I INVESTASI
1 Bangunan 5.505.381 3.670.254 1.835.127 1.835.127 1.835.127 1.835.127 -
2 Overhead 2.346.025 - - 2.346.025 - - 2.346.025 -
3 Mesin peralatan dan water 64.270.670 16.067.668 - 16.067.668 48.203.003 16.067.668 16.067.668 16.067.668
4 Listrik dan instalasi 2.384.573 - - - 2.384.573 - 1.192.287 1.192.287
5 Kenderaan 3.805.000 - - - 3.805.000 - 1.902.500 1.902.500
-
TOTAL INVESTASI 78.311.650 19.737.922 1.835.127 17.902.795 58.573.728 17.902.795 19.162.454 21.508.479 -
II PEMBIAYAAN - INVESTASI
1 Kredit Bank 61.346.556
- Kredit Investasi 65,0% # 50.902.572 12.829.649 1.192.833 11.636.817 38.072.923 11.636.817 12.455.595 13.980.511 -
- IDC 65,0% # 2.662.407 289.897 24.617 265.280 2.372.510 510.909 778.506 1.083.095 -
2 Self Financing - -
- Investasi Self Financing 35,0% # 27.409.077 6.908.273 642.294 6.265.978 20.500.805 6.265.978 6.706.859 7.527.968 -
- IDC Self Financing 35,0% # 1.433.604 156.098 13.255 142.843 1.277.505 275.105 419.195 583.205 -
TOTAL BIAYA INVESTASI & IDC 82.407.660 20.183.917 1.873.000 18.310.918 62.223.743 18.688.809 20.360.155 23.174.779 -
MODAL KERJA
1 Kredit Bank 65% # 1.214.281 - - 1.214.281 - - - 1.214.281
2 Self Financing 35% # 653.844 - - 653.844 - - - 653.844
Jumlah Modal Kerja 1.868.125 - - 1.868.125 - - - 1.868.125
TOTAL BIAYA PROYEK 84.275.785 20.183.917 1.873.000 18.310.918 64.091.868 18.688.809 20.360.155 23.174.779 1.868.125
LAMPIRAN 2
OBJECT : PEMBANGUNAN PKS KAP.30 TPJ
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : TOTAL RAB
I. PENYUSUTAN
1 Mesin peralatan dan water 64.270.670 15 6,7% 1.071.178 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711 4.284.711
2 Listrik dan instalasi 2.384.573 15 6,7% 39.743 158.972 158.972 158.972 158.972 158.972 158.972 158.972 158.972 158.972 158.972
3 Kenderaan 3.805.000 30 3,3% 31.708 126.833 126.833 126.833 126.833 126.833 126.833 126.833 126.833 126.833 126.833
TOTAL PENYUSUTAN 75.965.625 1.177.038 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151
II. AMORTISASI
Overhead 2.346.025 5 20% 117.301 469.205 469.205 469.205 469.205 351.904
TOTAL AMORTISASI 2.346.025 117.301 469.205 469.205 469.205 469.205 351.904 - - - - - -
LAMPIRAN 6
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : KREDIT INVESTASI
(Rp.000)
Keterangan Total Tahun - 1 Tahun - 2 Tahun - 3 Tahun - 4 Tahun - 5 Tahun - 6 Tahun - 7 Tahun - 8 Tahun - 9 Tahun - 10
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Penarikan Pinjaman :
- Trw-1 65% - 11.636.817 - - - -
- Trw-2 - 12.455.595 - - - -
- Trw-3 1.192.833 13.980.511 - - - -
- Trw-4 11.636.817 - - - - -
Total Penarikan 50.902.572 12.829.649 38.072.923 - - - - - - -
Pembayaran Cicilan : -
- Trw-1 14.238.326 - - 1.050.000 2.800.000 3.300.000 3.600.000 3.488.326 - -
