GROUP 15
INTAKE DAN
EXHAUST
DAFTAR ISI

SPESIFIKASI SERVICE ............................................................................................................. 15-3


SPECIAL TOOL ......................................................................................................................... 15-3
SERVICE PADA KENDARAAN .................................................................................................. 15-4
1. PEMERIKSAAN TURBOCHARGER SUPERCHARGING PRESSURE <4D5-DOHC> ... 15-4
2. PEMERIKSAAN WASTE GATE ACTUATOR <4D5-DOHC> ........................................... 15-4
AIR CLEANER ............................................................................................................................ 15-5
INTERCOOLER <4D5-DOHC> ................................................................................................. 15-6
INLET MANIFOLD <4D5-DOHC> .............................................................................................. 15-7
EXHAUST MANIFOLD DAN TURBOCHARGER<4D5-DOHC> ................................................. 15-10
EXHAUST PIPE AND MAIN MUFFLER ....................................................................................... 15-13

Mei 2007 - PWPE-CR 0507


15- 2

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Spesifikasi Service / Special Tool 15- 3

SPESIFIKASI SERVICE
Item Nilai standar Limit
Turbocharger supercharging pressure (waste gate solenoid valve tidak bekerja) kPa 178,9 – 215,0 -
Initial activation pressure pada waste gate actuator (pada stroke sekitar 1 mm) kPa 125,3 – 135,7 -
Distorsi pada permukaan pemasangan manifold mm 0,15 atau kurang 0,20

SPECIAL TOOL
Tool Number Name Use
MB991955 M.U.T.-III sub assembly Pengukuran turbocharger
A: MB991824 A: Vehicle communication supercharging pressure <4D5-
B: MB991827 interface (V.C.I.) DOHC>
C: MB991910 B: M.U.T.-III USB cable
D: MB991911 C: M.U.T.-III main harness A PERHATIAN
E: MB991825 (Vehicles with CAN Untuk kendaraan dengan
F: MB991826 communication system) komunikasi CAN, gunakan main
D: M.U.T.-III main harness B harness A M.U.T.-III untuk
(Vehicles without CAN mengirimkan simulasi
communication system) kecepatan kendaraan.
E: M.U.T.-III measurement
Jika menghubungkan main
adapter
harness B M.U.T.-III, komunikasi
F: M.U.T.-III trigger harness
tidak akan berfungsi dengan
baik.

Mei 2007 - PWPE-CR 0507


15- 4 INTAKE & EXHAUST - Service pada kendaraan

SERVICE PADA KENDARAAN


1. PEMERIKSAAN TURBOCHARGER SUPERCHARGING PRESSURE <4D5-DOHC>

1. Set kendaraan pada kondisi pre-inspection.


PERHATIAN
Lakukan test emngendara di lokasi yang aman untuk
melakukan akselerasi penuh. Test dilakukan dengan
dua orang di dalam kendaraan. Orang yang duduk
di kursi penumpang harus membaca M.U.T.-III.

2. Putar ignition switch ke posisi “LOCK” (OFF), dan


hubungkan diagnosis connector ke the M.U.T.-III.
3. Gunakan data list function bernama “Item No. 06”
boost pressure sensor pada M.U.T.-III untuk
memeriksa supercharging pressure jika kecepatan en-
gine meningkat ke sekitar 3.000 r/min atau lebih
dengan mengendarai pada akselesasi penuh di 2nd
gear (M/T).
Nilai standard: 178,9 - 215,0 kPa
4. Jika tekanan supercharging menyimpang dari nilai
standard, periksa item berikut untuk menemukan
penyebabnya.
• Kerusakan pada waste gate actuator
• Kerusakan pada boost pressure sensor
• Kebocoran tekanan supercharging
• Kerusakan pada turbocharger
5. Jika supercharging yang diperlihatkan lebih dari nilai
standar, kontrol supercharging kemungkinan keliru,
sehingga periksalah hal berikut.
• Waste gate actuator rubber hose yang terlepas
atau retak.
• Kerusakan pada waste gate actuator.
• Kerusakan pada waste gate valve.
• Kerusakan pada manifold absolute pressure sen-
sor

2. PEMERIKSAAN WASTE GATE ACTUATOR <4D5-DOHC>


1. Hubungkan sebuah manual pump (tipe pressure-ap-
plication) ke nipple.
Perhatian
Untuk menghindari kerusakan pada diaphragm,
jangan beri tekanan 159 kPa atau lebih.

2. Sambil memberikan tekanan secara bertahap, periksa


tekanan yang mulai mengaktifkan (sekitar 1 mm
stroke) waste gate actuator rod.
Nilai standar: 125,3 - 135,7 kPa

3. Jika ada penyimpangan yang signifikan dari nilai stan-


dard, periksa actuator atau waste gate valve: ganti
actuator atau turbocharger assembly jika perlu.

