1. GENERAL
1. UMUM
Supplier must provide and hand over all Pemasok harus menyediakan dan
the pipe, fitting, valve, coupling, nuts, menyerahkan semua pipa, fitting, valve,
bolt, gasket, connection material and coupling, mur, baut, gasket, material
supplementary materials as detailed and penyambung dan bahan pelengkap
mentioned in the Bill of Quantities and sebagaimana dirinci dan disebutkan
Design Drawing. dalam Daftar Kuantitas Barang atau
dalam gambar (Drawing).
Pemasok harus menyediakan perpipaan
Supplier must provide piping from all the
dari semua material sebagaimana yang
material as detailed and shown in the Bill
dirinci di sini dan ditunjukkan dalam
of Quantities. All pipe, fittings, valve and
Daftar Kuantitas Barang. Semua pipa,
accessories must compatible to use in the
fittings, valve dan accessories harus
tropical area with humid climate and air
sesuai untuk pemakaian di daerah tropis,
temperature 320C.
beriklim lembab dan bersuhu udara
320C.
Supplier must provide statement from the Pemasok harus menyediakan suatu
Goods Manucafturing Factory to declare pernyataan dari Pabrik Pembuat Barang
all goods produced in accordance all the yang menyatakan bahwa barang yang
needs as detailed in the Technical diproduksi sesuai dengan kebutuhan
Spesification. Supplier must provide sebagaimana dirinci dalam Spesifikasi
report certification about chemical test Teknis. Pemasok juga harus
and physical test that has been done in menyampaikan sertifikasi laporan
the factory. Supplier must submitt all tentang uji kimiawi dan fisik yang telah
information about storing method and dilakukan di pabrik. Pemasok
how to handle the goods and must get diharuskan untuk menyerahkan
approval in advance from the buyer. keterangan-keterangan tentang cara-cara
International or International Standard penyimpanan dan cara penanganan
Reference reference or Publication as barang yang harus mendapat persetujuan
stated in this Technical Spesification dari Pihak Pembeli terlebih dahulu.
intended as Reference/Configuration, Acuan standard international atau
general type and quality. national atau publikasi yang tertera di
dalam Spesifikasi Teknis ini
dimaksudkan sebagai kerangka acuan /
konfigurasi, tipe dan kualitas secara
umum.
1.1. Shop Drawing 1.1. Shop Drawings

15 calendar days after Letter of Award Dalam jangka waktu 15 hari kalender
beeing published, supplier must provide setelah diterbitkannya Surat Penunjukan
all shop drawings prepared by the Pemenang, Pemasok harus menyediakan
Manufacture which approved and semua shop drawing yang dipersiapkan
submitted to the buyers. Submission of oleh Pabrik dan yang telah mendapat
first shop drawing will be done in 7 persetujuan serta diserahkan kepada
calendar days after Winning Bidder Pihak Pembeli. Penyerahan shop
Announcement been published drawing yang pertama dilakukan dalam
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
jangka waktu 7 hari kalender setelah
diterbitkannya Pemberitahuan
Pemenang.
1.2. Standard Referee 1.2. Standard Yang Dikenakan

1.2.1. Agreement 1.2.1 Kesepakatan

International and National Standard Referensi standard nasional ataupun


Reference in this spesicifation internasional yang ada dalam spesifikasi
intended to indicate configuration of ini dimaksudkan untuk menunjukkan
type and quality in general. konfigurasi jenis dan mutu secara
umum. Barang-barang yang disediakan
Provided goods must comply with harus memenuhi standard yang diterima
Standard accept Internationally secara internasional yang dinyatakan
which indicate that overall quality bahwa kualitas secara keseluruhan
will be equivalent in minimum paling sedikit sama dengan yang
standard determined. dibutuhkan oleh standard yang telah
ditentukan.
1.2.2. Abbreviation 1.2.2 Singkatan-Singkatan

Abbreviation in this technical Bila ada singkatan-singkatan dalam


spesification refer to the Spesifikasi Teknis ini, maka singkatan-
spesification, standard or method singkatan tersebut dianggap mengacu
from the State or International kepada spesifikasi, standard atau metoda
Association. dari masing-masing negara atau asosiasi
internasional.
ASTM : American Society of
Testing Material ASTM : American Society of
Testing Material
AWWA : American Water Works (Lembaga Pengujian
Association Material Amerika).
BS : British Standard AWWA : American Water Works
ISO : International Association (Asosiasi
Organization for Pekerjaan Pengairan
Standardization Amerika).
JIS : Japanese Industrial BS : British Standard (Standar
Standard Inggris).
SII : Indonesian Industrial ISO : International
Standard. Organization for
Standardization
(Organisasi Internasional
untuk Standarisasi).
JIS : Japanese Industrial
Standard (Standar
Industri Jepang).
SII : Standard Industry
Indonesia.