- Trw-2 14.238.326 - - 1.050.000 2.800.000 3.300.000 3.600.000 3.488.326 - - -
- Trw-3 14.238.326 - - 1.050.000 2.800.000 3.300.000 3.600.000 3.488.326 - - -
- Trw-4 10.850.000 - 100.000 1.050.000 2.800.000 3.300.000 3.600.000 - - - -
Total Pembayaran Cicilan 53.564.979 - 100.000 4.200.000 11.200.000 13.200.000 14.400.000 10.464.979 - - -
100.000 4.200.000 11.200.000 13.200.000 14.400.000 10.464.979 - - -
Saldo Pinjaman :
- Trw-1 - 24.756.363 52.414.979 46.464.979 34.764.979 21.264.979 6.976.653 (0) (0) (0)
- Trw-2 - 37.722.867 51.364.979 43.664.979 31.464.979 17.664.979 3.488.326 (0) (0) (0)
- Trw-3 1.192.833 52.481.884 50.314.979 40.864.979 28.164.979 14.064.979 (0) (0) (0) (0)
- Trw-4 12.854.266 53.464.979 49.264.979 38.064.979 24.864.979 10.464.979 (0) (0) (0) (0)
13.119.546 53.464.979 49.264.979 38.064.979 24.864.979 10.464.979 (0) (0) (0)
Bunga Pinjaman : 13%
- Trw-1 13% - - 1.664.176 1.475.263 1.103.788 675.163 221.509 (0) (0) (0)
- Trw-2 - - 1.630.838 1.386.363 999.013 560.863 110.754 (0) (0) (0)
- Trw-3 - - 1.597.501 1.297.463 894.238 446.563 (0) (0) (0) (0)
- Trw-4 - 1.697.513 1.564.163 1.208.563 789.463 332.263 (0) (0) (0) (0)
Total Bunga per tahun 19.655.461 - 1.697.513 6.456.677 5.367.652 3.786.502 2.014.852 332.263 (0) (0) (0)
Bunga Masa Konstruksi :
- Trw-1 13% - 510.909 - - - - - - - -
- Trw-2 - 778.506 - - - - - - - -
- Trw-3 24.617 1.083.095 - - - - - - - -
- Trw-4 265.280 - - - - - - - - -
Total IDC 2.662.407 289.897 2.372.510 - - - -
LAMPIRAN - 7
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : KEBUTUHAN MODAL KERJA
(Rp.000)
DESCRIPTION Tahun -2015 Tahun -2016 Tahun -2017 Tahun -2018 Tahun -2019 Tahun -2020 Tahun -2021 Tahun -2022 Tahun -2023 Tahun -2024
Tahun -2021
Current Asset
- Piutang Usaha 0,1 1.810.324 8.389.246 9.124.111 9.220.151 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663
- Persediaan
a. Bahan Baku - - - - - - - - - -
b. Bahan Jadi 821.195 3.584.433 3.843.045 3.881.761 3.920.810 4.147.292 4.147.292 4.147.292 4.147.292 4.147.292
- Piutang Lain-Lain - - - - - - - - -
Current Liabilities
- - - - - - - - - - -
- Hutang Dagang 0,02 763.394 3.522.545 3.777.822 3.813.268 3.849.048 4.075.462 4.075.462 4.075.462 4.075.462 4.075.462
Net Working Capital 1.868.125 8.451.133 9.189.334 9.288.644 9.378.425 9.378.493 9.378.493 9.378.493 9.378.493 9.378.493
Increase (decrease) NWC 1.868.125 6.583.008 738.201 99.310 89.781 68 - - - -
Sumber Pendanaan
- Kredit Modal Kerja 65% 1.214.281 - - - - - - - - -
- Modal Kerja SF 35% 653.844 - - - - - - - - -
- Hutang
- Hasil Usaha 0 8.451.133 9.189.334 9.288.644 9.378.425 9.378.493 9.378.493 9.378.493 9.378.493 9.378.493
Total Pendanaan 1.868.125 8.451.133 9.189.334 9.288.644 9.378.425 9.378.493 9.378.493 9.378.493 9.378.493 9.378.493
