Diketahui oleh,
SUBARI ABDULLAH
MANAGER HSSE RDMP RU V
LAPORAN BULANAN
Daftar Isi :
NON SCORING
1 Fatality 0 0 angka total kasus Actual ≤ Target
NON SCORING
2 Lost Time Incident 0 0 angka total kasus Actual ≤ Target
3 Insiden berdampak pencemaran lingkungan 0 0 angka total kasus Actual ≤ Target
4 Insiden berdampak kebakaran / kerusakan aset 0 0 angka total kasus Actual ≤ Target
5 First Aid 12 0 8 8 angka total kasus Actual ≤ Target
Leading Indicator
1 HSE Meeting 100% Notulen / daftar hadir Actual ≥ Target
2 HSE Talk 100% Daftar Hadir Actual ≥ Target
3 HSE Induction 100%
4 HSE Training 100%
5 HSE Reporting 100% Laporan yang diserahkan Actual ≥ Target
6 HSE Management Visit /MWT (Management Walk Through) 100% Dokumen pelaksanaan MWT Actual ≥ Target
7 Closure Action/ Tindak Lanjut Temuan 100% Dokumen tindak lanjut temuan Actual ≥ Target
8 Program audit/Inspeksi/Joint Safety Patrol 100% Dokumen pelaksanaan Inspection / Audit Actual ≥ Target
9 Kepatuhan terhadap Penggunaan APD 100% Dokumen kepatuhan penggunaan APD Actual ≥ Target
10 Kepatuhan terhadap pengelolaan limbah 95% Dokumen kepatuhan pengelolaan limbah Actual ≥ Target
11 Kepatuhan terhadap pengelolaan hygiene industry 95% Dokumen kepatuhan Pengelolaan HI Actual ≥ Target
12 Kepatuhan terhadap pengelolaan good house keeping 95% Dokumen kepatuhan pengelolaan House Keeping Actual ≥ Target
14 Pelaporan Safety Non Conformity (Unsafe Act & Unsafe Condition) 100% Laporan Unsafe Act & Unsafe Condition Actual ≥ Target
Total Nilai 8 8
% Total Nilai = 100.00%
Kontraktor HSSE RDMP RU V Balikpapan & Lawe-Lawe HSSE RDMP RU V Balikpapan & Lawe-Lawe
0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
ECP/CST/OFF
ECP/CST/PWK
ECP/CST/OPB
ECP/QSE
ECP/QSE/M&P
ECP/QSE/OPS
ECP/QSE/QRM
ECP/STD
ECP/STD/DAS
ECP/STD/DMM
ECP/STD/DES
ECP/STD/PJT
ECP/PRO
ECP/PRO/SED
ECP/PJC
ECP/SCV
ECP/SVC/CTC
ECP/SVC/MAT
ECP/SVC/PCM
ECP/CMM
ECP/CMM/CSL PT. KALIRAYA SARI
ECP/SMK3 PT. KREUZ BERJAYA
PT. KORINDO JASA PETRA
PT. LENTERA MAS
ECP/SMK3/EPSC1 PT. LOGINDO SAMUDRAMAKMUR
ECP/SMK3/EPSC2 PT. SUPERINTENDING
PT. MAFHINDO UTAMA COMPANY OF INDONESIA
(SUCOFINDO)
PT. SUPRACO LINES
PT. SURVEYOR INDOENSIA
PT. SYNERGY ENGINEERING
PT. TECHNIP INDONESIA
PT. TEKNIKA REGULINDO ASIA
PT. TIGA INTI PILAR
PT. TIMAS SUPLINDO
PT. TRAKINDO UTAMA
PT. TRANSVIA OTOMASI PRATAMA
PT. TRIO SERVISINDO GEMILANG
PT. WAINDO SPECTERRA
PT. WORLEYPARSONS INDONESIA
PT. YAMA ENGINEERING
GRAFIK TREND UNSAFE ACT & UNSAFE CONDITION
No Kategori Jumlah
1 Housekeeping TREND UNSAFE ACT DAN UNSAFE CONDITION
2 PPE Complience
3 Sign & Barricade
Housekeeping
4 Environmental
PPE Complience
5 Working at Height Sign & Barricade
6 Tools & Equipment Environmental
7 Health & Hygiene Working at Height
8 Acces & Egress Tools & Equipment
9 Position Of People Health & Hygiene
10 Prosedur, JSA, Permiting Acces & Egress
11 Speed & Traffic Position Of People
Prosedur, JSA, Permiting
12 Lifting and rigging
Speed & Traffic
13 Fire Protection Lifting and rigging
TOTAL 0 Fire Protection
Akibat Jumlah
1 Tidak ada cedera, kerugian materi kecil 0 TREND KONSEKUENSI UA-UC
2 Cedera ringan/ PP, kerugian material sedang 0
Tidak ada cedera, kerugian
3 Hilang hari kerja, kerugian cukup besar 0 materi kecil
4 Cacat, kerugian materi besar 0 Cedera ringan/ PP, kerugian
material sedang
5 Kematian, kerugian materi sangat besar 0 Hilang hari kerja, kerugian
cukup besar
Cacat, kerugian materi besar
Kematian, kerugian materi
sangat besar
RINGKASAN INSIDEN BULANAN
Periode Laporan :Agustus 2019 Nama Proyek : Pekerjaan Site Development Terminal Lawe-Lawe
Dilaporkan oleh : HSE Nindya Karya Nama PT : PT. NINDYA KARYA (PERSERO)
Date : 31 Agustus 2019 Lokasi : Terminal Lawe-Lawe
No Kategori Kecelakaan Total Nilai Resiko Tanggal Nama/Kerusakan Usia Posisi Tipe Insiden Penyebab Insiden
1 Fatality - - - - - - - -
2 LTI - - - - - - - -
2 RWDC - - - - - - - -
3 Kasus Penanganan Medis (MTC) - - - - - - - -
3 Pertolongan Pertama (First Aid) - - - - - - - -
4 Near Miss -- -- -- -- -- -- -- --
Disiapkan oleh,
Agus Wahyudi
HSE Coordinator
DATA PERALATAN DAN KENDARAAN
DUMP TRUCK 0
EXCAVATOR 0
BULLDOZER 0
VIBRO / COMPACTOR 0
STATUS OF EQUIPMENTS
Equipment Types
Demob Aktif
Types Total
Dump Truck 31 0 31
Light Vehicle 9 0 9 Disiapkan oleh,
Excavator 13 0 13
Bulldozer 5 0 5
Crane(RT & Crawler 0 0 0
Vibro/Compactor 5 0 5 xxxxxxxxxxxxxx
Total Unit 63 0 63 xxxxxxx
DATA PERALATAN DAN KENDARAAN
NAMA PROYEK
DATA UNSAFE ACT DAN UNSAFE CONDITION
Proyek: SITE DEVELOPMENT LAWE
Departemen: HSSE NK
Bulan: AGUSTUS 2019
TGL NAMA JUMLAH PEMAKAIAN ISI KOTAK P3K Kronologis & Photo Paraf
Kasa steril Perban (10 Plester Kain Sarung Alkohol 70 Boor water / Balsem/ Buku catatan /
terbungkus Perban (5 cm) cm) cepat/ Kapas segitiga / Gunting Peniti tangan Bethaine % / Revanol Pinset Masker cuci mata Counterpain/Bioplac Lampu senter petunjuk
Hypafix mittela enton
NIHIL
Mengetahui,
Rudi Siahaan
Paramedik
TOOLBOX TALK/TOOLBOX MEETING
Reporting No of
No TOPIC
Date Participants