1.2.3. Used Material 1.2.3 Material Terpakai


 Pipa PVC dan asesoriesnya, sesuai
 PVC pipes and accesories refers to dengan SII 0344-82, S 10, SII 0950-84,
: SII 0344-82, S 10, SII ISO 4065-78, S 10
0950-84, ISO 4065-78, S 10  Pipa Steel dan asesoriesnya, sesuai

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
 Steel pipes and accesories, refers to dengan SII 2527-90
: SII 2527-90  Pipa, Fitting dan asesories galvanis,
sesuai dengan SII 0161-81
 Pipes, Fittings and accessories
 Fitting DCI, sesuai dengan ISO 2531-
refers to : SII 0161-81
1986
 Fitting DCI, refers to : ISO
2531-1986

2. PACKING
2. PENGEPAKAN
2.1 Storage of Pipes, Fittings and Pipes
2.1 Penyimpanan Pipa, Fitting dan
Equipment Peralatan Pipa
Pipa, fitting dan accessories harus
Pipes, fitting and accesories must be
disimpan oleh pemasok tidak langsung
store by supplier to avoid direct
bersentuhan dengan permukaan tanah,
contact to the ground and must
dan harus diberi penopang, diberi alas
bearing, give pad and tied and closed
dan diikat serta ditutup sehingga tidak
enough to avoid direct sunlight.
terkena sinar matahari secara langsung.
Pipes stack must avoid direct touch
Tumpukan pipa-pipa tidak boleh saling
to each other and stack based on rules
bersentuhan satu dengan yang lain
and regulation from the manufacture.
secara langsung dan ditumpuk sesuai
Coupling and joints (and all related aturan dan ketentuan yang ditetapkan
components) and other similar items oleh pabrikan.
must be store in the clean area, dry
and avoid direct contact to the
Coupling dan sambungan (dan semua
ground /floor and protected and in
komponen terkait) dan barang serupa
the closed area provided by buyer.
yang lain harus disimpan di tempat yang
If goods/item have limited durability bersih, kering tidak langsung diletakkan
or must be store in certain place, than di permukaan tanah / lantai dan
the storing method must refer to terlindung atau pada daerah yang
manufactures instruction. tertutup yang disediakan oleh Pihak
Pembeli.
Storage area must provide by the
buyer and goods supplier to Apabila ada item barang yang harus
guarantee the security. disimpan mempunyai keawetan yang
terbatas atau mengharuskan untuk
disimpan di tempat tertentu, maka cara
penyimpanannya harus sesuai dengan
instruksi pabrik.
Lahan penyimpanan disediakan oleh
Pihak Pembeli dan Pemasok barang
akan menjamin keamanannya.
2.2 Transportation and handling
2.2 Transportasi dan Handling
Every vehicle that will transporting Setiap kendaraan yang akan mengangkut
the goods must hae appropriate body pipa harus mempunyai panjang badan
length so that the items does not sedemikian rupa sehingga yang
hang. Big pipes will be load onto the diangkutnya tidak menggantung. Pipa
vehicle in an appropriate method to yang besar dimuat ke kendaraan
be safe during transporting. sedemikian rupa supaya aman selama
dalam perjalanan.
Pipes must be handle according to
manufacture recomendation. Pipes Pipa-pipa tersebut harus ditangani sesuai

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
must not be dropped or roll over from dengan rekomendasi pabrik. Pipa sama
the vehicle or beeing push to crash sekali tidak boleh dijatuhkan atau
each other, and must not drag or digulingkan dari kendaraan atau
being pull. This treatment applies didorong sedemikian rupa sehingga
also for valves, fittings and bertabrakan satu dengan yang lain, dan
accecories. juga tidak boleh diseret atau ditarik.
Perlakuan tersebut di atas berlaku juga
untuk valve, fitting dan accessories.
3. PIPES AND FITTING
3. PIPA DAN FITTING

3.1 POLYVINYL CHLORIDE (PVC)


3.1 PIPA POLYVINYL CHLORIDE
PIPES AND FITTINGS (PVC) DAN FITTING
Produk PVC yang digunakan dalam
PVC product will be use for this
proyek ini adalah pipa untuk kebutuhan
project are pipes for the needs of
sistem primer, sekunder dan tertier
primer system, secondary and
dengan diameter DN (50 - 350 mm).
tertiary with DN diameter (50-
350mm).

3.1.1 Planning Criteria


3.1.1 Kriteria Perencanaan
PVC pipes must comply with Pipa PVC harus sesuai dengan yang
requirement in SII 0344-82 S10, disyaratkan dalam SII 0344-82 S10,
ISO 4065-78 (E) or other ISO 4065-78 (E) atau standard
recognized international standard internasional lain yang diterima yang
with equal or higher quality. Fitting mempunyai kualitas sama atau lebih
refer to SII 0950-84. tinggi. Fitting mengikuti standard SII
0950-84.
Raw materials for PVC pipes must
be from Polyvinyl Chloride without Bahan baku untuk membuat pipa PVC
plasticizer contain 92,5% minimum harus polivinyl chloride tanpa
pure PVC. In all aspect the final plasticizer yang mempunyai kadar
product must be homogeny and PVC murni minimum 92,5%. Dalam
water tight. Undetectable odors and segala hal produk akhirnya harus
tastes. homogen, kedap air. Bau dan rasanya
tidak terdeteksi.
Supplier must be responsible for
any failure in pipe test of material Pemasok bertanggung jawab bila ada
element by an independent kegagalan dalam pengujian unsur
laboratory. bahan pipa yang dilaksanakan oleh
laboratorium independen.
50 mm PVC pipes and more, must
be provided with integral Pipa PVC 50 mm dan yang lebih besar
thicknened wall bells or coupling to harus diberi integral thicknened wall
connect with rubber ring. This bells atau coupling untuk
connection must be able to penyambungan dengan gelang karet /
withstand longitudinal movement rubber ring. Sambungan tersebut harus
due to the temperature changes up bisa menahan pergerakan longitudinal
to 500 C without losing its water- yang diakibatkan adanya perubahan
tightness. suhu sampai dengan 500C tanpa
kehilangan daya kekedapan airnya.
3.1.2 Pipes and Fitting Diameters
3.1.2 Diameter Pipa dan Fitting
Pipes and fitting diameter must Diameter pipa dan fitting harus
comply the SII 0344 dan SII 0950 memenuhi standar SII 0344 dan SII