LAMPIRAN - 8
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : HARGA POKOK PRODUKSI (Rp.000)
DESCRIPTION Tahun-2015 Tahun-2016 Tahun-2017 Tahun-2018 Tahun-2019 Tahun-2020 Tahun-2021 Tahun-2022 Tahun-2023 Tahun-2024
Biaya Langsung
Harga TBS 1.400 1.413 1.427 1.440 1.454 1.539 1.539 1.539 1.539 1.539
Bahan Baku (TBS)
Persediaan Awal - - - - 0 0 0 0 0 0
Pembelian Bahan 28.350 129.600 137.700 137.700 137.700 137.700 137.700 137.700 137.700 137.700
Persediaan Akhir - - - - - - - - - -
Pemakaian Bahan 28.350 129.600 137.700 137.700 137.700 137.700 137.700 137.700 137.700 137.700
Total Pemakaian Bahan 39.696.488 183.172.360 196.446.727 198.289.954 200.150.477 211.924.034 211.924.034 211.924.034 211.924.034 211.924.034
Biaya Pengolahan
- Upah langsung 2.252.065 2.379.541 2.507.016 2.634.492 2.761.967 2.761.967 2.761.967 2.761.967 2.761.967 2.761.967
- Gaji dan Upah Karyawan Kantor 614.643 649.434 684.225 719.016 753.808 753.808 753.808 753.808 753.808 753.808
- Biaya Bahan Kimia 7.939 36.634 39.289 39.658 40.030 42.385 42.385 42.385 42.385 42.385
- Biaya Utilitas 3.970 18.317 19.645 19.829 20.015 21.192 21.192 21.192 21.192 21.192
- Biaya Pemeliharaan Bangunan 58 62 65 68 72 72 72 72 72 72
- Biaya Pemeliharaan Mesin 76 80 84 89 93 93 93 93 93 93
- Biaya Asuransi 126.913 134.097 141.281 148.464 155.648 155.648 155.648 155.648 155.648 155.648
Total Biaya Pengolahan 3.005.665 3.218.165 3.391.606 3.561.617 3.731.633 3.735.165 3.735.165 3.735.165 3.735.165 3.735.165
Harga Pokok Produksi 42.702.153 186.390.526 199.838.332 201.851.571 203.882.109 215.659.199 215.659.199 215.659.199 215.659.199 215.659.199
Produksi
Kapasitas Terpasang (Ton/hari) 540 540 540 540 540 540 540 540 540 540
Hari Kerja Pertahun 75 300 300 300 300 300 300 300 300 300
Kapasitas Produksi 70% 80% 85% 85% 85% 85% 85% 85% 85% 85%
Rencana Pengolahan TBS 28.350 129.600 137.700 137.700 137.700 137.700 137.700 137.700 137.700 137.700
- - - - - - - - - -
1. Randemen Produksi
a. Rendemen MKS 20,0% 20,0% 20,0% 20,0% 20,0% 20,0% 20,0% 20,0% 20,0% 20,0%
b. Rendemen IKS 4,5% 4,5% 4,5% 4,5% 4,5% 4,5% 4,5% 4,5% 4,5% 4,5%
2. Produksi MKS dan IKS
a. Produksi MKS 5.670 25.920 27.540 27.540 27.540 27.540 27.540 27.540 27.540 27.540
b. Produksi IKS 1.276 5.832 6.197 6.197 6.197 6.197 6.197 6.197 6.197 6.197
Persediaan Awal
MKS - 109 498 530 530 530 530 530 530 530
IKS - 25 112 119 119 119 119 119 119 119
Persediaan Akhir
1 minggu
MKS 109 498 530 530 530 530 530 530 530 530
IKS 25 112 119 119 119 119 119 119 119 119
Penjualan
1. Produk Jual
a. Produk MKS 5.561 25.531 27.509 27.540 27.540 27.540 27.540 27.540 27.540 27.540
b. Produk IKS 1.251 5.744 6.189 6.197 6.197 6.197 6.197 6.197 6.197 6.197
2. Harga Jual
