DIAGRAM DAN NORMA PENGOPERASIAN INSTALASI STASIUN MINYAK SAWIT

TBS LOADING STERILIZER THRESHER DIGESTER


MATANG RAMP STERILIZER

BAK RO VIBRO SEPARATOR SAND TRAP PRESSAN


Back Pressure
Vessel (BPV)

TURBIN SLUDGE TANK STRAINER PRE CLEANER SLUDGE


CST SEPARATOR

BOILER
TANGKI
OIL TANK OIL PURIFER VACUUM DRIER TIMBUN
DIAGRAM DAN NORMA PENGOPERASIAN INSTALASI
STASIUN PABRIK BIJI KELAPA SAWIT

1.CAKE
BREAKER 2. DEPERICARPER 4. NUT GRADING
3. DESTONER
CONVEYOR SCREEN
(CBC)

7. LTDS I & II 6. RIPPLE MILE 5. NUT SILO


8. HYDROCYCLONE

9. KERNEL DRIER 10. KERNEL BUNGKER


KETERANGAN: - Lossis LTDS II ≤ 2,0%
1. Pemeriksaan dan pembersihan terhadap contoh
setiap pagi 8. - Sesuaikan diameter nozel
2. - Air lock tidak bocor inti dan cangkang dengan
- Tidak ada fibre yang terikut kapasitas olah
nutTidak ada notten terikut - Penyetelan vortex finder
fibre sesuai kebutuhan
- Lossis inti dalam fibre ≤ - Periksa kehausan bottom
2,00% cone/ nozel
- Pembersihan duchting - Bersihkan tromol sehingga
bagian dalam setiap minggu air tidak terikut inti &
3. - Air lock tidak bocor cangkang
- Stel kecepatan udara agar - Bersihkan bak hydrocyclone
batu/ logam tidak terikut ke dan periksa sekat-sekat
nut silo setiap minggu
- Payung tidak keropos (biji - Lossis inti dalam cangkang
tidak terikut dengan sampah ≤ 4% terhadap contoh
halus) 9. - Pembersihan kernel drier
4. Dapat memisahkan biji kecil, dilakukan setiap bulan
sedang dan besar - Pembersihan heater setiap
5. Pembersihan dilakukan setiap 6 minggu
bulan - Heater berfungsi baik
6. - Pembersihan magnit dan sehingga temperatur atas
vibrator setiap pagi (sebelum 70ºC, tengah 80ºC, dan
olah) bawah 60ºC
- Efesiensi pemecahan biji - Isian kernel drier harus
95-98% penuh sehingga waktu
- Kadar inti pecah ≤ 14% pengeringan 12-14 jam
- Pengaturan jarak antara - Penurunan inti dilakukan
rotor bar dan ripple plate secara teratur
sesuai ukuran fraksi 10. - Kadar air inti ≤ 7 %
- Periksa keausan rotor bar - Kadar kotoran inti ≤ 6 %
dan ripple plate - Pengiriman inti dilakukan
- Kecepatan putaran rotor bar FIFO
sesuai fraksi - Pembersihan bunker setiap
7. - Air lock tidak bocor 6 bulan
- Pemberian ducting bagian
dalam setiap minggu
- Lakukan penyetelan dumper
sesuai kebutuhan
- Lossis LTDS I ≤ 2,0%
terhadap contoh
DIAGRAM PROSES PENGOLAHAN CPO
Tandan Buah Segar

Steam Sterilizer Kondensat

Empty Fruit Bunch


Thresher (EFB)

Digester

Steam Screw Press

Oil PressCake

VibratingScreen Fiber Nut Separation fiber

Crude Nut
Setling Tank Purifier
Nut Drying &
Oil Grading
Under Flow
Dryer
Shell Kernel Shell
Separation
Desanding
Crude Palm Oil

Decanter Kernel Kernel


Separator Storage Drying Drying
ng
Sold
Waste Decanter
Water Cake

Steam

Waste Water Back Steam Boiler


Treatment Presure Turbine
Plant Vessel
St. Perebusan
St. Penerimaan Buah Oil losses 0,7 % (30 ton)
Losses 5% (1,5 ton)

Sterilizer 1-3 Unstrip


Timb Loading Capstand Suhu 95ºC Tek Bunch 2,0
TBS Sortasi Lori %
angan Ramp (11 KW) 3 kg/cm2 ( uap
30 ton/jam 270 kg uap/ton)

St. Thressing
St. Pressing Oil losses pada fiber 4,0-6,0 % Oil
Hoisting Threser 1-2 Tangkos 23% losses pada biji max 1,0 %
Crane 1-2 Putaran 23 berondolan
kaps max 5 rpm (30 65%
ton ton/jam)
Digester 1-4 Screw Press 1-4
Suhu 90ºC-95ºC Kapasitas 10 & 15
Waktu Pengadukan ton
± 30 menit Putaran 14,4 rpm
Oil losses
janjangan
kosong 1,5-1,8%

St. Klarifikasi
Sand Trap Tank Vibro Seperator 1-3 Crude Oil Tank Continuous Settling Oil Tank 1-2
1-2 Lapisan 1= 30 mesh Suhu 90ºC-95ºC Tank Suhu 95ºC
Suhu 90ºC-95ºC Lapisan 2= 40 mesh Kapasitas 5m3 Kapasitas 90 ton Kapasitas 10 ton
Suhu Air 90ºC Daya 7,5 KW, 955 air maks 0,6%,
Capstand (4 KW, 140 rpm, 380 volt kotoran maks 0,03%
rpm, 380 volt)
95ºC
Oil Purifier 1-3 Storage Tank 1-4 Vibro Separator 1- Sludge Tank 1-2
Vacum Dryer
Daya 7,5 KW, 1440 Kapasitas 1500 ton, 3 Suhu 90-95ºC
Suhu 90ºC-95ºC
rpm, 380 volt 500 ton, 500 ton, Lapisan 1= 30 mesh Kapasitas 10 m3
Tekanan 750-760
500 ton Lapisan 2= 40 mesh
mmHg
Suhu 50ºC-60ºC Suhu Air 90ºC
Capstand (4 KW,
140 rpm, 380 volt) Sludge Seperator
Ukuran
Nozzle1.45, 1.6, 1.8,
2.0 mm. Daya 18
kw, 1440 rpm, 380
volt

St. Kernel
Cake Breaker Nut Silo Kernel Silo 1-2 Kernel
Ripple Mill 1-2 Kapasitas 25 ton/
Conveyor 1-2 Kapasitas 57 ton Storage
Putaran 3000 rpm unit
Kapasitas 30 ton/jam Suhu atas 50ºC, Kapasitas 38
Kapasitas 8 ton/jam Suhu tingkat I 60ºC,
Putaran 1430 rpm tengah 60ºC dan ton/jam
bawah 70ºC II 50ºC, III 40ºC
Boiler

Fibre yang didapat Boiler 98,8 KW


dari St. Kernel (±20ton uap/
digunakan sebagai jam)
bahan baku boiler