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
standard or other equivalent 0950 atau standard internasional lainya
International Standard accepted by yang sama dan dapat diterima oleh
the buyer. Length of efective pipes Pembeli. Panjang efektif pipa adalah 6
will be 6 (six) meters. Minimum (enam) meter. Ketebalan minimum
thickeness of pipes wall and Pipes dinding pipa dan diameter luas pipa
diameter area must refer to the harus sesuai dengan tabel berikut ini.
following table.
Diameter Luar dan Ketebalan
Area Diameter and Minimum Minimum Dinding Pipa PVC
Thickenss of PVC Pipes Wall

3.1.3 Lubricants and Cleaners


3.1.3 Pelumas dan Pembersih
Numbers of lubricants and liquid Jumlah pelumas dan cairan pembersih
cleaner provide by the supplier yang disediakan oleh pemasok harus
must refer to manufature sesuai dengan rekomendasi pabrik.
recomendation.
Cairan pelumas dan pembersihnya,
Liquid lubricant and cleaners, when apabila diterapkan dengan benar, tidak
applied properly, must not affected boleh merusak atau mempunyai akibat
or adversed to PVC, and must not yang merugikan atas PVC, dan tidak
leave odor, taste or colour to boleh meninggalkan bau, rasa atau
drinking water or contain any toxic warna pada air minum atau
material that will be harmfull to mengandung bahan-bahan beracun
human being. yang membahayakan kesehatan
manusia.
Right instruction must show on this
liquid lubricant and cleaner Petunjuk yang benar harus ditunjukkan
packages. Instruction must contain pada pembungkus cairan pelumas dan
the following: pembersih ini. Petunjuk tersebut berisi
 Volume and composition of tentang :
the can - Volume dan isi kaleng
 Trademark - Merek dagang
 Usage instruction - Cara Pemakaian
 Manufactured month and years - Petunjuk mengenai bulan dan tahun
 Periode of the month, if the pembuatan
can left opened, this liquid still - Bila kaleng ditinggalkan terbuka
proper and functionable. dalam berapa bulan, cairan tersebut
masih bisa bertahan dan tetap
berfungsi.

3.1.4 Connection (joint)


3.1.4 Sambungan
Connection (joint) of PVC pipes for Sambungan pipa PVC untuk saluran
drinking water refer to SII 0950-84 air minum mengacu standard SII 0950-
standard. 84.

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
a. Push-on Joint with Rubber Ring
a. Sambungan Dorong Dengan Cincin
Karet
not required otherwise, joint must be
push-on joint wirth rubber ring. Pipes Jika tidak disyaratkan lain,
must have one side head of pipe and sambungan harus jenis sambungan
flat in the other side and bevelable by dorong dengan cincin karet. Pipa
approximately 15 degree. Pipe must harus mempunyai “Kepala” di satu
provided with with marking line as sisi dan sisi lain rata yang dapat
the entry line in the outer pipes dibefel kurang lebih 15 derajat. Pipa
surface. harus dilengkapi dengan garis tanda
batas masuk di permukaan luar pipa.

b. Sleeve Coupling
b. Sleeve Coupling
Sleeve coupling and adaptor must be Sleeve coupling dan adaptor harus
planned for the connecting works of direncanakan untuk pekerjaan
PVC pipes and suitable with outer penyambungan pipa PVC dan tepat /
diameter of PVC pipes. cocok dengan diameter luar pipa
PVC.

c. Rubber rings and Gasket


c. Cincin Karet dan Gasket
Rubber rings will be use in the push- Cincin karet untuk digunakan pada
on joint and gasket for mechanical sambungan dorong dan gasket untuk
joint of ductile pipes on fittings or sambungan mekanis pipa besi ductile
flens, must be Styrene Butadiene pada fitting atau flens, harus karet
rubber (SBR) or other shyntethic styrene butadiene (SBR) atau karet
rubber tobe use for drinking water sintetis lain yang dapat digunakan
services. untuk pelayanan air minum.

d. Pipes testing
d. Pengujian Pipa
Pipes testing must refers to the Pengujian pipa harus memenuhi
requirement of SII 0344-82 when persyaratan SII 0344-82 ketika diuji
tested as following: sebagai berikut :
Acceptance testing : in 42 bar Uji untuk penerimaan Pada tekanan
pressure for one hour at 200 Celcius 42 bar selaman satu jam pada
of temperature. temperatur 20 derajat Celcius
Pada tekanan 42 bar selaman satu
Quality testing : in 10 bar pressure
jam pada temperatur 20 derajat
for 1000 hours (or 12 bar for 100
Celcius.
hours) at 600 Celcius of temperature.
Uji kualitas Pada tekanan 10 bar
selama 1000 jam (atau 12 bar selama
100 jam) pada temperatur 60 derajat
Celcius. :
selama 1000 jam (atau 12 bar selama
100 jam) pada temperatur 60 derajat
Celcius.

e. Marking
e. Penandaan (Marking)
Each PVC pipes, fittings and Masing-masing pipa PVC, fitting dan
accessories must have marking of the accesories harus mempunyai tanda
manufacture, years of manufactured, pabrik pembuat, tahun pembuatan,