a. Harga Jual MKS (rata-rata) 7.582 7.654 7.725 7.798 7.871 7.871 7.871 7.871 7.871 7.871
b. Harga Jual IKS (rata-rata) 3.791 3.827 3.863 3.899 3.936 3.936 3.936 3.936 3.936 3.936
3. Penjualan
a. Minyak Kelapa Sawit / MKS / CPO 42.165.433 195.399.398 212.515.634 214.752.566 216.767.554 216.767.554 216.767.554 216.767.554 216.767.554 216.767.554
b. Minyak Inti Sawit / MIS / PKO 4.743.611 21.982.432 23.908.009 24.159.664 24.386.350 24.386.350 24.386.350 24.386.350 24.386.350 24.386.350
0 c. Cangkang Kernel 159.374 738.557 803.251 811.706 819.323 819.323 819.323 819.323 819.323 819.323
TOTAL PENJUALAN 47.068.419 218.120.388 237.226.894 239.723.936 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227
Piutang Penjualan 1.810.324 8.389.246 9.124.111 9.220.151 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663
PENERIMAAN PENJUALAN 45.258.095 211.541.466 236.492.028 239.627.896 241.886.716 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227
LAMPIRAN - 9
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : KREDIT MODAL KERJA
(Rp.000)
Keterangan Total Tahun-2015 Tahun-2016 Tahun-2017 Tahun-2018 Tahun-2019 Tahun-2020 Tahun-2021 Tahun-2022
Penarikan Pinjaman :
- Trw-1 1.214.281 - - -
- Trw-2 - - - -
- Trw-3 - - - -
- Trw-4 - - - -
Total Penarikan 1.214.281 1.214.281 - - - - - -
Pembayaran Cicilan : -
- Trw-1 - 60.714 60.714 60.714 60.714 15.179
- Trw-2 60.714 60.714 60.714 60.714 60.714 15.179
- Trw-3 60.714 60.714 60.714 60.714 60.714 15.179
- Trw-4 60.714 60.714 60.714 60.714 60.714 15.179 0
Total Pembayaran Cicilan 1.214.281 182.142 242.856 242.856 242.856 242.856 60.714 - 0
Saldo Pinjaman :
- Trw-1 1.214.281 971.425 728.569 485.713 242.856 45.536 0 0
- Trw-2 1.153.567 910.711 667.855 424.998 182.142 30.357 0 0
- Trw-3 1.092.853 849.997 607.141 364.284 121.428 15.179 0 0
- Trw-4 1.032.139 789.283 546.427 303.570 60.714 0 0 -
PENJUALAN 47.068.419 218.120.388 237.226.894 239.723.936 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227
HARGA POKOK PENJUALAN 41.880.958 183.627.288 199.579.721 201.812.855 203.843.061 215.432.716 215.659.199 215.659.199 215.659.199 215.659.199
LABA KOTOR 5.187.461 34.493.100 37.647.173 37.911.081 38.130.166 26.540.510 26.314.028 26.314.028 26.314.028 26.314.028
BEBAN USAHA
# - Biaya Umum 1.772.134 8.212.270 8.931.634 9.025.648 9.110.334 9.110.334 9.110.334 9.110.334 9.110.334 9.110.334
- Penyusutan 1.177.038 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151
Total Beban Administrasi dan Umum 3.066.473 13.389.626 14.108.989 14.203.004 14.287.690 14.170.388 13.818.485 13.818.485 13.818.485 13.818.485
Beban Penjualan
Perjalanan Dinas dan Kantor 55.409 256.773 279.266 282.205 284.853 284.853 284.853 284.853 284.853 284.853
