74% 1,01% 0,55% 0,27% 0,20%
4 Perhitungan Volume Hasil Pekerjaan -
0,00% 60%
5,99% 1,56% 0,92% 0,75% 0,74% 1,01% 0,55% 0,27% 0,20%
5 Perhitungan & Penelitian MC.100 -
0,00%
5,99% 1,56% 0,92% 0,75% 0,74% 1,01% 0,55% 0,27% 0,20%
6 Pemeriksaan As Built drawing -
0,00%
2,02% 1,01% 0,55% 0,27% 0,20% 50%
7 Persiapan PHO -
0,00%
0,00%
D PENYUSUNAN LAPORAN 0,00%
0,14% 0,14%
1 Laporan Rencana Mutu Kontrak -
0,00%
0,14% 0,14% 40%
2 Laporan Pendahuluan -
0,00%
4,28% 0,14% 0,22% 1,29% 0,58% 1,10% 0,74% 0,20%
3 Laporan Bulanan -
0,00%
0,20% 0,20%
4 Laporan Pengukuran -
0,00% 30%
0,20% 0,20%
5 Laporan Khusus -
0,00%
0,20% 0,20%
6 Laporan Akhir -
0,00%
0,20% 0,20% 20%
7 External Hard Disk 1 TB -
0,00%
0,00%
E DISKUSI 0,00%
0,14% 0,14%
1 Diskusi Pendahuluan -
0,00%
4,52% 0,15% 0,22% 1,30% 0,74% 1,11% 0,75% 0,27% 10%
2 Diskusi Bulanan -
0,00%
0,58% 0,58%
3 Diskusi Laporan Khusus -
0,00%
0,27% 0,27%
4 Diskusi Akhir Pelaksanaan -
0,00% 0%
100,00% 0,00% 2,76% 0,68% 1,42% 1,33% 1,50% 4,58% 2,14% 2,00% 1,98% 7,53% 5,14% 5,18% 5,16% 4,49% 2,16% 2,17% 2,21% 2,34% 5,86% 3,28% 3,32% 3,30% 6,24% 3,68% 3,73% 3,71% 5,03% 2,73% 2,12% 2,20%
RENCANA
0,00% 2,76% 3,44% 4,86% 6,20% 7,70% 12,28% 14,42% 16,43% 18,41% 25,94% 31,08% 36,27% 41,43% 45,92% 48,08% 50,25% 52,45% 54,79% 60,65% 63,93% 67,25% 70,55% 76,79% 80,47% 84,20% 87,92% 92,94% 95,67% 97,80% 100,00%
REALISASI
0
DEVIASI
BAB IX JADWAL PERALATAN
BULAN
BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII
JUML BULA MEI - JUNI JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKT OKTOBER - NOV NOVEMBER - DES
NO URAIAN SAT
AH N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
28 - 2 3 - 9 10 - 16 17 - 23 24 - 30 1 - 7 8 - 14 15 - 21 22 - 28 29 - 4 5 - 11 12 - 18 19 - 25 26 - 1 2 - 8 9 - 15 16 - 22 23 - 29 30 - 6 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 11 - 17 18 - 24 25 - 1 2 - 8 9 - 15 16 - 23
I. PERALATAN KANTOR
1 Sewa Komputer 2 bh 7
3 Sewa Printer A3 1 bh 7
III. TRANSPORTASI
BULAN
BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII
JUML MEI - JUNI JUNI - JULI JULI - AGUSTUS AGUSTUS - SEPTEMBER SEPTEMBER - OKT OKTOBER - NOV NOVEMBER - DES
NO URAIAN SAT BULAN 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
AH 1 2
28 - 2 3 - 9 10 - 16 17 - 23 24 - 30 1 - 7 8 - 14 15 - 21 22 - 28 29 - 4 5 - 11 12 - 18 19 - 25 26 - 1 2 - 8 9 - 15 16 - 22 23 - 29 30 - 6 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 11 - 17 18 - 24 25 - 1 2 - 8 9 - 15 16 - 23
4 Fotocopy 1 Ls
6 Cartride 2 Bln 7
I. TENAGA AHLI
TAHUN 2019
No Uraian Kegiatan Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Total
28 Mei s/d 30 Juni 1 Juli s/d 28 Juli 29 Juli s/d 25 Agustus 29 Agust s/d 29 September 30 Sept s/d 27 Oktober 28 Okt s/d 24 November 25 Nov s/d 23 Desember
A. PENERIMAAN ( CASH IN )
Uang Muka 20% 279.207.390
Termin I - 40% 446.731.824
Termin II - 30% 335.048.868 335.048.868
Termin III - 30%
Masa Simpan
No Nama Rekaman ( Bukti Kerja ) Lokasi Penyimpanan Rekaman
Rekaman