1 (UCS) …… 30,583 MPa (25-50) 2 RQD (%) …… 97,38% (90-100) 3 Spacing of Discontinuity …… 22,6 cm (20-60cm) 4 Condition of Discontinuity: a. Presistence …… (57,286 cm ) < 1 m b. Aperture …… (0,41 mm) 0,1-1 mm c. Roughness …… Slightly rough d. Infilling …… None e. Weathering …… Highly weather
5 Condition of Groundwater …… Dripping
6 Discontinuity Orientation For Tunneling, …… 251⁰- 290⁰, Unfavorable. Total Weight ……
No Parameters Weight Explanation
1 (UCS) …… 35,749 MPa (25-50) 2 RQD (%) …… 90,10% (90-100) 3 Spacing of Discontinuity …… 148 cm (60-200) 4 Condition of Discontinuity: a. Presistence …… 47 cm (< 1m) b. Aperture …… 21,34 mm (>5 mm) c. Roughness …… Rough d. Infilling …… None e. Weathering …… Hightly Weathered 5 Condition of Groundwater …… Completely Dry 6 Discontinuity Orientation For Tunneling, …… 241⁰-300⁰ Unfavorable. Total Weight ……
Lengkapilah tabel RMR dibawah ini dan Plot ke kurva stand up time serta analisa massa batuannya. Kelas Massa Batuan (Bieniawski,1993)
RMR (Kelas Batuan)
Parameter/kelas No massa batuan 100-81 80-61 60-41 40-21 ˂20 (I) (II) (III) (IV) (V)
Klasifikasi massa Sangat Sangat
1 Bagus Sedang Buruk batuan Bagus Buruk 20 Tahun 1 tahun 1 minggu 10 hari 30 menit untuk untuk untuk untuk untuk 2 Stand-up rata-rata kemajuan kemajuan kemajuan kemajuan kemajuan 15 m 10 m 5m 2,5 m s1 m
3 Kohesi massa batuan ˃0,4 0,3-0,4 0,2-0,3 0,1-0,2 ˂0,1
4 Sudut geser dalam ˃44° 35-45° 25-35° 15-25° ˂15°