Transportasi,pengiriman pos 435.594 2.018.593 2.195.414 2.218.523 2.239.339 2.239.339 2.239.339 2.239.339 2.239.339 2.239.339
Total Beban Penjualan 491.004 2.275.366 2.474.679 2.500.728 2.524.192 2.524.192 2.524.192 2.524.192 2.524.192 2.524.192
LABA USAHA 1.629.984 18.828.107 21.063.504 21.207.350 21.318.285 9.845.930 9.971.351 9.971.351 9.971.351 9.971.351
PENDAPATAN SEBELUM BUNGA 1.629.984 18.828.107 21.063.504 21.207.350 21.318.285 9.845.930 9.971.351 9.971.351 9.971.351 9.971.351
> Beban Bunga Bank 1.840.161 6.568.482 5.448.615 3.836.622 2.034.129 335.637 (0) (0) (0) -
LABA SEBELUM PAJAK (210.177) 12.259.625 15.614.890 17.370.728 19.284.156 9.510.294 9.971.351 9.971.351 9.971.351 9.971.351
> Pajak - 3.064.906 3.903.722 4.342.682 4.821.039 2.377.573 2.492.838 2.492.838 2.492.838 2.492.838
LABA BERSIH (210.177) 9.194.719 11.711.167 13.028.046 14.463.117 7.132.720 7.478.514 7.478.514 7.478.514 7.478.514
KUMULATIF (210.177) 8.984.542 20.695.709 33.723.755 48.186.872 55.319.592 62.798.106 70.276.620 77.755.133 85.233.647
LAMPIRAN - 11
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : CASH FLOW
Rp.000,-
Tahun-0 Tahun-1 Tahun-2 Tahun-3 Tahun-4 Tahun-5 Tahun-6 Tahun-7 Tahun-8 Tahun-9 Tahun-10
DESCRIPTION
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
CASH IN FLOW
Penerimaan Hasil Usaha
Penerimaan Penjualan 45.258.095 209.731.142 228.102.783 230.503.785 232.666.564 232.666.564 232.666.564 232.666.564 232.666.564 232.666.564
Penerimaan Piutang Usaha 1.810.324 8.389.246 9.124.111 9.220.151 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663
Penerimaan Modal
Kredit Bank (KI) 12.829.649 38.072.923
Modal Investasi Sendiri 6.908.273 20.500.805
Kredit IDC 289.897 2.372.510
Kredit Modal Kerja ( KMK ) 1.214.281
Modal Kerja Sendiri 653.844
IDC self Financing 156.098 1.277.505
TOTAL CASH IN FLOW 20.183.917 109.349.963 211.541.466 236.492.028 239.627.896 241.886.716 241.973.227 241.973.227 241.973.227 241.973.227 241.973.227
TOTAL CASH OUT FLOW 20.183.917 109.311.337 210.954.407 232.039.839 235.000.107 237.014.659 240.532.628 229.786.562 229.786.562 229.786.562 229.786.562
Net Cash Flow - 38.626 587.058 4.452.189 4.627.789 4.872.056 1.440.599 12.186.664 12.186.664 12.186.664 12.186.664
Saldo Awal - - 38.626 625.685 5.077.874 9.705.663 14.577.720 16.018.318 28.204.983 40.391.647 52.578.311
Saldo Akhir - 38.626 625.685 5.077.874 9.705.663 14.577.720 16.018.318 28.204.983 40.391.647 52.578.311 64.764.976
LAMPIRAN - 12
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : NERACA 1 2 3 4 5 6 7 8 9 10
DESCRIPTION 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Aktiva Lancar :
- Kas / Bank 38.626 625.685 5.077.874 9.705.663 14.577.720 16.018.318 28.204.983 40.391.647 52.578.311 64.764.976