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
diameter nominal (DN), pipes grade diameter nominal (DN), kelas pipa
(S8 or S10), (S8 atau S10), kata “PVC” dan kata
“WJ-UDSP” pada bahan pipa. Pada
setiap sisi bend diberi tanda derajat
sudutnya.
Dan pada setiap sisi bend, disamping
tulisan di atas, tanda derajat sudutnya
juga harus dicantumkan.

f. Hand Over
f. Penyerahan
Supplier must providethe following Pemasok harus menyediakan bagi
documents for the buyer: Pihak Pembeli dokumen-dokumen
berikut :
i. Actual record of approved testing
and inspection and its result i) Suatu catatan aktual tentang
according to the accepted standard pengujian dan inspeksi yang
diterima oleh Pihak Pembeli yang
ii. Pipes and joints detailed drawing
hasilnya sesuai dengan standard
(shop drawing)
yang diterima.
iii. Identation Hardness and tensile
ii) Gambar pipa dan sambungan
test results
secara rinci (shop drawing).
iv. Hydrostatic test result
iii)Hasil test kekerasan dan daya
v. Rubber gasket material test report rentang.
iv) Hasil test hidrostatik.
v) Laporan pengujian material gasket
karet.
g. Payment and Materials Handover
g. Pembayaran dan Penyerahan Barang
Unit price or lump sum for pipes and Harga satuan atau lump sum untuk
fittings supplier must include pemasokan pipa dan fitting harus
complementary material such as termasuk material pelengkap seperti
bolts, nuts, washers, rubber rings, baut, mur, washer, rubber rings,
seals, grease and other materials in seals, grease dan material-material
sufficient quantities lain dalam jumlah yang cukup.

4 VALVE
4. VALVE
4.1 General
4.1 U m u m
4.1.1 General Requirement
4.1,1 Persyaratan Umum

a. Each valve basically made from the a. Setiap katup pada dasarnya badannya
iron cast or iron ductile with a terdiri dari besi cor atau besi ductile
rubber holder, disc, a valve orifice dengan dudukan karet, piringan
and mechanical drive, and in all (disc), sebuah lubang katup dan
aspects must comply the penggerak mekanik, dan harus dalam
requirements of "Standards for segala hal memenuhi persyaratan
Rubber - Seater Butterfly Valves" “Standards for Rubber - Seater
(AWWA Designation C 504) or Butterfly Valves” (AWWA
other recognized international Designation C 504) atau standar
standard which guarantees an equal International yang lain yang diakui
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
quality to or higher than the yang menjamin kwalitas yang sama
standards specified herein and shall atau lebih tinggi dari standar yang
be planned for a working pressure disebutkan di sini dan harus
not less than 12 bars. direncanakan untuk tekanan kerja
tidak kurang dari 12 bars.

b. Each valve rotating disc with 90 b. Setiap piringan katup berputar


degree angle between open and dengan sudut 90 derajat antara
fully close and the disc will be in a keadaan terbuka penuh dengan
close position, a flat area trough the tertutup seluruhnya, dan piringan
rotating axis of the valve disc must berada dalam posisi tertutup, sebuah
be vertical bidang datar melalui sumbu
perputaran dari piringan katup harus
vertikal.
c. The mechanical drive must be c. Penggerak mekanik harus disertakan
attached to the valve body and must pada badan katup dan harus
comply with the AWWA C 504 memenuhi standar AWWA C 504.
standard. Mur operasi harus mempunyai luas 5
cm persegi (2 inci).
The operating nut must have 5
square centimeters area(2 inches).

d. Each mechanical drive must d. Setiap penggerak mekanik harus


detachable for inspection or repair dapat dilepaskan guna pemeriksanaan
and provided with a feature for atau perbaikan dan dilengkapi dengan
fully open disc locking or closed perlengkapan untuk penguncian
when pulling out the mechanical piringan dalam keadaan terbuka
drive penuh atau tertutup ketika penggerak
mekanik dilepas.

e. All part of mechanical drive must e. Semua bagian dari penggerak


always be ready for checking, mekanik harus siap setiap saat untuk
adjusting, fixing, and subsitution pemeriksaan, penyesuaian, perbaikan
dan penggantian.
f. Mechanical drive for valve with f. Penggerak mekanik untuk
hand operation must be self locking pengoperasian katup dengan tangan
to avoid vibration of water power harus dapat mengunci sendiri
move the disc from its position sedemikian rupa sehingga getaran
tenaga air tidak akan menyebabkan
piringan bergerak dari tempatnya.
g. All provided valve according to this g. Semua katup yang disediakan
provision must be suitable for menurut persyaratan ini harus cocok
repeated operation to manage the untuk pengoperasian berulang guna
flow of drinking water, and to be mengatur aliran air minum, dan juga
able to operate properly even after a tetap dapat beroperasi dengan baik
long period of non-operation meskipun setelah jangka waktu lama
whether closed or open tidak dioperasikan baik dalam
keadaan tertutup atau terbuka.

4.1.2 Body of Valves


4.1,2 Badan Katup
Badan katup dan flens harus terbuat
Body of valves and flens must be made
dari besi tuang yang memenuhi
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
made of cast iron and meet the persyaratan “Specifications for Grey
requirement of “Specifications for Iron Casting for Valves, Flanges and
Grey Iron Casting for Valves, Flanges pipe fittings”, kelas B (ASTM
and pipe fittings”, Grade B (ASTM Designation A 126), dari besi ductlile
Designation A 126), from ductlile iron (ASTM 536), atau dari besi baja yang
(ASTM 536), from fabricated steel dipabrikasi.
iron.

