EMISSION
CONTROL SYSTEM
DAFTAR ISI
UMUM ..................................................................................................................................... 17 - 3
• GARIS BESAR PERUBAHAN ......................................................................................... 17 - 3
• INFORMASI UMUM......................................................................................................... 17 - 3
SPESIFIKASI SERVICE .......................................................................................................... 17 - 3
SEALANT ................................................................................................................................ 17 - 3
SPECIAL TOOL ...................................................................................................................... 17 - 3
EXHAUST GAS RECIRCULATION (EGR) SYSTEM ............................................................ 17 - 4
• INFORMASI UMUM......................................................................................................... 17 - 4
• SYSTEM DIAGRAM ........................................................................................................ 17 - 4
• LOKASI KOMPONEN ..................................................................................................... 17 - 4
• PEMERIKSAAN FUNGSI ................................................................................................ 17 - 5
• PEMERIKSAAN KERJA EGR SOLENOID VALVE ......................................................... 17 - 6
• PEMERIKSAAN EGR SOLENOID VALVE RESISTANCE.............................................. 17 - 6
• PENYETELAN POSITION SENSOR (LPS) ................................................................... 17 - 6
• PEMERIKSAAN ENGINE SPEED SENSOR .................................................................. 17 - 7
• PEMERIKSAAN TIMING CONTROL VALVE COIL RESISTANCE ............................... 17 - 7
• PEMERIKSAAN KERJA TIMING CONTROL VALVE ..................................................... 17 - 8
• PEMERIKSAAN ENGINE COOLANT TEMPERATURE SENSOR ............................... 17 - 8
• PEMERIKSAAN EGR SOLENOID VALVE RESISTANCE.............................................. 17 - 8
• PENYETELAN POSITION SENSOR (LPS) ................................................................... 17 - 8
• PEMERIKSAAN ENGINE SPEED SENSOR .................................................................. 17 - 8
• PEMASANGAN EGR PIPE .............................................................................................. 17 - 9
PEMERIKSAAN GLOW DAN EGR CONTROL UNIT ........................................................... 17 - 10
• TABEL PEMERIKSAAN TEGANGAN TERMINAL ......................................................... 17 - 10
• TABEL PEMERIKSAAN RESISTANSI DAN HUBUNGAN TERMINAL
KONEKTOR HARNESS-SIDE ........................................................................................ 17 - 11
UMUM
GARIS BESAR PERUBAHAN
Saat ini engine kendaraan L300 baru dilengkapi dengan exhaust gas recirculation (EGR) system. Oleh
karena itu, berikut diinformasikan penambahan service procedure karena perubahan tersebut.
INFORMASI UMUM
Electronically-controlled EGR system dan fuel injection timing control system (timing control valve) berfungsi
untuk mengurangi jumlah gas buang (NOx).
SPESIFIKASI SERVICE
SEALANT
Item Spesifikasi sealant Keterangan
Engine coolant temperature sensor 3M Nut Locking Part No. 4171 atau
Drying sealant
threaded portion sejenisnya
SPECIAL TOOL
SYSTEM DIAGRAM
6AE0298
LOKASI KOMPONEN
DEM0039 DEM0040
DEM0041 B16G0454
AK503084AB AK503085AB
PEMERIKSAAN FUNGSI
1. Start engine dan panaskan hingga engine
coolant temperature sensor mencapai 65oC atau
lebih.
2. Pacu engine dengan menekan accelerator pedal,
kemudian pastikan EGR valve diaphram
terangkat.
A05G0039
Vacuum bocor
Ketika arus mengalir (kevakuman terjadi
ketika nipple B ditutup)
DEM0019
Vacuum bocor
Ketika arus mengalir (kevakuman terjadi
ketika nipple D ditutup)
Vacuum bocor
Ketika arus tidak
(kevakuman terjadi
mengalir
ketika nipple E ditutup)
DEM0613
DEM0042
DEM0012
Nilai standar :
DFU0007
Y6015AA
Y6016AA
A16G0454
0 7,7 – 9,5
20 2,9 – 3,6
40 1,3 – 1,7
DEL0033
80 0,26 – 0,35
7
9
10
12
13 11
Urutan pemasangan
1. Pasang dan kencangkan stud pada exhaust
manifold (torque: 2,5 - 3,5 Kgf.m).
14 2. Pasang intake & exhaust manifold gasket ke
stud cylinder head sisi kanan. Kencangkan
sementara dengan manifold nut dan plain
washer.
3. Kencangkan manifold nut (torque: 1,5 - 2,0
Keterangan Kgf.m).
1. EGR pipe assy 4. Pasang heat protector pada exhaust manifold,
2. Flange Bolt (8x20) kemudian kencangkan dengan flange bolt
3. EGR pipe gasket (torque: 1,2 - 1,5 Kgf.m).
4. Manifold nut 5. Pasang EGR pipe gasket kemudian EGR pipe
5. Plain washer assy pada exhaust manifold, lalu kencangkan
6. EGR pipe gasket sementara menggunakan manifold nut dan plain
7. Manifold nut washer.
8. Plain washer 6. Pasang sisi lain dari EGR pipe assy
9. Intake dan exhaust manifold gasket menggunakan EGR pipe gasket pada valve
10. Heat protector assy EGR, kemudian kencangkan dengan
11. Flange bolt flange bolt 8x20.
12. Stud 7. Kencangkan manifold nut (torque: 1,5 - 2,0
13. Exhaust manifold Kgf.m).
14. Stud 8. Kencangkan flange bolt 8x20 (torque: 1,5 - 2,0
Kgf.m).
PWLAS-SL 0307 - Maret 2007
17-10 EMISSION CONTROL SYSTEM - Glow dan EGR Control Unit
DEM0029
Tegangan
Ignition switch : ON
sistem
EGR solenoid
3
valve No.1
Saat engine dalam posisi idle setelah dipanaskan,
Naik sesaat
kemudian accelerator pedal ditekan seketika.
Sensor
7 impressed Ignition switch : ON 4,5 – 5,5 V
voltage
Tegangan
Ignition switch : ON
sistem
EGR solenoid
16
valve No.2
Saat engine dalam posisi idle setelah dipanaskan,
Naik sesaat
kemudian accelerator pedal ditekan seketika.
DEM0026
CATATAN