Introduction
Tujuan :
Berbagi pengalaman praktis tentang bagaimana perusahaan jasa
konstruksi EPCI (Kontraktor EPCI) mengelola proyek EPCI Offshore
di Industri Migas
Sasaran :
1) Menerapkan manajemen proyek pada proyek EPCI Offshore
2) Melaksanakan
phase
EPCI:
engineering,
procurement,
construction, commissioning and hand-over
3) Memahami Organisasi Proyek EPCI
4) Menerapkan HSE Management System (Sistem Manajemen K3LH)
5) Menerapkan Quality Management System
6) Mengetahui problem solving dalam mengelola proyek EPCI
Offshore
Referensi : PMBOK 5th Edition
Agenda
1. Pengenalan Obyek Kontrak EPCI Offshore
2. Tahapan Pelaksanaan Proyek EPCI
3. Project Management
4. Detailed Engineering
5. Procurement
6. Construction / Onshore Fabrication
7. Offshore Transportation & Installation
8. Pre-commissioning & Commissioning Support
9. Operations Readiness & Assurance
10.Project Control
11.QA/QC (Quality Assurance/Quality Control)
12.HSE (Health, Safety & Environmental)
Chapter-01
F a s i l i t a s Top s i d e s
Up to
520 m (1,710 ft)
370 to 910 m
180 to 1,300 m
(1,210 to 2,990 ft) (590 to 4,270 ft)
Semi-Submersible
Platform
590 to 1,710 m
(1,940 to 5,610 ft)
60 to 3,000 m
(200 to 10,000 ft)
Floating
Fixed
Production Platform
Systems
Fasilitas Subsea
Pipeline
Flowline
Tie in Spools
Manifold
Umbilical
Subsea Production
Control System
(SPCS)
Riser
Floating Production,
Storage, Offloading
System (FPSO)
Chapter-02
Chapter-03
PROJECT MANAGEMENT
EPCI
CONTRACTOR
Project
Manager
Engineering
Manager
Construction/
Commissioning Project Control
Fabrication
Manager
Manager
Manager
Procurement
Manager
Offshore
Ops. Assurance
Installation
Manager
Manager
Interface
Manager
Contract &
Subcontract
Manager
HSE
Manager
QA/QC
Manager
Kick-Off Meeting
Tujuan:
Membangun TRUST & COMMITMENT sesama anggota Project Team (Team Building)
Participants adalah semua Key Stakeholders (Key Personnel) yang terlibat proyek, al;
Company
Participants KOM
Project Sponsor
Project Director
Engineering Manager
Procurement Manager
Construction Managers
Installation Manager
QA/QC Manager
HSE Manager
Project Control/Services Manager
Others (Key Personnel)
Chapter-04
DETAILED ENGINEERING
Topsides
Lead
Engineer
Process
Mechanical
Piping
Electrical
Instrument
Structure
Safety
Drafter
Subsea Lead
Engineer
Pipeline
Umbilical
SPCS
Topsides Engineering
Subcontractor
Subsea Engineering
Subcontractor
Company A
Name
01 Jul 12
Company B
Name
01 Jul 12
T&I Engineer
Naval
Engineer
Offshore
Engineer
T&I Engineering
Subcontractor
Company C
Name
20 Dec 12
SUBCONTRACTOR
Engineering
Admin.