4.1.3 Valve Seat


4.1,3 Dudukan Katup
Dudukan katup harus tertahan dalam
Valve seat must be restained on the
alur yang dibuat dengan mesin di
plot made by the machine in the body
dalam badan katup dengan bantuan
of valve with the support of retaining
potongan penahan, atau dicor dengan
piece, or cement casting, or with other
semen, atau dengan cara lain yang
method to bind supporting pens,
mengikat pen-pen penahan, potongan-
restaining pieces, bolts, nuts and rings.
pottongan penahan, baut-baut, mur-
All of those components must be made
mur dan ring-ring. Semua komponen
from stainless steell.
tersebut harus terbuat dari baja anti
karat
4.1.4 Valve Disc (Valve Shaft)
4.1,4 Piringan Katup (Valve Shaft)
Piringan katup harus terbuat dari besi
Valve disc must be made of iron cast
tuang yang mengandung 2(dua) prosen
which contains of 2% of jackals. Disc
nekel. Dudukan piringan terbuat dari
seat made of iron cast or stainless steel
besi tuang atau dari baja anti karat
and must have a smooth base.
(stainless steel) dan harus mempunyai
dasar yang halus.

4.1.5 Valve Orifice (Valve shaft)


4.1,5 Lubang Katup (Valve Shaft)
Lubang katup harus dari baja anti karat
Valve orifice must be made of stainless
dan harus berdiameter minimum tidak
steel and must have minimum diameter
lebih kecil dari yang dipersyaratkan di
not less than required in the “ Standard
dalam tabel 5 “ Standard for Rubber -
for Rubber - Seated Butterfly Valves”
Seated Butterfly Valves” (AWWA
(AWWA Designation C 540), which is
Designation C 540), yang
planned for normal operating speed
direncanakan untuk kecepatan operasi
normalnya.

4.1.6 Stuffing Boxes, Gland and Gasket


4.1,6 Kotak penyumbat, gland dan paking
Lubang penyumbat (stuffing boxes)
Stuffing boxes must be equipped with
harus dilengkapi dengan gland yang
glands made of brass and an O-shaped
terbuat dari kuningan dan ring
ring as a gasket. All bolts, screws,
berbentuk O sebagai paking. Semua
mounts and nuts, which are used
baut-baut, sekrup-sekrup, dudukan dan
related to the stuffing box must be
mur-mur, yang dipakai yang
made of stainless steel.
berhubungan / bersentuhan dengan
The design of valve and stuffing box kotak penyumbat harus terbuat dari
must be in condition to make the bahan baja anti karat.
paking easy to adjust and replaceable Perencanaan katup dan kotak
without affecting to the other part of penyumbat harus sedemikian rupa
valve except ”Gasket Gland”. Each sehingga paking dapat diatur atau sama
part of stuffing box must be made of sekali diganti tanpa menggangu. Setiap
stainless steel. bagian dari katup penyumbat harus
terbuat dari bahan baja anti karat.
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
Perencanaan katup dan kotak
penyumbat harus sedemikian rupa
sehingga paking dapat diatur atau sama
sekali diganti tanpa mengganggu setiap
bagian dari katup atau bagian
penggerak kecuali bagian “Packing
gland”.
4.1.7 Epoxy Layer
4.1,7 Lapisan Epoxy
Permukaan besi bagian luar dan bagian
The outer side of iron surface and the
dalam dari katup (tidak termasuk
inner of valve (do not include of
permukaan yang dibuat dari bahan anti
surface made of anti-rust) must be coat
karat) harus dilapisi dengan coaltar
with coaltar epoxy. Layer must be
epoxy. Lapisan harus disemprotkan di
spray as thick as 3 layers at the factory
pabrik setebal 3 lapis (3 kali
(3 times spray). With 0.20 mm
semprotan). Ketebalan minimum
minimum thickness of dry layer.
pelapisan kering adalah 0.20 mm.
4.2 Gate Valve
4.2 Gate Valve

a. Gate Valve must be from a straight a. Katup pembuka harus dari bor yang
continous drill and its body made of menerus lurus dan badannya terbuat
iron ductile with the top of bronze dari besi ductile dan puncak katup
valve which is solid slice of double perunggu yang merupakan piringan
disc from the type which shaft do ganda irisan solid, dari tipe yang
not rise/arise upward. Valve must tangkainya tidak naik/timbul ke atas.
meet the standard of AWWA C 500 Katup harus memenuhi standar
“Gate Valves for Water and Other AWWA C 500 “ Gate Valves for
Liquid” or other recognized Water and Other Liquid” atau standar
international standard which can internasional yang lain yang diakui dan
guarantee an equal quality to or dapat menjamin kwalitas yang setara
higher than the standards stated atau lebih tinggi dari standar yang
herein and must be planned to have disebutkan di sini dan harus
a working pressure of not less than direncanakan untuk mempunyai
16 bars tekanan kerja tidak kurang dari 16
bars.
b. Valve with size  ND 50 mm must b. Katup dengan ukuran  ND 50 mm
be provided with the flens in the harus disediakan dengan flens pada
end. ujungnya.

c. Coaltar epoxy layer must be coating c. Lapisan coaltar epoxy harus dilapiskan
in the outer surface and the inner of pada permukaan luar dan dalam katup
iron valve except the end of surface besi kecuali permukaan akhir atau
or with burden bearing. The surface yang bersifat memikul beban.
must be clean, dry and not greasy Permukaan-permukaan harus bersih,
before coating. Coating will be kering dan tidak berminyak sebelum
carry out with 3 times of spray. pelapisan. Pelapisan dilaksanakan
Minimum thickness of dry coating dengan tiga kali semprotan. Ketebalan
will be 0,20 mm. pelapisan kering minimum 0.20 mm.