- Piutang Dagang - 1.810.324 8.389.246 9.124.111 9.220.151 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663 9.306.663
- Persediaan 821.195 3.584.433 3.843.045 3.881.761 3.920.810 4.147.292 4.147.292 4.147.292 4.147.292 4.147.292
Total Aktiva Lancar - 2.670.145 12.599.363 18.045.030 22.807.576 27.805.192 29.472.273 41.658.938 53.845.602 66.032.266 78.218.931
Aktiva Tetap :
Investasi 19.737.922 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650
Aktiva Tetap - - - - - - - - - -
Total Aktiva Tetap 19.737.922 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650 78.311.650
Komulatif Penyusutan - 1.177.038 5.885.188 10.593.339 15.301.490 20.009.641 24.717.791 29.425.942 34.134.093 38.842.244 43.550.395
Total Aktiva Tetap Bersih 19.737.922 77.134.612 72.426.461 67.718.310 63.010.160 58.302.009 53.593.858 48.885.707 44.177.557 39.469.406 34.761.255
Overhead - - - - - - - - - - -
Bunga Masa Konstruksi 445.995 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011
Total Aktiva Tak Berwujud 445.995 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011 4.096.011
Komulatif Amortisasi - 117.301 586.506 1.055.711 1.524.916 1.994.121 2.346.025 2.346.025 2.346.025 2.346.025 2.346.025
Aktiva Tak Merwujud Bersih 445.995 3.978.710 3.509.505 3.040.300 2.571.095 2.101.890 1.749.986 1.749.986 1.749.986 1.749.986 1.749.986
Total Aktiva 20.183.917 83.783.467 88.535.329 88.803.640 88.388.830 88.209.090 84.816.117 92.294.631 99.773.144 107.251.658 114.730.172
Hutang Lancar
- Hutang Dagang
- Hutang Lain-lain
- Kredit Modal Kerja 1.032.139 789.283 546.427 303.570 60.714 0 0
Total Hutang Lancar - 1.032.139 789.283 546.427 303.570 60.714 0 0
Kredit Investasi 13.119.546 53.464.979 49.264.979 38.064.979 24.864.979 10.464.979 (0) (0) (0) - -
(Termasuk bunga masa konstruksi)
Total Hutang & Modal 20.183.917 83.783.467 88.535.329 88.803.640 88.388.830 88.209.090 84.816.117 92.294.631 99.773.144 107.251.658 114.730.172
LAMPIRAN - 13
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : RATIO
0
DESCRIPTION Tahun-2014 Tahun-2014 Tahun-2015 Tahun-2016 Tahun-2017 Tahun-2018 Tahun-2019 Tahun-2020 Tahun-2021 Tahun-2022 Tahun-2023
SOLVABILITAS RATIO :
DEBT TO ASSETS RATIO 65,0% 65,0% 56,5% 43,5% 28,5% 11,9% 0,0% 0,0% 0,0% 0,0% 0,0%
LONG TERM DEBT TO EQUITY RATIO 185,7% 182,6% 128,0% 75,8% 39,3% 13,5% 0,0% 0,0% 0,0% 0,0% 0,0%
DEBT TO EQUITY RATIO 185,7% 186,1% 130,1% 76,9% 39,8% 13,5% 0,0% 0,0% 0,0% 0,0% 0,0%
PROFITABILITAS RATIO :
EBIT
OPERATING PROFIT MARGIN : ------------ #DIV/0! 3,5% 8,6% 8,9% 8,8% 8,8% 4,1% 4,1% 4,1% 4,1% 4,1%
SALES
EAT
PROFIT MARGIN : ------------- #DIV/0! -0,4% 4,2% 4,9% 5,4% 6,0% 2,9% 3,1% 3,1% 3,1% 3,1%
SALES
EAT
R.O.I : ----------- 0,0% -0,3% 10,4% 13,2% 14,7% 16,4% 8,4% 8,1% 7,5% 7,0% 6,5%
ASSETS
EAT
