Anda di halaman 1dari 12

STRUKTUR PROGRAM KOLEJ VOKASIONAL, KEMENTERIAN PENDIDIKAN MALAYSIA

BIDANG : TEKNOLOGI AWAM


PROGRAM : DIPLOMA TEKNOLOGI PEMBINAAN

SEMESTER 1
KOD KURSUS NAMA KURSUS
L P T CR-HR

KOD SI S2 SP S3 S4 S5 MATAPELAJARAN PENGAJIAN UMUM

MPU 2312 Islamic Studies


2 0 0 2
MPU 2322 Moral Studies

MPU 2162 Malaysia Studies 2

MPU 2232 Professionalism Ethics

MPU 2412 Community Service

MPU 2222 English For Communication

JUMLAH JAM / KREDIT MPU 2 0 0 2

TERAS

DCA 1313 Building Materials 2 2 0 3

DCA 1323 Construction Safety and Health 2 2 0 3

DCA 1233 Building Drawing 2 3 0 3

DCA 1343 Building Construction- I 2 3 0 3

DCA 1052 Computer Aided Drawing (CAD) I 1 3 0 2

UMT 1112 Mathematics for Technology I 1 0 2 2

DCA 2312 Building Construction- II

DCA 2022 Construction Planning

DCA 2053 Computer Aided Drawing (CAD) II - (Building Drawing)

DCA 2043 Basic Quantity Surveying

UMT 2122 Mathematics for Technology II

UST 2112 Technical Science I


UES 2012 Enterpreneurship

DCA 3314 Building Construction- III

DCA 3122 Fundamental of Mechanic Structure

DCA 3033 Specification and Quality Control for Construction Work

DCA 3042 Final Year Project- I

UST 3112 English for Business

UST 3112 Technical Science II

UMT 3132 Mathematics for Technology III

DCA 4113 Construction Survey

DCA 4123 Soil Investigation

DCA 4133 Industrialzed Building System (IBS)

DCA 4044 Final Year Project- II

JUMLAH JAM / KREDIT TERAS 10 13 2 16

ELEKTIF

ELA 3312 4322 Arabic Language I / II

ELM 3312 4322 Mandarin I / II

EXX 4012 Elektif *

EXX 4012 Elektif *

JUMLAH JAM / KREDIT ELEKTIF 0 0 0 0

ON-THE JOB TRAINING

DJT 50112 On-The Job Training

JUMLAH JAM / KREDIT OJT 0 0 0 0

JUMLAH KESELURUHAN 12 13 2 18

JUMLAH KREDIT

JAM KREDIT PERTEMUAN SEM 1

JUMLAH JAM-KREDIT MPU 10 11% MPU 2

JUMLAH JAM-KREDIT TERAS 60 67% TERAS 16

JUMLAH JAM-KREDIT ELEKTIF 8 9% ELEKTIF 0


JUMLAH JAM-KREDIT OJT 12 13% OJT 0

JUMLAH JAM-KREDIT 90 100% JUMLAH KREDIT 18

JUMLAH JAM PERTEMUAN 27


DIPLOMA TEKNOLOGI PEMBINAAN

SEMESTER 2 SEM PENDEK SEMESTER 3 SEMESTER 4 SEMESTER 5

L P T CR-HR L P T CR-HR L P T CR-HR L P T CR-HR L P T CR-HR

2 0 0 2

2 0 0 2

2 0 0 2

2 0 0 2

2 0 0 4 4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0

1 3 0 2

1 2 0 2

2 3 0 3

2 2 1 3

B TRANING
EMESTER

EMESTER

EMESTER

EMESTER
EMESTER

1 0 2 2

1 2 0 2
CUTI SE

CUTI SE

CUTI SE

CUTI SE
CUTI SE
2 0 0 2

ON JOB
2 2 0 3

2 0 2 3

1 2 0 2

2 1 0 2

2 0 0 2

1 2 0 2

1 0 2 2

2 3 0 3

2 2 0 3

1 2 0 2

2 5 0 4

8 12 3 14 2 0 0 2 11 7 4 16 7 12 0 12 0 0 0 0

2 0 0 2 2 0 0 2

2 0 0 2

2 0 0 2

0 0 0 0 0 0 0 0 2 0 0 2 6 0 0 6 0 0 0 0

12

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12

10 12 3 18 6 0 0 6 13 7 4 18 13 12 0 18 0 0 0 12

90

SEM 2 SEM PEND SEM 3 SEM 4 SEM 5


4 4 0 0 0

14 2 16 12 0

0 0 2 6 0
0 0 0 0 12

18 6 18 18 12

25 6 24 25 0 VERSI JA
10

LURUHAN KESELURUHAN
11
KESEL
60 67

KESELURUHAN

8 9

12 13

90
VERSI JANUARI 2018
DCA 1313
DCA 1323
SEMESTER 1
DCA 1233

DCA 1343

DCA 1052
UMT 1112
DCA 2312
DCA 2022
SEMESTER 2

DCA 2053
DCA 2043
UMT 2122
UST 2112
UES 2012
DCA 3314
DCA 3122
SEMESTER 3

DCA 3033
DCA 3042
UST 3112
UST 3112
UMT 3132
DCA 4113
SEMESTER 4

DCA 4123
DCA 4133
DCA 4044
Building Materials
Construction Safety and Health

Building Drawing

Building Construction- I

Computer Aided Drawing (CAD) I


Mathematics for Technology I
Building Construction- II
Construction Planning
Computer Aided Drawing (CAD) II - (Building Drawing)
Basic Quantity Surveying
Mathematics for Technology II
Technical Science I
Enterpreneurship
Building Construction- III
Fundamental of Mechanic Structure
Specification and Quality Control for Construction Work
Final Year Project- I
English for Business
Technical Science II
Mathematics for Technology III
Construction Survey
Soil Investigation
Industrialized Building System (IBS)
Final Year Project- II
On-The Job Training
FASA BUTIRAN KERJA ANGGARAN KOS

1 Kerja Tanah dan Pembangunan Surau 200,000.00

Pembinaan Blok Pentadbiran, Blok Kelas dan


2 1,800,000.00
Prasarana Berkaitan

Pembinaan 2 Blok Asrama ( 2 tigkat ), Dewan


3 1,600,000.00
Makan dan Dewan Kuliah Tahfiz

JUMLAH KESELURUHAN 3,600,000.00

Anda mungkin juga menyukai