Engineering
Manager
Engineering Activities
Setup Engineering Team & Faculties
Memahami Scope of Work (SOW)
Membuat Engineering Execution Plan:
Manpower planning
Schedule
Menetapkan Engineering Deliverables
Chapter-05
PROCUREMENT
Procurement Activities
Setup Procurement Team
Memahami Scope of Work (SOW)
Membuat Procurement Plan & Procedures
Melaksanakan kegiatan import/re-export termasuk membuat master
list
Menseleksi supplier/subkontraktor
Menerbitkan RFQ, PR/PO
Memperbaharui PMS (Procurement Master Schedule) dan
FES (Field Expediting Schedule)
Mengagendakan inspeksi dan/atau Test Witnessing
Melakukan pengepakan dan pengiriman barang
Melaporkan kinerja supplier dan subkontraktor
Buyer
Expeditor
Logistics
Contract
Supervisor
Subcontract
Supervisor
Subcontract Procedure
Evaluasi tender dilaksanakan menjadi 2 tahap yg terpisah ;
Evaluasi Teknis oleh Project Engineer atau Discipline engineer
Evaluasi Komersial oleh Subcontracts Engineer
Chapter-06
CONSTRUCTION / ONSHORE
FABRICATION
Material
Control
Site
Engineer
Fabrication
Supervisor
Welding
Supervisor
Chapter-07
Topsides
Installation
Superintendent
Subsea
Installation
Superintendent
Field Engineer
Field Engineer
Work Vessel
Superintendent
Diving Vessel
Superintendent
T&I Crew
Diving Crew
Vessel Crew
Vessel Crew
QA/QC
Supervisor
HSE
Supervisor
Chapter-08
PRE-COMMISSIONING &
COMMISSIONING SUPPORT
Commissioning Team
Pre-comm. &
Commissioning
Manager
PIMS
Administrator
Comm.
Mechanical
Engineer
Comm. Piping
Engineer
N2/He Leak
Testing
Subcontractor
Comm.
Electrical
Engineer
Vendors
Representative
Comm.
Instrument
Engineer
Chapter-09
assessment
Mengembangkan maintenance strategy
Melakukan study maintenance (RCM, RAM, RBI, etc)
Mengembangkan Asset register
Populasi data untuk CMMS
Mendefinsikan spare part yang diperlukan untuk masa 2 tahun operasional
Memberikan dukungan kepada client saat start up and handover
Operations
Lead Engineer
-
Process
Mechanical
Piping
Subsea Pipeline
E&I
Lifting
Technical Writer
Maintenance
Lead Engineer
-
Training
Engineer
-
POPM (Plant
Operating
Procedures &
manuals) for
Operator
Technical Writer
Chapter-10
PROJECT CONTROL
Weight
Factor
This Period
Forecast
Plan
Actual
To Date
Var
Forecast
Plan*
Actual
Var
Engineering
2.62
0.00%
0.00%
0.00%
95.00%
94.91%
-0.09%
Procurement
33.29
0.25%
0.25%
0.01%
99.76%
97.65%
-2.11%
6.20
0.00%
0.38%
0.37%
35.61%
34.79%
-0.82%
55.43
3.54%
1.06%
-2.48%
47.08%
32.76%
-14.31%
Topsides
21.74
0.65%
2.61%
1.96%
62.82%
22.66%
-40.17%
Subsea
78.26
1.01%
-0.63%
-1.64%
41.04%
35.57%
-5.47%
2.44
0.00%
0.00%
0.00%
43.04%
0.00%
-43.04%
100.00
2.05%
0.69%
-1.35%
65.06%
55.32%
-9.74%
Fabrication
Construction /
Installation
Precom /
Commissioning
Total
Cost
Control
Planner/
Scheduler
Document
Control
IT
Engineers
Project
Administration
Chapter-11
Quality Audit
MIGAS Certification :
SKPP/SKKP/SKPI Certificates
QA/QC Team
QA/QC Manager
Quality
Engineer
QA/QC Onshore
Fabrication Spv.
QC Inspector
-
Structural Welding
Mechanical
Electrical & Instrument
Coating / Painting
NDT
Technicians
- Ultrasonic
- X-Ray
QA/QC
Offshore Spv.
QC Inspector
-
Structural
Pipeline
Mechanical / Piping
Electrical & Instrument
Coating / Painting
NDT
Technicians
- Ultrasonic
- X-Ray
Chapter-12
HSE communication
HSE activities
HSE Team
HSE Manager
HSE Onshore
Fabrication
Coordinator
HSE Officer
HSE Offshore
Coordinator
HSE Officer