4.3 Air Valve


4.3 Air Valve (Katup Pelepas Udara)

a. Air valve must have body made of iron a. Katup pelepas udara harus mempunyai
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
cast or high power iron ductile, The badan yang terbuat dari besi tuang atau
buoy made of stainless steel, and besi ductile berkekuatan tinggi,
designed for 16 bars working pressure. pelampung dari baja anti karat, dan
The valve shall contain a complete dirancang untuk tekanan kerja sebesar
shut off valve to use during 16 bars. Katup harus berisikan katup
maintenance. penutup yang lengkap untuk digunakan
selama pemeliharaan.
b. All rotating part must be made of
stainless steel or bronze. b. Semua bagian-bagian yang bergerak
harus terbuat dari baja anti karat atau
c. Wide mouth valve/ large orifice (void
perunggu.
breaker) must have mouth (outlet) with
a spherical lid, that will be open if the c. Katup bemulut lebar / “ Large Orifice”
chamber of the valve empty and will (pemecah kehampaan) harus mempunyai
be close (drop tight) if the chamber of mulut (lubang pembukaan) dengan
the valve full of water. penutup berbentuk bola, yang terbuka
penuh bila ruang katup kosong dan
d. Small mouth valve/small orifice (air
tertutup rapat (drop-tight) bila ruangan
release) must be move floated and
katup penuh dengan air.
close if the valve chamber is full of
water. d. Katup bermulut kecil / “Small Orifice”
(pelepas udara) harus bergerak terapung
e. Double orifice valve must be a
dan tertutup apabila ruangan katup
combination of the small mouth valve
penuh dengan air.
characteristic and the wide mouth
valve characteristic. Valve must e. Katup bermulut ganda “ Double Orifice”
release tiny air bubles the line is harus merupakan gabungan antara
underpressure, large orifice will be karakteristik dari katup bermulut kecil
fully open when the valve chamber dan katup bermulut besar. Katup harus
empty and drop tight when the valve mengeluarkan kantong-kantong udara
chamber is full or water. kecil ketika saluran mendapat tekanan,
membuka penuh “Large Orifice” ketika
f. Each valve must be test hydrostatically
ruang katup kosong dan tertutup rapat
at 10 bars of air pressure without leak.
(drop-tight) ketika ruangan penuh
dengan air.
f. Setiap katup harus diuji secara
hidrostatis pada tekanan udara 10 bars
tanpa menunjukan kebocoran.

4.4 Joints
4.4 Sambungan

All joints in the form of flange must Semua sambungan yang berbetuk flange
refer to ISO 2531-86 standard. Spigot harus mengacu standar ISO 2531-86.
and socket must be suitable with PVC Spigot dan Socket harus sesuai / cocok
pipe and refer to SII 0344-82 standard dengan pipa PVC dan mengacu Standar
dan ISO 4065 - 78. SII 0344-82 dan ISO 4065 - 78.
DCI fitting that will be install provided Fititing DCI yang dipasang harus
with suitable rubber gasket for dilengkapi dengan gasket karet yang
mechanic connection, unless if stated cocok untuk sambungan mekanik,
otherwise. Gasket must be in same size kecuali bila dinyatakan lain. Gasket
and shape if connected according to harus berukuran dan berbentuk serupa
the manufactre’s instruction, and apabila disambung sesuai dengan
provide a positive seal within the limits petunjuk pabrik, serta memberikan
for deflection and maximum joint sealed yang positif dalam batas-batas
tension specified by the manufacture. defleksi dan tarikan sambungan
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
In the condition where the connection maksimum yang ditetapkan oleh pabrik.
and gasket are installed, within the Dalam keadaan terpasang antara
tolerance limits and within the sambungan dan gasket masih dalam
predetermined pressure limits. batas toleransi dan dalam batasan
tekanan yang telah ditetapkan.
Joint deflection permitted by the
manufacturer is no more than 2.5 Defleksi sambungan yang diijinkan
degrees per connection. pabrik tidak lebih dari 2,5 derajat
persambungan.
4.5 Inner Layer
4.5 Pelapisan Dalam
Fitting must comply with ISO 4179 Fitting harus sesuai dengan ISO 4179
and refer to thickness of straight pipe yang mengacu pada ketebalan pipa lurus
with the same diameter. Layer dengan diameter yang sama. Toleransi
thickness tolerance must be added to 6 ketebalan lapisan dalam harus ditambah
mm for fitting. Negatif tolerance do 6 mm untuk fitting. Toleransi negatif
not allow tidak diperbolehkan.