R.O.E : ----------- 0,0% -0,7% 31,2% 39,7% 44,2% 49,0% 24,2% 25,4% 25,4% 25,4% 25,4%
EQUITY
LAMPIRAN - 14
OBJECT : PEMBANGUNAN PABRIK KELAPA SAWIT KAP. 30 TON/JAM
OWNER : PT. KHARISMA ISKANDAR MUDA
ANALYSIS : ANALISIS KELAYAKAN PROYEK
Rp.000
0 1 2 3 4 5 6 7 8 9 10
NO. URAIAN JUMLAH 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
(Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000) (Rp.000)
A BENEFIT
1. LABA RUGI BERSIH 85.233.646,67 - (210.177) 9.194.719 11.711.167 13.028.046 14.463.117 7.132.720 7.478.514 7.478.514 7.478.514 7.478.514
2 PENYUSUTAN 48.258.545,29 1.177.038 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151 4.708.151
3 BUNGA 20.063.645,11 - 1.840.161 6.568.482 5.448.615 3.836.622 2.034.129 335.637 (0) (0) (0) -
4 NILAI SISA AKTIVA 34.761.255,15 - - - - - - - - - - 34.761.255
TOTAL BENEFIT 188.317.092,23 1.177.038 6.338.135 20.471.352 21.867.933 21.572.819 21.205.397 12.176.508 12.186.664 12.186.664 12.186.664 46.947.919
B TOTAL CASH OUT LAYS 87.690.142,34 19.737.922 60.441.853 6.583.008 738.201 99.310 89.781 68 0 0 0 0
1 INVESTMENT OUTLAY 19.737.922 58.573.728 0 0 0 0 0 0 0 0 0
2 MODAL KERJA 0 1.868.125 6.583.008 738.201 99.310 89.781 68 0 0 0 0
0 0 0
C NET CASH BENEFIT (PROCEED) 100.626.949,88 (18.560.884) (54.103.718) 13.888.343 21.129.732 21.473.509 21.115.616 12.176.440 12.186.664 12.186.664 12.186.664 46.947.919
DISCOUNT FACTOR 1,000 0,872 0,761 0,664 0,579 0,505 0,440 0,384 0,335 0,292 0,255
PRESENT VALUE (18.560.884) (47.193.078) 10.567.027 14.023.214 12.431.050 10.662.517 5.363.243 4.682.127 4.084.082 3.562.424 11.970.941
D PAY BACK (18.560.884) (72.664.602) (58.776.259) (37.646.527) (16.173.018) 4.942.598 17.119.037 29.305.702 41.492.366 53.679.030 100.626.950
C NET CASH BENEFIT -9.635.870,78 (18.560.884) (54.051.174) 11.589.664 18.201.940 18.216.498 17.499.837 10.393.260 10.317.036 10.317.036 10.317.036 45.078.291
DISCOUNT FACTOR 1,000 0,872 0,761 0,664 0,579 0,505 0,440 0,384 0,335 0,292 0,255
PRESENT VALUE (18.560.884) (47.147.246) 8.818.064 12.080.120 10.545.560 8.836.697 4.577.822 3.963.814 3.457.518 3.015.891 11.494.217
D PAY BACK (18.560.884) (72.612.058) (61.022.394) (42.820.455) (24.603.957) (7.104.120) 3.289.139 13.606.175 23.923.211 34.240.247 79.318.538
C NET CASH BENEFIT 424.419,84 (18.560.884) (55.971.843) 7.305.335 20.391.531 21.374.200 21.025.835 12.176.372 12.186.664 12.186.664 12.186.664 46.947.919
DISCOUNT FACTOR 1,000 0,872 0,761 0,664 0,579 0,505 0,440 0,384 0,335 0,292 0,255
PRESENT VALUE (18.560.884) (48.822.589) 5.558.307 13.533.291 12.373.559 10.617.181 5.363.213 4.682.127 4.084.082 3.562.424 11.970.941
D PAY BACK (18.560.884) (74.532.727) (67.227.392) (46.835.862) (25.461.662) (4.435.827) 7.740.545 19.927.209 32.113.873 44.300.538 91.248.457