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Air Cleaner 15- 5

AIR CLEANER
PELEPASAN DAN PEMASANGAN <4D5-DOHC>

Urutan pelepasan 6. Breather hose connection


1. Air cleaner element 7. Air intake hose
2. Intake air flow sensor connector Radiator condenser tank hose
8.
3. Intake air flow sensor connection
4. Harness clamp 9. Air duct
5. Air cleaner cover 10. Air cleaner body

Mei 2007 - PWPE-CR 0507


15- 6 INTAKE & EXHAUST - Intercooler <4D5-DOHC>

INTERCOOLER <4D5-DOHC>
PELEPASAN DAN PEMASANGAN

Urutan pelepasan · Front bumper assembly (Lihat GROUP


· Air Duct 51).

1. Air hose A1 4. Intercooler pipe

2. Air hose B2 >>A<< 5. Intercooler gasket

3. Intercooler, intercooler gasket, 6. Intercooler assembly


intercooler pipe assembly 7. Air hose B1
8. Air pipe B1

SERVICE POINT PEMASANGAN


>>A<< PEMASANGAN INTERCOOLER GASKET
Tab pada intercooler gasket harus diletakan seperti yang
diperlihatkan gambar.

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Inlet Manifold 15- 7

INLET MANIFOLD
PELEPASAN DAN PEMASANGAN <4D5-DOHC>
Langkah-langkah sebelum pelepasan Langkah-langkah sesudah pemasangan
• Pembuangan Engine Coolant (Lihat GROUP 14) • Pemasangan Cowl Top Panel Front
• Pelepasan Throttle Body (Lihat GROUP 13C) • Pemasangan Windshield Wiper (Lihat GROUP 51).
• Pelepasan EGR Valve dan EGR Pipe (Lihat • Pemasangan EGR Valve dan EGR Pipe (Lihat
GROUP 17) GROUP 17).
• Pelepasan Windshield Wiper (Lihat GROUP 51). • Pemasangan Throttle Body (Lihat GROUP 13C).
• Pelepasan Cowl Top Panel Front • Pengisian Engine Coolant (Lihat GROUP 14).
• Air Bleeding pada Fuel Line (Lihat GROUP 13C).

Mei 2007 - PWPE-CR 0507


15- 8 INTAKE & EXHAUST - Inlet Manifold

Urutan pelepasan 10. Brake booster vacuum hose


1. Fuel injector connector connection

2. Air temperature sensor connector 11. Vacuum pipe B

3. Fuel pressure sensor harness 12. Vacuum hose


connector 13. Vacuum pipe A
4. Glow plug terminal 14. Engine cover stay A
5. Control wiring harness clamp <<A>> 15. Fuel hose D connection
6. Battery cable clamp 16. Fuel inlet pipe
7. Earth cable connection 17. Inlet manifold stay
8. Vacuum hose and pipe assembly >>A<< 18. Inlet manifold assembly
9. Vacuum hose and pipe assembly 19. Inlet manifold helical gasket
20. Inlet manifold tangential gasket
21. Air temperature sensor
22. Gasket

SERVICE POINT PELEPASAN


<<A>> PELEPASAN FUEL HOSE D
PERHATIAN
Ketika melepaskan fuel hose D, tekanan fuel di fuel
line tinggi. Jadi tunggulah sekitar 3 menit atau lebih
setelah engine dimatikan, dan tutupi fuel hose D
dengan rag atau material serupa untuk mencegah
percikan fuel, lalu lepaskan fuel hose D.

SERVICE POINT PEMASANGAN


>>A<< PEMASANGAN INLET MANIFOLD ASSEMBLY
1. Seperti diperlihatkan pada ilustrasi, kencangkan untuk
sementara ke 0,6 ± 0,01 Kgf.m bolts yang terletak
pada sisi A.
2. Seperti diperlihatkan pada ilustrasi, kencangkan bolts
dan nuts yang terletak pada sisi B dengan torque yang
ditentukan.
Torque pengencangan:
2,4 ± 0,3 kgf <Bolt>
2,0 ± 0,2 kgf <Nut>

3. Seperti diperlihatkan pada ilustrasi, kencangkan bolt


yang terletak pada sisi A dengan torque yang
ditentukan.
Torque pengencangan: 2,4 ± 0,3 kgf.m

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Inlet Manifold 15- 9

INSPECTION Periksa hal-hal berikut; ganti part jika ditemukan masalah.