4.6 Outer Layer (Undergorund


4.6 Pelapisan Luar (Pipa terpendam)
Pipes)
Fitting-fitting yang dipasang di bawah
tanah harus dilapisi bagian luarnya
Underground fittings must have outer
dengan lapisan bituminous yang sesuai
layer from bituminous coatingwhich
dengan BS 4147 atau BS 3416, atau
suitable with BS 4147 or BS 3416, or
yang setingkat. Pelapisan yang telah
equivalent. The finished coating must
selesai harus memiliki ketebalan kira-
be about 0,04 mm thickness,
kira 0,04 mm, menerus, rata tidak rapuh
continous, non-brittle under wind or
pada waktu kena angin atau tidak lekat
non-adherent when exposed to
pada waktu kena sinar matahari.
sunlight. The coating must be firmly
Pelapisan harus benar-benar melekat
attached to the pipe.
pada pipa.

4.7 Factory Testing


4.7 Pengetesan di Pabrik
Inspection of the outer side, shape, Pemeriksaan bagian luar, bentuk,
dimension and weight must carry out dimensi dan berat harus dilaksanakan
for each fitting and valve. Fitting and pada setiap fitting dan valve. Fitting dan
valve must be done carefully to avoid valve harus dikerjakan dengan hati-hati
bending. All fitting must be in good untuk menghindari pembengkokan.
condition and free from any damage on Semua fitting harus baik dan bebas dari
the surface. kerusakan pada permukaan.
Every fitting must comply with the Setiap fitting harus sesuai dengan
hydostatic pressure testing as pengujian tekanan hidrostatik
mentioned in ISO 2531. Leakage sebagaimana telah ditetapkan dalam ISO
fitting or failure in pressure test will be 2531. Fitting yang bocor atau tidak
rejected. tahan dengan tekanan pengetesan akan
ditolak.
4.8 Marking
4.8 Pemberian Tanda
Every fitting and valve must be mark Masing-masing fitting dan valve harus
with the name of the manufacture, diberi tanda nama pabrik, tahun
production year, nominal diameter and pembuatan, diameter nominal dan kata-
word of ”ductile” on every fitting and kata “Ductile” pada semua fitting dan
valve. All marks may be casting, valve. Tanda-tanda tersebut boleh dicor,
painting or stamping. dicat atau cap-capan.
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
For the pipe bridge material (pipes and Untuk material jembatan pipa (pipa dan
fittings) which consists of steel and perlengkapannya) yang terdiri dari baja
galvanized, the procurement will dan galvanis pengadaannya dimasukkan
include in the implementation ke dalam paket-paket pelaksanaan.
packages.

5 TESTING AND INSPECTION


5. PENGETESAN DAN PEMERIKSAAN

5.1 Manufature’s Inspection and


5.1 Pemeriksaan dan Pengetesan Pipa,
Testing for Pipes, Fittings, Valves
Fitting, Valve dan Assessories di
and Accesories
Pabrik
5.1.1 Presentation in the
5.1.1 Presentasi di Pabrik
Manufacture
Presentasi test pipa, fitting dan
Test presentation for pipes,
accessories berlangsung di pabrik.
fittings and accesories will be
Pemasok menyediakan peralatan test,
done in the manufacture. Supplier
material yang diperlukan, alat-alat
will provide test equipment,
pemeriksa dan personalia yang terlatih
materials needed, inspection
untuk presentasi pengetesan.
equipment and trained persons to
present the test. Pemasok harus memberitahukan secara
tertulis tentang prosedure demonstrasi
Supplier must give a written
15 hari sebelum acara dimaksud
notice about demonstration
diadakan.
procedure 15 days before the
event. Wakil dari Pihak Pembeli yang
bertanggung jawab atas penerimaan
Representative from the buyer
hasil pengetesan boleh berperan serta
will be responsible for the
dalam persiapan dan pengambilan
acceptance of the test result and
contoh, juga dalam pemeriksaan
may be involve in the preparation
ukuran dan test hidrolis.
and sampling, and in measuring
the size and hydraulic test. Pemeriksaan dan pengecekan berat
pipa, fitting, valve dan Accessories
Inspection and chacking of pipes
bisa dilakukan setelah material-
weight, fitting, valves and
material tersebut diberi coating.
accesories will be carry out after
the materials have been coated.

5.1.2 Geometric test


5.1.2 Pengecekan Geometrik
All materials with bigger
Barang-barang yang deviasinya lebih
deviation than the tolerance will
besar dari toleransi akan ditolak
be rejected.