PEMERIKSAAN INTAKE MANIFOLD


1. Periksa jika terdapat kerusakan atau retakan pada
setiap part.
2. Penyumbatan tekanan negatif (vacuum) outlet port,
atau penyumbatan pada jalur exhaust gas recircula-
tion.
3. Dengan menggunakan sebuah straight edge dan feeler
gauge, periksa jika terdapat distorsi (ketidakrataan)
pada permukaan pemasangan cylinder head.
Nilai Standar : 0,15 mm atau kurang
Limit : 0,20 mm

Mei 2007 - PWPE-CR 0507


15- 10 INTAKE & EXHAUST - Exhaust manifold & Turbocharger

EXHAUST MANIFOLD AND TURBOCHARGER<4D5-DOHC>


PELEPASAN DAN PEMASANGAN
Langkah-langkah sebelum pelepasan Langkah-langkah setelah pemasangan
• Pelepasan Under Skid Plate dan Engine Room • Pemasangan Catalytic Converter (Lihat GROUP
Under Cover (Front) (Lihat GROUP 51) 17)
• Pembuangan Engine Coolant (Lihat GROUP 14) • Pemasangan Intercooler Air Hose A1
• Pelepasan Air Cleaner Assembly • Pemasangan Battery
• Pelepasan Battery • Pemasangan Air Cleaner Assembly
• Pelepasan Intercooler Air Hose A1 • Pengisian Engine Coolant (Lihat GROUP 14)
• Pelepasan Catalytic Converter (Lihat GROUP 17) • Pemasangan Under Skid Plate and Engine Room
Under Cover (Front) (Lihat GROUP 51).

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Exhaust manifold & Turbocharger 15- 11

Urutan pelepasan 10. Oil return pipe


1. Engine cover 11. Oil return pipe gasket
2. Oil pipe >>C<< 12. Oil return pipe gasket
3. Gasket >>B<< 13. Turbocharger assembly
4. Water pipe B >>A<< 14. Turbocharger gasket
5. Gasket 15. Exhaust manifold heat protector
6. Water hose 16. Engine hanger
7. Water pipe C 17. Exhaust manifold
8. Gasket 18. Exhaust manifold gasket
9. Water hose connection

SERVICE POINT PEMASANGAN


>>A<< PEMASANGAN TURBOCHARGER GASKET
Posisikan projection seperti pada ilustrasi.

>>B<< PEMASANGAN TURBOCHARGER ASSEMBLY


1. Periksa permukaan dalam, eye bolt dan permukaan
pertemuan dari oil pipe dan water pipe jika terdapat
penyumbatan, bersihkan jika perlu.
2. Jika ada lapisan karbon yang terkumpul pada saluran
oil turbocharger, bersihkan dengan menggunakan
udara bertekanan.
PERHATIAN
Hati-hati jangan sampai ada material asing
memasuki turbocharger.

3. Tambahkan engine oil bersih melalui oil feed pipe port


pada turbocharger.

>>C<< PEMASANGAN OIL RETURN PIPE GASKET


Posisikan projection seperti yang diperlihatkan dalam
ilustrasi.

Mei 2007 - PWPE-CR 0507


15- 12 INTAKE & EXHAUST - Exhaust manifold & Turbocharger

INSPECTION
Periksa hal-hal berikut; ganti part jika ditemukan masalah.

PEMERIKSAAN EXHAUST MANIFOLD


1. Periksa jika terdapat kerusakan atau retakan pada
setiap part.
2. Dengan menggunakan sebuah straight edge dan
sebuah feeler gauge, periksa distorsi (ketidakrataan)
pada permukaan instalasi cylinder head.
Nilai Standard : 0,15 mm atau kurang
Limit : 0,20 mm

PEMERIKSAAN TURBOCHARGER ASSEMBLY


1. Secara visual periksa turbine wheel dan compressor
wheel jika terdapat retakan atau kerusakan lainnya.
2. Periksa apakah turbine wheel dan compressor wheel
dapat dengan mudah diputar dengan tangan.
3. Periksa apakah ada kebocoran oil dari turbocharger
assembly.
4. Periksa apakah turbocharger waste gate regulating
valve masih terbuka. Jika ditemukan suatu masalah,
ganti part setelah dibongkar.

PEMERIKSAAN OIL PIPE DAN OIL RETURN


PIPE
Periksa apakah ada penyumbatan, bengkokan atau
kerusakan lain pada oil pipe dan oil return pipe. Jika ada
penymbatan, bersihkan.

PWPE-CR 0507 - Mei 2007


INTAKE & EXHAUST - Inlet Manifold 15- 13

EXHAUST PIPE DAN MAIN MUFFLER


PELEPASAN DAN PEMASANGAN <4D5-DOHC>

Urutan pelepasan
Exhaust main muffler
1. Exhaust main muffler
3. Exhaust pipe gasket
4. Exhaust muffler hanger
5. Exhaust muffler hanger
Urutan pelepasan
Centre exhaust pipe
· Under skid plate and engine room
under cover (Front) (Lihat GROUP
51).
2. Centre exhaust pipe
3. Exhaust pipe gasket
7. Seal ring
8. Exhaust muffler hanger
9. Centre under floor heat protector
Urutan pelepasan
Front exhaust pipe
· Under skid plate dan engine room
under cover (Front) (Lihat GROUP
51).
6. Front exhaust pipe
7. Seal ring
10. Exhaust pipe gasket
11. Front exhaust pipe bracket
12. Front under floor heat protector

Mei 2007 - PWPE-CR 0507


15- 14

MEMO

PWPE-CR 0507 - Mei 2007