5.1.3 Physical Inspection


5.1.3 Pengecekan Fisik
Pipes, fittings, valves and
Pipa, fitting, valve dan accessories
accesories, in the opinion of the
yang menurut pendapat para
inspectors, show minor defects
pemeriksa, menunjukkan kekurang
that must be occured during the
sempurnaan kecil yang tidak bisa tidak
manufacturing process and not
mesti terjadi pada saat proses pabrikasi
detrimental to use shall not be
dan tidak merugikan bila dipakai tidak
rejected and supplier will be
harus ditolak dan Pemasok atas
responsible for the method to
pertanggung jawabannya sendiri
remove the stains of defect. With
memutuskan cara-cara untuk
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
the approval of buyer, supplier menghilangkan noda-noda
may also repair defects that occur ketidaksempurnaan tersebut. Dengan
but do not require welding to the persetujuan Pihak Pembeli, Pemasok
repair. boleh juga memperbaiki cacat yang
terjadi namun yang tidak memerlukan
pengelasan untuk perbaikan tersebut.
a. Weight
a.Berat
All items must be weighed.
Pipes and fittings with normal Semua barang-barang harus
size of 300 mm or more must ditimbang. Pipa dan Fitting ukuran
be weighed separately. Items normal 300 mm atau lebih harus
with smaller diameter must be ditimbang secara terpisah. Barang-
weighed if on consignment to barang yang mempunyai diameter
the 2000 kg. lebih kecil harus ditimbang bila
Items with weight less than dalam konsinyasi sampai 2000 Kg.
normal (after diminish with Barang-barang yang beratnya
tolerance) may be accept by kurang dari berat normal (setelah
the buyer, with its own policy dikurangi dengan toleransi) boleh
and in the condition that diterima oleh Pihak Pembeli,
comply with the additional dengan kebijakannya sendiri dan
requirement. Items with weight dengan kondisi bahwa mereka
more than normal must be memenuhi persyaratan-persyaratan
accepted. lain yang diminta. Barang - barang
b. Mechanical Test yang beratnya melebihi berat
normal harus diterima.
The range test must be carry b. Test Mekanikal
out on the selected sample
from the lot that will be Test rentang harus dilakukan pada
handed over. If the result of contoh yang dipilih dari lot yang
test item comply with the akan diserahterimakan. Bila barang-
requirement, than the lot must barang yang test hasilnya
be accepted on condition that memenuhi syarat, maka lot tersebut
none of the tested sample item harus diterima dengan syarat bahwa
show the result less than 10% tidak satupun dari contoh barang
from the required value. yang ditest menunjukkan hasil
kurang dari 10 % dari nilai yang
diperlukan.
5.1.4 Report of the Manufacture
5.1.4 Laporan tentang Pemeriksaan di
Inspection
Pabrik
Inspection report made for each
Laporan pemeriksaan yang dibuat
lot must be signed by the parties
untuk setiap lot harus
present. Items that have been
ditandatangani oleh pihak-pihak
weighed separately must be
yang hadir. Barang - barang yang
shown in the report with mass and
ditimbang secara terpisah harus
numbers indication.
diditunjukkan dalam laporan
Each groups of item weighed tersebut dengan indikasi tentang
collectively must be indicate in massa dan nomernya.
the number and total weight.
All testing certificate that carry Masing-masing group barang yang
out in the manufacture must ditimbang secara bersama harus
attached in the Inspection Report. diindikasikan dalam nomor dan
The supplier submitt 5 (five) copy berat keseluruhan.
Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
of each test result. Semua sertifikat uji yang dilakukan
di pabrik harus dilampirkan pada
Inspection report and certificate
Laporan Pemeriksaan. Pemasok
are an inseparable part of the
menyerahkan 5 (lima) photocopy
material approval document.
dari masing-masing hasil test.
Laporan Pemeriksaan dan sertifikat
merupakan bagian yang tidak
terpisahkan dari dokumen
penerimaan barang.
5.2 Field Inspection for Pipes,
5.2 Pemeriksaan Pipa, Fitting dan
Fittings and Accesories Accessories di Lapangan

5.2.1 Aspect
5.2.1 Aspek
Items show defect, irregular
Barang yang menunjukkan adanya
bending, ovalization unsticking or
cacat, irregular bending, ovalisasi
outer coating defect or inner lining
unsticking atau cacat pada coating
must be rejected.
luar atau lining dalam harus ditolak.

5.2.2 Hydraulic Test


5.2.2 Test Hidrolik
Buyer has the right to carry out
Pihak Pembeli berhak melakukan test
hydraulic test to the items that
hidrolik terhadap barang-barang yang
indicate do not comply with
menurut pendapatnya tidak
requirement of water tight. This test
memenuhi persyaratan kekedapan air.
will be limited to 1% from total
Test tersebut dibatasi pada 1 % dari
item will be supplied to the field.
jumlah barang yang harus dipasok ke
This test will be done on supplier
lapangan.
expense.
Test tersebut dilakukan dengan biaya
dari Pihak Pemasok.
5.2.3 Procedure
5.2.3 Prosedure
The procedure for checking
Untuk prosedure pemeriksaan dan
procedure and temporary
penerimaan barang sementara
acceptance of goods will refer to
diterapkan peraturan - peraturan yang
the general requirement and special
terdapat pada Persyaratan Umum dan
requirement of this Bidding
Persyaratan Khusus Dokumen
Document.
Tender ini.

5.3 Payment
5.2.4 Pembayaran
In accordance to the General
Sesuai degan Persyaratan Umum dan
Requirement and Special
Persyaratan Khusus, maka biaya
Requirement, the cost to carry out
untuk penyelenggaraan test dan
the test and goods inspection
pemeriksaan barang yang tercakup
covered by this contract must
dalam Kontrak ini harus dimasukkan
include in the unit price of each
kedalam Harga Satuan dari masing-
items.
masing item barang.
Travel expenses of the buyer/field Biaya perjalanan Pihak Pembeli /
inspector and/or from the buyer’s Pemeriksa dari lapangan dan / atau
office (Palu/Indonesia) to the place dari Kantor Pihak Pembeli (Jakarta /
of inspection (manufacture), Indonesia) ke tempat pemeriksaan

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4
include the lodging cost must be (pabrik), beserta biaya penginapan
paid by the Supplier and must harus dibayar oleh Pemasok Barang
include in the unit price of the item dan harus sudah termasuk ke dalam
Harga Satuan Barang.

Bidding Document for Rehabilitation WTP Oloboju & Construction Reseirvor Sidera at Sigi District – Package 4
Dokumen Pengadaan untuk Pekerjaan Rehabilitasi IPA Oloboju & Pekerjaan Reseirvor Sidera di Kabupaten Sigi – Paket 4

Anda mungkin juga menyukai